TERRACERIAS, OBRA EXTERIOR Y CISTERNA MBA HUTABAMPO, SONORA CONCURSO ADICIONAL ORD CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE CANTIDAD CANTIDAD P.U CANTIDAD 220 PRELIMINARES 220.2 TRAZO Y NIVELACION 220.2.2 ML 171.1200 $195.71 $33,489.90 100.00 71.1200 $13,918.90 100.00 SUBTOTAL $33,489.90 $13,918.90 508 TRABAJOS FUERA DE PREDIO 508.2 VIALIDADES FUERA DE PREDIO 508.2.1 M2 450.0000 $13.25 450.00 508.2.2 M3 90.0000 $33.92 90.00 508.2.3 M3 0.0000 $0.00 - 508.2.4 M2 0.0000 $15.90 - 508.2.5 M3 0.0000 $121.90 - 508.2.6 M3 0.0000 $238.50 - 508.2.7 M2 450.0000 $16.81 450.00 508.2.8 M2 450.0000 $5.30 450.00 550.2.2 M2 80.0000 $211.33 80.00 SUBTOTAL $0.00 NOTA GENERAL: TODOS LOS PRECIOS UNITARIOS DEBERAN INCLUIR: MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO, MISCELÁNEOS INDIRECTOS Y TODO LO NECESARIO PARA SU CORR A SATISFACCION DEL CLIENTE, DEBERÁN INCLUIR, FLETES, DESCARGA, ALMACENAJE, ACARREOS VERTICALES Y HORIZONTALES A CUALQUIER ALTURA Y A CUALQUIER DISTANCIA DE MATERIALES. COLOCACION TAPIALES DE TRIPLAY EN EXTERIORES CON ACABADO PINTURA BLANCA INCLUYENDO DESMONTAJE AL FINAL DE LOS TRABAJOS, PROTECCIONES NECESARIAS C CORTES, DESPERDICIOS, ANDAMIOS, ESCALERAS, ACARREOS HASTA LOS TIROS AUTORIZADOS DENTRO Y FUERA DE LA OBRA CON CARGA MANUAL O MECANICA DE LOS MATERIALES PRODUCTO DE LAS DEMOLICIONES , TODOS LOS TRABAJOS SON EN HORARIO DIURNO, TODOS LOS CONCURSANTES DEBERÁN CONOCER LAS ESPECIFICACIONES GENERALES DE CONSTRUCCIÓ APLICARLAS , EL TOTAL DE LAS LIMPIEZAS SE DEBERÁN INCLUIR EN LA PARTIDA CORRESPONDIENTE, TODOS LOS TRABAJOS ADICIONALES A LOS QUE CONTEMPLA ESTE CATALOGO QUE SUR LA EJECUCION DE LA OBRA SOLO SERAN RECONOCIDOS BAJO AUTORIZACION PREVIA Y EXPRESA DEL GERENTE DE LA OBRA POR PARTE DE WAL-MART. TODOS LOS PRECIOS SON P. SUMINISTRO Y COLOCACION DE TAPIAL DE MADERA DE TRIPLAY DE PINO DE 19 MM EN HOJAS COMPLETAS DE 1.22 X 2.44 DE ALTURA, SOPORTADO CON POLINERIA DE 4" X 4" PARA RESGUARDO DE LA OBRA, CON ACABADO EN PINTURA VINILICA COLOR POR DEFINIR, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS. CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO I, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO. CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO. RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2. SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS. SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 12 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

Transcript of Presupuesto Mba Hutabampo 25 de Mayo(1)

Page 1: Presupuesto Mba Hutabampo 25 de Mayo(1)

TERRACERIAS, OBRA EXTERIOR Y CISTERNA MBA HUTABAMPO, SONORA

CONCURSO ADICIONAL ORDINARIO

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE CANTIDAD CANTIDAD P.U CANTIDAD CANTIDAD

220 PRELIMINARES

220.2 TRAZO Y NIVELACION

220.2.2 ML 171.1200 $195.71 $33,489.90 100.00 71.1200 $13,918.90 100.00 $19,571.00

SUBTOTAL $33,489.90 $13,918.90 $19,571.00

508 TRABAJOS FUERA DE PREDIO

508.2 VIALIDADES FUERA DE PREDIO

508.2.1 M2 450.0000 $13.25 450.00

508.2.2 M3 90.0000 $33.92 90.00

508.2.3 M3 0.0000 $0.00 -

508.2.4 M2 0.0000 $15.90 -

508.2.5 M3 0.0000 $121.90 -

508.2.6 M3 0.0000 $238.50 -

508.2.7 M2 450.0000 $16.81 450.00

508.2.8 M2 450.0000 $5.30 450.00

550.2.2 M2 80.0000 $211.33 80.00

SUBTOTAL $0.00

NOTA GENERAL: TODOS LOS PRECIOS UNITARIOS DEBERAN INCLUIR: MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO, MISCELÁNEOS INDIRECTOS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION A SATISFACCION DEL CLIENTE, DEBERÁN INCLUIR, FLETES, DESCARGA, ALMACENAJE, ACARREOS VERTICALES Y HORIZONTALES A CUALQUIER ALTURA Y A CUALQUIER DISTANCIA DE

TODOS LOS MATERIALES. COLOCACION TAPIALES DE TRIPLAY EN EXTERIORES CON ACABADO PINTURA BLANCA INCLUYENDO DESMONTAJE AL FINAL DE LOS TRABAJOS, PROTECCIONES NECESARIAS CON PLASTICO, CORTES, DESPERDICIOS, ANDAMIOS, ESCALERAS, ACARREOS HASTA LOS TIROS AUTORIZADOS DENTRO Y FUERA DE LA OBRA CON CARGA MANUAL O MECANICA

DE LOS MATERIALES SOBRANTES O PRODUCTO DE LAS DEMOLICIONES , TODOS LOS TRABAJOS SON EN HORARIO DIURNO, TODOS LOS CONCURSANTES DEBERÁN CONOCER LAS ESPECIFICACIONES GENERALES DE CONSTRUCCIÓN (WAL-MART) Y APLICARLAS , EL TOTAL DE LAS LIMPIEZAS SE DEBERÁN INCLUIR EN LA PARTIDA CORRESPONDIENTE, TODOS LOS TRABAJOS

ADICIONALES A LOS QUE CONTEMPLA ESTE CATALOGO QUE SURGIERAN DURANTE LA EJECUCION DE LA OBRA SOLO SERAN RECONOCIDOS BAJO AUTORIZACION PREVIA Y EXPRESA DEL GERENTE DE LA OBRA POR PARTE DE WAL-MART. TODOS LOS PRECIOS SON P.U.O.T.

SUMINISTRO Y COLOCACION DE TAPIAL DE MADERA DE TRIPLAY DE PINO DE 19 MM EN HOJAS COMPLETAS DE 1.22 X 2.44 DE ALTURA, SOPORTADO CON POLINERIA DE 4" X 4" PARA RESGUARDO DE LA OBRA, CON ACABADO EN PINTURA VINILICA COLOR POR DEFINIR, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO I, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 12 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

Page 2: Presupuesto Mba Hutabampo 25 de Mayo(1)

508.6 BANQUETAS FUERA DE PREDIO

508.6.1 M2 300.0000 $213.56 300.00 300.00

508.6.2 M2 190.0000 $382.97 190.00 190.00

SUBTOTAL $0.00 $0.00 509 DEMOLICIONES

509.1 DEMOLICIONES

509.1.1 DEMOLICION MURO DE MAMPOSTERIA h=1.80m M2 500.0000 $97.52 500.00

509.1.2 DEMOLICION MURO DE TABIQUE h=4.25m M2 2,782.7600 $69.75 400.00

509.1.2 M2 244.9300 $212.53 210.00

SUBTOTAL $0.00

510 TERRACERIAS

510.1 EXCAVACIONES PARA NIVELACION DE TERRENO, ESCARIFICACION

510.1.1 M2 6,198.0000 $13.25 $82,123.50 5,100.00 ### $14,548.50 5100.00 $67,575.00

510.1.2 M3 1,361.8300 $87.45 $119,092.03 1,000.00 361.8300 $31,642.03 1000.00 $87,450.00

510.1.3 M3 3,043.2400 $58.30 $177,420.89 1,709.00 ### $77,786.19 1709.00 $99,634.70

510.1.3 M3 0.0000 $0.00 -

510.1.4 M2 0.0000 $0.00 -

SUBTOTAL $378,636.43 $123,976.73 $254,659.70

510.2 RELLENOS PARA TERRAPLENES Y PLATAFORMAS

510.2.1 M3 1,902.5300 $121.90 $231,918.41 1,900.00 2.5300 $308.41 1900.00 $231,610.00

SUBTOTAL $231,918.41 $308.41 $231,610.00

510.3 MEJORAMIENTOS DE PLATAFORMA CON GRAVA, SUELO-CEMENTO, BASE HIDRÁULICA, ETC.

510.3.1 M3 470.8200 $238.50 $112,290.57 500.00 -29.1800 500.00 $119,250.00

SUBTOTAL $112,290.57 - $119,250.00

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO F'c=200 KG/CM2, DE 10 CM DE ESPESOR, ARMADA CON MALLA ELECTROSOLDADA 6x6/10-10, COLADO EN TABLEROS DE 2x2 CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. DE ESPESOR, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

GUARNICION DE CONCRETO HECHO EN OBRA F'C= 200 KG/CM2 DE 20 X 30 X 40 CM, ARMADA CON 4 VARILLAS 3/8" Y ESTRIBOS DEL No. 3, INCLUYE, EXCAVACION DE 15 CMS, MATERIALES, CIMBRA Y DESCIMBRA, MANO DE OBRA Y HERRAMIENTA

DESMONTEJE DE ESTRUCTURA METALICA SIN RECUPERACION A CUALQUIER ALTURA

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

DESPALME POR MEDIOS MECANICOS DE CAPA VEGETAL EN UN ESPESOR DE 40 CM MAXIMOS

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO II, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO III, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

Page 3: Presupuesto Mba Hutabampo 25 de Mayo(1)

510.4 ACARREOS DE PRODUCTOS DE EXCAVACION -

510.4.1 M3 2,742.2900 $121.90 $334,285.15 90.00

### $323,314.15

90.00 $10,971.00

510.4.2 M3 5,726.5900 $103.88 $594,878.17 2,700.00

### $314,402.17

2700.00 $280,476.00

SUBTOTAL $929,163.32 $637,716.32 $291,447.00

520 INST. HIDRÁULICA EXTERIOR (No incluir obra civil)

520.1 INST. HIDRÁULICA EXTERIOR: TUBERÍA, CODOS, COPLES, T'S, Y'S

520.1.1 M.L 94.8500 $59.77 $5,669.51 18.60 76.2500 $4,557.72

520.1.2 M.L 46.5000 $72.01 46.50

520.1.3 M.L 23.5000 $81.42 $1,913.34 104.63

520.1.4 PZA 5.0000 $30.75 5.00

520.1.5 PZA 3.0000 $36.98 3.00

520.1.6 PZA 7.0000 $45.37 7.00

520.1.7 PZA 5.0000 $71.17 5.00

520.1.8 PZA 4.0000 $47.59 4.00

520.1.9 PZA 5.0000 $44.10 5.00

520.1.10 PZA 5.0000 $38.47 5.00

520.1.11 PZA 5.0000 $38.47 5.00

520.1.12 PZA 6.0000 $48.60 6.00

520.1.13 PZA 2.0000 $974.20 2.00

520.1.14 PZA 2.0000 $579.11 2.00

520.1.15 SUMI. Y COL. DE MEDIDOR DE AGUA DE 38 MM PZA 1.0000 $5,293.78 1.00

520.1.16 PZA 6.0000 $44.36 6.00

520.1.17 PZA 1.0000 $314.51 $314.51 1.00 1.00 $314.51

520.1.18 PZA 1.0000 $271.18 1.00

520.1.19 PZA 1.0000 $588.52 1.00

520.1.20 SUMI. Y COL. DE SOLDERING 500GRS. PZA 1.0000 $69.25 1.00

520.1.21 PZA 5.0000 $6.15 5.00

520.1.22 PZA 7.0000 $125.29 7.00

520.1.23 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 4.0000 $96.46 4.00

520.1.24 PZA 10.0000 $5.76 10.00

520.1.25 PZA 3.0000 $37.98 3.00

520.1.26 PZA 5.0000 $31.76 5.00

520.1.27 PZA 2.0000 $1,589.27 2.00

520.1.28 PZA 2.0000 $796.30 2.00

520.1.29 PZA 2.0000 $1,263.32 2.00

520.1.30 PZA 2.0000 $45.99 2.00

520.1.31 PZA 2.0000 $22.05 2.00

520.1.32 ML 1.2000 $163.56 1.20

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DEL DESPALME Y EXCAVACIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 25 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 32 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 38 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-19 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-25 mm.

SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 19 mm.

SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 38 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 45 X 38 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90 X 38 mm.

SUMI. Y COL. DE EXTREMIDAD CAMPANA DE PVC DE 38 mm.

SUMI. Y COL. DE EXTREMIDAD ESPIGA DE PVC DE 38 mm.

SUMI. Y COL. DE EXTREMIDAD NIPLE DE PVC DE 25 mm.

SUMI. Y COL. DE VALV C/FLOTADOR A.P. 25MM SUMI. Y COL. DE VALV COMP ROS 125LF02 25MM

SUMI. Y COL. DE CONECTOR COBRE R/INT 13MM SUMI. Y COL. DE LLAVE NARIZ C/SAL MANG 19CR

SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 50-50

SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 95-5

SUMI. Y COL. DE LIJA ESMERIL 38MM METRO

SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L.

SUMI. Y COL. DE ROLLO DE TEFLON 25MM

SUMI. Y COL. DE RED BUSH PVC HID 32-25MM SUMI. Y COL. DE ADAPTADOR CAMPANA PVC H 25MM

SUMI. Y COL. DE VALVULA DE ACOPLADO RAPIDO MCA. RAIND BIRD DE 25

SUMI. Y COL. DE CODO GIRATORIO MCA RAIND BIRD DE 25 X 19

SUMI. Y COL. DE ACOPLADOR MCA. RAIND BIRD 25MM

SUMI. Y COL. DE NIPLE Fo. GALVANIZADO DE 25 MM X 10 CMS DE LONGITUD.

SUMI. Y COL. DE ADAPTADOR HEMBRA DE PVC HIDRAULICO CEMENTAR Y ROSCA INT. DE 25 MM.

SUMI. Y COL. DE TUBO GALVANIZADO ROSC 25MM

Page 4: Presupuesto Mba Hutabampo 25 de Mayo(1)

520.1.33 PZA 4.0000 $35.01 4.00

520.1.34 SUMI. Y COL. DE CODO COBRE 90-32MM PZA 2.0000 $119.02 2.00

520.1.35 PZA 1.0000 $772.90 1.00

520.1.36 PZA 1.0000 $343.60 1.00

520.1.37 ML 6.5000 $772.25 36.00

520.1.38 PZA 7.0000 $452.78 7.00

520.1.39 PZA 8.0000 $634.04 8.00

520.1.40 PZA 7.0000 $36.10 7.00

520.1.41 SUMI. Y COL. DE RONDANA PLANA 3/8' PZA 22.0000 $1.10 22.00

520.1.42 SUMI. Y COL. DE TORNILLO C/HEX 5/8' X 3' PZA 22.0000 $47.20 22.00

520.1.43 PZA 22.0000 $1.46 22.00

520.1.44 PZA 1.0000 $20,623.36 2.00

520.1.45 PZA 1.0000 $18,936.59 1.00

520.1.46 SUMI. Y COL. DE INTERRUPTOR TIPO PERA PZA 2.0000 $12,365.98 2.00

520.1.47 PZA 1.0000 $3,270.73 1.00

520.1.48 PZA 1.0000 $4,157.57 1.00

520.1.49 PZA 25.0000 $102.87 25.00

520.1.50 PZA 25.0000 $102.94 25.00

520.1.51 PZA 1.0000 $4,022.22 1.00

520.1.52 PZA 15.0000 $5.76 15.00

520.1.53 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 2.0000 $96.46 2.00

520.1.54 PZA 5.0000 $125.29 5.00

520.1.55 ML 36.0000 $694.38 36.00

520.1.56 SUMI. Y COL. DE CODO COBRE 90-50MM PZA 2.0000 $258.94 2.00

520.1.57 PZA 1.0000 $1,938.94 1.00

520.1.58 SUM.COL ADAPTADOR MACHO HID 38MM PZA 2.0000 $38.47 2.00

520.1.59 SUM.COL TUERCA UNION HID PVC 38MM PZA 2.0000 $123.18 2.00

520.1.60 PZA 2.0000 $39.92 2.00

520.1.61 PZA 1.0000 $47.59 1.00

SUBTOTAL $7,897.36 $4,557.72 $314.51

530 INSTALACION ELECTRICA EXTERIOR

530.2 ALUMBRADO EXTERIOR

530.2.1 M.L. 33.8000 $10.28 $347.53 64.20

530.2.2 M.L. 54.9200 $13.38 $734.68 38.99 15.9300 $213.10 38.99 $521.58

530.2.3 PZA 4.0000 $9.48 $37.91 15.00

530.2.4 PZA 3.0000 $13.17 $39.50 18.00

530.2.5 PZA 12.0000 $6.02 12.00

530.2.6 PZA 8.0000 $10.47 8.00

530.2.7 PZA 12.0000 $4.59 12.00

530.2.8 PZA 10.0000 $6.96 10.00

SUMI. Y COL. DE ADAPTADOR HEMBRA PVC H 32MM

SUMI. Y COL. DE VALV CHECK COL 125LF85T 32MM

SUMI. Y COL. DE VALV COMP ROS 125LF02 13MM

SUMI. Y COL. DE TUBO NEG SOLD C-40 S/C 75MM

SUMI. Y COL. DE CODO NEG SOLD STD 45-75MM

SUMI. Y COL. DE BRIDA CUELLO SOLD 150 LB 75MM

SUMI. Y COL. DE JUNTA PLOMO P/BRID 75MM

SUMI. Y COL. DE TUERCA HEXAGONAL GALV 5/8'

SUMI. Y COL. DE BOMBA SUMERGIBLE DE 1.5HP 220V

SUMI. Y COL. DE TABLERO DE CONTROL DE BOMBA

SUMI. Y COL. DE VALV CHEC BRID 928F 125L 75MM

SUMI. Y COL. DE VALV COMP BRID 719F 125L 75MM

SUMI. Y COL. DE SOLDADURA ELECTRICA 60-10 DE 1/8

SUMI. Y COL. DE SOLDADURA ELECTRICA 70-18 DE 1/8

SUMI. Y COL. DE VALV ELIM AIRE SARCO 13W 19

SUMI. Y COL. DE ROLLO DE TEFLON 25MM

SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L.

SUMI. Y COL. DE TUBO DE COBRE TIPO 'M' 50MM

SUM. Y COLOC. VALVULA WALWORTH COMPUERTA BRONCE DE 38 MM

SUM Y COL. DE CODO PVC HID CEMENTAR 45 GRADOS 32 MM

SUM Y COL DE CODO PVC HID CEMENTAR 45-38MM

SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 21 MM

SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 27MM

SUM. Y COLOC. DE CODO PVC PESADO DE 21MM

SUM. Y COLOC. DE CODO PVC PESADO DE 27MM

SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 21MM

SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 27MM

SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 21MM

SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 27MM

Page 5: Presupuesto Mba Hutabampo 25 de Mayo(1)

530.2.9 M.L. 116.9900 $4.83 165.00

530.2.10 PZA 8.0000 $27.45 8.00

530.2.11 PZA 8.0000 $2.85 8.00

530.2.12 PZA 8.0000 $33.50 8.00

530.2.13 PZA 8.0000 $3.75 8.00

530.2.14 SUM. Y COLOC. DE CONDULET LB, LR DE 13MM PZA 5.0000 $69.47 5.00

530.2.15 SUM. Y COLOC. DE CONDULET LB, LR DE 25MM PZA 6.0000 $110.38 6.00

530.2.16 SUM. Y COLOC. DE CAB LE THW CAL. 10AWG M.L. 1,091.5600 $17.39 $18,987.25 987.45 104.1100 $1,810.95 987.45 $17,176.30530.2.17 SUM. Y COLOC. DE CAB LE THW CAL. 14AWG M.L. 3.5700 $6.17 3.57

530.2.18 M.L. 26.8900 $22.54 26.89

530.2.19 M.L. 59.3600 $28.05 59.36

530.2.20 M.L. 1.6900 $28.94 1.69

530.2.21 M.L. 118.1800 $10.44 $1,233.92 189.44

530.2.22 M.L. 22.1600 $7.32 $162.31 1.69 20.4700 $149.93 1.69 $12.38

530.2.23 IZADO Y PEINADO DE POSTE DE 9M PZA 7.0000 $1,426.74 $9,987.17 16.00 7.00 $9,987.17530.2.24 PZA 4.0000 $625.67 $2,502.66 4.00 4.00 $2,502.66

530.2.25 PZA 6.0000 $673.37 $4,040.19 6.00 6.00 $4,040.19

530.2.26 PZA 4.0000 $790.31 $3,161.26 6.00 4.00 $3,161.26

530.2.27 SUM. Y COLOC. DE VARILLA ROSCADA DE 3/8" M.L. $13.05 22.60

530.2.28 SU. Y COLOC. DE PLACA PERFORADA DE 1"X1" PZA $25.30 6.00

530.2.29 SUM. Y COLOC. DE UNICANAL DE 4X4CM M.L. $57.17 12.00

530.2.30 PZA $6.54 8.00

530.2.31 M.L. $70.56 83.32

530.2.32 PZA $18.82 4.00

530.2.33 M.L. $4.83 115.60

530.2.34 PZA $199.36 5.00

530.2.35 PZA $162.21 5.00

SUBTOTAL $41,234.37 $2,173.99 $37,401.53

540 ALBAÑILERIA EXTERIOR (OBRA CIVIL EXTERIOR)

540.1 BANQUETAS (INCLUIR PERIMETRALES)

540.1.1 M2 538.5600 $191.16 $102,951.13 100.00 438.5600 $83,835.13 100.00 $19,116.00

540.1.2 ML $63.23 $0.00 70.00

540.1.3 PZA 9.0000 $3,146.08 $28,314.72 1.00 8.0000 $25,168.64 1.00 $3,146.08

SUBTOTAL $131,265.85 $109,003.77 $22,262.08

SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14

SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 19MM

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 19MM

SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 25MM

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 25MM

SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 16MM

SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 21MM

SUM. Y COLOC. DE TUBO CONDUIT P.G.G. DE 16MM

SUM. Y COLOC. DE CABLE DESNUDO CAL. 10AWG

SUM. Y COLOC. DE CABLE DESNUDO CAL. 12AWG

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 1 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 2 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 3 LUMINARIOS DE 400W 277V

SUM. Y COLOC. DE ABRAZADERA UNIC. DE 25MM

SUMI. Y COL. DE TUBO DE POLIETILENO ALTA DENSIDAD DE 103 MM

SUM. Y COLOC. DE CODO CONDUIT P.G.G. DE 102 MM

SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14

SUM. Y COLOC. DE VARILLA COPPERWELD DE 3/4"X3.0M

SUM. Y COLOC. DE CONEXIÓN MECANICA MOD. GAR6429 DE VARILLA A CABLE

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO HIDRAULICO F`c=200 KG/CM2, DE 10 CMS DE ESPESOR COLADO EN TABLEROS DE 2X2, CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. ESPESOR, MATERIALES MANO DE OBRA Y HERRAMIENTA.

JUNTA ASERRADA DE CONTRO L TIPICA (JA) EN PISOS Y/O BANQUETAS DE CONCRETO, RELLENO DE MATERIAL ELASTICO SL1 DE SONEBORN.

ELABORACIÓN DE RAMPAS PARA DISCAPACITADOS DE CONCRETO F´c=200 KG/CM2 DE 10 cms DE ESPESOR, ARMADAS CON MALLA 6/6 10 - 10, DE FORMA TRAPEZOIDAL DE 5.00 X 2.50 M. , ACABADO ESCOBILLADO, INCLUYE: MATERIALES, MANO DE OBRA HERRAMIENTA Y EQUIPO.

Page 6: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.2 GUARNICIONES

540.2.1 ML 514.9200 $221.04 $113,817.92 100.00 414.9200 $91,713.92 100.00 $22,104.00

SUBTOTAL $113,817.92 $91,713.92 $22,104.00

540.3 TOPES

540.3.1 PZA 7.0000 $343.13 $2,401.91 35.00 7.00 $2,401.91

SUBTOTAL $2,401.91 $2,401.91

540.4 OBRA CIVIL INSTALACION ELECTRICA DE EXTERIORES

INSTALACION ELECTRICA DE EXTERIORES TELEFONICA

540.4.1 M2 23.4500 $4.91 $115.14 10.15 13.3000 $65.30 4.09 20.08

540.4.2 M3 16.4200 $41.08 $674.53 6.09 10.3300 $424.36 6.09 $250.18

540.4.3 M3 9.3800 $75.10 $704.44 6.09 3.2900 $247.08 6.09 $457.36

540.4.4 M2 23.4500 $44.21 $1,036.72 10.15 13.3000 $587.99 10.15 $448.73

540.4.5 PZA 1.0000 $6,108.35 $6,108.35 2.00 1.00 $6,108.35

540.4.6 M3 9.1600 $107.61 $985.71 7.92 1.2430 $133.76 7.92 $851.95

540.4.7 M3 2.3500 $182.37 $428.57 1.02 1.3350 $243.46 1.02 $185.11

ALUMBRADO EXTERIOR -

540.4.8 M2 70.1700 $4.91 $344.53 114.68

540.4.9 LT 0.1000 $31.72 $3.17 17.20 0.10 $3.17

540.4.10 M3 49.1200 $41.08 $2,017.85 114.68 49.12 $2,017.85

540.4.11 M2 70.1700 $44.21 $3,102.22 114.68 70.17 $3,102.22

GUARNICION DE CONCRETO F'c=200 KG/CM2 DE 15 X 30 X 40 CM, TIPO 1 TRAPEZOIDAL INCLUYE: MATERIALES, CIMBRA Y DESCIMBRA MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE TOPE TIPO PARK-IT CON ADHESIVO DE URETANO ( ADHESIVO PREMIUM PL) FIJADO EN CARPETA ASFALTICA CON 4 CLAVOS DE CABEZA PLANA DE 14" DE LONGITUD DE 0.60 M. PREFABRICADO TIPO PARK-IT, ADHESIVO, CLAVOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA COLOCACION

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CONSTRUCCIÓN DE REGISTROS TELEFONICO DE 1.40 X 0.70 X 0.75 M. MEDIDAS INTERIORES DE PROFUNDIDAD, A BASE DE MUROS DE TABIQUE ROJO RECOCIDO, FIRME ARMADO F´c=200 KG/CM2 CON 4 VRS # 3 @ 20 CM. Y CADENA PERIMETRAL 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. CON ARENERO, ACABADO PULIDO EN INTERIOR. INCLUYE: EXCAVACION, PLANTILLA, TAPA DE PLACA DE CONCRETO ARMADO , MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE GROUT EN PLACAS DE COLUMNAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

Page 7: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.4.12 M3 21.0500 $182.37 $3,838.89 11.47 9.5820 $1,747.47 11.47 $2,091.42

540.4.13 PZA 4.0000 $4,676.94 $18,707.76 4.00 4.00 $18,707.76

540.4.14 M3 28.0700 $75.10 $2,108.06 85.60 28.07 $2,108.06

540.4.15 M3 27.3700 $107.61 $2,945.29 149.08 27.37 $2,945.29

MEDIA TENSION -

540.4.16 M2 $4.91 20.83

540.4.17 M3 $41.08 12.50

540.4.18 M2 $44.21 20.83

540.4.19 M3 $75.10 9.99

540.4.20 PZA $9,572.41 1.00

540.4.21 M3 $107.61 16.25

540.4.22 M3 $182.37 2.08

540.4.23 PZA $6,606.30 1.00

SUBTOTAL $43,121.23 $3,449.42 $39,297.51

540.5 OBRA CIVIL INSTALACION HIDRAULICA DE EXTERIORES

RED DE RIEGO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

CONSTRUCCIÓN DE REGISTRO ELECTRICO A BASE MUROS DE TABIQUE JUNTEADO CON MORTERO CEMENTO - ARENA 1:4, SECCIÓN 0.60 X 0.60 X 0.80 M. CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, CADENA SUPERIOR CON 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. TAPA DE CONCRETO F'c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM, CON MARCO Y CONTRAMARCO DE ANGULO 4" X 4" X1/4" Y ANGULO DE 3 1/2" X 3 1/2" X 1/4" INCLUYE: EXCAVACIÓN, RELLENO, ACARREO, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

FABRICACIÓN DE REGISTRO DE ALTA TENSION SECCION 1.16 X 1.16 X 1.16 M, ARMADO CON VARILLA DEL No. 3 @ 20 CM. AMBOS SENTIDOS CON MUROS DE CONCRETO F'c= 250 KG/CM2 DE 8 CM. Y LOSA INFERIOR DE 10 CM. INCLUYE: TAPA DE FIERRO FUNDIDO ESPECIFICACIÓN DCS-4-07 CON PESO MINIMO 75 KG Y DIGA L Y F., MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM

Page 8: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.5.1 M2 19.1800 $4.91 $94.17 60.45 19.18 $94.17TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

Page 9: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.5.2 M2 19.1800 $44.21 $847.95 60.45 19.18 $847.95

540.5.3 M3 16.4900 $41.08 $677.41 39.29 16.49 $677.41

540.5.4 M3 13.4700 $107.61 $1,449.51 51.08 13.47 $1,449.51

540.5.5 M3 10.1800 $182.37 $1,856.53 6.05 4.1350 $754.10 6.05 $1,102.43

540.5.6 M3 6.1300 $75.10 $460.36 60.45 6.13 $460.36

540.5.7 PZA 3.0000 $4,436.05 $13,308.15 3.00 3.00 $13,308.15

540.5.8 M3 $1,260.97 $0.00 13.05

540.5.9 PZA 5.0000 $376.66 $1,883.30 6.00 5.00 $1,883.30

LINEA DE ALIMENTACION DE AGUA POTABLE - 0.00 $0.00540.5.10 M2 50.8500 $4.91 $249.67 80.02 50.85 $249.67

540.5.11 M3 36.7400 $41.08 $1,509.28 48.01 36.74 $1,509.28

540.5.12 M3 12.4100 $75.10 $931.99 48.01 12.41 $931.99

540.5.13 M3 31.6400 $107.61 $3,404.78 62.41 31.64 $3,404.78

540.5.14 M2 50.8500 $44.21 $2,248.08 80.02 50.85 $2,248.08

540.5.15 M3 19.4100 $182.37 $3,539.80 8.00 11.4081 8.00 $1,459.31

540.5.16 PZA 1.00 $8,607.99 $8,607.99 1.00 1.00 $8,607.99

540.5.17 PZA 1.00 $5,734.94 $5,734.94 1.00 1.00 $5,734.94

SUBTOTAL $46,803.91 $754.10 $43,969.32

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

SUMINISTRO Y FABRICACIÓN DE ENCOFRADO DE TUBERIA A BASE DE CONCRETO CICLOPEO F'C=100 KG/CM2 DE 0.10 M. DE PERALTE. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN

FABRICACIÓN DE ATRAQUES DE CONCRETO F'C= 150 KG/CM2 DE 0.30 X 0.30 X 0.30 M, INCLUYE: CIMBRA COMUN, MATERIALES, MANO DE OBRA, HERRRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

SUMINISTRO Y FABRICACIÓN DE NICHO PARA CUADRO DE TUBERIA DE AGUA POTABLE A BASE DE MUROS DE BLOCK DE 15 cms Y LOSA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 10 cms DE ESPESOR Y CADENA PERIMETRAL DE 0.20 CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE 1/4" A CADA 20 cms, SECCION 0.80 X 0.50 X1.30 mts Y 2 PUERTAS TIPO LOUVER DE 0.33 X 0.54 mt CADA UNO CON MARCOS DE ANGULO.

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

Page 10: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.7 MUROS DE CONCRETO DE CONTENCION

540.7.2 M3 60.8700 $40.87 $2,487.76 - 60.8700 $2,487.76

540.7.3 M2 30.3500 $44.21 $1,341.77 - 30.3500 $1,341.77

540.7.4 M2 30.3500 $93.96 $2,851.69 - 30.3500 $2,851.69

540.7.5 TON 0.2580 $16,583.98 $4,278.67 - 0.2580 $4,278.67

540.7.6 TON 1.0150 $16,583.98 $16,832.74 - 1.0150 $16,832.74

540.7.7 M3 13.0800 $1,621.13 $21,204.38 - 13.0800 $21,204.38

540.7.8 M2 105.9300 $856.00 $90,676.08 - 105.9300 $90,676.08

540.7.9 M2 13.4000 $185.93 $2,491.46 - 13.4000 $2,491.46

540.7.10 M2 72.6900 $154.47 $11,228.42 - 72.6900 $11,228.42

540.7.11 M3 22.1000 $75.10 $1,659.71 - 22.1000 $1,659.71

540.7.12 M3 50.4000 $107.61 $5,423.54 - 50.4000 $5,423.54

540.7.13 PZA 7.0000 $943.04 $6,601.28 9.00 7.00 $6,601.28

540.7.14 ML 8.0000 $1,018.62 $8,148.96 17.00 8.00 $8,148.96

540.7.15 PZA 2.0000 $5,876.64 $11,753.28 1.00 1.0000 $5,876.64 1.00 $5,876.64

SUBTOTAL $186,979.74 $166,352.86 $20,626.88

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 ( 3/8"), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE MALLA CICLONICA CAL 10.5 CON CINTA DE PVC VERDE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE CIMBRA COMUN EN CIMENTACIÓN Y/O CISTERNA, A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO, FABRICACION Y COLOCACION DE POSTE DE PROTECCION ACCESOA TIENDA A BASE DE TUBO DE 4" CED. 40 ACABADO CON PINTURA DE ESMALTE COLOR NEGRO DE 15cm DE ANCHO MCA. SHERWIN WILLIAMS

SUMINISTRO, FABRICACIÓN Y COLOCACIÓN DE BARANDAL DE 1.00 M DE ALTURA EN RAMPA DE DIABLITOS, A BASE DE 2 TRAVESAÑOS Y POSTES A @ 1.14 M DE SEPARACION CON TUBO DE 2" DE DIAM. CED. 40, CON UNA MANO DE PRIMER ANTICORROSIVO Y DOS MANO DE PINTURA AUTOMOTRIZ COLOR AMARILLO TRANSITO, FIJADO AL PISO CON UNA PLACA DE 12 X 12 CM X 1/4" Y TAQUETES DE EXPANSIONDE 3/8".

SUMINISTRO, HABILITADO, FABRICACIÓN Y COLOCACIÓN DE BICICLETERO A BASE DE SOLERA DE 2 X 1/4", 4 X 1/4", 1 1/2" X 1/4" INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA, PINTURA DE ESMALTE Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

Page 11: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.9 BASES PARA POSTES DE ALUMBRADO

540.9.1 PZA 7.0000 $11,943.04 $83,601.28 3.00

4.0000 $47,772.16

3.00 $35,829.12

SUBTOTAL $83,601.28 $47,772.16 $35,829.12

550 PAVIMENTACION

550.1 PAVIMENTO ASFALTICO

550.1.1 M2 2,346.7900 $126.14 $296,024.09 2,295.00

51.7900 $6,532.79

2295.00 $289,491.30

550.1.1 M2 0.0000 $0.00 $0.00 - 0.00 $0.00

550.1.2 M2 2,346.7900 $16.81 $39,453.29 1,606.50 740.2900 $12,445.46

1606.50 $27,007.84

SUBTOTAL $335,477.39 $18,978.25 $316,499.14

550.2 PAVIMENTO HIDRAULICO

550.2.1 M2 353.4000 $256.15 $90,523.41 411.00 353.40 $90,523.41

550.2.2 ML 50.6700 $144.43 $7,318.27 75.00 50.67 $7,318.27

550.2.3 ML 33.4200 $157.03 $5,247.94 75.00 33.42 $5,247.94

550.2.4 ML 24.3100 $155.60 $3,782.64 75.00 24.31 $3,782.64

550.2.5 M2 353.4100 $72.72 $25,699.98 411.00 353.41 $25,699.98

SUBTOTAL $132,572.23 $132,572.23

550.3.1 M2 463.2800 $153.70 $71,206.14 120.00 343.2800 $52,762.14 120.00 $18,444.00

550.3.2 M3 23.1600 $30.63 $709.39 12.00 11.1600 $341.83

12.00 $367.56

SUBTOTAL $71,915.53 $53,103.97 $18,811.56

550.4 RIEGO DE IMPREGNACION, POREOS

550.4.1 M2 4,502.5800 $16.81 $75,695.57 5,100.00 4502.58 $75,695.57

550.4.2 M2 4,502.5800 $5.30 $23,863.67 5,100.00 4502.58 $23,863.67

SUBTOTAL $99,559.25 $99,559.25

CONSTRUCCIÓN DE BASE PARA POSTES DE ALUMBRADO EXTERIOR DE 61 cms DE DIAMETRO (24"), A BASE DE CONCRETO F'c=250 KG/CM2, ARMADO CON 6 VARILLAS DEL No. 5 Y ESTRIBOS DEL No. 3 @ 25 CM (11), ALTURA PROMEDIO DE 1.95, INCLUYE: COLOCACIÓN DE 4 ANCLAS DE 1", ACABADO MARTELINADO HASTA 0.70 mts, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 5 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 8 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA RR-2K, A RAZON DE 0.70 LTO/M2

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 15 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA

JUNTA LONGITUDINAL CONTRACCION (JLC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA TRANSVERSAL DE CONSTRUCCION (JTC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA LONGITUDINAL DE EXPANSION (JLE) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

ACABADO RASTRILLADO EN PISO VEHICULARES DE ESTACIONAMIENTO INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

550.3 ADOQUIN, CAMA DE ARENA PARA ADOQUIN

SUMINISTRO Y COLOCACION DE ADOPASTO DE 8 CM DE ESPESOR

SUMINISTRO Y COLOCACION DE CAMA DE ARENA PARA ADOPASTO INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

Page 12: Presupuesto Mba Hutabampo 25 de Mayo(1)

560 SEÑALIZACION

560.1 SEÑALIZACION HORIZONTAL

560.1.1 PZA 12.0000 $275.60 $3,307.20 6.00

6.0000 $1,653.60

6.00 $1,653.60

560.1.2 PZA 3.0000 $2,332.00 $6,996.00 3.00 3.00 $6,996.00

560.1.3 PZA 1.0000 $1,219.00 $1,219.00 1.00 1.00 $1,219.00

560.1.4 M2 126.2800 $48.76 $6,157.41 65.25

61.0300 $2,975.82

65.25 $3,181.59

560.1.5 PZA 1.0000 $826.80 $826.80 1.00 1.00 $826.80

560.1.6 M2 23.2700 $82.68 $1,923.96 85.68 23.27 $1,923.96

SUBTOTAL $20,430.38 $4,629.42 $15,800.95

560.2 SEÑALIZACION VERTICAL

560.2.1 PZA 26.0000 $1,086.69 $28,253.94 12.00 14.0000 $15,213.66 12.00 $13,040.28

SUBTOTAL $28,253.94 - $15,213.66 $13,040.28

570 CISTERNA

570.1 OBRA CIVIL PARA CISTERNA

570.1.1 M2 83.5300 $4.91 $410.13 70.08

13.4500 $66.04

70.08 $344.09

570.1.2 M2 64.1700 $93.96 $6,029.41 3.50

60.6660 $5,700.18

3.50 $329.24

570.1.3 TON 5.8870 $16,583.98 $97,629.89 4.51

1.3810 $22,902.48

4.51 $74,727.41

570.1.4 M2 301.5400 $154.47 $46,578.88 193.83 107.7062 $16,637.38

193.83 $29,941.51

570.1.5 M2 50.5400 $185.93 $9,396.90 47.56

2.9786 $553.81

47.56 $8,843.09

570.1.6 ML 0.0000 $192.28 $0.00 28.03

570.1.7 M3 57.4500 $1,621.13 $93,133.92 45.69

11.7579 $19,061.08

45.69 $74,072.83

570.1.8 M2 64.5300 $158.87 $10,251.88 56.06

8.4700 $1,345.63

56.06 $8,906.25

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO EN PAVIMENTO DE FLECHAS SENCILLAS DE PINTURA TRANSITO CON REFLEJANTE EN COLOR BLANCO. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE ESTACIONAMIENTO PARA MINUSVALIDOS CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA CAMIONETA DE VALORES DE 5 X 3.80 M CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE CRUCE PEATONAL CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA LOGO DE BICICLETERO CON PINTURA ANTIREFLEJANTE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE PINTURA CEBREADA A 45° INTERCALADA AMARILLO-NEGRO EN FRANJAS DE 10CM EN MUROS DE ANDENES EL PRECIO UNITARIO INCLUYE: TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

COLOCACION DE SEÑALAMIENTO VERTICAL "INFORMATIVA"

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

SUMINISTRO Y COLOCACIÓN DE BANDA OJILLADA DE PVC DE 15 CM. DE ANCHO EN JUNTA DE COLADO EN MUROS DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE SOBRE PLANTILLA PARA LOSA FONDO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 13: Presupuesto Mba Hutabampo 25 de Mayo(1)

570.1.9 M2 127.5800 $158.87 $20,268.63 70.08 57.5000 $9,135.03 70.08 $11,133.61

570.1.10 M2 82.5200 $158.87 $13,109.95 85.00 82.52 $13,109.95

570.1.11 PZA 4.0000 $795.54 $3,182.16 4.00 4.00 $3,182.16

570.1.12 PZA 3.0000 $3,953.38 $11,860.14 3.00 3.00 $11,860.14

570.1.13 PZA 1.0000 $3,953.38 $3,953.38 1.00 1.00 $3,953.38

570.1.14 PZA 2.0000 $4,558.85 $9,117.70 2.00 2.00 $9,117.70

570.1.15 PZA 1.0000 $15,819.77 $15,819.77 1.00 1.00 $15,819.77

570.1.16 PZA 1.0000 $5,498.32 $5,498.32 1.00 1.00 $5,498.32

570.1.17 PZA 2.0000 $3,290.26 $6,580.52 2.00 2.00 $6,580.52

570.1.18 PZA 1.0000 $12,928.61 $12,928.61 1.00 1.00 $12,928.61

570.1.19 M2 4.6400 $290.36 $1,347.27 3.97 0.6730 $195.41 3.97 $1,151.86

570.1.20 LTO 65,360.0000 $0.13 $8,496.80 92,600.00 65360.00 $8,496.80

SUBTOTAL $375,594.28 $75,597.03 $299,997.25

570.2 EXCAVACIONES Y RELLENOS PARA CISTERNA

570.2.1 M3 391.5900 $40.93 $16,027.78 210.24 181.3500 $7,422.66 210.24 $8,605.12

570.2.2 M2 67.8000 $44.21 $2,997.44 70.08 -2.2800 70.08 $3,098.24

570.2.3 M3 272.5800 $107.61 $29,332.33 273.31 -0.7300 273.31 $29,410.89

570.2.4 M3 181.9900 $75.10 $13,667.45 84.10 97.8940 $7,351.84 84.10 $6,315.61

SUBTOTAL $62,025.00 $14,774.49 $47,429.86

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE EN ÁREAS DE CONTACTO DE MUROS PERIMETARLES DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y APLICACIÓN DE IMPERMEABILIZACION DE CELDAS DE CISTERNA CON IMPERSEAL COLOR BLANCO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE CARRETE A BASE DE TUBO DE ACERO AL CARBON DE 6" DE DIAM. CED. 40 X 50 CM DE LONGITUD, CON DOS PLACAS DE ACERO DE 25 X 25 X 3/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE FIJO TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE PUERTA TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: 2 PUERTAS DE 0.90 X 0.90 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TAPA PARA CUARTO DE BOMBAS EN 2 HOJAS DE 2.10 X 2.10 M CON ÁNGULO 2" X 3/16" Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACION DE REJILLA IRVING SOBRE CARCAMO SECO EN CUARTO DE BOMBAS DE 1.00 X 1.00 DE 1" DE ESPESOR, INCLUYE: MARCO DE ANGULO DE 1 1/4".

SUMINISTRO Y COLOCACION DE VENTILACION DE CISTERNA A BASE DE TUBO GALV. CON "T" Y DOS CODOS DE 4" PROTEJIDAS C/MALLA DE ALAMBRE Y EMBEBIDAS EN EL CONCRETO.

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE BASES PARA BOMBAS, DE ESPESOR 10 CM SOBRE NPT, ARMADA CON VS #3 @ 20 CM, EN AMBOS SENTIDOS, INCLUYE. MATERIAL, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE PRIMERA CARGA DE AGUA A CISTERNA CON PIPA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

Page 14: Presupuesto Mba Hutabampo 25 de Mayo(1)

580 COLECTORES Y DRENAJES

580.1 COLECTORES Y DRENAJES PLUVIALES

580.1.1 M2 232.7100 $4.91 $1,142.61 69.32 163.3860 $802.23 69.32 $340.38

580.1.2 M2 232.7100 $44.21 $10,288.11 69.32 163.3860 $7,223.30 69.32 $3,064.81

580.1.3 M3 268.2900 $40.87 $10,965.01 86.66 181.6350 $7,423.42 86.66 $3,541.59

580.1.4 M3 90.3000 $182.37 $16,468.01 6.93 83.3676 $15,203.75 6.93 $1,264.26

580.1.5 M3 157.1400 $75.10 $11,801.21 86.66 70.4850 $5,293.42 86.66 $6,507.79

580.1.6 M3 149.9900 $107.61 $16,140.42 112.65 37.3385 $4,018.00 112.65 $12,122.43

580.1.7 ML 18.0100 $408.08 $7,349.50 46.30 18.01 $7,349.50

580.1.8 ML 177.0800 $499.15 $88,390.19 8.67 168.4100 $84,062.53 8.67 $4,327.67

580.1.9 ML $772.25 $0.00 2.80 0.00 $0.00

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10 CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 25 CM. DE DIAMETRO (10"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 30 CM. DE DIAMETRO (12"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN TUBO DE ACERO SOLDABLE C-40 SIN COSTURA de 3" de diámetro, I.NCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

Page 15: Presupuesto Mba Hutabampo 25 de Mayo(1)

580.1.10 PZA 5.0000 $6,348.86 $31,744.30 4.00 1.0000 $6,348.86 4.00 $25,395.44

580.1.11 PZA 4.0000 $12,258.64 $49,034.56 2.00 2.0000 $24,517.28 2.00 $24,517.28

580.1.12 ML $802.45 $0.00 39.85 0.00 $0.00

580.1.13 M2 5.1200 $6,299.65 $32,254.21 3.06 2.0640 $13,002.48 3.06 $19,251.73

SUBTOTAL $275,578.13 $167,895.25 $107,682.88

580.2 COLECTORES Y DRENAJES SANITARIO

580.2.1 M2 71.0000 $4.91 $348.61 47.63

23.3720 $114.76

47.63 $233.85

580.2.2 M3 91.4000 $40.87 $3,735.52 59.54

31.8650 $1,302.32

59.54 $2,433.20

580.2.3 M3 24.8600 $182.37 $4,533.72 4.76

20.0972 $3,665.13

4.76 $868.59

580.2.4 M2 71.0000 $44.21 $3,138.91 47.63

23.3720 $1,033.28

47.63 $2,105.63

580.2.5 M3 63.2700 $75.10 $4,751.58 59.54

3.7350 $280.50

59.54 $4,471.08

580.2.6 ML 101.0200 $307.01 $31,013.93 79.38

21.6400 $6,643.65

79.38 $24,370.28

580.2.7 PZA 0.0000 $8,279.55 5.00

580.2.8 M3 36.5700 $107.61 $3,935.30 77.40 36.57 $3,935.30

CONSTRUCCION DE REGISTRO DE SECCION 0.60 X 0.80 M. ( INTERIOR) X 1.50 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F'c=200 KG/CM2 DE 10 CMS DE ESPESOR ARMADA CON VARILLA DEL # 3@ 15 CM EN AMBOS SENTIDOS, MURO DE TABIQUE ROJO RECOCIDO 7X14X28, CON TAPA DE PLACA DE 1/4" ANTIDERRAPANTE CON MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

FABRICACIÓN DE POZO DE VISITA TIPO COMUN CON CAIDA ADOSADA CON MURO DE TABIQUE A TIZON, JUNTEADO CON CEMENTO ARENA 1:3 A UNA PROFUNDIDAD PROMEDIO DE 1.00 M, CON APLANADO INTERIOR CON MORTERO 1:3 Y BASE DE CONCRETO F´C=200KG/CM2 DE 20CM DE ESPESOR, ARMADA CON VARILLAS DEL # 4 @ 30CMEN AMBOS SENTIDOS CIRCULAR DE 1.76MTS DE DIAMETRO (PARA DESPLANTAR TABIQUE). INCLUYE: BROCAL Y TAPA DE FOFO. PARA TAFICO PESADO CON REJILLA DE 160 KG MARCA MYMACO Y ESCALONES DE FOFO., MATERIAL, M.O.,EXCAVACIÓN, HERRAMIENTA Y EQUIPO.

CONSTRUCCION DE CANALALETA DE CONCRETO F'C=200 KG/CM2 DE 10 CMS Y DE 0.50 X 0.29 MTS, ARMADO CON VARILLA DE 1/2" @ 20 CM INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

REJILLA TIPO IRVING IS-01 DE 3/16" X 2 1/2" CON UN ANCHO DE 0.60 M

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 20 CM. DE DIAMETRO (8"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCIÓN DE REGISTRO DE SECCIÓN 0.60 X 0.80 M X 1.00 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2, DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, MUROS DE TABIQUE ROJO RECOCIDO 7X14X28 , CON TAPA DE ACERO DE 1/2", MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 16: Presupuesto Mba Hutabampo 25 de Mayo(1)

580.2.9 PZA 1.0000 $10,247.65 $10,247.65 1.00 1.00 $10,247.65

CARCAMO DE BOMBEO

570.2.10 M2 $4.91 $0.00 42.25

570.2.11 M3 $40.93 $0.00 126.75

570.2.12 M2 $44.21 $0.00 42.25

570.2.13 M3 $107.61 $0.00 164.78

570.2.14 M3 $75.10 $0.00 105.63

570.2.15 M2 $93.36 $0.00 42.25

570.2.16 TON $16,583.98 $0.00 0.00

570.2.17 TON $16,583.98 $0.00 0.07

570.2.18 TON $16,583.98 $0.00 1.79

570.2.19 TON $16,583.98 $0.00 0.04

570.2.20 M2 $154.47 $0.00 169.92

CONSTRUCCION DE TRAMPA DE GRASA DE 1.50 X 0.70 X 2.00 M. CON MUROS Y LOSA FONDO DE CONCRETO SIMPLE F'C=200 KG/CM2, DE 10 CM. DE ESPESOR, CON 2 TAPAS FABRICADAS DE PLACA DE 1/2" DE ESPESOR , MARCO INTERIOR DE CUADRADO DE 1/2" CAL. 18, REFUERZO CON 2 BARRAS DIAGONALES DE ANGULO DE 1" X 3/16", CONTRAMARCO DE ÁNGULO DE 1 1/4" X 1/4", CON 4 ANCLAS, 2 BISAGRAS DE 3/4", JALA DERA DE REDONDO DE 3/8" DE DIAMETRO Y RECUBRIMIENTO ANTICORROSIVO, INCLUYE: PLANTILLA DE 0.05 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN (NO INCLUYE TUBERIA INTERIOR).

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 2 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 6 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

Page 17: Presupuesto Mba Hutabampo 25 de Mayo(1)

570.2.21 M2 $185.93 $0.00 34.76

570.2.22 M2 $1,621.13 $0.00 25.04

570.2.23 PZA $4,558.85 $0.00 2.00

570.2.24 PZA $12,928.61 $0.00 1.00

570.2.25 PZA $7,426.44 $0.00 1.00

SUBTOTAL $61,705.21 $13,039.63 $48,665.58

630 JARDINERIA

630.1 PASTO

630.1.1 M2 795.2100 $36.98 $29,406.87 400.00 395.2100 $14,614.87 400.00 $14,792.00

$29,406.87 $14,614.87 $14,792.00

630.2 PLANTAS, ARBOLES

630.2.1 PZA 0.0000 $0.00$0.00

SUBTOTAL $0.00

630.3 TIERRA NEGRA

630.3.1 M3 79.5200 $127.06 $10,103.81 180.00 79.52 $10,103.81

630.3.2 PIPA 6.0000 $521.71 $3,130.26 6.00 6.00 $3,130.26

SUBTOTAL $13,234.07 $13,234.07

TOTAL $3,848,374.45 $1,579,544.86 $2,268,829.61ADICIONAL ORDINARIO

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM.

SUMINISTRO Y COLOCACION DE PASTO DEDO MORO

SUMINISTRO Y COLOCACION DE ARBOLES CIPRES ITALIANO ALTURA MINIMA DE 2.50 M. CONFORME A PROYECTO

SUMINISTRO Y COLOCACION DE TIERRA NEGRA, INCLUYE MATERIAL Y MANO DE OBRA

RIEGO DE AREAS VERDES CON UN PIPA DIARIA DE 10,000 LTS ANTES DE LA ENTREGA A STORE PLANNING.

Page 18: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

18 de 53

TERRACERIAS, OBRA EXTERIOR Y CISTERNA MBA HUTABAMPO, SONORA

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

220 PRELIMINARES

220.2 TRAZO Y NIVELACION

220.2.2 ML 100.0000 $195.71 $19,571.00

SUBTOTAL $19,571.00

508 TRABAJOS FUERA DE PREDIO

508.2 VIALIDADES FUERA DE PREDIO

508.2.1 M2 450.0000 $13.25 $5,962.50

508.2.2 M3 90.0000 $33.92 $3,052.80

508.2.3 M3 0.0000 $0.00 $0.00

508.2.4 M2 0.0000 $15.90 $0.00

508.2.5 M3 0.0000 $121.90 $0.00

508.2.6 M3 0.0000 $238.50 $0.00

NOTA GENERAL: TODOS LOS PRECIOS UNITARIOS DEBERAN INCLUIR: MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO, MISCELÁNEOS INDIRECTOS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION A SATISFACCION DEL CLIENTE, DEBERÁN INCLUIR, FLETES, DESCARGA, ALMACENAJE, ACARREOS VERTICALES Y HORIZONTALES A CUALQUIER ALTURA Y A CUALQUIER DISTANCIA DE TODOS LOS MATERIALES. COLOCACION TAPIALES DE TRIPLAY EN EXTERIORES CON ACABADO PINTURA BLANCA INCLUYENDO DESMONTAJE AL FINAL DE LOS TRABAJOS, PROTECCIONES NECESARIAS CON PLASTICO, CORTES, DESPERDICIOS, ANDAMIOS, ESCALERAS, ACARREOS HASTA LOS TIROS AUTORIZADOS DENTRO Y FUERA DE LA OBRA CON CARGA MANUAL O MECANICA DE LOS MATERIALES SOBRANTES O PRODUCTO DE LAS DEMOLICIONES , TODOS LOS TRABAJOS SON EN HORARIO DIURNO, TODOS LOS CONCURSANTES DEBERÁN CONOCER LAS ESPECIFICACIONES GENERALES DE CONSTRUCCIÓN (WAL-MART) Y APLICARLAS , EL TOTAL DE LAS LIMPIEZAS SE DEBERÁN INCLUIR EN LA PARTIDA CORRESPONDIENTE, TODOS LOS TRABAJOS ADICIONALES A LOS QUE CONTEMPLA ESTE CATALOGO QUE SURGIERAN DURANTE LA EJECUCION DE LA OBRA SOLO SERAN RECONOCIDOS BAJO AUTORIZACION PREVIA Y EXPRESA DEL GERENTE DE LA OBRA POR PARTE DE WAL-MART. TODOS LOS PRECIOS SON P.U.O.T.

SUMINISTRO Y COLOCACION DE TAPIAL DE MADERA DE TRIPLAY DE PINO DE 19 MM EN HOJAS COMPLETAS DE 1.22 X 2.44 DE ALTURA, SOPORTADO CON POLINERIA DE 4" X 4" PARA RESGUARDO DE LA OBRA, CON ACABADO EN PINTURA VINILICA COLOR POR DEFINIR, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO I, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

Page 19: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

19 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

508.2.7 M2 450.0000 $16.81 $7,565.22

508.2.8 M2 450.0000 $5.30 $2,385.00

550.2.2 M2 80.0000 $211.33 $16,906.40

SUBTOTAL $35,871.92

508.6 BANQUETAS FUERA DE PREDIO

508.6.1 M2 300.0000 $213.56 $64,068.00

508.6.2 M2 190.0000 $382.97 $72,764.30

SUBTOTAL $136,832.30

509 DEMOLICIONES

509.1 DEMOLICIONES

509.1.1 DEMOLICION MURO DE MAMPOSTERIA h=1.80m M2 500.0000 $97.52 $48,760.00

509.1.2 DEMOLICION MURO DE TABIQUE h=4.25m M2 400.0000 $69.75 $27,899.20

509.1.2 M2 210.0000 $212.53 $44,631.30

SUBTOTAL $76,659.20

510 TERRACERIAS

510.1 EXCAVACIONES PARA NIVELACION DE TERRENO, ESCARIFICACION

510.1.1 M2 5,100.0000 $13.25 $67,575.00

510.1.2 M3 1,000.0000 $87.45 $87,450.00

510.1.3 M3 1,709.0000 $58.30 $99,634.70

510.1.3 M3 0.0000 $0.00

510.1.4 M2 0.0000 $0.00

SUBTOTAL $254,659.70

510.2 RELLENOS PARA TERRAPLENES Y PLATAFORMAS

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 12 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO F'c=200 KG/CM2, DE 10 CM DE ESPESOR, ARMADA CON MALLA ELECTROSOLDADA 6x6/10-10, COLADO EN TABLEROS DE 2x2 CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. DE ESPESOR, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

GUARNICION DE CONCRETO HECHO EN OBRA F'C= 200 KG/CM2 DE 20 X 30 X 40 CM, ARMADA CON 4 VARILLAS 3/8" Y ESTRIBOS DEL No. 3, INCLUYE, EXCAVACION DE 15 CMS, MATERIALES, CIMBRA Y DESCIMBRA, MANO DE OBRA Y HERRAMIENTA

DESMONTEJE DE ESTRUCTURA METALICA SIN RECUPERACION A CUALQUIER ALTURA

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

DESPALME POR MEDIOS MECANICOS DE CAPA VEGETAL EN UN ESPESOR DE 40 CM MAXIMOS

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO II, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO III, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 20: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

20 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

510.2.1 M3 1,900.0000 $121.90 $231,610.00

SUBTOTAL $231,610.00

510.3 MEJORAMIENTOS DE PLATAFORMA CON GRAVA, SUELO-CEMENTO, BASE HIDRÁULICA, ETC.

510.3.1 M3 500.0000 $238.50 $119,250.00

SUBTOTAL $119,250.00

510.4 ACARREOS DE PRODUCTOS DE EXCAVACION

510.4.1 M3 90.0000 $121.90 $10,971.00

510.4.2 M3 2,700.0000 $103.88 $280,476.00

SUBTOTAL $291,447.00

520 INST. HIDRÁULICA EXTERIOR (No incluir obra civil)

520.1 INST. HIDRÁULICA EXTERIOR: TUBERÍA, CODOS, COPLES, T'S, Y'S

520.1.1 M.L 18.6000 $59.77 $1,111.79

520.1.2 M.L 46.5000 $72.01 $3,348.27

520.1.3 M.L 104.6300 $81.42 $8,518.83

520.1.4 SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-19 mm. PZA 5.0000 $30.75 $153.75

520.1.5 SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-25 mm. PZA 3.0000 $36.98 $110.95

520.1.6 SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 19 mm. PZA 7.0000 $45.37 $317.58

520.1.7 SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 38 mm. PZA 5.0000 $71.17 $355.84

520.1.8 SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 45 X 38 mm. PZA 4.0000 $47.59 $190.38

520.1.9 SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90 X 38 mm. PZA 5.0000 $44.10 $220.48

520.1.10 SUMI. Y COL. DE EXTREMIDAD CAMPANA DE PVC DE 38 mm. PZA 5.0000 $38.47 $192.34

520.1.11 SUMI. Y COL. DE EXTREMIDAD ESPIGA DE PVC DE 38 mm. PZA 5.0000 $38.47 $192.34

520.1.12 SUMI. Y COL. DE EXTREMIDAD NIPLE DE PVC DE 25 mm. PZA 6.0000 $48.60 $291.61

520.1.13 SUMI. Y COL. DE VALV C/FLOTADOR A.P. 25MM PZA 2.0000 $974.20 $1,948.41

520.1.14 SUMI. Y COL. DE VALV COMP ROS 125LF02 25MM PZA 2.0000 $579.11 $1,158.22

520.1.15 SUMI. Y COL. DE MEDIDOR DE AGUA DE 38 MM PZA 1.0000 $5,293.78 $5,293.78

520.1.16 SUMI. Y COL. DE CONECTOR COBRE R/INT 13MM PZA 6.0000 $44.36 $266.17

520.1.17 SUMI. Y COL. DE LLAVE NARIZ C/SAL MANG 19CR PZA 1.0000 $314.51 $314.51

520.1.18 SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 50-50 PZA 1.0000 $271.18 $271.18

520.1.19 SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 95-5 PZA 1.0000 $588.52 $588.52

520.1.20 SUMI. Y COL. DE SOLDERING 500GRS. PZA 1.0000 $69.25 $69.25

520.1.21 SUMI. Y COL. DE LIJA ESMERIL 38MM METRO PZA 5.0000 $6.15 $30.74

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DEL DESPALME Y EXCAVACIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 25 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 32 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 38 mm.

Page 21: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

21 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

520.1.22 SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L. PZA 7.0000 $125.29 $877.04

520.1.23 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 4.0000 $96.46 $385.84

520.1.24 SUMI. Y COL. DE ROLLO DE TEFLON 25MM PZA 10.0000 $5.76 $57.56

520.1.25 SUMI. Y COL. DE RED BUSH PVC HID 32-25MM PZA 3.0000 $37.98 $113.94

520.1.26 SUMI. Y COL. DE ADAPTADOR CAMPANA PVC H 25MM PZA 5.0000 $31.76 $158.79

520.1.27 PZA 2.0000 $1,589.27 $3,178.54

520.1.28 PZA 2.0000 $796.30 $1,592.61

520.1.29 SUMI. Y COL. DE ACOPLADOR MCA. RAIND BIRD 25MM PZA 2.0000 $1,263.32 $2,526.64

520.1.30 PZA 2.0000 $45.99 $91.99

520.1.31 PZA 2.0000 $22.05 $44.10

520.1.32 SUMI. Y COL. DE TUBO GALVANIZADO ROSC 25MM ML 1.2000 $163.56 $196.27

520.1.33 SUMI. Y COL. DE ADAPTADOR HEMBRA PVC H 32MM PZA 4.0000 $35.01 $140.05

520.1.34 SUMI. Y COL. DE CODO COBRE 90-32MM PZA 2.0000 $119.02 $238.03

520.1.35 SUMI. Y COL. DE VALV CHECK COL 125LF85T 32MM PZA 1.0000 $772.90 $772.90

520.1.36 SUMI. Y COL. DE VALV COMP ROS 125LF02 13MM PZA 1.0000 $343.60 $343.60

520.1.37 SUMI. Y COL. DE TUBO NEG SOLD C-40 S/C 75MM ML 36.0000 $772.25 $27,801.09

520.1.38 SUMI. Y COL. DE CODO NEG SOLD STD 45-75MM PZA 7.0000 $452.78 $3,169.45

520.1.39 SUMI. Y COL. DE BRIDA CUELLO SOLD 150 LB 75MM PZA 8.0000 $634.04 $5,072.31

520.1.40 SUMI. Y COL. DE JUNTA PLOMO P/BRID 75MM PZA 7.0000 $36.10 $252.73

520.1.41 SUMI. Y COL. DE RONDANA PLANA 3/8' PZA 22.0000 $1.10 $24.25

520.1.42 SUMI. Y COL. DE TORNILLO C/HEX 5/8' X 3' PZA 22.0000 $47.20 $1,038.44

520.1.43 SUMI. Y COL. DE TUERCA HEXAGONAL GALV 5/8' PZA 22.0000 $1.46 $32.18

520.1.44 SUMI. Y COL. DE BOMBA SUMERGIBLE DE 1.5HP 220V PZA 2.0000 $20,623.36 $41,246.72

520.1.45 SUMI. Y COL. DE TABLERO DE CONTROL DE BOMBA PZA 1.0000 $18,936.59 $18,936.59

520.1.46 SUMI. Y COL. DE INTERRUPTOR TIPO PERA PZA 2.0000 $12,365.98 $24,731.96

520.1.47 SUMI. Y COL. DE VALV CHEC BRID 928F 125L 75MM PZA 1.0000 $3,270.73 $3,270.73

520.1.48 SUMI. Y COL. DE VALV COMP BRID 719F 125L 75MM PZA 1.0000 $4,157.57 $4,157.57

520.1.49 SUMI. Y COL. DE SOLDADURA ELECTRICA 60-10 DE 1/8 PZA 25.0000 $102.87 $2,571.83

520.1.50 SUMI. Y COL. DE SOLDADURA ELECTRICA 70-18 DE 1/8 PZA 25.0000 $102.94 $2,573.42

520.1.51 SUMI. Y COL. DE VALV ELIM AIRE SARCO 13W 19 PZA 1.0000 $4,022.22 $4,022.22

520.1.52 SUMI. Y COL. DE ROLLO DE TEFLON 25MM PZA 15.0000 $5.76 $86.34

520.1.53 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 2.0000 $96.46 $192.92

520.1.54 SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L. PZA 5.0000 $125.29 $626.46

520.1.55 SUMI. Y COL. DE TUBO DE COBRE TIPO 'M' 50MM ML 36.0000 $694.38 $24,997.85

520.1.56 SUMI. Y COL. DE CODO COBRE 90-50MM PZA 2.0000 $258.94 $517.87

520.1.57 PZA 1.0000 $1,938.94 $1,938.94

520.1.58 SUM.COL ADAPTADOR MACHO HID 38MM PZA 2.0000 $38.47 $76.93

520.1.59 SUM.COL TUERCA UNION HID PVC 38MM PZA 2.0000 $123.18 $246.37

520.1.60 SUM Y COL. DE CODO PVC HID CEMENTAR 45 GRADOS 32 MM PZA 2.0000 $39.92 $79.84

SUMI. Y COL. DE VALVULA DE ACOPLADO RAPIDO MCA. RAIND BIRD DE 25

SUMI. Y COL. DE CODO GIRATORIO MCA RAIND BIRD DE 25 X 19

SUMI. Y COL. DE NIPLE Fo. GALVANIZADO DE 25 MM X 10 CMS DE LONGITUD.

SUMI. Y COL. DE ADAPTADOR HEMBRA DE PVC HIDRAULICO CEMENTAR Y ROSCA INT. DE 25 MM.

SUM. Y COLOC. VALVULA WALWORTH COMPUERTA BRONCE DE 38 MM

Page 22: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

22 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

520.1.61 SUM Y COL DE CODO PVC HID CEMENTAR 45-38MM PZA 1.0000 $47.59 $47.59

SUBTOTAL $203,375.40

530 INSTALACION ELECTRICA EXTERIOR

530.2 ALUMBRADO EXTERIOR

530.2.1 SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 21 MM M.L. 64.2000 $10.28 $660.10

530.2.2 SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 27MM M.L. 38.9900 $13.38 $521.58

530.2.3 SUM. Y COLOC. DE CODO PVC PESADO DE 21MM PZA 15.0000 $9.48 $142.15

530.2.4 SUM. Y COLOC. DE CODO PVC PESADO DE 27MM PZA 18.0000 $13.17 $236.97

530.2.5 SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 21MM PZA 12.0000 $6.02 $72.25

530.2.6 SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 27MM PZA 8.0000 $10.47 $83.78

530.2.7 SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 21MM PZA 12.0000 $4.59 $55.08

530.2.8 SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 27MM PZA 10.0000 $6.96 $69.64

530.2.9 SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14 M.L. 165.0000 $4.83 $797.54

530.2.10 SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 19MM PZA 8.0000 $27.45 $219.63

530.2.11 PZA 8.0000 $2.85 $22.81

530.2.12 SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 25MM PZA 8.0000 $33.50 $267.97

530.2.13 PZA 8.0000 $3.75 $30.02

530.2.14 SUM. Y COLOC. DE CONDULET LB, LR DE 13MM PZA 5.0000 $69.47 $347.36

530.2.15 SUM. Y COLOC. DE CONDULET LB, LR DE 25MM PZA 6.0000 $110.38 $662.27

530.2.16 SUM. Y COLOC. DE CAB LE THW CAL. 10AWG M.L. 987.4500 $17.39 $17,176.30

530.2.17 SUM. Y COLOC. DE CAB LE THW CAL. 14AWG M.L. 3.5700 $6.17 $22.02

530.2.18 SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 16MM M.L. 26.8900 $22.54 $605.98

530.2.19 SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 21MM M.L. 59.3600 $28.05 $1,664.91

530.2.20 SUM. Y COLOC. DE TUBO CONDUIT P.G.G. DE 16MM M.L. 1.6900 $28.94 $48.91

530.2.21 SUM. Y COLOC. DE CABLE DESNUDO CAL. 10AWG M.L. 189.4400 $10.44 $1,977.94

530.2.22 SUM. Y COLOC. DE CABLE DESNUDO CAL. 12AWG M.L. 1.6900 $7.32 $12.38

530.2.23 IZADO Y PEINADO DE POSTE DE 9M PZA 16.0000 $1,426.74 $22,827.82

530.2.24 PZA 4.0000 $625.67 $2,502.66

530.2.25 PZA 6.0000 $673.37 $4,040.19

530.2.26 PZA 6.0000 $790.31 $4,741.89

530.2.27 SUM. Y COLOC. DE VARILLA ROSCADA DE 3/8" M.L. 22.6000 $13.05 $294.90

530.2.28 SU. Y COLOC. DE PLACA PERFORADA DE 1"X1" PZA 6.0000 $25.30 $151.81

530.2.29 SUM. Y COLOC. DE UNICANAL DE 4X4CM M.L. 12.0000 $57.17 $685.99

530.2.30 SUM. Y COLOC. DE ABRAZADERA UNIC. DE 25MM PZA 8.0000 $6.54 $52.32

530.2.31 M.L. 83.3200 $70.56 $5,879.41

530.2.32 SUM. Y COLOC. DE CODO CONDUIT P.G.G. DE 102 MM PZA 4.0000 $18.82 $75.26

530.2.33 SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14 M.L. 115.6000 $4.83 $558.76

530.2.34 SUM. Y COLOC. DE VARILLA COPPERWELD DE 3/4"X3.0M PZA 5.0000 $199.36 $996.82

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 19MM

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 25MM

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 1 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 2 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 3 LUMINARIOS DE 400W 277V

SUMI. Y COL. DE TUBO DE POLIETILENO ALTA DENSIDAD DE 103 MM

Page 23: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

23 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

530.2.35 PZA 5.0000 $162.21 $811.06

SUBTOTAL $69,316.49

540 ALBAÑILERIA EXTERIOR (OBRA CIVIL EXTERIOR)

540.1 BANQUETAS (INCLUIR PERIMETRALES)

540.1.1 M2 100.0000 $191.16 $19,116.00

540.1.2 ML 70.0000 $63.23 $4,426.10

540.1.3 PZA 1.0000 $3,146.08 $3,146.08

SUBTOTAL $26,688.18

540.2 GUARNICIONES

540.2.1 ML 100.0000 $221.04 $22,104.00

SUBTOTAL $22,104.00

540.3 TOPES

540.3.1 PZA 35.0000 $343.13 $12,009.55

SUBTOTAL $12,009.55

540.4 OBRA CIVIL INSTALACION ELECTRICA DE EXTERIORES

INSTALACION ELECTRICA DE EXTERIORES TELEFONICA

540.4.1 M2 10.1500 $4.91 $49.84

540.4.2 M3 6.0900 $41.08 $250.18

540.4.3 M3 6.0900 $75.10 $457.36

SUM. Y COLOC. DE CONEXIÓN MECANICA MOD. GAR6429 DE VARILLA A CABLE

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO HIDRAULICO F`c=200 KG/CM2, DE 10 CMS DE ESPESOR COLADO EN TABLEROS DE 2X2, CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. ESPESOR, MATERIALES MANO DE OBRA Y HERRAMIENTA.

JUNTA ASERRADA DE CONTRO L TIPICA (JA) EN PISOS Y/O BANQUETAS DE CONCRETO, RELLENO DE MATERIAL ELASTICO SL1 DE SONEBORN.

ELABORACIÓN DE RAMPAS PARA DISCAPACITADOS DE CONCRETO F´c=200 KG/CM2 DE 10 cms DE ESPESOR, ARMADAS CON MALLA 6/6 10 - 10, DE FORMA TRAPEZOIDAL DE 5.00 X 2.50 M. , ACABADO ESCOBILLADO, INCLUYE: MATERIALES, MANO DE OBRA HERRAMIENTA Y EQUIPO.

GUARNICION DE CONCRETO F'c=200 KG/CM2 DE 15 X 30 X 40 CM, TIPO 1 TRAPEZOIDAL INCLUYE: MATERIALES, CIMBRA Y DESCIMBRA MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE TOPE TIPO PARK-IT CON ADHESIVO DE URETANO ( ADHESIVO PREMIUM PL) FIJADO EN CARPETA ASFALTICA CON 4 CLAVOS DE CABEZA PLANA DE 14" DE LONGITUD DE 0.60 M. PREFABRICADO TIPO PARK-IT, ADHESIVO, CLAVOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA COLOCACION

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

Page 24: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

24 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

540.4.4 M2 10.1500 $44.21 $448.73

540.4.5 PZA 2.0000 $6,108.35 $12,216.70

540.4.6 M3 7.9170 $107.61 $851.95

540.4.7 M3 1.0150 $182.37 $185.11

ALUMBRADO EXTERIOR

540.4.8 M2 114.6800 $4.91 $563.08

540.4.9 LT 17.2020 $31.72 $545.65

540.4.10 M3 114.6780 $41.08 $4,710.97

540.4.11 M2 114.6800 $44.21 $5,070.00

540.4.12 M3 11.4680 $182.37 $2,091.42

540.4.13 PZA 4.0000 $4,676.94 $18,707.76

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CONSTRUCCIÓN DE REGISTROS TELEFONICO DE 1.40 X 0.70 X 0.75 M. MEDIDAS INTERIORES DE PROFUNDIDAD, A BASE DE MUROS DE TABIQUE ROJO RECOCIDO, FIRME ARMADO F´c=200 KG/CM2 CON 4 VRS # 3 @ 20 CM. Y CADENA PERIMETRAL 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. CON ARENERO, ACABADO PULIDO EN INTERIOR. INCLUYE: EXCAVACION, PLANTILLA, TAPA DE PLACA DE CONCRETO ARMADO , MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE GROUT EN PLACAS DE COLUMNAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

CONSTRUCCIÓN DE REGISTRO ELECTRICO A BASE MUROS DE TABIQUE JUNTEADO CON MORTERO CEMENTO - ARENA 1:4, SECCIÓN 0.60 X 0.60 X 0.80 M. CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, CADENA SUPERIOR CON 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. TAPA DE CONCRETO F'c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM, CON MARCO Y CONTRAMARCO DE ANGULO 4" X 4" X1/4" Y ANGULO DE 3 1/2" X 3 1/2" X 1/4" INCLUYE: EXCAVACIÓN, RELLENO, ACARREO, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 25: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

25 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

540.4.14 M3 85.6000 $75.10 $6,428.56

540.4.15 M3 149.0814 $107.61 $16,042.65

MEDIA TENSION

540.4.16 M2 20.8300 $4.91 $102.28

540.4.17 M3 12.4980 $41.08 $513.42

540.4.18 M2 20.8300 $44.21 $920.89

540.4.19 M3 9.9900 $75.10 $750.25

540.4.20 PZA 1.0000 $9,572.41 $9,572.41

540.4.21 M3 16.2470 $107.61 $1,748.34

540.4.22 M3 2.0830 $182.37 $379.88

540.4.23 PZA 1.0000 $6,606.30 $6,606.30

SUBTOTAL $89,213.71

540.5 OBRA CIVIL INSTALACION HIDRAULICA DE EXTERIORES

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

FABRICACIÓN DE REGISTRO DE ALTA TENSION SECCION 1.16 X 1.16 X 1.16 M, ARMADO CON VARILLA DEL No. 3 @ 20 CM. AMBOS SENTIDOS CON MUROS DE CONCRETO F'c= 250 KG/CM2 DE 8 CM. Y LOSA INFERIOR DE 10 CM. INCLUYE: TAPA DE FIERRO FUNDIDO ESPECIFICACIÓN DCS-4-07 CON PESO MINIMO 75 KG Y DIGA L Y F., MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM

Page 26: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

26 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

RED DE RIEGO

540.5.1 M2 60.4520 $4.91 $296.82

540.5.2 M2 60.4520 $44.21 $2,672.58

540.5.3 M3 39.2938 $41.08 $1,614.19

540.5.4 M3 51.0820 $107.61 $5,496.93

540.5.5 M3 6.0450 $182.37 $1,102.43

540.5.6 M3 60.4520 $75.10 $4,539.95

540.5.7 PZA 3.0000 $4,436.05 $13,308.15

540.5.8 M3 13.0500 $1,260.97 $16,455.66

540.5.9 PZA 6.0000 $376.66 $2,259.96

LINEA DE ALIMENTACION DE AGUA POTABLE

540.5.10 M2 80.0190 $4.91 $392.89

540.5.11 M3 48.0110 $41.08 $1,972.29

540.5.12 M3 48.0110 $75.10 $3,605.63

540.5.13 M3 62.4143 $107.61 $6,716.40

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

SUMINISTRO Y FABRICACIÓN DE ENCOFRADO DE TUBERIA A BASE DE CONCRETO CICLOPEO F'C=100 KG/CM2 DE 0.10 M. DE PERALTE. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN

FABRICACIÓN DE ATRAQUES DE CONCRETO F'C= 150 KG/CM2 DE 0.30 X 0.30 X 0.30 M, INCLUYE: CIMBRA COMUN, MATERIALES, MANO DE OBRA, HERRRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 27: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

27 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

540.5.14 M2 80.0190 $44.21 $3,537.64

540.5.15 M3 8.0019 $182.37 $1,459.31

540.5.16 PZA 1.00 $8,607.99 $8,607.99

540.5.17 PZA 1.00 $5,734.94 $5,734.94

SUBTOTAL $79,773.76

540.7 MUROS DE CONCRETO DE CONTENCION

540.7.2 M3 0.0000 $0.00 $0.00

540.7.3 M2 0.0000 $0.00 $0.00

540.7.4 M2 0.0000 $0.00 $0.00

540.7.5 TON 0.0000 $0.00 $0.00

540.7.6 TON 0.0000 $0.00 $0.00

540.7.7 M3 0.0000 $0.00 $0.00

540.7.8 M2 0.0000 $0.00 $0.00

540.7.9 M2 0.0000 $0.00 $0.00

540.7.10 M2 0.0000 $0.00 $0.00

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

SUMINISTRO Y FABRICACIÓN DE NICHO PARA CUADRO DE TUBERIA DE AGUA POTABLE A BASE DE MUROS DE BLOCK DE 15 cms Y LOSA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 10 cms DE ESPESOR Y CADENA PERIMETRAL DE 0.20 CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE 1/4" A CADA 20 cms, SECCION 0.80 X 0.50 X1.30 mts Y 2 PUERTAS TIPO LOUVER DE 0.33 X 0.54 mt CADA UNO CON MARCOS DE ANGULO.

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 ( 3/8"), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE MALLA CICLONICA CAL 10.5 CON CINTA DE PVC VERDE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE CIMBRA COMUN EN CIMENTACIÓN Y/O CISTERNA, A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

Page 28: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

28 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

540.7.11 M3 0.0000 $0.00 $0.00

540.7.12 M3 0.0000 $0.00 $0.00

540.7.13 PZA 9.0000 $943.04 $8,487.36

540.7.14 ML 17.0000 $1,018.62 $17,316.54

540.7.15 PZA 1.0000 $5,876.64 $5,876.64

SUBTOTAL $31,680.54

540.9 BASES PARA POSTES DE ALUMBRADO

540.9.1 PZA 3.0000 $11,943.04 $35,829.12

SUBTOTAL $35,829.12

550 PAVIMENTACION

550.1 PAVIMENTO ASFALTICO

550.1.1 M2 2,295.0000 $126.14 $289,491.30

550.1.1 M2 0.0000 $0.00 $0.00

550.1.2 M2 1,606.5000 $16.81 $27,007.84

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO, FABRICACION Y COLOCACION DE POSTE DE PROTECCION ACCESOA TIENDA A BASE DE TUBO DE 4" CED. 40 ACABADO CON PINTURA DE ESMALTE COLOR NEGRO DE 15cm DE ANCHO MCA. SHERWIN WILLIAMS

SUMINISTRO, FABRICACIÓN Y COLOCACIÓN DE BARANDAL DE 1.00 M DE ALTURA EN RAMPA DE DIABLITOS, A BASE DE 2 TRAVESAÑOS Y POSTES A @ 1.14 M DE SEPARACION CON TUBO DE 2" DE DIAM. CED. 40, CON UNA MANO DE PRIMER ANTICORROSIVO Y DOS MANO DE PINTURA AUTOMOTRIZ COLOR AMARILLO TRANSITO, FIJADO AL PISO CON UNA PLACA DE 12 X 12 CM X 1/4" Y TAQUETES DE EXPANSIONDE 3/8".

SUMINISTRO, HABILITADO, FABRICACIÓN Y COLOCACIÓN DE BICICLETERO A BASE DE SOLERA DE 2 X 1/4", 4 X 1/4", 1 1/2" X 1/4" INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA, PINTURA DE ESMALTE Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

CONSTRUCCIÓN DE BASE PARA POSTES DE ALUMBRADO EXTERIOR DE 61 cms DE DIAMETRO (24"), A BASE DE CONCRETO F'c=250 KG/CM2, ARMADO CON 6 VARILLAS DEL No. 5 Y ESTRIBOS DEL No. 3 @ 25 CM (11), ALTURA PROMEDIO DE 1.95, INCLUYE: COLOCACIÓN DE 4 ANCLAS DE 1", ACABADO MARTELINADO HASTA 0.70 mts, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 5 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 8 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA RR-2K, A RAZON DE 0.70 LTO/M2

Page 29: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

29 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

SUBTOTAL $316,499.14

550.2 PAVIMENTO HIDRAULICO

550.2.1 M2 411.0000 $256.15 $105,277.65

550.2.2 ML 75.0000 $144.43 $10,832.25

550.2.3 ML 75.0000 $157.03 $11,777.25

550.2.4 ML 75.0000 $155.60 $11,670.00

550.2.5 M2 411.0000 $72.72 $29,887.92

SUBTOTAL $169,445.07

550.3 ADOQUIN, CAMA DE ARENA PARA ADOQUIN

550.3.1 M2 120.0000 $153.70 $18,444.00

550.3.2 M3 12.0000 $30.63 $367.56

SUBTOTAL $18,811.56

550.4 RIEGO DE IMPREGNACION, POREOS

550.4.1 M2 5,100.0000 $16.81 $85,739.16

550.4.2 M2 5,100.0000 $5.30 $27,030.00

SUBTOTAL $112,769.16

560 SEÑALIZACION

560.1 SEÑALIZACION HORIZONTAL

560.1.1 PZA 6.0000 $275.60 $1,653.60

560.1.2 PZA 3.0000 $2,332.00 $6,996.00

560.1.3 PZA 1.0000 $1,219.00 $1,219.00

560.1.4 M2 65.2500 $48.76 $3,181.59

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 15 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA

JUNTA LONGITUDINAL CONTRACCION (JLC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA TRANSVERSAL DE CONSTRUCCION (JTC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA LONGITUDINAL DE EXPANSION (JLE) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

ACABADO RASTRILLADO EN PISO VEHICULARES DE ESTACIONAMIENTO INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ADOPASTO DE 8 CM DE ESPESOR

SUMINISTRO Y COLOCACION DE CAMA DE ARENA PARA ADOPASTO INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO EN PAVIMENTO DE FLECHAS SENCILLAS DE PINTURA TRANSITO CON REFLEJANTE EN COLOR BLANCO. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE ESTACIONAMIENTO PARA MINUSVALIDOS CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA CAMIONETA DE VALORES DE 5 X 3.80 M CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE CRUCE PEATONAL CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 30: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

30 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

560.1.5 PZA 1.0000 $826.80 $826.80

560.1.6 M2 85.6800 $82.68 $7,084.02

SUBTOTAL $20,961.01

560.2 SEÑALIZACION VERTICAL

560.2.1 COLOCACION DE SEÑALAMIENTO VERTICAL "INFORMATIVA" PZA 12.0000 $1,086.69 $13,040.28

SUBTOTAL $13,040.28

570 CISTERNA

570.1 OBRA CIVIL PARA CISTERNA

570.1.1 M2 70.0800 $4.91 $344.09

570.1.2 M2 3.5040 $93.96 $329.24

570.1.3 TON 4.5060 $16,583.98 $74,727.41

570.1.4 M2 193.8338 $154.47 $29,941.51

570.1.5 M2 47.5614 $185.93 $8,843.09

570.1.6 ML 28.0320 $192.28 $5,389.99

570.1.7 M3 45.6921 $1,621.13 $74,072.83

570.1.8 M2 56.0600 $158.87 $8,906.25

570.1.9 M2 70.0800 $158.87 $11,133.61

570.1.10 M2 85.0000 $158.87 $13,503.95

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA LOGO DE BICICLETERO CON PINTURA ANTIREFLEJANTE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE PINTURA CEBREADA A 45° INTERCALADA AMARILLO-NEGRO EN FRANJAS DE 10CM EN MUROS DE ANDENES EL PRECIO UNITARIO INCLUYE: TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

SUMINISTRO Y COLOCACIÓN DE BANDA OJILLADA DE PVC DE 15 CM. DE ANCHO EN JUNTA DE COLADO EN MUROS DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE SOBRE PLANTILLA PARA LOSA FONDO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE EN ÁREAS DE CONTACTO DE MUROS PERIMETARLES DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y APLICACIÓN DE IMPERMEABILIZACION DE CELDAS DE CISTERNA CON IMPERSEAL COLOR BLANCO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 31: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

31 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

570.1.11 PZA 4.0000 $795.54 $3,182.16

570.1.12 PZA 3.0000 $3,953.38 $11,860.14

570.1.13 PZA 1.0000 $3,953.38 $3,953.38

570.1.14 PZA 2.0000 $4,558.85 $9,117.70

570.1.15 PZA 1.0000 $15,819.77 $15,819.77

570.1.16 PZA 1.0000 $5,498.32 $5,498.32

570.1.17 PZA 2.0000 $3,290.26 $6,580.52

570.1.18 PZA 1.0000 $12,928.61 $12,928.61

570.1.19 M2 3.9670 $290.36 $1,151.86

570.1.20 LTO 92,600.0000 $0.13 $12,038.00

SUBTOTAL $309,322.44

570.2 EXCAVACIONES Y RELLENOS PARA CISTERNA

570.2.1 M3 210.2400 $40.93 $8,605.12

SUMINISTRO Y COLOCACIÓN DE CARRETE A BASE DE TUBO DE ACERO AL CARBON DE 6" DE DIAM. CED. 40 X 50 CM DE LONGITUD, CON DOS PLACAS DE ACERO DE 25 X 25 X 3/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE FIJO TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE PUERTA TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: 2 PUERTAS DE 0.90 X 0.90 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TAPA PARA CUARTO DE BOMBAS EN 2 HOJAS DE 2.10 X 2.10 M CON ÁNGULO 2" X 3/16" Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACION DE REJILLA IRVING SOBRE CARCAMO SECO EN CUARTO DE BOMBAS DE 1.00 X 1.00 DE 1" DE ESPESOR, INCLUYE: MARCO DE ANGULO DE 1 1/4".

SUMINISTRO Y COLOCACION DE VENTILACION DE CISTERNA A BASE DE TUBO GALV. CON "T" Y DOS CODOS DE 4" PROTEJIDAS C/MALLA DE ALAMBRE Y EMBEBIDAS EN EL CONCRETO.

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE BASES PARA BOMBAS, DE ESPESOR 10 CM SOBRE NPT, ARMADA CON VS #3 @ 20 CM, EN AMBOS SENTIDOS, INCLUYE. MATERIAL, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE PRIMERA CARGA DE AGUA A CISTERNA CON PIPA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 32: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

32 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

570.2.2 M2 70.0800 $44.21 $3,098.24

570.2.3 M3 273.3100 $107.61 $29,410.89

570.2.4 M3 84.0960 $75.10 $6,315.61

SUBTOTAL $47,429.86

580 COLECTORES Y DRENAJES

580.1 COLECTORES Y DRENAJES PLUVIALES

580.1.1 M2 69.3240 $4.91 $340.38

580.1.2 M2 69.3240 $44.21 $3,064.81

580.1.3 M3 86.6550 $40.87 $3,541.59

580.1.4 M3 6.9324 $182.37 $1,264.26

580.1.5 M3 86.6550 $75.10 $6,507.79

580.1.6 M3 112.6515 $107.61 $12,122.43

580.1.7 ML 46.3000 $408.08 $18,894.05

580.1.8 ML 8.6700 $499.15 $4,327.67

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10 CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 25 CM. DE DIAMETRO (10"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 30 CM. DE DIAMETRO (12"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

Page 33: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

33 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

580.1.9 ML 2.8000 $772.25 $2,162.31

580.1.10 PZA 4.0000 $6,348.86 $25,395.44

580.1.11 PZA 2.0000 $12,258.64 $24,517.28

580.1.12 ML 39.8498 $802.45 $31,977.47

580.1.13 M2 3.0560 $6,299.65 $19,251.73

SUBTOTAL $153,367.21

580.2 COLECTORES Y DRENAJES SANITARIO

580.2.1 M2 47.6280 $4.91 $233.85

580.2.2 M3 59.5350 $40.87 $2,433.20

580.2.3 M3 4.7628 $182.37 $868.59

SUMINISTRO Y COLOCACIÓN TUBO DE ACERO SOLDABLE C-40 SIN COSTURA de 3" de diámetro, I.NCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCION DE REGISTRO DE SECCION 0.60 X 0.80 M. ( INTERIOR) X 1.50 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F'c=200 KG/CM2 DE 10 CMS DE ESPESOR ARMADA CON VARILLA DEL # 3@ 15 CM EN AMBOS SENTIDOS, MURO DE TABIQUE ROJO RECOCIDO 7X14X28, CON TAPA DE PLACA DE 1/4" ANTIDERRAPANTE CON MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

FABRICACIÓN DE POZO DE VISITA TIPO COMUN CON CAIDA ADOSADA CON MURO DE TABIQUE A TIZON, JUNTEADO CON CEMENTO ARENA 1:3 A UNA PROFUNDIDAD PROMEDIO DE 1.00 M, CON APLANADO INTERIOR CON MORTERO 1:3 Y BASE DE CONCRETO F´C=200KG/CM2 DE 20CM DE ESPESOR, ARMADA CON VARILLAS DEL # 4 @ 30CMEN AMBOS SENTIDOS CIRCULAR DE 1.76MTS DE DIAMETRO (PARA DESPLANTAR TABIQUE). INCLUYE: BROCAL Y TAPA DE FOFO. PARA TAFICO PESADO CON REJILLA DE 160 KG MARCA MYMACO Y ESCALONES DE FOFO., MATERIAL, M.O.,EXCAVACIÓN, HERRAMIENTA Y EQUIPO.

CONSTRUCCION DE CANALALETA DE CONCRETO F'C=200 KG/CM2 DE 10 CMS Y DE 0.50 X 0.29 MTS, ARMADO CON VARILLA DE 1/2" @ 20 CM INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

REJILLA TIPO IRVING IS-01 DE 3/16" X 2 1/2" CON UN ANCHO DE 0.60 M

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

Page 34: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

34 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

580.2.4 M2 47.6280 $44.21 $2,105.63

580.2.5 M3 59.5350 $75.10 $4,471.08

580.2.6 ML 79.3800 $307.01 $24,370.28

580.2.7 PZA 5.0000 $8,279.55 $41,397.75

580.2.8 M3 77.3955 $107.61 $8,328.53

580.2.9 PZA 1.0000 $10,247.65 $10,247.65

CARCAMO DE BOMBEO

570.2.10 M2 42.25 $4.91 $207.45

570.2.11 M3 126.75 $40.93 $5,187.88

570.2.12 M2 42.25 $44.21 $1,867.87

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 20 CM. DE DIAMETRO (8"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCIÓN DE REGISTRO DE SECCIÓN 0.60 X 0.80 M X 1.00 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2, DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, MUROS DE TABIQUE ROJO RECOCIDO 7X14X28 , CON TAPA DE ACERO DE 1/2", MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CONSTRUCCION DE TRAMPA DE GRASA DE 1.50 X 0.70 X 2.00 M. CON MUROS Y LOSA FONDO DE CONCRETO SIMPLE F'C=200 KG/CM2, DE 10 CM. DE ESPESOR, CON 2 TAPAS FABRICADAS DE PLACA DE 1/2" DE ESPESOR , MARCO INTERIOR DE CUADRADO DE 1/2" CAL. 18, REFUERZO CON 2 BARRAS DIAGONALES DE ANGULO DE 1" X 3/16", CONTRAMARCO DE ÁNGULO DE 1 1/4" X 1/4", CON 4 ANCLAS, 2 BISAGRAS DE 3/4", JALA DERA DE REDONDO DE 3/8" DE DIAMETRO Y RECUBRIMIENTO ANTICORROSIVO, INCLUYE: PLANTILLA DE 0.05 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN (NO INCLUYE TUBERIA INTERIOR).

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

Page 35: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

35 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

570.2.13 M3 164.78 $107.61 $17,731.44

570.2.14 M3 105.63 $75.10 $7,932.81

570.2.15 M2 42.25 $93.36 $3,944.46

570.2.16 TON 0.0016 $16,583.98 $26.32

570.2.17 TON 0.0658 $16,583.98 $1,090.89

570.2.18 TON 1.7948 $16,583.98 $29,764.79

570.2.19 TON 0.04372 $16,583.98 $725.05

570.2.20 M2 169.92 $154.47 $26,247.54

570.2.21 M2 34.76 $185.93 $6,462.93

570.2.22 M2 25.04 $1,621.13 $40,593.10

570.2.23 PZA 2.00 $4,558.85 $9,117.70

570.2.24 PZA 1.00 $12,928.61 $12,928.61

570.2.25 PZA 1.00 $7,426.44 $7,426.44

SUBTOTAL $265,711.84

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 2 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 6 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM.

Page 36: Presupuesto Mba Hutabampo 25 de Mayo(1)

SERVICIOS ADMNISTRATIVOS WAL-MART, S. DE R. .L. DE C.V.INMOBILIARIA SIBET, S.A. DE C.V.

36 de 53

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

630 JARDINERIA

630.1 PASTO

630.1.1 SUMINISTRO Y COLOCACION DE PASTO DEDO MORO M2 400.0000 $36.98 $14,792.00

$14,792.00

630.2 PLANTAS, ARBOLES

630.2.1 PZA 0.0000 $0.00 $0.00

SUBTOTAL $0.00

630.3 TIERRA NEGRA

630.3.1 M3 180.0000 $127.06 $22,870.80

630.3.2 PIPA 6.0000 $521.71 $3,130.26

SUBTOTAL $26,001.06

$3,226,358.14

SUMINISTRO Y COLOCACION DE ARBOLES CIPRES ITALIANO ALTURA MINIMA DE 2.50 M. CONFORME A PROYECTO

SUMINISTRO Y COLOCACION DE TIERRA NEGRA, INCLUYE MATERIAL Y MANO DE OBRA

RIEGO DE AREAS VERDES CON UN PIPA DIARIA DE 10,000 LTS ANTES DE LA ENTREGA A STORE PLANNING.

Page 37: Presupuesto Mba Hutabampo 25 de Mayo(1)

TERRACERIAS, OBRA EXTERIOR Y CISTERNA MBA HUTABAMPO, SONORA

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE

220 PRELIMINARES

220.2 TRAZO Y NIVELACION

EVENTO 1.00 -

220.2.2 ML 100.0000 $195.71 $19,571.00

SUBTOTAL $19,571.00

508 TRABAJOS FUERA DE PREDIO

508.2 VIALIDADES FUERA DE PREDIO

508.2.1 M2 450.0000 $13.25 $5,962.50

508.2.2 M3 90.0000 $33.92 $3,052.80

508.2.3 M3 0.0000 $0.00 $0.00

508.2.4 M2 0.0000 $15.90 $0.00

508.2.5 M3 0.0000 $121.90 $0.00

508.2.6 M3 0.0000 $238.50 $0.00

508.2.7 M2 450.0000 $16.81 $7,565.22

508.2.8 M2 450.0000 $5.30 $2,385.00

550.2.2 M2 80.0000 $211.33 $16,906.40

SUBTOTAL $35,871.92

508.6 BANQUETAS FUERA DE PREDIO

508.6.1 M2 300.0000 $213.56 $64,068.00

508.6.2 M2 190.0000 $382.97 $72,764.30

TRABAJOS, PROTECCIONES NECESARIAS CON PLASTICO, CORTES, DESPERDICIOS, ANDAMIOS, ESCALERAS, ACARREOS HASTA LOS TIROS AUTORIZADOS DENTRO Y FUERA DE LA OBRA CON CARGA MANUAL O MECANICA DE LOS MATERIALES SOBRANTES O PRODUCTO DE LAS DEMOLICIONES , TODOS LOS TRABAJOS SON EN HORARIO DIURNO, TODOS LOS CONCURSANTES DEBERÁN CONOCER LAS

CONCEPTO EXT

EVENTO INICIAL DE COLOCACION DE LA "PRIMERA PIEDRA" SERVICIO DE MOBILIARIO, SONIDO Y SERVICIO

DE REFRIGERACION VARIOS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE TAPIAL DE MADERA DE TRIPLAY DE PINO DE 19 MM EN HOJAS COMPLETAS DE 1.22 X 2.44 DE ALTURA, SOPORTADO CON POLINERIA DE 4" X 4" PARA RESGUARDO DE LA OBRA, CON ACABADO EN PINTURA VINILICA COLOR POR DEFINIR, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO I, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 12 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO F'c=200 KG/CM2, DE 10 CM DE ESPESOR, ARMADA CON MALLA ELECTROSOLDADA 6x6/10-10, COLADO EN TABLEROS DE 2x2 CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. DE ESPESOR, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

GUARNICION DE CONCRETO HECHO EN OBRA F'C= 200 KG/CM2 DE 20 X 30 X 40 CM, ARMADA CON 4 VARILLAS 3/8" Y ESTRIBOS DEL No. 3, INCLUYE, EXCAVACION DE 15 CMS, MATERIALES, CIMBRA Y DESCIMBRA, MANO DE OBRA Y HERRAMIENTA

Page 38: Presupuesto Mba Hutabampo 25 de Mayo(1)

SUBTOTAL $136,832.30

Page 39: Presupuesto Mba Hutabampo 25 de Mayo(1)

509 DEMOLICIONES

509.1 DEMOLICIONES

509.1.1 DEMOLICION MURO DE MAMPOSTERIA h=1.80m M2 500.0000 $97.52 $48,760.00

509.1.2 DEMOLICION MURO DE TABIQUE h=4.25m M2 400.0000 $69.75 $27,899.20

509.1.2 M2 210.0000 $212.53 $44,631.30

SUBTOTAL $76,659.20

510 TERRACERIAS

510.1 EXCAVACIONES PARA NIVELACION DE TERRENO, ESCARIFICACION

510.1.1 M2 5,100.0000 $13.25 $67,575.00

510.1.2 M3 1,000.0000 $87.45 $87,450.00

510.1.3 M3 1,709.0000 $58.30 $99,634.70

510.1.3 M3 0.0000 $0.00

510.1.4 M2 0.0000 $0.00

SUBTOTAL $254,659.70

510.2 RELLENOS PARA TERRAPLENES Y PLATAFORMAS

510.2.1 M3 1,900.0000 $121.90 $231,610.00

SUBTOTAL $231,610.00

510.3 MEJORAMIENTOS DE PLATAFORMA CON GRAVA, SUELO-CEMENTO, BASE HIDRÁULICA, ETC.

510.3.1 M3 500.0000 $238.50 $119,250.00

SUBTOTAL $119,250.00

510.4 ACARREOS DE PRODUCTOS DE EXCAVACION

510.4.1 M3 90.0000 $121.90 $10,971.00

510.4.2 M3 2,700.0000 $103.88 $280,476.00

SUBTOTAL $291,447.00

520 INST. HIDRÁULICA EXTERIOR (No incluir obra civil)

520.1 INST. HIDRÁULICA EXTERIOR: TUBERÍA, CODOS, COPLES, T'S, Y'S

520.1.1 M.L 18.6000 $59.77 $1,111.79

520.1.2 M.L 46.5000 $72.01 $3,348.27

520.1.3 M.L 104.6300 $81.42 $8,518.83

520.1.4 PZA 5.0000 $30.75 $153.75

520.1.5 PZA 3.0000 $36.98 $110.95

520.1.6 SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 19 mm. PZA 7.0000 $45.37 $317.58

520.1.7 SUMI. Y COL. DE TEE DE PVC HIDRAULICO DE 38 mm. PZA 5.0000 $71.17 $355.84

520.1.8 PZA 4.0000 $47.59 $190.38

DESMONTEJE DE ESTRUCTURA METALICA SIN RECUPERACION A CUALQUIER ALTURA

TRAZO Y NIVELACION DEL TERRENO CON EQUIPO TOPOGRAFICO, PARA DESPLANTE DE TERRACERIAS.

DESPALME POR MEDIOS MECANICOS DE CAPA VEGETAL EN UN ESPESOR DE 40 CM MAXIMOS

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO II, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CORTE POR MEDIOS MECÁNICOS PARA ABRIR CAJA, EN MATERIAL TIPO III, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ESCARIFICACION Y COMPACTACION AL 90 % DE SU P.V.S.M. DEL TERRENO NATURAL. EN UNA CAPA DE 5 CM. AGREGANDO CAL EN UNA PROPORCION DE 3 KG/M2. INCLUYE: AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO Y COMPACTACIÓN AL 95 % DE SU PVSM DE SUBRASANTE (CON MATERIAL DE BANCO) PARA OBTENER NIVELES DE PROYECTO. INCLUYE: MATERIAL DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

RELLENO Y COMPACTACION AL 95 % DE SU PVSM DE BASE HIDRAULICA DE GRAVA CONTROLADA. INCLUYE: MATERIALES DE BANCO, ACARREOS, AGUA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DE DEMOLICIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

CARGA MECANICA Y ACARREO DE MATERIAL PRODUCTO DEL DESPALME Y EXCAVACIONES, INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 25 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 32 mm.

SUMI. Y COL. DE TUBO DE PVC HIDRAULICO RD 13.5 DE 38 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-19 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90-25 mm.

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 45 X 38 mm.

Page 40: Presupuesto Mba Hutabampo 25 de Mayo(1)

520.1.9 PZA 5.0000 $44.10 $220.48

520.1.10 PZA 5.0000 $38.47 $192.34

520.1.11 SUMI. Y COL. DE EXTREMIDAD ESPIGA DE PVC DE 38 mm. PZA 5.0000 $38.47 $192.34

520.1.12 SUMI. Y COL. DE EXTREMIDAD NIPLE DE PVC DE 25 mm. PZA 6.0000 $48.60 $291.61

520.1.13 SUMI. Y COL. DE VALV C/FLOTADOR A.P. 25MM PZA 2.0000 $974.20 $1,948.41

520.1.14 SUMI. Y COL. DE VALV COMP ROS 125LF02 25MM PZA 2.0000 $579.11 $1,158.22

520.1.15 SUMI. Y COL. DE MEDIDOR DE AGUA DE 38 MM PZA 1.0000 $5,293.78 $5,293.78

520.1.16 SUMI. Y COL. DE CONECTOR COBRE R/INT 13MM PZA 6.0000 $44.36 $266.17

520.1.17 SUMI. Y COL. DE LLAVE NARIZ C/SAL MANG 19CR PZA 1.0000 $314.51 $314.51

520.1.18 SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 50-50 PZA 1.0000 $271.18 $271.18

520.1.19 SUMI. Y COL. DE SOLDADURA CARRETE 'Z' 95-5 PZA 1.0000 $588.52 $588.52

520.1.20 SUMI. Y COL. DE SOLDERING 500GRS. PZA 1.0000 $69.25 $69.25

520.1.21 SUMI. Y COL. DE LIJA ESMERIL 38MM METRO PZA 5.0000 $6.15 $30.74

520.1.22 SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L. PZA 7.0000 $125.29 $877.04

520.1.23 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 4.0000 $96.46 $385.84

520.1.24 SUMI. Y COL. DE ROLLO DE TEFLON 25MM PZA 10.0000 $5.76 $57.56

520.1.25 SUMI. Y COL. DE RED BUSH PVC HID 32-25MM PZA 3.0000 $37.98 $113.94

520.1.26 SUMI. Y COL. DE ADAPTADOR CAMPANA PVC H 25MM PZA 5.0000 $31.76 $158.79

520.1.27 PZA 2.0000 $1,589.27 $3,178.54

520.1.28 PZA 2.0000 $796.30 $1,592.61

520.1.29 SUMI. Y COL. DE ACOPLADOR MCA. RAIND BIRD 25MM PZA 2.0000 $1,263.32 $2,526.64

520.1.30 PZA 2.0000 $45.99 $91.99

520.1.31 PZA 2.0000 $22.05 $44.10

520.1.32 SUMI. Y COL. DE TUBO GALVANIZADO ROSC 25MM ML 1.2000 $163.56 $196.27

520.1.33 SUMI. Y COL. DE ADAPTADOR HEMBRA PVC H 32MM PZA 4.0000 $35.01 $140.05

520.1.34 SUMI. Y COL. DE CODO COBRE 90-32MM PZA 2.0000 $119.02 $238.03

520.1.35 SUMI. Y COL. DE VALV CHECK COL 125LF85T 32MM PZA 1.0000 $772.90 $772.90

520.1.36 SUMI. Y COL. DE VALV COMP ROS 125LF02 13MM PZA 1.0000 $343.60 $343.60

520.1.37 SUMI. Y COL. DE TUBO NEG SOLD C-40 S/C 75MM ML 36.0000 $772.25 $27,801.09

520.1.38 SUMI. Y COL. DE CODO NEG SOLD STD 45-75MM PZA 7.0000 $452.78 $3,169.45

520.1.39 SUMI. Y COL. DE BRIDA CUELLO SOLD 150 LB 75MM PZA 8.0000 $634.04 $5,072.31

520.1.40 SUMI. Y COL. DE JUNTA PLOMO P/BRID 75MM PZA 7.0000 $36.10 $252.73

520.1.41 SUMI. Y COL. DE RONDANA PLANA 3/8' PZA 22.0000 $1.10 $24.25

520.1.42 SUMI. Y COL. DE TORNILLO C/HEX 5/8' X 3' PZA 22.0000 $47.20 $1,038.44

520.1.43 SUMI. Y COL. DE TUERCA HEXAGONAL GALV 5/8' PZA 22.0000 $1.46 $32.18

520.1.44 SUMI. Y COL. DE BOMBA SUMERGIBLE DE 1.5HP 220V PZA 2.0000 $20,623.36 $41,246.72

520.1.45 SUMI. Y COL. DE TABLERO DE CONTROL DE BOMBA PZA 1.0000 $18,936.59 $18,936.59

520.1.46 SUMI. Y COL. DE INTERRUPTOR TIPO PERA PZA 2.0000 $12,365.98 $24,731.96

520.1.47 SUMI. Y COL. DE VALV CHEC BRID 928F 125L 75MM PZA 1.0000 $3,270.73 $3,270.73

520.1.48 SUMI. Y COL. DE VALV COMP BRID 719F 125L 75MM PZA 1.0000 $4,157.57 $4,157.57

520.1.49 SUMI. Y COL. DE SOLDADURA ELECTRICA 60-10 DE 1/8 PZA 25.0000 $102.87 $2,571.83

520.1.50 SUMI. Y COL. DE SOLDADURA ELECTRICA 70-18 DE 1/8 PZA 25.0000 $102.94 $2,573.42

520.1.51 SUMI. Y COL. DE VALV ELIM AIRE SARCO 13W 19 PZA 1.0000 $4,022.22 $4,022.22

520.1.52 SUMI. Y COL. DE ROLLO DE TEFLON 25MM PZA 15.0000 $5.76 $86.34

520.1.53 SUMI. Y COL. DE LIMPIADOR SILER 500GRS. PZA 2.0000 $96.46 $192.92

520.1.54 SUMI. Y COL. DE PEGAMENTO TANGIT TI 475 M.L. PZA 5.0000 $125.29 $626.46

520.1.55 SUMI. Y COL. DE TUBO DE COBRE TIPO 'M' 50MM ML 36.0000 $694.38 $24,997.85

520.1.56 SUMI. Y COL. DE CODO COBRE 90-50MM PZA 2.0000 $258.94 $517.87

520.1.57 PZA 1.0000 $1,938.94 $1,938.94

520.1.58 SUM.COL ADAPTADOR MACHO HID 38MM PZA 2.0000 $38.47 $76.93

520.1.59 SUM.COL TUERCA UNION HID PVC 38MM PZA 2.0000 $123.18 $246.37

520.1.60 PZA 2.0000 $39.92 $79.84

520.1.61 SUM Y COL DE CODO PVC HID CEMENTAR 45-38MM PZA 1.0000 $47.59 $47.59

SUBTOTAL $203,375.40

SUMI. Y COL. DE CODO DE PVC HIDRAULICO DE 90 X 38 mm.

SUMI. Y COL. DE EXTREMIDAD CAMPANA DE PVC DE 38 mm.

SUMI. Y COL. DE VALVULA DE ACOPLADO RAPIDO MCA. RAIND BIRD DE 25

SUMI. Y COL. DE CODO GIRATORIO MCA RAIND BIRD DE 25 X 19

SUMI. Y COL. DE NIPLE Fo. GALVANIZADO DE 25 MM X 10 CMS DE LONGITUD.

SUMI. Y COL. DE ADAPTADOR HEMBRA DE PVC HIDRAULICO CEMENTAR Y ROSCA INT. DE 25 MM.

SUM. Y COLOC. VALVULA WALWORTH COMPUERTA BRONCE DE 38 MM

SUM Y COL. DE CODO PVC HID CEMENTAR 45 GRADOS 32 MM

Page 41: Presupuesto Mba Hutabampo 25 de Mayo(1)

530 INSTALACION ELECTRICA EXTERIOR

530.2 ALUMBRADO EXTERIOR

530.2.1 M.L. 64.2000 $10.28 $660.10

530.2.2 M.L. 38.9900 $13.38 $521.58

530.2.3 SUM. Y COLOC. DE CODO PVC PESADO DE 21MM PZA 15.0000 $9.48 $142.15

530.2.4 SUM. Y COLOC. DE CODO PVC PESADO DE 27MM PZA 18.0000 $13.17 $236.97

530.2.5 PZA 12.0000 $6.02 $72.25

530.2.6 PZA 8.0000 $10.47 $83.78

530.2.7 PZA 12.0000 $4.59 $55.08

530.2.8 PZA 10.0000 $6.96 $69.64

530.2.9 SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14 M.L. 165.0000 $4.83 $797.54

530.2.10 PZA 8.0000 $27.45 $219.63

530.2.11 PZA 8.0000 $2.85 $22.81

530.2.12 PZA 8.0000 $33.50 $267.97

530.2.13 PZA 8.0000 $3.75 $30.02

530.2.14 SUM. Y COLOC. DE CONDULET LB, LR DE 13MM PZA 5.0000 $69.47 $347.36

530.2.15 SUM. Y COLOC. DE CONDULET LB, LR DE 25MM PZA 6.0000 $110.38 $662.27

530.2.16 SUM. Y COLOC. DE CAB LE THW CAL. 10AWG M.L. 987.4500 $17.39 $17,176.30

530.2.17 SUM. Y COLOC. DE CAB LE THW CAL. 14AWG M.L. 3.5700 $6.17 $22.02

530.2.18 SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 16MM M.L. 26.8900 $22.54 $605.98

530.2.19 SUM. Y COLOC. DE TUBO CONDUIT P.D.G. DE 21MM M.L. 59.3600 $28.05 $1,664.91

530.2.20 SUM. Y COLOC. DE TUBO CONDUIT P.G.G. DE 16MM M.L. 1.6900 $28.94 $48.91

530.2.21 SUM. Y COLOC. DE CABLE DESNUDO CAL. 10AWG M.L. 189.4400 $10.44 $1,977.94

530.2.22 SUM. Y COLOC. DE CABLE DESNUDO CAL. 12AWG M.L. 1.6900 $7.32 $12.38

530.2.23 IZADO Y PEINADO DE POSTE DE 9M PZA 16.0000 $1,426.74 $22,827.82

530.2.24 PZA 4.0000 $625.67 $2,502.66

530.2.25 PZA 6.0000 $673.37 $4,040.19

530.2.26 PZA 6.0000 $790.31 $4,741.89

530.2.27 SUM. Y COLOC. DE VARILLA ROSCADA DE 3/8" M.L. 22.6000 $13.05 $294.90

530.2.28 SU. Y COLOC. DE PLACA PERFORADA DE 1"X1" PZA 6.0000 $25.30 $151.81

530.2.29 SUM. Y COLOC. DE UNICANAL DE 4X4CM M.L. 12.0000 $57.17 $685.99

530.2.30 SUM. Y COLOC. DE ABRAZADERA UNIC. DE 25MM PZA 8.0000 $6.54 $52.32

530.2.31 M.L. 83.3200 $70.56 $5,879.41

530.2.32 SUM. Y COLOC. DE CODO CONDUIT P.G.G. DE 102 MM PZA 4.0000 $18.82 $75.26

530.2.33 SUM. Y COLOC. DE ALAMBRE GALVANIZADO CAL. 14 M.L. 115.6000 $4.83 $558.76

530.2.34 SUM. Y COLOC. DE VARILLA COPPERWELD DE 3/4"X3.0M PZA 5.0000 $199.36 $996.82

530.2.35 PZA 5.0000 $162.21 $811.06

SUBTOTAL $69,316.49

540 ALBAÑILERIA EXTERIOR (OBRA CIVIL EXTERIOR)

540.1 BANQUETAS (INCLUIR PERIMETRALES)

540.1.1 M2 100.0000 $191.16 $19,116.00

540.1.2 ML 70.0000 $63.23 $4,426.10

SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 21 MM

SUM. Y COLOC. DE TUBO CONDUIT PVC PESADO DE 27MM

SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 21MM

SUM. Y COLOC. DE CONECTOR TUBO PVC PESADO DE 27MM

SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 21MM

SUM. Y COLOC. DE SEPARADOR TUBO PVC PESADO DE 27MM

SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 19MM

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 19MM

SUM. Y COLOC. DE CAJA REGISTRO GALVANIZADA DE 25MM

SUM. Y COLOC. DE TAPA CAJA REGISTRO GALVANIZADA DE 25MM

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 1 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 2 LUMINARIOS DE 400W 277V

COLOC. DE LUMINARIO SOMERSET CONJUNTO DE 3 LUMINARIOS DE 400W 277V

SUMI. Y COL. DE TUBO DE POLIETILENO ALTA DENSIDAD DE 103 MM

SUM. Y COLOC. DE CONEXIÓN MECANICA MOD. GAR6429 DE VARILLA A CABLE

SUMINISTRO Y COLOCACIÓN DE BANQUETA DE CONCRETO HIDRAULICO F`c=200 KG/CM2, DE 10 CMS DE ESPESOR COLADO EN TABLEROS DE 2X2, CON ACABADO ESCOBILLADO. INCLUYE: RELLENO CON TEPETATE DE 10 CM. ESPESOR, MATERIALES MANO DE OBRA Y HERRAMIENTA.

JUNTA ASERRADA DE CONTRO L TIPICA (JA) EN PISOS Y/O BANQUETAS DE CONCRETO, RELLENO DE MATERIAL ELASTICO SL1 DE SONEBORN.

Page 42: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.1.3 PZA 1.0000 $3,146.08 $3,146.08

SUBTOTAL $26,688.18

540.2 GUARNICIONES

540.2.1 ML 100.0000 $221.04 $22,104.00

SUBTOTAL $22,104.00

540.3 TOPES

540.3.1 PZA 35.0000 $343.13 $12,009.55

SUBTOTAL $12,009.55

540.4 OBRA CIVIL INSTALACION ELECTRICA DE EXTERIORES

INSTALACION ELECTRICA DE EXTERIORES TELEFONICA

540.4.1 M2 10.1500 $4.91 $49.84

540.4.2 M3 6.0900 $41.08 $250.18

540.4.3 M3 6.0900 $75.10 $457.36

540.4.4 M2 10.1500 $44.21 $448.73

540.4.5 PZA 2.0000 $6,108.35 $12,216.70

540.4.6 M3 7.9170 $107.61 $851.95

540.4.7 M3 1.0150 $182.37 $185.11

ALUMBRADO EXTERIOR

540.4.8 M2 114.6800 $4.91 $563.08

540.4.9 LT 17.2020 $31.72 $545.65

540.4.10 M3 114.6780 $41.08 $4,710.97

ELABORACIÓN DE RAMPAS PARA DISCAPACITADOS DE CONCRETO F´c=200 KG/CM2 DE 10 cms DE ESPESOR, ARMADAS CON MALLA 6/6 10 - 10, DE FORMA TRAPEZOIDAL DE 5.00 X 2.50 M. , ACABADO ESCOBILLADO, INCLUYE: MATERIALES, MANO DE OBRA HERRAMIENTA Y EQUIPO.

GUARNICION DE CONCRETO F'c=200 KG/CM2 DE 15 X 30 X 40 CM, TIPO 1 TRAPEZOIDAL INCLUYE: MATERIALES, CIMBRA Y DESCIMBRA MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE TOPE TIPO PARK-IT CON ADHESIVO DE URETANO ( ADHESIVO PREMIUM PL) FIJADO EN CARPETA ASFALTICA CON 4 CLAVOS DE CABEZA PLANA DE 14" DE LONGITUD DE 0.60 M. PREFABRICADO TIPO PARK-IT, ADHESIVO, CLAVOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA COLOCACION

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CONSTRUCCIÓN DE REGISTROS TELEFONICO DE 1.40 X 0.70 X 0.75 M. MEDIDAS INTERIORES DE PROFUNDIDAD, A BASE DE MUROS DE TABIQUE ROJO RECOCIDO, FIRME ARMADO F´c=200 KG/CM2 CON 4 VRS # 3 @ 20 CM. Y CADENA PERIMETRAL 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. CON ARENERO, ACABADO PULIDO EN INTERIOR. INCLUYE: EXCAVACION, PLANTILLA, TAPA DE PLACA DE CONCRETO ARMADO , MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE GROUT EN PLACAS DE COLUMNAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 43: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.4.11 M2 114.6800 $44.21 $5,070.00

540.4.12 M3 11.4680 $182.37 $2,091.42

540.4.13 PZA 4.0000 $4,676.94 $18,707.76

540.4.14 M3 85.6000 $75.10 $6,428.56

540.4.15 M3 149.0814 $107.61 $16,042.65

MEDIA TENSION

540.4.16 M2 20.8300 $4.91 $102.28

540.4.17 M3 12.4980 $41.08 $513.42

540.4.18 M2 20.8300 $44.21 $920.89

540.4.19 M3 9.9900 $75.10 $750.25

540.4.20 PZA 1.0000 $9,572.41 $9,572.41

540.4.21 M3 16.2470 $107.61 $1,748.34

540.4.22 M3 2.0830 $182.37 $379.88

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

CONSTRUCCIÓN DE REGISTRO ELECTRICO A BASE MUROS DE TABIQUE JUNTEADO CON MORTERO CEMENTO - ARENA 1:4, SECCIÓN 0.60 X 0.60 X 0.80 M. CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, CADENA SUPERIOR CON 4 VRS # 3 Y ESTRIBOS # 2 @ 20 CM. TAPA DE CONCRETO F'c=200 KG/CM2 DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM, CON MARCO Y CONTRAMARCO DE ANGULO 4" X 4" X1/4" Y ANGULO DE 3 1/2" X 3 1/2" X 1/4" INCLUYE: EXCAVACIÓN, RELLENO, ACARREO, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

FABRICACIÓN DE REGISTRO DE ALTA TENSION SECCION 1.16 X 1.16 X 1.16 M, ARMADO CON VARILLA DEL No. 3 @ 20 CM. AMBOS SENTIDOS CON MUROS DE CONCRETO F'c= 250 KG/CM2 DE 8 CM. Y LOSA INFERIOR DE 10 CM. INCLUYE: TAPA DE FIERRO FUNDIDO ESPECIFICACIÓN DCS-4-07 CON PESO MINIMO 75 KG Y DIGA L Y F., MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

Page 44: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.4.23 PZA 1.0000 $6,606.30 $6,606.30

SUBTOTAL $89,213.71

540.5 OBRA CIVIL INSTALACION HIDRAULICA DE EXTERIORES

RED DE RIEGO

540.5.1 M2 60.4520 $4.91 $296.82

540.5.2 M2 60.4520 $44.21 $2,672.58

540.5.3 M3 39.2938 $41.08 $1,614.19

540.5.4 M3 51.0820 $107.61 $5,496.93

540.5.5 M3 6.0450 $182.37 $1,102.43

540.5.6 M3 60.4520 $75.10 $4,539.95

540.5.7 PZA 3.0000 $4,436.05 $13,308.15

540.5.8 M3 13.0500 $1,260.97 $16,455.66

540.5.9 PZA 6.0000 $376.66 $2,259.96

LINEA DE ALIMENTACION DE AGUA POTABLE

540.5.10 M2 80.0190 $4.91 $392.89

540.5.11 M3 48.0110 $41.08 $1,972.29

540.5.12 M3 48.0110 $75.10 $3,605.63

540.5.13 M3 62.4143 $107.61 $6,716.40

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

SUMINISTRO Y FABRICACIÓN DE ENCOFRADO DE TUBERIA A BASE DE CONCRETO CICLOPEO F'C=100 KG/CM2 DE 0.10 M. DE PERALTE. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN

FABRICACIÓN DE ATRAQUES DE CONCRETO F'C= 150 KG/CM2 DE 0.30 X 0.30 X 0.30 M, INCLUYE: CIMBRA COMUN, MATERIALES, MANO DE OBRA, HERRRAMIENTA Y EQUIPO.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 45: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.5.14 M2 80.0190 $44.21 $3,537.64

540.5.15 M3 8.0019 $182.37 $1,459.31

540.5.16 PZA 1.00 $8,607.99 $8,607.99

540.5.17 PZA 1.00 $5,734.94 $5,734.94

SUBTOTAL $79,773.76

540.7 MUROS DE CONCRETO DE CONTENCION

540.7.2 M3 0.0000 $0.00 $0.00

540.7.3 M2 0.0000 $0.00 $0.00

540.7.4 M2 0.0000 $0.00 $0.00

540.7.5 TON 0.0000 $0.00 $0.00

540.7.6 TON 0.0000 $0.00 $0.00

540.7.7 M3 0.0000 $0.00 $0.00

540.7.8 M2 0.0000 $0.00 $0.00

540.7.9 M2 0.0000 $0.00 $0.00

540.7.10 M2 0.0000 $0.00 $0.00

540.7.11 M3 0.0000 $0.00 $0.00

540.7.12 M3 0.0000 $0.00 $0.00

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10CM DE ESPESOR

SUMINISTRO Y FABRICACIÓN DE NICHO PARA CUADRO DE TUBERIA DE AGUA POTABLE A BASE DE MUROS DE BLOCK DE 15 cms Y LOSA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 10 cms DE ESPESOR Y CADENA PERIMETRAL DE 0.20 CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE 1/4" A CADA 20 cms, SECCION 0.80 X 0.50 X1.30 mts Y 2 PUERTAS TIPO LOUVER DE 0.33 X 0.54 mt CADA UNO CON MARCOS DE ANGULO.

CONSTRUCCION DE CAJA DE REGISTRO PARA VALVULAS DE 0.60 X 0.90 X 0.70 M. DE DIMENSIONES INTERIORES A BASE DE TABIQUE ROJO RECOCIDO Y TAPA DE CONCRETO

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 ( 3/8"), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE MALLA CICLONICA CAL 10.5 CON CINTA DE PVC VERDE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE CIMBRA COMUN EN CIMENTACIÓN Y/O CISTERNA, A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 46: Presupuesto Mba Hutabampo 25 de Mayo(1)

540.7.13 PZA 9.0000 $943.04 $8,487.36

540.7.14 ML 17.0000 $1,018.62 $17,316.54

540.7.15 PZA 1.0000 $5,876.64 $5,876.64

SUBTOTAL $31,680.54

540.9 BASES PARA POSTES DE ALUMBRADO

540.9.1 PZA 3.0000 $11,943.04 $35,829.12

SUBTOTAL $35,829.12

550 PAVIMENTACION

550.1 PAVIMENTO ASFALTICO

550.1.1 M2 2,295.0000 $126.14 $289,491.30

550.1.1 M2 0.0000 $0.00 $0.00

550.1.2 M2 1,606.5000 $16.81 $27,007.84

SUBTOTAL $316,499.14

550.2 PAVIMENTO HIDRAULICO

550.2.1 M2 411.0000 $256.15 $105,277.65

550.2.2 ML 75.0000 $144.43 $10,832.25

550.2.3 ML 75.0000 $157.03 $11,777.25

550.2.4 ML 75.0000 $155.60 $11,670.00

550.2.5 M2 411.0000 $72.72 $29,887.92

SUBTOTAL $169,445.07

SUMINISTRO, FABRICACION Y COLOCACION DE POSTE DE PROTECCION ACCESOA TIENDA A BASE DE TUBO DE 4" CED. 40 ACABADO CON PINTURA DE ESMALTE COLOR NEGRO DE 15cm DE ANCHO MCA. SHERWIN WILLIAMS

SUMINISTRO, FABRICACIÓN Y COLOCACIÓN DE BARANDAL DE 1.00 M DE ALTURA EN RAMPA DE DIABLITOS, A BASE DE 2 TRAVESAÑOS Y POSTES A @ 1.14 M DE SEPARACION CON TUBO DE 2" DE DIAM. CED. 40, CON UNA MANO DE PRIMER ANTICORROSIVO Y DOS MANO DE PINTURA AUTOMOTRIZ COLOR AMARILLO TRANSITO, FIJADO AL PISO CON UNA PLACA DE 12 X 12 CM X 1/4" Y TAQUETES DE EXPANSIONDE 3/8".

SUMINISTRO, HABILITADO, FABRICACIÓN Y COLOCACIÓN DE BICICLETERO A BASE DE SOLERA DE 2 X 1/4", 4 X 1/4", 1 1/2" X 1/4" INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA, PINTURA DE ESMALTE Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

CONSTRUCCIÓN DE BASE PARA POSTES DE ALUMBRADO EXTERIOR DE 61 cms DE DIAMETRO (24"), A BASE DE CONCRETO F'c=250 KG/CM2, ARMADO CON 6 VARILLAS DEL No. 5 Y ESTRIBOS DEL No. 3 @ 25 CM (11), ALTURA PROMEDIO DE 1.95, INCLUYE: COLOCACIÓN DE 4 ANCLAS DE 1", ACABADO MARTELINADO HASTA 0.70 mts, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 5 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE CARPETA DE CONCRETO ASFALTICO DE 8 CM DE ESPESOR, TENDIDA EN CALIENTE CON EXTENDERORA FINISHER COMPACTADA CON RODILLO LISO AL 95 % MARSHALL., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA RR-2K, A RAZON DE 0.70 LTO/M2

SUMINISTRO Y COLOCACIÓN DE PISO DE CONCRETO PREMEZCLADO MR=36 KG/CM2, DE 15 CM DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA

JUNTA LONGITUDINAL CONTRACCION (JLC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA TRANSVERSAL DE CONSTRUCCION (JTC) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

JUNTA LONGITUDINAL DE EXPANSION (JLE) BASE DE TF-150 MBT DE 13 MM DE ESPESOR X 16 CM DE ALTURA, INCLUYE: PASAJUNTAS DEL No. 10 DE DIAMETRO @ 30.5 CM

ACABADO RASTRILLADO EN PISO VEHICULARES DE ESTACIONAMIENTO INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

Page 47: Presupuesto Mba Hutabampo 25 de Mayo(1)

550.3 ADOQUIN, CAMA DE ARENA PARA ADOQUIN

550.3.1 M2 120.0000 $153.70 $18,444.00

550.3.2 M3 12.0000 $30.63 $367.56

SUBTOTAL $18,811.56

550.4 RIEGO DE IMPREGNACION, POREOS

550.4.1 M2 5,100.0000 $16.81 $85,739.16

550.4.2 M2 5,100.0000 $5.30 $27,030.00

SUBTOTAL $112,769.16

560 SEÑALIZACION

560.1 SEÑALIZACION HORIZONTAL

560.1.1 PZA 6.0000 $275.60 $1,653.60

560.1.2 PZA 3.0000 $2,332.00 $6,996.00

560.1.3 PZA 1.0000 $1,219.00 $1,219.00

560.1.4 M2 65.2500 $48.76 $3,181.59

560.1.5 PZA 1.0000 $826.80 $826.80

560.1.6 M2 85.6800 $82.68 $7,084.02

SUBTOTAL $20,961.01

560.2 SEÑALIZACION VERTICAL

560.2.1 PZA 12.0000 $1,086.69 $13,040.28

SUBTOTAL $13,040.28

570 CISTERNA

570.1 OBRA CIVIL PARA CISTERNA

570.1.1 M2 70.0800 $4.91 $344.09

570.1.2 M2 3.5040 $93.96 $329.24

570.1.3 TON 4.5060 $16,583.98 $74,727.41

570.1.4 M2 193.8338 $154.47 $29,941.51

570.1.5 M2 47.5614 $185.93 $8,843.09

SUMINISTRO Y COLOCACION DE ADOPASTO DE 8 CM DE ESPESOR

SUMINISTRO Y COLOCACION DE CAMA DE ARENA PARA ADOPASTO INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA DE ROMPIMIENTO MEDIO RM-2K, A RAZON DE 1.70 LTS/M2.

SUMINISTRO Y COLOCACIÓN DE POREO CON ARENA PARA PROTECCIÓN DEL RIEGO DE IMPREGNACIÓN DE TERRACERIAS.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO EN PAVIMENTO DE FLECHAS SENCILLAS DE PINTURA TRANSITO CON REFLEJANTE EN COLOR BLANCO. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE ESTACIONAMIENTO PARA MINUSVALIDOS CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA CAMIONETA DE VALORES DE 5 X 3.80 M CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA AREAS DE CRUCE PEATONAL CON PINTURA ANTIREFLEJANTE. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y FABRICACIÓN DE SEÑALAMIENTO HORIZONTAL PARA LOGO DE BICICLETERO CON PINTURA ANTIREFLEJANTE INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE PINTURA CEBREADA A 45° INTERCALADA AMARILLO-NEGRO EN FRANJAS DE 10CM EN MUROS DE ANDENES EL PRECIO UNITARIO INCLUYE: TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

COLOCACION DE SEÑALAMIENTO VERTICAL "INFORMATIVA"

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

Page 48: Presupuesto Mba Hutabampo 25 de Mayo(1)

570.1.6 ML 28.0320 $192.28 $5,389.99

570.1.7 M3 45.6921 $1,621.13 $74,072.83

570.1.8 M2 56.0600 $158.87 $8,906.25

570.1.9 M2 70.0800 $158.87 $11,133.61

570.1.10 M2 85.0000 $158.87 $13,503.95

570.1.11 PZA 4.0000 $795.54 $3,182.16

570.1.12 PZA 3.0000 $3,953.38 $11,860.14

570.1.13 PZA 1.0000 $3,953.38 $3,953.38

570.1.14 PZA 2.0000 $4,558.85 $9,117.70

570.1.15 PZA 1.0000 $15,819.77 $15,819.77

570.1.16 PZA 1.0000 $5,498.32 $5,498.32

PZA 1.0000

570.1.17 PZA 2.0000 $3,290.26 $6,580.52

SUMINISTRO Y COLOCACIÓN DE BANDA OJILLADA DE PVC DE 15 CM. DE ANCHO EN JUNTA DE COLADO EN MUROS DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE SOBRE PLANTILLA PARA LOSA FONDO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABILIZANTE EN ÁREAS DE CONTACTO DE MUROS PERIMETARLES DE CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y APLICACIÓN DE IMPERMEABILIZACION DE CELDAS DE CISTERNA CON IMPERSEAL COLOR BLANCO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE CARRETE A BASE DE TUBO DE ACERO AL CARBON DE 6" DE DIAM. CED. 40 X 50 CM DE LONGITUD, CON DOS PLACAS DE ACERO DE 25 X 25 X 3/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE FIJO TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE PUERTA TIPO "L" EN CUARTO DE BOMBAS DE 2.00 X 0.90 M. CON MARCO DE PERFIL TUBULAR DE 2" X 2" CAL.18 Y LAMINA TIPO LOUVER CON MOSQUITERO, INCLUYE: 2 PUERTAS DE 0.90 X 0.90 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TAPA PARA CUARTO DE BOMBAS EN 2 HOJAS DE 2.10 X 2.10 M CON ÁNGULO 2" X 3/16" Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACION DE REJILLA IRVING SOBRE CARCAMO SECO EN CUARTO DE BOMBAS DE 1.00 X 1.00 DE 1" DE ESPESOR, INCLUYE: MARCO DE ANGULO DE 1 1/4".

CONCEPTO EXT EXTRAORDINARIO SUMINISTRO Y COLOCACION DE

REJILLA IRVING SOBRE CARCAMO SECO EN CUARTO DE BOMBAS DE 1.08 X 1.10 DE 1" DE ESPESOR, INCLUYE: MARCO DE ANGULO DE 1 1/4".

SUMINISTRO Y COLOCACION DE VENTILACION DE CISTERNA A BASE DE TUBO GALV. CON "T" Y DOS CODOS DE 4" PROTEJIDAS C/MALLA DE ALAMBRE Y EMBEBIDAS EN EL CONCRETO.

Page 49: Presupuesto Mba Hutabampo 25 de Mayo(1)

570.1.18 PZA 1.0000 $12,928.61 $12,928.61

570.1.19 M2 3.9670 $290.36 $1,151.86

570.1.20 LTO 92,600.0000 $0.13 $12,038.00

SUBTOTAL $309,322.44

570.2 EXCAVACIONES Y RELLENOS PARA CISTERNA

570.2.1 M3 210.2400 $40.93 $8,605.12

570.2.2 M2 70.0800 $44.21 $3,098.24

570.2.3 M3 273.3100 $107.61 $29,410.89

570.2.4 M3 84.0960 $75.10 $6,315.61

SUBTOTAL $47,429.86

580 COLECTORES Y DRENAJES

580.1 COLECTORES Y DRENAJES PLUVIALES

580.1.1 M2 69.3240 $4.91 $340.38

580.1.2 M2 69.3240 $44.21 $3,064.81

580.1.3 M3 86.6550 $40.87 $3,541.59

580.1.4 M3 6.9324 $182.37 $1,264.26

580.1.5 M3 86.6550 $75.10 $6,507.79

580.1.6 M3 112.6515 $107.61 $12,122.43

580.1.7 ML 46.3000 $408.08 $18,894.05

580.1.8 ML 8.6700 $499.15 $4,327.67

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE BASES PARA BOMBAS, DE ESPESOR 10 CM SOBRE NPT, ARMADA CON VS #3 @ 20 CM, EN AMBOS SENTIDOS, INCLUYE. MATERIAL, MANO DE OBRA Y HERRAMIENTA.

SUMINISTRO Y COLOCACIÓN DE PRIMERA CARGA DE AGUA A CISTERNA CON PIPA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN DE 10 CM DE ESPESOR

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 25 CM. DE DIAMETRO (10"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 30 CM. DE DIAMETRO (12"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

Page 50: Presupuesto Mba Hutabampo 25 de Mayo(1)

ML 72.8200

580.1.9 ML 2.8000 $772.25 $2,162.31

580.1.10 PZA 4.0000 $6,348.86 $25,395.44

PZA 1.0000

PZA 2.0000 $12,258.64 $24,517.28

VOL-AD PZA 1.0000 $12,258.64

580.1.12 ML 39.8498 $802.45 $31,977.47

580.1.13 M2 3.0560 $6,299.65 $19,251.73

SUBTOTAL $153,367.21

CONCEPTO EXT

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 38 CM. DE DIAMETRO (15"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN TUBO DE ACERO SOLDABLE C-40 SIN COSTURA de 3" de diámetro, I.NCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCION DE REGISTRO DE SECCION 0.60 X 0.80 M. ( INTERIOR) X 1.50 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F'c=200 KG/CM2 DE 10 CMS DE ESPESOR ARMADA CON VARILLA DEL # 3@ 15 CM EN AMBOS SENTIDOS, MURO DE TABIQUE ROJO RECOCIDO 7X14X28, CON TAPA DE PLACA DE 1/4" ANTIDERRAPANTE CON MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CONCEPTO EXT

FABRICACIÓN DE POZO DE VISITA 1.76 m. DE DIÁMETRO MEDIDA EXTERIOR, DE 0.60 m DE DIAMETRO Y 3.00 m. DE ALTURA PROMEDIO, MEDIDAS INTERIORES, CON BROCAL Y TAPA DE FIERRO FUNDIDO DE 60 cm DE DIAMETRO DE TRAFICO PESADO, MUROS DE TABIQUE ROJO RECOCIDO JUNTEADO CON MORTERO 1:3, APLANADO PULIDO CON MORTERO 1:2 EN MUROS ACABADO PULIDO, LOSA DE FONDO DE CONCRETO F´C=200 kg/cm2, CON VARILLA No. 4 @ 30 cm. EN AMBOS SENTIDOS DE 20 cm DE ESPESOR, CONCRETO F´C=250 kg/cm2, ESCALONES FORJADOS DE VARILLA No. 8 DE 60 de ANCHO, ANCLADOS AL MURO DEL POZO. INCLUYE: EL SUMINISTRO DE LOS MATERIALES, HERRAMIENTA, EQUIPO Y MANO DE OBRA.

580.1.11 LOS POZOS

SON DE 1.44 Y DE 1.60

PROFUNDIDAD

FABRICACIÓN DE POZO DE VISITA TIPO COMUN CON CAIDA ADOSADA CON MURO DE TABIQUE A TIZON,

JUNTEADO CON CEMENTO ARENA 1:3 A UNA PROFUNDIDAD PROMEDIO DE 1.00 M, CON APLANADO INTERIOR CON MORTERO 1:3 Y BASE DE CONCRETO F´C=200KG/CM2 DE 20CM DE ESPESOR, ARMADA CON

VARILLAS DEL # 4 @ 30CMEN AMBOS SENTIDOS CIRCULAR DE 1.76MTS DE DIAMETRO (PARA DESPLANTAR TABIQUE).

INCLUYE: BROCAL Y TAPA DE FOFO. PARA TAFICO PESADO CON REJILLA DE 160 KG MARCA MYMACO Y

ESCALONES DE FOFO., MATERIAL, M.O.,EXCAVACIÓN, HERRAMIENTA Y EQUIPO.

FABRICACIÓN DE POZO DE VISITA TIPO COMUN CON CAIDA ADOSADA CON MURO DE TABIQUE A TIZON, JUNTEADO CON CEMENTO ARENA 1:3 A UNA PROFUNDIDAD PROMEDIO DE 1.00 M, CON APLANADO INTERIOR CON MORTERO 1:3 Y BASE DE CONCRETO F´C=200KG/CM2 DE 20CM DE ESPESOR, ARMADA CON VARILLAS DEL # 4 @ 30CMEN AMBOS SENTIDOS CIRCULAR DE 1.76MTS DE DIAMETRO (PARA DESPLANTAR TABIQUE). INCLUYE: BROCAL Y TAPA DE FOFO. PARA TAFICO PESADO CON REJILLA DE 160 KG MARCA MYMACO Y ESCALONES DE FOFO., MATERIAL, M.O.,EXCAVACIÓN, HERRAMIENTA Y EQUIPO.

CONSTRUCCION DE CANALALETA DE CONCRETO F'C=200 KG/CM2 DE 10 CMS Y DE 0.50 X 0.29 MTS, ARMADO CON VARILLA DE 1/2" @ 20 CM INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

REJILLA TIPO IRVING IS-01 DE 3/16" X 2 1/2" CON UN ANCHO DE 0.60 M

Page 51: Presupuesto Mba Hutabampo 25 de Mayo(1)

580.2 COLECTORES Y DRENAJES SANITARIO

580.2.1 M2 47.6280 $4.91 $233.85

580.2.2 M3 59.5350 $40.87 $2,433.20

580.2.3 M3 4.7628 $182.37 $868.59

580.2.4 M2 47.6280 $44.21 $2,105.63

580.2.5 M3 59.5350 $75.10 $4,471.08

580.2.6 ML 79.3800 $307.01 $24,370.28

ML 2.0000

580.2.7 PZA 5.0000 $8,279.55 $41,397.75

580.2.8 M3 77.3955 $107.61 $8,328.53

PZA

580.2.9 PZA 1.0000 $10,247.65 $10,247.65

CARCAMO DE BOMBEO

570.2.10 M2 42.25 $4.91 $207.45

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO

SUMINISTRO Y COLOCACIÓN DE CAMA DE ARENA PARA TUBERIAS DE 10 CM DE ESPESOR. INCLUYE: MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA ELABORACIÓN.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO EXCAVACION 90% PROCTOR, EN CAPAS DE 20 CM. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD CORRUGADA TIPO HDPE DE 20 CM. DE DIAMETRO (8"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONCEPTO EXT

EXTRAORDINARIO SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIESTILENO DE ALTA DENSIDAD

CORRUGADA TIPO HDPE DE 15 CM. DE DIAMETRO (6"), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

CONSTRUCCIÓN DE REGISTRO DE SECCIÓN 0.60 X 0.80 M X 1.00 M DE PROFUNDIDAD PROMEDIO, CON LOSA INFERIOR DE CONCRETO F´c=200 KG/CM2, DE 10 CM ESP ARMADA CON VRS # 3 @ 15 CM. AMBOS SENTIDOS, MUROS DE TABIQUE ROJO RECOCIDO 7X14X28 , CON TAPA DE ACERO DE 1/2", MARCO DE ANGULO DE 4" X 1/4" Y CONTRAMARCO DE ANGULO DE 3 1/2" X 1/4". INCLUYE: MATERIALES, EXCAVACION, RELLENO, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

CONCEPTO EXT

FABRICACIÓN DE POZO DE VISITA 1.76 m. DE DIÁMETRO MEDIDA EXTERIOR, DE 0.60 m DE DIAMETRO Y 3.00 m. DE ALTURA PROMEDIO, MEDIDAS INTERIORES, CON BROCAL Y TAPA DE FIERRO FUNDIDO DE 60 cm DE DIAMETRO DE TRAFICO PESADO, MUROS DE TABIQUE ROJO RECOCIDO JUNTEADO CON MORTERO 1:3, APLANADO PULIDO CON MORTERO 1:2 EN MUROS ACABADO PULIDO, LOSA DE FONDO DE CONCRETO F´C=200 kg/cm2, CON VARILLA No. CONSTRUCCION DE TRAMPA DE GRASA DE 1.50 X 0.70 X 2.00 M. CON MUROS Y LOSA FONDO DE CONCRETO SIMPLE F'C=200 KG/CM2, DE 10 CM. DE ESPESOR, CON 2 TAPAS FABRICADAS DE PLACA DE 1/2" DE ESPESOR , MARCO INTERIOR DE CUADRADO DE 1/2" CAL. 18, REFUERZO CON 2 BARRAS DIAGONALES DE ANGULO DE 1" X 3/16", CONTRAMARCO DE ÁNGULO DE 1 1/4" X 1/4", CON 4 ANCLAS, 2 BISAGRAS DE 3/4", JALA DERA DE REDONDO DE 3/8" DE DIAMETRO Y RECUBRIMIENTO ANTICORROSIVO, INCLUYE: PLANTILLA DE 0.05 M., MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN (NO INCLUYE TUBERIA INTERIOR).

TRAZO Y NIVELACION DEL TERRENO CON APARATOS TOPOGRAFICOS PARA TERRACERIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO

Page 52: Presupuesto Mba Hutabampo 25 de Mayo(1)

570.2.11 M3 126.75 $40.93 $5,187.88

570.2.12 M2 42.25 $44.21 $1,867.87

570.2.13 M3 164.78 $107.61 $17,731.44

570.2.14 M3 105.63 $75.10 $7,932.81

570.2.15 M2 42.25 $93.36 $3,944.46

570.2.16 TON 0.0016 $16,583.98 $26.32

570.2.17 TON 0.0658 $16,583.98 $1,090.89

570.2.18 TON 1.7948 $16,583.98 $29,764.79

570.2.19 TON 0.04372 $16,583.98 $725.05

570.2.20 M2 169.92 $154.47 $26,247.54

570.2.21 M2 34.76 $185.93 $6,462.93

570.2.22 M2 25.04 $1,621.13 $40,593.10

570.2.23 PZA 2.00 $4,558.85 $9,117.70

570.2.24 PZA 1.00 $12,928.61 $12,928.61

570.2.25 PZA 1.00 $7,426.44 $7,426.44

SUBTOTAL $265,711.84

EXCAVACION A MAQUINA CON RETROEXCAVADORA DE 0.00 A 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

AFINE Y COMPACTACIÓN DE FONDOS DE CEPAS DE CIMENTACIÓN PARA RECIBIR PLANTILLA DE CONCRETO SIMPLE, INCLUYE: RIESGOS NECESARIOS, MANO DE OBRA, EQUIPO DE COMPACTACIÓN CON PISON DE MANO, EQUIPO Y HERRAMIENTA.

CARGA MECANICA Y RETIRO EN CAMION DE VOLTEO DEL MATERIAL PRODUCTO DE LAS EXCAVACIONES. INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO.

RELLENO EN CEPAS DE CIMENTACIÓN Y/O EN CISTERNA CON MATERIAL PRODUCTO DE LA EXCAVACIÓN, COMPACTADO AL 90 % PROCTOR, EN CAPAS DE 20 CM.

SUMINISTRO Y COLOCACION DE PLANTILLA DE CONCRETO PREMEZCLADO F'c=100 KG/CM2, DE 5 CM ESP., INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 2 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 3 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 4 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO EN CIMENTACIONES Fy=4200 KG/CM2 DEL No. 6 (12.7 MM), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

SUMINISTRO Y COLOCACION DE CIMBRA APARENTE EN CIMENTACION A CUALQUIER PROFUNDIDAD.

SUMINISTRO Y COLOCACION DE CIMBRA DE CONTACTO EN LOSA DE CISTERNA, INCLUE: CIMBRA EN FRONTERAS, CIMBRA Y DESCIMBRA.

SUMINISTRO Y COLOCACIÓN DE CONCRETO PREMEZCLADO F'=250 KG/CM2, RESISTENCIA NORMAL, TMA 19 MM, REV. 12, CON IMPERMEABILIZANTE INTEGRAL, EN CISTERNA, INCLUYE: MATERIALES, MANO DE OBRA, BOMBEO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE TAPA DE CISTERNA DE 0.95 X 0.95 M. CON ANGULO Y PLACA 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE ESCALERA MARINA EN CUARTO DE MAQUINAS DE 4.45 X 0.60 M. CON TUBO 3/4" Y TRAVESAÑOS @ 30 cm CON PROTECCIÓN DE SOLERA DE 2" X 1/8", INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y FABRICACIÓN DE NICHO PARA INSTRUMENTOS DE MEDICION ELECTRICA A BASE DE UNA DALA PERIMETRAL DE DESPLANTE EN UN RECTANGULO DE 1.10 X 0.60 M, DOS MURETES DE TABIQUE ROJO RECOCIDO DE 0.60 X 2.00 M DE ALTURA, CON LOSA INTERMEDIA Y LOSA TAPA DE CONCRETO ARMADO CON VARILLA 3/8" A CADA 15 cms, DE 8 cms DE ESPESOR. INCLUYE UNA PUERTA DE ALUMINIO NATURAL CON PERFIL DE 1 1/2" CRISTAL DE 6 MM TRANSPARENTE, CON PORTACANDADO DE 84 X 45 CM.

Page 53: Presupuesto Mba Hutabampo 25 de Mayo(1)

630 JARDINERIA

630.1 PASTO

630.1.1 SUMINISTRO Y COLOCACION DE PASTO DEDO MORO M2 400.0000 $36.98 $14,792.00

VOL-AD

SUMINISTRO Y COLOCACION DE PASTO DEDO MORO M2 314.3800 $36.98

$14,792.00

630.2 PLANTAS, ARBOLES

CONCEPTO EXT PZA 17.0000

630.2.1 PZA 0.0000 $0.00 $0.00

SUBTOTAL $0.00

630.3 TIERRA NEGRA

630.3.1 M3 180.0000 $127.06 $22,870.80

630.3.2 PIPA 6.0000 $521.71 $3,130.26

SUBTOTAL $26,001.06

$3,226,358.14

SUMINISTRO Y COLOCACION DE ARBOLES FICUS A UNA ALTURA MINIMA DE 2.50 M CONFORMEMA PROYECTO

SUMINISTRO Y COLOCACION DE ARBOLES CIPRES ITALIANO ALTURA MINIMA DE 2.50 M. CONFORME A PROYECTO

SUMINISTRO Y COLOCACION DE TIERRA NEGRA, INCLUYE MATERIAL Y MANO DE OBRA

RIEGO DE AREAS VERDES CON UN PIPA DIARIA DE 10,000 LTS ANTES DE LA ENTREGA A STORE PLANNING.