PRECIOSTOO ABARCA MARCA COSTO2 MARCA ahuatepec COSTO 3 $2,060.00 $1,480.00 TON M3 M3 M3 PZA PZA PZA PZA M M $85.00 $105.00 $17.50 $20.00 $16.67 $16.33 $340.00 PZA MT MT KG KG KG M3 $80.00 $20.00 $350.00 $45.00 $77.50 $19.00 $19.00 $20.00 $17.00 $17.00 $20.00 $17.00 $16.00 $40.00 $360.00 $45.00 $80.00 $20.00 $22.00 $20.00 $0.30 $85.00 $100.00 $5.00 $75.00 $160.00 $1,364.00 $166.67 $216.67 $166.67 $5.50 $1.80 $940.00 $1,250.00 $620.00 $261.67 $1,300.00 $5.40 $2.20 $92.60 $168.00 $5.40 $1.60 $150.00 $85.00 $5.60 $1.70 $155.00 $84.00 $7.10 $17.50 $17.50 $1,363.64 $166.67 $216.67 $40.00 $150.00 $200.00 $1,364.00 $166.67 $216.67 $166.67 $5.00 $1.80 MARCA ABRIL COSTO $2,000.00 MARCA CRUZ A MAT CRUZ COSTO $2,040.00 MARCA ELECCION $1,800.00

CLAVE MAT001 MAT002 MAT003 MAT004 MAT005 MAT006 MAT007 MAT008 MAT009 MAT010 MAT011 MAT012 MAT013 MAT014 MAT015 MAT016 MAT017 MAT018 MAT019 MAT020

MATERIAL CEMENTO MORTERO CAL ARENA GRAVA PIEDRA BLOCK TABIQUE VARILLA #2 VARILLA #3 ARMEX 10X10 ARMEX 10X15 PANEL #2 PANEL #3 MALLA PISO MALLA LOSA ESTRIBOS ALAMBRE QUEMADO CLAVO AGUA

U TON

COSTO

$2,100.00 CONSTRURAMA

DUELA DE 10"X 2.5MTS PZA

POLIN 10X10ACEITE QUEMADO MICROLASTI FESTERFELT

PZA

MANO DE OBRA CLAVE CUA00 PEON CUA11 ALBAIL CUA001 2 PEONES CUA002 PEON , ALBAIL CUA003 CABO DE OFICIOS

$180.00 $220.00 $360.00 $580.00 $500.00

PRECIOS

OBSERVACIONES

3 mtrs3

85 12MTS

MULTIPLICAR X 6 PRECIO PZA

PRESUPUESTO

Partida preliminares

No 1 2 3 4 5 6 7 8 9 10 11

Concepto Limpieza Trazo Excavacion en terreno tipo B a mano de 0 a 2 mts de profundidad. Plantilla de cimentacin con concreto de 100kg/cm2 y 2cm de espesor. Cimentacin de mampostera. Relleno de cepas con material producto de excavacin. Cadena de desplante de 15X20cm con concreto de 150kg/cm2. Impermeavilizacin de cadena de desplante de 15X20cm. Muro de tabique. Cadena de 15X20cm con concreto de 150kg/cm2. Castillo de 10X10 con concreto de 150kg/cm2.

U M2 M2 M3 M2 M3 M3 M2 M M2 M M

C 110.00 110.00 88.00

Albailera

PU importe $5.44 $598.16 $2.55 $280.11 $188.31 $16571.36 SUBTOTAL $17449.64 77.00 $76.40 $5882.87 55.00 $923.41 $50787.68 30.80 $108.32 $3336.26 110.00 $219.75 $24172.92 60.50 $133.21 $8058.98 275.00 $124.23 $34163.13 110.00 $105.44 $11597.90 96.00 84.64596 $8126.01 subtotal $126401.84total $143851.47

MORTEROS LOGOTIPO CONCEPTO CLAVE TIPO MORT001 CLAVE Elaboracin de mortero cemento arena prop. 1:5 FECHA REALIZO: DESCRIPCION Cemento Gris Arena Agua UNIDAD TON M3 M3 CANTIDAD 0.260 1.200 0.285 P.U. $2,000.00 $150.00 $0.30 SUBTOTAL MANO DE OBRA SUBTOTAL $0.000 IMPORTE $520.00 $180.00 $0.09 $700.09 $0.00 UNIDAD M3

MATERIALES

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

$0.00 $0.00

SUBTOTAL C.I. TOTAL MORTEROS LOGOTIPO CONCEPTO: CLAVE TIPO MORT001 CLAVE Elaboracin de mortero cemento cal-arena- prop. 1:1:8 FECHA REALIZO: DESCRIPCION Cemento Gris Cal Arena Agua UNIDAD TON TON M3 M3 CANTIDAD 0.193 0.114 1.192 0.331 P.U. $2,000.00 $1,250.00 $150.00 $0.30 SUBTOTAL MANO DE OBRA SUBTOTAL $0.000 UNIDAD

$0.00 $700.09

M3

MATERIALES

IMPORTE $385.20 $142.88 $178.79 $0.10 $706.96 $0.00

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

$0.00 $0.00

SUBTOTAL C.I. TOTAL

$0.00 $706.96

CONCRETOS LOGOTIPO CONCEPTO: CLAVE TIPO MORT001 CLAVE MAT001 MAT003 Elavoracin de concreto con resistencia de 150kg/cm2. FECHA REALIZO DESCRIPCION Cemento Gris Grava Arena Agua Unidad Cantidad TON 0.323 M3 0.480 M3 0.670 M3 0.210 P.U. $2,000.00 $216.67 $150.00 $0.30 SUBTOTAL MANO DE OBRA SUBTOTAL $0.000 $0.00 $0.00 IMPORTE $646.00 $104.00 $100.50 $0.06 $850.56 $0.00 UNIDAD M3

MATERIALES

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

SUBTOTAL C.I. TOTAL CONCRETOS LOGOTIPO CONCEPTO: CLAVE TIPO CONC001 CLAVE MAT001 MAT003 ELABORACION CONCRETO DE RESISTENCIA DE 100 KG/CM2 FECHA REALIZO DESCRIPCION Cemento Gris Grava Arena Agua UNIDAD TON TON M3 M3 CANIDAD 0.260 0.680 0.500 0.195 P.U. $2,000.00 $216.67 $150.00 $0.30 SUBTOTAL MANO DE OBRA SUBTOTAL $0.000 UNIDAD M3

$0.00 $850.56

MATERIALES

IMPORTE $520.00 $147.33 $75.00 $0.06 $742.39 $0.00

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

$0.00 $0.00

SUBTOTAL C.I. TOTAL CIMBRAS

$0.00 $742.39

LOGOTIPO CONCEPTO: CLAVE TIPO CIMB001 CLAVE Cimbra para dadenas y castillos con acabado comn.

UNIDAD FECHA REALIZO: DESCRIPCION Duela de 10" X2.5m. Poln Alambre quemado Clavos de 2 1/2" Aceite quemado Unidad Cantidad PZA 0.140 PZA 0.010 KG 0.129 KG 0.050 LTS 0.020 P.U.

M

MATERIALES

MANO DE OBRA Medios manuales y/o herramientas HERRAMIENTA % 3.00

IMPORTE $85.00 $11.90 $100.00 $1.00 $22.00 $2.84 $20.00 $1.00 $5.00 $0.10 SUBTOTAL $16.84 $0.00 SUBTOTAL $0.00 $0.000 $0.00

SUBTOTAL C.I. TOTAL CUADRILLAS LOGOTIPO CONCEPTO: CLAVE TIPO MANO DE OBRA CUA 001 CLAVE JOGPO000 JOGPO000 REALIZO DESCRIPCION Cuadrilla de Peones Cabo de Oficio Cuadrilla de Peones FECHA UNIDAD Cantidad J 1.000 J 0.100 UNIDAD J

$0.00 $16.84

precio IMPORTE $306.000 $306.000 $68.000 $680.000 TOTAL $374.00

CUADRILLAS LOGOTIPO CONCEPTO: CLAVE TIPO MANO DE OBRA CUA 002 CLAVE JOGPO000 JOGPO000 JOGPO000 REALIZO DESCRIPCION Cuadrilla de Peones Albail Cabo de Oficio Cuadrilla de Albailes FECHA UNIDAD Cantidad J 1.000 J 1.000 J 0.100 precio IMPORTE $306.000 $306.000 $374.000 $374.000 $68.000 $680.000 TOTAL $748.00 UNIDAD J

MANO DE OBRA CLAVE PEO1 ALB1 CABO1 OCUPACION Peon Albail cabo de Oficio COSTO $180.00 $220.00 $400.00 SDB $306.00 $374.00 $680.00

LOGOTIPO CONCEPTO:

UNIDAD FECHA

CLAVE TIPO

CIMB001 CLAVE

REALIZO: DESCRIPCION

Unidad Cantidad

P.U.

IMPORTE

MATERIALES

MANO DE OBRA SUBTOTAL HERRAMIENTA SUBTOTAL C.I. TOTAL

LIMPIEZA CONCEPTO: LOGOTIPO CLAVE PRE001 TIPO CLAVE MATERIALES MANO DE OBRA HERRAMIENTA CUA001 Limpieza y deshierbe en terreno con maleza de hasta 1 metro de altura incluye apile de hierba y material en lugar. REALIZO DESCRIPCION UNIDAD FECHA UNIDAD CANTIDAD precio IMPORTE $0.00 SUBTOTAL $0.00 $360.00 $4.32 SUBTOTAL $4.32 CD C.I. (10%) SUBTOTAL FINANCIADA (1%) SUBTOTAL UTLDD. (10%) TOTAL TRAZO Y NIVELACION CONCEPTO: Trazo y nivelacin en terreno plano por medios maniales, para desplante UNIDADde estructura, estableciendo ejes auxiliares pasos y referencias. incluye material y mano de obra.

M2

Cuadrilla de Peones

J

0.012

Medios manuales y/o herramientas

%

3.00

$4.32 $0.13 $4.45 0.445 $4.89 $0.05 $4.94 $0.49 $5.44

LOGOTIPO

M2

CLAVE TIPO

PRE002 CLAVE MAT003

MATERIALES

REALIZO DESCRIPCION Calhidra Barrote de 1 1/2" X 4 " X 8' Duela de 3/4 " x 4 " x 8 Hilo plastico Varilla 1/2" Cuadrilla de Albail

UNIDAD Cantidad TON 0.0002 PT 0.0027 PT 0.018 M 0.350 TON 0.0002 J 0.001

MANO DE OBRA

CUA002

FECHA precio IMPORTE $940.00 $0.19 $6.10 $0.02 $7.10 $0.13 $0.10 $0.04 $3690.00 $0.74 SUBTOTAL $1.11 $748.00 $0.898 SUBTOTAL $0.027 $0.90 $0.08

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIADA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$2.08 $0.21 $2.29 $0.02 $2.31 $0.23 $2.55

EXCABACIN LOGOTIPO CONCEPTO: CLAVE CIM001 TIPO CLAVE MATERIALES MANO DE OBRA CUA000 Excavacin a mano n terreno tipo "B" seco en cepas de hasta UNIDAD 2m. D e altura; incluye afloje, extraccin, amacice, limpieza de plantilla y taludes, medida en banco. FECHA REALIZO DESCRIPCION UNIDAD Cantidad M3

Cuadrilla de peones

J

0.400

IMPORTE $0.00 SUBTOTAL $0.00 $374.00 $149.60 $149.60 $4.49

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

SUBTOTAL $149.600

CD C.I. (10%) SUBTOTAL FINANCIADA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$154.09 $15.41 $169.50 $1.69 $171.19 $17.12 $188.31

PLANTILLA DE CIMENTACION LOGOTIPO CONCEPTO: CLAVE ALB001 TIPO CLAVE MATERIALES CONC001 MANO DE OBRA CUA002 Plantilla de cimentacin de 100kg/cm2 con agregado de 3/4 y un espesor de 2cm, incluye material y mano de obra. REALIZO DESCRIPCION Concreto 100 kg /cm2 Albailes UNIDAD M3 J CANTIDAD 0.051 0.032 UNIDAD FECHA PRECIO $742.39 SUBTOTAL $748.00 SUBTOTAL $23.936 IMPORTE $37.86 $37.86 $23.936 $23.94 $0.72 M2

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$62.52 $6.25 $68.77 $0.69 $69.46 $6.95 $76.40

CIMIENTO DE MAMPOSTERIA LOGOTIPO CONCEPTO: CLAVE TIPO ALB002 CLAVE MATERIALES MORT001 MAT006 MANO DE OBRA CUA002 Cimentacin de piedra brasa asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estacin. REALIZO DESCRIPCION Mortero 1:1:6 Piedra brasa de 3ra Albailes UNIDAD FECHA PRECIO 700.09 166.67 SUBTOTAL $748.000 SUBTOTAL $276.760 IMPORTE 220.53 250.01 $470.53 $276.760 $276.76 $8.30 M3

UNIDAD M3 M3 J

CANTIDAD 0.315 1.500 0.370

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$755.59 $75.56 $831.15 $8.31 $839.47 $83.95 $923.41

LOGOTIPO CONCEPTO: CLAVE ALB003 TIPO CLAVE MATERIALES MANO DE OBRA HERRAMIENTA CUA 001

RELLENO DE CEPAS Relleno de cepas con material producto de excavacin compactado con pizn a mano en capas de 10cm. I ncluye volteo con pala. REALIZO DESCRIPCION Agua Peones UNIDAD M3 J CANTIDAD 0.113 0.230

UNIDAD FECHA PRECIO $0.30 SUBTOTAL $374.00 SUBTOTAL $86.020

M3

IMPORTE $0.03 $0.03 $86.020 $86.02 $2.58

Medios manuales y/o herramientas

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$88.63 $8.86 $97.50 $0.97 $98.47 $9.85 $108.32

LOGOTIPO CONCEPTO: CLAVE TIPO ALB004 CLAVE CONC001 MAT002 MATERIALES MAT012

CADENA DE DESPLANTE Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 UNIDAD con agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos del no.2 a cada 20cm. FECHA REALIZO DESCRIPCION Concreto 150kg/cm2 Agua Armex para cadena Cimbra de madera Albailes UNIDAD Cantidad M3 0.03 M 0.05 M 1.100 M 1.000 J 0.085

M

MANO DE OBRA

CUA 002

$850.56 $0.30 $17.50 $16.84 SUBTOTAL $748.00 SUBTOTAL $63.580

IMPORTE $25.52 $0.02 $19.25 $16.84 $44.78 $63.58 $63.58 $3.03

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$111.39 $111.49 $222.88 $2.23 $225.11 $22.51 $219.75

IMPERMEABILIZACION DE CADENA DE DESPLANTE LOGOTIPO CONCEPTO: CLAVE TIPO MATERIALES ALB005 CLAVE Impermeavilizacin de cadena de desplante de 15X20 a base de UNIDAD 2 capas de emulsin asfaltica y 1 capa de fieltro asfltico con riego de arena, incluye limpieza y acarreos a 1ra estcin. FECHA REALIZO DESCRIPCION Microlastic Festerfelt UNIDAD LTS PZA CANTIDAD 0.35 0.48 PRECIO $75.00 $160.00 SUBTOTAL $748.00 SUBTOTAL $5.775 IMPORTE $26.25 $76.80 $0.00 $103.05 $5.775 $5.77 $0.17 M2

MANO DE OBRA

CUA 002

Albailes

J

0.008

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$109.00 $10.90 $119.90 $1.20 $121.10 $12.11 $133.21

LOGOTIPO CONCEPTO: CLAVE TIPO ALB005 CLAVE MAT008 MORT002 MATERIALES MAT002

MURO DE TABIQUE Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de espesor, inc. material y acarreo hasta 1er estacin. REALIZO DESCRIPCION Tabique rojo de 5X11.5X23 Mortero prop. 1:1:8 Agua Andamios Albail y pen Cabo de Oficio Medios manuales y/o herramientas UNIDAD M2 M3 M3 USO J J % CANTIDAD 12 0.0358 0.048 0.036 0.085 0.010 3.00

UNIDAD FECHA PRECIO $1.70 $706.96 $0.30 $8.28 SUBTOTAL $580.00 $500.00 SUBTOTAL $54.30

M2

MANO DE OBRA HERRAMIENTA

CUA 002 CUA003

IMPORTE $20.40 $25.31 $0.01 $0.30 $45.72 $49.30 $5.00 $54.30 $1.63

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$101.65 $10.17 $111.82 $1.12 $112.94 $11.29 $124.23

CADENA LOGOTIPO CONCEPTO: CLAVE TIPO ALB004 CLAVE CONC001 MAT002 MATERIALES MAT012 CIMB001 MANO DE OBRA CUA 002 Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm. REALIZO DESCRIPCION Concreto 150 kg/cm2 Agua Armex para cadena Cimbra acabado comn Albailes UNIDAD FECHA UNIDAD Cantidad M3 0.03 M3 0.05 M 1.100 M 1.000 J 0.032 IMPORTE $25.52 $0.02 $19.25 $16.84 $61.62 $23.94 $23.94 $0.72 M

$850.56 $0.30 $17.50 $16.84 SUBTOTAL $748.00 SUBTOTAL $23.94

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIADA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$86.27 $8.63 $94.90 $0.95 $95.85 $9.59 $105.44

CASTILLO LOGOTIPO CONCEPTO: CLAVE TIPO ALB004 CLAVE CONC001 MATERIALES MAT002 MAT012 CIMB001 MANO DE OBRA CUA 002 Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero de armex colocado a cada 3m. Aprox. REALIZO DESCRIPCION Concreto de 100kg/cm2 Agua Armex para castillo Cimbra acabado comn Albailes UNIDAD FECHA UNIDAD Cantidad M3 M3 M M J 0.01 0.05 1.100 1.000 0.032 $850.56 $0.30 $17.50 $16.84 SUBTOTAL $748.00 SUBTOTAL $23.936 IMPORTE $8.51 $0.02 $19.25 $16.84 $44.61 $23.94 $23.94 $0.72 M

Medios manuales y/o herramientas HERRAMIENTA

%

3.00

CD C.I. (10%) SUBTOTAL FINANCIDA (1%) SUBTOTAL UTLDD. (10%) TOTAL

$69.26 $6.93 $76.19 $0.76 $76.95 $7.70 $84.65

EXPLOSIN DE INSUMOS CONCEPTO PRELIMINARES CODIGO CANTIDAD RENDIMIENTO PRECIO CUA001 330 0.012 $374.00 CUA002 330 0 $500.00 % 330 $0.13 MAT003 CUA002 CUA003 110.00 110.00 110.00 110.00 88.00 88.00 88.00 0.0002 $940.00 0.0012 $748.00 0 $500.00 $0.08 0.4 $360.00 0 $500.00 $4.49 $1,481.04 $0.00 $42.77 $1,523.81 $20.68 $98.74 $0.00 $8.89 $128.30 $12,672.00 $0.00 $394.94 $13,066.94 $1,279.08 $228.80 $245.67 $0.14 $1,429.12 $0.00 $55.29 $3,238.10 $13,750.28 $6,795.36 #REF! $2,904.01 $11,803.00 $0.00 $456.65 #REF!

TRAZO

EXCAVACION

CUA001 CUA003 %

PLANTILLA

CONCRETO MAT001 MAT005 MAT004 MAT020 MO CUA002 CUA003 %

2.20 2.20 2.20 2.20 77.00 77.00 77.00

0.323 0.48 0.67 0.21 0.032 0

$1,800.00 $216.67 $166.67 $0.30 $580.00 $500.00 $0.72

CIMIENTO MAMPOSTERIA PIEDRA MAT006 MORTERO MAT001 MAT003 MAT004 MO CUA002 CUA003 %

55.00 14.52 14.52 14.52 55.00 55.00 55.00

1.5 $166.67 0.26 $1,800.00 #REF! $1,364.00 1.2 $166.67 0.37 $580.00 0 $500.00 $8.30

EXPLOSIN DE INSUMOS CONCEPTO RELLENO DE CEPAS CODIGO CANTIDAD RENDIMIENTO PRECIO MAT020 30.80 0.113 $0.30 CUA001 30.80 0.23 $360.00 CUA003 30.80 0 $500.00 % 30.80 $2.58 $1.04 $2,550.24 $0.00 $79.48 $2,630.77 $1,918.62 $343.20 $368.50 $0.21 $5,423.00 $0.00

CADENAS DESPLANTE CONCRETO MATOO1 MAT005 MAT004 MAT020 CUA002 CUA003 %

3.30 3.30 3.30 3.30 110.00 110.00

0.323 $1,800.00 0.48 $216.67 0.67 $166.67 0.21 0.3 0.085 $580.00 0 $500.00

ALBAILERIA CEMENTO CAL GRAVA ARENA AGUA PIEDRA TABIQUE ARMEX CADENA ARMEX CASTILLO ALAMBRE QUEMADO PEON ALBAIL 2 PEONES PEON, ALBAIL CABO DE OFICIOS HERRAMIENTAS

CODIGO CANTIDA

RENDIMIENTO PRECIO

TOTAL

EXPLOSIN DE INSUMOS

EXPLOSIN DE INSUMOS Partida preliminares No Concepto 1 limpieza 2 trazo U M2 M2 C PU importe 330 10.1588 3352.404 110 11.3918 1253.1024 7385.84

3 Excavacion en terreno tipo B a mano de 0 a 2 mts88 profundidad M3 de 83.93

EXPLOSIN DE INSUMOS

ALBAILERIA

4 5 6 7 8 9 10 11

SUBTOTAL 11991.3464 PLANTILLA DE CIMENTACION CON CONCRETO DE 100KG/CM2 Y 3651.17623 M2 110 33.1925 2CM DE ESPESOR CIMIENTO DE MAMPOSTERIA M3 48.4 845.331 40913.9997 RELLENO CON MATERIAL PRODUCTO DE LA EXCAVACION M3 30.8 95.7359 2948.66572 CADENA DE DESPLANTE DE 15X 20 ONCRETO DE110 121.794 13397.3946 M2 150KG /CM2 IMPERMEABILIZACION DE CADENA DE DESPLANTE DE 140.631 8508.15033 M 60.5 10X15 MURO DE TABIQUE M2 275 192.578 52958.8718 CADENA DE 15X 20 CONCRETO DE 150KG /CM2 110 105.126 11563.8486 M CASTILLO DE 10X10 CONCRETO DE 150 KG/CM2 96 76.2309 7318.16629 M subtotal 122378.258

13 subtotal 27277.6111

EXPLOSIN DE INSUMOS total 161647.216

PROY. NO. CONCEPTO Limpieza y deshierbe en terreno con maleza de hasta 1 metro de altura incluye apile de hierba y material en lugar.

GENERADORES LOCALIZACION U EJE TRAMO LARGO ANCHO ALTO No PIEZAS RESULTADO 25 1 25 A 1-2 25 1 25 B 1-2 M2 30 1 30 1 A-B 30 1 30 2 A-B TOTAL 110 A B M2 1 2 A M3 B 1 2 A B 1 2 A B 1 2 A M3 B 1 2 A M3 B 1 2 A B M2 1 2 A B M2 1 2 A-B A-B A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 A-B A-B 1-2 1-2 1-2 1-2 25 25 30 30 25 25 30 30 25 25 30 30 25 25 30 30 25 25 30 30 25 25 30 30 1 1 1 1 TOTAL 1 1 1 1 0.7 0.7 0.7 0.7 0.5 0.5 0.5 0.5 TOTAL 0.28 0.28 0.28 0.28 TOTAL 1 1 1 1 TOTAL 0.8 0.8 0.8 0.8 TOTAL 0.05 0.05 0.05 0.05 TOTAL 25 25 30 30 110 20 20 24 24 88 17.5 17.5 21 21 77 12.5 12.5 15 15 55 7 7 8.4 8.4 30.8 25 25 30 30 110 13.75 13.75 16.5 16.5 60.5 62.5 62.5 75 TOTAL 75 275

Trazo y nivelacin en terreno plano por medios maniales, para desplante de estructura, estableciendo ejes auxiliares pasos y referencias. incluye material y mano de obra.

Excavacin a mano n terreno tipo "B" seco en cepas de hasta 2m. D e altura; incluye afloje, extraccin, amacice, limpieza de plantilla y taludes, medida en banco. Plantilla de cimentacin de 100kg/cm2 con agregado de 3/4 y un espesor de 2cm, incluye material y mano de obra. Cimentacin de piedra brasa asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estacin.

M2

M3

Relleno de cepas con material producto de excavacin compactado con pizn a mano en capas de 10cm. I ncluye volteo con pala.

Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 con agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos del no.2 a cada 20cm.

Impermeavilizacin de cadena de desplante de 15X20 a base de 2 capas de emulsin asfaltica y 1 capa de fieltro asfltico con riego de arena, incluye limpieza y acarreos a 1ra estcin. Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de espesor, inc. material y acarreo hasta 1er estacin.

25 25 30 30 25 25 30 30

0.55 0.55 0.55 0.55 TOTAL 2.5 2.5 2.5 2.5

Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.

A M2

1-2

25

1

25

Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.

M2

B 1 2 A B 1 2

1-2 A-B A-B 1-2 1-2 A-B A-B

25 30 30 3 3 3 3

1 1 1 TOTAL 7 7 9 9 TOTAL

Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero de armex colocado a cada 3m. Aprox.

M

25 30 30 110 21 21 27 27 96

Programa de Obra Cdigo ConceptoLimpieza y deshierbe en terreno con maleza de hasta 1 metro de PRE001 altura incluye apile de hierba y material en lugar. Trazo y nivelacin en terreno plano por medios maniales, para desplante de estructura, PRE002 estableciendo ejes auxiliares pasos y referencias. incluye material y mano de obra. Excavacin a mano n terreno tipo "B" seco en cepas de hasta 2m. D e altura; incluye afloje, CIM001 extraccin, amacice, limpieza de plantilla y taludes, medida en banco. Plantilla de cimentacin de 100kg/cm2 con agregado de 3/4 ALB001 y un espesor de 2cm, incluye material y mano de obra. Cimentacin de piedra brasa ALB002 asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estacin. Relleno de cepas con material producto de excavacin ALB003 compactado con pizn a mano en capas de 10cm. I ncluye volteo con pala. Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 con agregado de 3/4 y refuerzo ALB004 con 4 varillas del #3 y estribos del no.2 a cada 20cm.

U.

Cant.

P.U.

Imprte.

Rndmto.

Inicia

m2

110

$5.44

$598.16

83.333

10/17/2011

m2

110

$2.55

$280.11

833.33

10/18/2011

m3

88

$188.31 $16,571.36

7.5

10/19/2011

m2

77

$76.40

$5,882.87

31.25

11/29/2011

m3

55

$923.41 $50,787.68

5.405

11/2/2011

m3

30.8

$108.32

$3,336.26

4.348

11/24/2011

m

110

$219.75 $24,172.92

11.765

11/14/2011

Impermeavilizacin de cadena de desplante de 15X20 a base de ALB005 2 capas de emulsin asfaltica y 1 m2 capa de fieltro asfltico con riego de arena, incluye limpieza y acarreos a 1ra estcin.

60.5

$133.21

$8,058.98

129.534

11/23/2011

Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de ALB006 espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de espesor, inc. material y acarreo hasta 1er estacin. Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero ALB008 de armex colocado a cada 3m. Aprox. Cadena de cerramiento de ALB007 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.

m2

275

$124.23 $34,163.13

23.529

11/24/2011

m

96

$84.65

$8,126.01

31.25

11/24/2011

m

110

$105.44 $11,597.90

31.25

12/6/2011

$163,575.4

Programa de Obra Fin Duracin Fza. Tbjo.Perido 1 Perido 2 Perido 3 Perido 4 Perido 5 Perido 6 Perido 7 L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L M

10/18/2011

1.3

1 CUA001

10/18/2011

0.13

1 CUA002

11/30/2011

12

3CUA001

11/4/2011

2

1CUA002

11/21/2011

10

2CUA002

12/1/2011

7

1CUA001

11/22/2011

9

1CUA002

11/23/2011

0.47

1CUA002

12/7/2011

12

2CUA001

11/27/2011

3.1

1 CUA002

12/9/2011

4

1CUA002

$5,021.11

$8,285.68

$30,340.78 $32,855.37 $22,922.01 $35,882.99 $28,264.69

Perido 7 MJ VS

$28,264.69

$163,572.63

Estimacin 1 Descripcin Limpieza, deshierve y desenraice del terreno con maleza de 1m de altura, incluyematerial y apile de hierba en el lugar Trazo y nivelacin en terreno plano por medios manuales, para desplante de estructura, estableciendo ejes auxiliares, pasos y referencias, incluye material y mano de obra.

Perido del: U Cntdd. P.U.

17/10/20011 Imprte.

al: Esta estimacin Cant. % Imprt.

10/22/2011

m2

110

7.19

791

110

100.00

791.26

m2

110

68.96

7585.54

110

100.00

7585.54

Excabacin a mano en terreno tipo B seco en cepas de hasta 2 m de m3 88 profundidad, incluye afloje, estraccin, amacice,limpieza de plantilla y taludes, medida en banco. Estimacin 2 Perido del: Excabacin a mano en terreno tipo B seco en cepas de hasta 2 m de m3 profundidad, incluye afloje, estraccin, amacice,limpieza de 2 plantilla y taludes, medida en banco.

258.43

22741.42

15

17.05

255.68

21/10/20011

al:

88

258.43

22741.42

45

51.13636

2301.14

10/22/2011 Acumulado Cant. %

Imprt.

Cant.

Por Ejercer %

Imprt.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

73.00

82.95

6055.682

al: