Crystal Reports ActiveX Designer - PresupuestoCliente.Rpt
UNIVERSIDAD NACIONAL DEL ALTIPLANO PUNO INGENIERA DE MINAS
ItemDescripcinUnd.MetradoPrecio S.Parcial S.
OBRAS PROVISIONALES800.00
CARTEL DE OBRAUnd1.00800.00800.00
DESARENADOR (04 UND)7,799.00
OBRAS PRELIMINARES97.95
LIMPIEZA DE TERRENO MANUALm243.841.1048.22
TRAZO Y REPLANTEO DE OBRAS DE ARTEm244.401.1249.73
MOVIMIENTO DE TIERRAS809.02
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m344.1210.50463.26
REFINE Y NIVELACION EN TERRENO NORMALm244.401.5367.93
ACARREO DE MATERIAL EXCEDENTE D=30 Mm352.925.25277.83
CONCRETO SIMPLE255.59
SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m243.845.83255.59
CONCRETO ARMADO5,949.64
CONCRETO FC=175 KG/CM2 C/M O.A.m38.24275.312,268.55
ENCOFRADO Y DESENCOFRADO O.A.m249.6032.131,593.65
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg441.324.732,087.44
REVOQUES, ENLUCIDOS Y MOLDURAS686.80
TARRAJEO EN INTERIORESm268.009.84669.12
CURADO DE OBRAS DE ARTEm268.000.2617.68
CONSTRUCCION DE CANAL DE CONDUCCION (3,770.0 ML)225,119.15
OBRAS PRELIMINARES8,897.20
TRAZO Y REPLANTEO DE CANALml3,770.000.853,204.50
NIVELACION Y PLANTILLADO RASANTE DE CANALml3,770.001.515,692.70
MOVIMIENTO DE TIERRAS49,076.72
EXCAVACION Y/O CORTE EN TERRENO SUELTOm31,091.856.306,878.66
ACARREO DE MATERIAL EXCEDENTE D=30 Mm31,419.415.257,451.90
CARGUIO DE MATERIAL DE RELLENOm3164.080.1321.33
TRANSPORTE DE MATERIAL DE RELLENOm3164.083.84630.07
CONFORMACION DE TERRAPLENm3164.089.001,476.72
EXCAVACION DE CAJA DE CANAL EN TIERRA ( A MANO)m31,357.209.4512,825.54
REFINE CAJA CANAL A MANOml3,770.005.2519,792.50
CONCRETO SIMPLE165,567.11
CONCRETO FC=175 KG/CM2 C/MEZm3452.40288.32130,435.97
CERCHAS METLICAS PARA JUNTAS DE DILATACINUnd60.0040.002,400.00
COLOCACION DE CERCHAS SEMICIRCULARESUnd1,508.004.807,238.40
JUNTA FLEXIBLE DE POLIURETANOml2,427.8810.5025,492.74
REVOQUES, ENLUCIDOS Y MOLDURAS1,578.12
CURADO EN CANALES DE CONCRETOm26,069.700.261,578.12
CAMARAS DE CARGA22,155.11
CAMARA DE CARGA 5.0 M3 (03 UND)16,108.36
TRABAJOS PRELIMINARES90.86
LIMPIEZA DE TERRENO MANUALm234.681.1038.15
TRAZO Y REPLANTEO PRELIMINARm234.681.5252.71
MOVIMIENTO DE TIERRAS251.29
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m313.8610.50145.53
REFINE, NIVELACION Y COMPACTACIONm234.680.3211.10
ACARREO DE MATERIAL EXCEDENTE D=30 Mm318.035.2594.66
CONCRETO SIMPLE540.31
SOLADO e=4"m234.6815.58540.31
CONCRETO ARMADO13,325.85
CONCRETO FC=210 KG/CM2 (LOSA DE FONDO Y MUROS)m318.59344.306,400.54
ENCOFRADO Y DESENCOFRADO (LOSA DE FONDO Y MURO)m292.6429.142,699.53
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg893.404.734,225.78
REVOQUES, ENLUCIDOS Y MOLDURAS1,523.65
TARRAJEO CON IMPERMEABILIZANTESm249.2019.66967.27
TARRAJEO EN INTERIORESm244.649.84439.26
TARRAJEO PARA PENDIENTE DE FONDOm212.009.76117.12
PINTURA321.41
ItemDescripcinUnd.MetradoPrecio S.Parcial S.
PINTURA DOS MANOSm244.647.20321.41
VARIOS54.99
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)Und3.0018.3354.99
CAMARA DE CARGA 7.0 M3 (01 UND)6,046.75
TRABAJOS PRELIMINARES25.18
LIMPIEZA DE TERRENO MANUALm29.611.1010.57
TRAZO Y REPLANTEO PRELIMINARm29.611.5214.61
MOVIMIENTO DE TIERRAS69.65
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m33.8410.5040.32
REFINE, NIVELACION Y COMPACTACIONm29.610.323.08
ACARREO DE MATERIAL EXCEDENTE D=30 Mm35.005.2526.25
CONCRETO SIMPLE149.72
SOLADO e=4"m29.6115.58149.72
CONCRETO ARMADO4,939.02
CONCRETO FC=210 KG/CM2 (LOSA DE FONDO Y MUROS)m35.25344.301,807.58
ENCOFRADO Y DESENCOFRADO (LOSA DE FONDO Y MURO)m235.3429.141,029.81
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg444.324.732,101.63
REVOQUES, ENLUCIDOS Y MOLDURAS724.32
TARRAJEO CON IMPERMEABILIZANTESm220.6419.66405.78
TARRAJEO EN EXTERIORESm216.7415.67262.32
TARRAJEO PARA PENDIENTE DE FONDOm25.769.7656.22
PINTURA120.53
PINTURA DOS MANOSm216.747.20120.53
VARIOS18.33
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)Und1.0018.3318.33
PASE PEATONAL (21 UND)21,561.37
OBRAS PRELIMINARES114.31
TRAZO Y REPLANTEO DE OBRAS DE ARTEm2102.061.12114.31
MOVIMIENTO DE TIERRAS471.56
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m327.2210.50285.81
ACARREO DE MATERIAL EXCEDENTE D=30 Mm335.385.25185.75
CONCRETO20,506.62
CONCRETO FC=140 KG/CM2 + 30% PIEDRA MEDIANA C/M O.A.m349.52227.8311,282.14
CONCRETO FC=175 KG/CM2 C/M O.A.m37.56275.312,081.34
ENCOFRADO Y DESENCOFRADO O.A.m267.2032.132,159.14
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg1,053.704.734,984.00
REVOQUES, ENLUCIDOS Y MOLDURAS468.88
TARRAJEO EN EXTERIORES M / 1:5 e= 1.5 CMm244.109.84433.94
CURADO DE OBRAS DE ARTEm2134.400.2634.94
TOMA LATERAL (21 UND)17,556.37
OBRAS PRELIMINARES57.62
TRAZO Y REPLANTEO DE OBRAS DE ARTEm251.451.1257.62
MOVIMIENTO DE TIERRAS192.10
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m311.0910.50116.45
ACARREO DE MATERIAL EXCEDENTE D=30 Mm314.415.2575.65
CONCRETO5,193.92
CONCRETO FC=175 KG/CM2 C/M O.A.m37.32275.312,015.27
ENCOFRADO Y DESENCOFRADO O.A.m266.4732.132,135.68
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg220.504.731,042.97
REVOQUES, ENLUCIDOS Y MOLDURAS3,912.86
TARRAJEO EN EXTERIORES M / 1:5 e= 1.5 CMm272.249.84710.84
JUNTA WATER STOP DE 6" PROVISION Y COLOCADOml147.8421.523,181.52
CURADO DE OBRAS DE ARTEm278.860.2620.50
CARPINTERIA METALICA8,199.87
COMPUERTA METALICA TIPO TARJETA 0.25 X 0.30 MUnd21.00390.478,199.87
PUENTE VEHICULAR (02 UND)7,969.95
OBRAS PRELIMINARES19.88
TRAZO Y REPLANTEO DE OBRAS DE ARTEm217.751.1219.88
ItemDescripcinUnd.MetradoPrecio S.Parcial S.
MOVIMIENTO DE TIERRAS201.13
EXCAVACION MANUAL EN TERRENO SUELTO O.A.m311.6110.50121.91
ACARREO DE MATERIAL EXCEDENTE D=30 Mm315.095.2579.22
CONCRETO7,547.97
CONCRETO FC=140 KG/CM2 + 30% PIEDRA MEDIANA C/M O.A.m315.61227.833,556.43
CONCRETO FC=210 KG/CM2 C/Mm32.06341.37703.22
ENCOFRADO Y DESENCOFRADO O.A.m252.5432.131,688.11
ACERO DE REFUERZO FY=4200 KG/CM2 C/M 0.A.kg338.314.731,600.21
REVOQUES, ENLUCIDOS Y MOLDURAS200.97
TARRAJEO EN EXTERIORES M / 1:5 e= 1.5 CMm219.399.84190.80
CURADO DE OBRAS DE ARTEm239.130.2610.17
VARIOS13,106.64
CAPACITACION Y ASISTENCIA TECNICAEto1.001,500.001,500.00
SEGURIDAD EN OBRAglb1.002,500.002,500.00
MAESTRO DE OBRAmes3.002,000.006,000.00
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)Und8.0018.33146.64
BRIQUETERAUnd1.00140.00140.00
FLETE TERRESTREglb1.002,500.002,500.00
DISEO DE MEZCLAUnd1.00320.00320.00
Costo Directo316,067.59
Gastos Generales (4.22 %)13,348.00
Gastos de Supervisin (4.45 %)14,063.41
Expediente Tcnico (1.90 %)6,000.00
=========================TOTAL PRESUPUESTO 359,479.00SON : TRESCIENTOS CINCUENTA NUEVE MIL CUATROCIENTOS SETENTINUEVE Y 00/100 NUEVOS SOLES