PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA...

289
3.1 MEDICIONES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ U N I D A D E S DIMENSIONES Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO (SALAMANCA) 01 TRABAJOS PREVIOS y MEDIOS AUXILIARES 01.01 m. 1.- Vallado ciego con placas metálicas de acero galvanizado plegado sustentadas por pies dere- chos formados con perfiles laminados, con puertas de acceso. La altura de dichos paneles será de un mínimo de 2 m. cuando se coloquen de forma horizontal en la zona prevista para li- mitar la zona de talleres y/o de trabajo, los loca- les de obra, la zona de almacenaje y acopios y la zona para gestión de residuos y de altura 3,5 m. o superior cuando se adosen al andamiaje a colocar en la Fachada Este del Claustro, para li- mitar el posible acceso de ladrones y/o malean- tes al interior del bien. Todo incluido, montaje, desmontaje y limpieza. El exterior deberá estar rematado en tono según indicaciones del Ayun- tamiento o la Comisión de Patrimonio corres- pondiente, pudiendo sustituirse en dicho caso por material adecuado que cumpla las funcio- nes de seguridad necesarias. Medios auxiliares y costes indirectos incluidos, incluso carga de escombros generados y gestión de residuos. (E00med01) vallado de obra 1 68,07 68,07 en previsión zona andamiaje (mínimo 3,50 1,59 30,05 47,78 metros altura) Total partida01.01 ............................................................................................. 115,85 01.02 m. 2.- Vallado de paneles enrejados 80x150 prefa- bricados de acero galvanizado, de 3.50x2,00 m. de altura, D=8 mm. de espesor, soldado a tubos de D=40 mm. y 1,50 mm. de espesor, autoportantes sobre soportes de hormigón pre- fabricado separados cada 3,50 m., previstos para aquella zona que bien por motivos de se- guridad bien por motivos de operatividad o bien por motivos de respeto al bien (Atrio de Ama- yuelas, en donde se evitarán anclajes innecesa- rios) se pretenda dejar vista desde el exterior. (E00med02) acceso medios zona "PUERTA DE LOS 1 19,97 19,97 CARROS" cierre zonas 1 5,50 5,50 delimitación acopios 1 18,00 18,00 Total partida01.02 ................................................................................................ 43,47 01.03 m2 M2. Andamio TUBULAR "EUROPEO" para "MARCOS O FACHADAS", homologado, de acero o duraluminio, apto para trabajos hasta una altura de 16 m., consistente en: suministro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, ama- rres a huecos mediante husillos con tacos de madera contrachapada y control periodico de

Transcript of PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA...

Page 1: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO (SALAMANCA) 01 TRABAJOS PREVIOS y MEDIOS AUXILIARES 01.01 m. 1.- Vallado ciego con placas metálicas de acero galvanizado plegado sustentadas por pies dere- chos formados con perfiles laminados, con puertas de acceso. La altura de dichos paneles será de un mínimo de 2 m. cuando se coloquen de forma horizontal en la zona prevista para li- mitar la zona de talleres y/o de trabajo, los loca- les de obra, la zona de almacenaje y acopios y la zona para gestión de residuos y de altura 3,5 m. o superior cuando se adosen al andamiaje a colocar en la Fachada Este del Claustro, para li- mitar el posible acceso de ladrones y/o malean- tes al interior del bien. Todo incluido, montaje, desmontaje y limpieza. El exterior deberá estar rematado en tono según indicaciones del Ayun- tamiento o la Comisión de Patrimonio corres- pondiente, pudiendo sustituirse en dicho caso por material adecuado que cumpla las funcio- nes de seguridad necesarias. Medios auxiliares y costes indirectos incluidos, incluso carga de escombros generados y gestión de residuos. (E00med01) vallado de obra 1 68,07 68,07 en previsión zona andamiaje (mínimo 3,50 1,59 30,05 47,78 metros altura) Total partida 01.01 ............................................................................................. 115,85 01.02 m. 2.- Vallado de paneles enrejados 80x150 prefa- bricados de acero galvanizado, de 3.50x2,00 m. de altura, D=8 mm. de espesor, soldado a tubos de D=40 mm. y 1,50 mm. de espesor, autoportantes sobre soportes de hormigón pre- fabricado separados cada 3,50 m., previstos para aquella zona que bien por motivos de se- guridad bien por motivos de operatividad o bien por motivos de respeto al bien (Atrio de Ama- yuelas, en donde se evitarán anclajes innecesa- rios) se pretenda dejar vista desde el exterior. (E00med02) acceso medios zona "PUERTA DE LOS 1 19,97 19,97 CARROS" cierre zonas 1 5,50 5,50 delimitación acopios 1 18,00 18,00 Total partida 01.02 ................................................................................................43,47 01.03 m2 M2. Andamio TUBULAR "EUROPEO" para "MARCOS O FACHADAS", homologado, de acero o duraluminio, apto para trabajos hasta una altura de 16 m., consistente en: suministro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, ama- rres a huecos mediante husillos con tacos de madera contrachapada y control periodico de

Page 2: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

su tensión y amarres a fábricas o elementos re- sistentes con tacos de expansión, químicos , especiales para piedra, coincidiendo en zona de juntas de mortero de cal, colocados según normas con un mínimo de 1 anclaje cada 12m2, con suficiente resistencia a tracción, red de protección para caida de materiales, prepa- ración de base, placas de apoyo al suelo sobre tacos de madera y/o durmientes a base de ta- blones de 7 cm. especialmente en aquellas zo- nas indicadas, y siempre de acuerdo con la ca- pacidad de carga de la base, incluso accesos de plataformas con trampilla y escaleras abati- bles en su interior (en número suficiente que garantice una evacuación con una distancia máxima de recorrido de 15 metros), barandilla exterior con dos barras y rodapie, barandilla in- terior con 1 o 2 barras, plataformas de descar- ga y/o elevación, plataformas según niveles, puntales, codales, tornapuntas, refuerzos, etc, todo según detalle de planos de montaje y la normativa de obligado cumplimiento sobre an- damiajes. Criterios de medición: 75% al monta- je y 25% una vez retirado el andamio y restau- rado los puntos de anclaje. No se admitirá en ningún caso medición superior a la expresada en proyecto, en base a valoraciones de organi- zación, etc. (E00med03) ANDAMIO EUROPEO HOMOLOGADO con p.p. MÉNSULAS, ETC UNIDAD III :FACHADA ESTE tramo 1 1 11,10 12,00 133,20 tramo 2 1 18,00 10,60 190,80 suplemento pináculos 4 6,00 1,50 36,00 suplemento pináculo central 1 8,80 3,00 26,40 TOTAL fachada Este 386,40 m2 UNIDAD IV: PARAMENTOS CLAUSTRO EXTERIOR- CUBIERTA perímetro exterior Claustro (l=119,80) 1 124,80 8,30 1.035,84 perímetro interior Claustro (l=106,45) 1 110,45 6,74 744,43 UNIDAD V: PARAMENTOS CLAUSTRO INTERIOR ^^^ perímetro paramento interior Claustro 1 144,53 6,74 974,13 Total partida 01.03 ..........................................................................................3.140,80 01.04 m3 M3. Andamio tubular tipo MULTIDIRECCIO- NAL homologado, de acero o duraluminio, apto para trabajos hasta una altura de 15 m., consis- tente en: suministro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, amarres a huecos mediante husillos con tacos de madera contrachapada y control periodico de su tensión y amarres a fá- bricas o elementos resistentes con tacos de ex- pansión, químicos , especiales para piedra, coincidiendo en zona de juntas de mortero de cal, colocados según normas con un mínimo de 1 anclaje cada 12m2, con suficiente resis- tencia a tracción, red de protección para caida

Page 3: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

de materiales, preparación de base, placas de apoyo al suelo sobre tacos de madera y/o dur- mientes a base de tablones de 7 cm. especial- mente en aquellas zonas indicadas, y siempre de acuerdo con la capacidad de carga de la ba- se, incluso accesos de plataformas con trampi- lla y escaleras abatibles en su interior (en núme- ro suficiente que garantice una evacuación con una distancia máxima de recorrido de 15 metros), barandilla exterior con dos barras y ro- dapie, barandilla interior con 1 o 2 barras, plata- formas de descarga y/o elevación, plataformas según niveles, puntales, codales, tornapuntas, refuerzos y p.p. de cimbras en su caso, etc to- do según detalle de planos de montaje y la nor- mativa de obligado cumplimiento sobre anda- miajes. Criterios de medición: 75% al montaje y 25% una vez retirado el andamio y restaurado los puntos de anclaje. (E00med03a) UNIDAD VI: BÓVEDAS Tratamiento bóvedas intradós 1 127,00 3,90 5,50 2.724,15 Tratamiento bóvedas y acceso trabajo extradós 24 6,50 0,80 1,80 224,64 "" 12 7,75 0,80 1,80 133,92 Total partida 01.04 .......................................................................................... 3.082,71 01.05 m2 M2 Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio Eu- ropeo descrito en partida anterior, con todos sus elementos y accesorios, incluidas escaleras de acceso, todo incluido. Se valorará su puesta según criterios de la dirección facultativa, ade- cuandose en cualquier caso a un uso razona- ble dentro de la organización optimizada de una obra, no admitiendose en ningún caso la pues- ta innecesaria o por motivos de falta de organi- zación de la empresa constructora, no habien- do lugar a reclamación de mayor plazo que el establecido en este proyecto, independiente- mente de las causas que lo motiven. (E00med04) UNIDAD III :FACHADA ESTE tramo 1 1 11,10 100,00 12,00 13.320,00 tramo 2 1 18,00 100,00 10,60 19.080,00 suplemento pináculos 4 6,00 60,00 1,50 2.160,00 suplemento pináculo central 1 8,80 60,00 3,00 1.584,00 TOTAL fachada Este 386,40 m2 UNIDAD IV: PARAMENTOS CLAUSTRO EXTERIOR y CUBIERTA perímetro exterior Claustro (l=119,80) 1 124,80 180,00 8,30 186.451,20 perímetro interior Claustro (l=106,45) 1 110,45 120,00 6,74 89.331,96 UNIDAD V: PARAMENTOS CLAUSTRO INTERIOR perímetro paramento interior Claustro 1 144,53 120,00 6,74 116.895,86 Total partida 01.05 ......................................................................................428.823,02 01.06 m3 M3/Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio tipo MULTIDIRECCIONAL con p.p. de refuerzos y

Page 4: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

piezas especiales para apeo y cimbrado de las bóvedas objeto, así como de las escaleras, 1 por panda, incorporadas, y todo lo necesario para acceder a las bóvedas y elementos singu- lares de la intervención, con todos sus elemen- tos y accesorios, todo incluido. Se valorará su puesta según criterios de la dirección facultati- va, adecuandose en cualquier caso a un uso razonable dentro de la organización optimizada de una obra, no admitiendose en ningún caso la puesta innecesaria o por motivos de falta de organización de la empresa constructora, no habiendo lugar a reclamación de mayor plazo que el establecido en este proyecto, indepen- dientemente de las causas que lo motiven. (E00med04a) UNIDAD VI: BÓVEDAS Tratamiento bóvedas intradós 1 127,00 3,90 5,50 2.724,15 Tratamiento bóvedas y acceso trabajo extradós 24 6,50 0,80 1,80 224,64 "" 12 7,75 0,80 1,80 133,92 Total volumen 3082,71 m3/día 150 3.083,00 462.450,00 Total partida 01.06 ......................................................................................465.532,71 01.07 ud Ud. Montaje y desmontaje de grua-torre eléctri- ca, hasta 69 m. de altura con brazo de 40 a 48 m., arriostrado convenientemente, con proyecto técnico completo y dirección de montaje por in- geniero técnico, permisos (p.p. incluido en al- quiler por meses) y montaje de elementos auxi- liares, cuadro eléctrico, ...etc. con p.p. de me- dios auxiliares (gruás telescopicas), ocupación de vía pública, costes indirectos, etc. Medida la unidad en un 50% al montaje y un 50% al des- montaje. (E00med05) 1 1,00 Total partida 01.07 ..................................................................................................1,00 01.08 ud Ud. Alquiler por mes de grua-torre eléctrica, hasta 69 m. de altura con brazo de 35 a 48 m., con p.p. de elementos auxiliares, proyecto, per- misos, cuadro eléctrico, ...etc. (E00med06) 1 1,00 Total partida 01.08 ..................................................................................................1,00

Page 5: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

02 UNIDAD I: PATIO CENTRAL 02.01 ud Retirada del conjunto de tinajas y otros elemen- tos en la zona de intervención de esta unidad, con acopio y protección en zona adecuada a determinar, para su posterior recolocación en lugar según indicaciones D.F. con p.p. de me- dios auxiliares y costes indirectos. (E001levan00) 1 1,00 Total partida 02.01 ..................................................................................................1,00 02.02 ud Levantado de banco corrido adosado a facha- da este del Claustro de la Catedral para poder ejecutar la cámara de aireación y drenaje pro- yectada, incluyendo p.p. de toma de datos, nu- meración de piezas, reportaje fotográfico y des- montaje, traslado de piezas a zona de acopio adecuada y protegida, limpieza y retirada de es- combros a contenedor, medios auxiliares y cos- tes indirectos. (E001levan01) 1 1,00 Total partida 02.02 ..................................................................................................1,00 02.03 ud Levantado de ESCALINATA de acceso a la "puerta en esviaje" de acceso al Claustro de la Catedral por su cara este, necesaria para poder ejecutar la cámara de aireación y drenaje pro- yectada, incluyendo p.p. de toma de datos, nu- meración de piezas, reportaje fotográfico y des- montaje, traslado de piezas a zona de acopio adecuada y protegida, limpieza y retirada de es- combros a contenedor, medios auxiliares y cos- tes indirectos. (E001levan02) 1 1,00 Total partida 02.03 ..................................................................................................1,00 02.04 m2 Retirada de la capa de grava existente enn la Plazuela y que afecta a la zona de intervención de la fachada este, acopiandola para su poste- rior reutilización en la formación de rellenos contra la cara exterior de las cámaras bufas, o en formación de canales de drenaje del Patio Central, con p.p. de medios auxiliares y costes indirectos. (E001levan03) 1 168,00 168,00 Total partida 02.04 ............................................................................................. 168,00 02.05 ud Ayuda de albañilería a trabajos de retirada de pilón de fibrocemento y otros materiales a retirar en obra con amianto (tuberías), incluyendo úni- camente la ayuda, estando incluido el resto en partida independiente dentro del capítulo de gestión de residuos. En compensación trabajos

Page 6: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ayuda. (E001levan05) 1 1,00 Total partida 02.05 ..................................................................................................1,00 02.06 ud Desmontaje del Calvario central del Patio del Claustro de la Catedral de Ciudad Rodrigo, así como la repisa escalonada sobre la que des- cansa, liberando su base y limpiando el pozo de cualquier resto incluidas raices, así como trata- miento a base de agua coloreada para determi- nar el trazado y desague existente, incluyendo el acopio del material en lugar seguro, todo pre- via numeración de piezas, levantamiento de croquis y reportaje fotográfico, (E01levan0) 1 1,00 Total partida 02.06 ..................................................................................................1,00 02.07 ud Limpieza de la conexión a red existente bajo el Calvario y su pozo, retirando elementos ajenos, raices y suciedad y haciendo prueba de com- probación de red con agua coloreada no conta- minante. (E01levan01) 1 1,00 Total partida 02.07 ..................................................................................................1,00 02.08 ud Levantamiento del peldañeado existente en la "Puerta de los Carros", interior y exterior, previa toma de datos y fotografías, para posterior re- colocación, acopiando el material servible en lu- gar adecuado y retirando el escombro a verte- dero, dotando a dicho acceso de una pasarela de madera con elementos antideslizantes y en su caso pasamanos, con p.p. de medios auxi- liares y costes indirectos. (E01levan02) 1 1,00 Total partida 02.08 ..................................................................................................1,00 02.09 m2 Levantado de solado de baldosas de granito del Claustro de la Catedral de Ciudad Rodrigo, con supervisión arqueológica, por medios manuales y mecánicos, acopiándolas en zona preparada, protegiendo paramentos y elementos que pue- dan verse afectados, limpiándolas superficial- mente y preparando sus bordes para recoloca- ción de piezas posterior, eliminando cualquier resto de mortero, incluyendo la retirada de las inservibles y restos generados a contenedor pa- ra transporte a vertedero, y en su caso acopio en depósito a determinar de las reutilizbles para futuras reposiciones posibles,incluso limpieza con p.p. de medios auxiliares y costes indirec- tos. (E01levan1)

Page 7: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

superficie patio central 1 23,93 23,80 569,53 franja conexión husillo canaleta patio 1 9,50 0,55 5,23 franja conexión zona bombeo a "puerta de los 1 20,00 0,55 11,00 carros" ATRIO AMAYUELAS zona cámara aireación 1 11,00 1,50 16,50 acometida a pozo 1 9,00 1,50 13,50 acometida a desague 1 20,79 1,50 31,19 Total partida 02.09 ............................................................................................. 646,95 02.10 m3 Picado de solera de hormigón, estimando un espesor de 15 a 20 cm. sobre la que se asienta el solado del patio central del Claustro, por me- dios mecánicos y manuales, retirando escom- bro a pie de carga para transporte a vertedero y limpieza final, (E01levan2) superficie patio central 1 23,93 23,80 0,15 85,43 Total partida 02.10 ................................................................................................85,43 02.11 m3 Retirada del encachado bajo solera en el Patio Central del Claustro, en caso de su existencia, estimando una capa de 15 a 20 cm. de espe- sor, por medios manuales, con retirada de es- combro a contenedor, (E01levan21) superficie patio central 1 23,93 23,80 0,25 142,38 Total partida 02.11 ............................................................................................. 142,38 02.12 m3 Cajeado de la sub-base del solado existente del patio central del Claustro, según niveles a defi- nir para alojar zona ajardinada, incluso limpieza de restos ajenos, con ligera supervisión arqueo- lógica incluida, incluyendo la carga de escom- bro a zona exterior para su posterior retirada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirectos. (E01levan3) superficie patio central 1 23,93 23,80 0,25 142,38 franja conexión husillo canaleta patio 1 9,50 0,55 0,20 1,05 franja conexión zona bombeo a "puerta de los 1 20,00 0,55 0,20 2,20 carros" Total partida 02.12 ............................................................................................. 145,63 02.13 ud Realización de CALICATA TIPO 1, en zona de aproximadamente 2x2 metros en planta y hasta una profundidad de 1,50 metros máximo, con metodología arqueológica según previsión pro- yectada tal y como figura en plano, con asisten- cia de arqueólogo director y dos peones espe- cializados, con p.p. de reportaje fotográfico, to- ma de datos, retirada de escombros, protección de elementos, y documentación final escrita con copias para dirección facultativa y promo- tor, según memoria y planos. (E01arqu1)

Page 8: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

patio central 3 3,00 exterior 2 2,00 Total partida 02.13 ..................................................................................................5,00 02.14 ud Realización de CALICATA TIPO 2, en zona de aproximadamente 250x250 cm. en planta y hasta una profundidad de 3,00 metros máximo, con metodología arqueológica según previsión proyectada tal y como figura en plano, con asis- tencia de arqueólogo director y dos peones es- pecializados, con p.p. de reportaje fotográfico, toma de datos, retirada de escombros, protec- ción de elementos, y documentación final escri- ta con copias para dirección facultativa y pro- motor, según memoria y planos. (E01arqu2) patio central, zona bombas 1 1,00 Total partida 02.14 ..................................................................................................1,00 02.15 m3 Excavación de zanjas por medios manuales au- xiliados puntualmente por maquinaria de pe- queñas dimensiones y herramienta mecánica en su caso, y según criterio de intervención in- dicado en memoria e instrucciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cámaras de airea- ción y drenaje y trabajos análogos, con ligera supervisión arqueológica inicial (en caso de no requerise la presencia total del arqueólogo, quedando por tanto a expensas de dictaminar por la D.F. una vez se realicen las catas y co- miencen los trabajos) incluyendo tanto la retira- da de las tierras hasta zona de acopio para car- ga a camión, como el perfilado perimetral, api- sonado de fondo de excavación y la gestión co- rrespondiente de residuos, con p.p. de medios auxiliares y costes indirectos. (E01exc0) ZONA PERÍMETRO CALVARIO 2 3,80 0,80 0,70 4,26 2 3,90 0,80 0,70 4,37 TALUDES SEGURIDAD lado norte 1 17,26 0,50 8,63 lado sur 1 17,42 0,50 8,71 lado este 1 17,78 0,50 8,89 ""perímetro zona pozo 1 2 2,11 0,50 2,11 "" perímetro zona pozo 1 1 3,22 0,50 1,61 lado oeste 1 17,64 0,50 8,82 perímetro base Calvario 4 3,80 0,50 7,60 Total partida 02.15 ................................................................................................55,00 02.16 m3 Excavación de zanjas CON SUPERVISIÓN ARQUEOLÓGICA total, por medios manuales auxiliados puntualmente por maquinaria de pe- queñas dimensiones y herramienta mecánica en su caso, y SEGÚN CRITERIO DE INTER- VENCIÓN indicado en la memoria y las instruc- ciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cámaras de aireación y drenaje y trabajos aná-

Page 9: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

logos, con supervisión arqueológica total (presencia de arqueólogo y/o ayudante 100% excavación), incluyendo el perfilado perimetral, apisonado de fondo de excavación y la carga y transporte de tierras hasta zona de acopio y carga para traslado a vertedero, asi como p.p. de reportaje fotográfico y documentación final en su caso. En caso de que la D.F. junto con el arqueólogo responsable de la Administración una vez realizadas las catas previstas e inicia- dos estos trabajos comprueben no se hace ne- cario la presencia total, sino parcial del equipo de arqueólogos, podrá establecerse un criterio de medición diferente, teniendo en cuenta la partida anterior y siempre según criterio de la D.F. (E01exc1) PATIO CENTRAL cara este-oeste 2 23,90 1,40 0,90 60,23 2 23,90 1,80 1,25 107,55 cara norte-sur 2 23,40 1,40 0,90 58,97 2 23,40 1,80 1,25 105,30 a deducir encuentros rincones -4 2,50 3,00 1,10 -33,00 FACHADA ESTE FACHADA ESTE CLAUSTRO - ATRIO 1 10,78 2,10 1,25 28,30 AMAYUELAS FACHADA ESTE CLAUSTRO a PLAZUELA 1 16,60 1,10 1,25 22,83 ATRIO AMAYUELAS acometida a pozo 1 9,00 1,50 0,40 5,40 acometida a desague 1 20,79 1,50 0,40 12,47 Total partida 02.16 ............................................................................................. 368,05 02.17 m. Formación de cámara de drenaje perimetral en ZONA CENTRAL PATIO, bordeando el pelda- ñeado del Calvario, según detalle de planos e indicaciones de la D.F.incluyendo la formación de solera base de hormigón armado HA-25, de 10 cm. de espesor, con mallazo doble r12#10/10 con barras del díametro 12, fábricas de ladrillo perforado de 1/2 asta, recibida con mortero de cemento y cal M-60 de dosificación aproximada (a determinar) 1:1:6, colocando placa separadora de poliestireno expandido que impida el contacto de la obra nueva con la fábrica existente o en su defecto lamina drenan- te tipo "deltadrain" o similar, y formación de ca- naleta de desague y sus conexiones con tubo PVC de diámetro 200 mm. tipo "Terrain" o simi- lar, según niveles y pendiente mínima del 1% enfoscada con mortero impereabilizante "Sika Monotop-107 Seal" o similar, dejando la cáma- ra lista para la colocación del solado y bordillos de piedra, todo incluido incluso rejilla corrida con marco, tipo "RM-20 C-250" de Benito o similar., y limpieza final, retirando el material so- brante a vertedero, con p.p. de medios auxilia- res y costes indirectos. Incluida rejilla corrida con marco, tipo "RM-20 C-250" de Benito o si- milar. (E01drenaj1)

Page 10: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ZONA PERÍMETRO CALVARIO 2 3,80 7,60 2 3,90 7,80 Total partida 02.17 ................................................................................................15,40 02.18 m. Formación de cámara de aireación y drenaje, en PATIO CENTRAL CLAUSTRO CATEDRAL DE CIUDAD RODRIGO, previo apisonado de la zona excavada, siguiendo ordén de ejecución según CRITERIOS de INTERVENCIÓN refleja- dos en memoria y e indicaciones de la D.F., y plano de detalle nº29, incluyendo: la formación de una solera base de hormigón armado HA-25 de 15 cm. de espesor, con mallazo doble r12#30/30, fábricas de 1 asta de ladrillo cerámi- co perforado de 9 cm. a la palomera permitien- do aireación de fábricas excepto la perimetral maciza, dispuestas según detalle y recibidas con mortero de cemento y cal M-60, de dosifi- caicón aprox. a determinar 1:1:6, colocando placa separadora de poliestireno expandido que impida el contacto de la obra nueva con la fábrica del claustro, colocación de placas nerva- das prefabricadas tipo "Phrefor" de diferentes dimensiones según pandas, a modo de enco- frado perdido, para formación de losa superior en la que descansará el solado de granito, con hormigón HA-250, de espesor medio 11 cm. y armado r12#15/15, con formación de ligera pendiente para posterior colocación del solado, incluyendo la formación de la canaleta de desa- gue adaptada a pendientes y niveles indicados, con una pendiente mínima del 1%, revestida a base de enfoscado de mortero tipo "Sika Top Seal 107" o similar en dos o mas capas según rendimiento indicado por el fabricante, incluso relleno con grava recuperada del talud exterior, realizando a su vez función drenante o en su defecto relleno de tierras y apisonado, dejando la cámara lista para la colocación del solado y bordillos de piedra (no incluida), y colocación de rejilla con marco tipo "RM-30 C-250" de Be- nito o similar, todo incluido y limpieza final, reti- rando el material sobrante a contenedor, con p.p. de medios auxiliares y costes indirectos. Para un ancho medio aproximado de 3,30 me- tros. Medido en su longitud, a lo largo de la ca- naleta de desague. Según planos y memoria. (E01drenaj2) cara este-oeste 1 23,90 23,90 1 23,90 23,90 cara norte-sur 1 23,40 23,40 1 23,40 23,40 a deducir encuentros rincones 1 4,00 4,00 Total partida 02.18 ................................................................................................98,60 02.19 m. Cámara de aireación y drenaje, según memo- ria, planos y criterios indicados en partidas ante- riores, con la inclusión de rejillas de fundición

Page 11: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

con marco, costes indirectos y medios auxilia- res (E01drenaje2.1) FACHADA ESTE CLAUSTRO - ATRIO 1 10,78 10,78 AMAYUELAS Total partida 02.19 ................................................................................................10,78 02.20 m. Cámara de aireación y drenaje, según memo- ria, planos y criterios indicados en partidas ante- riores, con la inclusión de rejillas de fundición con marco, y formación de pozo para conexión a nivel inferior, costes indirectos y medios auxi- liares (E01drenaje2.2) FACHADA ESTE CLAUSTRO a PLAZUELA 1 16,60 16,60 Total partida 02.20 ................................................................................................16,60 02.21 ud Ejecución de pozo de bombeo, registro e inclu- so absorción, con rebosadero comunicado a red existente actualmente bajo Calvario en patio central del Claustro de la Catedral de Ciudad Rodrigo, hasta una profundidad aprox. de 3 metros teniendo en cuenta la recogida de aguas del desague de la cámara de aireación y drenaje ue comunicará a 1,10 metros de pro- fundidad aproximada, incluyendo entre otros: preparación de terreno base, formación de so- lera base de hormigón armado HA-250 de es- pesor 15 cm. armada con mallazo doble r12#10/10, de dimensiones en planta 250x250 cm. pudiendo trazarse de forma circular, forma- ción de pozo con fábrica de ladrillo cerámico perforado de 1 asta recibido con mortero M-40 según trazado indicado en planos, de 2 metros libres de diametro en base y coronado por tapa de fundición de diámetro 80 cm. con su cerco y el revestimiento interior a base de enfoscado impermeabilizante "Sika Monotop-107 Seal" o similar, y solera superior de hormigón armado HA-250 de 10 cm. para apoyo de solado, arma- da con r12/10/10 dejando prevista argollas de redondo de acero inoxidable y/o galvanizado según D.F., incluso el relleno drenante perime- tral a base de bolo y/o grava y tierra vegetal compactada. Instalación de bombas en partida independiente. (E01drenaj3) 1 1,00 Total partida 02.21 ..................................................................................................1,00 02.22 ud Ejecución de pozo de bombeo, registro e inclu- so absorción, con rebosadero comunicado a red existente en extremo del Atrio de Amayue- las, de la Catedral de Ciudad Rodrigo, hasta la profundidad requerida en función de la cámara de aireación y drenaje y la red existente, marca en planos, incluyendo entre otros: preparación de terreno base, formación de solera base de

Page 12: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

hormigón armado HA-250 de espesor 15 cm. armada con mallazo doble r12#10/10, de di- mensiones en planta 250x250 cm. pudiendo trazarse de forma circular, formación de pozo con fábrica de ladrillo cerámico perforado de 1 asta recibido con mortero M-40 según trazado indicado en planos, de 2 metros libres de dia- metro en base y coronado por tapa de fundi- ción de diámetro 90 cm. con su cerco y el re- vestimiento interior a base de enfoscado imper- meabilizante "Sika Monotop-107 Seal" o similar, y solera superior de hormigón armado HA-250 de 10 cm. para apoyo de solado, armada con r12/10/10 dejando prevista argollas de redondo de acero inoxidable y/o galvanizado según D.F., incluso el relleno drenante perimetral a base de bolo y/o solera para recolocación del solado desmontado a recuperar en la posición original, Instalación de bombas en partida independien- te. (E01drenaje3.1) 1 1,00 Total partida 02.22 ..................................................................................................1,00 02.23 m3 Relleno del trasdós del murete de las cámaras de aireación con grava y bolo de diferente ta- maño, y/o en trabajo de compactación o forma- ción de drenaje de zonas con capa superior ve- getal, incluyendo p.p. de la grava desmontada junto la Fachada Este, en la Plazuela y la que pudiera aparecer bajo la solera de patio central, inlcuyendo p.p. de medios auxialres y costes in- directos. (E01drenaj4) PATIO CENTRAL lado norte 1 17,26 0,50 0,75 6,47 0,lado sur 1 17,42 0,50 0,75 6,53 lado este 1 17,78 0,50 0,75 6,67 ""perímetro zona pozo 1 2 2,11 0,50 0,75 1,58 "" perímetro zona pozo 1 1 3,22 0,50 0,75 1,21 lado oeste 1 17,64 0,50 0,75 6,62 perímetro base Calvario 4 3,80 0,50 0,30 2,28 perímetro pozos reaprovechando grava retirada fachada Este Total partida 02.23 ................................................................................................31,36 02.24 ud Conexión de arqueta de achique ejecutada en fase IV con arqueta nueva, a base de doble tu- bo flexible en primer tramo y rígido en resto, tipo "Terrain" o similar, con p.p. de ayudas. (E001sanea2) desde arqueta de achique FASE IV a arqueta a 1 1,00 ejecutar 51/51 Total partida 02.24 ..................................................................................................1,00 02.25 ud Arqueta de registro de 51x51x65 cm. de medi- das interiores, construida con fábrica de ladrillo perforado tosco de 1/2 pie de espesor, recibido

Page 13: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

con mortero de cemento M-5, colocado sobre solera de hormigón en masa HM-20/P/40/I de 10 cm. de espesor, enfoscada y bruñida por el interior con mortero de cemento M-15 redon- deando ángulos, ligeramente armada con ma- llazo, enfoscada y bruñida por el interior con mortero de cemento M-15, y con tapa y marco de hormigón armado prefabricada, terminada y con p.p. de medios auxiliares, sin incluir la exca- vación, ni el relleno perimetral posterior, s/ CTE-HS-5. (E001sanea3) 2 2,00 Total partida 02.25 ..................................................................................................2,00 02.26 m. Formación de zanja para saneamiento, inclu- yendo la apertura, prepración de base, y el re- lleno posterior, por medios manuales auxiliados puntualmente por maquinaria de pequeñas di- mensiones incluyendo tanto la retirada de las tierras sobrantes hasta zona de acopio para carga a camión, como el perfilado perimetral, apisonado de fondo de excavación y la gestión correspondiente de residuos, con p.p. de me- dios auxiliares y costes indirectos. (E001sanea4) tramo entre arquetas 51/51 1 23,00 23,00 Total partida 02.26 ................................................................................................23,00 02.27 ud Unidad de intervención para facilitar la acometi- da de aguas adecuando el paso una vez se desmonten los peldaños de la "Puerta de los Carros", sustituyendo el tramo afectado hasta una arqueta de registro con tapa de fundición 30/30 con llave de corte de escuadra, incluso sustitución del tramo y nuevo trazado hasta la toma existente en el actual pilón de fibrocemen- to, a retirar, incluso formación de paso bajo mu- ro, según memoria, con p.p. de medios auxilia- res y costes indirectos. (E001sanea5) 1 1,00 Total partida 02.27 ..................................................................................................1,00 02.28 ud Formación de acometida desde arqueta 51/51 junto zona de aparcamiento hasta pozo de en- tronque reglamentario según Servicio Municipal correspondiente, para una longitud entre 13 y 15 metros, incluyendo la rotura del pavimento con compresor, excavación manual de zanjas de saneamiento en terrenos de consistencia dura, colocación de tubería de PVC de 200 mm. "Terrain" o similar, con sus uniones, acce- sorios y obras auxiliares necesarias, cama de arena, tapado posterior de la acometida y repo- sición del pavimento con hormigón en masa HM-20/P/40/I, y con p.p. de medios auxiliares. (E001sanea6)

Page 14: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

1 1,00 Total partida 02.28 ..................................................................................................1,00 02.29 m2 Recolocación de solado de baldosas de granito recuperado, previa limpieza y preparación, se- leccionando piezas de dimensiones aproxima- das 100x50 cm., colocadas matando juntas, sobre cama de arena/cemento recibidas con mortero de cal y cemento gris al 50%, libre de sales, y arena seleccionada, incluso rejuntado final con posible adiccion de colorantes natura- les según muestras previas a realizar, incluso cortes en formación de encuentros, remates y sellado con mortero tipo "Sikaflex Pro HP" gris o similar, así como cortes de piezas para alojar rejillas de fundición, con rebajes indicados en planos y memoria, con aportación mínima y puntual de elementos de idéntico material, in- cluyendo la homogeneización del acabado abu- jardado y limpieza de superficie y lavado final, en formación de solado de patio central y aná- logos, (E001solado1) PATIO CENTRAL lado norte 1 20,50 3,25 66,63 lado sur 1 20,25 3,10 62,78 lado sur en prevision aumento franja 1 20,25 0,50 10,13 lado este 1 20,92 3,38 70,71 lado oeste 1 20,80 3,16 65,73 perímetro base Calvario 4 3,20 0,50 6,40 formación zona pozo bombeo 1 1 2,00 3,12 6,24 FACHADA ESTE tramo nivel superior 1 16,52 1,03 17,02 tramo nivel inferior 1 10,70 1,53 16,37 ATRIO AMAYUELAS zona cámara aireación^^ 1 11,00 1,50 16,50 acometida a pozo 1 9,00 1,50 13,50 acometida a desague 1 20,79 1,50 31,19 Total partida 02.29 ............................................................................................. 383,20 02.30 m2 Reposición de solado de piedra arenisca inclu- yendo el desmontaje y la posterior recoloca- ción, en trabajos de formación de canalizacio- nes y zanjas para instalaciones en zona de in- tervención, incluyendo la limpieza y preparación de piezas, formación de base de asiento estabi- lizada, cama de arena y mortero y recibido con mortero de cal, cemento y arena seleccionada y rejuntado con aportación de colorantes natura- les previa realización de muestras, con p.p. de cortes, formación de encuentros y sellados, se- gún memoria, planos e indicaciones de la D.F., así como medios auxiliares y costes indirectos. (E001solado2) 1 20,00 20,00 Total partida 02.30 ................................................................................................20,00 02.31 m. Bordillo de granito con acabado abujardado, de

Page 15: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

dimensiones 10/12, ligeramente biselado en án- gulos libres y con formación de cortes para ma- yor agarre, recibido con hormigón en masa HM-25, en formación de remate de solados, in- cluyendo rejuntado con mortero de cal y ce- mento idem solado, con p.p. de medios auxilia- res y costes indirectos. (E001solado3) FACHADA ESTE tramo nivel superior 1 16,52 16,52 tramo nivel inferior 1 10,70 10,70 Total partida 02.31 ................................................................................................27,22 02.32 m. Bordillo de granito con acabado abujardado, de dimensiones 10/20, ligeramente biselado en án- gulos libres y con formación de cortes para ma- yor agarre, recibido con hormigón en masa HM-25, en formación de remate de solados, in- cluyendo rejuntado con mortero de cal y ce- mento idem solado, con p.p. de medios auxilia- res y costes indirectos. (E001solado4) PATIO CENTRAL lado norte 1 17,26 17,26 lado sur 1 17,42 17,42 lado este 1 17,78 17,78 ""perímetro zona pozo 1 2 2,11 4,22 "" perímetro zona pozo 1 1 3,22 3,22 lado oeste 1 17,64 17,64 perímetro base Calvario 4 3,80 15,20 Total partida 02.32 ................................................................................................92,74 02.33 m. Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y preparación de la base con morte- ro de cal y arena, aditivado en su caso, y reco- locación de elementos recuperados, con apor- tación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patinada, inclyendo el rejun- tado de elementos con mortero de cal y arena seleccionada con aportación de pigmentos na- turales según pruebas previas, con p.p. de me- dios auxiliares y costes indirectos. (E001rep1) 5 2,65 13,25 Total partida 02.33 ................................................................................................13,25 02.34 ud Reposición del peldañeado desmontado de la base del Calvario, incluyendo la limpieza y pre- paración de la base con mortero de cal y arena (incluso aportación de cemento o en su defecto hormigón en masa), y recolocación de elemen- tos recuperados, con aportación de nuevas pie- zas de identico trazado y remate, retirando las grapas metálicas y en su caso realizando ancla- jes según necesidades, inclyendo el recibido y rejuntado con mortero de cal y arena seleccio- nada con aportación de pigmentos naturales

Page 16: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

según pruebas previas, respetando los aliviade- ros de los laterales y manteniendo su funcionali- dad en previsión de desbordamiento de la ca- naleta perimetral, todo con limpieza y remates y con p.p. de medios auxiliares y costes indirec- tos. (E001rep2) 1 1,00 Total partida 02.34 ..................................................................................................1,00 02.35 ud Reposición de la ESCALINATA de acceso a la puerta en "esviaje" de la fachada este del Claustro, previamente desmontada, devolvién- dola a su estado original en base al levanta- miento previo realizado, con aportación mínmia de piezas nuevas de piedra arenisca de Ciudad Rodrigo, incluyendo la formación de asiento, re- cibido con mortero de cal, cemento y arena y el rejuntado con arena seleccionada, cal y pig- mentos inorgánicos,según criterios generales de intervención, limpieza, consolidación e im- permeabilización en su caso, con p.p. de me- dios auxiliares y costes indirectos. (E001rep3) 1 1,00 Total partida 02.35 ..................................................................................................1,00 02.36 ud Reposición del BANCO CORRIDO de la facha- da este del Claustro, previamente desmontado para acometer la cámara de aireación, devol- viéndola a su estado original en base al levanta- miento previo realizado, con aportación mínmia de piezas nuevas de piedra arenisca de Ciudad Rodrigo, incluyendo la formación de asiento, re- cibido con mortero de cal, cemento y arena y el rejuntado con arena seleccionada, cal y pig- mentos inorgánicos,según criterios generales de intervención, limpieza, consolidación e im- permeabilización en su caso, con p.p. de me- dios auxiliares y costes indirectos. (E001rep4) 1 1,00 Total partida 02.36 ..................................................................................................1,00 02.37 ud Recolocación de la toma y linea de pararrayos, según posición indicada en unidad IV (ver pla- no 19), repasando su trazado y tirantez así co- mo su conexión afectada por los trabajos de esta unidad, anclajes, posición de elementos para evitar escorrentias de agua en fachada, etc. con p.p. de medios auxiliares y costes indi- rectos. (E001rep6) 1 1,00 Total partida 02.37 ..................................................................................................1,00 02.38 ud Restauración del Calvario central, asegurando

Page 17: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

en primer lugar su estabilidad, procediendo posteriormente a la limpieza de líquenes según criterio general y aplicando un tratamiento de consolidación e impermeabilización en su caso, con p.p. de medios auxiliares y costes indirec- tos. (E001rest1) 1 1,00 Total partida 02.38 ..................................................................................................1,00 02.39 ud Reposición del conjunto de tinajas previamente retiradas del patio central, previa limpieza de las mismas, traslado y preparación de base y fija- ción, con p.p. de medios auxiliares y costes in- directos. En lugar a indicar por la D.F. (E001rep5) 1 1,00 Total partida 02.39 ..................................................................................................1,00 02.40 m3 Aportación de tierra vegetal limpia selecciona- da, de primera categoría, en formación de zona ajardinada del Patio Central del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la pre- paración de base con apisonado de primera tongada extendida con ligera pendiente a zona central que permita escorrentia hasta canaleta central, respetando niveles proyectados con p.p. de apisonado, modelado y rastrillado, de- jándola lista para posterior plantación e instala- ción de riego, con p.p. de medios auxiliares y costes indirectos. (E001jard01) zona patio central 1 17,71 17,34 0,35 107,48 a deducir zona central -1 3,79 3,79 0,35 -5,03 Total partida 02.40 ............................................................................................. 102,45 02.41 ud Suministro y plantación de Aromáticas del tipo 1, a base de Salvia officinalis , Rosmarinus offi- cinalis, Lavandula officinalis y Myrtus communis microphylla, de 40 cm. de altura, suministradas en contenedor y plantación en hoyo, incluso apertura del mismo a mano, abonado con hu- mus de lombriz, formación de alcorque y primer riego y resto necesarios hasta la entrega de la obra. (E001jard02) Salvia 35 35,00 Romero 39 39,00 Lavanda 48 48,00 Myrtus 60 60,00 Total partida 02.41 ............................................................................................. 182,00 02.42 ud Suministro y plantación de Aromáticas del tipo 2, a base de Thymus Vulgaris de 20 cm. de al- tura, suministradas en contenedor y plantación en hoyo, incluso apertura del mismo a mano, abonado con humus de lombriz, formación de

Page 18: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

alcorque y primer riego y resto necesarios hasta la entrega de la obra. (E001jard03) Thymus 34 34,00 Total partida 02.42 ................................................................................................34,00 02.43 ud Instalación de riego automático, completa, in- cluyendo el material, mano de obra y medios necesarios, compuesta básicamente de: - LLaves de cierre bola polipropileno 3/4 rosca macho, con p.p. de piezas de unión a tubería. - Tubería PE 20 mm 6bar con p.p.de acceso- rios e instalación - Arqueta 40x27 con doble tapa, la superior en arqueta de fábrica con tapa de fundición. - Boca de riego 3/4 con llave. - Electroválvulas de riego bobina 12V - Reductor de presión 3/4 para goteo - Tuberías de goteo ciego de 16 mm. con p.p. de pieza de goteo según plano. - Programador de riego para zonas. - Accesorios, piezas y material auxiliar no des- crito. - Mano de obra incluida y p.p. de medios auxila- res y costes indirectos. (E001jard04) 1 1,00 Total partida 02.43 ..................................................................................................1,00 02.44 ud Suministro, instalación y conexionado de bom- bas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grundfos SE1 100.100.40, 4.51d de 4kW, 1450 rpm 400V - 2 ud Zócalos para autoacoplamientos DN 150. - 4 Interruptores de nivel IFP1 10m. - 9 m. Tubo flexible necesario, de 100 mm. en salidas bombas. - 60 m.Tubería de PVC presión 100 mm. con p.p. de accesorios, instalación y ayudas de al- bañilería. ,- 2 ud Válvula de retención 100 mm. cierre bola - Accesorios, piezas y material no descrito ne- cesario - Mano de obra, incluida las pruebas de funcio- namiento. - P.p. de medios auxiliares y costes indirectos. (E01bombeo01) 1 1,00 Total partida 02.44 ..................................................................................................1,00 02.45 ud Suministro, instalación y conexionado de bom- bas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grundfos AP 35B.50.06.3 de 0,7kW, 2950 rpm 400V - 2 ud Zócalos para autoacoplamientos DN

Page 19: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

150. - 4 Interruptores de nivel IFP1 10m. - 7 m. Tubo flexible necesario, de 63 mm. en salidas bombas. - 40 m.Tubería de PVC presión 63 mm. con p.p. de accesorios, instalación y ayudas de al- bañilería. ,- 2 ud Válvula de retención 63 mm. cierre bola - Accesorios, piezas y material no descrito ne- cesario - Mano de obra, incluida las pruebas de funcio- namiento. - P.p. de medios auxiliares y costes indirectos. (E01bombeo02) 1 1,00 Total partida 02.45 ..................................................................................................1,00 02.46 ud Instalación eléctrica de cuadros, según memo- ria, planos e indicaciones de la D.F., consisten- te en la colocación de: 1ud,- Protección en cuadro general mediante 1 Int. Auto. General de 32A-4P, 1 Int. Auto. Dife- rencial de 40/4/500 mA, cableado, bornas, ac- cesorios y montaje. 1ud.- Cuadro de protección bajo escalera, con 1 Int. Aut. General 32A-4P, 2 Int. Auto. Dif. 40/4/300 mA, 1 Int Dif. 252/30 mA, 1 Aut. Magn. 20A-4P, 1 16A-4P y uno 10A-2 P 1ud.- Cuadro de protección y mando de 2 bom- bas de 4 kW "Tipo Grundfos CS 203-10" o si- milar con alternancia, arranque en cascada, protecciones, pilotos, cableado, bornas, acce- sorios y montaje. 1 ud.- Cuadro de protección y mando de 2 bombas de 0,7 kW "tipo Grundfos cs 203-1,6 " o similar con alternancia, arranque en cascada, protecciones, pilotos, cableado, bornas, acce- sorios y montaje. (E01electr01) 1 1,00 Total partida 02.46 ..................................................................................................1,00 02.47 ud Instalación eléctrica necesaria para completar las líneas descritas en memoria y planos, bási- camente a base de: ,- 40 m. Línea grapada con cable armado CU 5x6 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 80m. Línea enterrada con cable CU 4x4 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 95m. Línea enterrada con cable CU 4x2,5 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 120m. Línea enterrada con cable CU 3x1,5 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 140 m. Tubo reforzado de pvc de 20 mm. con p.p. de cajas y montaje, incluso acabado en to-

Page 20: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

no a definir en obra, acorde al edificio. 120 m. Tubo reforzado de pvc de 40 mm. idem anterior. 1 ud. Pequeño material, accesorios y el necesa- rio no descrito. 1,- Mano de obra, medios auxiliares y costesin- directos incluidos. (E01electr02) 1 1,00 Total partida 02.47 ..................................................................................................1,00

Page 21: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

03 UNIDAD II: CUBIERTAS 03.01 m2 Protección del solado en trabajos de restaura- ción de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espe- sor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, se- llando uniones con cinta adhesiva plástica, verti- do de cama de arena seca de regulización y co- loción de tablero aglomerado de 30 mm. de es- pesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los tra- bajos, medios auxiliares y costes indirectos. (E002prot01) Protección solado Panda Sur 1 116,00 116,00 Protección solado Panda Oeste 1 106,60 106,60 Protección solado Panda Norte 1 117,32 117,32 Protección solado Panda Este 1 120,74 120,74 Total partida 03.01 ............................................................................................. 460,66 03.02 m2 Desmontaje con recuperación de TEJAS de cubiertas del Claustro de la Catedral de Ciudad Rodrigo, retirando el material servible a zona de acopio, limpiandolo y seleccionándolo y el resto para su reutilización máxima posible, con carga de escombro a contenedor o a zona de acopio y gestión de residuos, con p.p. de otros ele- mentos y remates de la cubierta (llimas, en- constillados, limahoyas, etc.) de medios auxilia- res y costes indirectos. Medida la superficie en proyección horizontal'. (E002lev01) Panda Sur 1 161,00 161,00 Panda Oeste 1 165,00 165,00 Panda Norte 1 184,00 184,00 Panda Este 1 169,00 169,00 Total partida 03.02 ............................................................................................. 679,00 03.03 m2 Colocación de lona de protección de las bóve- das y fábricas del Claustro de la Catedral de Ciudad Rodrigo, contra las inclemencias me- teorológicas, principalmente lluvia,inmediatamente a la retirada de la teja, an- clada tanto a paramentos de fábrica como al propio andamio u otro medio auxiliar adecuado para tal fin, perfectamente atirantadas evitando formación de bolsas, incluso colocación y retira- da según necesidades (incluyendo siempre que no se esté trabajando en la obra), amortización de lonas y accesorios estimada en 7 usos.Medida en proyección horizontal (se valo- ra únicamente ayuda a esta partida, debiendo asumirse el resto en el porcentaje de medios y gastos generales, así como los propios de la empresa ejecutora). (E002lon01)

Page 22: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Panda Sur 1,17 161,00 188,37 Panda Oeste 1,17 165,00 193,05 Panda Norte 1,17 184,00 215,28 Panda Este 1,17 169,00 197,73 Total partida 03.03 ............................................................................................. 794,43 03.04 m2 Retirada de la capa de cartón embreado y/o placa tipo "Onduline" colocada en las cubiertas de la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, y elementos secundarios, fija- ciones, uniones etc con acopio en contenedor adecuado, para su gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superfi- cie en proyección horizontal'. (E002lev02) Panda Sur 1 161,00 161,00 Total partida 03.04 ............................................................................................. 161,00 03.05 m2 Retirada de capa de telas asfálticas colocada sobre tablero de cubiertas del Claustro, a con- tenedor espécifico para gestión de residuos, con p.p. de medios auxiliares y costes indirec- tos. (E002lev02.1) Panda Oeste 1 165,00 165,00 Panda Norte 1 184,00 184,00 Total partida 03.05 ............................................................................................. 349,00 03.06 m2 Desmontaje de tablero de cubierta a base pla- cas prefabricas de hormigón, colocadas en las cubiertas del Claustro de la Catedral de Ciudad Rodrigo, con retirada de escombro a contene- dor para su posterior gestión, inc. p.p. de me- dios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal'. (E002lev03) Panda Sur 1,07 90,00 96,30 Panda Oeste 1,07 165,00 176,55 Panda Norte 1,07 184,00 196,88 Total partida 03.06 ............................................................................................. 469,73 03.07 m2 Desmontaje de estructura de madera de cu- bierta completa, incluida la tabla base de teja, pares, vigas, tornapuntas y demas elementos, con protección previa de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superfi- cie en proyección horizontal'. (E002lev04) Panda Este 1,07 169,00 180,83 Total partida 03.07 ............................................................................................. 180,83 03.08 m2 Demolición de tabiques de ladrillo hueco doble y/o tabicón (en este caso la medición se com- pesará redución un -20%), a la palomera exis- tentes en las cubiertas de las pandas del Claus-

Page 23: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tro de la Catedral de Ciudad Rodrigo, por me- dios manuales auxiliados mecanicamente, inc.p.p. de protección previa de elementos que puedan verse afectados, limpieza final de restos y retirada de escombro a zona de acopio o con- tenedor para su posterior gestión, con recupe- ración de materiales para futuro empleo en obra, inc. p.p. de medios auxiliares y costes in- directos. Medida la superficie en proyección ho- rizontal' deduciendo un 20% en caso de tratar- se de ladrillo tabicón en lugar de hueco doble. (E002lev05) Panda Sur 1,07 70,00 74,90 en previsión resto limas 1,07 20,00 21,40 Total partida 03.08 ................................................................................................96,30 03.09 m2 Desmontaje de estructura de madera de cu- bierta completa, incluida la tabla base de teja, pares, vigas, tornapuntas y demas elementos, con protección previa de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superfi- cie en proyección horizontal'. (E002lev06) Panda Este 1,07 169,00 180,83 Total partida 03.09 ............................................................................................. 180,83 03.10 m. Levantado de los elementos metálicos tipo "Tramex" colocados a modo de pasarela sobre la cubierta de la Panda Sur, con retirada a pun- to de reciclaje o lugar a indicar por la D.F. para posible reutilización, incluida la p.p. de compe- sanción por reciclaje, medios auxiliares y costes indirectos. (E002lev07) PANDA ESTE lima posterior (ref. tramex) 1 8,19 8,19 lima posterior 1 8,39 8,39 lima posterior 1 17,82 17,82 Total partida 03.10 ................................................................................................34,40 03.11 m. Desmontaje del plomo que forma limas y babe- ros existentes en la Panda Este, tanto en la posterior junto a la Nave como las transversa- les, salvo las indicadas en memoria que puedan servir de base para la formación de unas nue- vas, con retirada de escombro a contenedor es- pecífico y gestión de residuos según estudio específico, con p.p. de medios auxiliares y cos- tes indirectos. Medida según trazado en planos. (E002lev08) PANDA ESTE lima posterior (ref. tramex) 1 8,19 8,19 lima posterior 1 8,39 8,39 lima posterior 1 17,82 17,82 limas transversales 4 5,00 20,00

Page 24: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

en previsión 1 15,00 15,00 Total partida 03.11 ................................................................................................69,40 03.12 m2 Retirada de cascotes sobre bóvedas y material de relleno ajeno a la fábrica original, respetando en todo caso el relleno de riñones e incluso si se considera aportándolo, todo con ligera su- pervisión arqueológica, (en caso de determinar la supervisión exhaustiva, se procederá según partida correspondiente en "UNIDAD VI:BÓVEDAS") según indicaciones de la direc- ción facultativa, con carga, retirada y selección de escombro a vertedero, según plan RDC, con p.p. de costes indirectos y medios auxilia- res. Medida en proyección horizontal según pla- nos. (E002lim1) Sur 1,5 70,00 105,00 Oeste 1,5 106,60 159,90 Norte 1,5 117,32 175,98 Este 1,5 120,75 181,13 Total partida 03.12 ............................................................................................. 622,01 03.13 ud Replanteo de las cubiertas proyectadas, una vez desmontadas las existentes, marcando pendientes, limas, encuentros y situación exac- ta de pares y correas, para formación de mure- tes, mechinales, preparación de vigas, etc. todo con p.p. de medios auxiliares y costes indirec- tos. (E002cub01) 1 1,00 Total partida 03.13 ..................................................................................................1,00 03.14 m2 Formación de cubierta con taquiques de ladrillo hueco doble a la palomera, recibidos con mor- tero bastardo de cemento, cal y arena, inclu- yendo ladrillo, en parte recuperado y reaprove- chable y resto aportado, dejándo la fábrica sóli- damente arriostrada y macizada en uniones, in- cluso replanteo, protección de bóvedas con lá- mina de polietileno, formación de maestras, ca- ma de mortero de cemento para asiento de pla- cas, encuentros, humedecido de piezas, cortes y desperdicios, limpieza de restos y carga de escombros generados a contenedor o punto de acopio, con medios auxiliares y costes indirec- tos. (E002cub02) Panda Sur 1 70,00 70,00 Total partida 03.14 ................................................................................................70,00 03.15 m. Formación de PESEBRÓN o LIMA POSTE- RIOR de PLOMO en la cubierta de la panda Sur del Claustro de la Catedral de Ciudad Ro- drigo, paralela a la Nave del Evangelio, con plo- mo tipo PB-2, de espesor 2,5 mm., y desarrollo mínimo según planos, adaptándose a las nece-

Page 25: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

sidades de obra, incluso formación de soporte y cama de yeso con p.p. de faldones sobre ven- tanales incluyendo el replanteo, ejecución de rozas sobre fábricas, cama de yeso, y engatilla- dos longitudinales - tramos nunca superiores a 2,50 metros- y transversale, babero recibido a roza, engatillado, pestañas en extremos, etc. y sellado de encuentros plomo-roza y otros posi- bles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rema- tada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. Según me- moria, planos e indicaciones de la D.F.. Medida longitudinalmente en paralelo a la Nave. (E002plom01) PANDA ESTE lima posterior (ref. tramex) 1 8,19 8,19 lima posterior 1 8,39 8,39 lima posterior 1 17,82 17,82 Total partida 03.15 ................................................................................................34,40 03.16 m. Formación de "LIMA TRANSVERSAL" de PLOMO en la cubierta de la panda Sur del Claustro de la Catedral de Ciudad Rodrigo y/o análogas, con plomo tipo PB-2, de espesor 2,5 mm., y desarrollo mínimo según planos, adap- tándose a las necesidades de obra, aseguran- do un sección de evacuación mínima de 500 cm2, con p.p. de solapes de 25 cm. y encuen- tro con gárgola de cobre, incluyendo el replan- teo, ejecución de rozas sobre fábricas, cama de yeso, y engatillados longitudinales - tramos nun- ca superiores a 2,50 metros- y transversales, con formación de pestañas en extremos, etc. y sellado de encuentros plomo-roza y otros posi- bles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rema- tada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. Para evitar bolsas o retenciones en los solapes se genera- rá una cama de yeso lo suficientemente sólida que permita un rebaje (siempre con caida) en la zona de solape. (E002plomo02) PANDA ESTE limas transversales 4 5,00 20,00 en previsión 1 5,00 5,00 Total partida 03.16 ................................................................................................25,00 03.17 m. Restauración de cornisa del muro exterior del Claustro, incluyendo la limpieza con cepillo de cerdas suaves, eliminación de líquenes, conso- lidación y en su caso impermeabilización según criterios generales de intervención en paramen- tos exteriores, con reposición puntual con mor- tero "Petratex" o similar asegurando nivelación, dejando lista para la colocación de gatos de co- bre y formación de nuevas cubiertas, incluso reintegración en la zona de encuetro de cubier-

Page 26: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tas con pináculos formando base para coloca- ción de babero de plomo y canalón de cobre, etc, todo con p.p. de medios auxiliares y costes indirectos. (E002corn01) panda sur 1 23,30 23,30 panda oeste 1 23,63 23,63 panda norte 1 23,12 23,12 panda este 1 23,64 23,64 a deducir reposición piedra Total partida 03.17 ................................................................................................93,69 03.18 m3 Sustitución de cornisa de piedra o restitución, en zonas marcadas previamente por la direc- ción facultativa, incluyendo el cajeado de piedra necesario para la suplantación de piedra nueva selecciona, arenisca de Ciudad Rodrigo, extrai- da de cantera o recuperada una vez comproba- da su idoneidad, previa selección por parte de la d.f., incluso p.p. de sacado de plantillas, talla- do de piedra, preparación de soporte, limpieza, recibido con mortero de cal y anclaje con vari- llas de fibra y mortero de restauración, rejunta- do, sellado y limpieza final, con marcado de pie- dra nueva según memoria, patinado y limpieza final, costes indirectos y medios auxiliares. Me- dida el volumen realmente colocado. (E002corn02) En previsión colocación nuevas piezas 4 1,00 0,95 0,55 2,09 Total partida 03.18 ..................................................................................................2,09 03.19 ud Trabajos de DESMONTAJE y posterior RECO- LOCACIÓN de la coronación de contrafuertes y cornisas aledañas en la fachada exterior de la Panda Sur de la Catedral de Ciudad Rodrigo, con el objeto de poder acometer las obras de canalización de desagües de pluviales de la cu- bierta que protege esa Panda, previa numera- ción, toma de datos y reportaje fotográfico, y posteriormente al cimbrado de la bóvedas 4,5 y 6, preparando zona adecuada y protegida para el acopio de piezas, retirando cornisas, sillares, piezas de remate y elementos necesarios, inclu- yendo la adaptación y reposición de los ele- mentos según las nuevas canalizaciones, inclu- so restaurando cornisas afectadas según crite- rios ya indicados, con p.p. de aportación de pie- dra nueva y su tallado, formación de asientos, recibidos, retacados, y rejuntados empleando mortero de cal y arena seleccionada coloreado con pigmentos inorgánicos, limpieza con cepillo de cerdas, consolidación e impermeabilización y patinado en su caso, con p.p. de medios auxi- liares y costes indirectos, medida la unidad en un 25% a su completo desmontaje y el 75% restante a la finalización y remate del elemento indicado. Se limitará el plazo entre desmontaje y montaje al máximo posible, cargando vertical- mente o en su defecto apuntalando los contra-

Page 27: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

fuertes afectados. (E002mur00) Contrafuertes y cornisas PANDA SUR 4 4,00 Total partida 03.19 ..................................................................................................4,00 03.20 m2 Restauración de MUROS DE SILLERIA, exis- tentes entre el extradós de bóvedas del Claus- tro y sus cubiertas, compuestos por fábricas de SILLERIA y sillarejos con interposición puntual de otros, ladrillo, necesitados de estabilizacio- nes puntuales, retacados, retirada de enfosca- dos de cemento y los de cal en mal estado, lim- pieza de juntas, soplado, descarnados y rejun- tados según criterios generales de intervención (uso de materiales y formas de actuación), in- cluyendo la p.p. de protección de bóvedas con lámina de polietileno y la limpieza final, con reti- rada de escombros a contenedor, medida la superficie realmente ejecutada compensando medición según criterio de la Dirección Faculta- tiva e igualmente deduciendo la parte de muro intervenida en la preparación de muros para apoyo de durmientes (hasta un máximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cubiertas así como la parte correspondiente al desmontaje de contrafuertes y cornisas de la Panda Sur, todo con medios auxiliares y costes indirectos. Los muros de fá- brica de silleria o en mejor estado se medirán según partida independiente. (E002mur01) PANDA OESTE cara a Museo, nivel inferior, en partida a parte nivel superior, muro silleria 1 36,40 2,00 72,80 PANDA NORTE cara Muralla 1 36,39 1,50 54,59 PANDA ESTE cara a Crucero Iglesia 1 3,50 3,85 13,48 Intradós Fachada Este 1 29,15 1,00 29,15 Total partida 03.20 ............................................................................................. 170,02 03.21 m2 Restauración de MUROS DE MAMPOSTERIA, existentes entre el extradós de bóvedas del Claustro y sus cubiertas, compuestos por fábri- cas de mampostería de piedra, sillarejos y/o la- drillo, de pobre factura en general, necesitados de estabilizaciones puntuales, retacados, retira- da de enfoscados de cemento y los de cal en mal estado, limpieza de juntas, soplado, des- carnados y rejuntados según criterios generales de intervención (uso de materiales y formas de actuación), incluyendo la p.p. de protección de bóvedas con lámina de polietileno y la limpieza final, con retirada de escombros a contenedor, medida la superficie realmente ejecutada com- pensando medición según criterio de la Direc- ción Facultativa e igualmente deduciendo la parte de muro intervenida en la preparación de muros para apoyo de durmientes (hasta un má-

Page 28: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cubiertas así como la parte correspondiente al desmontaje de contrafuertes y cornisas de la Panda Sur, to- do con medios auxiliares y costes indirectos. Los muros de fábrica de silleria o en mejor esta- do se medirán según partida independiente. (E002mur05) PANDA SUR franja a desmontar + previsión posible 1 12,79 1,10 14,07 en previsión 1 3,00 1,10 3,30 PANDA OESTE cara interior a Patio 1 28,08 1,10 30,89 cara a Museo, nivel inferior 1 36,40 2,08 75,71 nivel superior, muro silleria - ver partida específica- PANDA NORTE cara interior a Patio 1 27,76 1,10 30,54 cara a Muralla 1 36,39 3,49 127,00 PANDA ESTE Intradós muro a Claustro 1 28,02 1,10 30,82 Intradós Fachada Este 1 29,15 3,85 112,23 ''150 A deducir zona muro apoyo durmiente -1 -1,00 Total partida 03.21 ............................................................................................. 423,56 03.22 m2 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, la- drillos y elementos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur06) 1 185,00 185,00 Total partida 03.22 ............................................................................................. 185,00 03.23 m2 Picado de enfoscados de cemento y/o cal en trabajos de restauración de paramentos, por medios manuales con p.p. de retirada de es- combros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur07) en previsión 1 180,00 180,00 Total partida 03.23 ............................................................................................. 180,00 03.24 m2 Formación de tablero de cubierta a base de pie- zas de hormgión prefabricado autoportantes, incluso relleno de juntas en encuentros para re- gularización del tablero, empleando placas tipo "Prephor" 100/50, 100/33, recibidas con morte- ro de cemento y/o pasta de yeso negro s/RY-85 y recomendaciones del fabricante, adaptándo- se a medidas de tabicones, incluso remates, dejando lista para colocación de placa BTU, con p.p. de pequeño material de agarre y fija- ción, medios auxiliares y costes indirectos. Me- dida la unidad en proyección horizontal y/o

Page 29: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

s/criterio D.F. en base a trabajos realizados. En caso de una posible reutilización de placas, una vez comprobado su estado, se descontará un 25% sobre medición de obra ejecutada. (E002cub03) Sur zona bóveda 4,5,6 1 70,00 70,00 Sur, otras limas 1 20,00 20,00 Total partida 03.24 ................................................................................................90,00 03.25 m2 Tarima machihembrada de pino Norte de 23 mm. de espesor, seleccionada y tratada en lu- gar de origen en su caso, i/p.p. replanteo, nive- lación, acuñados, recibidos, clavado, acuchilla- do, lijado y si hace falta cajeados en piedra se- gún detalle, incluso tratamiento con dos manos de Xylamon fondo en todas las caras y cortes y otras dos de "Xylamón roble mate" en sus ca- ras vistas o accesibles, s/NTE-RSR-13, memo- ria, planos e indicaciones de la D.F., medida en proyección horizontal,, con p.p. de accesorios, medios auxiliares y costes indirectos. (E002cub04) Panda Oeste 1 29,45 6,04 177,88 Panda Norte 1 29,07 6,75 196,22 Panda Este 1 28,76 6,36 182,91 ^39 Total partida 03.25 ............................................................................................. 557,01 03.26 m2 Capa de regularización de faldón de cubierta para asegurar tanto la alienación como el pla- neamiento adecuado del mismo, teniendo en cuenta se va a colocar directamente fijada una placa BTU, según partida correspondiente, in- cluyendo la formación de encuentros y remates necesarios, teniendo en cuenta el estado del faldón sur actual que cubre la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, con p.p. de medios auxiliares, costes indirectos y re- tirada de escombros a camión para transporte a vertedero. (E002cub5.1) Panda Sur - faldón a Nave 1 33,94 2,46 83,49 Panda Sur - faldón a patio 1 33,94 3,07 104,20 a deducir encuentros con faldón este -0,5 5,14 3,07 -7,89 a deducir encuentro con faldón oeste -0,5 5,44 3,07 -8,35 ^ Total partida 03.26 ............................................................................................. 171,45 03.27 m2 Suministro, colocación y remates de cubierta a base de placa tipo BTU "Euronit" 230 normal o maxi, fijada sobre faldón de cubierta previamen- te raseado y alineado, incluso elementos de fija- ción a base de tornillos de anclaje con arandela expansiva, con p.p. de solapes, encuentros, protección de limas, etc. limpieza final y p.p. de medios auxiliares y costes indirectos. (E002cub05)

Page 30: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Panda Sur - faldón a Nave 1 33,94 2,46 83,49 Panda Sur - faldón a patio 1 33,94 3,07 104,20 a deducir encuentros con faldón este -0,5 5,14 3,07 -7,89 a deducir encuentro con faldón oeste -0,5 5,44 3,07 -8,35 ^ Total partida 03.27 ............................................................................................. 171,45 03.28 m2 Suministro y colocación de CHAPA NERVADA DE ACERO GALVANIZADO perfil tipo "PL 33/07" de "Acelor Mittal" o similar con tirafondos con arandelas de goma sobre las crestas, auto- portante, para luces de 100 cm., galvanizado por ambas caras, colocada sobre LÁMÍNA GEOTEXTIL y esta sobre la tarima de madera y clavada a correas, y vertido de CAPA DE "MORTERO DE "ARLITA" -mortero ligero de arcilla expandida y cemento- de 4-5 cm. de es- pesor (cubriendo totalmente la onda y con re- mate en borde según planos a base de mortero teñido y aditivado con Primal), armada con MA- LLA DE SIMPLE TORSIÓN GALVANIZADA 50/50/1mm. sujeta a la chapa en la cabeza de los tirafondos, i/p.p. de geotextil evitando con- tactos de materiales incompatibles, lámina anti-impacto, aislamiento, solapes, accesorios de fijación, juntas de estanqueidad, piezas de remate, incluidas las de formación de limas a base de elemento especial adaptable y estanco (ref. "Uraterm" o similar). Todo includio y p.p. de medios auxiliares y costes indirectos, s/NTE-QTG-7, medida en proyección horizontal.' (E002cub06) Panda Oeste 1 29,45 6,04 177,88 Panda Norte 1 29,07 6,75 196,22 Panda Este 1 28,76 6,36 182,91 ^39 Total partida 03.28 ............................................................................................. 557,01 03.29 m2 Cubricción de cubierta sobre placa tipo "BTU Euronit", a base de teja cerámica curva nueva en canales (excepto en remates vistos), a elegir por la dirección facultativa, y teja curva vieja en cobijas, bien recuperada apilada previa limpieza y selección bien aportando el resto de teja, de carácterísticas, calidad y acabado similar, recibi- das con adhesivo mono-componente de espu- ma de poliuretano en el lateral de las canales, MACIZANDO con mortero pobre bastardo de cal, cemento y arena de rio teñido con pigmen- tos inorgánicos previa muestra a aprobar por la dirección facultativa (mortero M-20), colocada respetando escrupulosamente alieaciones de tejas en vertical perpendiculares a canal de de- sague y en horizontal, macizando según criterio indicado en memoria, generando pasos de mantenimiento y o protegiendo las zonas que reciban aguas de cubierta superior, incluso for- mación de cumbreras, limatesas, limahoyas y

Page 31: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

otros encuentros, ganchos de sujección, en- cuentros, emboquillados y remate que evite en- trada de pájaros y otros animales, remate con lucernario y elementos salientes, ventilaciones y remate de borde, todo incluido con LIMPIEZA FINAL tanto de la cubierta con cepillo y agua, como de los elementos afectados, y p.p. de medios auxiliares y costes indirectos, con carga de escombros a contenedor. Medida la unidad en proyección horizontal y/o según criterio D.F.' (E002cub07) Panda Sur - faldón a Nave 1 33,94 2,46 83,49 Panda Sur - faldón a patio 1 33,94 3,07 104,20 a deducir encuentros con faldón este -0,5 5,14 3,07 -7,89 a deducir encuentro con faldón oeste -0,5 5,44 3,07 -8,35 ^ Total partida 03.29 ............................................................................................. 171,45 03.30 m2 Cubricción de cubierta sobre capa de mortero aligerado, a base de teja cerámica curva nueva en canales, a elegir por la dirección facultativa, y teja curva vieja recuperada apilada previa lim- pieza y selección aportando teja de carácterísti- cas, calidad y acabado similar según necesida- des, recibidas con mortero pobre bastardo de cal, cemento y arena de rio teñido con pigmen- tos inorgánicos previa muestra a aprobar por la dirección facultativa (mortero M-20), colocada respetando escrupulosamente alieaciones de tejas en vertical perpendiculares a canal de de- sague y en horizontal mediante el tirado de cuerdas, macizando según se indica en memo- ria (como creiterio general macizando dos hila- das si y cuatro no en vertical, tres horizontales junto a los muros a parte del encostillado, otras dos junto el canalón y las hiladas intermedias horizontales para que nunca queden más de 6 sin macizar, asi como zonas de paso a lucerna- rios, o zonas que reciban aguas de cubierta su- perior, y p.p. de macizado en los encuentros con los muros, con mortero de cal impermeabi- lizado con la adicción "Super Sikalite" o similar, incluso formación de cumbreras, limatesas, li- mahoyas y otros encuentros, ganchos de su- jección, encuentros, emboquillados y remate que evite entrada de pájaros y otros animales, remate con lucernario y elementos salientes, ventilaciones y remate de borde, todo incluido con LIMPIEZA FINAL tanto de la cubierta con cepillo y agua, como de los elementos afecta- dos, y p.p. de medios auxiliares y costes indi- rectos, con carga de escombro a contenedor. Medida la unidad en proyección horizontal y/o según criterio D.F.' (E002cub08) Panda Oeste 1 29,45 6,04 177,88 Panda Norte 1 29,07 6,75 196,22 Panda Este 1 28,76 6,36 182,91 ^39

Page 32: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Total partida 03.30 ............................................................................................. 557,01 03.31 m. Fabricación, suministro y montaje de canalón de cobre "1/4 duro" de 0,8 mm. de espesor de chapa y díametro 125 mm., con p.p. de gatos de fijación a base de gatos de cobre "1/2 duro" de pletina 3/30 mm. colacados cada 50 cm. en- tre ejes y siempre uno a cada lado de las gár- golas, anclados a la fábrica con dos tirafondos de acero inoxidable 5/50 con taco de plástico, previa preparación de soporte, con p.p. de reci- bidos, soldaduras, conexiones, orificios para montaje de gárgolas, tapas, y conexiones con limas de cubierta y adaptación en encuentros con pináculos, sellados, etc. con p.p. de me- dios auxiliares y costes indirectos. (E002cob01) panda sur 1 23,30 23,30 panda oeste 1 23,63 23,63 panda norte 1 23,12 23,12 panda este 1 23,64 23,64 Total partida 03.31 ................................................................................................93,69 03.32 ud Fabricación, suministro y colocación de gárgola de cobre incluso soporte de fijación, todo se- gún detalle, con tubo de cobre idem canalón, y soporte formado por angular de cobre "1/2 du- ro" de 2 mm. de espesor , con base superior de 12x15 cm., y faldón vertical de 12x6 cm., con taladros para recibido mediante tirafondos de acero inoxidable 5/50 y tacos plasticos, y forma- ción de angular en bucle para sujección de ple- tina 2/20, costillas de cobre 4/2 mm., envolven- te de 0,8 mm , remates, conexiones con cana- lón y con limas de plomo, sellados, etc. todo se- gún detalle constructivo e indicaciones de la d.f, incluso tratamiento y protección del cobre en su caso, preparación del soporte y colocación de elementos auxiliares, todo según memoria, pla- nos e indicaciones de la D.F., con p.p. de me- dios auxiliares y costes indirectos. (E002cob02) 9 9,00 9 9,00 9 9,00 9 9,00 Total partida 03.32 ................................................................................................36,00 03.33 m2 Formación de babero y/o remate de cubierta en encuentro faldón-canalón, con formación de pestaña y entrega sobre canalón perfectamente alineada, empleando bandejas de cobre "1/2 duro" de 8 mm. de espesor, incluso cortes y ta- ladros, fijado a la fábrica con dos tirafondos de acero inoxidable y tacos de material plástico, cada 50 cm., solapes y sellados, según memo- ria y planos, Medida la superficie en proyección, con p.p. de formación de pestaña y remates, limpieza, medios auxiliares y costes indirectos.

Page 33: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(E002cob03) panda sur 1 23,30 0,35 8,16 panda oeste 1 23,63 0,35 8,27 panda norte 1 23,12 0,35 8,09 panda este 1 23,64 0,35 8,27 Total partida 03.33 ................................................................................................32,79 03.34 m2 Retirada de capa de tierra de apoyo de teja en cubierta de Claustro de la Catedral de Ciudad Rodrigo, con retirada de escombro a contene- dor o zona de acopio de esombros, con p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. (E002lev09) Panda Oeste 1 29,45 6,04 177,88 Panda Norte 1 29,07 6,75 196,22 Panda Este 1 28,76 6,36 182,91 ^39 Total partida 03.34 ............................................................................................. 557,01 03.35 m2 Retirada de la lámina asfáltica colocada en las cubiertas del Claustro de la Catedral de Ciudad Rodrigo, con acopio en contenedor adecuado para su gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superficie en pro- yección horizontal'. (E002lev10) Panda Sur ^ 1,07 70,00 74,90 Panda Oeste 1,07 165,00 176,55 Panda Norte 1,07 184,00 196,88 Total partida 03.35 ............................................................................................. 448,33 03.36 m. Retirada de canalón y gárgolas existentes, con carga a contenedor o hasta zona de acopio de escombros, para su gestión, con p.p. de me- dios auxiliares y costes indirectos. (E002lev11) Panda Sur 1 23,33 23,33 Panda Oeste 1 23,52 23,52 Panda Norte 1 23,25 23,25 Panda Este 1 23,64 23,64 prolongaciones 23 1,85 42,55 gárgolas 23 23,00 Total partida 03.36 ............................................................................................. 159,29 03.37 m2 Demolición de tabique de tabiques a la palor- mera en formación de cubierta, a base de ladri- llo "HUECO BILBAO", con carga a contenedor o hasta zona de acopio de escombros, para su gestión, con p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. (E002lev12) Panda Oeste 1,07 165,00 176,55 Panda Norte 1,07 184,00 196,88 Total partida 03.37 ............................................................................................. 373,43

Page 34: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

03.38 m3 Partida en previsión para la retirada de los posi- bles zunchos de hormigón existentes según in- tervenciones relativamente recientes, previa consideración, evaluación y autorización de la D.F. especialmente en los casos en que su po- sicionamiento interfiera en la cubierta proyecta- da, o bien por su inadecuado estado, funciona- lidad, etc, procediendose en cualquier caso al picado cuidadoso con martillos de poca poten- cia, procurando previamente la desolidarización con las fábricas que los acojen en la medida de lo posible, evitando vibracciones, con p.p. de retirada de esombros a contendero, medios au- xiliares y costes indirectos. (E002lev13) Muro Oeste 1 27,08 0,40 0,35 3,79 1 32,25 0,40 0,35 4,52 Muro Norte 1 26,76 0,40 0,35 3,75 1 34,67 0,40 0,35 4,85 tirantes en prevision^ 6 6,05 0,30 0,30 3,27 6 6,32 0,35 0,35 4,65 Total partida 03.38 ................................................................................................24,83 03.39 ud Formación de mechinal en fábrica maciza de piedra arenisca de Ciudad Rodrigo, para apoyo de elementos estructurales proyectados, dejan- do previsto el apoyo mediante cama de mortero de cal a nivel, y lámina de neopreno de 1 cm. regularizando el hueco que será de al menos 25 cm. de ancho, (E002mur02) PARES Panda Oeste 6 6,00 Panda Norte 6 6,00 Panda Este 6 6,00 LIMAS Encuentro oeste-norte 1 1,00 Encuentro Norte-Este 1 1,00 Encuentro Este-Sur 1 1,00 CORREAS encuentro con contrafuertes FALDÓN OESTE 3 3,00 en previsión ESTE a Crucero' 1 1,00 Total partida 03.39 ................................................................................................25,00 03.40 m. Preparación de muros para apoyo de durmien- te, a base de cajeado de muro existente, y/o re- crecidos, según casos dejando formada una cama de asiento con mortero de cal incluyendo como p.p. los rellenos, retacados y/o refuerzos necesarios que aseguren su estabilidad, em- pleando piedra arenisca y/o ladrillo de tejar o el recuperado si la D.F. lo estimada, así como pre- paración de la coronación de muros para el asiento en su caso de la tabla o chapa de pro- tección a base retacados de mortero de cal, empleando mortero de cal y arena, perfecta- mente nivelada para asiento de durmientes de madera, con p.p. de medios auxiliares y costes

Page 35: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

indirectos. (E002mur03) Muro Oeste 1 26,08 26,08 Muro Norte 1 25,76 25,76 Muro Este 1 26,02 26,02 Total partida 03.40 ................................................................................................77,86 03.41 m3 Fabricación, suministro, colocación, tratamiento previo y acabado de durmientes de madera de ROBLE FRANCES -ME1- de escuadría 24x20 cm. con encuentros entre durmientes a media madera y anclajes de los durmientes a muros mediante varillas de acero inoxidable de 20 mm. de díametro recibidas con "Sikadur 42" o similar en orificios de 30 mm. de díametro realizados por rotación con una entrega a fábrica mínima de 50 cm. situados cada 1,50 metros - ó según planos e indicaciones de la D.F.- y al tresbolillo, con doble tuerca superior y arandela, todo en acero inoxidable, incluyendo replanteo, prepa- ración, tacos especiales para unión entre pie- zas, cortes, rebajes, encuentros, empalmes y obra necesaria, cepillado y lijado previo de la madera y tratamiento en taller, presentación, asiento, montaje total y tratamiento en obra en todas las caras y cortes con dos manos de "Xylamon fondo" o similar todo con p.p. de me- dios auxiliares y costes indirectos. (E002mad01) Muro Oeste 1 27,08 0,24 0,20 1,30 Muro Norte 1 26,76 0,24 0,20 1,28 Muro Este 1 27,02 0,24 0,20 1,30 Total partida 03.41 ..................................................................................................3,88 03.42 m3 Fabricación suministro y montaje de madera la- minada tipo GL24, de Picea Abies, según me- moria y planos, en formación de PARES y simi- lares, incluso p.p. de herrajes de acero con su tornillería y accesorios de ensamblaje, así como cuñas y otros elementos necesarios, todo se- gún planos, replanteo, cortes, tratamiento pre- vio de la madera y acabado protector en obra en todas sus caras y cortes con dos manos de Xyladecor roble mate, totalmente colocada y re- matada, con p.p. cajeados puntuales necesara- rios y/o apoyos en fábrica, sean de piedra o la- drillo, incluso interposición de elementos sepa- radores o formando juntas de trabajo, limpieza, con p.p. de medios auxiliares y costes indirec- tos. Medido en obra según criterio D.F. Según norma DIN 1052, asegurando una estabilidad mínima al fuego s/CTE. (E002mad02) PARES panda oeste 6 6,50 0,20 0,32 2,50 panda norte 6 6,71 0,20 0,32 2,58 panda este 6 6,30 0,20 0,32 2,42 LIMAS

Page 36: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

encuentro faldón oeste-norte 1,16 10,80 0,20 0,32 0,80 encuentro faldón norte-este 1,16 9,87 0,20 0,32 0,73 resto ajustes^ 18 0,80 0,20 0,32 0,92 Total partida 03.42 ..................................................................................................9,95 03.43 m3 Fabricación suministro y montaje de madera la- minada tipo GL24c, de Picea Abies, según me- moria y planos, en formación de CORREAS y similares, colocadas sin herrajes, en hendidu- ras, salvo puntualmente bajo aprobación de la D.F. siendo en tal caso de acero con su tornille- ría y accesorios de ensamblaje, así como cu- ñas y otros elementos necesarios, todo según planos, replanteo, cortes, tratamiento previo de la madera y acabado protector en obra en to- das sus caras y cortes con dos manos de Xyla- decor roble mate, totalmente colocada y rema- tada, con p.p. cajeados puntuales necesararios y/o apoyos en fábrica, sean de piedra o ladrillo hueco (por ejem. en apoyo junto contrafuerte antigua Capilla de los Hierros y en formación de limas con faldón panda sur) limpieza, con p.p. de medios auxiliares y costes indirectos. Según norma DIN 1052, asegurando una estabilidad mínima al fuego s/CTE. Medida en verdadera magnitud. (E002mad03) CORREAS correas faldón oeste''' 1 203,22 0,12 0,20 4,88 correas faldón norte''' 1 179,80 0,12 0,20 4,32 correas faldón este''' 1 204,18 0,12 0,20 4,90 en formación estruc. retic. sobre bóvedas 1 91,62 0,12 0,20 2,20 mont/desm.^^ Total partida 03.43 ................................................................................................16,30 03.44 m2 Formación de estructura reticular sobre bóve- das, en previsión, asegurando la separación mí- nima de 5 cm. entre pares, correas y extradós de bóvedas, empleando correas calzadas sobre la fábrica y arriostradas con piezas de madera 10/9, completamente separadas de los pares, empleando madera laminada idem anterior en características, calidad y acabado. Medios auxi- liares y costes indirectos incluidos. Medida en proyeccion horizontal, incluyendo tabla. (E002mad04) 1 78,00 78,00 Total partida 03.44 ................................................................................................78,00 03.45 m. Formación de BABERO DE PLOMO ENGATI- LLADO PB-2 certificado, de 2,5 mm. de espe- sor y 50 cm. de desarrollo, en formación de EN- CUENTRO CUBIERTA-MURO de piedra, inclu- yendo el replanteo, ejecución de roza perfecta- mente alineada sobre fábrica del muro, forma- ción de cama y adaptación al encostillado de te- ja realizado, recibido a roza con pestaña en ex- tremo y sellado con "Sikaflex Pro 2 HP" o simi- lar, de color gris o, p.p. de costes indirectos y

Page 37: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdi- cios a contenedor especial. (E002plom03) ENCUENTRO CUBIERTA PARAMENTO encuentro panda oeste-muro Museo 1 37,23 37,23 encuentro Panda Norte-muro 1 35,22 35,22 encuentro Panda Este-muro fachada Este 1 29,16 29,16 encuentro Panda Este y Sur con Crucero 1 8,26 8,26 Iglesia encuentro Panda Sur con paño Ref."Capilla 1 6,08 6,08 Hierros" OTROS ENCUENTROS ANÁLOGOS protección encuentro cubierta con pináculos 8 1,25 10,00 Total partida 03.45 ............................................................................................. 125,95 03.46 m. Formación de LIMAHOYA o similares, de PLO- MO ENGATILLADO PB-2 certificado, de 2,5 mm. de espesor y 90 cm. de desarrollo, con p.p. de pestañas y engatilldos, en formación de ENCUENTRO entre FALDONES DE CUBIER- TA, incluyendo la formación de una CAMA DE YESO sobre el soporte, incluyendo el replanteo, y sellados puntuales en encuentros con "Sikaflex Pro 2 HP" o similar, de color gris o, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. Medida en proyección horizontal. (E002plom04) ENCUENTROS DE CUBIERTAS DE PANDAS Este-Sur 1,12 4,86 5,44 Sur-Oeste 1,12 3,80 4,26 Oeste-Norte 1,12 8,91 9,98 Norte-Este 1,12 9,40 10,53 Total partida 03.46 ................................................................................................30,21 03.47 ud Suministro y colocación de extintor de eficacia 21A, a colocar en zona bajo cubierta de Nave del Evangelio, en las proximidades de los lucer- nacios de acceso, incluyendo p.p. de accesos de cuelgue y fijación, con p.p. de costes indi- rectos y medios auxiliares. (E002pcf01) Bajo cubierta PANDAS ESTE, OESTE y 3 3,00 NORTE Total partida 03.47 ..................................................................................................3,00 03.48 ud Colocación de lucernario de fundición en faldón de cubierta, incluyendo recrecido en chapa per- forada de 2 mm. de espesor y 5 mm. el díame- tro de las perforaciones para ventilación conti- nua según modelo empleado en anteriores in- tervenciones, incluyendo la preparación, trata- miento y colocación del lucernario, con p.p. de material auxilar, medios auxiliares y costes indi- rectos. Segun detalle de proyecto.

Page 38: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(E002cub10) Faldón cubierta PANDAS ESTE, OESTE y 3 3,00 NORTE Total partida 03.48 ..................................................................................................3,00 03.49 ud Cegado del óculo del trasdós de la fachada de la Capilla de San Jerónimo, con fábrica de ladri- llo recuperado y mortero de cal, incluso p.p. de medios auxiliares y costes indirectos, con lim- pieza final y retirada de escombros a contene- dor. (E002mur04) 1 1,00 Total partida 03.49 ..................................................................................................1,00

Page 39: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

04 UNIDAD III:FACHADA ESTE 04.01 m2 Protección del solado en trabajos de restaura- ción de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espe- sor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, se- llando uniones con cinta adhesiva plástica, verti- do de cama de arena seca de regulización y co- loción de tablero aglomerado de 30 mm. de es- pesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los tra- bajos, medios auxiliares y costes indirectos. (E002prot01) FACHADA ESTE tramo nivel superior 1 16,52 1,13 18,67 tramo nivel inferior 1 10,70 1,63 17,44 Total partida 04.01 ................................................................................................36,11 04.02 ud Retirada de aquellos elementos ajenos a la fá- brica, tales como soporte de antiguas instala- ciones, cableados, grapas, clavos, etc. previa indicación y aprobación expresa por parte de la D.F., con p.p. de reterida y acopio para gestión de residuos, medios auxiliares y costes indirec- tos. En intervención de la FACHADA ESTE del CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO. (E03lev01) 1 1,00 Total partida 04.02 ..................................................................................................1,00 04.03 m2 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, la- drillos y elementos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur06) FACHADA ESTE lateral derecho "puerta de los carros" 1 1,94 1,54 2,99 bajos muro saliente 1 5,18 0,50 2,59 otros 1 4,00 0,70 2,80 1 0,80 0,50 0,40 bajos 1 12,00 0,50 6,00 zona puerta en esviaje 1 4,00 0,70 2,80 Total partida 04.03 ................................................................................................17,58 04.04 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURA- CIÓN DE ZÓCALOS DE PIEDRA, de fábricas de sillería, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fá- brica, incluyendo el suministro de la piedra

Page 40: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(arenisca de Ciudad Rodrigo), cajeados, retira- da de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, for- mación de cama y asiento, recibido con morte- ro de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patina- do y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización mediane tres manos de "Sikaguard 710" o similar aplica- das "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. (E003mur01) FACHADA ESTE lateral derecho "puerta de los carros" 1 1,94 1,54 2,99 bajos muro saliente 1 5,18 0,50 2,59 en previsión bajos 1 12,00 0,40 4,80 Total partida 04.04 ................................................................................................10,38 04.05 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURA- CIÓN DE FABRICAS DE SILLERÍA, de escua- dria adaptada a las hiladas y para un fondo mí- nimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajeados, retirada de fábricas ajenas o rellenos, prepara- ción de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mor- tero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patina- do y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización mediane tres manos de "Sikaguard 710" o similar aplica- das "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. (E003mur02) SUSTITUCIÓN FÁBRICAS DE PIEDRA DE SILLERIA zona fachada Este a Atrio 1 4,00 0,70 2,80 Total partida 04.05 ..................................................................................................2,80 04.06 m3 Sustitución de fábricas talladas en piedra are- nisca de Ciudad Rodrigo , en trabajos de RES- TAURACIÓN DE FABRICAS TALLADAS, tipo 1 (BOTAAGUAS, IMPOSTAS , REMATES de la fachada Este Claustro Catedral de Ciudad

Page 41: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Rodrigo y similares), de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el suministro de la pie- dra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajeados, retirada de fábricas aje- nas o rellenos, preparación de piedras y sopor- te, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fi- bra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de interven- ción, incluyendo el marcado, patinado y consoli- dación en su caso con "Tegovakon V" protegi- do con "Tegosivin HL 100" o similares hasta sa- turación e impermeabilización mediane tres ma- nos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar previa aprobación de la D.F., por medios manuales con p.p. de costes indi- rectos y medios auxiliares. (E003mur03) En previsión zona botaaguas 1 5,00 0,50 0,45 1,13 otros 1 0,50 0,50 Total partida 04.06 ..................................................................................................1,63 04.07 m3 Sustitución de fábricas talladas en piedra are- nisca de Ciudad Rodrigo , en trabajos de RES- TAURACIÓN DE FABRICAS TALLADAS, tipo 2 (para elemento de la CRESTERIA de la fa- chada Este Claustro Catedral de Ciudad Rodri- go y similares), de escuadria y despiece adapta- da al elemento existente, incluyendo únicamen- te los elementos necesarios que garanticen la estabilidad, una vez se compruebe a pie de obra el estado real de la fábrica, con tratamien- tos idem anterior. (E003mur04) En previsión, zona crestería y otros a justificar 1 0,35 0,35 Total partida 04.07 ..................................................................................................0,35 04.08 m2 Restauración de la crestería de la Fachada Es- te del Claustro de la Catedral de Ciudad Rodri- go, por todas sus caras, consistente en asegu- rar la estabilidad del elemento, recolocando pie- zas en su caso, o fijando las sueltas, (y muy puntualmente, previa aprobación de la D.F. con posible incorporación de piezas nuevas o ele- mentos de piedra arenisca de Ciudad Rodrigo), empleando cuñas y varillas de vidrio-epoxi de diferentes diametros y longitudes según necesi- dades, recibiendolas con cal hidráulica natural NHL 3,5 CE de FYM Italcementi Group hasta colmatación, introduciendo el extremo de la va- rilla lo suficiente como para rematar la parte vis- ta con mortero de rejuntado, CPA "M8"= osimi- lar, limpiando la superficie con cepillo de cer-

Page 42: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

das, incluso líquenes, musgos y otras costras, descarnando y rejuntando juntas, consolidan- do, impermeabilizando y patinando, todo en su caso previa autorización de la D.F. y siguiendo los criterios generales de intervención, dedu- ciendo proporcionalmente los tratamientos no realizados en base a partidas ya incluidas en este presupuesto, con p.p. de medios auxiliares y costes indirectos. (E003mur05) CRESTERIA tramo 1 1 5,86 5,86 tramo 2 1 5,59 5,59 tramo 3 1 3,38 3,38 tramo 4 1 0,72 0,72 tramo 5 1 1,09 1,09 tramo 6 1 0,67 0,67 resto caras 1,2 17,31 20,77 Total partida 04.08 ................................................................................................38,08 04.09 m2 Eliminación de líquenes, musgos y demás cos- tras biogénicas sobre piedra arenisca de Ciu- dad Rodrigo, en fachadas, contrafuertes, albar- dillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello pe- róxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecuti- vas, dejando actuar al menos 10 días, eliminan- do los restos con cepillos de cerdas de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, limpiando de nuevo la superficie transcurrida una semana con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, lim- pieza final , medios auxiliares y costes indirec- tos. Medida la superficie en proyección vertical por su cara exterior. (E03fab01) Botaaguas fachada este 1 28,30 0,85 24,06 Remate superior fachada este 1 28,30 0,68 19,24 Bajos fachada y o salientes 1 28,30 0,60 16,98 resto a comprobar en obra 0,05 351,00 17,55 Total partida 04.09 ................................................................................................77,83 04.10 m2 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contem- plados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo la limpieza con cepillos de cerdas sua- ves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de ele- mento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o ele-

Page 43: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

mentos labrados, dejando las superficies aca- badas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, im- permeabilización etc.) incluso aspirado y/o so- plado. Medida en proyección vertical según pla- nos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxiliares. (E03fab02) FACHADA ESTE fachada 1 28,86 10,00 288,60 diferencia nivel zona Atrio Amayuelas 1 11,05 1,53 16,91 a mayores botaguas 1 28,24 0,25 7,06 a mayores salientes zona superior 1 28,24 0,40 11,30 entrante tramo sobre botaaguas hacia crucero 1 0,80 4,76 3,81 muro perpendicular a fachada, prolongación 1 5,23 4,50 23,54 cierre Norte Claustro 30^ Total partida 04.10 ............................................................................................. 351,22 04.11 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos_ 1,- DESCARNADO de juntas de fábricas de si- llería y elementos contemplados en esta inter- vención, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, previa inspección a pie de obra e indicaciones de la di- rección facultativa, empleando material adecua- do -cinceles finos, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior 3,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena selecciona- da y tamizada, con aglomerante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 4,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. 5,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, estimando no más del 4% de la super- ficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de

Page 44: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

fachada completo, con p.p. de salientes, pilas- tras, molduras, etc deduciendo huecos y esti- mando un 30% el descarnado de juntas y so- plado, el 60% a la finalización del rejuntado y el 10% restante a la retirada de los andamios pre- via autorización por escrito de la D.F. (E03fab03) FACHADA ESTE fachada 1 28,86 10,00 288,60 diferencia nivel zona Atrio Amayuelas 1 11,05 1,53 16,91 a mayores botaguas 1 28,24 0,25 7,06 a mayores salientes zona superior 1 28,24 0,40 11,30 entrante tramo sobre botaaguas hacia crucero 1 0,80 4,76 3,81 muro perpendicular a fachada, prolongación 1 5,23 4,50 23,54 cierre Norte Claustro 30^ Total partida 04.11 ............................................................................................. 351,22 04.12 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplica- ción de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la prepa- ración previa del soporte y la protección poste- rior, con p.p. de costes indirectos y medios au- xiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. (E03fab04) 35% fachada Este 0,35 351,22 122,93 Total partida 04.12 ............................................................................................. 122,93 04.13 m2 Patinado de fábricas de piedra y elementos in- cluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inor- gánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de ele- mentos y limpieza final, de costes indirectos y medios auxiliares. (E03fab05) 35% fachada Este 0,35 351,22 122,93 Total partida 04.13 ............................................................................................. 122,93 04.14 m2 Tratamiento de hidrofugado de fábricas de pie- dra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungici- das tipo "Sikaguard 710" o similar en "húmedo sobre húmedo" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Faculta- tiva se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o simi- lar a base de nanoparticulas, ambos según indi- caciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, prepara- ción y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en pro- yección vertical, con p.p. de salientes, cornisas,

Page 45: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

molduras, etc. (E03fab06) 35% fachada Este 0,35 351,22 122,93 Total partida 04.14 ............................................................................................. 122,93

Page 46: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

05 UNIDAD IV: MURO EXTERIOR PANDAS 05.01 m2 Protección del solado en trabajos de restaura- ción de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espe- sor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, se- llando uniones con cinta adhesiva plástica, verti- do de cama de arena seca de regulización y co- loción de tablero aglomerado de 30 mm. de es- pesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los tra- bajos, medios auxiliares y costes indirectos. (E002prot01) PATIO CENTRAL lado norte 1 20,50 3,35 68,68 lado sur 1 20,25 3,20 64,80 lado sur en prevision aumento franja 1 20,25 0,50 10,13 lado este 1 20,92 3,48 72,80 lado oeste 1 20,80 3,26 67,81 perímetro base Calvario 4 3,20 0,60 7,68 formación zona pozo bombeo 1 1 2,20 3,22 7,08 Total partida 05.01 ............................................................................................. 298,98 05.02 m2 Protección del solado en trabajos de restaura- ción de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espe- sor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, se- llando uniones con cinta adhesiva plástica, verti- do de cama de arena seca de regulización, in- cluso p.p. de otras protecciones, accesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxiliares y costes indirectos. (E002prot02) acceso puertas Carros y otros 1 4,80 4,30 20,64 otros 1 15,00 10,00 150,00 Total partida 05.02 ............................................................................................. 170,64 05.03 ud Retirada de las mangueras eléctricas insevibles colocadas en el Claustro de la Catedral de Ciu- dad Rodrigo, tanto al exterior como al interior, incluyendo la inspección y comprobación pre- via, corte y remates, retirando el material a con- tenedor para su gestión correspondiente, con p.p. de medios auxiliares y costes indirectos. (E004lev01) 1 1,00 Total partida 05.03 ..................................................................................................1,00 05.04 ud Retirada de anclajes modernos y otros elemen- tos ajenos a las fábricas de los muros del Claustro de la Catedral de Ciudad Rodrigo, hasta contenedor para su gestión posterior, con

Page 47: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

p.p. de medios auxiliares y costes indirectos. (E004lev02) 1 1,00 Total partida 05.04 ..................................................................................................1,00 05.05 ud Retirada de pantallas y canaletas de iluminación existentes en el Claustro, acopiándolas y prote- giendolas en lugar a determinar, para su poste- rior recolocación (en lugar ajeno) igualmente en lugar a determinar, con p.p. de medios auxilia- res y costes indirectos. (E004lev03) 1 1,00 Total partida 05.05 ..................................................................................................1,00 05.06 m2 Eliminación de líquenes, musgos y demás cos- tras biogénicas sobre piedra arenisca de Ciu- dad Rodrigo, en fachadas, contrafuertes, albar- dillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello pe- róxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecuti- vas, dejando actuar al menos 10 días, eliminan- do los restos con cepillos de cerdas de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, limpiando de nuevo la superficie transcurrida una semana con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, lim- pieza final , medios auxiliares y costes indirec- tos. Medida la superficie en proyección vertical por su cara exterior. (E03fab01) MURO EXTERIOR DEL CLAUSTRO CARA EXTERIOR Zócalos cara exterior Cara exterior muro exterior Panda Sur 1 29,20 1,76 51,39 Cara exterior muro exterior Panda Oeste 1 30,87 1,76 54,33 Cara exterior muro exterior Panda Norte 1 29,80 1,76 52,45 Cara exterior muro exterior Panda Este 1 29,91 1,76 52,64 Resto paramentos a justificar ^ Cara exterior muro exterior Panda Sur 0,2 29,20 5,35 31,24 Cara exterior muro exterior Panda Oeste 0,2 30,87 5,35 33,03 Cara exterior muro exterior Panda Norte 0,15 29,80 5,35 23,91 Cara exterior muro exterior Panda Este 0,15 29,91 5,35 24,00 CARA INTERIOR a justificar 20% del zócalo interior ^ 0,2 162,87 32,57 CORNISAS Cornisa muro exterior Panda Sur 1 29,20 0,75 21,90 Cornisa muro exterior Panda Oeste 1 30,87 0,75 23,15 Cornisa muro exterior Panda Norte 1 29,80 0,75 22,35 Cornisa muro exterior Panda Este 1 29,91 0,75 22,43 REPISAS Repisa ventanales 15% s/103,20 ^ 0,15 103,20 15,48 Repisa arranque pináculos 8 1,11 1,00 8,88 Remate contrafuertes 8 1,11 1,00 8,88 Remate superior rincones 4 0,55 0,55 1,21

Page 48: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Total partida 05.06 ............................................................................................. 479,84 05.07 m2 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contem- plados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo la limpieza con cepillos de cerdas sua- ves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de ele- mento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o ele- mentos labrados, dejando las superficies aca- badas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, im- permeabilización etc.) incluso aspirado y/o so- plado. Medida en proyección vertical según pla- nos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxiliares. (E03fab02) MURO EXTERIOR DEL CLAUSTRO CARA EXTERIOR Cara exterior muro exterior Panda Sur 1 29,20 7,11 207,61 Cara exterior muro exterior Panda Oeste 1 30,87 7,11 219,49 Cara exterior muro exterior Panda Norte 1 29,80 7,11 211,88 Cara exterior muro exterior Panda Este 1 29,91 7,11 212,66 A ded. superficie ventanales románicos ^ -1 131,89 -131,89 A ded. superficie de ventanales góticos ^ -1 197,65 -197,65 Repisas sur^ 1,05 23,27 24,43 Repisas oeste^ 1,05 27,63 29,01 Repisas norte^ 1,05 25,84 27,13 Repisas este^ 1,05 21,55 22,63 CARA INTERIOR del muro exterior Claustro Paños interiores cara Sur 1 106,79 106,79 Paños interiores cara Oeste 1 103,67 103,67 Paños int. N y E medido en ventanales goticos Zócalo interior cara Sur 1 26,80 1,53 41,00 Zócalo interior cara Oeste 1 26,90 1,53 41,16 Zócalo interior cara Norte 1 26,13 1,53 39,98 Zócalo interior cara Este 1 26,62 1,53 40,73 total zócalos interior =162,87 m2 Total partida 05.07 ............................................................................................. 998,63 05.08 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de si- llería y elementos de piedra contemplados en esta intervención, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomien- de, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspec- ción a pie de obra e indicaciones de la dirección facultativa, empleando material adecuado

Page 49: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

-cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fa- chada completo, o proyección horizontal en ca- so de elementos de cubricción con p.p. de sa- lientes, pilastras, molduras, etc deduciendo huecos. (E03fab03a) idem limpieza cerdas suaves 1 998,63 998,63 Total partida 05.08 ............................................................................................. 998,63 05.09 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena selecciona- da y tamizada, con aglomerante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, estimando no más del 3% de la super- ficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilas- tras, molduras, etc deduciendo huecos. (E03fab03b) idem limpieza cerdas suaves 1 998,63 998,63 Total partida 05.09 ............................................................................................. 998,63 05.10 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplica-

Page 50: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ción de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la prepa- ración previa del soporte y la protección poste- rior, con p.p. de costes indirectos y medios au- xiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. (E03fab04) EN PREVISIÓN Zona: Panda Este, zócalo acceso a patio 1 4,32 0,85 3,67 "" 1 4,21 0,85 3,58 "" 1 4,08 0,85 3,47 "" 1 3,90 0,85 3,32 "" 1 3,67 0,85 3,12 Zócalo exterior 183,26 m2_________60% 0,6 183,26 109,96 Zócalo interior 162,87 m2________ 40% 0,4 162,87 65,15 REPISAS (en previsión) Repisas sur 0,7 23,27 16,29 Repisas oeste 0,7 27,63 19,34 Repisas norte 0,7 25,84 18,09 Repisas este 0,7 21,55 15,09 Total partida 05.10 ............................................................................................. 261,08 05.11 m2 Patinado de fábricas de piedra y elementos in- cluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inor- gánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de ele- mentos y limpieza final, de costes indirectos y medios auxiliares. (E03fab05) sobre actuación muros 0,15 998,63 149,79 sobre actuación ventanales románicos 0,05 293,25 14,66 sobre actuación ventanales góticos 0,05 466,45 23,32 Total partida 05.11 ............................................................................................. 187,77 05.12 m2 Tratamiento de hidrofugado de fábricas de pie- dra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungici- das tipo "Sikaguard 710" o similar en "húmedo sobre húmedo" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Faculta- tiva se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o simi- lar a base de nanoparticulas, ambos según indi- caciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, prepara- ción y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en pro- yección vertical, con p.p. de salientes, cornisas, molduras, etc. (E03fab06) EN PREVISIÓN Zona: Panda Este, zócalo acceso a patio 1 4,32 0,85 3,67 "" 1 4,21 0,85 3,58 "" 1 4,08 0,85 3,47

Page 51: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

"" 1 3,90 0,85 3,32 "" 1 3,67 0,85 3,12 Zócalo exterior 183,26 m2_________60% 0,6 183,26 109,96 Zócalo interior 162,87 m2________ 40% 0,4 162,87 65,15 REPISAS (en previsión) Repisas sur 0,7 23,27 16,29 Repisas oeste 0,7 27,63 19,34 Repisas norte 0,7 25,84 18,09 Repisas este 0,7 21,55 15,09 Total partida 05.12 ............................................................................................. 261,08 05.13 m2 Tratamiento de IMPERMEABILIZACIÓN y/o hi- drofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de producto base "Tecnadis PRS EFFECT", de "Tecnan" o simi- lar a base de nanoparticulas, según indicacio- nes del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 ho- ras siguientes o hasta su secado, costes indi- rectos y medios auxiliares. Medida en proyec- ción vertical y/o horizontal, con p.p. de salien- tes, cornisas, molduras, etc. (E04imp01) taludes contrafuertes y otros similares Claustro 12 1,00 0,55 6,60 4 0,50 0,35 0,70 otros 10 1,20 0,80 9,60 Total partida 05.13 ................................................................................................16,90 05.14 m2 RESTAURACIÓN DE VENTANAL RÓMANI- CO del Claustro de la Catedral de Ciudad Ro- drigo (Salamanca) consistente en la limpieza to- tal mediante cepillo de cerdas suaves, con so- plado y aspiración según casos, y puntualmen- te limpieza de líquenes y musgos, detritus y otras costras, tratamiento de juntas eliminando y/o retirando únicamente las sueltas o en mal estado y rehundiendo las que lo precisen, pre- via aprobación de la D.F. y en su caso rejuntan- do con mortero de cal teñido; igualmente de forma puntual, reparación de nervios según in- dicaciones de la D.F. y consolidación e imper- meabilización y en su caso patinado de las su- perficies que lo requieran, todo siguiendo los criterios generales de la intervención. Medida la superficie en proyección vertical desde el borde moldurado en el encuentro con el paramento que lo cobija s/criterio D.F., con p.p. de desa- rrollo de basas, repisa, columnillas, pilaretes maineles, pilastras, capiteles, impostas, arque- rías, óculos, etc. dejando la únidad totalmente restaurada incluyendo la limpieza final y carga de escombros a contenedor. (E04rest1) VENTANALES PANDA SUR - exterior ventanal 1 1 12,00 12,00 ventanal 2 1 14,50 14,50 ventanal 3 1 14,62 14,62

Page 52: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ventanal 4 1 14,65 14,65 ventanal 5 1 11,42 11,42 VENTANALES PANDA OESTE - exterior ventanal 6 1 10,20 10,20 ventanal 7 1 12,79 12,79 ventanal 8 1 13,04 13,04 ventanal 9 1 14,09 14,09 ventanal 10 1 11,08 11,08 encuentro con trazado gotico 1 4,50 4,50 VENTANALES PANDA SUR interior ventanal 1 1 11,73 11,73 ventanal 2 1 13,94 13,94 ventanal 3 1 13,96 13,96 ventanal 4 1 13,96 13,96 ventanal 5 1 11,25 11,25 arranques decorados 1 7,38 7,38 otros 9 0,45 4,05 VENTANALES PANDA OESTE - interior ventanal 6 1 10,73 10,73 ventanal 7 1 13,13 13,13 ventanal 8 1 13,50 13,50 ventanal 9 1 14,35 14,35 ventanal 10 1 11,58 11,58 encuentro con trazado gotico 1 4,50 4,50 arranques decorados 1 12,25 12,25 otros 9 0,45 4,05 Total partida 05.14 ............................................................................................. 293,25 05.15 m2 RESTAURACIÓN DE VENTANAL GÓTICO del Claustro de la Catedral de Ciudad Rodrigo (Salamanca) consistente en la limpieza total mediante cepillo de cerdas suaves, con soplado y aspiración según casos, y puntualmente lim- pieza de líquenes y musgos, detritus y otras costras, tratamiento de juntas eliminando y/o re- tirando únicamente las sueltas, las que estén en mal estado o las advertidas por la D.F., rehun- diendo las que lo precisen, previa aprobación de la D.F. y en su caso rejuntando con mortero de cal teñido; igualmente de forma puntual, consolidación (fundamentalmente zonas daña- das o con falta de piezas por rotura) e imper- meabilización y en su caso patinado de las su- perficies que lo requieran, todo siguiendo los criterios generales de la intervención. Medida la superficie en proyección vertical desde el borde moldurado con el paramento que lo cobija, con p.p. de desarrollo de basas, repisa, columnillas, pilaretes maineles, pilastras, capiteles, impos- tas, arquerías, óculos, etc. dejando la únidad totalmente restaurada incluyendo la limpieza fi- nal y carga de escombros a contenedor. (E04rest2) VENTANALES PANDA NORTE - exterior ventanal 1 1 18,11 18,11 ventanal 2 1 21,66 21,66 ventanal 3 1 22,15 22,15 ventanal 4 1 21,37 21,37 ventanal 5 1 19,57 19,57 VENTANALES PANDA ESTE exterior

Page 53: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ventanal 6 1 19,92 19,92 ventanal 7 1 21,69 21,69 ventanal acceso patio central 1 12,22 12,22 ventanal 9 1 21,00 21,00 ventanal 10 1 19,96 19,96 CARA INTERIOR ventanales ventanales 1,2,3,4 y 5 cara interior 1 133,52 133,52 ventanales 6,7,8,9 y 10 cara interior 1 135,28 135,28 Total partida 05.15 ............................................................................................. 466,45 05.16 ud Recolocación de dovelas de arquerías de ven- tanales, incluyendo el apuntalamiento previo y cimbras necesarias, cuñas y tirantes, piezas de estronque e inclusión puntual de injertos de pie- dra arenisca - a modo de cuñas- previa aproba- ción de la D.F. y siempre que sea necesario pa- ra garantizar la estabilidad del elemento, que deberá asegurarse, devolviendo la "tirantez" adecuada al arco, incluso el uso de gatos con- trolados y el recibido de piezas, retirada de apuntalamiento por fases y limpieza final y reti- rada de escombros a contenedor. El rejuntado del elemento se valora en partida independiente.Con p.p. de medios auxiliares y costes indirectos. (E04rest3) ventanal gótico panda Norte, lado oeste 5 5,00 Total partida 05.16 ..................................................................................................5,00 05.17 ud Restauración de NERVIOS ROTOS DE VEN- TANALES, mediante MICRO-COSIDOS con varillas vidrio-epoxi y/o acero inoxidable según se valore en obra, incluso la inclusión puntual de injertos de piedra arenisca - a modo de cu- ñas- previa aprobación de la D.F. y siempre que sea necesario para garantizar la estabilidad del elemento, incluyendo el apuntalamiento del ele- mento afectado, el estudio y trazado de los co- sidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de juntas y la colocación de varillas dejándolas re- hundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos, limpieza final y retirada de escombros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima de 50 cm. por varilla. El rejuntado del elemento se valora en partida in- dependiente. (E04cos01) ventanales norte 8 8,00 ventanales este 6 6,00 Total partida 05.17 ................................................................................................14,00 05.18 ud Restauración de arquerías, mediante COSIDO DE DOVELAS con varillas de acero inoxidable de díametro 12 (o inferiores, o en su caso vidrio-epoxi) según determine la D.F. en obra, comprobando la "tirantez" del trazado del ele-

Page 54: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

mento incluso la inclusión puntual de injertos de piedra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea nece- sario para garantizar la estabilidad del elemen- to, incluyendo el APUNTALAMIENTO del ele- mento afectado, el estudio y trazado de los co- sidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de los huecos y juntas y la colocación de varillas de- jándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos, limpieza fi- nal y retirada de escombros a contenedor. Me- dida la unidad teniendo en cuenta un doble co- sido por unidad, con longitud máxima de 85 cm. por varilla. El rejuntado del elemento se va- lora en partida independiente. (E04cos02) Panda norte, ventanal gótico 8 8,00 Panda Sur, interior rotura de nervios entre 12 12,00 bóvedas 5,6 otros^^zona A, superior, ocult 9 9,00 otros^^zona superior oculta 4,5 4,50 Total partida 05.18 ................................................................................................33,50 05.19 ud REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrietadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 me- tros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replan- teo del taladro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETA- CADO de las grietas y oquedades con mortero de cal teñido (sustituible por pasta de yeso que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hidráulica natural NHL 3,5 CE de "FYm Italcementi Group" o similar, con implantación de equipo, realizando las perforaciones por ro- tación a baja potencia y controlada, con escru- puloso soplado y limpieza posterior, colocación de varillas -dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos- y limpieza final y retirada de escombros a conte- nedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima de 90 cm. por varilla. El rejuntado final del ele- mento se valora en partida independiente. (E04cos03) REFUERZO MACHONES BÓVEDAS 4,5,6 machón exterior entre bóvedas 3 y 4 6 6,00 machón exterior entre bóvedas 4 y 5 6 6,00 machón exterior entre bóvedas 5 y 6 6 6,00 en previsión por su cara lateral y/o exterior 12 12,00 otros^^ 6 6,00 Total partida 05.19 ................................................................................................36,00

Page 55: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

05.20 m2 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, la- drillos y elementos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur06) Zona 1: Ref. PILON FIBROCEMENTO Zona pilón fibrocemento exterior 2 2,40 1,35 6,48 "" idem por el interior 2 1,50 1,35 4,05 Zona 2: Ref.Panda Norte retirada restos 1 1,50 1,50 2,25 reparación defectuosa Zona 3: Panda Este, zócalo acceso a patio 1 4,32 0,85 3,67 "" 1 4,21 0,85 3,58 "" 1 4,08 0,85 3,47 "" 1 3,90 0,85 3,32 "" 1 3,67 0,85 3,12 Zona 4: Otros en zócalo exterior (pegotes 0,1 183,26 18,33 mortero) Zona 5: Retirada de pegotes en zócalo interior 0,1 162,87 16,29 162,87 m2 Zona 6:picado zona columnilla, ventanal 1, 1 3,20 3,20 panda Sur Zona 7: otros interior 1 12,00 12,00 Total partida 05.20 ................................................................................................79,76 05.21 m2 Retacado de fábricas agrietadas o afectadas por trabajos defectuosos, con cal hidráullica (hasta saturación) y mortero de cal, dejándo las juntas rehundidas y acabando las superficies con mortero CPA "M8" o similar o bien con Pe- tratex en función de si afecta puntualmente a elemento decorativo, según criterios generales de la intervención, en fábricas de silleria ligera- mente moldurada, en trabajos de reparación de grietas, de faltas, etc con p.p. de medios auxilia- res y costes indirectos. (E04rest4) EXTERIOR zona "destrozo" pilón fibrocemento 1 6,50 6,50 varios en zona limas a recolocar 4 0,50 2,00 zona de fábrica enjuta ventanal este, panda 2 2,00 4,00 Norte otros 4 0,50 2,00 INTERIOR machones entre bóvedas 5 y 6 2 4,00 8,00 ""en compensación relleno cal hídraulica grietas 1 8,00 8,00 otros 1 6,50 6,50 Total partida 05.21 ................................................................................................37,00 05.22 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURA- CIÓN DE ZÓCALOS DE PIEDRA, de fábricas de sillería, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fá- brica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), cajeados, retira-

Page 56: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

da de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, for- mación de cama y asiento, recibido con morte- ro de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patina- do y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización mediane tres manos de "Sikaguard 710" o similar aplica- das "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. (E003mur01) En previsión muro exterior Este acceso a patio 12 0,95 0,45 5,13 Total partida 05.22 ..................................................................................................5,13 05.23 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURA- CIÓN DE FABRICAS DE SILLERÍA, de escua- dria adaptada a las hiladas y para un fondo mí- nimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajeados, retirada de fábricas ajenas o rellenos, prepara- ción de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mor- tero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patina- do y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización mediane tres manos de "Sikaguard 710" o similar aplica- das "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. (E003mur02) En previsión retacado limas 4 0,60 0,50 1,20 Total partida 05.23 ..................................................................................................1,20 05.24 m2 Recolocación de fábricas de sillería en trabajos de restauración, incluyendo el trabajo de cante- ría necesario para retirada en su caso de la pie- za, preparación del asiento y recolocación, em- pleando mortero de cal teñido según los crite- rios generales de la intervención, retacando con cal hidráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, repasos, etc (E003mur06) sillares cara norte 2 0,75 0,40 0,60

Page 57: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

"" 2 0,67 0,42 0,56 sillares brocal pozo cara sur 8 1,20 0,42 4,03 otros 1 2,50 0,42 1,05 Total partida 05.24 ..................................................................................................6,24 05.25 ud Restauración de pináculo del Claustro de la Ca- tedral de Ciudad Rodrigo incluyendo previa co- locación de medios auxiliares, la limpieza de lí- quines y otras costras biogénicas, la limpieza con cepillo de cerdas suaves, aspiración y so- plado, descarnado únicamente de las juntas que lo requieran y rejuntado en su caso, previo soplado y preparación del soporte, incluyendo la posible consolidación, e hidrofugado de los elementose que lo requieran una vez se com- prueba a pie de obra su estado, siempre bajo aprobación de la D.F., incluso fijación y anclaje en caso de falta de estabilidad según criterios de intervención generales, colocando protec- ción de cobre idem contrafuertes adaptada a la geometría con p.p. de formación de encuen- tros, medios auxiliares y costes indirectos. (E004rest5) fachada Este 4 4,00 fachada Norte 4 4,00 encuentro fachadas Este-Norte 1 1,00 Fachada Este 4 4,00 Total partida 05.25 ................................................................................................13,00 05.26 ud Colocación de remate de cobre en coronación de contrafuertes previa restauración de los mis- mos a base de LIMPIEZA de líquenes y vegeta- ción, consolidación en su caso, y CAPA DE REGULARIZACIÓN con mortero teñido de cal y arena y pigmentos inorgánicos, incluso p.p. de remate de las faltas en bordes devolviendo su geometría parcialmente con mortero "Petratex", dejando rehundido el plomo 3 cm. según figura en detalle de proyecto, dejando lis- to para la colocación, también incluida de TA- PAS DE COBRE de 0,8 mm. de espesor, rigidi- zadas mediante pletinas 30/2 colocadas cada 30 cm. como máximo fijadas cada una con tira- fondos de acero inoxidable 50/5 y tacos de ma- terial plástico, y entregando en finas rozas prác- ticadas en el paramento posterior o sobre piná- culos, incluyendo p.p. de engatillados, forma- ción de bordes rigidizados, sellado, etc. todo según detalle e indicaciones de la D.F., con p.p. de medios auxilaires y costes indirectos. (E004rest6) fachada Sur 4 4,00 fachada Oeste 4 4,00 base protección encuentros en compensacíón 2 2,00 Total partida 05.26 ................................................................................................10,00 05.27 ud Reposición, en su caso, de las pantallas y ca- naletas de iluminación previamente retiradas y acopiadas en lugar a determinar, con p.p. de

Page 58: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

medios auxiliares y costes indirectos. (E04rep01) 1 1,00 Total partida 05.27 ..................................................................................................1,00

Page 59: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

06 UNIDAD V: MURO INTERIOR 06.01 ud Desmontaje total del conjunto de bombillas con su red y mecanismos así como los soportes de los paramentos interiores del Claustro y los inte- rruptores a sustituir, con retirada de material in- servible a contenedor, acopiando el resto en lu- gar a indicar, con p.p. de medios auxiliares y costes indirectos. (E05lev01) 1 1,00 Total partida 06.01 ..................................................................................................1,00 06.02 ud Desmontaje total del conjunto de cruces de madera que conforman el Viacrucis del Claus- tro, acopiándolas y protegiéndolas en lugar se- guro para su posterior recolocación, con retira- da de material inservible a contenedor, acopian- do el resto en lugar a indicar, con p.p. de me- dios auxiliares y costes indirectos. (E05lev02) 1 1,00 Total partida 06.02 ..................................................................................................1,00 06.03 ud Levantado de lápida sepulcral del arcosolio que la cobija, bajo supervisión arqueológica, para su acopio por separado y debidamente coloca- da sobre estructura de madera en lugar seguro y protegido hasta su posterior recolocación en estructura métalica según diseño o en su de- fecto lugar a determinar por la D.F. o el estudio museístico, incluyendo la retirada de elementos bajo la misma necesarios retirar para la restau- ración de paramentos, así como la retirada de escombros o material inservible a contenedor para su posterior gestión, con p.p. de medios auxiliares y costes indirectos. (E05lev03) lápidas a recolocar 8 8,00 lápida a recolocar en su nicho X 1 1,00 Total partida 06.03 ..................................................................................................9,00 06.04 ud Retirada del conjunto de restos expuestos en el Claustro de la Catedral de Ciudad Rodrigo y aquellos susceptibles de acopio que aparezcan bajo las lápidas de los arcosolios y otros para su evaluación, con acopio y protección en zona adecuada a determinar, incluso su posterior re- colocación en lugar según indicaciones D.F. con p.p. de medios auxiliares y costes indirec- tos. (E05lev04) 1 1,00 Total partida 06.04 ..................................................................................................1,00 06.05 ud Retirada de todos los anclajes modernos y otros elementos ajenos a las fábricas de los

Page 60: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

muros interiores del Claustro de la Catedral de Ciudad Rodrigo, hasta contenedor para su ges- tión posterior, con p.p. de medios auxiliares y costes indirectos. (E05lev05) 1 1,00 Total partida 06.05 ..................................................................................................1,00 06.06 ud Retirada de las carpinterías existentes en el hu- sillo de subida al Coro de las Viudas, incluida la malla de gallinero, dejando los elementos libres para su posterior intervención y colocación de nuevas carpinterías o tratamientos, con carga de restos a contenedor de escombros y p.p. de medios auxiliares y costes indirectos. (E05lev06) 1 1,00 Total partida 06.06 ..................................................................................................1,00 06.07 ud Retirada de canaletas de iluminación y elemen- tos auxiliares, dejando la zona de intervención libre de elementos y riesgos eléctricos relativos a dicha instalación, con posterior recolocación en su caso, con p.p. de medios auxiliares y cos- tes indirectos. (E05lev07) 1 1,00 Total partida 06.07 ..................................................................................................1,00 06.08 m2 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contem- plados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo la limpieza con cepillos de cerdas sua- ves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de ele- mento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o ele- mentos labrados, dejando las superficies aca- badas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, im- permeabilización etc.) incluso aspirado y/o so- plado. Medida en proyección vertical según pla- nos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxiliares. (E03fab02) LIMPIEZA PARAMENTOS MURO INTERIOR PANDAS Cara Sur 1 35,18 6,50 228,67 Cara Oeste 1 34,17 6,50 222,11 Cara Norte 1 35,32 6,50 229,58

Page 61: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Cara Este 1 39,86 6,50 259,09 Arcosolios Panda Sur _ intradós I 1,2 6,84 0,97 7,96 III 1,2 6,35 0,88 6,71 IV 1,2 6,68 0,85 6,81 V 1,2 6,30 0,85 6,43 VI 1,2 6,08 0,85 6,20 VII 1,2 6,14 0,85 6,26 IX 1,2 6,18 0,85 6,30 Arcosolios Panda Norte_intradós X 1,2 7,03 0,84 7,09 XI 1,2 7,60 0,84 7,66 XII 1,2 7,80 0,87 8,14 XIII 1,2 7,80 0,87 8,14 XIV 1,2 8,04 0,87 8,39 XV 1,2 8,27 0,85 8,44 XVI 1,2 7,88 0,83 7,85 nicho Virgen 1,2 9,25 11,10 Arcosolios Panda Este_intradós XVII 1,2 8,26 0,85 8,43 XVIII 1,2 8,23 0,85 8,39 XIX 1,2 8,48 0,85 8,65 XX 1,2 8,10 0,85 8,26 XI 1,2 8,55 0,85 8,72 Nichos Panda Oeste 1,2 11,27 0,90 12,17 Total partida 06.08 ..........................................................................................1.107,55 06.09 m2 Limpieza de muros de sillería y o fábricas de la- drillo, bóvedas, etc mediante aplicación de se- piolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la elimina- ción de las sales. Todo incluido con p.p. de me- dios auxiliares y costes indirectos. (E05lim01) fondo nicho X 1 3,75 3,75 OTROS A JUSTIFICAR panda Este 4 31,75 0,15 19,05 Total partida 06.09 ................................................................................................22,80 06.10 m2 Limpieza de deyecciones de aves, consistente en: 1,-Eliminación primaria en seco, de biodepósi- tos (acumulaciones de microorganismos, restos orgánicos, excrementos de aves etc.) deposita- dos sobre las superficies de muros, actuando manualmente con cepillos de cerda suave, e instrumentos desincrustantes manuales ade- cuados (espátulas, escalpelos etc). Aplicando el tratamiento en las zonas de acumulación, inclu- so retirada de detritus. La delgada película de material residual se tratarán mediante lavado con toronda de guata humedecida con agua amoniacal, considerando un grado de dificulta- da normal ( a determinar en obra). 2,-Limpieza de paramentos descritos en la in- tervención de las deyecciones de aves median- te agua y detergente, por medios manuales me- diante espátulas, escalpelos, etc. protegiendo la zona para no verse afectada, retirando los res- tos de detritus, (patinando las superficies afec-

Page 62: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tadas s/criterio D.F.) con p.p. de medios auxilia- res y costes indirectos Medida la unidad un 35% (1 ) y un 65% (2). En caso de intervención total (1+2) al 100%. (E05lim02) LIMPIEZA DEYECCIONES AVES Panda Sur 5 2,00 10,00 Panda Oeste 6 3,50 21,00 Panda Norte 7 3,85 26,95 Panda Este 7 4,20 29,40 Otras zonas 1 12,00 12,00 Total partida 06.10 ................................................................................................99,35 06.11 m2 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, la- drillos y elementos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur06) juntas constructivas y otros 1 13,56 13,56 rellenos Panda Sur 52 0,35 0,35 6,37 rellenos Panda Oeste 42 0,35 0,35 5,15 rellenos Panda Norte 48 0,50 0,50 12,00 rellenos Panda Este 43 0,40 0,40 6,88 Total partida 06.11 ................................................................................................43,96 06.12 m2 Picado de rellenos, retacados y enfoscados, de cemento y/o cal, en trabajos de RESTAURA- CIÓN DE ARCOSOLIOS, respetando las poli- cromias, retirando el material de relleno inade- cuado o en mal estado, para su posterior trata- miento o simple limpieza, ejecutado manual- mente por ESPECIALISTA RESTAURADOR, con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E05mur01) ACTUACIÓN PUNTUAL EN ARCOSOLIOS Arcosolios panda Este 1 17,25 17,25 Arcosolios Panda Norte 1 16,95 16,95 Arcosolios Panda Este 1 17,75 17,75 frente nicho NªSra. de los Angeles (panda 1 2,15 0,70 1,51 Oeste) picado relleno hornacinas cegadas anejas a 2 2,50 5,00 Capilla del Crucifijo Total partida 06.12 ................................................................................................58,46 06.13 m2 Picado de enfoscados de cemento y/o cal en trabajos de restauración de paramentos, por medios manuales con p.p. de retirada de es- combros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. (E002mur07) enfoscado arcosolio VIII 1 4,23 4,23 Otros pandas< 1 10,00 10,00

Page 63: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Total partida 06.13 ................................................................................................14,23 06.14 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de si- llería y elementos de piedra contemplados en esta intervención, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomien- de, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspec- ción a pie de obra e indicaciones de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fa- chada completo, o proyección horizontal en ca- so de elementos de cubricción con p.p. de sa- lientes, pilastras, molduras, etc deduciendo huecos. (E03fab03a) LIMPIEZA PARAMENTOS MURO INTERIOR PANDAS Cara Sur 1 35,18 6,50 228,67 Cara Oeste 1 34,17 6,50 222,11 Cara Norte 1 35,32 6,50 229,58 Cara Este 1 39,86 6,50 259,09 Arcosolios Panda Sur _ intradós I 1,2 6,84 0,97 7,96 III 1,2 6,35 0,88 6,71 IV 1,2 6,68 0,85 6,81 V 1,2 6,30 0,85 6,43 VI 1,2 6,08 0,85 6,20 VII 1,2 6,14 0,85 6,26 IX 1,2 6,18 0,85 6,30 Arcosolios Panda Norte_intradós X 1,2 7,03 0,84 7,09 XI 1,2 7,60 0,84 7,66 XII 1,2 7,80 0,87 8,14 XIII 1,2 7,80 0,87 8,14 XIV 1,2 8,04 0,87 8,39 XV 1,2 8,27 0,85 8,44 XVI 1,2 7,88 0,83 7,85 nicho Virgen 1,2 9,25 11,10 Arcosolios Panda Este_intradós XVII 1,2 8,26 0,85 8,43 XVIII 1,2 8,23 0,85 8,39 XIX 1,2 8,48 0,85 8,65 XX 1,2 8,10 0,85 8,26 XI 1,2 8,55 0,85 8,72 Nichos Panda Oeste 1,2 11,27 0,90 12,17 En compen. descar.juntas dific. cemnt. 0,15 968,35 145,25 s/criterio D.F.

Page 64: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Total partida 06.14 ..........................................................................................1.252,80 06.15 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena selecciona- da y tamizada, con aglomerante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, estimando no más del 3% de la super- ficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilas- tras, molduras, etc deduciendo huecos. (E03fab03b) LIMPIEZA PARAMENTOS MURO INTERIOR PANDAS Cara Sur 1 35,18 6,50 228,67 Cara Oeste 1 34,17 6,50 222,11 Cara Norte 1 35,32 6,50 229,58 Cara Este 1 39,86 6,50 259,09 Arcosolios Panda Sur _ intradós I 1,2 6,84 0,97 7,96 III 1,2 6,35 0,88 6,71 IV 1,2 6,68 0,85 6,81 V 1,2 6,30 0,85 6,43 VI 1,2 6,08 0,85 6,20 VII 1,2 6,14 0,85 6,26 IX 1,2 6,18 0,85 6,30 Arcosolios Panda Norte_intradós X 1,2 7,03 0,84 7,09 XI 1,2 7,60 0,84 7,66 XII 1,2 7,80 0,87 8,14 XIII 1,2 7,80 0,87 8,14 XIV 1,2 8,04 0,87 8,39

Page 65: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

XV 1,2 8,27 0,85 8,44 XVI 1,2 7,88 0,83 7,85 nicho Virgen 1,2 9,25 11,10 Arcosolios Panda Este_intradós XVII 1,2 8,26 0,85 8,43 XVIII 1,2 8,23 0,85 8,39 XIX 1,2 8,48 0,85 8,65 XX 1,2 8,10 0,85 8,26 XI 1,2 8,55 0,85 8,72 Nichos Panda Oeste 1,2 11,27 0,90 12,17 Total partida 06.15 .......................................................................................... 1.107,55 06.16 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplica- ción de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la prepa- ración previa del soporte y la protección poste- rior, con p.p. de costes indirectos y medios au- xiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. (E03fab04) CONSOLIDACIÓN PARAMENTOS MURO INTERIOR PANDAS a justificar Cara Sur 0,1 235,71 23,57 Cara Oeste 0,1 228,94 22,89 Cara Norte 0,18 236,64 42,60 Cara Este 0,22 267,06 58,75 Total partida 06.16 ............................................................................................. 147,81 06.17 m2 Patinado de fábricas de piedra y elementos in- cluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inor- gánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de ele- mentos y limpieza final, de costes indirectos y medios auxiliares. (E03fab05) LIMPIEZA PARAMENTOS MURO INTERIOR PANDAS Cara Sur 0,08 235,71 18,86 Cara Oeste 0,08 228,94 18,32 Cara Norte 0,08 236,64 18,93 Cara Este 0,08 267,06 21,36 Total partida 06.17 ................................................................................................77,47 06.18 m2 Tratamiento de hidrofugado de fábricas de pie- dra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungici- das tipo "Sikaguard 710" o similar en "húmedo sobre húmedo" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Faculta- tiva se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o simi- lar a base de nanoparticulas, ambos según indi- caciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, prepara- ción y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las

Page 66: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en pro- yección vertical, con p.p. de salientes, cornisas, molduras, etc. (E03fab06) IMPERM. PARAMENTOS MURO INTERIOR PANDAS Cara Sur 1 35,18 0,50 17,59 Cara Oeste 1 34,17 0,50 17,09 Cara Norte 1 35,32 1,50 52,98 Cara Este 1 39,86 1,50 59,79 Total partida 06.18 ............................................................................................. 147,45 06.19 m2 Revoco de paramentos en trabajos de restaura- ción a base de aplicación de diferentes morte- ros de cal grasa y arenas seleccionadas en tres capas de la siguiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosificación 1:4 empleando arena limpia se- leccionada y de tamiz 2,5 mm previo descarna- do, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de testigos para regletea- do. 2.- Una segunda capa de espesor 6 ó 7 mm., de dosificación 1:2, empleando arena limpia se- leccionada de tamiz 1,2 mm. extendida con fra- tás. 3.- Una tercera y última capa de espesor 3 mm., de dosificación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y control de retracciones. Se empleará cal grasa para realización de mor- teros y se pigmentarán con tierras naturales, realizando muestras para elección por parte de la dirección facultativa, incluso teniendo en cuenta un patinado final para conseguir tono adecuado (según criterios establecidos en me- moria) empleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosifica- ciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un correcto agarre y p.p. de medios auxiliares y costes indirectos. Según memoria y criterios ge- nerales establecidos para la intervención. Inclu- so ensayos de humedad de paramentos pre- vios a la aplicación, para su posterior compro- bación, incluso realización de ensayos de dosifi- caciones y tipos de arena y cal. (E05enf1) ACTUACIÓN EN ARCOSOLIOS regularización bases Arcosolios panda Este 1 17,25 17,25 Arcosolios Panda Norte 1 16,95 16,95 Arcosolios Panda Este 1 17,75 17,75

Page 67: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

REPOSICIÓN enfoscado arcosolio VIII (en 1 4,23 4,23 previsión) frente nicho NªSra. de los Angeles (panda 1 2,15 2,15 Oeste) en previsión picado relleno hornacinas cegadas anejas a 2 2,50 5,00 Capilla del Crucifijo Total partida 06.19 ................................................................................................63,33 06.20 m2 Revoco de paramentos en trabajos de restaura- ción a base de aplicación de una capa de en- foscado de mortero de cal previa preparación del paño, incluida, empleando mortero de cal grasa teñida con pigmentos naturales, arena seleccionada y tamizada, para un espesor apro- ximado de 15 ó 16 mm., de dosificación 1:3 (1:3,5, en función de la arena) empleando are- na limpia seleccionada y de tamiz 2,5 mm con sacado de plomos y niveles y colocación de testigos para regleteado y fratasado final, dejan- do acabado fino. (E05enf2) en previsión 25% medición anterior 0,25 63,33 15,83 Total partida 06.20 ................................................................................................15,83 06.21 m2 Recolocación de fábricas de sillería en trabajos de restauración, incluyendo el trabajo de cante- ría necesario para retirada en su caso de la pie- za, preparación del asiento y recolocación, em- pleando mortero de cal teñido según los crite- rios generales de la intervención, retacando con cal hidráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, repasos, etc (E003mur06) RETIRADA sillar arcosolio VIII (en previsión) 6 0,85 0,45 2,30 Total partida 06.21 ..................................................................................................2,30 06.22 ud REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrietadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 me- tros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replan- teo del taladro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETA- CADO de las grietas y oquedades con mortero de cal teñido (sustituible por pasta de yeso que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hidráulica natural NHL 3,5 CE de "FYm Italcementi Group" o similar, con implantación de equipo, realizando las perforaciones por ro- tación a baja potencia y controlada, con escru- puloso soplado y limpieza posterior, colocación de varillas -dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos- y limpieza final y retirada de escombros a conte- nedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima

Page 68: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

de 90 cm. por varilla. El rejuntado final del ele- mento se valora en partida independiente. (E04cos03) UNIDAD 5 cosido en aspa rotura dintel Panda Oeste 2 2,00 cosido en aspa rotura dintel Panda Norte 2 2,00 en previsión 2 2,00 Total partida 06.22 ..................................................................................................6,00 06.23 ud Trabajos de recolocación de lápidas, incluyen- do el traslado por personal cualificado y la colo- cación en los soportes diseñados para su muestra, en zona a determinar por la D.F., in- cluso p.p. de trabajos auxiliares de calzo y/o an- claje en su caso, evitando posibles movimientos o desplazamientos de las piezas que pudieran poner en peligro la integridad de las mismas y de los visitantes. (E05rec01) 8 8,00 Total partida 06.23 ..................................................................................................8,00 06.24 ud Sorte lápidas, según diseño, fabricación, sumi- nistro y montaje, incluso protección del acero para evitar manchas en solados y paramentos. (E05rec02) 8 8,00 Total partida 06.24 ..................................................................................................8,00 06.25 ud Recolocación de la escultura -Virgen- existente en el arcosolio nº XVIII, incluyendo la prepara- ción de la base, presentado, repaso y recibido y en su caso anclaje de la misma, empleando mortero de cal, por medios manuales y con p.p. de medios auxiliares y costes indirectos, (E05rec03) 1 1,00 Total partida 06.25 ..................................................................................................1,00 06.26 ud Partida para la recolocación del conjunto de elementos y motivos arquitectónicos desmonta- dos tanto en el Patio Central como en las Na- ves del Claustro, anteriormete retirados y aco- piados, previa preparación y adecuación del lu- gar a determinar por la D.F. y en su caso según el estudio museístico, con p.p. de medios auxi- liares y costes indirectos. (E05rec04) 1 1,00 Total partida 06.26 ..................................................................................................1,00 06.27 m. Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y preparación de la base con morte- ro de cal y arena, aditivado en su caso, y reco- locación de elementos recuperados, con apor-

Page 69: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patinada, inclyendo el rejun- tado de elementos con mortero de cal y arena seleccionada con aportación de pigmentos na- turales según pruebas previas, con p.p. de me- dios auxiliares y costes indirectos. (E001rep1) 5 2,65 13,25 Total partida 06.27 ................................................................................................13,25 06.28 ud Colocación de interruptor de color en tono ma- rrón oscuro uniforme, de marca y modelo a ele- gir por la D.F., acorde al edificio, con p.p. de medios auxiliares y costes indirectos. Medida la unidad teniendo en cuenta el trabajo mínimo. (E05elec01) 2 2,00 Total partida 06.28 ..................................................................................................2,00 06.29 m2 Tratamiento de rejas y elementos similares a base de aceite de linaza cruda, (mezclado con betun según casos) aplicado a muñequilla, pre- via limpieza del elemento, con p.p. de medios auxiliares y costes indirectos. (E05trat01) Primer hueco del husillo con aceite de linaza 2 0,50 0,50 0,50 en compensación por trabajo en superficie 1 1,00 1,00 mínima Total partida 06.29 ..................................................................................................1,50 06.30 ud Cerramiento de hueco de husillo del Coro de las Viudas con alabrastro, previa aprobación de muestra por parte de la D.F. incluyendo el sumi- nistro, corte y montaje, con p.p. de preparación de hueco, adaptación, formación de mochetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxiliares y cos- tes indirectos. (E05trat02) 1 1,00 Total partida 06.30 ..................................................................................................1,00 06.31 m. Sistema de control anti-aves para cornisas, vi- gas, desagües, pretiles y áreas con poca pre- sencia de aves a base de cadenas de espinas formadas por punzones de acero inoxidable de 11,5cm de altura sostenidos en una base de policarbonato transparente. La base se coloca mediante tornillería o pegamento para uso exte- rior resistente a factores climáticos como lluvia, calor, frío, etc. Medido por metro lineal de cade- na, valorado para una longitud entre 1 y 30 m. (E05prot01) pandas 4 5,00 20,00 otros crester. 1 25,00 25,00 Total partida 06.31 ................................................................................................45,00

Page 70: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 71: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

07 UNIDAD VI: BÓVEDAS 07.01 m2 Protección del solado en trabajos de restaura- ción de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espe- sor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, se- llando uniones con cinta adhesiva plástica, verti- do de cama de arena seca de regulización y co- loción de tablero aglomerado de 30 mm. de es- pesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los tra- bajos, medios auxiliares y costes indirectos. (E002prot01) bóveda 4 1,1 22,00 24,20 bóveda 5 1,1 22,00 24,20 bóveda 6 1,1 22,00 24,20 bóveda 16 1,1 22,00 24,20 en previsión bóveda 19 1,1 22,00 24,20 paso desde Museo PB a Museo P1 por Panda 1 16,00 16,00 Oeste Total partida 07.01 ............................................................................................. 137,00 07.02 m2 Previa protección del solado, EJECUCIÓN DE APEO Y CIMBRA de madera para bóveda de la Catedral de Ciudad Rodrigo, 4-5-6 y/o 16, y otras similares, con formación de pies dere- chos, arriostramientos, tirantes y tirantes torna- punteados establecida provisionalmente con el objeto de sostener la construcción hasta que adquiera la consistencia necesaria para su es- tabilidad, construida con madera de pino nacio- nal de clase 2ª en sus partes resistentes y ma- dera de encofrar en tablas y tablones para for- ma, con la directriz, montea y cuaje, dimensio- nada para soportar sin deformación las cargas previstas, con diseño no rígido para facilitar en el momento adecuado el afloje para descimbra- do y de fácil armado y desarmado para diferen- tes posturas, comprendiendo: apeos, construc- ción de la cimbra, con aporte de madera, inclu- so parte proporcional de mermas, material de unión, cimbrado y posterior descimbrado, por cualquiera de los siguientes procedimientos: acuñado, sacos de arena, cajas de arena, torni- llos o gatos y excéntricas, sopandas y puntales, con interposición de elementos metálicos si fue- ra necesario o en su sustitución, con p.p. de medios auxiliares y costes indirectos. Medida en proyección horizontal. (E06cim01) bóveda 4 1,1 22,00 24,20 bóveda 5 1,1 22,00 24,20 bóveda 6 1,1 22,00 24,20 bóveda 16 1,1 22,00 24,20 Total partida 07.02 ................................................................................................96,80

Page 72: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

07.03 m2 Supervisión arqueológica en fase de limpieza de extradós de bóvedas, retirando sólo el mate- rial ajeno a la fábrica directamente a camión de transporte a vertedero (ver partida capítulo "UNIDAD II:CUBIERTAS"), respetando en cual- quier caso el relleno de riñones. Medición de partida según criterio de la D.F, teniendo en cuenta el grado de supervisión necesario, con p.p. de medios auxiliares y costes indirectos. A justificar. (E06lim01) Sur 1,5 115,00 172,50 Oeste 1,5 106,60 159,90 Norte 1,5 117,32 175,98 Este 1,5 120,75 181,13 Total partida 07.03 ............................................................................................. 689,51 07.04 m2 Limpieza de BÓVEDAS de piedra del Claustro de la Catedral de Ciudad Rodrigo, incluyendo todos los elementos que la forman, arcos for- meros, perpiaños, ojivas, nervios, rosetones, claves, escudos, figuras, elementos decorati- vos, etc, por medios manuales empleando cepi- llos de cerdas suaves de nylon, incluso el cuida- doso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el picado de restos aislados de mortero de ce- mento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función del elemento a limpiar, teniendo es- pecial atención con aquellas zonas con policro- mías, marcas etc y/o elementos labrados, de- jando las superficies acabadas o en su caso lis- tas para el tratamiento correspondiente (rejuntado, retacado, consolidación, impermea- bilización etc según orden a establecer.) incluso aspirado y/o soplado. Medida en proyección horizontal según planos, con p.p. de desarrollo de dóvelas, nervios, molduras, etc, limpieza final con retirada de escombro generado a vertedero y con p.p. costes indirectos y medios auxiliares. (E06lim02) Sur 1,5 115,00 172,50 Oeste 1,5 106,60 159,90 Norte 1,5 117,32 175,98 Este 1,5 120,75 181,13 Total partida 07.04 ............................................................................................. 689,51 07.05 m2 Tratamiento de manchas por humedades en bóvedas, consistente en la limpieza de las se- ñales generadas y la posible existencia de sales (grado bajo-medio, salvo en bóveda 4-5-6 y nervios puntuales) etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la elimina- ción de las sales. Aprovechando el uso de an- damiaje montado para la restauración general de las bóvedas, iniciando los trabajos lo antes posible para poder ir comprobando la absorción

Page 73: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

de la humedad y las manchas, y poder en su caso patinar los elementos que se vean notoria- mente afectados. Todo incluido con p.p. de me- dios auxiliares y costes indirectos. Criterio de medición, en función del grado (de 1 a 3 ), gra- do 1:50%, grado 2: 75%, grado 3:100%, a de- terminar previamente por D.F. Medida la super- ficie en proyección horizontal, con p.p. de desa- rrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. (E06lim03) bóveda 2 1,25 4,57 5,71 bóveda 3 1,25 1,15 1,44 bóveda 5 1,25 3,83 4,79 bóveda 6 1,25 4,39 5,49 bóveda 8 1,25 1,53 1,91 bóveda 20 1,25 0,99 1,24 bóveda 20-21 1,25 1,50 1,88 bóveda 21-22 1,25 1,50 1,88 otras a justificar en obra 1,25 6,00 7,50 Total partida 07.05 ................................................................................................31,84 07.06 m2 Trabajos de restauración de bóvedas con todos sus elementos, arcos formeros, perpiaños, oji- vas, nervios, claves, escudos, elementos deco- rativos, etc consistente en el DESCARNADO DE JUNTAS para su posterior tratamiento/s (rejuntado, retacado, etc.) siguiendo los mis- mos criterios establecidos en este proyecto, por medios manuales incluyendo el soplado con ai- re a presión controlado y por aspiración según casos, con p.p. de medios auxiliares y costes indirectos.Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de ar- cos, nervios y otros elementos así como cascos de plementería. (E06bov01) Sur 115,00 Oeste 106,60 Norte 117,32 Este 120,75 TRATAMIENTO III (Ref.:49) bóveda 2,3,4,5,6 1,25 103,87 129,84 bóveda 8 1,25 20,00 25,00 bóveda 9 1,25 21,49 26,86 bóveda 10 1,25 21,61 27,01 bóveda 11 1,25 21,83 27,29 bóveda 17 1,25 22,91 28,64 resto en previsión 8 27,87 222,96 Total partida 07.06 ............................................................................................. 487,60 07.07 m2 Tratamiento en juntas no pasantes de bóvedas y todos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su retacado y rejuntado posterior 2,- RETACADOS o RELLENOS en las JUN-

Page 74: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

TAS NO PASANTES empleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Ital- cementi Group y arena seleccionada y tamiza- da. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, nervios y otros ele- mentos así como cascos de plementería. (E06bov02) TRATAMIENTO III (Ref.:49) bóveda 2,3,4,5,6 1,25 103,87 129,84 bóveda 8 1,25 20,00 25,00 bóveda 9 1,25 21,49 26,86 bóveda 10 1,25 21,61 27,01 bóveda 11 1,25 21,83 27,29 bóveda 17 1,25 22,91 28,64 resto en previsión 8 27,87 222,96 Total partida 07.07 ............................................................................................. 487,60 07.08 m2 Tratamiento en juntas pasantes de bóvedas y todos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- LIMPIEZA DE JUNTAS PASANTES por ASPIRACIÓN mediante equipo a presión y/o aspiración controlada. 2,- Previo rejuntado que servirá a modo de en- cofrado, RETACADO de las juntas pasantes hasta colmatación empleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Italce- menti Group y arena seleccionada y tamizada, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal, por el extra- dós o en su defecto por intradós con p.p. de desarrollos tanto de arcos, nervios y otros ele- mentos así como cascos de plementería. (E06bov03) TRATAMIENTO III (Ref.:49) bóveda 2,3,4,5,6 1,25 103,87 129,84 bóveda 8 1,25 20,00 25,00 bóveda 9 1,25 21,49 26,86 bóveda 10 1,25 21,61 27,01 bóveda 11 1,25 21,83 27,29

Page 75: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

bóveda 17 1,25 22,91 28,64 Otras 14 10,00 140,00 Total partida 07.08 ............................................................................................. 404,64 07.09 m2 Saneamiento de plementería afectada por di- versas patologías en conjunto o paño, no pun- tualmente, principalmente bóvedas 4-5-6 según plano 49 de este proyecto, referente a las de bóvedas del Claustro de la Catedral de Ciudad Rodrigo y consistente en el cosido de los frag- mentos rotos que amenacen desprendimiento, con varillas de acero inoxidable de díametro 12, u otros de menor tamaño en función de la zona a reparar, incluyendo la limpieza y descarnado, rejuntado y retacado para saturar en la medida de lo posible la zona de afectada por la inyec- ción, que será de cal NHL, según criterios ge- nerales de intervención, memoria, planos e indi- caciones de la D.F. Medida la unidad con p.p. costes indirectos y medios auxiliares. (E06plem01) TRATAMIENTO IV bóveda 3 1,25 15,25 19,06 bóveda 5 1,25 15,23 19,04 bóveda 6 1,25 14,50 18,13 otros 24 0,35 8,40 Total partida 07.09 ................................................................................................64,63 07.10 ud SANEAMIENTO, a base de limpieza, soplado y preparación de elementos y COSIDO DE PLE- MENTERIA en cruz, con doble varilla de díame- tro 12mm. en diferentes longitudes, y tenida en cuenta para un máximo de tres plementos por "unidad de cosido", siguiendo criterios genera- les de intervención, con p.p. de medios auxilia- res y costes indirectos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a modo de encofrado. Varilla rehundida para facilitar sella- do con mortero de cal CPA "M8" teñido. Medi- da la unidad para una superficie de 0,50 m2 o un máximo de tres plementos. (E06plem02) COSIDO PLEMENTOS bóveda 3 3 3,00 bóveda 5 18 18,00 bóveda 6 18 18,00 otros en previsión 10 10,00 Total partida 07.10 ................................................................................................49,00 07.11 ud Reparación de NERVIOS ROTOS DE BÓVE- DAS, incluso sus arcos formeros, perpiaños, ojivas, etc. consistente en la limpieza y prepara- ción del elemento a tratar y el COSIDO EN CRUZ con doble VARILLA DE ACERO INOXI- DABLE corrugado DE DIAMETRO 12mm. en diferente longitud según casos (incluso podría variar el díametro puntualmente según se deter- mine a pie de obra por la D.F.), y tenida en

Page 76: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

cuenta para un máximo de tres elementos por "unidad de cosido", siguiendo criterios genera- les de intervención, con p.p. de medios auxilia- res y costes indirectos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a modo de encofrado, dejando la varilla rehundida para fa- cilitar sellado de orificio (ejecutado con perfora- dora por rotación a baja presión libre de vibra- ciones) con mortero de cal CPA "M8" teñido. Medida la unidad en proyección horizontal s/criterio D.F. Medios auxiliares y costes indirec- tos incluidos. (E06nervios01) TRATAMIENTO VI (Ref.49) entre bóveda 4 y 5 3 3,00 entre bóveda 5 y 6 3 3,00 en bóveda 6 4 4,00 entre bóveda 10 y 11 3 3,00 bóveda 16 8 8,00 en previsión zona 456 20 20,00 en bóveda 16, fijación escudo 4 4,00 Total partida 07.11 ................................................................................................45,00 07.12 ud COSIDO DE ELEMENTOS DE BÓVEDAS de la Catedral de Ciudad Rodrigo, bien en repara- ciones o afianzamiento, pudiendo afectar tanto a arcos, ojivas, nervios y plementos, consisten- te en la limpieza y preparación del elemento a tratar y el COSIDO EN CRUZ con doble varilla de acero inoxidable corrugado díametro 6mm. en diferente longitud según casos (incluso po- dría variar el díametro puntualmente según se determine a pie de obra por la D.F.), siguiendo criterios generales de intervención, con p.p. de medios auxiliares y costes indirectos, incluyen- do el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado in- ferior a modo de encofrado, dejando la varilla rehundida para facilitar sellado de orificio (ejecutado con perforadora por rotación a baja presión libre de vibraciones) con mortero de cal CPA "M8" teñido. Medida la unidad en proyec- ción horizontal, s/criterio D.F. Medios auxiliares y costes indirectos incluidos. (E06nervios1a) cosidos bóveda 16 48 48,00 en previsión posible actuación plementería 15 15,00 bóvedas 4-5-6 Total partida 07.12 ................................................................................................63,00 07.13 m3 SUSTITUCIÓN DE NERVIOS de las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, rehechos en 1929 con mortero de cemento, por otros de piedra arenisca de Ciudad Rodri- go, seca, sana y seleccionada, incluyendo el perfecto apeo completo de la zona afectada, tanto nervios como plementería, el picado del cemento y si la D.F. no decide rehacerlos con

Page 77: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

mortero "Petratex", proceder a la toma de plan- tillas y preparación de injertos e incluso piezas completas si fuera el caso, perfectamente ado- veladas o acuñadas según la profundidad, y en cualquier caso cosidas con varillas de acero inoxidable de diferentes diametros según zona de actuación, empleando mortero de cal hi- dráulica y acabando la superficie con mortero teñido de cal, CPA "M8", con p.p. de medios auxiliares y costes indirectos. Partida aplicable a otros nervios, bien de formeros, perpiaños, oji- vas, etc. Incluyendo en cualquier caso la labra según modelo original. (E06nervios02) bóveda 19 1 9,00 0,45 0,45 1,82 en previsión bóveda 16 nervios 1 4,00 0,50 0,50 1,00 en previsión plementos 6 0,35 1,20 0,35 0,88 Total partida 07.13 ..................................................................................................3,70 07.14 m. SUSTITUCIÓN DE NERVIOS (formaletes) de las bóvedas del Claustro de la Catedral de Ciu- dad Rodrigo, rehechos en 1929 con mortero de cemento, que será picado para ser sustituido por un mortero de cal teñido, tipo "Petratex", in- cluyendo el perfecto apeo completo de la zona afectada, tanto nervios como plementería, el pi- cado del cemento y si la D.F. no decide reha- cerlos piedra, proceder a la toma de plantillas y preparación del soporte, realización de cosidos en diferentes diametros, devolviendo la geome- tría original con el mortero PETRATEX" o simi- lar indicado, procediendo al patinado del ele- mento. Todo con p.p. de medios auxiliares y costes indirectos. Medido a cinta corrida por el intradós del nervio central saliente. (E06nervios03) bóveda 19 9,5 9,50 otros en previsión faltas 24 0,30 7,20 Total partida 07.14 ................................................................................................16,70 07.15 m2 Patinado de las juntas de mortero de cemento y rellenos efectuados en las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, fundamental- mente las ejecutadas en 1929 y no consideran- do su retirada para no dañar la piedra que "lo soporta", en tono adecuado, previa realización de pruebas y elección de muestra por parte de la D.F., según criterios generales de interven- ción, memoria, planos etc. con p.p. de medios auxiliares y costes indirectos. Medida la superfi- cie en proyección horizontal, con p.p. de desa- rrollos tanto de arcos, ojivas, nervios, claves, escudos y otros elementos decorativos así co- mo cascos de plementería. (E06pat01) bóvedas 13,14,15,16,17,18 y 19 (norte) 1,65 140,85 232,40 bóvedas 1,20,21,22,23 y 24 (este) 1,65 122,65 202,37 Total partida 07.15 ............................................................................................. 434,77

Page 78: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

07.16 m2 Patinado de fábricas de piedra qeu conforman bóvedas y todos sus elementos incluidos los decorativos, tallas, nervios, perpiaños, forme- ros, ojivas, claves, escudos, etc. en la interven- ción de este proyecto, a base de agua de cal grasa con pigmentos inorgánicos, previa elec- ción sobre muestras según dirección facultati- va, con p.p. protección de elementos y limpieza final, de costes indirectos y medios auxiliares. Unicamente en las zonas a determinar por la D.F. (E06pat02) Zona tratamiento humedades 1 31,84 31,84 Reposiciones 1 6,00 6,00 Varios 0,04 689,51 27,58 Total partida 07.16 ................................................................................................65,42 07.17 m2 Formación de encamisado de bóveda de la Ca- tedral de Ciudad Rodrigo, según memoria, a base de una capa de mortero de cal hidráulica NHL 3,5 de 8 cm. de espesor mínimo, incluyen- do la preparación del soporte y la colocación de un mallazo conformado de redondos de díame- tro 12 y malla #15/15cm. galvanizado en calien- te, adaptado al trazado del extradós, incluyendo p.p. de anclajes y formación de asientos para conseguir el trabajo solidario del conjunto de nervios y plementería. Medido en proyección horizontal, con p.p. de medios auxiliares y cos- tes indirectos. (E06bov04) bóveda 16 1,65 21,71 35,82 ^^ 1,65 12,00 19,80 Total partida 07.17 ................................................................................................55,62 07.18 m2 Partida para la restauración de bóveda del Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo el apuntalamiento sobre plataforma multidireccional metálica, homologada, y forma- ción de cimbra para apeo de los arcos formeros-perpiaños, las ojivas y resto de ner- vios, así como el escudo en el caso de la bóve- da marcada en planos con el nº16, previa toma de datos y reportaje fotográfico, con numerá- ción de todas las piezas para su escrupulosa recolocación, previa corrección del trazado, modificando la "tirantez" según las condiciones mínimas que aseguren la estabilidad del con- junto, incluyendo trabajos de carpinteros en montaje y desmontaje de cimbras y apeos, y de cantero en labores de desmontaje y montaje, incluyendo la adaptación de piezas y en su ca- so rectificación de encuentros, anclajes, entre- gas, uniones, formación de asientos entre ple- mentería y nervios, cosidos necesarios a parte de los indicados en la restauración del escudo, así como labores de rejuntado y retacado, con inclusión mínima de piezas puntuales de piedra

Page 79: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

arenisca de Ciudad Rodrigo que será patinada, en caso de no poder recuperar algún elemento o bien por que el trazado lo aconseje, siempre bajo supervisión y aprobación previa de la D.F., con p.p. de medios auxiliares y costes indirec- tos. Medida en proyección horizontal según plo- mo de elementos no desmontados. (E06bov05) bóveda 16 1,1 22,00 24,20 ^^^en previsión plemen 4-5-6 1 10,00 10,00 Total partida 07.18 ................................................................................................34,20 07.19 m2 Picado de rellenos y configuraciones no desea- bles con mortero de cemento en las bóvedas de la Catedral de Ciudad Rodrigo, afectando a elementos singulaes (resto incluidos en partida de descarnado de juntas), como por ejemplo en trabajos para la restauración del escudo de la bóveda marcada con el nº16 -plano 49-, con- sistente en eliminar cuidadosamente cualquier resto de mortero de cemento, para coser el mismo con 4 varillas de acero inoxidable corru- gado de diámetro 12 mm. a través del vástago de cuelgue y del espesor de la bóveda, para posteriormente realizar el resto de cosidos, etc. Medido en proyección horizontal con p.p. de medios auxiliares y costes indirectos. (E06bov06) bóveda 16 1,4 1,50 1,50 3,15 otros<< 46 0,35 0,35 5,64 Total partida 07.19 ..................................................................................................8,79

Page 80: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

08 UNIDAD VII: CARPINTERÍAS DE PASO 08.01 ud Suministro y colocación de cerradura de plas- tón "Mottura" o similar , a colocar en la puerta de entrada al Museo, en acabado cromado ma- te, con llaves maestradas de borjas -3 copias- con ruleta interior y cinco bulones, incluso an- claje con 8 tirafondos M/5/70 mm. perforando la hoja y enrasando el cerco en toda la altura de la puerta con el contramarco, recibido del cerra- dero con escudo exterior en torno al bombillo, de acero inoxidable mate de 7 cm. de díametro y 5 mm. de espesor mínimo (nunca retranquea- do respecto el frente del bombillo), con p.p.de pequeño material y el no descrito, medios auxi- liares y costes indirectos. Medida la unidad completamente colocada y funcionando correc- tamente (E07cerr01) 2 2,00 Total partida 08.01 ..................................................................................................2,00 08.02 ud Intervención en puerta nº1, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. intervención consistente en: Retirada de cerraduras modernas de plastón. Retirada del pasador inferior. Lijado y decapado. Cajeado para colocación de cerradura de segu- ridad embutida con bocallave de forja redonda lisa. Colocación de prótesis en la barra inferior de las hojas. Tapado de orificios y faltas. Ajustado de las hojas. Reparación de la cerradura antigua incluso fa- bricación de dos llaves artesanas de forja. Limpieza del pasador superior primitivo y de la reja del óculo para acabarlos en aceite de lina- za. Limpieza del vidrio, colocando nuevos listones de sujeción 20/20 mm. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mismo tono, rematando a la cera. Colocación de un nuevo pasador inferior, de forja.

Page 81: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Medios auxiliares y costes indirectos En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas co- locadas en la IV Fase. (E07puerta1) 1 1,00 Total partida 08.02 ..................................................................................................1,00 08.03 ud Intervención en puerta nº2, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Retirada de cerraduras modernas de plastón. Retirada de la inadecuada argolla de la aldaba de seguridad existente en la hoja fija. Lijado y decapado. Cajeado para colocación de dos cerraduras de seguridad embutidas con bocallaves de forja re- dondas lisas. Cegado de huecos de antiguas cerraduras. Limpieza de herrajes para su acabado. Colocación de una nueva argolla de forja en sustitución de la retirada para recibir la aldaba. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mismo tono, rematando a la cera. (E07puerta2) 1 1,00 Total partida 08.03 ..................................................................................................1,00 08.04 ud Intervención en puerta nº3, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Eliminación de los soportes modernos de corti- na existentes en el interior, fuera de uso. Eliminación de las dos cerraduras modernas de plastón.

Page 82: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Lijado y decapado. Sustitución de la hoja de paso pequeña por otra de 50 mm de espesor, reduciendo el diente del "cerco", colgándola de pernios de forja. Tapado de las faltas dejadas por las cerraduras retiradas, dejando los orificios donde estuvo an- clada en su día una reja hacia el Claustro. Colocación de dos nuevas cerraduras de segu- ridad embutidas con bocallaves de forja redon- das lisas. Limpieza de los herrajes para su acabado. La reja moderna existente tras el óculo, una vez limpia, se acabará en "Oxiron" negro forja. Limpieza del vidrio impreso del óculo. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mismo tono, rematando a la cera. (E07puerta3) 1 1,00 Total partida 08.04 ..................................................................................................1,00 08.05 ud Intervención en puerta nº4, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Desmontaje de la puerta. Desmontaje y restauración de herrajes. Retirada de la malla de plástico verde existente tras los barrotes. Retirada de las tablas que tapan la falta de dos plafones. Lijado y decapado. Restauración de los cuatro plafones abiertos de la mitad superior de las hojas. Restauración de faltas y partes inferiores daña- das, cajeando y ensamblando prótesis encola- das. Colocación de dos plafones nuevos, dotados de molduraje perimetral igual al existente, sin parte central labrada. Limpieza del pasador primitivo inferior y de los barrotes para acabarlos igual que el resto de herrajes en aceite de linaza. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base

Page 83: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

oleosa en el mismo tono, rematando a la cera. Colocación detrás de los barrotes de una malla de nylon anti pájaros Ø 1/30/30 mm sujeta en- tre dos listones perimetrales 10/20 mm clava- dos interiormente al cerco del hueco. Recolocación de las hojas y puesta en funcio- namiento colocando un pasador de forja, aca- bado en aceite de linaza, que asegure su cierre fuera de las horas de visitas, para asegurar la estabilidad del elemento. (E07puerta4) 1 1,00 Total partida 08.05 ..................................................................................................1,00 08.06 ud Intervención en puerta nº7, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Desmontado de la hoja y cerramiento provisio- nal con tablero aglomerado de 30 mm para es- cuadrarla mediante presión y colocación de un refuerzo perimetral de platabanda continua de 5 mm de espesor acabada en "Oxiron" negro for- ja en cajeado y atornillada al bastidor de la puerta que servirá, a su vez, para la fijación del nuevo herraje de colgar, de forja. Retirada de las dos cerraduras de plastón. Limpieza y acabado del pasador y de la aldaba de forja existentes. Tapado de huecos y faltas. Colocación de una cerradura de seguridad em- butida. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mismo tono, rematando a la cera. Colocación de dos trancas en el interior, cons- truida tanto en sus barras como en sus perfiles de sujeción con pletina 50/10 mm acabadas en "Oxiron" negro forja. (E07puerta7) 1 1,00 Total partida 08.06 ..................................................................................................1,00 08.07 ud Intervención en puerta nº8, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de

Page 84: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Retirada de las dos anillas para paso de cadena del candado actual. Lijado y decapado. Saneado y colocación de prótesis de madera, mediante cajeado y ensamblado de láminas de madera encolada. Ajustado y emplastecido de prótesis antiguas. Estando ahora mismo encomendada la seguri- dad de la puerta al diente existente entre las ho- jas, colocación de otra aldaba de seguridad de forja en la hoja que no la tiene, recibiendo sen- das anillas del mismo material en la hoja y en la fábrica de piedra de la mocheta. Tratamiento de la madera con producto antixiló- fagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mismo tono, rematando a la cera. (E07puerta8) 1 1,00 Total partida 08.07 ..................................................................................................1,00 08.08 ud Intervención en puerta nº9, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Retirada de la puerta de acero existente, tenien- do preparada la de madera que la sustituirá pa- ra su colocación en el día. La nueva puerta de madera será de roble ame- ricano "Prime" con el mismo tono de acabado en roble oscuro que se le dio en su día a la de la Torre de Campanas y a la del Portillo del Al- ba. Contará con una cerradura similar a las dos a colocar en el acceso al Museo, con llave amaestreada con ellas, variando el escudo ex- terior, definido en planos. La hoja se levantará 3 cm del umbral, lo cual unido a las amplias aber- turas de la puerta del Coro proporcionará la ventilación cruzada necesaria para poder cegar los dos huecos del husillo. (E07puerta9) 1 1,00

Page 85: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Total partida 08.08 ..................................................................................................1,00 08.09 ud Intervención en puerta nº10, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acaba- rán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" negro forja para diferenciarlos claramente; En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas coloca- das en la IV Fase. Desmontado, ajuste y sustitución de herrajes por otros de acero inoxidable similares a los existentes que permitan la corrección de ala- beos y deformaciones. (E07puerta10) 1 1,00 Total partida 08.09 ..................................................................................................1,00

Page 86: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

09 UNIDAD VIII: CAPILLA DE SAN JERÓNIMO 09.01 m2 Picado de solado de mortero de cemento exis- tente en la Capilla de San Jerónimo y su Sacris- tía, o zonas asimilables, por medios manuales y mecánicos, protegiendo paramentos y elemen- tos que puedan verse afectados, limpiándo la superficie y valorando el cajeado del terreno pa- ra un posible saneado, eliminando cualquier resto de mortero de cemento que pudiera apa- recer sobre los muros perimetrales, incluyendo la retirada del escombro generado a zona de carga o a contenedor para transporte a verte- dero y limpieza final con p.p. de plataformas de protección para evacuación de escombros, tan- to en umbral como en recorrido, así como pro- tección de la carpintería de acceso -puerta 4- y p.p. de medios auxiliares y costes indirectos. (E08lev01) Capilla San Jerónimo 1 24,73 24,73 Sacristía de la Capilla de S. Jerónimo 1 13,92 13,92 Total partida 09.01 ................................................................................................38,65 09.02 m3 Partida en previsión para el posible cajeado, si procede y a determinar por la D.F., de la base del solado existente en la Capilla de San Jeróni- mo y su Sacristía, según niveles a determinar en función de los estratos que aparezcan, inclu- so limpieza de restos ajenos, con supervisión arqueológica incluida, incluyendo la carga de escombro a zona exterior para su posterior reti- rada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirectos. (E08lev02) Capilla San Jerónimo 1 24,73 24,73 Sacristía de la Capilla de S. Jerónimo 1 13,92 13,92 Total partida 09.02 ................................................................................................38,65 09.03 m2 Picado de los restos de mortero de cal de la bó- veda de ladrillo de la Capilla de San Jerónimo en la Catedral de Ciudad Rodrigo, tanto enfos- cados como retacados y rejuntados, para pro- ceder a su limpieza y saneado, o en su defecto para volver a enfoscar, según valoración en obra por parte de la D.F., con p.p. de retirada de escombros, limpieza y medios auxiliares y costes indirectos. (E08pic01) Bóveda Capilla San Jerónimo 1 6,45 6,88 44,38 Frente-tabica bóveda 1 2,78 1,50 4,17 Bóveda Sacristia de la Capilla de San Jerónimo 1 5,72 3,73 21,34 ^ Total partida 09.03 ................................................................................................69,89 09.04 m2 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contem- plados en este Proyecto de Restauración del

Page 87: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo la limpieza con cepillos de cerdas sua- ves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de ele- mento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o ele- mentos labrados, dejando las superficies aca- badas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, im- permeabilización etc.) incluso aspirado y/o so- plado. Medida en proyección vertical según pla- nos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxiliares. (E03fab02) Capilla Sán Jerónimo perímetro< 1 20,68 3,30 68,24 Capilla San Jerónimo bóveda 1 6,45 6,88 44,38 Frente-tabica bóveda Capilla S.Jerónimo 1 2,78 1,50 4,17 Sacrístia perímetro 1 19,47 3,80 73,99 Boveda Sacristia 1 5,72 3,73 21,34 Total partida 09.04 ............................................................................................. 212,12 09.05 m2 Limpieza de muros de sillería y o fábricas de la- drillo, bóvedas, etc mediante aplicación de se- piolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la elimina- ción de las sales. Todo incluido con p.p. de me- dios auxiliares y costes indirectos. (E05lim01) Para el abono de la partida, previamente la D.F. marcará la zona exacta zona entrada 0,6 207,65 124,59 zona sacristia 0,6 2,78 1,50 2,50 en fondo 1 15,00 15,00 Total partida 09.05 ............................................................................................. 142,09 09.06 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de si- llería y elementos de piedra contemplados en esta intervención, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomien- de, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspec- ción a pie de obra e indicaciones de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior

Page 88: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fa- chada completo, o proyección horizontal en ca- so de elementos de cubricción con p.p. de sa- lientes, pilastras, molduras, etc deduciendo huecos. (E03fab03a) Sacrístia perímetro 1 19,47 3,80 73,99 Boveda Sacristia 1 5,72 3,73 21,34 intradós arco ingreso 1 3,00 3,00 Total partida 09.06 ................................................................................................98,33 09.07 m2 Tratamiento en juntas de fábrica de silleria, con incoporación de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena selecciona- da y tamizada, con aglomerante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, estimando no más del 3% de la super- ficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilas- tras, molduras, etc deduciendo huecos. (E03fab03b) Sacrístia perímetro 1 19,47 3,80 73,99 Boveda Sacristia 1 5,72 3,73 21,34 intradós arco ingreso 1 3,00 3,00 Total partida 09.07 ................................................................................................98,33 09.08 m2 Tratamiento en juntas de FÁBRICA DE LADRI- LLO en bóvedas, con incoporación puntual de algún elemento labrado de sillería de piedra in- cluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de la-

Page 89: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

drillo macizo, incluyendo el picado de las suel- tas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de cemento previa inspección a pie de obra e indicaciones de la di- rección facultativa, empleando material adecua- do -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie según proyec- ción proyección horiz. Con p.p. de medios auxi- liars y costes indirectos. (E08fab01) Capilla San Jerónimo bóveda 1 6,45 6,88 44,38 Frente-tabica bóveda 1 2,78 1,50 4,17 Total partida 09.08 ................................................................................................48,55 09.09 m2 Tratamiento en juntas en BÓVEDAS DE LA- DRILLO MACIZO incluyendo los siguientes tra- bajos: 1,- SOPLADO DE JUNTAS mecánico, median- te equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena selecciona- da y tamizada, con aglomerante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pig- mentos inorgánicos, por medios manuales in- cluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPA- RACIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulveri- zación y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bor- des. Todo con limpieza final incluida, repasos, me- dios auxiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, estimando no más del 3% de la super- ficie tratada. Resto en partida independiente. Criterio de medición: proyección horizontal, me- dido al 100% en caso de trabajos para dejar visto el ladrillo, y en caso de ejecutar trabajos de retacado únicamente para posteriormente enfoscar, un 30% sobre el total. (E08fab02) BÓVEDA de la Capilla de San Jerónimo 1 6,45 6,88 44,38 Frente-tabica bóveda 1 2,78 1,50 4,17 Total partida 09.09 ................................................................................................48,55 09.10 m2 Revoco de paramentos en trabajos de restaura- ción a base de aplicación de diferentes morte-

Page 90: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ros de cal grasa y arenas seleccionadas en tres capas de la siguiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosificación 1:4 empleando arena limpia se- leccionada y de tamiz 2,5 mm previo descarna- do, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de testigos para regletea- do. 2.- Una segunda capa de espesor 6 ó 7 mm., de dosificación 1:2, empleando arena limpia se- leccionada de tamiz 1,2 mm. extendida con fra- tás. 3.- Una tercera y última capa de espesor 3 mm., de dosificación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y control de retracciones. Se empleará cal grasa para realización de mor- teros y se pigmentarán con tierras naturales, realizando muestras para elección por parte de la dirección facultativa, incluso teniendo en cuenta un patinado final para conseguir tono adecuado (según criterios establecidos en me- moria) empleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosifica- ciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un correcto agarre y p.p. de medios auxiliares y costes indirectos. Según memoria y criterios ge- nerales establecidos para la intervención. Inclu- so ensayos de humedad de paramentos pre- vios a la aplicación, para su posterior compro- bación, incluso realización de ensayos de dosifi- caciones y tipos de arena y cal. (E08enf01) BÓVEDA de la Capilla de San Jerónimo 1 6,45 6,88 44,38 Frente-tabica bóveda 1 2,78 1,50 4,17 Total partida 09.10 ................................................................................................48,55 09.11 m2 Preparación de base de solado de la Capilla de San Jerónimo y su Sacristía, incluyendo el dre- naje a determinar en función del estado, la aportación de tierras especiales y su estabiliza- ción con cal mediante técnicas tradicionales, in- cluso capa separadora, apisonado, todo para un espesor según condiciones del terreno entre 10-20 cm., dejando la superficie lista para la co- locación de nuevo solado, con p.p. de costes indirectos y medios auxiliares. (E08sol01) Capilla San Jerónimo 1 24,73 24,73 Sacristía de la Capilla de S. Jerónimo 1 13,92 13,92 Total partida 09.11 ................................................................................................38,65 09.12 m2 Solado de la Capilla de San Jerónimo y su Sa-

Page 91: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

cristía, o zonas asimilables, con baldosas de piedra arenisca de Ciudad Rodrigo, seca y sa- na, de espesor 10 cm. y medidas 50x50, con acabado apomazado, incluso formación de jun- tas de 1 cm. , base de mortero seco sobre are- na seca apisonada, y rejuntado con mortero de cal teñido (arena seleccionada y tamizada) pre- via realización de muestras, con protección de paramentos y zonas que pudieras verse afecta- das, limpieza final y retirada de material sobran- te y selección en contenedores, costes indirec- tos y medios auxiliares. (E08sol02) Sacristía de la Capilla de S. Jerónimo 1 13,92 13,92 Capilla San Jerónimo 1 24,73 24,73 Total partida 09.12 ................................................................................................38,65 09.13 ud Partida para la ejecución de los trabajos de al- bañilería completos para poder instalar los pun- tos de iluminación y control en la Capilla de San Jerónimo y su Sacristía, así como las reparacio- nes en la zona de acometida marcadas en pla- nos, incluyendo la formación de acometida a la red existente en Sala contigua del Museo (caja de enchufe en suelo), incluyendo las rozas ne- cesarias tanto en solado, paramentos, muros (perforación para un grosor estimado de 1,50 metros y 1,10 m.), bóveda, etc. para poder ins- talar una manguera de 2x1,5+1,5 mm2, incluso remates, tanto de la Capilla y su Sacristía como la zona necesaria afectada del Museo, con p.p. de medios auxiliares y costes indirectos. (E08elec01) Capilla de San Jerónimo/Sacristía y Museo 1 1,00 Total partida 09.13 ..................................................................................................1,00 09.14 ud Suministro y montaje de proyector foco led, de la marca "LEDBOX" mod. "Lexus" o similar, de 9 w, incluyendo p.p. de línea a base de man- guera 2x1,5+1,5 mm2, conexiones, acometida, regletas y linea de control por detector, material auxiliar, accesorios y el no descrito, mano de obra, medios auxiliars y costes indirectos. Medi- da la unidad colocada y funcionando (E08elec02) Capilla de San Jerónimo 1 1,00 Sacristía Capilla San Jerónimo 1 1,00 Total partida 09.14 ..................................................................................................2,00 09.15 ud Suministro y montaje de DETECTOR DE PRE- SENCIA tipo "Orbise Prosimat PRO CR" o simi- lar, con 360º de ángulo de captación, campo de detección: Hasta ø 30 m. a 3,5 m de altura, instalación en techo a altura máxima de 7 m. o en pared, con led de funcionamiento, progra- mable con Mando a Distancia CR ( accesorio), el cual permite cambiar con gran rapidez, facili- dad y precisión los parámetros regulables y fun-

Page 92: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ciones especiales de los detectores de proximi- dad CR ya instalados, con un alcance de apro- ximadamente 8 metros que permita una rápida y precisa programación sin necesidad de herra- mientas ni escaleras, incluyendo p.p. de línea a base de manguera 2x1,5+1,5 mm2, conexio- nes, acometida, regletas y material auxiliar, ac- cesorios y el no descrito, mano de obra, medios auxiliars y costes indirectos. Medida la unidad colocada y funcionando (E08elec03) Capilla de San Jerónimo 1 1,00 Sacristía Capilla San Jerónimo 1 1,00 Total partida 09.15 ..................................................................................................2,00 09.16 ud Cerramiento de hueco con alabrastro, previa aprobación de muestra por parte de la D.F. in- cluyendo el suministro, corte y montaje, con p.p. de preparación de hueco, adaptación, for- mación de mochetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxiliares y costes indirectos. En Capilla de San Jerónimo. (E08alab1) 1 1,00 Total partida 09.16 ..................................................................................................1,00

Page 93: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

10 SEGURIDAD Y SALUD 10.01 ud Partida alzada basada en el Estudio de Seguri- dad y Salud redactado por el Arquitecto Técni- co Fernando Polo González, anejo a este Pro- yecto - apartado 3- (E09SyS01) 1 1,00 Total partida 10.01 ..................................................................................................1,00

Page 94: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

11 GESTIÓN DE RESIDUOS 11.01 m3 Carga de tierras a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondien- tes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con ca- mión bañera basculante cargado a mediante maquina retro, de diferente volumen según ne- cesidades, incluso p.p. de adaptación y protec- ción de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. (E10GRes1) 1,3 773,10 1.005,03 Total partida 11.01 .......................................................................................... 1.005,03 11.02 m3 Carga de escombro según tipo codigo LER a camión y transporte al punto de gestión de resi- duos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facul- tativa, a una distancia aprox. de 20 km., consi- derando ida y vuelta, con camión bañera bas- culante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. (E10GRes2) 1 180,13 180,13 Total partida 11.02 ............................................................................................. 180,13 11.03 m3 Carga de madera y similares a camión y trans- porte al punto de gestión de residuos, que será como para el resto de partidas de este proyec- to, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera basculante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. (E10GRes3) 1,75 4,50 7,88 2,5 16,00 40,00 Total partida 11.03 ................................................................................................47,88 11.04 m3 Carga de MATERIAL CERÁMICO SOBRANTE a camión y transporte al punto de gestión de re- siduos, que será como para el resto de partidas de este proyecto, homologado y que extenderá

Page 95: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facul- tativa, a una distancia aprox. de 20 km., consi- derando ida y vuelta, con camión bañera bas- culante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. (E10GRes4) 1,35 370,00 499,50 Total partida 11.04 ............................................................................................. 499,50 11.05 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont01) 6 6,00 otros en prev. 10 10,00 Total partida 11.05 ................................................................................................16,00 11.06 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont02) 2 2,00 Total partida 11.06 ..................................................................................................2,00 11.07 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont03) residuos apuntalamientos, tableros seguridad y 2 2,00 otros Desmontaje de otros de obra, directos a camión Total partida 11.07 ..................................................................................................2,00 11.08 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per-

Page 96: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont04) 7 7,00 Total partida 11.08 ..................................................................................................7,00 11.09 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont05) 1 1,00 Total partida 11.09 ..................................................................................................1,00 11.10 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont06) 2 2,00 Total partida 11.10 ..................................................................................................2,00 11.11 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont07) 9 9,00 Total partida 11.11 ..................................................................................................9,00 11.12 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont08) 1 1,00 Total partida 11.12 ..................................................................................................1,00

Page 97: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.1 MEDICIONES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

U N I D A D E S

DIMENSIONES

Longitud Latitud Altura __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

N.º DESIGNACION DE LA CLASE DE OBRA Y N.ºde orden DE LAS PARTES EN QUE DEBE EJECUTARSE partes iguales Subtotales TOTALES

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

11.13 ud Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reciclaje o vertederos, según casos por Gestor Homologado con p.p. de per- misos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. (E10cont09) 2 2,00 3 3,00 Total partida 11.13 ..................................................................................................5,00 11.14 ud Partida para la manipulación de materiales con amianto, principalmente pilón en patio central, tuberías de fibrocemento y otros, incluso otros potencialmente peligrosos (disolventes, aditivos, resinas, residuos varillas vidrio-epoxi, etc. con contenidos de hidrocarburos, etc.) incluyendo el desmontaje y retirada de obra, selección, car- ga y transporte a vertedero homologado, inclu- yendo todo el tratamiento regulado según RD 396/2006 y normativa vigente. Para un volumen máximo de 17 m3, con p.p. de certificados, cá- non de vertedero, etc. Todo según normativa, con p.p. de costes indirectos y medios auxilia- res. (E10cont10) 1 1,00 Total partida 11.14 ..................................................................................................1,00

Page 98: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.1 CUADRO DE PRECIOS UNITARIOS: MANO DE OBRA __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

MANO DE OBRA O01OA010 h. Encargado 21,50 O01OA030 h. Oficial primera 17,62 O01OA040 h. Oficial segunda 16,62 O01OA050 h. Ayudante 16,06 O01OA060 h. Peón especializado 16,20 O01OA070 h. Peón ordinario 14,50 O01OA130 h. Cuadrilla E 32,12 O01OB030 h. Oficial 1ª ferralla 17,70 O01OB040 h. Ayudante ferralla 16,61 O01OB070 h. Oficial cantero 18,00 O01OB130 h. Oficial 1ª cerrajero 18,20 O01OB140 h. Ayudante cerrajero 16,23 O01OB150 h. Oficial 1ª carpintero 14,58 O01OB160 h. Ayudante carpintero 13,70 O01OB170 h. Oficial 1ª fontanero 18,24 O01OB195 h. Ayudante fontanero 16,38 O01OB200 h. Oficial 1ª electricista 17,51 O01OB270 h. Oficial 1ª jardinería 17,20 O01OB280 h. Peón jardinería 15,50 O01OB910 h. Oficial 1ª revocador 18,50 O01OB920 h. Ayudante revocador 18,00 O01OC160 h. Especialista restaurador 20,00 O01OC230 h. Especialista restaurador pintura 30,92 O01OC270 h. Arqueólogo 19,88 O01OC275 h. Ayudante de Arqueólogo 16,50 O01OC280 h. Restaurador de piedra 19,75

Page 99: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.2 CUADRO DE PRECIOS UNITARIOS: MATERIALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

MATERIALES P001arqueo01h. Informe arqueolog, trabajo en gabinete. 19,88 P001Sika01 m2 Mortero SikaMonotop 107-Seal 3,00 P002placa01 m2 Placa cubierta hormig. pref. "Prephor" o similar 4,40 P00and01 m2 Día/alquiler andamio "europeo" homolog. facha 0,03 P00and02 m3 Día/alquiler andamio multidireccional homolog 0,04 P00grua1 ud Montaje/Desmontaje grúa torre 45 m.+ proy 1.650,00 P01AA020 m3 Arena de río 0/6 mm. 16,80 P01AA030 t. Arena de río 0/6 mm. 13,22 P01AA082 t. Arena 0/3 triturada lavada 15,70 P01AA084 kg Arenilla de polvo de mármol 0,06 P01AA110 m3 Arena caliza de machaqueo 0/5 mm 16,36 P01AF040 t. Zahorra natural 8,52 P01AG020 t. Garbancillo 4/20 mm. 13,82 P01AG060 t. Gravilla 20/40 mm. 10,43 P01AG130 m3 Grava 40/80 mm. 17,56 P01AL010 m3 Arcilla exp.Arlita a granel 53,46 P01AL020 m3 Arcilla exp.Arlita F-3 (3-8 mm) sacos 68,40 P01ANDrev ud Certificados andamiaje 0,02 P01aceite1 l. Aceite de linaza crudo 3,95 P01acom1 ud Adaptación acometida y registro polietl20 22,25 P01alab1 m2 Alabastro seleccionado a elegir 110,50 P01aren01 m3 Arena de rio seca protección pav. 17,85 P01asf01 m2 Reposición capa asfalto en acometidas saneami 34,25 P01bord01 m. Bordillo granito abujar. bisel. 10/12 cm. 9,85 P01bord02 m. Bordillo granito aburj. bisel. 10/20 cm. 12,90 P01CC010 t. Cemento CEM II/B-P 32,5 N granel 95,62 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 95,64 P01CC045 Tm. Cemento CEM II/A-L 42,5 sacos 91,95 P01CC140 t. Cemento blanco BL-II 42,5R sacos 127,41 P01CL010 t. Cal viva molida en sacos Q 134,53 P01CL020 t. Cal viva molida a granel Q 74,31 P01CL030 t. Cal hidratada en sacos S 155,00 P01CL060 t. Cal hidráulica HL 212,93 P01CPA8 kg. Cal CPA "M8"o similar 0,75 P01CY010 t. Yeso negro en sacos 70,35 P01CY030 t. Yeso blanco en sacos 95,38 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 174,00 P01con1 l. Consolidante Tegovakon V o similar 52,41 P01con2 l. "Tegosivin HL 100" o similar 64,60 P01con3 kg Consol.Imperm. "Estel 1000" o similar 36,31 P01cont1 ud Contenedor 11 m3 69,50 P01DW050 m3 Agua 0,80 P01DW210 kg Pigmentos de tierra natural 2,50 P01EB010 m3 Tablón pino 2,50/5,50x205x76 195,89 P01EMaderautm3 Tratamiento autoclave Vac-Vac riesgo 3 156,21 P01EMadrobl m3 Madera de roble seca durmientes cl. ME-1 1.125,32 P01ET005 m3 Tabla encf pino 10-20cm L=2m 223,95 P01ET080 m2 Ripia 15x3,5 cm s/cepillar 8,94 P01EW620 ud Material de ensamble estructural s/planos 85,00 P01EW621 ud Material anclaje durmiente 25,23 P01EW630 m3 Madera laminada GL24c Picea Abies vacsolizada 925,52 P01electric01 ud Cuadro de Protección General 180,00 P01electric02 ud Cuadro de protección bajo escalera 700,00 P01electric03 ud Cuadro protección y mando 2 bombas 4 kW 1.200,00 P01electric04 ud Cuadro protección y mando 2 bombas 0,7 kW 1.000,00 P01electric05 ud Ayuda albañileria-electricidad instal.cuadros 250,00 P01electric06 m. Linea grapada CU 5X6 mm2. 0,6/1 KV libre halo 18,00 P01electric07 m. Linea enterrada cu 4x4 mm2, 0,6/1kV libre hal 5,00 P01electric08 m. Linea enterrada CU 4x2,5 mm2, 0,6/1libre halo 4,00 P01electric09 m. Linea enterrada CU 3x1,5 mm2, 0,6/1kV libre h 2,00 P01electric10 m. Tubo reforzado PVC 20 mm. inc. cajas y mont. 1,20 P01electric11 m. Tubo reforzado PVC 40 mm. inc. cajas y mont. 2,50 P01electric12 ud Pequeño material y accesorios elec.pozo2 15,00

Page 100: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.2 CUADRO DE PRECIOS UNITARIOS: MATERIALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01ext1 ud Extintor eficacia 21A 65,50 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 10,00 P01HA010 m3 Hormigón HA-25/P/20/I central 58,20 P01HM010 m3 Hormigón HM-20/P/20/I central 83,11 P01HM020 m3 Hormigón HM-20/P/40/I central 83,11 P01herr1 ud Material auxiliar correas 15,50 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 14,15 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 5,45 P01informear ud Informe arquéologa 4 copias 250,00 P01LG141 ud Rasillón cerámico m-h 80x25x4 0,75 P01LH020 mudLadrillo hueco doble 24x11,5x9 cm. 8,90 P01LHD01 ud Ladrillo cerámico 25x11 formación tab.palome 0,15 P01LT010 ud Ladrillo perforado tosco 24x11,5x10 cm. 0,10 P01LT020 ud Ladrillo perforado tosco 24x11,5x7 cm. 0,12 P01lad1 ud Ladrillo cerámico macizo de tejar 0,17 P01lasur1 l. Envase 750 cm3 "Xyladecor Sol" mate o similar 10,50 P01lona1 m2 Lona protección cubiertas 7 usos 21,90 P01lona2 m2 Estrucutra colocación lona protección 20 usos 45,00 P01MC010 m3 Mortero cem. gris II/B-M 32,5 M-15/CEM 76,15 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 65,85 P01ME010 l. Mortero tixotrópico epoxi 3,05 P01mad01 m2 Estruc. Reticular s/bóvedas c/tratm y acabado 13,20 P01ProyAnd1 ud Proyecto Montaje Andamios 0,21 P01per1 l. Peróxido de hidrógeno 4,55 P01per2 l. Formaldéhido 3% 4,20 P01plom1 m2 Lámina de plomo 2,5 mm. PB-2 72,50 P01prim1 l. Primal AC-235 k o similar 5,95 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 0,25 P01prot02 m2 Tablero aglomerado 30 mm. protección pav. 3,50 P01prot03 m. Cinta adhesiva láminas polietileno 0,15 P01rej01 ud Rejilla RM-30 C-250 Benito o similar l=0,70 37,00 P01rej02 ud Rejilla RM-20 C-250 Benito o similar l=0,70 16,80 P01rej03 ud Rejilla tipo R05-30 Benito o similar 52,00 P01rejilla1 m. Rejilla con marco RM-30 C-250 Benito o simila 39,42 P01res1 ud Tratam. completo resid.amianto <15 m3 homol. 980,00 P01res3 ud Canón vertedero contenedor 11 m3 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 12,50 P01res4a ud Tasas y certificado contenedor 11 m3 bitumino 15,50 P01res4b ud Tasas y certificado Gestor homol. plomo/cobre 18,00 P01res4c ud Tasas y certificado Gestor homologado Cables 16,85 P01res5 ud Tasas y certif. Gestor Homolog. mat.peligroso 20,20 P01SikaPlan12Gm2Lámina PVC 1,2 SikaPlan12G o similar 20x2 4,85 P01SM230 m3 Bloque piedra arenisca CR sin escuadrar 480,25 P01sanea1 ud Tubo conexión D=63 + accesrios 15,00 P01sk2 ud Masilla sellado "Sikaflex PRO 2 HP" o similar 5,50 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 0,05 P01UC010 ud Clavo cobre D=3 mm. 0,04 P01UC020 kg Puntas 17x70 7,30 P01UC040 kg Puntas 21x110 7,30 P01UC042 ud Clavo pucelado 15 cm. carp.armar 1,02 P01var1 m. Varilla roscada acero inox. D=4 a 8 inc. 3,89 P01var2 m. Varilla roscada acero inox D=12 mm. 5,15 P01var3 m. Varilla vidrio-epoxi D=4 mm 4,74 P01var4 m. Varilla vidrio-epoxi D=6 mm. 5,20 P01var5 ud Boquilla inyección resinas/cal hid 0,10 P01Xyla01 l Xylamon fondo env. 20 litros 6,10 P01Xylad01 l. Xyladecor roble mate env. 20 litros 6,50 P01Xylamon l. 750 cm3 Xylamon fondo o similar 7,70 P02chap01 m2 Chapa galv. "PL33/07" Acelor Mittal o similar 5,75 P02cob01 ud Gato cobre pletina 30/3 mm. 8,25 P02cob02 m. Canalón cobre 125 "1/2 duro" e=8 mm. 32,58 P02cob3 ud Soporte gárgola s/detalle 76,26 P02cob4 ud Gárgola cobre s/detalle y memoria 89,07 P02EAT030 ud Tapa cuadrada HA e=6cm 60x60cm 19,58 P02EPT010 ud Cerco/tapa FD/25Tn D=60 40,90 P02EPW001 ud Cerco/tapa d=80cm. T-2085 k C400 D.Benito 212,00 P02EPW020 ud Pates acero galvanizado 30x25 5,37 P02EPW021 ud Argolla acero galvanizado o inox. pozo bombeo 17,25

Page 101: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.2 CUADRO DE PRECIOS UNITARIOS: MATERIALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P02epw002 ud Cerca/tapa d=90 cm. Pozo 2 245,25 P02lucer01 ud Lucernario fundición adaptado s/diseño 180,50 P02placa02 m2 Placa BTU "Euronit" 230 o similar 9,85 P02placa03 ud Accesorios fijación placa BTU/m2 0,37 P02sikalite kg. Super Sikalite o similar 7,20 P02THE150 m. Tub.HM j.elástica 60kN/m2 D=300mm 11,08 P02TVO480 m. Tub.PVC liso evacuación encolado D=200 9,35 P03AA020 kg Alambre atar 1,30 mm. 1,75 P03AC210 kg Acero corrug. B 500 S pref. 1,05 P03AM020 m2 Malla 15x15x5 2,078 kg/m2 1,40 P03AM030 m2 Malla 15x15x6 2,870 kg/m2 1,91 P03AM070 m2 Malla 15x30x5 1,564 kg/m2 1,10 P03AM110 m2 Malla 30x30 Diametro=12 mm. 6,25 P03AM111 m2 Mallazo #15x15 Diametro 12 mm. 6,88 P03AM112 m2 Malla 10x10 Díametro 12 mm. 12,50 P03lam01 m2 Geotextil o capa separadora imperb Madilit o 1,75 P03lucer1 ud Adaptación de lucernario a mod. s/diseño 150,50 P03MALst m2 Malla triple torsión acero galvanizado 1,52 P03REMlim m. Remate especial limas sist. "uralita" o simil 3,80 P03Z030 kg Galvaniz. en caliente mallazo 0,60 P04plet1 m. Pletina cobre 30/2 42,50 P05CC090 ud Chapa cobre 2,00x0,67mx0,80mm "1/2" 65,50 P05CC210 ud Patilla ancl. engatillado simple 0,34 P05CC240 ud Patilla junta alzada fija 0,34 P05CP050 m2 Chapa de plomo de 2,50 mm. elaborada 34,35 P05CP210 ud Grapa para alero de plomo 0,43 P05CP211 m. Tubo cobre diam.6 mm. 1,25 P05corten1 kg. Acero corten en palastro 10/10 o 10/20 1,65 P05corten2 l. Tratamiento acelerador óxido 4,50 P05corten3 l. Tratamiento fijador óxido 9,25 P05EE010 ud Placa Arlita armada 100x50x5 4,40 P05EH020 ud Tablero placas prefab.hormigón tipo "Prephor" 16,20 P05EH021 m2 Tablero placas prefab. hormig. tipo "Prephor" 16,20 P05elect01 ud Interruptor marrón marca y modelo s/DF 65,00 P05espum1 ud Bote espuma poliuretano 4,78 P05FT010 m2 Placa BTU fibroc. granond. T. cerám curva 12,85 P05FWG010 ud Gancho equ.IPN-8:170x44 G-O 0,37 P05TC010 ud Teja curva nueva s/d.f. 0,20 P05TC030 ud Teja curva vieja paletizada y en obra 0,21 P05TC031 ud Seleccionado y limp. teja vieja recuperada 0,05 P06mallazo m2 Mallazo r12#15/15 galvan. + anclajes encamisa 24,50 P06SL180 m2 Lámina plástico 0,16 P07AL100 m2 Lámina acústica Impactodan 3 mm. 0,75 P07cerr1 ud Cerradura seguridad "Mottura" o similar 5 bul 185,00 P07cerr2 ud Bombillo cerradura Mottura 85,00 P07puerta1 ud Intervención completa puerta 1 s/memoria-D.F 750,00 P07puerta10 ud Intervención puerta 10 s/memoria y DF 380,00 P07puerta2 ud Intervención completa puerta 2 s/memoria-DF 360,00 P07puerta3 ud Intervención completa puerta 3 s/memo y DF. 1.050,00 P07puerta4 ud Intervención completa puerta 4 s/memo y DF 2.490,00 P07puerta7 ud Intervención completa puerta 7 s/memo y DF 1.200,00 P07puerta8 ud Intervención puerta 8, s/memoria y DF 530,00 P07puerta9 ud Intervención completa puerta 9 s/memo y DF 848,00 P07TE090 m3 Poliest.exp.tipo I-AE 10 kg/m3 M1 43,71 P07TE091 m2 Poliestireno expandido e=1 cm. 2,20 P07TX015 m2 P.polies.extruido 40 kg/m3 40 mm. 5,95 P07TX360 m2 Poliestireno extruido e=2 cm. 3,60 P08elec1 m. Manguera arm 2x1,5x1,5 libre halógenos + acce 3,50 P08elec2 ud Proyector "Ledbox Nexus" o similar 9w 65,50 P08elec3 ud Detector "Orbise Prosimat PRO CR" o similar 116,35 P08MA060 ud Mat. auxiliar colocación tarima 2,37 P08MT033 m2 Tarima Pino Norte e=23 mm. tratada taller 11,05 P08XBB010 m. Bord.recto grani.picona.10x20 15,72 P08XBB011 m. Bordillo granito abujardado biselado 10/12 cm 9,50 P09SYS01 ud Coste Total Seguridad y Salud según Estudio F 30.218,25 P10gest1 ud Tasa/m3 sustancia no peligrosa en camión 2,90 P11DE020 m2 Celosía lamas orien. 145 mm.pino flandes 310,30 P25WW180 m. Lija 0,72

Page 102: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.2 CUADRO DE PRECIOS UNITARIOS: MATERIALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P25WW220 ud Pequeño material 0,79 P26bombeo01 ud Bomba achique Grundfos SE1 100.100.40 4,51 d 7.500,00 P26bombeo02 ud Zócalo para autoacoplamientos DN 150 1.400,00 P26bombeo03 ud Interruptores nivel IFP1 10 m. 65,00 P26bombeo04 ud Tubo flexible 100 mm. salida bombas 20,00 P26bombeo05 ud Tub. PVC presión 100 mm. + accesorios 8,00 P26bombeo06 ud Válvula de retención 100 mm. cierre bola 190,00 P26bombeo07 ud Accesorios, piezas y otros POZO1 70,00 P26bombeo201ud Bomba Grundfos AP35B.50.06.3 715,00 P26bombeo202ud Zócalo para autoacomplamientos 195,00 P26bombeo203ud Tubo flexible 63 mm. salida bomba 15,00 P26bombeo204m. Tub.PVC presión 63 mm. + accesorios 6,00 P26bombeo205ud Válvula retención 65 mm. cierre bola 110,00 P26bombeo206ud Accesorios, piezas, y otros POZO 2 55,00 P26riego02 m. Tuberia PE 20 mm. 6 bar inc. accesorios 2,00 P26riego03 ud Arqueta PVC 40/27 con tapa fundición 69,25 P26riego04 ud Boca de riego 3/4 con llave 70,00 P26riego05 ud Electroválvula de riego bobina 12V 25,00 P26riego06 ud Reductor de presión 3/4 para goteo 10,00 P26riego07 m. Tubería goteo ciego 16 mm. con p.p goteo s/pl 0,50 P26riego08 ud Programador de riego 2 zonas 65,00 P26riego09 ud Accesorios,piezas, y material auxiliar riego 50,00 P26riego1 ud LLave bola poliprop. 3/4 rosca macho + acceso 20,00 P26SP130 ud Kit programador 2 zonas 2 pilas LR6x1,5v 230,85 P26SV010 ud Electroválvula 24 V apertura manual 1" 31,15 P26TPI010 m. Tub.PEBD c/goteo integr. c/35cm. D=16mm. 0,49 P26TPI020 m. Tuberia PE DB c/goteo integr. c/50cm. D=16mm. 0,44 P26TPI030 m. Tub.PEBD c/goteo integr. c/50cm. D=17mm. 1,65 P26TPI040 m. Tub.PEBD c/goteo integr. c/100cm. D=17mm. 0,77 P26valv1 ud prueba cochinaaaaaaaa 1,10 P28DA010 m3 Tierra vegetal limpia 15,50 P28DA100 m3 Mantillo limpio cribado 28,00 P28DA130 kg Substrato vegetal fertilizado 3,20 P28EH052 ud Salvia officinalis 40 cm.ct. 3,05 P28EH070 ud Thymus vulgaris 40 cm. cont. 1,98 P31CB100 m. Valla chapa ciega galvan. 2,20 m 3usos c/pies 24,50 P31CB101a m. Valla enrejado 80/150 350x220 m. 10 usos 19,20 P33A090 kg Adhesivo epoxi 100/35 10,46 P33A120 kg Adhesivo Calatón CA disol. 70/30 7,68 P33A130 l. Adhesivo de nylón soluble 2,50 P33A240 m3 Carga inerte para resinas termoplásticas 104,82 P33A250 kg Árido impalpable espesante 2,07 P33E010 l. Pentaclorofenato sódico acuoso 4,34 P33I140 l. Alcohol etílico 1,90 P33J050 kg Atapulgita celulósica 6,89 P33J130 l. Gel decapante eliminación pinturas 9,49 P33J170 l. Agua desionizada no polarizada 0,11 P33MORpetratexkg.Mortero de restaruación "Petratex" o similar 2,20 P33OD010 m. Varilla a/inoxidable roscado D=4mm 3,14 P33OE150 ud Boquilla de inyección manual resinas 0,08 P33P030 ud Materiales fungibles para arqueologia 187,35 P33P100 kg Pulpa papel p/humedecer 2,15 P33P180 ud Conductivímetro 220,69 P33P210 ud Varios material y utillaje 150,50 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 1.015,25 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 195,35 P33piegr m3 Piedra granítica gris seleccionada escuad. 1.048,00 P33XB100 kg Hidróxido de bario 20,50 P33YA030 m. Cadena de espinas de 1 a 30 m. 8,92 P3CHAPA01 m2 Chapa galv. PL 30/209/07 "CSI Transform." o s 5,75 Parena0_8 m3 Arena seleccionada y tamiz. 0,8 mm. 18,25 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 18,25 Parena2_5 m3 Arena seleccionada y tamiz 2,5 mm. 20,00 U41AA005 M2 Andamio transportado m2/m3 0,05 U41AA015 M2 Día alquiler andamio Europeo "fachadas" 0,04 U41AA205 M2 Montaje andamio europeo "marco o fachada" 3,10 U41AA225 M2 Desmontaje andamio Europeo 1,70

Page 103: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.1.2 CUADRO DE PRECIOS UNITARIOS: MATERIALES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Código Descripción Precio __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

MAQUINARIA M02GE050 h. Grúa telescópica autoprop. 60 t. 95,00 M02GT280 ms Alquiler grúa torre 45 m. 1200 kg. 1.182,00 M02GT340 ud Mont/desm. grúa torre 45 m. flecha 1.650,00 M02GT360 ms Contrato mantenimiento 75,00 M02GT370 ms Alquiler telemando 115,32 M03B100 h. Taladradora mecánica 7,52 M03C010 h. Batidera mecánica fosas apagado 3,63 M03C020 h. Balsa apagado de cal por fusión 0,26 M03HH020 h. Hormigonera 200 l. gasolina 1,80 M03HH030 h. Hormigonera 300 l. gasolina 3,39 M03HH070 h. Hormigonera 250 l. eléctrica 1,92 M03HH090 h. Batidera mecánica 0,66 M04YI010 h. Inyectadora hidráulica c/grupo 35,72 M05EN030 h. Excav.hidráulica neumáticos 100CV 50,00 M05PN110 h. Minicargadora neumáticos 40 CV 30,60 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 9,00 M06CM010 h. Compre.port.diesel m.p. 2 m3/min 7 bar 2,26 M06CM030 h. Compre.port.diesel m.p. 5 m3/min 7 bar 3,91 M06MI010 h. Martillo manual picador neumático 9 kg 3,01 M06MI020 h. Martillo manual picador eléctrico 11kg 3,01 M07AA020 h. Dumper autocargable 2.000 kg. 5,41 M07CB030 h. Camión basculante 6x4 20 t. 36,00 M07N060 m3 Canon vertedero 0,82 M08RI010 h. Pisón vibrante 70 kg. 2,04 M10HV220 h. Vibrador hormigón gasolina 75 mm 4,50 M10MR030 h. Rodillo auto.90 cm. 1 kg/cm.gene 5,50 M10PN010 h. Motoazada normal 4,75 M11AF020 h. Equipo atomizador agua 314,47 M11C010 h. Bailarín mecánico abujardado/apomazado 2,75 M11med1 h. Barrenadora rotación 14,57 M11PI020 h. Eq. de inyección manual resinas 4,96 M11W010 h. Equipo chorro aire presión 2,95 M11W060 h. Equipo pulverizador aerográfico 4,50 M12AM170 m2 Montaje y desm. red andam. 0,45 M12T010 h. Taladro eléctrico 2,50 M13B300 m2 Formación de cimbra de madera 30,66 M13B310 m2 Formación de cimbra metálica 29,37 M13B350 ud Tablón 20/7 complemento apeos 6,72 M13B360 ud Tabloncillo 15/5 complem. apeos 7,08 M13B370 ud Tabla 10/3 complemento apeos 4,75 M13CC030 ud Codal met.exten.c/pp.correa met. 0,55 M13CP130 ud Puntal telesc. fuerte 4m 100 usos 16,59 M13W200 ud Tanque abonado red riego 60 l. 478,00 U02OD115 H. Grúa autopropuls.50Tm./50m. 79,00

Page 104: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A01 A01A010 m3 Pasta de cal viva apagada, amasada manualmente. O01OA070 h. Peón ordinario 2,500 14,50 36,25 P01CL030 t. Cal hidratada en sacos S 0,350 155,00 54,25 P01DW050 m3 Agua 0,700 0,80 0,56 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 91,06 NOVENTA Y UN EUROS CON SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A02 A01A010a m3 LECHADA CAL NHL 3,5 CE FYM o similar O01OA070 h. Peón ordinario 2,000 14,50 29,00 P01DW050 m3 Agua 0,850 0,80 0,68 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,300 174,00 52,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 81,88 OCHENTA Y UN EUROS CON OCHENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A03 A01A010b m3 PASTA DE CAL NHL 3,5 CE FYM o similar O01OA070 h. Peón ordinario 2,500 14,50 36,25 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,450 174,00 78,30 P01DW050 m3 Agua 0,700 0,80 0,56 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 115,11 CIENTO QUINCE EUROS CON ONCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A04 A01A015 m3 Cal grasa apagada en balsas por el procedimiento de fusión, almacenada en fosas durante 4-5 sema- nas y suministrada en pasta. O01OA060 h. Peón especializado 4,000 16,20 64,80 P01CL030 t. Cal hidratada en sacos S 0,385 155,00 59,68 P01DW050 m3 Agua 0,770 0,80 0,62 M03C010 h. Batidera mecánica fosas apagado 4,000 3,63 14,52 M03C020 h. Balsa apagado de cal por fusión 336,000 0,26 87,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 226,98 DOSCIENTOS VEINTISEIS EUROS CON NOVENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A05 A01A030 m3 Pasta de yeso negro amasado manualmente s/RY-85. O01OA070 h. Peón ordinario 2,500 14,50 36,25 P01CY010 t. Yeso negro en sacos 0,850 70,35 59,80 P01DW050 m3 Agua 0,600 0,80 0,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 96,53 NOVENTA Y SEIS EUROS CON CINCUENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A06 A01A040 m3 Pasta de yeso blanco amasado manualmente, s/RY-85. O01OA070 h. Peón ordinario 2,500 14,50 36,25 P01CY030 t. Yeso blanco en sacos 0,810 95,38 77,26 P01DW050 m3 Agua 0,650 0,80 0,52 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 114,03 CIENTO CATORCE EUROS CON TRES CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 105: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

A07 A01L100 m3 Lechada de mezcla colorante y cemento para reves- timientos confeccionada en obra. O01OA060 h. Peón especializado 3,325 16,20 53,87 P01DW050 m3 Agua 0,865 0,80 0,69 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,120 95,64 11,48 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 66,04 SESENTA Y SEIS EUROS CON CUATRO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A08 A02A080 m3 Mortero de cemento CEM II/B-P 32,5 N y arena de río de tipo M-5 para uso corriente (G), con resisten- cia a compresión a 28 días de 5,0 N/mm2, confec- cionado con hormigonera de 200 l., s/RC-03 y UNE-EN-998-1:2004. O01OA070 h. Peón ordinario 1,700 14,50 24,65 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,270 95,64 25,82 P01AA020 m3 Arena de río 0/6 mm. 1,090 16,80 18,31 P01DW050 m3 Agua 0,255 0,80 0,20 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 69,70 SESENTA Y NUEVE EUROS CON SETENTA CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A09 A02C001 m3 MORTERO CAL NHL ESTRUCT. O01OA070 h. Peón ordinario 1,700 14,50 24,65 A01A010b m3 PASTA DE CAL NHL 3,5 CE FYM o similar 0,480 115,11 55,25 Parena0_8 m3 Arena seleccionada y tamiz. 0,8 mm. 1,250 18,25 22,81 P01DW210 kg Pigmentos de tierra natural 8,980 2,50 22,45 P01DW050 m3 Agua 0,320 0,80 0,26 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 M03HH090 h. Batidera mecánica 1,000 0,66 0,66 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 126,80 CIENTO VEINTISEIS EUROS CON OCHENTA CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A10 A02C010 m3 Mortero de cal y arena de río de dosificación 1/2 confeccionado con hormigonera de 250 l. O01OA070 h. Peón ordinario 1,700 14,50 24,65 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,440 91,06 40,07 Parena0_8 m3 Arena seleccionada y tamiz. 0,8 mm. 1,250 18,25 22,81 P01AA084 kg Arenilla de polvo de mármol 1,538 0,06 0,09 P01DW210 kg Pigmentos de tierra natural 8,980 2,50 22,45 P01DW050 m3 Agua 0,290 0,80 0,23 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 M03HH090 h. Batidera mecánica 1,000 0,66 0,66 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 111,68 CIENTO ONCE EUROS CON SESENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A11 A02C020 m3 Mortero de cal y arena de río de dosificación 1/3 confeccionado con hormigonera de 250 l. O01OA070 h. Peón ordinario 1,700 14,50 24,65 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,350 91,06 31,87 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 1,080 18,25 19,71 P01DW050 m3 Agua 0,275 0,80 0,22 P01prim1 l. Primal AC-235 k o similar 0,010 5,95 0,06 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72

Page 106: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01DW210 kg Pigmentos de tierra natural 0,100 2,50 0,25 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 77,48 SETENTA Y SIETE EUROS CON CUARENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A12 A02C030 m3 Mortero de cal y arena de río de dosificación 1/4 confeccionado con hormigonera de 250 l. O01OA070 h. Peón ordinario 1,700 14,50 24,65 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,260 91,06 23,68 Parena2_5 m3 Arena seleccionada y tamiz 2,5 mm. 1,100 20,00 22,00 P01DW050 m3 Agua 0,270 0,80 0,22 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 71,27 SETENTA Y UN EUROS CON VEINTISIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A13 A02C040 m3 Mortero de cal para ejecución de estucos y revocos naturales, M-15, confeccionado a partir de cal grasa apagada en pasta obtenida mediante apagado de cal viva aérea (preferentemente calcinada con leña, cal leña) por el procedimiento de fusión en balsas apropiadas, refinada tamizando los caliches con ta- miz 20 de luz de malla 1,25 mm. y dejando reposar en fosas durante 4-5 semanas al menos, y arena de mármol, lavadas procedentes de la trituración de ro- cas naturales arena de mármol, de granulometría muy fina 0,1-0,3 mm., según UNE 7.050, confeccio- nado en obra mediante amasado mecánico en bati- dera apropiada momento en el que se le añaden los pigmentos constituidos exclusivamente por tierras naturales para conseguir el color, incluso almacena- do en recipientes herméticos para su transporte y aplicación en obra. O01OA060 h. Peón especializado 1,700 16,20 27,54 A01A015 m3 CAL GRASA APAGADA EN PASTA 0,410 226,98 93,06 P01AA110 m3 Arena caliza de machaqueo 0/5 mm 1,000 16,36 16,36 P01AA084 kg Arenilla de polvo de mármol 1,538 0,06 0,09 P01DW210 kg Pigmentos de tierra natural 8,980 2,50 22,45 P01DW050 m3 Agua 0,102 0,80 0,08 M03HH090 h. Batidera mecánica 1,000 0,66 0,66 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 160,24 CIENTO SESENTA EUROS CON VEINTICUATRO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A14 A02M020 m3 Mortero bastardo con cemento CEM II/B-P 32,5 N cal y arena de río M-5 confeccionado con hormigo- nera de 200 l., s/RC-03. O01OA070 h. Peón ordinario 1,800 14,50 26,10 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,270 91,06 24,59 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,270 95,64 25,82 P01AA020 m3 Arena de río 0/6 mm. 0,980 16,80 16,46 P01DW050 m3 Agua 0,200 0,80 0,16 M03HH020 h. Hormigonera 200 l. gasolina 0,500 1,80 0,90 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 94,03 NOVENTA Y CUATRO EUROS CON TRES CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A15 A02M030 m3 Mortero bastardo con cemento blanco BL-II 42,5 R, cal y arena de río de dosificación 1/1/4, confecciona-

Page 107: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

do con hormigonera de 250 l., s/RC-97. O01OA070 h. Peón ordinario 1,800 14,50 26,10 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,215 91,06 19,58 P01CC140 t. Cemento blanco BL-II 42,5R sacos 0,290 127,41 36,95 P01AA020 m3 Arena de río 0/6 mm. 0,860 16,80 14,45 P01DW050 m3 Agua 0,188 0,80 0,15 M03HH020 h. Hormigonera 200 l. gasolina 0,500 1,80 0,90 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 98,13 NOVENTA Y OCHO EUROS CON TRECE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A16 A02S220 l. Mortero tixotrópico de formulación epoxídica, con carga tixotrópica neutra de gel de sílice, preparación para inyecciones con carga, constituido por ligante, endurecedor en proporción 100/35, inhibidor, carga 1-6 mm. de tamaño máximo, comprendiendo sumi- nistro del material, fabricación del mortero en batide- ra mecánica a rotación y pérdidas globales conside- radas en el proceso de ejecución y aplicación. O01OA040 h. Oficial segunda 0,014 16,62 0,23 O01OA070 h. Peón ordinario 0,014 14,50 0,20 P01AA084 kg Arenilla de polvo de mármol 0,750 0,06 0,05 M03HH090 h. Batidera mecánica 0,400 0,66 0,26 P01ME010 l. Mortero tixotrópico epoxi 1,000 3,05 3,05 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3,79 TRES EUROS CON SETENTA Y NUEVE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A17 A03H050 m3 Hormigón de dosificación 250 kg. con cemento CEM II/B-P 32,5 N, arena de río y árido rodado Tmáx. 20 mm., con hormigonera de 300 l., para vi- brar y consistencia plástica, en formación de canale- ta. O01OA070 h. Peón ordinario 0,834 14,50 12,09 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,258 95,64 24,68 P01AA030 t. Arena de río 0/6 mm. 0,697 13,22 9,21 P01AG020 t. Garbancillo 4/20 mm. 1,393 13,82 19,25 P01DW050 m3 Agua 0,180 0,80 0,14 M03HH030 h. Hormigonera 300 l. gasolina 0,550 3,39 1,86 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 67,23 SESENTA Y SIETE EUROS CON VEINTITRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A18 A03H060 m3 Hormigón de Fck. 100 kg/cm2. con cemento CEM II/A-P 32,5R, arena de río y árido rodado Tmáx. 40 mm., con hormigonera de 250 l., para vibrar y con- sistencia plástica. O01OA070 h. Peón ordinario 1,850 14,50 26,83 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,225 95,64 21,52 P01AA030 t. Arena de río 0/6 mm. 0,700 13,22 9,25 P01AG060 t. Gravilla 20/40 mm. 1,400 10,43 14,60 P01DW050 m3 Agua 0,160 0,80 0,13 M03HH030 h. Hormigonera 300 l. gasolina 0,500 3,39 1,70 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 74,03 SETENTA Y CUATRO EUROS CON TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A19 A03S020 m3 Hormigón aislante de densidad 650 kg/m3, con ce-

Page 108: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

mento CEM II/B-P 32,5 N y arcilla expandida Arlita ti- po G-3 o F-3, confeccionado en obra con hormigo- nera de 250 l. O01OA070 h. Peón ordinario 1,850 14,50 26,83 M03HH070 h. Hormigonera 250 l. eléctrica 0,500 1,92 0,96 P01AL010 m3 Arcilla exp.Arlita a granel 1,100 53,46 58,81 P01CC020 t. Cemento CEM II/B-P 32,5 N sacos 0,150 95,64 14,35 P01DW050 m3 Agua 0,120 0,80 0,10 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 101,05 CIENTO UN EUROS CON CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A20 E001sanea4 m. Formación de zanja para saneamiento, incluyendo la apertura, prepración de base, y el relleno posterior, por medios manuales auxiliados puntualmente por maquinaria de pequeñas dimensiones incluyendo tanto la retirada de las tierras sobrantes hasta zona de acopio para carga a camión, como el perfilado perimetral, apisonado de fondo de excavación y la gestión correspondiente de residuos, con p.p. de medios auxiliares y costes indirectos. O01OC270 h. Arqueólogo 0,030 19,88 0,60 O01OA070 h. Peón ordinario 0,250 14,50 3,63 M05PN110 h. Minicargadora neumáticos 40 CV 0,100 30,60 3,06 P01AA020 m3 Arena de río 0/6 mm. 0,038 16,80 0,64 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,015 67,23 1,01 %medaux % Medios auxiliares 0,030 8,94 0,27 %costind % Costes indirectos 0,020 9,21 0,18 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,39 NUEVE EUROS CON TREINTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A21 E002mur06 m2 Picado de rellenos y retacados enfoscados con ce- mento y/o cal en trabajos de restauración de para- mentos, incluso retirada de los tejones, ladrillos y ele- mentos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios au- xiliares y costes indirectos. Medida en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 8,05 0,24 %costind % Costes indirectos 0,020 8,29 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,46 OCHO EUROS CON CUARENTA Y SEIS CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A22 E002mur07 m2 Picado de enfoscados de cemento y/o cal en traba- jos de restauración de paramentos, por medios ma- nuales con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en ver- dadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,250 18,00 4,50 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 7,15 0,21 %costind % Costes indirectos 0,020 7,36 0,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,51

Page 109: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

SIETE EUROS CON CINCUENTA Y UN CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A23 E004rest6 ud Colocación de remate de cobre en coronación de contrafuertes previa restauración de los mismos a base de LIMPIEZA de líquenes y vegetación, conso- lidación en su caso, y CAPA DE REGULARIZA- CIÓN con mortero teñido de cal y arena y pigmentos inorgánicos, incluso p.p. de remate de las faltas en bordes devolviendo su geometría parcialmente con mortero "Petratex", dejando rehundido el plomo 3 cm. según figura en detalle de proyecto, dejando lis- to para la colocación, también incluida de TAPAS DE COBRE de 0,8 mm. de espesor, rigidizadas me- diante pletinas 30/2 colocadas cada 30 cm. como máximo fijadas cada una con tirafondos de acero inoxidable 50/5 y tacos de material plástico, y entre- gando en finas rozas prácticadas en el paramento posterior o sobre pináculos, incluyendo p.p. de en- gatillados, formación de bordes rigidizados, sellado, etc. todo según detalle e indicaciones de la D.F., con p.p. de medios auxilaires y costes indirectos. O01OB140 h. Ayudante cerrajero 1,200 16,23 19,48 O01OB070 h. Oficial cantero 0,650 18,00 11,70 O01OA050 h. Ayudante 1,200 16,06 19,27 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 1,200 13,01 15,61 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,200 8,77 10,52 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P05CC090 ud Chapa cobre 2,00x0,67mx0,80mm "1/2" 1,150 65,50 75,33 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 8,000 0,05 0,40 P04plet1 m. Pletina cobre 30/2 1,150 42,50 48,88 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 0,500 2,20 1,10 P01DW210 kg Pigmentos de tierra natural 0,150 2,50 0,38 P01DW050 m3 Agua 0,100 0,80 0,08 %medaux % Medios auxiliares 0,030 205,46 6,16 %costind % Costes indirectos 0,020 211,62 4,23 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 215,85 DOSCIENTOS QUINCE EUROS CON OCHENTA Y CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A24 E01exc1 m3 Excavación de zanjas CON SUPERVISIÓN AR- QUEOLÓGICA total, por medios manuales auxilia- dos puntualmente por maquinaria de pequeñas di- mensiones y herramienta mecánica en su caso, y SEGÚN CRITERIO DE INTERVENCIÓN indicado en la memoria y las instrucciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cámaras de aireación y drenaje y trabajos análogos, con supervisión arqueológica to- tal (presencia de arqueólogo y/o ayudante 100% excavación), incluyendo el perfilado perimetral, api- sonado de fondo de excavación y la carga y trans- porte de tierras hasta zona de acopio y carga para traslado a vertedero, asi como p.p. de reportaje foto- gráfico y documentación final en su caso. En caso de que la D.F. junto con el arqueólogo responsable de la Administración una vez realizadas las catas previstas e iniciados estos trabajos comprueben no se hace necario la presencia total, sino parcial del equipo de arqueólogos, podrá establecerse un crite- rio de medición diferente, teniendo en cuenta la parti- da anterior y siempre según criterio de la D.F. O01OC270 h. Arqueólogo 0,200 19,88 3,98

Page 110: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OC275 h. Ayudante de Arqueólogo 0,250 16,50 4,13 O01OA060 h. Peón especializado 0,550 16,20 8,91 M05PN110 h. Minicargadora neumáticos 40 CV 0,150 30,60 4,59 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,120 19,88 2,39 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,330 10,00 3,30 %medaux % Medios auxiliares 0,030 27,30 0,82 %costind % Costes indirectos 0,020 28,12 0,56 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 28,68 VEINTIOCHO EUROS CON SESENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A25 E01levan3 m3 Cajeado de la sub-base del solado existente del pa- tio central del Claustro, según niveles a definir para alojar zona ajardinada, incluso limpieza de restos ajenos, con ligera supervisión arqueológica incluida, incluyendo la carga de escombro a zona exterior pa- ra su posterior retirada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirec- tos. O01OC270 h. Arqueólogo 0,150 19,88 2,98 O01OA060 h. Peón especializado 0,450 16,20 7,29 P33P210 ud Varios material y utillaje 0,005 150,50 0,75 P33P030 ud Materiales fungibles para arqueologia 0,005 187,35 0,94 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,250 19,88 4,97 M06MI020 h. Martillo manual picador eléctrico 11kg 1,100 3,01 3,31 %medaux % Medios auxiliares 0,070 20,24 1,42 %costind % Costes indirectos 0,020 21,66 0,43 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 22,09 VEINTIDOS EUROS CON NUEVE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A26 E03fab01 m2 Eliminación de líquenes, musgos y demás costras biogénicas sobre piedra arenisca de Ciudad Rodri- go, en fachadas, contrafuertes, albardillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello peróxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecutivas, dejando actuar al menos 10 días, eliminando los restos con cepillos de cerdas de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, lim- piando de nuevo la superficie transcurrida una sema- na con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, limpieza final , medios auxiliares y costes indirectos. Medida la superficie en proyección vertical por su cara exterior. O01OC160 h. Especialista restaurador 0,300 20,00 6,00 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01per1 l. Peróxido de hidrógeno 0,530 4,55 2,41 P01per2 l. Formaldéhido 3% 0,250 4,20 1,05 P01DW050 m3 Agua 0,100 0,80 0,08 M11W060 h. Equipo pulverizador aerográfico 0,090 4,50 0,41 %medaux % Medios auxiliares 0,030 12,38 0,37 %costind % Costes indirectos 0,020 12,75 0,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,01 TRECE EUROS CON UN CENTIMO ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A27 E03fab02 m2 Limpieza de fábricas de sillería incluso p.p. de ele- mentos labrados que la conforman, contemplados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza

Page 111: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el pica- do de restos aislados de mortero de cemento o ele- mentos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labra- dos, dejando las superficies acabadas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, impermeabilización etc.) incluso aspi- rado y/o soplado. Medida en proyección vertical se- gún planos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxi- liares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 8,35 0,25 %costind % Costes indirectos 0,020 8,60 0,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,77 OCHO EUROS CON SETENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A28 E03fab03 m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos_ 1,- DESCARNADO de juntas de fábricas de sillería y elementos contemplados en esta intervención, inclu- yendo el picado de las sueltas y/o aquellas que su estado lo recomiende, previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, cuchari- lla, etc-, sin dañar en ningún caso la fábrica a restau- rar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 3,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 4,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 5,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 4% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos y estimando un 30% el des-

Page 112: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

carnado de juntas y soplado, el 60% a la finalización del rejuntado y el 10% restante a la retirada de los andamios previa autorización por escrito de la D.F. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,800 19,75 15,80 O01OA060 h. Peón especializado 0,100 16,20 1,62 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 4,200 0,75 3,15 P01prim1 l. Primal AC-235 k o similar 0,005 5,95 0,03 P01DW210 kg Pigmentos de tierra natural 0,050 2,50 0,13 P01DW050 m3 Agua 0,010 0,80 0,01 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 %costind % Costes indirectos 0,020 22,37 0,45 %medaux % Medios auxiliares 0,030 22,82 0,68 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 23,50 VEINTITRES EUROS CON CINCUENTA CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A29 E03fab03a m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de sillería y elementos de piedra contemplados en esta interven- ción, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicacio- nes de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior Criterio de medición: superficie ejecutada por pro- yección vertical perpendicular a paño de fachada completo, o proyección horizontal en caso de ele- mentos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,180 16,20 2,92 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 9,30 0,28 %costind % Costes indirectos 0,020 9,58 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,77 NUEVE EUROS CON SETENTA Y SIETE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A30 E03fab03b m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 2,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa-

Page 113: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 3% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,003 21,50 0,06 O01OC280 h. Restaurador de piedra 0,450 19,75 8,89 O01OA060 h. Peón especializado 0,050 16,20 0,81 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,900 0,75 2,18 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 M03HH020 h. Hormigonera 200 l. gasolina 0,070 1,80 0,13 %medaux % Medios auxiliares 0,030 12,72 0,38 %costind % Costes indirectos 0,020 13,10 0,26 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,36 TRECE EUROS CON TREINTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A31 E03fab04 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posterior- mente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la preparación previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,200 19,75 3,95 O01OA060 h. Peón especializado 0,400 16,20 6,48 P01con1 l. Consolidante Tegovakon V o similar 0,200 52,41 10,48 P01con2 l. "Tegosivin HL 100" o similar 0,050 64,60 3,23 %costind % Costes indirectos 0,050 24,18 1,21 %medaux % Medios auxiliares 0,030 25,39 0,76 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 26,15 VEINTISEIS EUROS CON QUINCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A32 E03fab05 m2 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inorgánicos, previa elec- ción sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de cos- tes indirectos y medios auxiliares. O01OA010 h. Encargado 0,002 21,50 0,04

Page 114: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OC280 h. Restaurador de piedra 0,290 19,75 5,73 O01OA060 h. Peón especializado 0,050 16,20 0,81 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %costind % Costes indirectos 0,020 7,73 0,15 %medaux % Medios auxiliares 0,030 7,88 0,24 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,12 OCHO EUROS CON DOCE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A33 E03fab06 m2 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de pro- ducto base silano-siloxano con fungicidas tipo "Sikaguard 710" o similar en "húmedo sobre húme- do" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanopar- ticulas, ambos según indicaciones del fabricante, in- cluso p.p. de ensayos y pruebas, protección de ele- menos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OC280 h. Restaurador de piedra 0,100 19,75 1,98 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 0,025 14,15 0,35 P01DW050 m3 Agua 0,010 0,80 0,01 %medaux % Medios auxiliares 0,030 9,41 0,28 %costind % Costes indirectos 0,020 9,69 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,88 NUEVE EUROS CON OCHENTA Y OCHO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A34 E04AB040 kg Acero corrugado B 500 S, preformado en taller y co- locado en obra. Según EHE. O01OB030 h. Oficial 1ª ferralla 0,005 17,70 0,09 O01OB040 h. Ayudante ferralla 0,005 16,61 0,08 P03AC210 kg Acero corrug. B 500 S pref. 1,000 1,05 1,05 P03AA020 kg Alambre atar 1,30 mm. 0,006 1,75 0,01 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1,23 UN EURO CON VEINTITRES CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A35 E04AM061f m2 Malla electrosoldada con acero corrugado B 500 T de D=12 mm. en cuadrícula 30x30 cm., colocado en obra, i/p.p. de alambre de atar. Según EHE y CTE-SE-A. O01OB030 h. Oficial 1ª ferralla 0,009 17,70 0,16 O01OB040 h. Ayudante ferralla 0,009 16,61 0,15 P03AM110 m2 Malla 30x30 Diametro=12 mm. 1,000 6,25 6,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 6,56 SEIS EUROS CON CINCUENTA Y SEIS CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A36 E04AM062f m2 MALLA 10/10 D=12 mm.

Page 115: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OB030 h. Oficial 1ª ferralla 0,009 17,70 0,16 O01OB040 h. Ayudante ferralla 0,009 16,61 0,15 P03AM112 m2 Malla 10x10 Díametro 12 mm. 1,000 12,50 12,50 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 12,81 DOCE EUROS CON OCHENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A37 E04AMmall2 m2 MALLAZO ACERO #15x15 D=12 mm. O01OB030 h. Oficial 1ª ferralla 0,009 17,70 0,16 O01OB040 h. Ayudante ferralla 0,009 16,61 0,15 P03AM111 m2 Mallazo #15x15 Diametro 12 mm. 1,050 6,88 7,22 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,53 SIETE EUROS CON CINCUENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A38 E04CM050 m3 Hormigón en masa HA-25/P/20/I, elaborado en cen- tral en relleno de zapatas y zanjas de cimentación, incluso encamillado de pilares y muros, vertido por medios manuales, vibrado y colocación. Según nor- mas NTE-CSZ y EHE. O01OA030 h. Oficial primera 0,260 17,62 4,58 O01OA070 h. Peón ordinario 0,260 14,50 3,77 M10HV220 h. Vibrador hormigón gasolina 75 mm 0,260 4,50 1,17 P01HA010 m3 Hormigón HA-25/P/20/I central 1,100 58,20 64,02 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 73,54 SETENTA Y TRES EUROS CON CINCUENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A39 E04cos01 ud Restauración de NERVIOS ROTOS DE VENTANA- LES, mediante MICRO-COSIDOS con varillas vidrio-epoxi y/o acero inoxidable según se valore en obra, incluso la inclusión puntual de injertos de pie- dra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea necesario para garanti- zar la estabilidad del elemento, incluyendo el apunta- lamiento del elemento afectado, el estudio y trazado de los cosidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de juntas y la colocación de varillas dejándolas rehundi- das para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgá- nicos, limpieza final y retirada de escombros a conte- nedor. Medida la unidad teniendo en cuenta un do- ble cosido por unidad, con longitud máxima de 50 cm. por varilla. El rejuntado del elemento se valora en partida independiente. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,200 18,00 21,60 O01OA060 h. Peón especializado 1,200 16,20 19,44 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 A02S220 l. MORTERO EPOXÍDICO TIXOTRÓPICO 1,000 3,79 3,79 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,055 174,00 9,57 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,020 195,35 3,91 P01var3 m. Varilla vidrio-epoxi D=4 mm 1,000 4,74 4,74 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,550 5,20 2,86 P33A090 kg Adhesivo epoxi 100/35 0,030 10,46 0,31 P33A240 m3 Carga inerte para resinas termoplásticas 0,008 104,82 0,84 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,050 10,00 0,50

Page 116: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 M03B100 h. Taladradora mecánica 0,400 7,52 3,01 %medaux % Medios auxiliares 0,030 77,81 2,33 %costind % Costes indirectos 0,020 80,14 1,60 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 81,74 OCHENTA Y UN EUROS CON SETENTA Y CUATRO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A40 E04rest4 m2 Retacado de fábricas agrietadas o afectadas por tra- bajos defectuosos, con cal hidráullica (hasta satura- ción) y mortero de cal, dejándo las juntas rehundidas y acabando las superficies con mortero CPA "M8" o similar o bien con Petratex en función de si afecta puntualmente a elemento decorativo, según criterios generales de la intervención, en fábricas de silleria li- geramente moldurada, en trabajos de reparación de grietas, de faltas, etc con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,150 18,00 2,70 O01OA030 h. Oficial primera 0,180 17,62 3,17 O01OA060 h. Peón especializado 0,500 16,20 8,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %costind % Costes indirectos 0,020 17,21 0,34 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 17,55 DIECISIETE EUROS CON CINCUENTA Y CINCO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A41 E04SA010 m2 Solera de hormigón de 10 cm. de espesor, realizada con hormigón HA-25 N/mm2, Tmáx.20 mm., elabo- rado en obra, i/vertido, colocación y armado con ma- llazo 15x15x5, p.p. de juntas, aserrado de las mis- mas y fratasado. Según NTE-RSS y EHE. E04SE090 m3 HORMIGÓN HA-25/P/20/I EN SOLERA 0,150 65,20 9,78 E04AM061f m2 MALLA 30x30 cm. D=12 mm. 2,000 6,56 13,12 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 22,90 VEINTIDOS EUROS CON NOVENTA CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A42 E04SA011 m2 SOLERA HA-25, e=10 cm. r12#10x10 E04SE090 m3 HORMIGÓN HA-25/P/20/I EN SOLERA 0,100 65,20 6,52 E04AM062f m2 MALLA 10/10 D=12 mm. 1,000 12,81 12,81 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,33 DIECINUEVE EUROS CON TREINTA Y TRES CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A43 E04SA011f m2 SOLERA HA-25, 11 cm. ARM. r12#15x15 E04SE090 m3 HORMIGÓN HA-25/P/20/I EN SOLERA 0,120 65,20 7,82 E04AMmall2 m2 MALLAZO ACERO #15x15 D=12 mm. 1,000 7,53 7,53 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 15,35 QUINCE EUROS CON TREINTA Y CINCO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A44 E04SA012 m2 SOLERA HA-25, e=15 cm. r12#10x10 doble

Page 117: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

E04SE090 m3 HORMIGÓN HA-25/P/20/I EN SOLERA 0,100 65,20 6,52 E04AM062f m2 MALLA 10/10 D=12 mm. 2,000 12,81 25,62 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 32,14 TREINTA Y DOS EUROS CON CATORCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A45 E04SE090 m3 Hormigón para armar HA-25/P/20/I, elaborado en central en solera, incluso vertido, compactado según EHE, p.p. de vibrado, regleado y curado en soleras. O01OA030 h. Oficial primera 0,200 17,62 3,52 O01OA070 h. Peón ordinario 0,200 14,50 2,90 P01HA010 m3 Hormigón HA-25/P/20/I central 1,010 58,20 58,78 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 65,20 SESENTA Y CINCO EUROS CON VEINTE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A46 E05enf2 m2 Revoco de paramentos en trabajos de restauración a base de aplicación de una capa de enfoscado de mortero de cal previa preparación del paño, incluida, empleando mortero de cal grasa teñida con pigmen- tos naturales, arena seleccionada y tamizada, para un espesor aproximado de 15 ó 16 mm., de dosifica- ción 1:3 (1:3,5, en función de la arena) empleando arena limpia seleccionada y de tamiz 2,5 mm con sa- cado de plomos y niveles y colocación de testigos para regleteado y fratasado final, dejando acabado fino. O01OA010 h. Encargado 0,005 21,50 0,11 O01OB910 h. Oficial 1ª revocador 0,450 18,50 8,33 O01OB920 h. Ayudante revocador 0,200 18,00 3,60 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,010 71,27 0,71 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,015 111,68 1,68 P01DW050 m3 Agua 0,030 0,80 0,02 %medaux % Medios auxiliares 0,030 14,45 0,43 %costind % Costes indirectos 0,020 14,88 0,30 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 15,18 QUINCE EUROS CON DIECIOCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A47 E05lim01 m2 Limpieza de muros de sillería y o fábricas de ladrillo, bóvedas, etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Todo in- cluido con p.p. de medios auxiliares y costes indirec- tos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 1,500 19,75 29,63 O01OA060 h. Peón especializado 0,200 16,20 3,24 P33A130 l. Adhesivo de nylón soluble 1,320 2,50 3,30 P33P100 kg Pulpa papel p/humedecer 3,200 2,15 6,88 P01DW050 m3 Agua 0,008 0,80 0,01 P33XB100 kg Hidróxido de bario 0,050 20,50 1,03 P33I140 l. Alcohol etílico 0,400 1,90 0,76 P33J170 l. Agua desionizada no polarizada 1,000 0,11 0,11 P33J050 kg Atapulgita celulósica 0,550 6,89 3,79 P33P180 ud Conductivímetro 0,010 220,69 2,21 P33A120 kg Adhesivo Calatón CA disol. 70/30 0,350 7,68 2,69 %medaux % Medios auxiliares 0,030 53,76 1,61 %costind % Costes indirectos 0,020 55,37 1,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 56,48

Page 118: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

CINCUENTA Y SEIS EUROS CON CUARENTA Y OCHO CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A48 E06bov02 m2 Tratamiento en juntas no pasantes de bóvedas y to- dos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su reta- cado y rejuntado posterior 2,- RETACADOS o RELLENOS en las JUNTAS NO PASANTES empleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group y arena seleccionada y tamizada. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. O01OC280 h. Restaurador de piedra 0,030 19,75 0,59 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 1,250 13,36 16,70 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,005 174,00 0,87 P01DW050 m3 Agua 0,050 0,80 0,04 %medaux % Medios auxiliares 0,030 18,20 0,55 %costind % Costes indirectos 0,020 18,75 0,38 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,13 DIECINUEVE EUROS CON TRECE CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A49 E06cim01 m2 Previa protección del solado, EJECUCIÓN DE APEO Y CIMBRA de madera para bóveda de la Ca- tedral de Ciudad Rodrigo, 4-5-6 y/o 16, y otras simi- lares, con formación de pies derechos, arriostra- mientos, tirantes y tirantes tornapunteados estableci- da provisionalmente con el objeto de sostener la construcción hasta que adquiera la consistencia ne- cesaria para su estabilidad, construida con madera de pino nacional de clase 2ª en sus partes resisten- tes y madera de encofrar en tablas y tablones para forma, con la directriz, montea y cuaje, dimensiona- da para soportar sin deformación las cargas previs- tas, con diseño no rígido para facilitar en el momento adecuado el afloje para descimbrado y de fácil arma- do y desarmado para diferentes posturas, compren- diendo: apeos, construcción de la cimbra, con apor- te de madera, incluso parte proporcional de mermas, material de unión, cimbrado y posterior descimbrado, por cualquiera de los siguientes procedimientos: acuñado, sacos de arena, cajas de arena, tornillos o gatos y excéntricas, sopandas y puntales, con inter- posición de elementos metálicos si fuera necesario o en su sustitución, con p.p. de medios auxiliares y costes indirectos. Medida en proyección horizontal. O01OB150 h. Oficial 1ª carpintero 1,850 14,58 26,97 O01OB160 h. Ayudante carpintero 1,850 13,70 25,35 P01EB010 m3 Tablón pino 2,50/5,50x205x76 0,095 195,89 18,61 P01ET005 m3 Tabla encf pino 10-20cm L=2m 0,010 223,95 2,24

Page 119: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01UC020 kg Puntas 17x70 0,750 7,30 5,48 P01ET080 m2 Ripia 15x3,5 cm s/cepillar 1,050 8,94 9,39 P01UC042 ud Clavo pucelado 15 cm. carp.armar 2,500 1,02 2,55 M12T010 h. Taladro eléctrico 0,750 2,50 1,88 %medaux % Medios auxiliares 0,030 92,47 2,77 %costind % Costes indirectos 0,020 95,24 1,90 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 97,14 NOVENTA Y SIETE EUROS CON CATORCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A50 E07LP001 m2 MURETE LADRILLO PERF. 1 ASTA O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25 P01LT010 ud Ladrillo perforado tosco 24x11,5x10 cm. 95,000 0,10 9,50 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 0,045 65,85 2,96 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 28,52 VEINTIOCHO EUROS CON CINCUENTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A51 E07LP002 m2 MURETE LADRILLO PERF. 1 ASTA PALOMERA O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25 P01LT010 ud Ladrillo perforado tosco 24x11,5x10 cm. 70,000 0,10 7,00 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 0,040 65,85 2,63 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 25,69 VEINTICINCO EUROS CON SESENTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A52 E07LP003 m2 MURETE LADRILLO PERF. 1/2 ASTA O01OA030 h. Oficial primera 0,400 17,62 7,05 O01OA070 h. Peón ordinario 0,400 14,50 5,80 P01LT020 ud Ladrillo perforado tosco 24x11,5x7 cm. 50,000 0,12 6,00 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 0,025 65,85 1,65 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 20,50 VEINTE EUROS CON CINCUENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A53 E07LP004 m2 MURETE LADRILLO PERF. 1/2 ASTA PALOMERA O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25 P01LT020 ud Ladrillo perforado tosco 24x11,5x7 cm. 35,000 0,12 4,20 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 0,020 65,85 1,32 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 21,58 VEINTIUN EUROS CON CINCUENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A54 E08PFA001 m2 Enfoscado impermeabilizante a base de capa de mortero de cemento rematado con mortero especial "Sika Monotop-107 Seal" o similar, suministrado en sacos de 25 kg. y mezclados en obra según dosifi- cación mínima requerida, teniendo en cuenta un mí- nimo de 1,5kg/capa con una mínimo de 2 capas de un máximo de 2 mm. cada una, dejando los para- mentos perfectamente rematados. O01OA030 h. Oficial primera 0,300 17,62 5,29 O01OA050 h. Ayudante 0,300 16,06 4,82

Page 120: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3.3 CUADRO DE PRECIOS AUXILIARES __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P001Sika01 m2 Mortero SikaMonotop 107-Seal 1,100 3,00 3,30 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,41 TRECE EUROS CON CUARENTA Y UN CENTIMOS ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

A55 E08PFA110 m2 Enfoscado fratasado sin maestrear con mortero bas- tardo de cemento CEM II/B-P 32,5 N, cal NHL y are- na de río M-5, en paramentos verticales de 10 mm. de espesor, incluso regleado, sacado de aristas, rin- cones y andamiaje, s/NTE-RPE-5/6, medido dedu- ciendo huecos, en trabajos de base de revestimiento para impermeabilización o similares. O01OA030 h. Oficial primera 0,200 17,62 3,52 O01OA050 h. Ayudante 0,200 16,06 3,21 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,010 94,03 0,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,67 SIETE EUROS CON SESENTA Y SIETE CENTIMOS

Page 121: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO 01 TRABAJOS PREVIOS y MEDIOS AUXILIARES .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.01 E00med01 m. 1.- Vallado ciego con placas metálicas de acero gal- vanizado plegado sustentadas por pies derechos for- mados con perfiles laminados, con puertas de acce- so. La altura de dichos paneles será de un mínimo de 2 m. cuando se coloquen de forma horizontal en la zona prevista para limitar la zona de talleres y/o de trabajo, los locales de obra, la zona de almacenaje y acopios y la zona para gestión de residuos y de altu- ra 3,5 m. o superior cuando se adosen al andamiaje a colocar en la Fachada Este del Claustro, para limi- tar el posible acceso de ladrones y/o maleantes al in- terior del bien. Todo incluido, montaje, desmontaje y limpieza. El exterior deberá estar rematado en tono según indicaciones del Ayuntamiento o la Comisión de Patrimonio correspondiente, pudiendo sustituirse en dicho caso por material adecuado que cumpla las funciones de seguridad necesarias. Medios auxilia- res y costes indirectos incluidos, incluso carga de es- combros generados y gestión de residuos. O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA060 h. Peón especializado 0,150 16,20 2,43 P31CB100 m. Valla chapa ciega galvan. 2,20 m 3usos c/pies 0,500 24,50 12,25 A03H060 m3 HORMIGÓN H-100 kg/cm2 Tmáx.40 0,055 74,03 4,07 %medaux % Medios auxiliares 0,030 21,39 0,64 %costind % Costes indirectos 0,020 22,03 0,44 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 22,47 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 22,47 VEINTIDOS EUROS CON CUARENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.02 E00med02 m. 2.- Vallado de paneles enrejados 80x150 prefabrica- dos de acero galvanizado, de 3.50x2,00 m. de altu- ra, D=8 mm. de espesor, soldado a tubos de D=40 mm. y 1,50 mm. de espesor, autoportantes sobre soportes de hormigón prefabricado separados cada 3,50 m., previstos para aquella zona que bien por motivos de seguridad bien por motivos de operativi- dad o bien por motivos de respeto al bien (Atrio de Amayuelas, en donde se evitarán anclajes innecesa- rios) se pretenda dejar vista desde el exterior. O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,150 16,20 2,43 P31CB101a m. Valla enrejado 80/150 350x220 m. 10 usos 0,100 19,20 1,92 A03H060 m3 HORMIGÓN H-100 kg/cm2 Tmáx.40 0,080 74,03 5,92 %medaux % Medios auxiliares 0,030 12,03 0,36 %costind % Costes indirectos 0,020 12,39 0,25 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 12,64 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 12,64 DOCE EUROS CON SESENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.03 E00med03 m2 M2. Andamio TUBULAR "EUROPEO" para "MARCOS O FACHADAS", homologado, de acero o duraluminio, apto para trabajos hasta una altura de 16 m., consistente en: suministro en alquiler, monta- je y desmontaje,separación al paramento de 15 cm.

Page 122: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

aproximadamente, amarres a huecos mediante husi- llos con tacos de madera contrachapada y control periodico de su tensión y amarres a fábricas o ele- mentos resistentes con tacos de expansión, quími- cos , especiales para piedra, coincidiendo en zona de juntas de mortero de cal, colocados según nor- mas con un mínimo de 1 anclaje cada 12m2, con suficiente resistencia a tracción, red de protección para caida de materiales, preparación de base, pla- cas de apoyo al suelo sobre tacos de madera y/o durmientes a base de tablones de 7 cm. especial- mente en aquellas zonas indicadas, y siempre de acuerdo con la capacidad de carga de la base, inclu- so accesos de plataformas con trampilla y escaleras abatibles en su interior (en número suficiente que ga- rantice una evacuación con una distancia máxima de recorrido de 15 metros), barandilla exterior con dos barras y rodapie, barandilla interior con 1 o 2 barras, plataformas de descarga y/o elevación, plataformas según niveles, puntales, codales, tornapuntas, re- fuerzos, etc, todo según detalle de planos de monta- je y la normativa de obligado cumplimiento sobre an- damiajes. Criterios de medición: 75% al montaje y 25% una vez retirado el andamio y restaurado los puntos de anclaje. No se admitirá en ningún caso medición superior a la expresada en proyecto, en ba- se a valoraciones de organización, etc. U41AA005 M2 Andamio transportado m2/m3 1,000 0,05 0,05 U41AA205 M2 Montaje andamio europeo "marco o fachada" 1,000 3,10 3,10 U41AA225 M2 Desmontaje andamio Europeo 1,000 1,70 1,70 M12AM170 m2 Montaje y desm. red andam. 1,000 0,45 0,45 P01ProyAnd1 ud Proyecto Montaje Andamios 1,000 0,21 0,21 P01ANDrev ud Certificados andamiaje 3,000 0,02 0,06 %medaux % Medios auxiliares 0,030 5,57 0,17 %costind % Costes indirectos 0,020 5,74 0,11 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 5,85 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 5,85 CINCO EUROS CON OCHENTA Y CINCO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.04 E00med03a m3 M3. Andamio tubular tipo MULTIDIRECCIONAL ho- mologado, de acero o duraluminio, apto para traba- jos hasta una altura de 15 m., consistente en: sumi- nistro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, amarres a huecos mediante husillos con tacos de madera contrachapada y control periodico de su tensión y amarres a fábricas o elementos resistentes con ta- cos de expansión, químicos , especiales para piedra, coincidiendo en zona de juntas de mortero de cal, colocados según normas con un mínimo de 1 ancla- je cada 12m2, con suficiente resistencia a tracción, red de protección para caida de materiales, prepara- ción de base, placas de apoyo al suelo sobre tacos de madera y/o durmientes a base de tablones de 7 cm. especialmente en aquellas zonas indicadas, y siempre de acuerdo con la capacidad de carga de la base, incluso accesos de plataformas con trampilla y escaleras abatibles en su interior (en número sufi- ciente que garantice una evacuación con una distan- cia máxima de recorrido de 15 metros), barandilla ex- terior con dos barras y rodapie, barandilla interior con 1 o 2 barras, plataformas de descarga y/o eleva- ción, plataformas según niveles, puntales, codales,

Page 123: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tornapuntas, refuerzos y p.p. de cimbras en su caso, etc todo según detalle de planos de montaje y la nor- mativa de obligado cumplimiento sobre andamiajes. Criterios de medición: 75% al montaje y 25% una vez retirado el andamio y restaurado los puntos de anclaje. U41AA005 M2 Andamio transportado m2/m3 1,000 0,05 0,05 U41aa205a m3 Montaje andamio multidireccional homolog. 1,000 2,80 2,80 U41AA225a m3 Desmontaje andamio multidireccional 1,000 0,80 0,80 M12AM170 m2 Montaje y desm. red andam. 0,850 0,45 0,38 P01ProyAnd1 ud Proyecto Montaje Andamios 0,800 0,21 0,17 P01ANDrev ud Certificados andamiaje 2,000 0,02 0,04 %medaux % Medios auxiliares 0,030 4,24 0,13 %costind % Costes indirectos 0,020 4,37 0,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 4,46 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 4,46 CUATRO EUROS CON CUARENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.05 E00med04 m2 M2 Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio Europeo descrito en partida anterior, con todos sus elementos y accesorios, incluidas escaleras de acceso, todo in- cluido. Se valorará su puesta según criterios de la di- rección facultativa, adecuandose en cualquier caso a un uso razonable dentro de la organización optimiza- da de una obra, no admitiendose en ningún caso la puesta innecesaria o por motivos de falta de organi- zación de la empresa constructora, no habiendo lu- gar a reclamación de mayor plazo que el establecido en este proyecto, independientemente de las causas que lo motiven. P00and01 m2 Día/alquiler andamio "europeo" homolog. facha 1,000 0,03 0,03 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 0,03 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 0,03 CERO EUROS CON TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.06 E00med04a m3 M3/Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio tipo MULTI- DIRECCIONAL con p.p. de refuerzos y piezas espe- ciales para apeo y cimbrado de las bóvedas objeto, así como de las escaleras, 1 por panda, incorpora- das, y todo lo necesario para acceder a las bóvedas y elementos singulares de la intervención, con todos sus elementos y accesorios, todo incluido. Se valora- rá su puesta según criterios de la dirección facultati- va, adecuandose en cualquier caso a un uso razo- nable dentro de la organización optimizada de una obra, no admitiendose en ningún caso la puesta in- necesaria o por motivos de falta de organización de la empresa constructora, no habiendo lugar a recla- mación de mayor plazo que el establecido en este proyecto, independientemente de las causas que lo motiven. P00and02 m3 Día/alquiler andamio multidireccional homolog 1,000 0,04 0,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 0,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 0,04 CERO EUROS CON CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 124: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01.07 E00med05 ud Ud. Montaje y desmontaje de grua-torre eléctrica, hasta 69 m. de altura con brazo de 40 a 48 m., arriostrado convenientemente, con proyecto técnico completo y dirección de montaje por ingeniero técni- co, permisos (p.p. incluido en alquiler por meses) y montaje de elementos auxiliares, cuadro eléctrico, ...etc. con p.p. de medios auxiliares (gruás telescopicas), ocupación de vía pública, costes indi- rectos, etc. Medida la unidad en un 50% al montaje y un 50% al desmontaje. P00grua1 ud Montaje/Desmontaje grúa torre 45 m.+ proy 1,000 1.650,00 1.650,00 E01exc1 m3 EXCAVACIÓN FORMACIÓN ZANJAS 9,800 28,68 281,06 c/SUP.ARQUEO. E04AB040 kg ACERO CORR. B 500 S PREFOR. 254,000 1,23 312,42 E04CM050 m3 HORM. HA-25/P/20/I V. MANUAL 6,120 73,54 450,06 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 50,000 0,25 12,50 P01prot03 m. Cinta adhesiva láminas polietileno 10,000 0,15 1,50 M02GE050 h. Grúa telescópica autoprop. 60 t. 16,000 95,00 1.520,00 %medaux % Medios auxiliares 0,030 4.227,54 126,83 %costind % Costes indirectos 0,020 4.354,37 87,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 4.441,46 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 4.441,46 CUATRO MIL CUATROCIENTOS CUARENTA Y UN EUROS CON CUARENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

01.08 E00med06 ud Ud. Alquiler por mes de grúa-torre eléctrica, hasta 69 m. de altura con brazo de 35 a 48 m., con p.p. de elementos auxiliares, proyecto, permisos, cuadro eléctrico, ...etc. M02GT280 ms Alquiler grúa torre 45 m. 1200 kg. 9,000 1.182,00 10.638,00 M02GT360 ms Contrato mantenimiento 7,000 75,00 525,00 M02GT370 ms Alquiler telemando 7,000 115,32 807,24 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11.970,24 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11.970,24 ONCE MIL NOVECIENTOS SETENTA EUROS CON VEINTICUATRO CENTIMOS

Page 125: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

02 UNIDAD I: PATIO CENTRAL .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.01 E001levan00 ud Retirada del conjunto de tinajas y otros elementos en la zona de intervención de esta unidad, con aco- pio y protección en zona adecuada a determinar, pa- ra su posterior recolocación en lugar según indica- ciones D.F. con p.p. de medios auxiliares y costes in- directos. O01OA030 h. Oficial primera 4,000 17,62 70,48 O01OA060 h. Peón especializado 4,000 16,20 64,80 %medaux % Medios auxiliares 0,030 135,28 4,06 %costind % Costes indirectos 0,020 139,34 2,79 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 142,13 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 142,13 CIENTO CUARENTA Y DOS EUROS CON TRECE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.02 E001levan01 ud Levantado de banco corrido adosado a fachada este del Claustro de la Catedral para poder ejecutar la cá- mara de aireación y drenaje proyectada, incluyendo p.p. de toma de datos, numeración de piezas, repor- taje fotográfico y desmontaje, traslado de piezas a zona de acopio adecuada y protegida, limpieza y reti- rada de escombros a contenedor, medios auxiliares y costes indirectos. O01OB070 h. Oficial cantero 8,000 18,00 144,00 O01OA060 h. Peón especializado 8,000 16,20 129,60 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,750 10,00 7,50 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %medaux % Medios auxiliares 0,050 281,32 14,07 %costind % Costes indirectos 0,020 295,39 5,91 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 301,30 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 301,30 TRESCIENTOS UN EUROS CON TREINTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.03 E001levan02 ud Levantado de ESCALINATA de acceso a la "puerta en esviaje" de acceso al Claustro de la Catedral por su cara este, necesaria para poder ejecutar la cáma- ra de aireación y drenaje proyectada, incluyendo p.p. de toma de datos, numeración de piezas, reportaje fotográfico y desmontaje, traslado de piezas a zona de acopio adecuada y protegida, limpieza y retirada de escombros a contenedor, medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 6,500 18,00 117,00 O01OA060 h. Peón especializado 6,500 16,20 105,30 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,750 10,00 7,50 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %medaux % Medios auxiliares 0,050 232,17 11,61 %costind % Costes indirectos 0,020 243,78 4,88 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 248,66 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 248,66 DOSCIENTOS CUARENTA Y OCHO EUROS CON SESENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.04 E001levan03 m2 Retirada de la capa de grava existente enn la Plazue- la y que afecta a la zona de intervención de la facha-

Page 126: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

da este, acopiandola para su posterior reutilización en la formación de rellenos contra la cara exterior de las cámaras bufas, o en formación de canales de drenaje del Patio Central, con p.p. de medios auxilia- res y costes indirectos. O01OA060 h. Peón especializado 0,100 16,20 1,62 %medaux % Medios auxiliares 0,030 1,62 0,05 %costind % Costes indirectos 0,020 1,67 0,03 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1,70 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1,70 UN EURO CON SETENTA CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.05 E001levan05 ud Ayuda de albañilería a trabajos de retirada de pilón de fibrocemento y otros materiales a retirar en obra con amianto (tuberías), incluyendo únicamente la ayuda, estando incluido el resto en partida indepen- diente dentro del capítulo de gestión de residuos. En compensación trabajos ayuda. O01OA030 h. Oficial primera 2,500 17,62 44,05 O01OA060 h. Peón especializado 2,500 16,20 40,50 %medaux % Medios auxiliares 0,030 84,55 2,54 %costind % Costes indirectos 0,020 87,09 1,74 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 88,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 88,83 OCHENTA Y OCHO EUROS CON OCHENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.06 E01levan0 ud Desmontaje del Calvario central del Patio del Claus- tro de la Catedral de Ciudad Rodrigo, así como la re- pisa escalonada sobre la que descansa, liberando su base y limpiando el pozo de cualquier resto incluidas raices, así como tratamiento a base de agua colorea- da para determinar el trazado y desague existente, incluyendo el acopio del material en lugar seguro, to- do previa numeración de piezas, levantamiento de croquis y reportaje fotográfico, O01OB070 h. Oficial cantero 6,500 18,00 117,00 O01OA060 h. Peón especializado 6,500 16,20 105,30 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,500 10,00 5,00 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %medaux % Medios auxiliares 0,050 227,52 11,38 %costind % Costes indirectos 0,020 238,90 4,78 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 243,68 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 243,68 DOSCIENTOS CUARENTA Y TRES EUROS CON SESENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.07 E01levan01 ud Limpieza de la conexión a red existente bajo el Cal- vario y su pozo, retirando elementos ajenos, raices y suciedad y haciendo prueba de comprobación de red con agua coloreada no contaminante. O01OA030 h. Oficial primera 5,500 17,62 96,91 O01OA060 h. Peón especializado 5,500 16,20 89,10 %medaux % Medios auxiliares 0,030 186,01 5,58 %costind % Costes indirectos 0,020 191,59 3,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 195,42 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 195,42

Page 127: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

CIENTO NOVENTA Y CINCO EUROS CON CUARENTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.08 E01levan02 ud Levantamiento del peldañeado existente en la "Puerta de los Carros", interior y exterior, previa toma de datos y fotografías, para posterior recolocación, acopiando el material servible en lugar adecuado y retirando el escombro a vertedero, dotando a dicho acceso de una pasarela de madera con elementos antideslizantes y en su caso pasamanos, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 6,850 18,00 123,30 O01OA060 h. Peón especializado 6,850 16,20 110,97 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,750 10,00 7,50 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %medaux % Medios auxiliares 0,050 244,14 12,21 %costind % Costes indirectos 0,020 256,35 5,13 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 261,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 261,48 DOSCIENTOS SESENTA Y UN EUROS CON CUARENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.09 E01levan1 m2 Levantado de solado de baldosas de granito del Claustro de la Catedral de Ciudad Rodrigo, con su- pervisión arqueológica, por medios manuales y me- cánicos, acopiándolas en zona preparada, prote- giendo paramentos y elementos que puedan verse afectados, limpiándolas superficialmente y preparan- do sus bordes para recolocación de piezas posterior, eliminando cualquier resto de mortero, incluyendo la retirada de las inservibles y restos generados a con- tenedor para transporte a vertedero, y en su caso acopio en depósito a determinar de las reutilizbles para futuras reposiciones posibles,incluso limpieza con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,001 21,50 0,02 O01OC270 h. Arqueólogo 0,050 19,88 0,99 O01OC275 h. Ayudante de Arqueólogo 0,050 16,50 0,83 O01OB070 h. Oficial cantero 0,250 18,00 4,50 O01OA060 h. Peón especializado 0,250 16,20 4,05 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,750 10,00 7,50 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %medaux % Medios auxiliares 0,050 18,11 0,91 %costind % Costes indirectos 0,020 19,02 0,38 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,40 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 19,40 DIECINUEVE EUROS CON CUARENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.10 E01levan2 m3 Picado de solera de hormigón, estimando un espe- sor de 15 a 20 cm. sobre la que se asienta el solado del patio central del Claustro, por medios mecánicos y manuales, retirando escombro a pie de carga para transporte a vertedero y limpieza final, O01OA060 h. Peón especializado 1,000 16,20 16,20 M06MI020 h. Martillo manual picador eléctrico 11kg 1,000 3,01 3,01 M06CM030 h. Compre.port.diesel m.p. 5 m3/min 7 bar 1,000 3,91 3,91 %medaux % Medios auxiliares 0,030 23,12 0,69 %costind % Costes indirectos 0,020 23,81 0,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 24,29

Page 128: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 24,29 VEINTICUATRO EUROS CON VEINTINUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.11 E01levan21 m3 Retirada del encachado bajo solera en el Patio Cen- tral del Claustro, en caso de su existencia, estimando una capa de 15 a 20 cm. de espesor, por medios manuales, con retirada de escombro a contenedor, O01OA070 h. Peón ordinario 0,700 14,50 10,15 %medaux % Medios auxiliares 0,030 10,15 0,30 %costind % Costes indirectos 0,020 10,45 0,21 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 10,66 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 10,66 DIEZ EUROS CON SESENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.12 E01levan3 m3 Cajeado de la sub-base del solado existente del pa- tio central del Claustro, según niveles a definir para alojar zona ajardinada, incluso limpieza de restos ajenos, con ligera supervisión arqueológica incluida, incluyendo la carga de escombro a zona exterior pa- ra su posterior retirada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirec- tos. O01OC270 h. Arqueólogo 0,150 19,88 2,98 O01OA060 h. Peón especializado 0,450 16,20 7,29 P33P210 ud Varios material y utillaje 0,005 150,50 0,75 P33P030 ud Materiales fungibles para arqueologia 0,005 187,35 0,94 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,250 19,88 4,97 M06MI020 h. Martillo manual picador eléctrico 11kg 1,100 3,01 3,31 %medaux % Medios auxiliares 0,070 20,24 1,42 %costind % Costes indirectos 0,020 21,66 0,43 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 22,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 22,09 VEINTIDOS EUROS CON NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.13 E01arqu1 ud Realización de CALICATA TIPO 1, en zona de apro- ximadamente 2x2 metros en planta y hasta una pro- fundidad de 1,50 metros máximo, con metodología arqueológica según previsión proyectada tal y como figura en plano, con asistencia de arqueólogo direc- tor y dos peones especializados, con p.p. de reporta- je fotográfico, toma de datos, retirada de escombros, protección de elementos, y documentación final es- crita con copias para dirección facultativa y promo- tor, según memoria y planos. O01OC270 h. Arqueólogo 12,000 19,88 238,56 O01OC275 h. Ayudante de Arqueólogo 6,000 16,50 99,00 O01OA060 h. Peón especializado 32,660 16,20 529,09 P33P210 ud Varios material y utillaje 0,064 150,50 9,63 P33P030 ud Materiales fungibles para arqueologia 0,036 187,35 6,74 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 3,000 19,88 59,64 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 1,000 10,00 10,00 %medaux % Medios auxiliares 0,030 952,66 28,58 %costind % Costes indirectos 0,020 981,24 19,62 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.000,86 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.000,86 MIL EUROS CON OCHENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 129: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

02.14 E01arqu2 ud Realización de CALICATA TIPO 2, en zona de apro- ximadamente 250x250 cm. en planta y hasta una profundidad de 3,00 metros máximo, con metodolo- gía arqueológica según previsión proyectada tal y como figura en plano, con asistencia de arqueólogo director y dos peones especializados, con p.p. de re- portaje fotográfico, toma de datos, retirada de es- combros, protección de elementos, y documenta- ción final escrita con copias para dirección facultativa y promotor, según memoria y planos. O01OC270 h. Arqueólogo 24,000 19,88 477,12 O01OC275 h. Ayudante de Arqueólogo 10,000 16,50 165,00 O01OA060 h. Peón especializado 64,000 16,20 1.036,80 P33P210 ud Varios material y utillaje 0,064 150,50 9,63 P33P030 ud Materiales fungibles para arqueologia 0,036 187,35 6,74 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 4,500 19,88 89,46 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 1,000 10,00 10,00 %medaux % Medios auxiliares 0,030 1.794,75 53,84 %costind % Costes indirectos 0,020 1.848,59 36,97 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.885,56 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.885,56 MIL OCHOCIENTOS OCHENTA Y CINCO EUROS CON CINCUENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.15 E01exc0 m3 Excavación de zanjas por medios manuales auxilia- dos puntualmente por maquinaria de pequeñas di- mensiones y herramienta mecánica en su caso, y se- gún criterio de intervención indicado en memoria e instrucciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cá- maras de aireación y drenaje y trabajos análogos, con ligera supervisión arqueológica inicial (en caso de no requerise la presencia total del arqueólogo, quedando por tanto a expensas de dictaminar por la D.F. una vez se realicen las catas y comiencen los trabajos) incluyendo tanto la retirada de las tierras hasta zona de acopio para carga a camión, como el perfilado perimetral, apisonado de fondo de excava- ción y la gestión correspondiente de residuos, con p.p. de medios auxiliares y costes indirectos. O01OC270 h. Arqueólogo 0,050 19,88 0,99 O01OA070 h. Peón ordinario 0,150 14,50 2,18 M05PN110 h. Minicargadora neumáticos 40 CV 0,320 30,60 9,79 %medaux % Medios auxiliares 0,030 12,96 0,39 %costind % Costes indirectos 0,020 13,35 0,27 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,62 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,62 TRECE EUROS CON SESENTA Y DOS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.16 E01exc1 m3 Excavación de zanjas CON SUPERVISIÓN AR- QUEOLÓGICA total, por medios manuales auxilia- dos puntualmente por maquinaria de pequeñas di- mensiones y herramienta mecánica en su caso, y SEGÚN CRITERIO DE INTERVENCIÓN indicado en la memoria y las instrucciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cámaras de aireación y drenaje y trabajos análogos, con supervisión arqueológica to- tal (presencia de arqueólogo y/o ayudante 100% excavación), incluyendo el perfilado perimetral, api- sonado de fondo de excavación y la carga y trans-

Page 130: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

porte de tierras hasta zona de acopio y carga para traslado a vertedero, asi como p.p. de reportaje foto- gráfico y documentación final en su caso. En caso de que la D.F. junto con el arqueólogo responsable de la Administración una vez realizadas las catas previstas e iniciados estos trabajos comprueben no se hace necario la presencia total, sino parcial del equipo de arqueólogos, podrá establecerse un crite- rio de medición diferente, teniendo en cuenta la parti- da anterior y siempre según criterio de la D.F. O01OC270 h. Arqueólogo 0,200 19,88 3,98 O01OC275 h. Ayudante de Arqueólogo 0,250 16,50 4,13 O01OA060 h. Peón especializado 0,550 16,20 8,91 M05PN110 h. Minicargadora neumáticos 40 CV 0,150 30,60 4,59 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,120 19,88 2,39 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,330 10,00 3,30 %medaux % Medios auxiliares 0,030 27,30 0,82 %costind % Costes indirectos 0,020 28,12 0,56 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 28,68 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 28,68 VEINTIOCHO EUROS CON SESENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.17 E01drenaj1 m. Formación de cámara de drenaje perimetral en ZO- NA CENTRAL PATIO, bordeando el peldañeado del Calvario, según detalle de planos e indicaciones de la D.F.incluyendo la formación de solera base de hormigón armado HA-25, de 10 cm. de espesor, con mallazo doble r12#10/10 con barras del díametro 12, fábricas de ladrillo perforado de 1/2 asta, recibida con mortero de cemento y cal M-60 de dosificación aproximada (a determinar) 1:1:6, colocando placa separadora de poliestireno expandido que impida el contacto de la obra nueva con la fábrica existente o en su defecto lamina drenante tipo "deltadrain" o si- milar, y formación de canaleta de desague y sus co- nexiones con tubo PVC de diámetro 200 mm. tipo "Terrain" o similar, según niveles y pendiente mínima del 1% enfoscada con mortero impereabilizante "Sika Monotop-107 Seal" o similar, dejando la cáma- ra lista para la colocación del solado y bordillos de piedra, todo incluido incluso rejilla corrida con marco, tipo "RM-20 C-250" de Benito o similar., y limpieza fi- nal, retirando el material sobrante a vertedero, con p.p. de medios auxiliares y costes indirectos. Incluida rejilla corrida con marco, tipo "RM-20 C-250" de Be- nito o similar. O01OA030 h. Oficial primera 0,160 17,62 2,82 O01OA070 h. Peón ordinario 0,160 14,50 2,32 E04SA010 m2 SOLERA.HA-25, 15 cm. ARMA. r12#30x30 doble 1,000 22,90 22,90 E04SA011 m2 SOLERA HA-25, e=10 cm. r12#10x10 1,600 19,33 30,93 E07LP003 m2 MURETE LADRILLO PERF. 1/2 ASTA 0,600 20,50 12,30 P05EH021 m2 Tablero placas prefab. hormig. tipo "Prephor" 0,800 16,20 12,96 P07TE091 m2 Poliestireno expandido e=1 cm. 0,100 2,20 0,22 P07TX015 m2 P.polies.extruido 40 kg/m3 40 mm. 0,100 5,95 0,60 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,070 67,23 4,71 E08PFA110 m2 ENFOSCADO CEMENTO/CAL BASE IMPERM. 0,300 7,67 2,30 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 0,650 13,41 8,72 P01rej03 ud Rejilla tipo R05-30 Benito o similar 0,500 52,00 26,00 P01rej02 ud Rejilla RM-20 C-250 Benito o similar l=0,70 1,450 16,80 24,36 P02TVO480 m. Tub.PVC liso evacuación encolado D=200 0,350 9,35 3,27 %medaux % Medios auxiliares 0,030 154,41 4,63 %costind % Costes indirectos 0,020 159,04 3,18 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 162,22 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 131: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 162,22 CIENTO SESENTA Y DOS EUROS CON VEINTIDOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.18 E01drenaj2 m. Formación de cámara de aireación y drenaje, en PA- TIO CENTRAL CLAUSTRO CATEDRAL DE CIU- DAD RODRIGO, previo apisonado de la zona exca- vada, siguiendo ordén de ejecución según CRITE- RIOS de INTERVENCIÓN reflejados en memoria y e indicaciones de la D.F., y plano de detalle nº29, in- cluyendo: la formación de una solera base de hormi- gón armado HA-25 de 15 cm. de espesor, con ma- llazo doble r12#30/30, fábricas de 1 asta de ladrillo cerámico perforado de 9 cm. a la palomera permi- tiendo aireación de fábricas excepto la perimetral maciza, dispuestas según detalle y recibidas con mortero de cemento y cal M-60, de dosificaicón aprox. a determinar 1:1:6, colocando placa separa- dora de poliestireno expandido que impida el contac- to de la obra nueva con la fábrica del claustro, colo- cación de placas nervadas prefabricadas tipo "Phrefor" de diferentes dimensiones según pandas, a modo de encofrado perdido, para formación de lo- sa superior en la que descansará el solado de grani- to, con hormigón HA-250, de espesor medio 11 cm. y armado r12#15/15, con formación de ligera pen- diente para posterior colocación del solado, incluyen- do la formación de la canaleta de desague adaptada a pendientes y niveles indicados, con una pendiente mínima del 1%, revestida a base de enfoscado de mortero tipo "Sika Top Seal 107" o similar en dos o mas capas según rendimiento indicado por el fabri- cante, incluso relleno con grava recuperada del talud exterior, realizando a su vez función drenante o en su defecto relleno de tierras y apisonado, dejando la cámara lista para la colocación del solado y bordillos de piedra (no incluida), y colocación de rejilla con marco tipo "RM-30 C-250" de Benito o similar, todo incluido y limpieza final, retirando el material sobrante a contenedor, con p.p. de medios auxiliares y costes indirectos. Para un ancho medio aproximado de 3,30 metros. Medido en su longitud, a lo largo de la canaleta de desague. Según planos y memoria. O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA070 h. Peón ordinario 0,250 14,50 3,63 E04SA010 m2 SOLERA.HA-25, 15 cm. ARMA. r12#30x30 doble 3,300 22,90 75,57 E07LP001 m2 MURETE LADRILLO PERF. 1 ASTA 0,850 28,52 24,24 E07LP002 m2 MURETE LADRILLO PERF. 1 ASTA PALOMERA 1,690 25,69 43,42 P05EH021 m2 Tablero placas prefab. hormig. tipo "Prephor" 3,000 16,20 48,60 E04SA011f m2 SOLERA HA-25, 11 cm. ARM. r12#15x15 3,300 15,35 50,66 P07TE091 m2 Poliestireno expandido e=1 cm. 0,120 2,20 0,26 P07TX015 m2 P.polies.extruido 40 kg/m3 40 mm. 0,150 5,95 0,89 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,100 67,23 6,72 E08PFA110 m2 ENFOSCADO CEMENTO/CAL BASE IMPERM. 0,320 7,67 2,45 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 0,630 13,41 8,45 P01rej01 ud Rejilla RM-30 C-250 Benito o similar l=0,70 1,450 37,00 53,65 %medaux % Medios auxiliares 0,030 322,95 9,69 %costind % Costes indirectos 0,020 332,64 6,65 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 339,29 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 339,29 TRESCIENTOS TREINTA Y NUEVE EUROS CON VEINTINUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.19 E01drenaje2.1 m. Cámara de aireación y drenaje, según memoria, pla-

Page 132: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

nos y criterios indicados en partidas anteriores, con la inclusión de rejillas de fundición con marco, costes indirectos y medios auxiliares O01OA030 h. Oficial primera 0,220 17,62 3,88 O01OA070 h. Peón ordinario 0,220 14,50 3,19 E04SA010 m2 SOLERA.HA-25, 15 cm. ARMA. r12#30x30 doble 2,010 22,90 46,03 E07LP004 m2 MURETE LADRILLO PERF. 1/2 ASTA PALOMERA 1,200 21,58 25,90 E07LP002 m2 MURETE LADRILLO PERF. 1 ASTA PALOMERA 0,500 25,69 12,85 E07LP003 m2 MURETE LADRILLO PERF. 1/2 ASTA 0,600 20,50 12,30 P05EH021 m2 Tablero placas prefab. hormig. tipo "Prephor" 1,800 16,20 29,16 E04SA011f m2 SOLERA HA-25, 11 cm. ARM. r12#15x15 2,010 15,35 30,85 P07TE091 m2 Poliestireno expandido e=1 cm. 0,070 2,20 0,15 P07TX015 m2 P.polies.extruido 40 kg/m3 40 mm. 0,045 5,95 0,27 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,100 67,23 6,72 E08PFA110 m2 ENFOSCADO CEMENTO/CAL BASE IMPERM. 0,270 7,67 2,07 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 0,540 13,41 7,24 P01rej03 ud Rejilla tipo R05-30 Benito o similar 0,500 52,00 26,00 %medaux % Medios auxiliares 0,030 206,61 6,20 %costind % Costes indirectos 0,020 212,81 4,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 217,07 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 217,07 DOSCIENTOS DIECISIETE EUROS CON SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.20 E01drenaje2.2 m. Cámara de aireación y drenaje, según memoria, pla- nos y criterios indicados en partidas anteriores, con la inclusión de rejillas de fundición con marco, y for- mación de pozo para conexión a nivel inferior, costes indirectos y medios auxiliares O01OA030 h. Oficial primera 0,160 17,62 2,82 O01OA070 h. Peón ordinario 0,160 14,50 2,32 E04SA010 m2 SOLERA.HA-25, 15 cm. ARMA. r12#30x30 doble 1,100 22,90 25,19 E07LP004 m2 MURETE LADRILLO PERF. 1/2 ASTA PALOMERA 0,900 21,58 19,42 E07LP003 m2 MURETE LADRILLO PERF. 1/2 ASTA 0,450 20,50 9,23 P05EH021 m2 Tablero placas prefab. hormig. tipo "Prephor" 1,200 16,20 19,44 E04SA011f m2 SOLERA HA-25, 11 cm. ARM. r12#15x15 1,100 15,35 16,89 P07TE091 m2 Poliestireno expandido e=1 cm. 0,150 2,20 0,33 P07TX015 m2 P.polies.extruido 40 kg/m3 40 mm. 0,150 5,95 0,89 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,100 67,23 6,72 E08PFA110 m2 ENFOSCADO CEMENTO/CAL BASE IMPERM. 0,270 7,67 2,07 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 0,540 13,41 7,24 P01rej03 ud Rejilla tipo R05-30 Benito o similar 0,450 52,00 23,40 %medaux % Medios auxiliares 0,030 135,96 4,08 %costind % Costes indirectos 0,020 140,04 2,80 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 142,84 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 142,84 CIENTO CUARENTA Y DOS EUROS CON OCHENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.21 E01drenaj3 ud Ejecución de pozo de bombeo, registro e incluso ab- sorción, con rebosadero comunicado a red existente actualmente bajo Calvario en patio central del Claus- tro de la Catedral de Ciudad Rodrigo, hasta una pro- fundidad aprox. de 3 metros teniendo en cuenta la recogida de aguas del desague de la cámara de ai- reación y drenaje ue comunicará a 1,10 metros de profundidad aproximada, incluyendo entre otros: pre- paración de terreno base, formación de solera base de hormigón armado HA-250 de espesor 15 cm. ar- mada con mallazo doble r12#10/10, de dimensiones en planta 250x250 cm. pudiendo trazarse de forma circular, formación de pozo con fábrica de ladrillo ce-

Page 133: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

rámico perforado de 1 asta recibido con mortero M-40 según trazado indicado en planos, de 2 metros libres de diametro en base y coronado por tapa de fundición de diámetro 80 cm. con su cerco y el re- vestimiento interior a base de enfoscado impermea- bilizante "Sika Monotop-107 Seal" o similar, y solera superior de hormigón armado HA-250 de 10 cm. pa- ra apoyo de solado, armada con r12/10/10 dejando prevista argollas de redondo de acero inoxidable y/o galvanizado según D.F., incluso el relleno drenante perimetral a base de bolo y/o grava y tierra vegetal compactada. Instalación de bombas en partida inde- pendiente. O01OA030 h. Oficial primera 5,200 17,62 91,62 O01OA070 h. Peón ordinario 5,200 14,50 75,40 E04SA012 m2 SOLERA HA-25, e=15 cm. r12#10x10 doble 6,250 32,14 200,88 E04SA011 m2 SOLERA HA-25, e=10 cm. r12#10x10 6,500 19,33 125,65 E07LP001 m2 MURETE LADRILLO PERF. 1 ASTA 16,450 28,52 469,15 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 13,188 13,41 176,85 P02EPW001 ud Cerco/tapa d=80cm. T-2085 k C400 D.Benito 1,000 212,00 212,00 P02EPW020 ud Pates acero galvanizado 30x25 8,000 5,37 42,96 P02EPW021 ud Argolla acero galvanizado o inox. pozo bombeo 1,000 17,25 17,25 %medaux % Medios auxiliares 0,030 1.411,76 42,35 %costind % Costes indirectos 0,020 1.454,11 29,08 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.483,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.483,19 MIL CUATROCIENTOS OCHENTA Y TRES EUROS CON DIECINUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.22 E01drenaje3.1 ud Ejecución de pozo de bombeo, registro e incluso ab- sorción, con rebosadero comunicado a red existente en extremo del Atrio de Amayuelas, de la Catedral de Ciudad Rodrigo, hasta la profundidad requerida en función de la cámara de aireación y drenaje y la red existente, marca en planos, incluyendo entre otros: preparación de terreno base, formación de solera base de hormigón armado HA-250 de espesor 15 cm. armada con mallazo doble r12#10/10, de dimen- siones en planta 250x250 cm. pudiendo trazarse de forma circular, formación de pozo con fábrica de la- drillo cerámico perforado de 1 asta recibido con mor- tero M-40 según trazado indicado en planos, de 2 metros libres de diametro en base y coronado por ta- pa de fundición de diámetro 90 cm. con su cerco y el revestimiento interior a base de enfoscado imper- meabilizante "Sika Monotop-107 Seal" o similar, y solera superior de hormigón armado HA-250 de 10 cm. para apoyo de solado, armada con r12/10/10 dejando prevista argollas de redondo de acero inoxi- dable y/o galvanizado según D.F., incluso el relleno drenante perimetral a base de bolo y/o solera para recolocación del solado desmontado a recuperar en la posición original, Instalación de bombas en partida independiente. O01OA030 h. Oficial primera 5,200 17,62 91,62 O01OA070 h. Peón ordinario 5,200 14,50 75,40 E04SA012 m2 SOLERA HA-25, e=15 cm. r12#10x10 doble 6,250 32,14 200,88 E04SA011 m2 SOLERA HA-25, e=10 cm. r12#10x10 6,500 19,33 125,65 E07LP001 m2 MURETE LADRILLO PERF. 1 ASTA 9,450 28,52 269,51 E08PFA001 m2 ENFOSCADO IMPERM. "SIKA TOP 107-SEAL" 9,188 13,41 123,21 P02epw002 ud Cerca/tapa d=90 cm. Pozo 2 1,000 245,25 245,25 P02EPW020 ud Pates acero galvanizado 30x25 8,000 5,37 42,96 P02EPW021 ud Argolla acero galvanizado o inox. pozo bombeo 1,000 17,25 17,25 %medaux % Medios auxiliares 0,030 1.191,73 35,75

Page 134: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

%costind % Costes indirectos 0,020 1.227,48 24,55 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.252,03 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.252,03 MIL DOSCIENTOS CINCUENTA Y DOS EUROS CON TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.23 E01drenaj4 m3 Relleno del trasdós del murete de las cámaras de ai- reación con grava y bolo de diferente tamaño, y/o en trabajo de compactación o formación de drenaje de zonas con capa superior vegetal, incluyendo p.p. de la grava desmontada junto la Fachada Este, en la Plazuela y la que pudiera aparecer bajo la solera de patio central, inlcuyendo p.p. de medios auxialres y costes indirectos. O01OA060 h. Peón especializado 0,450 16,20 7,29 P01AG130 m3 Grava 40/80 mm. 1,000 17,56 17,56 %medaux % Medios auxiliares 0,020 24,85 0,50 %costind % Costes indirectos 0,020 25,35 0,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 25,86 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 25,86 VEINTICINCO EUROS CON OCHENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.24 E001sanea2 ud Conexión de arqueta de achique ejecutada en fase IV con arqueta nueva, a base de doble tubo flexible en primer tramo y rígido en resto, tipo "Terrain" o si- milar, con p.p. de ayudas. O01OB170 h. Oficial 1ª fontanero 3,000 18,24 54,72 P01sanea1 ud Tubo conexión D=63 + accesrios 4,500 15,00 67,50 %medaux % Medios auxiliares 0,050 122,22 6,11 %costind % Costes indirectos 0,020 128,33 2,57 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 130,90 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 130,90 CIENTO TREINTA EUROS CON NOVENTA CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.25 E001sanea3 ud Arqueta de registro de 51x51x65 cm. de medidas in- teriores, construida con fábrica de ladrillo perforado tosco de 1/2 pie de espesor, recibido con mortero de cemento M-5, colocado sobre solera de hormigón en masa HM-20/P/40/I de 10 cm. de espesor, enfos- cada y bruñida por el interior con mortero de cemen- to M-15 redondeando ángulos, ligeramente armada con mallazo, enfoscada y bruñida por el interior con mortero de cemento M-15, y con tapa y marco de hormigón armado prefabricada, terminada y con p.p. de medios auxiliares, sin incluir la excavación, ni el relleno perimetral posterior, s/ CTE-HS-5. O01OA030 h. Oficial primera 2,750 17,62 48,46 O01OA060 h. Peón especializado 1,600 16,20 25,92 P01HM020 m3 Hormigón HM-20/P/40/I central 0,059 83,11 4,90 P01LT020 ud Ladrillo perforado tosco 24x11,5x7 cm. 45,000 0,12 5,40 P01MC040 m3 Mortero cem. gris II/B-M 32,5 M-5/CEM 0,035 65,85 2,30 P01MC010 m3 Mortero cem. gris II/B-M 32,5 M-15/CEM 0,027 76,15 2,06 P03AM070 m2 Malla 15x30x5 1,564 kg/m2 0,620 1,10 0,68 P02EAT030 ud Tapa cuadrada HA e=6cm 60x60cm 1,000 19,58 19,58 %medaux % Medios auxiliares 0,030 109,30 3,28 %costind % Costes indirectos 0,020 112,58 2,25 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 114,83 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 135: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 114,83 CIENTO CATORCE EUROS CON OCHENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.26 E001sanea4 m. Formación de zanja para saneamiento, incluyendo la apertura, prepración de base, y el relleno posterior, por medios manuales auxiliados puntualmente por maquinaria de pequeñas dimensiones incluyendo tanto la retirada de las tierras sobrantes hasta zona de acopio para carga a camión, como el perfilado perimetral, apisonado de fondo de excavación y la gestión correspondiente de residuos, con p.p. de medios auxiliares y costes indirectos. O01OC270 h. Arqueólogo 0,030 19,88 0,60 O01OA070 h. Peón ordinario 0,250 14,50 3,63 M05PN110 h. Minicargadora neumáticos 40 CV 0,100 30,60 3,06 P01AA020 m3 Arena de río 0/6 mm. 0,038 16,80 0,64 A03H050 m3 HORM. DOSIF. 250 kg /CEMENTO Tmáx.20 0,015 67,23 1,01 %medaux % Medios auxiliares 0,030 8,94 0,27 %costind % Costes indirectos 0,020 9,21 0,18 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,39 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,39 NUEVE EUROS CON TREINTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.27 E001sanea5 ud Unidad de intervención para facilitar la acometida de aguas adecuando el paso una vez se desmonten los peldaños de la "Puerta de los Carros", sustituyendo el tramo afectado hasta una arqueta de registro con tapa de fundición 30/30 con llave de corte de escua- dra, incluso sustitución del tramo y nuevo trazado hasta la toma existente en el actual pilón de fibroce- mento, a retirar, incluso formación de paso bajo mu- ro, según memoria, con p.p. de medios auxiliares y costes indirectos. O01OB170 h. Oficial 1ª fontanero 3,500 18,24 63,84 P01acom1 ud Adaptación acometida y registro polietl20 1,000 22,25 22,25 %medaux % Medios auxiliares 0,050 86,09 4,30 %costind % Costes indirectos 0,020 90,39 1,81 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 92,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 92,20 NOVENTA Y DOS EUROS CON VEINTE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.28 E001sanea6 ud Formación de acometida desde arqueta 51/51 junto zona de aparcamiento hasta pozo de entronque re- glamentario según Servicio Municipal correspondien- te, para una longitud entre 13 y 15 metros, incluyen- do la rotura del pavimento con compresor, excava- ción manual de zanjas de saneamiento en terrenos de consistencia dura, colocación de tubería de PVC de 200 mm. "Terrain" o similar, con sus uniones, ac- cesorios y obras auxiliares necesarias, cama de are- na, tapado posterior de la acometida y reposición del pavimento con hormigón en masa HM-20/P/40/I, y con p.p. de medios auxiliares. O01OA030 h. Oficial primera 5,000 17,62 88,10 O01OA060 h. Peón especializado 5,000 16,20 81,00 E001sanea4 m. ZANJA DESAGÜE PVC "TERRAIN" D=200 14,000 9,39 131,46 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 0,280 18,25 5,11

Page 136: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01HM020 m3 Hormigón HM-20/P/40/I central 0,580 83,11 48,20 P01asf01 m2 Reposición capa asfalto en acometidas saneami 5,600 34,25 191,80 M06CM010 h. Compre.port.diesel m.p. 2 m3/min 7 bar 1,200 2,26 2,71 M06MI010 h. Martillo manual picador neumático 9 kg 1,200 3,01 3,61 %medaux % Medios auxiliares 0,060 551,99 33,12 %costind % Costes indirectos 0,020 585,11 11,70 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 596,81 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 596,81 QUINIENTOS NOVENTA Y SEIS EUROS CON OCHENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.29 E001solado1 m2 Recolocación de solado de baldosas de granito re- cuperado, previa limpieza y preparación, seleccio- nando piezas de dimensiones aproximadas 100x50 cm., colocadas matando juntas, sobre cama de arena/cemento recibidas con mortero de cal y ce- mento gris al 50%, libre de sales, y arena selecciona- da, incluso rejuntado final con posible adiccion de colorantes naturales según muestras previas a reali- zar, incluso cortes en formación de encuentros, re- mates y sellado con mortero tipo "Sikaflex Pro HP" gris o similar, así como cortes de piezas para alojar rejillas de fundición, con rebajes indicados en planos y memoria, con aportación mínima y puntual de ele- mentos de idéntico material, incluyendo la homoge- neización del acabado abujardado y limpieza de su- perficie y lavado final, en formación de solado de pa- tio central y análogos, O01OA030 h. Oficial primera 0,550 17,62 9,69 O01OA070 h. Peón ordinario 0,550 14,50 7,98 A01L100 m3 LECHADA COLORANTE - CEMENTO 0,001 66,04 0,07 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,020 94,03 1,88 P01AA082 t. Arena 0/3 triturada lavada 0,050 15,70 0,79 P01CC010 t. Cemento CEM II/B-P 32,5 N granel 0,001 95,62 0,10 P01DW210 kg Pigmentos de tierra natural 0,015 2,50 0,04 M11C010 h. Bailarín mecánico abujardado/apomazado 0,050 2,75 0,14 %medaux % Medios auxiliares 0,030 20,69 0,62 %costind % Costes indirectos 0,020 21,31 0,43 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 21,74 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 21,74 VEINTIUN EUROS CON SETENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.30 E001solado2 m2 Reposición de solado de piedra arenisca incluyendo el desmontaje y la posterior recolocación, en traba- jos de formación de canalizaciones y zanjas para instalaciones en zona de intervención, incluyendo la limpieza y preparación de piezas, formación de base de asiento estabilizada, cama de arena y mortero y recibido con mortero de cal, cemento y arena selec- cionada y rejuntado con aportación de colorantes naturales previa realización de muestras, con p.p. de cortes, formación de encuentros y sellados, según memoria, planos e indicaciones de la D.F., así como medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,850 17,62 14,98 O01OA070 h. Peón ordinario 0,850 14,50 12,33 A01L100 m3 LECHADA COLORANTE - CEMENTO 0,001 66,04 0,07 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,020 94,03 1,88 P01AA082 t. Arena 0/3 triturada lavada 0,050 15,70 0,79 P01CC010 t. Cemento CEM II/B-P 32,5 N granel 0,001 95,62 0,10 P01DW210 kg Pigmentos de tierra natural 0,015 2,50 0,04

Page 137: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

M11C010 h. Bailarín mecánico abujardado/apomazado 0,050 2,75 0,14 %medaux % Medios auxiliares 0,030 30,33 0,91 %costind % Costes indirectos 0,020 31,24 0,62 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 31,86 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 31,86 TREINTA Y UN EUROS CON OCHENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.31 E001solado3 m. Bordillo de granito con acabado abujardado, de di- mensiones 10/12, ligeramente biselado en ángulos li- bres y con formación de cortes para mayor agarre, recibido con hormigón en masa HM-25, en forma- ción de remate de solados, incluyendo rejuntado con mortero de cal y cemento idem solado, con p.p. de medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA070 h. Peón ordinario 0,250 14,50 3,63 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,001 94,03 0,09 P01bord01 m. Bordillo granito abujar. bisel. 10/12 cm. 1,050 9,85 10,34 P01HM010 m3 Hormigón HM-20/P/20/I central 0,040 83,11 3,32 %medaux % Medios auxiliares 0,030 21,79 0,65 %costind % Costes indirectos 0,020 22,44 0,45 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 22,89 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 22,89 VEINTIDOS EUROS CON OCHENTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.32 E001solado4 m. Bordillo de granito con acabado abujardado, de di- mensiones 10/20, ligeramente biselado en ángulos li- bres y con formación de cortes para mayor agarre, recibido con hormigón en masa HM-25, en forma- ción de remate de solados, incluyendo rejuntado con mortero de cal y cemento idem solado, con p.p. de medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA070 h. Peón ordinario 0,250 14,50 3,63 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,001 94,03 0,09 P01bord02 m. Bordillo granito aburj. bisel. 10/20 cm. 1,100 12,90 14,19 P01HM010 m3 Hormigón HM-20/P/20/I central 0,040 83,11 3,32 %medaux % Medios auxiliares 0,030 25,64 0,77 %costind % Costes indirectos 0,020 26,41 0,53 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 26,94 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 26,94 VEINTISEIS EUROS CON NOVENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.33 E001rep1 m. Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y preparación de la base con mortero de cal y arena, aditivado en su caso, y recolocación de ele- mentos recuperados, con aportación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patina- da, inclyendo el rejuntado de elementos con mortero de cal y arena seleccionada con aportación de pig- mentos naturales según pruebas previas, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,000 18,00 18,00 O01OA030 h. Oficial primera 0,250 17,62 4,41

Page 138: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA060 h. Peón especializado 0,750 16,20 12,15 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,025 1.015,25 25,38 P01CPA8 kg. Cal CPA "M8" 1,800 0,75 1,35 P01var2 m. Varilla roscada acero inox D=12 mm. 0,250 5,15 1,29 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01prim1 l. Primal AC-235 k o similar 0,005 5,95 0,03 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 %medaux % Medios auxiliares 0,030 69,15 2,07 %costind % Costes indirectos 0,020 71,22 1,42 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 72,64 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 72,64 SETENTA Y DOS EUROS CON SESENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.34 E001rep2 ud Reposición del peldañeado desmontado de la base del Calvario, incluyendo la limpieza y preparación de la base con mortero de cal y arena (incluso aporta- ción de cemento o en su defecto hormigón en masa), y recolocación de elementos recuperados, con aportación de nuevas piezas de identico trazado y remate, retirando las grapas metálicas y en su caso realizando anclajes según necesidades, inclyendo el recibido y rejuntado con mortero de cal y arena se- leccionada con aportación de pigmentos naturales según pruebas previas, respetando los aliviaderos de los laterales y manteniendo su funcionalidad en pre- visión de desbordamiento de la canaleta perimetral, todo con limpieza y remates y con p.p. de medios auxiliares y costes indirectos. O01OB070 h. Oficial cantero 5,500 18,00 99,00 O01OA030 h. Oficial primera 3,800 17,62 66,96 O01OC280 h. Restaurador de piedra 2,500 19,75 49,38 O01OA060 h. Peón especializado 5,500 16,20 89,10 A01L100 m3 LECHADA COLORANTE - CEMENTO 0,050 66,04 3,30 A02M020 m3 MORT.BAST.CAL M-5 CEM II/A-P 32,5R 0,390 94,03 36,67 P01AA082 t. Arena 0/3 triturada lavada 0,150 15,70 2,36 P01CC010 t. Cemento CEM II/B-P 32,5 N granel 0,010 95,62 0,96 P01DW210 kg Pigmentos de tierra natural 1,500 2,50 3,75 M11C010 h. Bailarín mecánico abujardado/apomazado 0,500 2,75 1,38 %medaux % Medios auxiliares 0,030 352,86 10,59 %costind % Costes indirectos 0,020 363,45 7,27 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 370,72 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 370,72 TRESCIENTOS SETENTA EUROS CON SETENTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.35 E001rep3 ud Reposición de la ESCALINATA de acceso a la puer- ta en "esviaje" de la fachada este del Claustro, pre- viamente desmontada, devolviéndola a su estado ori- ginal en base al levantamiento previo realizado, con aportación mínmia de piezas nuevas de piedra are- nisca de Ciudad Rodrigo, incluyendo la formación de asiento, recibido con mortero de cal, cemento y are- na y el rejuntado con arena seleccionada, cal y pig- mentos inorgánicos,según criterios generales de in- tervención, limpieza, consolidación e impermeabiliza- ción en su caso, con p.p. de medios auxiliares y cos- tes indirectos.

Page 139: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 8,000 18,00 144,00 O01OA030 h. Oficial primera 5,000 17,62 88,10 O01OA060 h. Peón especializado 8,000 16,20 129,60 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,750 77,48 58,11 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,085 1.015,25 86,30 P01CPA8 kg. Cal CPA "M8" 1,800 0,75 1,35 P01var2 m. Varilla roscada acero inox D=12 mm. 1,500 5,15 7,73 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01prim1 l. Primal AC-235 k o similar 0,750 5,95 4,46 M11PI020 h. Eq. de inyección manual resinas 1,000 4,96 4,96 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 %medaux % Medios auxiliares 0,030 527,34 15,82 %costind % Costes indirectos 0,020 543,16 10,86 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 554,02 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 554,02 QUINIENTOS CINCUENTA Y CUATRO EUROS CON DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.36 E001rep4 ud Reposición del BANCO CORRIDO de la fachada es- te del Claustro, previamente desmontado para aco- meter la cámara de aireación, devolviéndola a su es- tado original en base al levantamiento previo realiza- do, con aportación mínmia de piezas nuevas de pie- dra arenisca de Ciudad Rodrigo, incluyendo la for- mación de asiento, recibido con mortero de cal, ce- mento y arena y el rejuntado con arena selecciona- da, cal y pigmentos inorgánicos,según criterios ge- nerales de intervención, limpieza, consolidación e im- permeabilización en su caso, con p.p. de medios au- xiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 8,000 18,00 144,00 O01OA030 h. Oficial primera 5,000 17,62 88,10 O01OA060 h. Peón especializado 8,000 16,20 129,60 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,950 77,48 73,61 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,085 1.015,25 86,30 P01CPA8 kg. Cal CPA "M8" 1,800 0,75 1,35 P01var2 m. Varilla roscada acero inox D=12 mm. 1,500 5,15 7,73 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01prim1 l. Primal AC-235 k o similar 0,750 5,95 4,46 M11PI020 h. Eq. de inyección manual resinas 1,000 4,96 4,96 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 %medaux % Medios auxiliares 0,030 542,84 16,29 %costind % Costes indirectos 0,020 559,13 11,18 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 570,31 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 570,31 QUINIENTOS SETENTA EUROS CON TREINTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.37 E001rep6 ud Recolocación de la toma y linea de pararrayos, se- gún posición indicada en unidad IV (ver plano 19), repasando su trazado y tirantez así como su cone- xión afectada por los trabajos de esta unidad, ancla- jes, posición de elementos para evitar escorrentias de agua en fachada, etc. con p.p. de medios auxilia- res y costes indirectos. O01OB200 h. Oficial 1ª electricista 6,000 17,51 105,06

Page 140: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

%medaux % Medios auxiliares 0,030 105,06 3,15 %costind % Costes indirectos 0,020 108,21 2,16 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 110,37 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 110,37 CIENTO DIEZ EUROS CON TREINTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.38 E001rest1 ud Restauración del Calvario central, asegurando en primer lugar su estabilidad, procediendo posterior- mente a la limpieza de líquenes según criterio gene- ral y aplicando un tratamiento de consolidación e im- permeabilización en su caso, con p.p. de medios au- xiliares y costes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,425 19,75 8,39 O01OA060 h. Peón especializado 0,300 16,20 4,86 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 1,950 13,01 25,37 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 6,500 8,77 57,01 E03fab03 m2 DESCARNADO y REJUNTADO FÁBRICAS 0,800 23,50 18,80 E03fab04 m2 CONSOLIDACIÓN DE FÁBRICAS 3,200 26,15 83,68 E004rest6 ud RESTAURACIÓN REMATE CONTRAFUERTES 1,000 215,85 215,85 E03fab06 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 3,500 9,88 34,58 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,048 77,48 3,72 %medaux % Medios auxiliares 0,030 452,37 13,57 %costind % Costes indirectos 0,020 465,94 9,32 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 475,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 475,26 CUATROCIENTOS SETENTA Y CINCO EUROS CON VEINTISEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.39 E001rep5 ud Reposición del conjunto de tinajas previamente reti- radas del patio central, previa limpieza de las mis- mas, traslado y preparación de base y fijación, con p.p. de medios auxiliares y costes indirectos. En lu- gar a indicar por la D.F. O01OA030 h. Oficial primera 2,500 17,62 44,05 O01OA060 h. Peón especializado 2,500 16,20 40,50 %medaux % Medios auxiliares 0,030 84,55 2,54 %costind % Costes indirectos 0,020 87,09 1,74 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 88,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 88,83 OCHENTA Y OCHO EUROS CON OCHENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.40 E001jard01 m3 Aportación de tierra vegetal limpia seleccionada, de primera categoría, en formación de zona ajardinada del Patio Central del Claustro de la Catedral de Ciu- dad Rodrigo, incluyendo la preparación de base con apisonado de primera tongada extendida con ligera pendiente a zona central que permita escorrentia hasta canaleta central, respetando niveles proyecta- dos con p.p. de apisonado, modelado y rastrillado, dejándola lista para posterior plantación e instalación de riego, con p.p. de medios auxiliares y costes indi- rectos. O01OB270 h. Oficial 1ª jardinería 0,180 17,20 3,10 O01OB280 h. Peón jardinería 0,110 15,50 1,71 P28DA010 m3 Tierra vegetal limpia 1,000 15,50 15,50 M10PN010 h. Motoazada normal 0,055 4,75 0,26

Page 141: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

M10MR030 h. Rodillo auto.90 cm. 1 kg/cm.gene 0,015 5,50 0,08 P28DA100 m3 Mantillo limpio cribado 0,005 28,00 0,14 %medaux % Medios auxiliares 0,020 20,79 0,42 %costind % Costes indirectos 0,010 21,21 0,21 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 21,42 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 21,42 VEINTIUN EUROS CON CUARENTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.41 E001jard02 ud Suministro y plantación de Aromáticas del tipo 1, a base de Salvia officinalis , Rosmarinus officinalis, La- vandula officinalis y Myrtus communis microphylla, de 40 cm. de altura, suministradas en contenedor y plantación en hoyo, incluso apertura del mismo a mano, abonado con humus de lombriz, formación de alcorque y primer riego y resto necesarios hasta la entrega de la obra. O01OB270 h. Oficial 1ª jardinería 0,010 17,20 0,17 O01OB280 h. Peón jardinería 0,035 15,50 0,54 P28EH052 ud Salvia officinalis 40 cm.ct. 1,000 3,05 3,05 P28DA130 kg Substrato vegetal fertilizado 0,050 3,20 0,16 P01DW050 m3 Agua 0,016 0,80 0,01 %medaux % Medios auxiliares 0,020 3,93 0,08 %costind % Costes indirectos 0,010 4,01 0,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 4,05 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 4,05 CUATRO EUROS CON CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.42 E001jard03 ud Suministro y plantación de Aromáticas del tipo 2, a base de Thymus Vulgaris de 20 cm. de altura, sumi- nistradas en contenedor y plantación en hoyo, inclu- so apertura del mismo a mano, abonado con humus de lombriz, formación de alcorque y primer riego y resto necesarios hasta la entrega de la obra. O01OB270 h. Oficial 1ª jardinería 0,020 17,20 0,34 O01OB280 h. Peón jardinería 0,040 15,50 0,62 P28EH070 ud Thymus vulgaris 40 cm. cont. 1,000 1,98 1,98 P28DA130 kg Substrato vegetal fertilizado 0,050 3,20 0,16 P01DW050 m3 Agua 0,016 0,80 0,01 %medaux % Medios auxiliares 0,020 3,11 0,06 %costind % Costes indirectos 0,010 3,17 0,03 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3,20 TRES EUROS CON VEINTE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.43 E001jard04 ud Instalación de riego automático, completa, incluyen- do el material, mano de obra y medios necesarios, compuesta básicamente de: - LLaves de cierre bola polipropileno 3/4 rosca ma- cho, con p.p. de piezas de unión a tubería. - Tubería PE 20 mm 6bar con p.p.de accesorios e instalación - Arqueta 40x27 con doble tapa, la superior en ar- queta de fábrica con tapa de fundición. - Boca de riego 3/4 con llave. - Electroválvulas de riego bobina 12V - Reductor de presión 3/4 para goteo - Tuberías de goteo ciego de 16 mm. con p.p. de pieza de goteo según plano. - Programador de riego para zonas.

Page 142: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

- Accesorios, piezas y material auxiliar no descrito. - Mano de obra incluida y p.p. de medios auxilares y costes indirectos. O01OB170 h. Oficial 1ª fontanero 8,000 18,24 145,92 O01OB195 h. Ayudante fontanero 8,000 16,38 131,04 P26TPI020 m. Tuberia PE DB c/goteo integr. c/50cm. D=16mm. 1,000 0,44 0,44 P26riego1 ud LLave bola poliprop. 3/4 rosca macho + acceso 2,000 20,00 40,00 P26riego02 m. Tuberia PE 20 mm. 6 bar inc. accesorios 25,000 2,00 50,00 P26riego03 ud Arqueta PVC 40/27 con tapa fundición 1,000 69,25 69,25 P26riego04 ud Boca de riego 3/4 con llave 1,000 70,00 70,00 P26riego05 ud Electroválvula de riego bobina 12V 1,000 25,00 25,00 P26riego06 ud Reductor de presión 3/4 para goteo 2,000 10,00 20,00 P26riego07 m. Tubería goteo ciego 16 mm. con p.p goteo s/pl 260,000 0,50 130,00 P26riego08 ud Programador de riego 2 zonas 1,000 65,00 65,00 P26riego09 ud Accesorios,piezas, y material auxiliar riego 1,000 50,00 50,00 %medaux % Medios auxiliares 0,020 796,65 15,93 %costind % Costes indirectos 0,010 812,58 8,13 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 820,71 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 820,71 OCHOCIENTOS VEINTE EUROS CON SETENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.44 E01bombeo01 ud Suministro, instalación y conexionado de bombas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grund- fos SE1 100.100.40, 4.51d de 4kW, 1450 rpm 400V - 2 ud Zócalos para autoacoplamientos DN 150. - 4 Interruptores de nivel IFP1 10m. - 9 m. Tubo flexible necesario, de 100 mm. en sali- das bombas. - 60 m.Tubería de PVC presión 100 mm. con p.p. de accesorios, instalación y ayudas de albañilería. ,- 2 ud Válvula de retención 100 mm. cierre bola - Accesorios, piezas y material no descrito necesario - Mano de obra, incluida las pruebas de funciona- miento. - P.p. de medios auxiliares y costes indirectos. O01OB170 h. Oficial 1ª fontanero 8,000 18,24 145,92 O01OB195 h. Ayudante fontanero 8,000 16,38 131,04 P26bombeo01 ud Bomba achique Grundfos SE1 100.100.40 4,51 d 2,000 7.500,00 15.000,00 P26bombeo02 ud Zócalo para autoacoplamientos DN 150 2,000 1.400,00 2.800,00 P26bombeo03 ud Interruptores nivel IFP1 10 m. 4,000 65,00 260,00 P26bombeo04 ud Tubo flexible 100 mm. salida bombas 9,000 20,00 180,00 P26bombeo05 ud Tub. PVC presión 100 mm. + accesorios 60,000 8,00 480,00 P26bombeo06 ud Válvula de retención 100 mm. cierre bola 2,000 190,00 380,00 P26bombeo07 ud Accesorios, piezas y otros POZO1 1,000 70,00 70,00 %medaux % Medios auxiliares 0,005 19.446,96 97,23 %costind % Costes indirectos 0,005 19.544,19 97,72 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19.641,91 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 19.641,91 DIECINUEVE MIL SEISCIENTOS CUARENTA Y UN EUROS CON NOVENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.45 E01bombeo02 ud Suministro, instalación y conexionado de bombas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grund- fos AP 35B.50.06.3 de 0,7kW, 2950 rpm 400V - 2 ud Zócalos para autoacoplamientos DN 150. - 4 Interruptores de nivel IFP1 10m. - 7 m. Tubo flexible necesario, de 63 mm. en salidas bombas. - 40 m.Tubería de PVC presión 63 mm. con p.p. de

Page 143: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

accesorios, instalación y ayudas de albañilería. ,- 2 ud Válvula de retención 63 mm. cierre bola - Accesorios, piezas y material no descrito necesario - Mano de obra, incluida las pruebas de funciona- miento. - P.p. de medios auxiliares y costes indirectos. O01OB170 h. Oficial 1ª fontanero 6,000 18,24 109,44 O01OB195 h. Ayudante fontanero 5,000 16,38 81,90 P26bombeo201 ud Bomba Grundfos AP35B.50.06.3 2,000 715,00 1.430,00 P26bombeo202 ud Zócalo para autoacomplamientos 2,000 195,00 390,00 P26bombeo03 ud Interruptores nivel IFP1 10 m. 4,000 65,00 260,00 P26bombeo203 ud Tubo flexible 63 mm. salida bomba 7,000 15,00 105,00 P26bombeo204 m. Tub.PVC presión 63 mm. + accesorios 40,000 6,00 240,00 P26bombeo205 ud Válvula retención 65 mm. cierre bola 2,000 110,00 220,00 P26bombeo206 ud Accesorios, piezas, y otros POZO 2 1,000 55,00 55,00 %medaux % Medios auxiliares 0,010 2.891,34 28,91 %costind % Costes indirectos 0,010 2.920,25 29,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 2.949,45 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 2.949,45 DOS MIL NOVECIENTOS CUARENTA Y NUEVE EUROS CON CUARENTA Y CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.46 E01electr01 ud Instalación eléctrica de cuadros, según memoria, planos e indicaciones de la D.F., consistente en la colocación de: 1ud,- Protección en cuadro general mediante 1 Int. Auto. General de 32A-4P, 1 Int. Auto. Diferencial de 40/4/500 mA, cableado, bornas, accesorios y monta- je. 1ud.- Cuadro de protección bajo escalera, con 1 Int. Aut. General 32A-4P, 2 Int. Auto. Dif. 40/4/300 mA, 1 Int Dif. 252/30 mA, 1 Aut. Magn. 20A-4P, 1 16A-4P y uno 10A-2 P 1ud.- Cuadro de protección y mando de 2 bombas de 4 kW "Tipo Grundfos CS 203-10" o similar con alternancia, arranque en cascada, protecciones, pilo- tos, cableado, bornas, accesorios y montaje. 1 ud.- Cuadro de protección y mando de 2 bombas de 0,7 kW "tipo Grundfos cs 203-1,6 " o similar con alternancia, arranque en cascada, protecciones, pilo- tos, cableado, bornas, accesorios y montaje. O01OB200 h. Oficial 1ª electricista 16,000 17,51 280,16 P01electric01 ud Cuadro de Protección General 1,000 180,00 180,00 P01electric02 ud Cuadro de protección bajo escalera 1,000 700,00 700,00 P01electric03 ud Cuadro protección y mando 2 bombas 4 kW 1,000 1.200,00 1.200,00 P01electric04 ud Cuadro protección y mando 2 bombas 0,7 kW 1,000 1.000,00 1.000,00 P01electric05 ud Ayuda albañileria-electricidad instal.cuadros 1,000 250,00 250,00 %medaux % Medios auxiliares 0,020 3.610,16 72,20 %costind % Costes indirectos 0,010 3.682,36 36,82 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3.719,18 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3.719,18 TRES MIL SETECIENTOS DIECINUEVE EUROS CON DIECIOCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

02.47 E01electr02 ud Instalación eléctrica necesaria para completar las lí- neas descritas en memoria y planos, básicamente a

Page 144: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

base de: ,- 40 m. Línea grapada con cable armado CU 5x6 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 80m. Línea enterrada con cable CU 4x4 mm2 0,6/1KV libre de halógenos con p.p. de bornas, ac- cesorios y montaje. 95m. Línea enterrada con cable CU 4x2,5 mm2 0,6/1KV libre de halógenos con p.p. de bornas, ac- cesorios y montaje. 120m. Línea enterrada con cable CU 3x1,5 mm2 0,6/1KV libre de halógenos con p.p. de bornas, ac- cesorios y montaje. 140 m. Tubo reforzado de pvc de 20 mm. con p.p. de cajas y montaje, incluso acabado en tono a defi- nir en obra, acorde al edificio. 120 m. Tubo reforzado de pvc de 40 mm. idem ante- rior. 1 ud. Pequeño material, accesorios y el necesario no descrito. 1,- Mano de obra, medios auxiliares y costesindirec- tos incluidos. O01OB200 h. Oficial 1ª electricista 54,000 17,51 945,54 P01electric06 m. Linea grapada CU 5X6 mm2. 0,6/1 KV libre halo 40,000 18,00 720,00 P01electric07 m. Linea enterrada cu 4x4 mm2, 0,6/1kV libre hal 80,000 5,00 400,00 P01electric08 m. Linea enterrada CU 4x2,5 mm2, 0,6/1libre halo 90,000 4,00 360,00 P01electric09 m. Linea enterrada CU 3x1,5 mm2, 0,6/1kV libre h 120,000 2,00 240,00 P01electric10 m. Tubo reforzado PVC 20 mm. inc. cajas y mont. 140,000 1,20 168,00 P01electric11 m. Tubo reforzado PVC 40 mm. inc. cajas y mont. 120,000 2,50 300,00 P01electric12 ud Pequeño material y accesorios elec.pozo2 1,000 15,00 15,00 %medaux % Medios auxiliares 0,020 3.148,54 62,97 %costind % Costes indirectos 0,010 3.211,51 32,12 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3.243,63 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3.243,63 TRES MIL DOSCIENTOS CUARENTA Y TRES EUROS CON SESENTA Y TRES CENTIMOS

Page 145: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

03 UNIDAD II: CUBIERTAS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.01 E002prot01 m2 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consis- tente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plásti- ca, vertido de cama de arena seca de regulización y coloción de tablero aglomerado de 30 mm. de espe- sor, incluso p.p. de otras protecciones, accesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 1,070 0,25 0,27 P01prot03 m. Cinta adhesiva láminas polietileno 0,500 0,15 0,08 P01aren01 m3 Arena de rio seca protección pav. 0,022 17,85 0,39 P01prot02 m2 Tablero aglomerado 30 mm. protección pav. 1,050 3,50 3,68 %medaux % Medios auxiliares 0,030 7,80 0,23 %costind % Costes indirectos 0,020 8,03 0,16 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,19 OCHO EUROS CON DIECINUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.02 E002lev01 m2 Desmontaje con recuperación de TEJAS de cubier- tas del Claustro de la Catedral de Ciudad Rodrigo, retirando el material servible a zona de acopio, lim- piandolo y seleccionándolo y el resto para su reutili- zación máxima posible, con carga de escombro a contenedor o a zona de acopio y gestión de resi- duos, con p.p. de otros elementos y remates de la cubierta (llimas, enconstillados, limahoyas, etc.) de medios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal'. O01OA010 h. Encargado 0,050 21,50 1,08 O01OA030 h. Oficial primera 0,270 17,62 4,76 O01OA060 h. Peón especializado 0,270 16,20 4,37 %medaux % Medios auxiliares 0,030 10,21 0,31 %costind % Costes indirectos 0,020 10,52 0,21 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 10,73 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 10,73 DIEZ EUROS CON SETENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.03 E002lon01 m2 Colocación de lona de protección de las bóvedas y fábricas del Claustro de la Catedral de Ciudad Rodri- go, contra las inclemencias meteorológicas, princi- palmente lluvia,inmediatamente a la retirada de la te- ja, anclada tanto a paramentos de fábrica como al propio andamio u otro medio auxiliar adecuado para tal fin, perfectamente atirantadas evitando formación de bolsas, incluso colocación y retirada según nece- sidades (incluyendo siempre que no se esté traba- jando en la obra), amortización de lonas y acceso- rios estimada en 7 usos.Medida en proyección hori- zontal (se valora únicamente ayuda a esta partida, debiendo asumirse el resto en el porcentaje de me- dios y gastos generales, así como los propios de la empresa ejecutora). O01OA010 h. Encargado 0,005 21,50 0,11

Page 146: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,200 16,20 3,24 P01lona1 m2 Lona protección cubiertas 7 usos 0,143 21,90 3,13 P01lona2 m2 Estrucutra colocación lona protección 20 usos 0,050 45,00 2,25 %medaux % Medios auxiliares 0,030 10,49 0,31 %costind % Costes indirectos 0,020 10,80 0,22 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11,02 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11,02 ONCE EUROS CON DOS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.04 E002lev02 m2 Retirada de la capa de cartón embreado y/o placa ti- po "Onduline" colocada en las cubiertas de la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, y elementos secundarios, fijaciones, uniones etc con acopio en contenedor adecuado, para su gestión, inc. p.p. de medios auxiliares y costes indirectos. Me- dida la superficie en proyección horizontal'. O01OA010 h. Encargado 0,010 21,50 0,22 O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 %medaux % Medios auxiliares 0,030 3,60 0,11 %costind % Costes indirectos 0,020 3,71 0,07 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3,78 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3,78 TRES EUROS CON SETENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.05 E002lev02.1 m2 Retirada de capa de telas asfálticas colocada sobre tablero de cubiertas del Claustro, a contenedor espé- cifico para gestión de residuos, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,001 21,50 0,02 O01OA030 h. Oficial primera 0,050 17,62 0,88 O01OA060 h. Peón especializado 0,050 16,20 0,81 %medaux % Medios auxiliares 0,050 1,71 0,09 %costind % Costes indirectos 0,020 1,80 0,04 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1,84 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1,84 UN EURO CON OCHENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.06 E002lev03 m2 Desmontaje de tablero de cubierta a base placas prefabricas de hormigón, colocadas en las cubiertas del Claustro de la Catedral de Ciudad Rodrigo, con retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indi- rectos. Medida la superficie en proyección horizontal'. O01OA010 h. Encargado 0,050 21,50 1,08 O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,050 6,15 0,31 %costind % Costes indirectos 0,020 6,46 0,13 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 6,59 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 6,59 SEIS EUROS CON CINCUENTA Y NUEVE CENTIMOS

Page 147: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.07 E002lev04 m2 Desmontaje de estructura de madera de cubierta completa, incluida la tabla base de teja, pares, vigas, tornapuntas y demas elementos, con protección pre- via de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Me- dida la superficie en proyección horizontal'. O01OA010 h. Encargado 0,050 21,50 1,08 O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 %medaux % Medios auxiliares 0,030 4,46 0,13 %costind % Costes indirectos 0,020 4,59 0,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 4,68 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 4,68 CUATRO EUROS CON SESENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.08 E002lev05 m2 Demolición de tabiques de ladrillo hueco doble y/o tabicón (en este caso la medición se compesará re- dución un -20%), a la palomera existentes en las cu- biertas de las pandas del Claustro de la Catedral de Ciudad Rodrigo, por medios manuales auxiliados mecanicamente, inc.p.p. de protección previa de ele- mentos que puedan verse afectados, limpieza final de restos y retirada de escombro a zona de acopio o contenedor para su posterior gestión, con recupera- ción de materiales para futuro empleo en obra, inc. p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal' deduciendo un 20% en caso de tratarse de ladrillo tabicón en lugar de hueco doble. O01OA010 h. Encargado 0,001 21,50 0,02 O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA060 h. Peón especializado 0,250 16,20 4,05 %medaux % Medios auxiliares 0,030 8,48 0,25 %costind % Costes indirectos 0,020 8,73 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,90 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,90 OCHO EUROS CON NOVENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.09 E002lev06 m2 Desmontaje de estructura de madera de cubierta completa, incluida la tabla base de teja, pares, vigas, tornapuntas y demas elementos, con protección pre- via de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Me- dida la superficie en proyección horizontal'. O01OA010 h. Encargado 0,020 21,50 0,43 O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 5,50 0,17 %costind % Costes indirectos 0,020 5,67 0,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 5,78 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 5,78 CINCO EUROS CON SETENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.10 E002lev07 m. Levantado de los elementos metálicos tipo "Tramex" colocados a modo de pasarela sobre la cubierta de

Page 148: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

la Panda Sur, con retirada a punto de reciclaje o lu- gar a indicar por la D.F. para posible reutilización, in- cluida la p.p. de compesanción por reciclaje, medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA060 h. Peón especializado 0,150 16,20 2,43 O01OA070 h. Peón ordinario 0,100 14,50 1,45 %medaux % Medios auxiliares 0,030 7,60 0,23 %costind % Costes indirectos 0,020 7,83 0,16 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,99 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 7,99 SIETE EUROS CON NOVENTA Y NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.11 E002lev08 m. Desmontaje del plomo que forma limas y baberos existentes en la Panda Este, tanto en la posterior junto a la Nave como las transversales, salvo las indi- cadas en memoria que puedan servir de base para la formación de unas nuevas, con retirada de es- combro a contenedor específico y gestión de resi- duos según estudio específico, con p.p. de medios auxiliares y costes indirectos. Medida según trazado en planos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA060 h. Peón especializado 0,250 16,20 4,05 %costind % Costes indirectos 0,020 10,61 0,21 %medaux % Medios auxiliares 0,050 10,82 0,54 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11,36 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11,36 ONCE EUROS CON TREINTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.12 E002lim1 m2 Retirada de cascotes sobre bóvedas y material de relleno ajeno a la fábrica original, respetando en todo caso el relleno de riñones e incluso si se considera aportándolo, todo con ligera supervisión arqueológi- ca, (en caso de determinar la supervisión exhaustiva, se procederá según partida correspondiente en "UNIDAD VI:BÓVEDAS") según indicaciones de la dirección facultativa, con carga, retirada y selección de escombro a vertedero, según plan RDC, con p.p. de costes indirectos y medios auxiliares. Medida en proyección horizontal según planos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OA030 h. Oficial primera 0,200 17,62 3,52 O01OA060 h. Peón especializado 0,200 16,20 3,24 O01OA070 h. Peón ordinario 0,100 14,50 1,45 %medaux % Medios auxiliares 0,030 9,29 0,28 %costind % Costes indirectos 0,020 9,57 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,76 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,76 NUEVE EUROS CON SETENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.13 E002cub01 ud Replanteo de las cubiertas proyectadas, una vez desmontadas las existentes, marcando pendientes, limas, encuentros y situación exacta de pares y co- rreas, para formación de muretes, mechinales, pre-

Page 149: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

paración de vigas, etc. todo con p.p. de medios auxi- liares y costes indirectos. O01OA010 h. Encargado 10,000 21,50 215,00 O01OA030 h. Oficial primera 10,000 17,62 176,20 O01OA060 h. Peón especializado 10,000 16,20 162,00 %medaux % Medios auxiliares 0,030 553,20 16,60 %costind % Costes indirectos 0,020 569,80 11,40 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 581,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 581,20 QUINIENTOS OCHENTA Y UN EUROS CON VEINTE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.14 E002cub02 m2 Formación de cubierta con taquiques de ladrillo hue- co doble a la palomera, recibidos con mortero bas- tardo de cemento, cal y arena, incluyendo ladrillo, en parte recuperado y reaprovechable y resto aportado, dejándo la fábrica sólidamente arriostrada y maciza- da en uniones, incluso replanteo, protección de bó- vedas con lámina de polietileno, formación de maes- tras, cama de mortero de cemento para asiento de placas, encuentros, humedecido de piezas, cortes y desperdicios, limpieza de restos y carga de escom- bros generados a contenedor o punto de acopio, con medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,420 17,62 7,40 O01OA070 h. Peón ordinario 0,420 14,50 6,09 P01LHD01 ud Ladrillo cerámico 25x11 formación tab.palome 20,000 0,15 3,00 A02A080 m3 MORTERO CEMENTO M-5 0,010 69,70 0,70 %medaux % Medios auxiliares 0,030 17,19 0,52 %costind % Costes indirectos 0,020 17,71 0,35 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 18,06 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 18,06 DIECIOCHO EUROS CON SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.15 E002plom01 m. Formación de PESEBRÓN o LIMA POSTERIOR de PLOMO en la cubierta de la panda Sur del Claustro de la Catedral de Ciudad Rodrigo, paralela a la Nave del Evangelio, con plomo tipo PB-2, de espesor 2,5 mm., y desarrollo mínimo según planos, adaptándo- se a las necesidades de obra, incluso formación de soporte y cama de yeso con p.p. de faldones sobre ventanales incluyendo el replanteo, ejecución de ro- zas sobre fábricas, cama de yeso, y engatillados lon- gitudinales - tramos nunca superiores a 2,50 metros- y transversale, babero recibido a roza, engatillado, pestañas en extremos, etc. y sellado de encuentros plomo-roza y otros posibles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. Se- gún memoria, planos e indicaciones de la D.F.. Me- dida longitudinalmente en paralelo a la Nave. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB170 h. Oficial 1ª fontanero 2,000 18,24 36,48 O01OB195 h. Ayudante fontanero 1,750 16,38 28,67 P01plom1 m2 Lámina de plomo 2,5 mm. PB-2 1,500 72,50 108,75 P01sk2 ud Masilla sellado "Sikaflex PRO 2 HP" o similar 1,200 5,50 6,60 P01SikaPlan12G m2 Lámina PVC 1,2 SikaPlan12G o similar 20x2 0,500 4,85 2,43 A01A030 m3 PASTA DE YESO NEGRO 0,030 96,53 2,90 A01A040 m3 PASTA DE YESO BLANCO 0,005 114,03 0,57

Page 150: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

%medaux % Medios auxiliares 0,030 188,55 5,66 %costind % Costes indirectos 0,020 194,21 3,88 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 198,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 198,09 CIENTO NOVENTA Y OCHO EUROS CON NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.16 E002plomo02 m. Formación de "LIMA TRANSVERSAL" de PLOMO en la cubierta de la panda Sur del Claustro de la Ca- tedral de Ciudad Rodrigo y/o análogas, con plomo ti- po PB-2, de espesor 2,5 mm., y desarrollo mínimo según planos, adaptándose a las necesidades de obra, asegurando un sección de evacuación mínima de 500 cm2, con p.p. de solapes de 25 cm. y en- cuentro con gárgola de cobre, incluyendo el replan- teo, ejecución de rozas sobre fábricas, cama de ye- so, y engatillados longitudinales - tramos nunca su- periores a 2,50 metros- y transversales, con forma- ción de pestañas en extremos, etc. y sellado de en- cuentros plomo-roza y otros posibles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor espe- cial. Para evitar bolsas o retenciones en los solapes se generará una cama de yeso lo suficientemente sólida que permita un rebaje (siempre con caida) en la zona de solape. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB170 h. Oficial 1ª fontanero 2,000 18,24 36,48 O01OB195 h. Ayudante fontanero 1,500 16,38 24,57 P01plom1 m2 Lámina de plomo 2,5 mm. PB-2 1,500 72,50 108,75 P01sk2 ud Masilla sellado "Sikaflex PRO 2 HP" o similar 1,500 5,50 8,25 P01SikaPlan12G m2 Lámina PVC 1,2 SikaPlan12G o similar 20x2 0,500 4,85 2,43 A01A030 m3 PASTA DE YESO NEGRO 0,030 96,53 2,90 A01A040 m3 PASTA DE YESO BLANCO 0,005 114,03 0,57 %medaux % Medios auxiliares 0,030 186,10 5,58 %costind % Costes indirectos 0,020 191,68 3,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 195,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 195,51 CIENTO NOVENTA Y CINCO EUROS CON CINCUENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.17 E002corn01 m. Restauración de cornisa del muro exterior del Claus- tro, incluyendo la limpieza con cepillo de cerdas sua- ves, eliminación de líquenes, consolidación y en su caso impermeabilización según criterios generales de intervención en paramentos exteriores, con repo- sición puntual con mortero "Petratex" o similar ase- gurando nivelación, dejando lista para la colocación de gatos de cobre y formación de nuevas cubiertas, incluso reintegración en la zona de encuetro de cu- biertas con pináculos formando base para coloca- ción de babero de plomo y canalón de cobre, etc, to- do con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OC160 h. Especialista restaurador 1,400 20,00 28,00 O01OA060 h. Peón especializado 0,200 16,20 3,24 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,050 111,68 5,58 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 1,300 2,20 2,86 P01DW210 kg Pigmentos de tierra natural 0,070 2,50 0,18

Page 151: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01per1 l. Peróxido de hidrógeno 0,730 4,55 3,32 P01per2 l. Formaldéhido 3% 0,320 4,20 1,34 P01DW050 m3 Agua 0,150 0,80 0,12 P01var2 m. Varilla roscada acero inox D=12 mm. 1,250 5,15 6,44 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 M11PI020 h. Eq. de inyección manual resinas 0,120 4,96 0,60 M11W060 h. Equipo pulverizador aerográfico 0,100 4,50 0,45 M11W010 h. Equipo chorro aire presión 0,250 2,95 0,74 M03HH090 h. Batidera mecánica 0,890 0,66 0,59 M11med1 h. Barrenadora rotación 0,070 14,57 1,02 %medaux % Medios auxiliares 0,030 55,76 1,67 %costind % Costes indirectos 0,020 57,43 1,15 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 58,58 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 58,58 CINCUENTA Y OCHO EUROS CON CINCUENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.18 E002corn02 m3 Sustitución de cornisa de piedra o restitución, en zo- nas marcadas previamente por la dirección facultati- va, incluyendo el cajeado de piedra necesario para la suplantación de piedra nueva selecciona, arenisca de Ciudad Rodrigo, extraida de cantera o recupera- da una vez comprobada su idoneidad, previa selec- ción por parte de la d.f., incluso p.p. de sacado de plantillas, tallado de piedra, preparación de soporte, limpieza, recibido con mortero de cal y anclaje con varillas de fibra y mortero de restauración, rejuntado, sellado y limpieza final, con marcado de piedra nue- va según memoria, patinado y limpieza final, costes indirectos y medios auxiliares. Medida el volumen realmente colocado. O01OA010 h. Encargado 1,250 21,50 26,88 O01OB070 h. Oficial cantero 7,500 18,00 135,00 O01OA060 h. Peón especializado 7,500 16,20 121,50 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 1,250 1.015,25 1.269,06 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 1,300 2,20 2,86 P01CL030 t. Cal hidratada en sacos S 0,020 155,00 3,10 P01DW210 kg Pigmentos de tierra natural 0,350 2,50 0,88 P01DW050 m3 Agua 0,060 0,80 0,05 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,180 77,48 13,95 %costind % Costes indirectos 0,030 1.573,28 47,20 %medaux % Medios auxiliares 0,030 1.620,48 48,61 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.669,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.669,09 MIL SEISCIENTOS SESENTA Y NUEVE EUROS CON NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.19 E002mur00 ud Trabajos de DESMONTAJE y posterior RECOLO- CACIÓN de la coronación de contrafuertes y corni- sas aledañas en la fachada exterior de la Panda Sur de la Catedral de Ciudad Rodrigo, con el objeto de poder acometer las obras de canalización de desa- gües de pluviales de la cubierta que protege esa Panda, previa numeración, toma de datos y reporta- je fotográfico, y posteriormente al cimbrado de la bó- vedas 4,5 y 6, preparando zona adecuada y protegi- da para el acopio de piezas, retirando cornisas, silla- res, piezas de remate y elementos necesarios, inclu- yendo la adaptación y reposición de los elementos según las nuevas canalizaciones, incluso restauran- do cornisas afectadas según criterios ya indicados, con p.p. de aportación de piedra nueva y su tallado,

Page 152: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

formación de asientos, recibidos, retacados, y rejun- tados empleando mortero de cal y arena selecciona- da coloreado con pigmentos inorgánicos, limpieza con cepillo de cerdas, consolidación e impermeabili- zación y patinado en su caso, con p.p. de medios auxiliares y costes indirectos, medida la unidad en un 25% a su completo desmontaje y el 75% restante a la finalización y remate del elemento indicado. Se li- mitará el plazo entre desmontaje y montaje al máxi- mo posible, cargando verticalmente o en su defecto apuntalando los contrafuertes afectados. O01OA010 h. Encargado 0,100 21,50 2,15 O01OC270 h. Arqueólogo 2,000 19,88 39,76 O01OC275 h. Ayudante de Arqueólogo 6,000 16,50 99,00 O01OB070 h. Oficial cantero 15,000 18,00 270,00 O01OA060 h. Peón especializado 15,000 16,20 243,00 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,850 111,68 94,93 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 4,000 19,88 79,52 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 1,000 10,00 10,00 P01SM230 m3 Bloque piedra arenisca CR sin escuadrar 0,050 480,25 24,01 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 2,500 2,20 5,50 P01CL030 t. Cal hidratada en sacos S 0,020 155,00 3,10 P01CPA8 kg. Cal CPA "M8" 5,000 0,75 3,75 P01prim1 l. Primal AC-235 k o similar 1,000 5,95 5,95 P01DW210 kg Pigmentos de tierra natural 3,500 2,50 8,75 P01DW050 m3 Agua 0,450 0,80 0,36 M11W010 h. Equipo chorro aire presión 1,500 2,95 4,43 M03HH090 h. Batidera mecánica 1,200 0,66 0,79 %medaux % Medios auxiliares 0,050 895,00 44,75 %costind % Costes indirectos 0,020 939,75 18,80 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 958,55 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 958,55 NOVECIENTOS CINCUENTA Y OCHO EUROS CON CINCUENTA Y CINCO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.20 E002mur01 m2 Restauración de MUROS DE SILLERIA, existentes entre el extradós de bóvedas del Claustro y sus cu- biertas, compuestos por fábricas de SILLERIA y silla- rejos con interposición puntual de otros, ladrillo, ne- cesitados de estabilizaciones puntuales, retacados, retirada de enfoscados de cemento y los de cal en mal estado, limpieza de juntas, soplado, descarna- dos y rejuntados según criterios generales de inter- vención (uso de materiales y formas de actuación), incluyendo la p.p. de protección de bóvedas con lá- mina de polietileno y la limpieza final, con retirada de escombros a contenedor, medida la superficie real- mente ejecutada compensando medición según cri- terio de la Dirección Facultativa e igualmente dedu- ciendo la parte de muro intervenida en la prepara- ción de muros para apoyo de durmientes (hasta un máximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cubiertas así como la parte correspondiente al desmontaje de contra- fuertes y cornisas de la Panda Sur, todo con medios auxiliares y costes indirectos. Los muros de fábrica de silleria o en mejor estado se medirán según parti- da independiente. E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,000 8,77 8,77 E03fab03a m2 DESCARNADO DE JUNTAS SILLERIA 0,500 9,77 4,89 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 0,750 13,36 10,02 E03fab05 m2 PATINADO DE FÁBRICAS 0,050 8,12 0,41 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 24,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 153: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 24,09 VEINTICUATRO EUROS CON NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.21 E002mur05 m2 Restauración de MUROS DE MAMPOSTERIA, exis- tentes entre el extradós de bóvedas del Claustro y sus cubiertas, compuestos por fábricas de mampos- tería de piedra, sillarejos y/o ladrillo, de pobre factura en general, necesitados de estabilizaciones puntua- les, retacados, retirada de enfoscados de cemento y los de cal en mal estado, limpieza de juntas, sopla- do, descarnados y rejuntados según criterios gene- rales de intervención (uso de materiales y formas de actuación), incluyendo la p.p. de protección de bóve- das con lámina de polietileno y la limpieza final, con retirada de escombros a contenedor, medida la su- perficie realmente ejecutada compensando medición según criterio de la Dirección Facultativa e igualmen- te deduciendo la parte de muro intervenida en la pre- paración de muros para apoyo de durmientes (hasta un máximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cubiertas así co- mo la parte correspondiente al desmontaje de con- trafuertes y cornisas de la Panda Sur, todo con me- dios auxiliares y costes indirectos. Los muros de fá- brica de silleria o en mejor estado se medirán según partida independiente. O01OA010 h. Encargado 0,050 21,50 1,08 O01OB070 h. Oficial cantero 0,100 18,00 1,80 O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA060 h. Peón especializado 0,150 16,20 2,43 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,015 71,27 1,07 P01SM230 m3 Bloque piedra arenisca CR sin escuadrar 0,009 480,25 4,32 E002mur07 m2 PICADO DE ENFOSCADOS 0,100 7,51 0,75 E002mur06 m2 PICADO DE RELLENOS 0,250 8,46 2,12 E03fab03a m2 DESCARNADO DE JUNTAS SILLERIA 0,100 9,77 0,98 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 0,150 13,36 2,00 E04rest4 m2 RETACADO DE FÁBRICAS CON MORTERO DE 0,350 17,55 6,14 CAL E05enf2 m2 ENFOSCADO MORTERO DE CAL 1 CAPA 0,100 15,18 1,52 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 M03HH090 h. Batidera mecánica 0,890 0,66 0,59 %medaux % Medios auxiliares 0,030 27,59 0,83 %costind % Costes indirectos 0,020 28,42 0,57 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 28,99 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 28,99 VEINTIOCHO EUROS CON NOVENTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.22 E002mur06 m2 Picado de rellenos y retacados enfoscados con ce- mento y/o cal en trabajos de restauración de para- mentos, incluso retirada de los tejones, ladrillos y ele- mentos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios au- xiliares y costes indirectos. Medida en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 8,05 0,24 %costind % Costes indirectos 0,020 8,29 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,46 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,46

Page 154: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

OCHO EUROS CON CUARENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.23 E002mur07 m2 Picado de enfoscados de cemento y/o cal en traba- jos de restauración de paramentos, por medios ma- nuales con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en ver- dadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,250 18,00 4,50 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 7,15 0,21 %costind % Costes indirectos 0,020 7,36 0,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 7,51 SIETE EUROS CON CINCUENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.24 E002cub03 m2 Formación de tablero de cubierta a base de piezas de hormgión prefabricado autoportantes, incluso re- lleno de juntas en encuentros para regularización del tablero, empleando placas tipo "Prephor" 100/50, 100/33, recibidas con mortero de cemento y/o pasta de yeso negro s/RY-85 y recomendaciones del fabri- cante, adaptándose a medidas de tabicones, incluso remates, dejando lista para colocación de placa BTU, con p.p. de pequeño material de agarre y fija- ción, medios auxiliares y costes indirectos. Medida la unidad en proyección horizontal y/o s/criterio D.F. en base a trabajos realizados. En caso de una posible reutilización de placas, una vez comprobado su esta- do, se descontará un 25% sobre medición de obra ejecutada. O01OA030 h. Oficial primera 0,200 17,62 3,52 O01OA070 h. Peón ordinario 0,200 14,50 2,90 A01A030 m3 PASTA DE YESO NEGRO 0,010 96,53 0,97 P01UC040 kg Puntas 21x110 0,050 7,30 0,37 P002placa01 m2 Placa cubierta hormig. pref. "Prephor" o simi 1,170 4,40 5,15 %medaux % Medios auxiliares 0,030 12,91 0,39 %costind % Costes indirectos 0,020 13,30 0,27 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,57 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,57 TRECE EUROS CON CINCUENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.25 E002cub04 m2 Tarima machihembrada de pino Norte de 23 mm. de espesor, seleccionada y tratada en lugar de origen en su caso, i/p.p. replanteo, nivelación, acuñados, recibidos, clavado, acuchillado, lijado y si hace falta cajeados en piedra según detalle, incluso tratamien- to con dos manos de Xylamon fondo en todas las caras y cortes y otras dos de "Xylamón roble mate" en sus caras vistas o accesibles, s/NTE-RSR-13, memoria, planos e indicaciones de la D.F., medida en proyección horizontal,, con p.p. de accesorios, medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA070 h. Peón ordinario 0,250 14,50 3,63 P08MT033 m2 Tarima Pino Norte e=23 mm. tratada taller 1,050 11,05 11,60 P08MA060 ud Mat. auxiliar colocación tarima 1,000 2,37 2,37

Page 155: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01Xyla01 l Xylamon fondo env. 20 litros 0,100 6,10 0,61 P01Xylad01 l. Xyladecor roble mate env. 20 litros 0,150 6,50 0,98 P25WW180 m. Lija 0,200 0,72 0,14 %costind % Costes indirectos 0,020 23,74 0,47 %medaux % Medios auxiliares 0,030 24,21 0,73 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 24,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 24,94 VEINTICUATRO EUROS CON NOVENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.26 E002cub5.1 m2 Capa de regularización de faldón de cubierta para asegurar tanto la alienación como el planeamiento adecuado del mismo, teniendo en cuenta se va a co- locar directamente fijada una placa BTU, según par- tida correspondiente, incluyendo la formación de en- cuentros y remates necesarios, teniendo en cuenta el estado del faldón sur actual que cubre la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, con p.p. de medios auxiliares, costes indirectos y reti- rada de escombros a camión para transporte a ver- tedero. O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA070 h. Peón ordinario 0,150 14,50 2,18 A02A080 m3 MORTERO CEMENTO M-5 0,004 69,70 0,28 %medaux % Medios auxiliares 0,030 5,10 0,15 %costind % Costes indirectos 0,050 5,25 0,26 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 5,51 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 5,51 CINCO EUROS CON CINCUENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.27 E002cub05 m2 Suministro, colocación y remates de cubierta a base de placa tipo BTU "Euronit" 230 normal o maxi, fija- da sobre faldón de cubierta previamente raseado y alineado, incluso elementos de fijación a base de tor- nillos de anclaje con arandela expansiva, con p.p. de solapes, encuentros, protección de limas, etc. limpie- za final y p.p. de medios auxiliares y costes indirec- tos. O01OA030 h. Oficial primera 0,150 17,62 2,64 O01OA050 h. Ayudante 0,150 16,06 2,41 P02placa02 m2 Placa BTU "Euronit" 230 o similar 1,050 9,85 10,34 P02placa03 ud Accesorios fijación placa BTU/m2 1,500 0,37 0,56 %medaux % Medios auxiliares 0,030 15,95 0,48 %costind % Costes indirectos 0,050 16,43 0,82 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 17,25 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 17,25 DIECISIETE EUROS CON VEINTICINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.28 E002cub06 m2 Suministro y colocación de CHAPA NERVADA DE ACERO GALVANIZADO perfil tipo "PL 33/07" de "Acelor Mittal" o similar con tirafondos con arandelas de goma sobre las crestas, autoportante, para luces de 100 cm., galvanizado por ambas caras, colocada sobre LÁMÍNA GEOTEXTIL y esta sobre la tarima de madera y clavada a correas, y vertido de CAPA DE "MORTERO DE "ARLITA" -mortero ligero de ar- cilla expandida y cemento- de 4-5 cm. de espesor (cubriendo totalmente la onda y con remate en bor-

Page 156: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

de según planos a base de mortero teñido y aditiva- do con Primal), armada con MALLA DE SIMPLE TORSIÓN GALVANIZADA 50/50/1mm. sujeta a la chapa en la cabeza de los tirafondos, i/p.p. de geo- textil evitando contactos de materiales incompatibles, lámina anti-impacto, aislamiento, solapes, accesorios de fijación, juntas de estanqueidad, piezas de rema- te, incluidas las de formación de limas a base de ele- mento especial adaptable y estanco (ref. "Uraterm" o similar). Todo includio y p.p. de medios auxiliares y costes indirectos, s/NTE-QTG-7, medida en proyec- ción horizontal.' O01OA030 h. Oficial primera 0,350 17,62 6,17 O01OA070 h. Peón ordinario 0,350 14,50 5,08 A03S020 m3 HGÓN.AISLANTE ARLITA HL-20 0,042 101,05 4,24 P02chap01 m2 Chapa galv. "PL33/07" Acelor Mittal o similar 1,120 5,75 6,44 P03MALst m2 Malla triple torsión acero galvanizado 1,050 1,52 1,60 P03lam01 m2 Geotextil o capa separadora imperb Madilit o 1,050 1,75 1,84 P01CC045 Tm. Cemento CEM II/A-L 42,5 sacos 0,002 91,95 0,18 P01AA020 m3 Arena de río 0/6 mm. 0,001 16,80 0,02 P01AL020 m3 Arcilla exp.Arlita F-3 (3-8 mm) sacos 0,022 68,40 1,50 P01DW050 m3 Agua 0,100 0,80 0,08 P07AL100 m2 Lámina acústica Impactodan 3 mm. 1,000 0,75 0,75 P07TX360 m2 Poliestireno extruido e=2 cm. 0,050 3,60 0,18 P05CP050 m2 Chapa de plomo de 2,50 mm. elaborada 0,050 34,35 1,72 P05CP210 ud Grapa para alero de plomo 0,500 0,43 0,22 P03REMlim m. Remate especial limas sist. "uralita" o simil 0,085 3,80 0,32 M03HH070 h. Hormigonera 250 l. eléctrica 0,100 1,92 0,19 %medaux % Medios auxiliares 0,030 30,53 0,92 %costind % Costes indirectos 0,020 31,45 0,63 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 32,08 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 32,08 TREINTA Y DOS EUROS CON OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.29 E002cub07 m2 Cubricción de cubierta sobre placa tipo "BTU Euronit", a base de teja cerámica curva nueva en ca- nales (excepto en remates vistos), a elegir por la di- rección facultativa, y teja curva vieja en cobijas, bien recuperada apilada previa limpieza y selección bien aportando el resto de teja, de carácterísticas, calidad y acabado similar, recibidas con adhesivo mono-componente de espuma de poliuretano en el lateral de las canales, MACIZANDO con mortero po- bre bastardo de cal, cemento y arena de rio teñido con pigmentos inorgánicos previa muestra a aprobar por la dirección facultativa (mortero M-20), colocada respetando escrupulosamente alieaciones de tejas en vertical perpendiculares a canal de desague y en horizontal, macizando según criterio indicado en me- moria, generando pasos de mantenimiento y o prote- giendo las zonas que reciban aguas de cubierta su- perior, incluso formación de cumbreras, limatesas, li- mahoyas y otros encuentros, ganchos de sujección, encuentros, emboquillados y remate que evite entra- da de pájaros y otros animales, remate con lucerna- rio y elementos salientes, ventilaciones y remate de borde, todo incluido con LIMPIEZA FINAL tanto de la cubierta con cepillo y agua, como de los elemen- tos afectados, y p.p. de medios auxiliares y costes in- directos, con carga de escombros a contenedor. Medida la unidad en proyección horizontal y/o según criterio D.F.' O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25

Page 157: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P05TC030 ud Teja curva vieja paletizada y en obra 10,000 0,21 2,10 P05TC031 ud Seleccionado y limp. teja vieja recuperada 8,000 0,05 0,40 P05TC010 ud Teja curva nueva s/d.f. 16,000 0,20 3,20 P05espum1 ud Bote espuma poliuretano 0,580 4,78 2,77 P05CP050 m2 Chapa de plomo de 2,50 mm. elaborada 0,150 34,35 5,15 P02sikalite kg. Super Sikalite o similar 0,001 7,20 0,01 %costind % Costes indirectos 0,015 29,69 0,45 %medaux % Medios auxiliares 0,030 30,14 0,90 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 31,04 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 31,04 TREINTA Y UN EUROS CON CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.30 E002cub08 m2 Cubricción de cubierta sobre capa de mortero alige- rado, a base de teja cerámica curva nueva en cana- les, a elegir por la dirección facultativa, y teja curva vieja recuperada apilada previa limpieza y selección aportando teja de carácterísticas, calidad y acabado similar según necesidades, recibidas con mortero pobre bastardo de cal, cemento y arena de rio teñido con pigmentos inorgánicos previa muestra a aprobar por la dirección facultativa (mortero M-20), colocada respetando escrupulosamente alieaciones de tejas en vertical perpendiculares a canal de desague y en horizontal mediante el tirado de cuerdas, macizando según se indica en memoria (como creiterio general macizando dos hiladas si y cuatro no en vertical, tres horizontales junto a los muros a parte del encostilla- do, otras dos junto el canalón y las hiladas interme- dias horizontales para que nunca queden más de 6 sin macizar, asi como zonas de paso a lucernarios, o zonas que reciban aguas de cubierta superior, y p.p. de macizado en los encuentros con los muros, con mortero de cal impermeabilizado con la adicción "Super Sikalite" o similar, incluso formación de cum- breras, limatesas, limahoyas y otros encuentros, ganchos de sujección, encuentros, emboquillados y remate que evite entrada de pájaros y otros anima- les, remate con lucernario y elementos salientes, ventilaciones y remate de borde, todo incluido con LIMPIEZA FINAL tanto de la cubierta con cepillo y agua, como de los elementos afectados, y p.p. de medios auxiliares y costes indirectos, con carga de escombro a contenedor. Medida la unidad en pro- yección horizontal y/o según criterio D.F.' O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,020 77,48 1,55 P05TC030 ud Teja curva vieja paletizada y en obra 10,000 0,21 2,10 P05TC031 ud Seleccionado y limp. teja vieja recuperada 8,000 0,05 0,40 P05TC010 ud Teja curva nueva s/d.f. 16,000 0,20 3,20 P02sikalite kg. Super Sikalite o similar 0,001 7,20 0,01 %medaux % Medios auxiliares 0,030 23,32 0,70 %costind % Costes indirectos 0,015 24,02 0,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 24,38 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 24,38 VEINTICUATRO EUROS CON TREINTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.31 E002cob01 m. Fabricación, suministro y montaje de canalón de co- bre "1/4 duro" de 0,8 mm. de espesor de chapa y díametro 125 mm., con p.p. de gatos de fijación a base de gatos de cobre "1/2 duro" de pletina 3/30

Page 158: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

mm. colacados cada 50 cm. entre ejes y siempre uno a cada lado de las gárgolas, anclados a la fábri- ca con dos tirafondos de acero inoxidable 5/50 con taco de plástico, previa preparación de soporte, con p.p. de recibidos, soldaduras, conexiones, orificios para montaje de gárgolas, tapas, y conexiones con limas de cubierta y adaptación en encuentros con pi- náculos, sellados, etc. con p.p. de medios auxiliares y costes indirectos. O01OB140 h. Ayudante cerrajero 0,500 16,23 8,12 O01OA050 h. Ayudante 0,500 16,06 8,03 P02cob01 ud Gato cobre pletina 30/3 mm. 2,000 8,25 16,50 P02cob02 m. Canalón cobre 125 "1/2 duro" e=8 mm. 1,010 32,58 32,91 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 4,500 0,05 0,23 %medaux % Medios auxiliares 0,020 65,79 1,32 %costind % Costes indirectos 0,050 67,11 3,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 70,47 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 70,47 SETENTA EUROS CON CUARENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.32 E002cob02 ud Fabricación, suministro y colocación de gárgola de cobre incluso soporte de fijación, todo según detalle, con tubo de cobre idem canalón, y soporte formado por angular de cobre "1/2 duro" de 2 mm. de espe- sor , con base superior de 12x15 cm., y faldón verti- cal de 12x6 cm., con taladros para recibido mediante tirafondos de acero inoxidable 5/50 y tacos plasticos, y formación de angular en bucle para sujección de pletina 2/20, costillas de cobre 4/2 mm., envolvente de 0,8 mm , remates, conexiones con canalón y con limas de plomo, sellados, etc. todo según detalle constructivo e indicaciones de la d.f, incluso trata- miento y protección del cobre en su caso, prepara- ción del soporte y colocación de elementos auxilia- res, todo según memoria, planos e indicaciones de la D.F., con p.p. de medios auxiliares y costes indi- rectos. O01OB140 h. Ayudante cerrajero 0,850 16,23 13,80 O01OA050 h. Ayudante 0,850 16,06 13,65 P02cob3 ud Soporte gárgola s/detalle 1,000 76,26 76,26 P02cob4 ud Gárgola cobre s/detalle y memoria 1,000 89,07 89,07 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 6,000 0,05 0,30 %medaux % Medios auxiliares 0,020 193,08 3,86 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 196,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 196,94 CIENTO NOVENTA Y SEIS EUROS CON NOVENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.33 E002cob03 m2 Formación de babero y/o remate de cubierta en en- cuentro faldón-canalón, con formación de pestaña y entrega sobre canalón perfectamente alineada, em- pleando bandejas de cobre "1/2 duro" de 8 mm. de espesor, incluso cortes y taladros, fijado a la fábrica con dos tirafondos de acero inoxidable y tacos de material plástico, cada 50 cm., solapes y sellados, según memoria y planos, Medida la superficie en proyección, con p.p. de formación de pestaña y re- mates, limpieza, medios auxiliares y costes indirec- tos. O01OB140 h. Ayudante cerrajero 0,650 16,23 10,55

Page 159: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA050 h. Ayudante 0,650 16,06 10,44 P05CC090 ud Chapa cobre 2,00x0,67mx0,80mm "1/2" 0,600 65,50 39,30 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 6,000 0,05 0,30 %medaux % Medios auxiliares 0,030 60,59 1,82 %costind % Costes indirectos 0,020 62,41 1,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 63,66 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 63,66 SESENTA Y TRES EUROS CON SESENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.34 E002lev09 m2 Retirada de capa de tierra de apoyo de teja en cu- bierta de Claustro de la Catedral de Ciudad Rodrigo, con retirada de escombro a contenedor o zona de acopio de esombros, con p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. O01OA060 h. Peón especializado 0,080 16,20 1,30 %costind % Costes indirectos 0,020 1,30 0,03 %medaux % Medios auxiliares 0,030 1,33 0,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1,37 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1,37 UN EURO CON TREINTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.35 E002lev10 m2 Retirada de la lámina asfáltica colocada en las cu- biertas del Claustro de la Catedral de Ciudad Rodri- go, con acopio en contenedor adecuado para su gestión, inc. p.p. de medios auxiliares y costes indi- rectos. Medida la superficie en proyección horizontal'. O01OA070 h. Peón ordinario 0,250 14,50 3,63 %medaux % Medios auxiliares 0,030 3,63 0,11 %costind % Costes indirectos 0,020 3,74 0,07 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3,81 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3,81 TRES EUROS CON OCHENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.36 E002lev11 m. Retirada de canalón y gárgolas existentes, con carga a contenedor o hasta zona de acopio de escombros, para su gestión, con p.p. de medios auxiliares y cos- tes indirectos. O01OA060 h. Peón especializado 0,150 16,20 2,43 O01OA070 h. Peón ordinario 0,050 14,50 0,73 %medaux % Medios auxiliares 0,030 3,16 0,09 %costind % Costes indirectos 0,020 3,25 0,07 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 3,32 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 3,32 TRES EUROS CON TREINTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.37 E002lev12 m2 Demolición de tabique de tabiques a la palormera en formación de cubierta, a base de ladrillo "HUECO BILBAO", con carga a contenedor o hasta zona de acopio de escombros, para su gestión, con p.p. de medios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal'. O01OA010 h. Encargado 0,001 21,50 0,02 O01OA030 h. Oficial primera 0,350 17,62 6,17

Page 160: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA060 h. Peón especializado 0,350 16,20 5,67 %medaux % Medios auxiliares 0,030 11,86 0,36 %costind % Costes indirectos 0,020 12,22 0,24 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 12,46 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 12,46 DOCE EUROS CON CUARENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.38 E002lev13 m3 Partida en previsión para la retirada de los posibles zunchos de hormigón existentes según intervencio- nes relativamente recientes, previa consideración, evaluación y autorización de la D.F. especialmente en los casos en que su posicionamiento interfiera en la cubierta proyectada, o bien por su inadecuado es- tado, funcionalidad, etc, procediendose en cualquier caso al picado cuidadoso con martillos de poca po- tencia, procurando previamente la desolidarización con las fábricas que los acojen en la medida de lo posible, evitando vibracciones, con p.p. de retirada de esombros a contendero, medios auxiliares y cos- tes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OA030 h. Oficial primera 2,500 17,62 44,05 O01OA070 h. Peón ordinario 2,500 14,50 36,25 M06MI020 h. Martillo manual picador eléctrico 11kg 2,500 3,01 7,53 %medaux % Medios auxiliares 0,030 89,98 2,70 %costind % Costes indirectos 0,020 92,68 1,85 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 94,53 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 94,53 NOVENTA Y CUATRO EUROS CON CINCUENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.39 E002mur02 ud Formación de mechinal en fábrica maciza de piedra arenisca de Ciudad Rodrigo, para apoyo de elemen- tos estructurales proyectados, dejando previsto el apoyo mediante cama de mortero de cal a nivel, y lá- mina de neopreno de 1 cm. regularizando el hueco que será de al menos 25 cm. de ancho, O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,200 18,00 21,60 O01OA060 h. Peón especializado 1,200 16,20 19,44 %costind % Costes indirectos 0,020 43,19 0,86 %medaux % Medios auxiliares 0,030 44,05 1,32 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 45,37 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 45,37 CUARENTA Y CINCO EUROS CON TREINTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.40 E002mur03 m. Preparación de muros para apoyo de durmiente, a base de cajeado de muro existente, y/o recrecidos, según casos dejando formada una cama de asiento con mortero de cal incluyendo como p.p. los relle- nos, retacados y/o refuerzos necesarios que asegu- ren su estabilidad, empleando piedra arenisca y/o la- drillo de tejar o el recuperado si la D.F. lo estimada, así como preparación de la coronación de muros pa- ra el asiento en su caso de la tabla o chapa de pro- tección a base retacados de mortero de cal, em- pleando mortero de cal y arena, perfectamente nive- lada para asiento de durmientes de madera, con p.p.

Page 161: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,500 18,00 27,00 O01OA060 h. Peón especializado 1,500 16,20 24,30 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,050 111,68 5,58 P01SM230 m3 Bloque piedra arenisca CR sin escuadrar 0,005 480,25 2,40 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 1,300 2,20 2,86 P01CL030 t. Cal hidratada en sacos S 0,002 155,00 0,31 P01DW210 kg Pigmentos de tierra natural 0,070 2,50 0,18 P01DW050 m3 Agua 0,025 0,80 0,02 M11W010 h. Equipo chorro aire presión 0,250 2,95 0,74 M03HH090 h. Batidera mecánica 0,890 0,66 0,59 %medaux % Medios auxiliares 0,030 66,13 1,98 %costind % Costes indirectos 0,020 68,11 1,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 69,47 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 69,47 SESENTA Y NUEVE EUROS CON CUARENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.41 E002mad01 m3 Fabricación, suministro, colocación, tratamiento pre- vio y acabado de durmientes de madera de ROBLE FRANCES -ME1- de escuadría 24x20 cm. con en- cuentros entre durmientes a media madera y ancla- jes de los durmientes a muros mediante varillas de acero inoxidable de 20 mm. de díametro recibidas con "Sikadur 42" o similar en orificios de 30 mm. de díametro realizados por rotación con una entrega a fábrica mínima de 50 cm. situados cada 1,50 metros - ó según planos e indicaciones de la D.F.- y al tres- bolillo, con doble tuerca superior y arandela, todo en acero inoxidable, incluyendo replanteo, preparación, tacos especiales para unión entre piezas, cortes, re- bajes, encuentros, empalmes y obra necesaria, cepi- llado y lijado previo de la madera y tratamiento en ta- ller, presentación, asiento, montaje total y tratamien- to en obra en todas las caras y cortes con dos ma- nos de "Xylamon fondo" o similar todo con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,150 21,50 3,23 O01OA030 h. Oficial primera 1,000 17,62 17,62 O01OB150 h. Oficial 1ª carpintero 10,000 14,58 145,80 O01OB160 h. Ayudante carpintero 10,000 13,70 137,00 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,080 111,68 8,93 P01EMadrobl m3 Madera de roble seca durmientes cl. ME-1 1,050 1.125,32 1.181,59 P01EMaderaut m3 Tratamiento autoclave Vac-Vac riesgo 3 1,050 156,21 164,02 P01EW621 ud Material anclaje durmiente 10,000 25,23 252,30 P01Xylamon l. 750 cm3 Xylamon fondo o similar 3,150 7,70 24,26 P25WW220 ud Pequeño material 15,000 0,79 11,85 U02OD115 H. Grúa autopropuls.50Tm./50m. 1,000 79,00 79,00 %medaux % Medios auxiliares 0,030 2.025,60 60,77 %costind % Costes indirectos 0,020 2.086,37 41,73 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 2.128,10 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 2.128,10 DOS MIL CIENTO VEINTIOCHO EUROS CON DIEZ CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.42 E002mad02 m3 Fabricación suministro y montaje de madera lamina- da tipo GL24, de Picea Abies, según memoria y pla- nos, en formación de PARES y similares, incluso p.p. de herrajes de acero con su tornillería y acceso- rios de ensamblaje, así como cuñas y otros elemen-

Page 162: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tos necesarios, todo según planos, replanteo, cortes, tratamiento previo de la madera y acabado protector en obra en todas sus caras y cortes con dos manos de Xyladecor roble mate, totalmente colocada y re- matada, con p.p. cajeados puntuales necesararios y/o apoyos en fábrica, sean de piedra o ladrillo, inclu- so interposición de elementos separadores o for- mando juntas de trabajo, limpieza, con p.p. de me- dios auxiliares y costes indirectos. Medido en obra según criterio D.F. Según norma DIN 1052, asegu- rando una estabilidad mínima al fuego s/CTE. O01OA010 h. Encargado 1,000 21,50 21,50 O01OB150 h. Oficial 1ª carpintero 5,200 14,58 75,82 O01OB160 h. Ayudante carpintero 5,200 13,70 71,24 P01EW630 m3 Madera laminada GL24c Picea Abies vacsolizada 1,150 925,52 1.064,35 P01EW620 ud Material de ensamble estructural s/planos 1,000 85,00 85,00 U07DA032 ud Conjunto herrajes limas, vigas, etc mad.lamin 6,000 39,50 237,00 U02OD115 H. Grúa autopropuls.50Tm./50m. 0,800 79,00 63,20 P01Xylamon l. 750 cm3 Xylamon fondo o similar 0,950 7,70 7,32 P01lasur1 l. Envase 750 cm3 "Xyladecor Sol" mate o similar 1,500 10,50 15,75 %medaux % Medios auxiliares 0,030 1.641,18 49,24 %costind % Costes indirectos 0,020 1.690,42 33,81 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.724,23 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.724,23 MIL SETECIENTOS VEINTICUATRO EUROS CON VEINTITRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.43 E002mad03 m3 Fabricación suministro y montaje de madera lamina- da tipo GL24c, de Picea Abies, según memoria y planos, en formación de CORREAS y similares, co- locadas sin herrajes, en hendiduras, salvo puntual- mente bajo aprobación de la D.F. siendo en tal caso de acero con su tornillería y accesorios de ensam- blaje, así como cuñas y otros elementos necesarios, todo según planos, replanteo, cortes, tratamiento previo de la madera y acabado protector en obra en todas sus caras y cortes con dos manos de Xylade- cor roble mate, totalmente colocada y rematada, con p.p. cajeados puntuales necesararios y/o apoyos en fábrica, sean de piedra o ladrillo hueco (por ejem. en apoyo junto contrafuerte antigua Capilla de los Hie- rros y en formación de limas con faldón panda sur) limpieza, con p.p. de medios auxiliares y costes indi- rectos. Según norma DIN 1052, asegurando una es- tabilidad mínima al fuego s/CTE. Medida en verdade- ra magnitud. O01OA010 h. Encargado 0,850 21,50 18,28 O01OB150 h. Oficial 1ª carpintero 6,250 14,58 91,13 O01OB160 h. Ayudante carpintero 6,150 13,70 84,26 P01EW630 m3 Madera laminada GL24c Picea Abies vacsolizada 1,250 925,52 1.156,90 P01EW620 ud Material de ensamble estructural s/planos 1,000 85,00 85,00 P01herr1 ud Material auxiliar correas 1,000 15,50 15,50 P01Xylamon l. 750 cm3 Xylamon fondo o similar 0,950 7,70 7,32 P01lasur1 l. Envase 750 cm3 "Xyladecor Sol" mate o similar 1,500 10,50 15,75 %medaux % Medios auxiliares 0,030 1.474,14 44,22 %costind % Costes indirectos 0,020 1.518,36 30,37 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.548,73 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.548,73 MIL QUINIENTOS CUARENTA Y OCHO EUROS CON SETENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.44 E002mad04 m2 Formación de estructura reticular sobre bóvedas, en

Page 163: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

previsión, asegurando la separación mínima de 5 cm. entre pares, correas y extradós de bóvedas, em- pleando correas calzadas sobre la fábrica y arriostra- das con piezas de madera 10/9, completamente se- paradas de los pares, empleando madera laminada idem anterior en características, calidad y acabado. Medios auxiliares y costes indirectos incluidos. Medi- da en proyeccion horizontal, incluyendo tabla. O01OA010 h. Encargado 0,020 21,50 0,43 O01OB150 h. Oficial 1ª carpintero 0,750 14,58 10,94 O01OB160 h. Ayudante carpintero 0,300 13,70 4,11 P01mad01 m2 Estruc. Reticular s/bóvedas c/tratm y acabado 1,020 13,20 13,46 %medaux % Medios auxiliares 0,050 28,94 1,45 %costind % Costes indirectos 0,020 30,39 0,61 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 31,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 31,00 TREINTA Y UN Euros .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.45 E002plom03 m. Formación de BABERO DE PLOMO ENGATILLA- DO PB-2 certificado, de 2,5 mm. de espesor y 50 cm. de desarrollo, en formación de ENCUENTRO CUBIERTA-MURO de piedra, incluyendo el replan- teo, ejecución de roza perfectamente alineada sobre fábrica del muro, formación de cama y adaptación al encostillado de teja realizado, recibido a roza con pestaña en extremo y sellado con "Sikaflex Pro 2 HP" o similar, de color gris o, p.p. de costes indirec- tos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,150 18,00 2,70 O01OB170 h. Oficial 1ª fontanero 0,500 18,24 9,12 O01OB195 h. Ayudante fontanero 0,500 16,38 8,19 A01A030 m3 PASTA DE YESO NEGRO 0,015 96,53 1,45 A01A040 m3 PASTA DE YESO BLANCO 0,005 114,03 0,57 P01plom1 m2 Lámina de plomo 2,5 mm. PB-2 0,500 72,50 36,25 P01sk2 ud Masilla sellado "Sikaflex PRO 2 HP" o similar 0,200 5,50 1,10 P01SikaPlan12G m2 Lámina PVC 1,2 SikaPlan12G o similar 20x2 0,500 4,85 2,43 %medaux % Medios auxiliares 0,030 62,03 1,86 %costind % Costes indirectos 0,020 63,89 1,28 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 65,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 65,17 SESENTA Y CINCO EUROS CON DIECISIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.46 E002plom04 m. Formación de LIMAHOYA o similares, de PLOMO ENGATILLADO PB-2 certificado, de 2,5 mm. de es- pesor y 90 cm. de desarrollo, con p.p. de pestañas y engatilldos, en formación de ENCUENTRO entre FALDONES DE CUBIERTA, incluyendo la forma- ción de una CAMA DE YESO sobre el soporte, in- cluyendo el replanteo, y sellados puntuales en en- cuentros con "Sikaflex Pro 2 HP" o similar, de color gris o, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desperdicios a contenedor especial. Me- dida en proyección horizontal. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB170 h. Oficial 1ª fontanero 0,800 18,24 14,59

Page 164: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OB195 h. Ayudante fontanero 0,800 16,38 13,10 P01plom1 m2 Lámina de plomo 2,5 mm. PB-2 0,930 72,50 67,43 P01sk2 ud Masilla sellado "Sikaflex PRO 2 HP" o similar 0,200 5,50 1,10 P01SikaPlan12G m2 Lámina PVC 1,2 SikaPlan12G o similar 20x2 0,500 4,85 2,43 A01A030 m3 PASTA DE YESO NEGRO 0,015 96,53 1,45 A01A040 m3 PASTA DE YESO BLANCO 0,005 114,03 0,57 %costind % Costes indirectos 0,020 100,89 2,02 %medaux % Medios auxiliares 0,030 102,91 3,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 106,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 106,00 CIENTO SEIS Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.47 E002pcf01 ud Suministro y colocación de extintor de eficacia 21A, a colocar en zona bajo cubierta de Nave del Evange- lio, en las proximidades de los lucernacios de acce- so, incluyendo p.p. de accesos de cuelgue y fijación, con p.p. de costes indirectos y medios auxiliares. O01OA010 h. Encargado 0,300 21,50 6,45 O01OA030 h. Oficial primera 0,500 17,62 8,81 P01ext1 ud Extintor eficacia 21A 1,000 65,50 65,50 %costind % Costes indirectos 0,020 80,76 1,62 %medaux % Medios auxiliares 0,030 82,38 2,47 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 84,85 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 84,85 OCHENTA Y CUATRO EUROS CON OCHENTA Y CINCO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.48 E002cub10 ud Colocación de lucernario de fundición en faldón de cubierta, incluyendo recrecido en chapa perforada de 2 mm. de espesor y 5 mm. el díametro de las per- foraciones para ventilación continua según modelo empleado en anteriores intervenciones, incluyendo la preparación, tratamiento y colocación del lucernario, con p.p. de material auxilar, medios auxiliares y cos- tes indirectos. Segun detalle de proyecto. O01OA030 h. Oficial primera 1,250 17,62 22,03 O01OA070 h. Peón ordinario 1,000 14,50 14,50 P02lucer01 ud Lucernario fundición adaptado s/diseño 1,000 180,50 180,50 %medaux % Medios auxiliares 0,030 217,03 6,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 223,54 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 223,54 DOSCIENTOS VEINTITRES EUROS CON CINCUENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

03.49 E002mur04 ud Cegado del óculo del trasdós de la fachada de la Ca- pilla de San Jerónimo, con fábrica de ladrillo recupe- rado y mortero de cal, incluso p.p. de medios auxilia- res y costes indirectos, con limpieza final y retirada de escombros a contenedor. O01OA030 h. Oficial primera 1,200 17,62 21,14 O01OA070 h. Peón ordinario 1,200 14,50 17,40 A02M030 m3 MORT.BAST.CAL 1/1/4 CEM BL-II 42,5R 0,300 98,13 29,44 %costind % Costes indirectos 0,020 67,98 1,36 %medaux % Medios auxiliares 0,030 69,34 2,08 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 71,42 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 71,42 SETENTA Y UN EUROS CON CUARENTA Y DOS

Page 165: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

CENTIMOS

Page 166: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

04 UNIDAD III:FACHADA ESTE .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.01 E002prot01 m2 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consis- tente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plásti- ca, vertido de cama de arena seca de regulización y coloción de tablero aglomerado de 30 mm. de espe- sor, incluso p.p. de otras protecciones, accesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 1,070 0,25 0,27 P01prot03 m. Cinta adhesiva láminas polietileno 0,500 0,15 0,08 P01aren01 m3 Arena de rio seca protección pav. 0,022 17,85 0,39 P01prot02 m2 Tablero aglomerado 30 mm. protección pav. 1,050 3,50 3,68 %medaux % Medios auxiliares 0,030 7,80 0,23 %costind % Costes indirectos 0,020 8,03 0,16 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,19 OCHO EUROS CON DIECINUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.02 E03lev01 ud Retirada de aquellos elementos ajenos a la fábrica, tales como soporte de antiguas instalaciones, ca- bleados, grapas, clavos, etc. previa indicación y aprobación expresa por parte de la D.F., con p.p. de reterida y acopio para gestión de residuos, medios auxiliares y costes indirectos. En intervención de la FACHADA ESTE del CLAUSTRO DE LA CATE- DRAL DE CIUDAD RODRIGO. O01OA010 h. Encargado 0,100 21,50 2,15 O01OA030 h. Oficial primera 4,000 17,62 70,48 O01OA060 h. Peón especializado 3,000 16,20 48,60 %medaux % Medios auxiliares 0,030 121,23 3,64 %costind % Costes indirectos 0,020 124,87 2,50 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 127,37 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 127,37 CIENTO VEINTISIETE EUROS CON TREINTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.03 E002mur06 m2 Picado de rellenos y retacados enfoscados con ce- mento y/o cal en trabajos de restauración de para- mentos, incluso retirada de los tejones, ladrillos y ele- mentos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios au- xiliares y costes indirectos. Medida en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 8,05 0,24 %costind % Costes indirectos 0,020 8,29 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,46 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,46 OCHO EUROS CON CUARENTA Y SEIS

Page 167: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.04 E003mur01 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE ZÓ- CALOS DE PIEDRA, de fábricas de sillería, de es- cuadria adaptada a las hiladas y para un fondo míni- mo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), cajeados, re- tirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y an- claje en su caso con varillas de acero inoxidable o fi- bra de vidrio, y mortero de cal aditivado según condi- ciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización me- diane tres manos de "Sikaguard 710" o similar apli- cadas "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 0,850 18,00 15,30 O01OA060 h. Peón especializado 1,000 16,20 16,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 1,050 195,35 205,12 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 252,40 7,57 %costind % Costes indirectos 0,020 259,97 5,20 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 265,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 265,17 DOSCIENTOS SESENTA Y CINCO EUROS CON DIECISIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.05 E003mur02 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE FA- BRICAS DE SILLERÍA, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábri- ca, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajea- dos, retirada de fábricas ajenas o rellenos, prepara- ción de piedras y soporte, cortes, presentación, for- mación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxi- dable o fibra de vidrio, y mortero de cal aditivado se- gún condiciones a establecer en obra por D.F., acor- des a los criterios generales de intervención, inclu- yendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabili- zación mediane tres manos de "Sikaguard 710" o si- milar aplicadas "humedo sobre húmedo" hasta satu- ración y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares.

Page 168: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,250 18,00 22,50 O01OA060 h. Peón especializado 0,900 16,20 14,58 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 1,050 195,35 205,12 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 258,05 7,74 %costind % Costes indirectos 0,020 265,79 5,32 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 271,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 271,11 DOSCIENTOS SETENTA Y UN EUROS CON ONCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.06 E003mur03 m3 Sustitución de fábricas talladas en piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE FABRICAS TALLADAS, tipo 1 (BOTAAGUAS, IMPOSTAS , REMATES de la fachada Este Claustro Catedral de Ciudad Rodrigo y similares), de escua- dria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según con- diciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios generales de inter- vención, incluyendo el marcado, patinado y consoli- dación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e im- permeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EF- FECT" de "Tecnan" o similar previa aprobación de la D.F., por medios manuales con p.p. de costes indi- rectos y medios auxiliares. O01OA010 h. Encargado 0,500 21,50 10,75 O01OB070 h. Oficial cantero 7,000 18,00 126,00 O01OA060 h. Peón especializado 6,000 16,20 97,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,200 77,48 15,50 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 1,350 1.015,25 1.370,59 P01var1 m. Varilla roscada acero inox. D=4 a 8 inc. 1,580 3,89 6,15 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var3 m. Varilla vidrio-epoxi D=4 mm 1,500 4,74 7,11 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,750 5,20 3,90 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW050 m3 Agua 0,060 0,80 0,05 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 3,000 10,00 30,00 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M11med1 h. Barrenadora rotación 0,050 14,57 0,73 %medaux % Medios auxiliares 0,030 1.673,14 50,19 %costind % Costes indirectos 0,020 1.723,33 34,47 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.757,80 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.757,80

Page 169: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

MIL SETECIENTOS CINCUENTA Y SIETE EUROS CON OCHENTA CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.07 E003mur04 m3 Sustitución de fábricas talladas en piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE FABRICAS TALLADAS, tipo 2 (para elemento de la CRESTERIA de la fachada Este Claustro Cate- dral de Ciudad Rodrigo y similares), de escuadria y despiece adaptada al elemento existente, incluyendo únicamente los elementos necesarios que garanti- cen la estabilidad, una vez se compruebe a pie de obra el estado real de la fábrica, con tratamientos idem anterior. O01OA010 h. Encargado 0,500 21,50 10,75 O01OB070 h. Oficial cantero 23,000 18,00 414,00 O01OA060 h. Peón especializado 9,000 16,20 145,80 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,200 77,48 15,50 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 1,350 1.015,25 1.370,59 P01DW050 m3 Agua 0,060 0,80 0,05 P01var1 m. Varilla roscada acero inox. D=4 a 8 inc. 3,000 3,89 11,67 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var3 m. Varilla vidrio-epoxi D=4 mm 1,500 4,74 7,11 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,750 5,20 3,90 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 3,000 10,00 30,00 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M11med1 h. Barrenadora rotación 0,050 14,57 0,73 %costind % Costes indirectos 0,020 2.015,26 40,31 %medaux % Medios auxiliares 0,030 2.055,57 61,67 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 2.117,24 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 2.117,24 DOS MIL CIENTO DIECISIETE EUROS CON VEINTICUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.08 E003mur05 m2 Restauración de la crestería de la Fachada Este del Claustro de la Catedral de Ciudad Rodrigo, por to- das sus caras, consistente en asegurar la estabilidad del elemento, recolocando piezas en su caso, o fi- jando las sueltas, (y muy puntualmente, previa apro- bación de la D.F. con posible incorporación de pie- zas nuevas o elementos de piedra arenisca de Ciu- dad Rodrigo), empleando cuñas y varillas de vidrio-epoxi de diferentes diametros y longitudes se- gún necesidades, recibiendolas con cal hidráulica natural NHL 3,5 CE de FYM Italcementi Group hasta colmatación, introduciendo el extremo de la varilla lo suficiente como para rematar la parte vista con mor- tero de rejuntado, CPA "M8"= osimilar, limpiando la superficie con cepillo de cerdas, incluso líquenes, musgos y otras costras, descarnando y rejuntando juntas, consolidando, impermeabilizando y patinan- do, todo en su caso previa autorización de la D.F. y siguiendo los criterios generales de intervención, de- duciendo proporcionalmente los tratamientos no rea- lizados en base a partidas ya incluidas en este pre- supuesto, con p.p. de medios auxiliares y costes in- directos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 0,500 18,00 9,00 O01OA060 h. Peón especializado 0,250 16,20 4,05 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,200 77,48 15,50 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 1,300 2,20 2,86 P01DW210 kg Pigmentos de tierra natural 0,350 2,50 0,88

Page 170: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01DW050 m3 Agua 0,060 0,80 0,05 P01var2 m. Varilla roscada acero inox D=12 mm. 0,300 5,15 1,55 P01var3 m. Varilla vidrio-epoxi D=4 mm 0,800 4,74 3,79 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,500 5,20 2,60 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,500 10,00 5,00 M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 M11med1 h. Barrenadora rotación 0,250 14,57 3,64 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 0,200 13,01 2,60 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,000 8,77 8,77 E03fab03 m2 DESCARNADO y REJUNTADO FÁBRICAS 1,000 23,50 23,50 E03fab04 m2 CONSOLIDACIÓN DE FÁBRICAS 0,750 26,15 19,61 E03fab05 m2 PATINADO DE FÁBRICAS 0,350 8,12 2,84 E03fab06 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 0,500 9,88 4,94 %costind % Costes indirectos 0,020 114,27 2,29 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 116,56 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 116,56 CIENTO DIECISEIS EUROS CON CINCUENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.09 E03fab01 m2 Eliminación de líquenes, musgos y demás costras biogénicas sobre piedra arenisca de Ciudad Rodri- go, en fachadas, contrafuertes, albardillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello peróxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecutivas, dejando actuar al menos 10 días, eliminando los restos con cepillos de cerdas de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, lim- piando de nuevo la superficie transcurrida una sema- na con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, limpieza final , medios auxiliares y costes indirectos. Medida la superficie en proyección vertical por su cara exterior. O01OC160 h. Especialista restaurador 0,300 20,00 6,00 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01per1 l. Peróxido de hidrógeno 0,530 4,55 2,41 P01per2 l. Formaldéhido 3% 0,250 4,20 1,05 P01DW050 m3 Agua 0,100 0,80 0,08 M11W060 h. Equipo pulverizador aerográfico 0,090 4,50 0,41 %medaux % Medios auxiliares 0,030 12,38 0,37 %costind % Costes indirectos 0,020 12,75 0,26 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,01 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,01 TRECE EUROS CON UN CENTIMO .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.10 E03fab02 m2 Limpieza de fábricas de sillería incluso p.p. de ele- mentos labrados que la conforman, contemplados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el pica- do de restos aislados de mortero de cemento o ele- mentos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labra- dos, dejando las superficies acabadas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, impermeabilización etc.) incluso aspi-

Page 171: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

rado y/o soplado. Medida en proyección vertical se- gún planos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxi- liares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 8,35 0,25 %costind % Costes indirectos 0,020 8,60 0,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,77 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,77 OCHO EUROS CON SETENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.11 E03fab03 m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos_ 1,- DESCARNADO de juntas de fábricas de sillería y elementos contemplados en esta intervención, inclu- yendo el picado de las sueltas y/o aquellas que su estado lo recomiende, previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, cuchari- lla, etc-, sin dañar en ningún caso la fábrica a restau- rar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 3,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 4,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 5,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 4% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos y estimando un 30% el des- carnado de juntas y soplado, el 60% a la finalización del rejuntado y el 10% restante a la retirada de los andamios previa autorización por escrito de la D.F. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,800 19,75 15,80 O01OA060 h. Peón especializado 0,100 16,20 1,62 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 4,200 0,75 3,15 P01prim1 l. Primal AC-235 k o similar 0,005 5,95 0,03

Page 172: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01DW210 kg Pigmentos de tierra natural 0,050 2,50 0,13 P01DW050 m3 Agua 0,010 0,80 0,01 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 %costind % Costes indirectos 0,020 22,37 0,45 %medaux % Medios auxiliares 0,030 22,82 0,68 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 23,50 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 23,50 VEINTITRES EUROS CON CINCUENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.12 E03fab04 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posterior- mente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la preparación previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,200 19,75 3,95 O01OA060 h. Peón especializado 0,400 16,20 6,48 P01con1 l. Consolidante Tegovakon V o similar 0,200 52,41 10,48 P01con2 l. "Tegosivin HL 100" o similar 0,050 64,60 3,23 %costind % Costes indirectos 0,050 24,18 1,21 %medaux % Medios auxiliares 0,030 25,39 0,76 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 26,15 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 26,15 VEINTISEIS EUROS CON QUINCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.13 E03fab05 m2 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inorgánicos, previa elec- ción sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de cos- tes indirectos y medios auxiliares. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,290 19,75 5,73 O01OA060 h. Peón especializado 0,050 16,20 0,81 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %costind % Costes indirectos 0,020 7,73 0,15 %medaux % Medios auxiliares 0,030 7,88 0,24 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,12 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,12 OCHO EUROS CON DOCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

04.14 E03fab06 m2 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de pro- ducto base silano-siloxano con fungicidas tipo "Sikaguard 710" o similar en "húmedo sobre húme- do" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanopar- ticulas, ambos según indicaciones del fabricante, in- cluso p.p. de ensayos y pruebas, protección de ele- menos, preparación y limpieza previa del soporte y

Page 173: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OC280 h. Restaurador de piedra 0,100 19,75 1,98 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 0,025 14,15 0,35 P01DW050 m3 Agua 0,010 0,80 0,01 %medaux % Medios auxiliares 0,030 9,41 0,28 %costind % Costes indirectos 0,020 9,69 0,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,88 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,88 NUEVE EUROS CON OCHENTA Y OCHO CENTIMOS

Page 174: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

05 UNIDAD IV: MURO EXTERIOR PANDAS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.01 E002prot01 m2 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consis- tente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plásti- ca, vertido de cama de arena seca de regulización y coloción de tablero aglomerado de 30 mm. de espe- sor, incluso p.p. de otras protecciones, accesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 1,070 0,25 0,27 P01prot03 m. Cinta adhesiva láminas polietileno 0,500 0,15 0,08 P01aren01 m3 Arena de rio seca protección pav. 0,022 17,85 0,39 P01prot02 m2 Tablero aglomerado 30 mm. protección pav. 1,050 3,50 3,68 %medaux % Medios auxiliares 0,030 7,80 0,23 %costind % Costes indirectos 0,020 8,03 0,16 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,19 OCHO EUROS CON DIECINUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.02 E002prot02 m2 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consis- tente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plásti- ca, vertido de cama de arena seca de regulización, incluso p.p. de otras protecciones, accesorios y pe- queño material, solapes, revisiones y retirada de ele- mentos a la finalización de los trabajos, medios auxi- liares y costes indirectos. O01OA030 h. Oficial primera 0,050 17,62 0,88 O01OA060 h. Peón especializado 0,030 16,20 0,49 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 1,070 0,25 0,27 P01prot03 m. Cinta adhesiva láminas polietileno 0,500 0,15 0,08 P01aren01 m3 Arena de rio seca protección pav. 0,022 17,85 0,39 %medaux % Medios auxiliares 0,030 2,11 0,06 %costind % Costes indirectos 0,020 2,17 0,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 2,21 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 2,21 DOS EUROS CON VEINTIUN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.03 E004lev01 ud Retirada de las mangueras eléctricas insevibles colo- cadas en el Claustro de la Catedral de Ciudad Rodri- go, tanto al exterior como al interior, incluyendo la inspección y comprobación previa, corte y remates, retirando el material a contenedor para su gestión correspondiente, con p.p. de medios auxiliares y costes indirectos. O01OB200 h. Oficial 1ª electricista 3,000 17,51 52,53 O01OA060 h. Peón especializado 3,000 16,20 48,60 %medaux % Medios auxiliares 0,030 101,13 3,03 %costind % Costes indirectos 0,020 104,16 2,08 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 106,24 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 175: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 106,24 CIENTO SEIS EUROS CON VEINTICUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.04 E004lev02 ud Retirada de anclajes modernos y otros elementos ajenos a las fábricas de los muros del Claustro de la Catedral de Ciudad Rodrigo, hasta contenedor para su gestión posterior, con p.p. de medios auxiliares y costes indirectos. O01OB070 h. Oficial cantero 2,500 18,00 45,00 O01OA060 h. Peón especializado 2,500 16,20 40,50 %medaux % Medios auxiliares 0,030 85,50 2,57 %costind % Costes indirectos 0,020 88,07 1,76 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 89,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 89,83 OCHENTA Y NUEVE EUROS CON OCHENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.05 E004lev03 ud Retirada de pantallas y canaletas de iluminación exis- tentes en el Claustro, acopiándolas y protegiendolas en lugar a determinar, para su posterior recolocación (en lugar ajeno) igualmente en lugar a determinar, con p.p. de medios auxiliares y costes indirectos. O01OB200 h. Oficial 1ª electricista 5,000 17,51 87,55 O01OA060 h. Peón especializado 5,000 16,20 81,00 %medaux % Medios auxiliares 0,030 168,55 5,06 %costind % Costes indirectos 0,020 173,61 3,47 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 177,08 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 177,08 CIENTO SETENTA Y SIETE EUROS CON OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.06 E03fab01 m2 Eliminación de líquenes, musgos y demás costras biogénicas sobre piedra arenisca de Ciudad Rodri- go, en fachadas, contrafuertes, albardillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello peróxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecutivas, dejando actuar al menos 10 días, eliminando los restos con cepillos de cerdas de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, lim- piando de nuevo la superficie transcurrida una sema- na con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, limpieza final , medios auxiliares y costes indirectos. Medida la superficie en proyección vertical por su cara exterior. O01OC160 h. Especialista restaurador 0,300 20,00 6,00 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01per1 l. Peróxido de hidrógeno 0,530 4,55 2,41 P01per2 l. Formaldéhido 3% 0,250 4,20 1,05 P01DW050 m3 Agua 0,100 0,80 0,08 M11W060 h. Equipo pulverizador aerográfico 0,090 4,50 0,41 %medaux % Medios auxiliares 0,030 12,38 0,37 %costind % Costes indirectos 0,020 12,75 0,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,01 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,01

Page 176: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

TRECE EUROS CON UN CENTIMO .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.07 E03fab02 m2 Limpieza de fábricas de sillería incluso p.p. de ele- mentos labrados que la conforman, contemplados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el pica- do de restos aislados de mortero de cemento o ele- mentos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labra- dos, dejando las superficies acabadas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, impermeabilización etc.) incluso aspi- rado y/o soplado. Medida en proyección vertical se- gún planos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxi- liares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 8,35 0,25 %costind % Costes indirectos 0,020 8,60 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,77 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,77 OCHO EUROS CON SETENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.08 E03fab03a m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de sillería y elementos de piedra contemplados en esta interven- ción, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicacio- nes de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior Criterio de medición: superficie ejecutada por pro- yección vertical perpendicular a paño de fachada completo, o proyección horizontal en caso de ele- mentos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,180 16,20 2,92 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 9,30 0,28 %costind % Costes indirectos 0,020 9,58 0,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,77 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 177: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,77 NUEVE EUROS CON SETENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.09 E03fab03b m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 2,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 3% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,003 21,50 0,06 O01OC280 h. Restaurador de piedra 0,450 19,75 8,89 O01OA060 h. Peón especializado 0,050 16,20 0,81 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,900 0,75 2,18 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 M03HH020 h. Hormigonera 200 l. gasolina 0,070 1,80 0,13 %medaux % Medios auxiliares 0,030 12,72 0,38 %costind % Costes indirectos 0,020 13,10 0,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,36 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,36 TRECE EUROS CON TREINTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.10 E03fab04 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posterior- mente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la preparación previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OA010 h. Encargado 0,002 21,50 0,04

Page 178: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OC280 h. Restaurador de piedra 0,200 19,75 3,95 O01OA060 h. Peón especializado 0,400 16,20 6,48 P01con1 l. Consolidante Tegovakon V o similar 0,200 52,41 10,48 P01con2 l. "Tegosivin HL 100" o similar 0,050 64,60 3,23 %costind % Costes indirectos 0,050 24,18 1,21 %medaux % Medios auxiliares 0,030 25,39 0,76 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 26,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 26,15 VEINTISEIS EUROS CON QUINCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.11 E03fab05 m2 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inorgánicos, previa elec- ción sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de cos- tes indirectos y medios auxiliares. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,290 19,75 5,73 O01OA060 h. Peón especializado 0,050 16,20 0,81 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %costind % Costes indirectos 0,020 7,73 0,15 %medaux % Medios auxiliares 0,030 7,88 0,24 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,12 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,12 OCHO EUROS CON DOCE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.12 E03fab06 m2 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de pro- ducto base silano-siloxano con fungicidas tipo "Sikaguard 710" o similar en "húmedo sobre húme- do" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanopar- ticulas, ambos según indicaciones del fabricante, in- cluso p.p. de ensayos y pruebas, protección de ele- menos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OC280 h. Restaurador de piedra 0,100 19,75 1,98 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 0,025 14,15 0,35 P01DW050 m3 Agua 0,010 0,80 0,01 %medaux % Medios auxiliares 0,030 9,41 0,28 %costind % Costes indirectos 0,020 9,69 0,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,88 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,88 NUEVE EUROS CON OCHENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.13 E04imp01 m2 Tratamiento de IMPERMEABILIZACIÓN y/o hidrofu- gado de fábricas de piedra arenisca y/o granitica me- diante aplicación de producto base "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanopar-

Page 179: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ticulas, según indicaciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirec- tos y medios auxiliares. Medida en proyección verti- cal y/o horizontal, con p.p. de salientes, cornisas, molduras, etc. O01OC280 h. Restaurador de piedra 0,200 19,75 3,95 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 0,200 14,15 2,83 P01DW050 m3 Agua 0,010 0,80 0,01 %medaux % Medios auxiliares 0,030 8,41 0,25 %costind % Costes indirectos 0,020 8,66 0,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,83 OCHO EUROS CON OCHENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.14 E04rest1 m2 RESTAURACIÓN DE VENTANAL RÓMANICO del Claustro de la Catedral de Ciudad Rodrigo (Salamanca) consistente en la limpieza total median- te cepillo de cerdas suaves, con soplado y aspiración según casos, y puntualmente limpieza de líquenes y musgos, detritus y otras costras, tratamiento de jun- tas eliminando y/o retirando únicamente las sueltas o en mal estado y rehundiendo las que lo precisen, previa aprobación de la D.F. y en su caso rejuntando con mortero de cal teñido; igualmente de forma pun- tual, reparación de nervios según indicaciones de la D.F. y consolidación e impermeabilización y en su caso patinado de las superficies que lo requieran, to- do siguiendo los criterios generales de la interven- ción. Medida la superficie en proyección vertical des- de el borde moldurado en el encuentro con el para- mento que lo cobija s/criterio D.F., con p.p. de desa- rrollo de basas, repisa, columnillas, pilaretes maine- les, pilastras, capiteles, impostas, arquerías, óculos, etc. dejando la únidad totalmente restaurada inclu- yendo la limpieza final y carga de escombros a con- tenedor. O01OA010 h. Encargado 0,005 21,50 0,11 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 0,100 13,01 1,30 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,700 8,77 14,91 E03fab03a m2 DESCARNADO DE JUNTAS SILLERIA 0,250 9,77 2,44 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 0,395 13,36 5,28 E04cos01 ud MICRO-COSIDO NERVIOS DE VENTANALES 0,050 81,74 4,09 E03fab04 m2 CONSOLIDACIÓN DE FÁBRICAS 0,100 26,15 2,62 E03fab05 m2 PATINADO DE FÁBRICAS 0,050 8,12 0,41 %medaux % Medios auxiliares 0,030 31,16 0,93 %costind % Costes indirectos 0,020 32,09 0,64 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 32,73 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 32,73 TREINTA Y DOS EUROS CON SETENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.15 E04rest2 m2 RESTAURACIÓN DE VENTANAL GÓTICO del Claustro de la Catedral de Ciudad Rodrigo (Salamanca) consistente en la limpieza total median- te cepillo de cerdas suaves, con soplado y aspiración según casos, y puntualmente limpieza de líquenes y musgos, detritus y otras costras, tratamiento de jun-

Page 180: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

tas eliminando y/o retirando únicamente las sueltas, las que estén en mal estado o las advertidas por la D.F., rehundiendo las que lo precisen, previa apro- bación de la D.F. y en su caso rejuntando con mor- tero de cal teñido; igualmente de forma puntual, con- solidación (fundamentalmente zonas dañadas o con falta de piezas por rotura) e impermeabilización y en su caso patinado de las superficies que lo requieran, todo siguiendo los criterios generales de la interven- ción. Medida la superficie en proyección vertical des- de el borde moldurado con el paramento que lo co- bija, con p.p. de desarrollo de basas, repisa, colum- nillas, pilaretes maineles, pilastras, capiteles, impos- tas, arquerías, óculos, etc. dejando la únidad total- mente restaurada incluyendo la limpieza final y carga de escombros a contenedor. O01OA010 h. Encargado 0,010 21,50 0,22 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 0,080 13,01 1,04 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,520 8,77 13,33 E03fab03a m2 DESCARNADO DE JUNTAS SILLERIA 0,250 9,77 2,44 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 0,375 13,36 5,01 E04cos01 ud MICRO-COSIDO NERVIOS DE VENTANALES 0,030 81,74 2,45 E03fab04 m2 CONSOLIDACIÓN DE FÁBRICAS 0,050 26,15 1,31 E03fab05 m2 PATINADO DE FÁBRICAS 0,050 8,12 0,41 %medaux % Medios auxiliares 0,030 26,21 0,79 %costind % Costes indirectos 0,020 27,00 0,54 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 27,54 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 27,54 VEINTISIETE EUROS CON CINCUENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.16 E04rest3 ud Recolocación de dovelas de arquerías de ventana- les, incluyendo el apuntalamiento previo y cimbras necesarias, cuñas y tirantes, piezas de estronque e inclusión puntual de injertos de piedra arenisca - a modo de cuñas- previa aprobación de la D.F. y siem- pre que sea necesario para garantizar la estabilidad del elemento, que deberá asegurarse, devolviendo la "tirantez" adecuada al arco, incluso el uso de gatos controlados y el recibido de piezas, retirada de apun- talamiento por fases y limpieza final y retirada de es- combros a contenedor. El rejuntado del elemento se valora en partida independiente.Con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 2,500 18,00 45,00 O01OA060 h. Peón especializado 2,500 16,20 40,50 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,015 77,48 1,16 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,100 195,35 19,54 P01DW050 m3 Agua 0,010 0,80 0,01 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M13CP130 ud Puntal telesc. fuerte 4m 100 usos 0,166 16,59 2,75 M13CC030 ud Codal met.exten.c/pp.correa met. 4,000 0,55 2,20 M13B350 ud Tablón 20/7 complemento apeos 2,000 6,72 13,44 M13B360 ud Tabloncillo 15/5 complem. apeos 2,000 7,08 14,16 M13B370 ud Tabla 10/3 complemento apeos 2,000 4,75 9,50 M13B300 m2 Formación de cimbra de madera 2,500 30,66 76,65 M13B310 m2 Formación de cimbra metálica 0,100 29,37 2,94 %medaux % Medios auxiliares 0,030 230,72 6,92 %costind % Costes indirectos 0,020 237,64 4,75 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 242,39 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 242,39

Page 181: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

DOSCIENTOS CUARENTA Y DOS EUROS CON TREINTA Y NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.17 E04cos01 ud Restauración de NERVIOS ROTOS DE VENTANA- LES, mediante MICRO-COSIDOS con varillas vidrio-epoxi y/o acero inoxidable según se valore en obra, incluso la inclusión puntual de injertos de pie- dra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea necesario para garanti- zar la estabilidad del elemento, incluyendo el apunta- lamiento del elemento afectado, el estudio y trazado de los cosidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de juntas y la colocación de varillas dejándolas rehundi- das para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgá- nicos, limpieza final y retirada de escombros a conte- nedor. Medida la unidad teniendo en cuenta un do- ble cosido por unidad, con longitud máxima de 50 cm. por varilla. El rejuntado del elemento se valora en partida independiente. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,200 18,00 21,60 O01OA060 h. Peón especializado 1,200 16,20 19,44 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 A02S220 l. MORTERO EPOXÍDICO TIXOTRÓPICO 1,000 3,79 3,79 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,055 174,00 9,57 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,020 195,35 3,91 P01var3 m. Varilla vidrio-epoxi D=4 mm 1,000 4,74 4,74 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,550 5,20 2,86 P33A090 kg Adhesivo epoxi 100/35 0,030 10,46 0,31 P33A240 m3 Carga inerte para resinas termoplásticas 0,008 104,82 0,84 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,050 10,00 0,50 M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 M03B100 h. Taladradora mecánica 0,400 7,52 3,01 %medaux % Medios auxiliares 0,030 77,81 2,33 %costind % Costes indirectos 0,020 80,14 1,60 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 81,74 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 81,74 OCHENTA Y UN EUROS CON SETENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.18 E04cos02 ud Restauración de arquerías, mediante COSIDO DE DOVELAS con varillas de acero inoxidable de día- metro 12 (o inferiores, o en su caso vidrio-epoxi) se- gún determine la D.F. en obra, comprobando la "tirantez" del trazado del elemento incluso la inclu- sión puntual de injertos de piedra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea necesario para garantizar la estabilidad del elemento, incluyendo el APUNTALAMIENTO del ele- mento afectado, el estudio y trazado de los cosidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de los huecos y juntas y la colocación de varillas dejándolas rehundidas pa- ra en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos, limpieza final y retirada de escombros a contenedor. Medida la unidad teniendo en cuenta un doble cosi- do por unidad, con longitud máxima de 85 cm. por varilla. El rejuntado del elemento se valora en partida

Page 182: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

independiente. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 0,900 18,00 16,20 O01OA060 h. Peón especializado 0,900 16,20 14,58 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,025 77,48 1,94 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,015 174,00 2,61 P33A250 kg Árido impalpable espesante 0,850 2,07 1,76 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,020 195,35 3,91 P01var2 m. Varilla roscada acero inox D=12 mm. 1,000 5,15 5,15 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 %medaux % Medios auxiliares 0,030 49,86 1,50 %costind % Costes indirectos 0,020 51,36 1,03 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 52,39 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 52,39 CINCUENTA Y DOS EUROS CON TREINTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.19 E04cos03 ud REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrie- tadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 metros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replanteo del taladro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETACADO de las grietas y oquedades con mortero de cal teñido (sustituible por pasta de yeso que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hidráulica natural NHL 3,5 CE de "FYm Italce- menti Group" o similar, con implantación de equipo, realizando las perforaciones por rotación a baja po- tencia y controlada, con escrupuloso soplado y lim- pieza posterior, colocación de varillas -dejándolas re- hundidas para en su caso rematar con mortero Pe- tratex o "CPA M8" o similares, teñidos con pigmen- tos inorgánicos- y limpieza final y retirada de escom- bros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud má- xima de 90 cm. por varilla. El rejuntado final del ele- mento se valora en partida independiente. O01OA010 h. Encargado 0,100 21,50 2,15 O01OC280 h. Restaurador de piedra 0,500 19,75 9,88 O01OA060 h. Peón especializado 0,550 16,20 8,91 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,055 174,00 9,57 P33A250 kg Árido impalpable espesante 1,000 2,07 2,07 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,020 195,35 3,91 P01var2 m. Varilla roscada acero inox D=12 mm. 1,500 5,15 7,73 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 %medaux % Medios auxiliares 0,030 48,49 1,45 %costind % Costes indirectos 0,020 49,94 1,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 50,94 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 50,94 CINCUENTA EUROS CON NOVENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 183: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

05.20 E002mur06 m2 Picado de rellenos y retacados enfoscados con ce- mento y/o cal en trabajos de restauración de para- mentos, incluso retirada de los tejones, ladrillos y ele- mentos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios au- xiliares y costes indirectos. Medida en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 8,05 0,24 %costind % Costes indirectos 0,020 8,29 0,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,46 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,46 OCHO EUROS CON CUARENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.21 E04rest4 m2 Retacado de fábricas agrietadas o afectadas por tra- bajos defectuosos, con cal hidráullica (hasta satura- ción) y mortero de cal, dejándo las juntas rehundidas y acabando las superficies con mortero CPA "M8" o similar o bien con Petratex en función de si afecta puntualmente a elemento decorativo, según criterios generales de la intervención, en fábricas de silleria li- geramente moldurada, en trabajos de reparación de grietas, de faltas, etc con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,150 18,00 2,70 O01OA030 h. Oficial primera 0,180 17,62 3,17 O01OA060 h. Peón especializado 0,500 16,20 8,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 %costind % Costes indirectos 0,020 17,21 0,34 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 17,55 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 17,55 DIECISIETE EUROS CON CINCUENTA Y CINCO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.22 E003mur01 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE ZÓ- CALOS DE PIEDRA, de fábricas de sillería, de es- cuadria adaptada a las hiladas y para un fondo míni- mo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), cajeados, re- tirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y an- claje en su caso con varillas de acero inoxidable o fi- bra de vidrio, y mortero de cal aditivado según condi- ciones a establecer en obra por D.F., acordes a los criterios generales de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización me- diane tres manos de "Sikaguard 710" o similar apli- cadas "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de

Page 184: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

costes indirectos y medios auxiliares. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 0,850 18,00 15,30 O01OA060 h. Peón especializado 1,000 16,20 16,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 1,050 195,35 205,12 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 252,40 7,57 %costind % Costes indirectos 0,020 259,97 5,20 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 265,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 265,17 DOSCIENTOS SESENTA Y CINCO EUROS CON DIECISIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.23 E003mur02 m2 Sustitución de sillares de piedra arenisca de Ciudad Rodrigo , en trabajos de RESTAURACIÓN DE FA- BRICAS DE SILLERÍA, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábri- ca, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajea- dos, retirada de fábricas ajenas o rellenos, prepara- ción de piedras y soporte, cortes, presentación, for- mación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxi- dable o fibra de vidrio, y mortero de cal aditivado se- gún condiciones a establecer en obra por D.F., acor- des a los criterios generales de intervención, inclu- yendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e impermeabili- zación mediane tres manos de "Sikaguard 710" o si- milar aplicadas "humedo sobre húmedo" hasta satu- ración y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirectos y medios auxiliares. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,250 18,00 22,50 O01OA060 h. Peón especializado 0,900 16,20 14,58 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 1,050 195,35 205,12 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 258,05 7,74 %costind % Costes indirectos 0,020 265,79 5,32 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 271,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 271,11 DOSCIENTOS SETENTA Y UN EUROS CON ONCE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.24 E003mur06 m2 Recolocación de fábricas de sillería en trabajos de

Page 185: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

restauración, incluyendo el trabajo de cantería nece- sario para retirada en su caso de la pieza, prepara- ción del asiento y recolocación, empleando mortero de cal teñido según los criterios generales de la inter- vención, retacando con cal hidráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, re- pasos, etc O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,450 18,00 26,10 O01OA060 h. Peón especializado 1,000 16,20 16,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 58,15 1,74 %costind % Costes indirectos 0,020 59,89 1,20 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 61,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 61,09 SESENTA Y UN EUROS CON NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.25 E004rest5 ud Restauración de pináculo del Claustro de la Catedral de Ciudad Rodrigo incluyendo previa colocación de medios auxiliares, la limpieza de líquines y otras cos- tras biogénicas, la limpieza con cepillo de cerdas suaves, aspiración y soplado, descarnado únicamen- te de las juntas que lo requieran y rejuntado en su caso, previo soplado y preparación del soporte, in- cluyendo la posible consolidación, e hidrofugado de los elementose que lo requieran una vez se com- prueba a pie de obra su estado, siempre bajo apro- bación de la D.F., incluso fijación y anclaje en caso de falta de estabilidad según criterios de intervención generales, colocando protección de cobre idem con- trafuertes adaptada a la geometría con p.p. de for- mación de encuentros, medios auxiliares y costes in- directos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,300 16,20 4,86 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 1,950 13,01 25,37 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 5,500 8,77 48,24 E03fab03 m2 DESCARNADO y REJUNTADO FÁBRICAS 0,800 23,50 18,80 E03fab04 m2 CONSOLIDACIÓN DE FÁBRICAS 3,200 26,15 83,68 E004rest6 ud RESTAURACIÓN REMATE CONTRAFUERTES 1,000 215,85 215,85 E03fab06 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 1,800 9,88 17,78 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,048 77,48 3,72 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 5,500 2,20 12,10 P01DW210 kg Pigmentos de tierra natural 0,150 2,50 0,38 P01DW050 m3 Agua 0,100 0,80 0,08 %medaux % Medios auxiliares 0,030 436,90 13,11 %costind % Costes indirectos 0,020 450,01 9,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 459,01 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 459,01 CUATROCIENTOS CINCUENTA Y NUEVE EUROS CON UN CENTIMO .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.26 E004rest6 ud Colocación de remate de cobre en coronación de

Page 186: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

contrafuertes previa restauración de los mismos a base de LIMPIEZA de líquenes y vegetación, conso- lidación en su caso, y CAPA DE REGULARIZA- CIÓN con mortero teñido de cal y arena y pigmentos inorgánicos, incluso p.p. de remate de las faltas en bordes devolviendo su geometría parcialmente con mortero "Petratex", dejando rehundido el plomo 3 cm. según figura en detalle de proyecto, dejando lis- to para la colocación, también incluida de TAPAS DE COBRE de 0,8 mm. de espesor, rigidizadas me- diante pletinas 30/2 colocadas cada 30 cm. como máximo fijadas cada una con tirafondos de acero inoxidable 50/5 y tacos de material plástico, y entre- gando en finas rozas prácticadas en el paramento posterior o sobre pináculos, incluyendo p.p. de en- gatillados, formación de bordes rigidizados, sellado, etc. todo según detalle e indicaciones de la D.F., con p.p. de medios auxilaires y costes indirectos. O01OB140 h. Ayudante cerrajero 1,200 16,23 19,48 O01OB070 h. Oficial cantero 0,650 18,00 11,70 O01OA050 h. Ayudante 1,200 16,06 19,27 E03fab01 m2 LIMPIEZA DE LÍQUENES y MUSGOS 1,200 13,01 15,61 E03fab02 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 1,200 8,77 10,52 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P05CC090 ud Chapa cobre 2,00x0,67mx0,80mm "1/2" 1,150 65,50 75,33 P01tiraf01 ud Tirafondo acero inox. + taco 5/50 8,000 0,05 0,40 P04plet1 m. Pletina cobre 30/2 1,150 42,50 48,88 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 0,500 2,20 1,10 P01DW210 kg Pigmentos de tierra natural 0,150 2,50 0,38 P01DW050 m3 Agua 0,100 0,80 0,08 %medaux % Medios auxiliares 0,030 205,46 6,16 %costind % Costes indirectos 0,020 211,62 4,23 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 215,85 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 215,85 DOSCIENTOS QUINCE EUROS CON OCHENTA Y CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

05.27 E04rep01 ud Reposición, en su caso, de las pantallas y canaletas de iluminación previamente retiradas y acopiadas en lugar a determinar, con p.p. de medios auxiliares y costes indirectos. O01OB200 h. Oficial 1ª electricista 6,000 17,51 105,06 O01OA060 h. Peón especializado 5,000 16,20 81,00 %medaux % Medios auxiliares 0,030 186,06 5,58 %costind % Costes indirectos 0,020 191,64 3,83 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 195,47 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 195,47 CIENTO NOVENTA Y CINCO EUROS CON CUARENTA Y SIETE CENTIMOS

Page 187: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

06 UNIDAD V: MURO INTERIOR ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.01 E05lev01 ud Desmontaje total del conjunto de bombillas con su red y mecanismos así como los soportes de los pa- ramentos interiores del Claustro y los interruptores a sustituir, con retirada de material inservible a conte- nedor, acopiando el resto en lugar a indicar, con p.p. de medios auxiliares y costes indirectos. O01OB200 h. Oficial 1ª electricista 3,000 17,51 52,53 %medaux % Medios auxiliares 0,030 52,53 1,58 %costind % Costes indirectos 0,020 54,11 1,08 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 55,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 55,19 CINCUENTA Y CINCO EUROS CON DIECINUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.02 E05lev02 ud Desmontaje total del conjunto de cruces de madera que conforman el Viacrucis del Claustro, acopiándo- las y protegiéndolas en lugar seguro para su poste- rior recolocación, con retirada de material inservible a contenedor, acopiando el resto en lugar a indicar, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OA060 h. Peón especializado 3,500 16,20 56,70 %medaux % Medios auxiliares 0,030 56,81 1,70 %costind % Costes indirectos 0,020 58,51 1,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 59,68 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 59,68 CINCUENTA Y NUEVE EUROS CON SESENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.03 E05lev03 ud Levantado de lápida sepulcral del arcosolio que la cobija, bajo supervisión arqueológica, para su aco- pio por separado y debidamente colocada sobre es- tructura de madera en lugar seguro y protegido has- ta su posterior recolocación en estructura métalica según diseño o en su defecto lugar a determinar por la D.F. o el estudio museístico, incluyendo la retirada de elementos bajo la misma necesarios retirar para la restauración de paramentos, así como la retirada de escombros o material inservible a contenedor pa- ra su posterior gestión, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC270 h. Arqueólogo 0,400 19,88 7,95 O01OA060 h. Peón especializado 0,500 16,20 8,10 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,500 19,88 9,94 %medaux % Medios auxiliares 0,030 26,10 0,78 %costind % Costes indirectos 0,020 26,88 0,54 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 27,42 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 27,42 VEINTISIETE EUROS CON CUARENTA Y DOS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.04 E05lev04 ud Retirada del conjunto de restos expuestos en el Claustro de la Catedral de Ciudad Rodrigo y aquellos susceptibles de acopio que aparezcan bajo las lápi- das de los arcosolios y otros para su evaluación, con acopio y protección en zona adecuada a determinar,

Page 188: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

incluso su posterior recolocación en lugar según in- dicaciones D.F. con p.p. de medios auxiliares y cos- tes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC270 h. Arqueólogo 0,500 19,88 9,94 O01OA060 h. Peón especializado 4,000 16,20 64,80 O01OB070 h. Oficial cantero 4,000 18,00 72,00 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 2,000 19,88 39,76 %medaux % Medios auxiliares 0,070 186,61 13,06 %costind % Costes indirectos 0,020 199,67 3,99 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 203,66 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 203,66 DOSCIENTOS TRES EUROS CON SESENTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.05 E05lev05 ud Retirada de todos los anclajes modernos y otros ele- mentos ajenos a las fábricas de los muros interiores del Claustro de la Catedral de Ciudad Rodrigo, hasta contenedor para su gestión posterior, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OA060 h. Peón especializado 5,000 16,20 81,00 %medaux % Medios auxiliares 0,030 81,11 2,43 %costind % Costes indirectos 0,020 83,54 1,67 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 85,21 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 85,21 OCHENTA Y CINCO EUROS CON VEINTIUN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.06 E05lev06 ud Retirada de las carpinterías existentes en el husillo de subida al Coro de las Viudas, incluida la malla de gallinero, dejando los elementos libres para su pos- terior intervención y colocación de nuevas carpinte- rías o tratamientos, con carga de restos a contene- dor de escombros y p.p. de medios auxiliares y cos- tes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OA060 h. Peón especializado 2,750 16,20 44,55 %medaux % Medios auxiliares 0,030 44,66 1,34 %costind % Costes indirectos 0,020 46,00 0,92 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 46,92 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 46,92 CUARENTA Y SEIS EUROS CON NOVENTA Y DOS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.07 E05lev07 ud Retirada de canaletas de iluminación y elementos auxiliares, dejando la zona de intervención libre de elementos y riesgos eléctricos relativos a dicha insta- lación, con posterior recolocación en su caso, con p.p. de medios auxiliares y costes indirectos. O01OB200 h. Oficial 1ª electricista 4,500 17,51 78,80 %medaux % Medios auxiliares 0,030 78,80 2,36 %costind % Costes indirectos 0,020 81,16 1,62 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 82,78 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 82,78 OCHENTA Y DOS EUROS CON SETENTA Y OCHO CENTIMOS

Page 189: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.08 E03fab02 m2 Limpieza de fábricas de sillería incluso p.p. de ele- mentos labrados que la conforman, contemplados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el pica- do de restos aislados de mortero de cemento o ele- mentos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labra- dos, dejando las superficies acabadas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, impermeabilización etc.) incluso aspi- rado y/o soplado. Medida en proyección vertical se- gún planos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxi- liares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 8,35 0,25 %costind % Costes indirectos 0,020 8,60 0,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,77 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,77 OCHO EUROS CON SETENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.09 E05lim01 m2 Limpieza de muros de sillería y o fábricas de ladrillo, bóvedas, etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Todo in- cluido con p.p. de medios auxiliares y costes indirec- tos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 1,500 19,75 29,63 O01OA060 h. Peón especializado 0,200 16,20 3,24 P33A130 l. Adhesivo de nylón soluble 1,320 2,50 3,30 P33P100 kg Pulpa papel p/humedecer 3,200 2,15 6,88 P01DW050 m3 Agua 0,008 0,80 0,01 P33XB100 kg Hidróxido de bario 0,050 20,50 1,03 P33I140 l. Alcohol etílico 0,400 1,90 0,76 P33J170 l. Agua desionizada no polarizada 1,000 0,11 0,11 P33J050 kg Atapulgita celulósica 0,550 6,89 3,79 P33P180 ud Conductivímetro 0,010 220,69 2,21 P33A120 kg Adhesivo Calatón CA disol. 70/30 0,350 7,68 2,69 %medaux % Medios auxiliares 0,030 53,76 1,61 %costind % Costes indirectos 0,020 55,37 1,11 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 56,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 56,48 CINCUENTA Y SEIS EUROS CON CUARENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.10 E05lim02 m2 Limpieza de deyecciones de aves, consistente en: 1,-Eliminación primaria en seco, de biodepósitos (acumulaciones de microorganismos, restos orgáni- cos, excrementos de aves etc.) depositados sobre

Page 190: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

las superficies de muros, actuando manualmente con cepillos de cerda suave, e instrumentos desin- crustantes manuales adecuados (espátulas, escal- pelos etc). Aplicando el tratamiento en las zonas de acumulación, incluso retirada de detritus. La delgada película de material residual se tratarán mediante la- vado con toronda de guata humedecida con agua amoniacal, considerando un grado de dificultada normal ( a determinar en obra). 2,-Limpieza de paramentos descritos en la interven- ción de las deyecciones de aves mediante agua y detergente, por medios manuales mediante espátu- las, escalpelos, etc. protegiendo la zona para no ver- se afectada, retirando los restos de detritus, (patinando las superficies afectadas s/criterio D.F.) con p.p. de medios auxiliares y costes indirectos Medida la unidad un 35% (1 ) y un 65% (2). En caso de intervención total (1+2) al 100%. O01OC230 h. Especialista restaurador pintura 0,450 30,92 13,91 O01OA060 h. Peón especializado 0,121 16,20 1,96 P33E010 l. Pentaclorofenato sódico acuoso 0,242 4,34 1,05 P33P100 kg Pulpa papel p/humedecer 1,210 2,15 2,60 P33J170 l. Agua desionizada no polarizada 1,392 0,11 0,15 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,67 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 19,67 DIECINUEVE EUROS CON SESENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.11 E002mur06 m2 Picado de rellenos y retacados enfoscados con ce- mento y/o cal en trabajos de restauración de para- mentos, incluso retirada de los tejones, ladrillos y ele- mentos ajenos a la fábrica o en mal estado, etc con p.p. de retirada de escombros, limpieza, medios au- xiliares y costes indirectos. Medida en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 8,05 0,24 %costind % Costes indirectos 0,020 8,29 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,46 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,46 OCHO EUROS CON CUARENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.12 E05mur01 m2 Picado de rellenos, retacados y enfoscados, de ce- mento y/o cal, en trabajos de RESTAURACIÓN DE ARCOSOLIOS, respetando las policromias, retiran- do el material de relleno inadecuado o en mal esta- do, para su posterior tratamiento o simple limpieza, ejecutado manualmente por ESPECIALISTA RES- TAURADOR, con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medi- da en verdadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OC280 h. Restaurador de piedra 0,480 19,75 9,48 O01OA060 h. Peón especializado 0,200 16,20 3,24 %medaux % Medios auxiliares 0,030 12,94 0,39 %costind % Costes indirectos 0,020 13,33 0,27 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,60 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,60

Page 191: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

TRECE EUROS CON SESENTA CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.13 E002mur07 m2 Picado de enfoscados de cemento y/o cal en traba- jos de restauración de paramentos, por medios ma- nuales con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en ver- dadera magnitud. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,250 18,00 4,50 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 7,15 0,21 %costind % Costes indirectos 0,020 7,36 0,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 7,51 SIETE EUROS CON CINCUENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.14 E03fab03a m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de sillería y elementos de piedra contemplados en esta interven- ción, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicacio- nes de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior Criterio de medición: superficie ejecutada por pro- yección vertical perpendicular a paño de fachada completo, o proyección horizontal en caso de ele- mentos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,180 16,20 2,92 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 9,30 0,28 %costind % Costes indirectos 0,020 9,58 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,77 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,77 NUEVE EUROS CON SETENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.15 E03fab03b m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 2,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami-

Page 192: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 3% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,003 21,50 0,06 O01OC280 h. Restaurador de piedra 0,450 19,75 8,89 O01OA060 h. Peón especializado 0,050 16,20 0,81 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,900 0,75 2,18 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 M03HH020 h. Hormigonera 200 l. gasolina 0,070 1,80 0,13 %medaux % Medios auxiliares 0,030 12,72 0,38 %costind % Costes indirectos 0,020 13,10 0,26 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,36 TRECE EUROS CON TREINTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.16 E03fab04 m2 Tratamiento de consolidación de fábricas de piedra arenisca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posterior- mente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la preparación previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,200 19,75 3,95 O01OA060 h. Peón especializado 0,400 16,20 6,48 P01con1 l. Consolidante Tegovakon V o similar 0,200 52,41 10,48 P01con2 l. "Tegosivin HL 100" o similar 0,050 64,60 3,23 %costind % Costes indirectos 0,050 24,18 1,21 %medaux % Medios auxiliares 0,030 25,39 0,76 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 26,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 26,15 VEINTISEIS EUROS CON QUINCE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.17 E03fab05 m2 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inorgánicos, previa elec- ción sobre muestras según dirección facultativa, con

Page 193: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

p.p. protección de elementos y limpieza final, de cos- tes indirectos y medios auxiliares. O01OA010 h. Encargado 0,002 21,50 0,04 O01OC280 h. Restaurador de piedra 0,290 19,75 5,73 O01OA060 h. Peón especializado 0,050 16,20 0,81 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %costind % Costes indirectos 0,020 7,73 0,15 %medaux % Medios auxiliares 0,030 7,88 0,24 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,12 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,12 OCHO EUROS CON DOCE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.18 E03fab06 m2 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de pro- ducto base silano-siloxano con fungicidas tipo "Sikaguard 710" o similar en "húmedo sobre húme- do" hasta saturación, con mínimo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanopar- ticulas, ambos según indicaciones del fabricante, in- cluso p.p. de ensayos y pruebas, protección de ele- menos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, molduras, etc. O01OC280 h. Restaurador de piedra 0,100 19,75 1,98 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 P01imp01 l. Hidrófugo nanopartículas "Tecnadis" PRS EFFEC 0,025 14,15 0,35 P01DW050 m3 Agua 0,010 0,80 0,01 %medaux % Medios auxiliares 0,030 9,41 0,28 %costind % Costes indirectos 0,020 9,69 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,88 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,88 NUEVE EUROS CON OCHENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.19 E05enf1 m2 Revoco de paramentos en trabajos de restauración a base de aplicación de diferentes morteros de cal grasa y arenas seleccionadas en tres capas de la si- guiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosificación 1:4 empleando arena limpia selecciona- da y de tamiz 2,5 mm previo descarnado, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de tes- tigos para regleteado. 2.- Una segunda capa de espesor 6 ó 7 mm., de do- sificación 1:2, empleando arena limpia seleccionada de tamiz 1,2 mm. extendida con fratás. 3.- Una tercera y última capa de espesor 3 mm., de dosificación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y con- trol de retracciones. Se empleará cal grasa para realización de morteros y

Page 194: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

se pigmentarán con tierras naturales, realizando muestras para elección por parte de la dirección fa- cultativa, incluso teniendo en cuenta un patinado fi- nal para conseguir tono adecuado (según criterios establecidos en memoria) empleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosificaciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un co- rrecto agarre y p.p. de medios auxiliares y costes in- directos. Según memoria y criterios generales esta- blecidos para la intervención. Incluso ensayos de hu- medad de paramentos previos a la aplicación, para su posterior comprobación, incluso realización de ensayos de dosificaciones y tipos de arena y cal. O01OA010 h. Encargado 0,005 21,50 0,11 O01OB910 h. Oficial 1ª revocador 1,850 18,50 34,23 O01OB920 h. Ayudante revocador 0,550 18,00 9,90 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,001 71,27 0,07 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,001 111,68 0,11 A02C040 m3 MORTERO DE CALGRASA 1/1 0,001 160,24 0,16 P01DW050 m3 Agua 0,030 0,80 0,02 %medaux % Medios auxiliares 0,030 44,60 1,34 %costind % Costes indirectos 0,020 45,94 0,92 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 46,86 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 46,86 CUARENTA Y SEIS EUROS CON OCHENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.20 E05enf2 m2 Revoco de paramentos en trabajos de restauración a base de aplicación de una capa de enfoscado de mortero de cal previa preparación del paño, incluida, empleando mortero de cal grasa teñida con pigmen- tos naturales, arena seleccionada y tamizada, para un espesor aproximado de 15 ó 16 mm., de dosifica- ción 1:3 (1:3,5, en función de la arena) empleando arena limpia seleccionada y de tamiz 2,5 mm con sa- cado de plomos y niveles y colocación de testigos para regleteado y fratasado final, dejando acabado fino. O01OA010 h. Encargado 0,005 21,50 0,11 O01OB910 h. Oficial 1ª revocador 0,450 18,50 8,33 O01OB920 h. Ayudante revocador 0,200 18,00 3,60 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,010 71,27 0,71 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,015 111,68 1,68 P01DW050 m3 Agua 0,030 0,80 0,02 %medaux % Medios auxiliares 0,030 14,45 0,43 %costind % Costes indirectos 0,020 14,88 0,30 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 15,18 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 15,18 QUINCE EUROS CON DIECIOCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.21 E003mur06 m2 Recolocación de fábricas de sillería en trabajos de restauración, incluyendo el trabajo de cantería nece- sario para retirada en su caso de la pieza, prepara- ción del asiento y recolocación, empleando mortero de cal teñido según los criterios generales de la inter- vención, retacando con cal hidráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, re- pasos, etc O01OA010 h. Encargado 0,100 21,50 2,15

Page 195: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OB070 h. Oficial cantero 1,450 18,00 26,10 O01OA060 h. Peón especializado 1,000 16,20 16,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01imp1 l. Impermeab. piedra "Sikaguard 710" Env.25 l. 1,000 5,45 5,45 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 58,15 1,74 %costind % Costes indirectos 0,020 59,89 1,20 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 61,09 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 61,09 SESENTA Y UN EUROS CON NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.22 E04cos03 ud REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrie- tadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 metros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replanteo del taladro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETACADO de las grietas y oquedades con mortero de cal teñido (sustituible por pasta de yeso que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hidráulica natural NHL 3,5 CE de "FYm Italce- menti Group" o similar, con implantación de equipo, realizando las perforaciones por rotación a baja po- tencia y controlada, con escrupuloso soplado y lim- pieza posterior, colocación de varillas -dejándolas re- hundidas para en su caso rematar con mortero Pe- tratex o "CPA M8" o similares, teñidos con pigmen- tos inorgánicos- y limpieza final y retirada de escom- bros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud má- xima de 90 cm. por varilla. El rejuntado final del ele- mento se valora en partida independiente. O01OA010 h. Encargado 0,100 21,50 2,15 O01OC280 h. Restaurador de piedra 0,500 19,75 9,88 O01OA060 h. Peón especializado 0,550 16,20 8,91 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,055 174,00 9,57 P33A250 kg Árido impalpable espesante 1,000 2,07 2,07 P33piedraCR m2 Sillar piedra Ciudad Rodrigo labrado e=20 cm. 0,020 195,35 3,91 P01var2 m. Varilla roscada acero inox D=12 mm. 1,500 5,15 7,73 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,150 4,96 0,74 %medaux % Medios auxiliares 0,030 48,49 1,45 %costind % Costes indirectos 0,020 49,94 1,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 50,94 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 50,94 CINCUENTA EUROS CON NOVENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.23 E05rec01 ud Trabajos de recolocación de lápidas, incluyendo el traslado por personal cualificado y la colocación en los soportes diseñados para su muestra, en zona a determinar por la D.F., incluso p.p. de trabajos auxi-

Page 196: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

liares de calzo y/o anclaje en su caso, evitando posi- bles movimientos o desplazamientos de las piezas que pudieran poner en peligro la integridad de las mismas y de los visitantes. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,700 18,00 12,60 O01OC280 h. Restaurador de piedra 0,700 19,75 13,83 O01OA060 h. Peón especializado 0,150 16,20 2,43 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,220 0,75 1,67 %medaux % Medios auxiliares 0,015 31,21 0,47 %costind % Costes indirectos 0,020 31,68 0,63 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 32,31 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 32,31 TREINTA Y DOS EUROS CON TREINTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.24 E05rec02 ud Sorte lápidas, según diseño, fabricación, suministro y montaje, incluso protección del acero para evitar manchas en solados y paramentos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB130 h. Oficial 1ª cerrajero 3,850 18,20 70,07 O01OA060 h. Peón especializado 3,850 16,20 62,37 O01OC230 h. Especialista restaurador pintura 0,850 30,92 26,28 P05corten1 kg. Acero corten en palastro 10/10 o 10/20 42,200 1,65 69,63 P05corten2 l. Tratamiento acelerador óxido 0,300 4,50 1,35 P05corten3 l. Tratamiento fijador óxido 0,500 9,25 4,63 %medaux % Medios auxiliares 0,050 236,48 11,82 %costind % Costes indirectos 0,020 248,30 4,97 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 253,27 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 253,27 DOSCIENTOS CINCUENTA Y TRES EUROS CON VEINTISIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.25 E05rec03 ud Recolocación de la escultura -Virgen- existente en el arcosolio nº XVIII, incluyendo la preparación de la base, presentado, repaso y recibido y en su caso an- claje de la misma, empleando mortero de cal, por medios manuales y con p.p. de medios auxiliares y costes indirectos, O01OA010 h. Encargado 0,100 21,50 2,15 O01OC280 h. Restaurador de piedra 1,250 19,75 24,69 O01OB070 h. Oficial cantero 1,000 18,00 18,00 O01OA060 h. Peón especializado 1,000 16,20 16,20 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,000 0,75 1,50 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 63,34 1,90 %costind % Costes indirectos 0,020 65,24 1,30 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 66,54 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 66,54 SESENTA Y SEIS EUROS CON CINCUENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.26 E05rec04 ud Partida para la recolocación del conjunto de elemen- tos y motivos arquitectónicos desmontados tanto en el Patio Central como en las Naves del Claustro, an- teriormete retirados y acopiados, previa preparación

Page 197: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

y adecuación del lugar a determinar por la D.F. y en su caso según el estudio museístico, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC270 h. Arqueólogo 0,500 19,88 9,94 O01OA060 h. Peón especializado 5,000 16,20 81,00 O01OB070 h. Oficial cantero 5,000 18,00 90,00 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 2,000 19,88 39,76 %medaux % Medios auxiliares 0,070 220,81 15,46 %costind % Costes indirectos 0,020 236,27 4,73 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 241,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 241,00 DOSCIENTOS CUARENTA Y UN Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.27 E001rep1 m. Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y preparación de la base con mortero de cal y arena, aditivado en su caso, y recolocación de ele- mentos recuperados, con aportación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patina- da, inclyendo el rejuntado de elementos con mortero de cal y arena seleccionada con aportación de pig- mentos naturales según pruebas previas, con p.p. de medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,000 18,00 18,00 O01OA030 h. Oficial primera 0,250 17,62 4,41 O01OA060 h. Peón especializado 0,750 16,20 12,15 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,035 77,48 2,71 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,025 1.015,25 25,38 P01CPA8 kg. Cal CPA "M8" 1,800 0,75 1,35 P01var2 m. Varilla roscada acero inox D=12 mm. 0,250 5,15 1,29 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW210 kg Pigmentos de tierra natural 0,030 2,50 0,08 P01DW050 m3 Agua 0,010 0,80 0,01 P01prim1 l. Primal AC-235 k o similar 0,005 5,95 0,03 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M11med1 h. Barrenadora rotación 0,020 14,57 0,29 %medaux % Medios auxiliares 0,030 69,15 2,07 %costind % Costes indirectos 0,020 71,22 1,42 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 72,64 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 72,64 SETENTA Y DOS EUROS CON SESENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.28 E05elec01 ud Colocación de interruptor de color en tono marrón oscuro uniforme, de marca y modelo a elegir por la D.F., acorde al edificio, con p.p. de medios auxiliares y costes indirectos. Medida la unidad teniendo en cuenta el trabajo mínimo. O01OB200 h. Oficial 1ª electricista 1,000 17,51 17,51 P05elect01 ud Interruptor marrón marca y modelo s/DF 1,000 65,00 65,00 %medaux % Medios auxiliares 0,030 82,51 2,48 %costind % Costes indirectos 0,020 84,99 1,70 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 86,69 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 86,69 OCHENTA Y SEIS EUROS CON SESENTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 198: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

06.29 E05trat01 m2 Tratamiento de rejas y elementos similares a base de aceite de linaza cruda, (mezclado con betun según casos) aplicado a muñequilla, previa limpieza del ele- mento, con p.p. de medios auxiliares y costes indi- rectos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC230 h. Especialista restaurador pintura 1,500 30,92 46,38 O01OA060 h. Peón especializado 0,450 16,20 7,29 P01DW050 m3 Agua 0,090 0,80 0,07 P01aceite1 l. Aceite de linaza crudo 1,000 3,95 3,95 %medaux % Medios auxiliares 0,030 57,84 1,74 %costind % Costes indirectos 0,020 59,58 1,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 60,77 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 60,77 SESENTA EUROS CON SETENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.30 E05trat02 ud Cerramiento de hueco de husillo del Coro de las Viu- das con alabrastro, previa aprobación de muestra por parte de la D.F. incluyendo el suministro, corte y montaje, con p.p. de preparación de hueco, adapta- ción, formación de mochetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxiliares y costes indirectos. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OC280 h. Restaurador de piedra 2,000 19,75 39,50 O01OA060 h. Peón especializado 0,500 16,20 8,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,009 77,48 0,70 P01alab1 m2 Alabastro seleccionado a elegir 0,850 110,50 93,93 P01CPA8 kg. Cal CPA "M8" 0,350 0,75 0,26 P01DW050 m3 Agua 0,009 0,80 0,01 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 148,42 4,45 %costind % Costes indirectos 0,020 152,87 3,06 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 155,93 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 155,93 CIENTO CINCUENTA Y CINCO EUROS CON NOVENTA Y TRES CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

06.31 E05prot01 m. Sistema de control anti-aves para cornisas, vigas, desagües, pretiles y áreas con poca presencia de aves a base de cadenas de espinas formadas por punzones de acero inoxidable de 11,5cm de altura sostenidos en una base de policarbonato transpa- rente. La base se coloca mediante tornillería o pega- mento para uso exterior resistente a factores climáti- cos como lluvia, calor, frío, etc. Medido por metro li- neal de cadena, valorado para una longitud entre 1 y 30 m. O01OA060 h. Peón especializado 0,100 16,20 1,62 O01OA070 h. Peón ordinario 0,100 14,50 1,45 P33YA030 m. Cadena de espinas de 1 a 30 m. 1,050 8,92 9,37 %medaux % Medios auxiliares 0,030 12,44 0,37 %costind % Costes indirectos 0,020 12,81 0,26 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,07 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,07 TRECE EUROS CON SIETE CENTIMOS

Page 199: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

07 UNIDAD VI: BÓVEDAS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.01 E002prot01 m2 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consis- tente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en patio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plásti- ca, vertido de cama de arena seca de regulización y coloción de tablero aglomerado de 30 mm. de espe- sor, incluso p.p. de otras protecciones, accesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxiliares y costes indirectos. O01OA030 h. Oficial primera 0,100 17,62 1,76 O01OA060 h. Peón especializado 0,100 16,20 1,62 P01prot01 m2 Lámina de poetileno 0,15 mm. rollos 100 m2 1,070 0,25 0,27 P01prot03 m. Cinta adhesiva láminas polietileno 0,500 0,15 0,08 P01aren01 m3 Arena de rio seca protección pav. 0,022 17,85 0,39 P01prot02 m2 Tablero aglomerado 30 mm. protección pav. 1,050 3,50 3,68 %medaux % Medios auxiliares 0,030 7,80 0,23 %costind % Costes indirectos 0,020 8,03 0,16 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,19 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,19 OCHO EUROS CON DIECINUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.02 E06cim01 m2 Previa protección del solado, EJECUCIÓN DE APEO Y CIMBRA de madera para bóveda de la Ca- tedral de Ciudad Rodrigo, 4-5-6 y/o 16, y otras simi- lares, con formación de pies derechos, arriostra- mientos, tirantes y tirantes tornapunteados estableci- da provisionalmente con el objeto de sostener la construcción hasta que adquiera la consistencia ne- cesaria para su estabilidad, construida con madera de pino nacional de clase 2ª en sus partes resisten- tes y madera de encofrar en tablas y tablones para forma, con la directriz, montea y cuaje, dimensiona- da para soportar sin deformación las cargas previs- tas, con diseño no rígido para facilitar en el momento adecuado el afloje para descimbrado y de fácil arma- do y desarmado para diferentes posturas, compren- diendo: apeos, construcción de la cimbra, con apor- te de madera, incluso parte proporcional de mermas, material de unión, cimbrado y posterior descimbrado, por cualquiera de los siguientes procedimientos: acuñado, sacos de arena, cajas de arena, tornillos o gatos y excéntricas, sopandas y puntales, con inter- posición de elementos metálicos si fuera necesario o en su sustitución, con p.p. de medios auxiliares y costes indirectos. Medida en proyección horizontal. O01OB150 h. Oficial 1ª carpintero 1,850 14,58 26,97 O01OB160 h. Ayudante carpintero 1,850 13,70 25,35 P01EB010 m3 Tablón pino 2,50/5,50x205x76 0,095 195,89 18,61 P01ET005 m3 Tabla encf pino 10-20cm L=2m 0,010 223,95 2,24 P01UC020 kg Puntas 17x70 0,750 7,30 5,48 P01ET080 m2 Ripia 15x3,5 cm s/cepillar 1,050 8,94 9,39 P01UC042 ud Clavo pucelado 15 cm. carp.armar 2,500 1,02 2,55 M12T010 h. Taladro eléctrico 0,750 2,50 1,88 %medaux % Medios auxiliares 0,030 92,47 2,77 %costind % Costes indirectos 0,020 95,24 1,90 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 97,14 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 97,14

Page 200: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NOVENTA Y SIETE EUROS CON CATORCE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.03 E06lim01 m2 Supervisión arqueológica en fase de limpieza de ex- tradós de bóvedas, retirando sólo el material ajeno a la fábrica directamente a camión de transporte a ver- tedero (ver partida capítulo "UNIDAD II:CUBIERTAS"), respetando en cualquier caso el re- lleno de riñones. Medición de partida según criterio de la D.F, teniendo en cuenta el grado de supervi- sión necesario, con p.p. de medios auxiliares y cos- tes indirectos. A justificar. O01OC270 h. Arqueólogo 0,350 19,88 6,96 O01OC275 h. Ayudante de Arqueólogo 0,050 16,50 0,83 O01OC280 h. Restaurador de piedra 0,050 19,75 0,99 O01OA060 h. Peón especializado 0,050 16,20 0,81 P001arqueo01 h. Informe arqueolog, trabajo en gabinete. 0,050 19,88 0,99 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,005 10,00 0,05 %medaux % Medios auxiliares 0,030 10,63 0,32 %costind % Costes indirectos 0,020 10,95 0,22 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11,17 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11,17 ONCE EUROS CON DIECISIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.04 E06lim02 m2 Limpieza de BÓVEDAS de piedra del Claustro de la Catedral de Ciudad Rodrigo, incluyendo todos los elementos que la forman, arcos formeros, perpiaños, ojivas, nervios, rosetones, claves, escudos, figuras, elementos decorativos, etc, por medios manuales empleando cepillos de cerdas suaves de nylon, in- cluso el cuidadoso descamado de las zonas más de- terioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, empleando ai- re a presión, que será controlada en función del ele- mento a limpiar, teniendo especial atención con aquellas zonas con policromías, marcas etc y/o ele- mentos labrados, dejando las superficies acabadas o en su caso listas para el tratamiento correspon- diente (rejuntado, retacado, consolidación, imper- meabilización etc según orden a establecer.) incluso aspirado y/o soplado. Medida en proyección horizon- tal según planos, con p.p. de desarrollo de dóvelas, nervios, molduras, etc, limpieza final con retirada de escombro generado a vertedero y con p.p. costes in- directos y medios auxiliares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,400 19,75 7,90 O01OA060 h. Peón especializado 0,300 16,20 4,86 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 14,37 0,43 %costind % Costes indirectos 0,020 14,80 0,30 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 15,10 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 15,10 QUINCE EUROS CON DIEZ CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.05 E06lim03 m2 Tratamiento de manchas por humedades en bóve- das, consistente en la limpieza de las señales gene- radas y la posible existencia de sales (grado bajo-medio, salvo en bóveda 4-5-6 y nervios puntua- les) etc mediante aplicación de sepiolíta, según mé-

Page 201: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

todo tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Aprove- chando el uso de andamiaje montado para la restau- ración general de las bóvedas, iniciando los trabajos lo antes posible para poder ir comprobando la absor- ción de la humedad y las manchas, y poder en su caso patinar los elementos que se vean notoriamen- te afectados. Todo incluido con p.p. de medios auxi- liares y costes indirectos. Criterio de medición, en función del grado (de 1 a 3 ), grado 1:50%, grado 2: 75%, grado 3:100%, a determinar previamente por D.F. Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. O01OC280 h. Restaurador de piedra 0,150 19,75 2,96 E05lim01 m2 LIMPIEZA DE SALES CON "SEPIOLITA" 0,880 56,48 49,70 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %medaux % Medios auxiliares 0,030 53,81 1,61 %costind % Costes indirectos 0,020 55,42 1,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 56,53 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 56,53 CINCUENTA Y SEIS EUROS CON CINCUENTA Y TRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.06 E06bov01 m2 Trabajos de restauración de bóvedas con todos sus elementos, arcos formeros, perpiaños, ojivas, ner- vios, claves, escudos, elementos decorativos, etc consistente en el DESCARNADO DE JUNTAS para su posterior tratamiento/s (rejuntado, retacado, etc.) siguiendo los mismos criterios establecidos en este proyecto, por medios manuales incluyendo el sopla- do con aire a presión controlado y por aspiración se- gún casos, con p.p. de medios auxiliares y costes indirectos.Medida la superficie en proyección hori- zontal, con p.p. de desarrollos tanto de arcos, ner- vios y otros elementos así como cascos de plemen- tería. E03fab03a m2 DESCARNADO DE JUNTAS SILLERIA 1,450 9,77 14,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 14,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 14,17 CATORCE EUROS CON DIECISIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.07 E06bov02 m2 Tratamiento en juntas no pasantes de bóvedas y to- dos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su reta- cado y rejuntado posterior 2,- RETACADOS o RELLENOS en las JUNTAS NO PASANTES empleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group y arena seleccionada y tamizada. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes.

Page 202: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. O01OC280 h. Restaurador de piedra 0,030 19,75 0,59 E03fab03b m2 REJUNTADO DE FÁBRICAS CPA "M8" 1,250 13,36 16,70 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,005 174,00 0,87 P01DW050 m3 Agua 0,050 0,80 0,04 %medaux % Medios auxiliares 0,030 18,20 0,55 %costind % Costes indirectos 0,020 18,75 0,38 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,13 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 19,13 DIECINUEVE EUROS CON TRECE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.08 E06bov03 m2 Tratamiento en juntas pasantes de bóvedas y todos sus elementos, del Claustro del Ciudad Rodrigo, in- cluyendo los siguientes trabajos: 1,- LIMPIEZA DE JUNTAS PASANTES por ASPI- RACIÓN mediante equipo a presión y/o aspiración controlada. 2,- Previo rejuntado que servirá a modo de encofra- do, RETACADO de las juntas pasantes hasta col- matación empleando mortero de cal hidráulica natu- ral NHL 3,5 CE DE FYM Italcementi Group y arena seleccionada y tamizada, controlando grado de hu- medad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la su- perficie tratada y limpieza de bordes Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. Medida la superficie en proyección horizontal, por el extradós o en su defec- to por intradós con p.p. de desarrollos tanto de ar- cos, nervios y otros elementos así como cascos de plementería. O01OB070 h. Oficial cantero 0,200 18,00 3,60 O01OA060 h. Peón especializado 0,200 16,20 3,24 A01A010a m3 LECHADA CAL NHL 3,5 CE FYM o similar 0,050 81,88 4,09 P33A250 kg Árido impalpable espesante 0,100 2,07 0,21 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M03C010 h. Batidera mecánica fosas apagado 0,100 3,63 0,36 %medaux % Medios auxiliares 0,030 12,10 0,36 %costind % Costes indirectos 0,020 12,46 0,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 12,71 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 12,71 DOCE EUROS CON SETENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.09 E06plem01 m2 Saneamiento de plementería afectada por diversas patologías en conjunto o paño, no puntualmente, principalmente bóvedas 4-5-6 según plano 49 de es- te proyecto, referente a las de bóvedas del Claustro de la Catedral de Ciudad Rodrigo y consistente en el cosido de los fragmentos rotos que amenacen des- prendimiento, con varillas de acero inoxidable de día- metro 12, u otros de menor tamaño en función de la zona a reparar, incluyendo la limpieza y descarnado, rejuntado y retacado para saturar en la medida de lo posible la zona de afectada por la inyección, que se- rá de cal NHL, según criterios generales de interven- ción, memoria, planos e indicaciones de la D.F. Me- dida la unidad con p.p. costes indirectos y medios

Page 203: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

auxiliares. O01OA010 h. Encargado 0,100 21,50 2,15 O01OB070 h. Oficial cantero 1,200 18,00 21,60 O01OA060 h. Peón especializado 0,500 16,20 8,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,005 77,48 0,39 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,010 174,00 1,74 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P01var2 m. Varilla roscada acero inox D=12 mm. 6,850 5,15 35,28 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 71,62 2,15 %costind % Costes indirectos 0,020 73,77 1,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 75,25 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 75,25 SETENTA Y CINCO EUROS CON VEINTICINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.10 E06plem02 ud SANEAMIENTO, a base de limpieza, soplado y pre- paración de elementos y COSIDO DE PLEMENTE- RIA en cruz, con doble varilla de díametro 12mm. en diferentes longitudes, y tenida en cuenta para un máximo de tres plementos por "unidad de cosido", siguiendo criterios generales de intervención, con p.p. de medios auxiliares y costes indirectos, inclu- yendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a mo- do de encofrado. Varilla rehundida para facilitar sella- do con mortero de cal CPA "M8" teñido. Medida la unidad para una superficie de 0,50 m2 o un máximo de tres plementos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OB070 h. Oficial cantero 0,400 18,00 7,20 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,010 174,00 1,74 P01CPA8 kg. Cal CPA "M8" 0,100 0,75 0,08 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 0,030 18,25 0,55 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P01var2 m. Varilla roscada acero inox D=12 mm. 3,200 5,15 16,48 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 31,92 0,96 %costind % Costes indirectos 0,020 32,88 0,66 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 33,54 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 33,54 TREINTA Y TRES EUROS CON CINCUENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.11 E06nervios01 ud Reparación de NERVIOS ROTOS DE BÓVEDAS, incluso sus arcos formeros, perpiaños, ojivas, etc. consistente en la limpieza y preparación del elemen- to a tratar y el COSIDO EN CRUZ con doble VARI- LLA DE ACERO INOXIDABLE corrugado DE DIA- METRO 12mm. en diferente longitud según casos (incluso podría variar el díametro puntualmente se- gún se determine a pie de obra por la D.F.), y tenida en cuenta para un máximo de tres elementos por "unidad de cosido", siguiendo criterios generales de intervención, con p.p. de medios auxiliares y costes

Page 204: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

indirectos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejunta- do inferior a modo de encofrado, dejando la varilla rehundida para facilitar sellado de orificio (ejecutado con perforadora por rotación a baja presión libre de vibraciones) con mortero de cal CPA "M8" teñido. Medida la unidad en proyección horizontal s/criterio D.F. Medios auxiliares y costes indirectos incluidos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OB070 h. Oficial cantero 0,400 18,00 7,20 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,010 174,00 1,74 P01CPA8 kg. Cal CPA "M8" 0,100 0,75 0,08 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 0,030 18,25 0,55 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P01var2 m. Varilla roscada acero inox D=12 mm. 4,200 5,15 21,63 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,330 10,00 3,30 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 40,37 1,21 %costind % Costes indirectos 0,020 41,58 0,83 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 42,41 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 42,41 CUARENTA Y DOS EUROS CON CUARENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.12 E06nervios1a ud COSIDO DE ELEMENTOS DE BÓVEDAS de la Ca- tedral de Ciudad Rodrigo, bien en reparaciones o afianzamiento, pudiendo afectar tanto a arcos, oji- vas, nervios y plementos, consistente en la limpieza y preparación del elemento a tratar y el COSIDO EN CRUZ con doble varilla de acero inoxidable corruga- do díametro 6mm. en diferente longitud según casos (incluso podría variar el díametro puntualmente se- gún se determine a pie de obra por la D.F.), siguien- do criterios generales de intervención, con p.p. de medios auxiliares y costes indirectos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a modo de encofrado, dejando la varilla rehundida para facilitar sellado de orificio (ejecutado con perforadora por ro- tación a baja presión libre de vibraciones) con morte- ro de cal CPA "M8" teñido. Medida la unidad en pro- yección horizontal, s/criterio D.F. Medios auxiliares y costes indirectos incluidos. O01OA010 h. Encargado 0,050 21,50 1,08 O01OB070 h. Oficial cantero 0,400 18,00 7,20 O01OA060 h. Peón especializado 0,150 16,20 2,43 P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,010 174,00 1,74 P01CPA8 kg. Cal CPA "M8" 0,100 0,75 0,08 Parena1_2 m3 Arena seleccionada y tamiz. 1,2 mm. 0,030 18,25 0,55 P33A250 kg Árido impalpable espesante 0,500 2,07 1,04 P01var1 m. Varilla roscada acero inox. D=4 a 8 inc. 2,000 3,89 7,78 P01var5 ud Boquilla inyección resinas/cal hid 2,000 0,10 0,20 P01DW050 m3 Agua 0,500 0,80 0,40 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,330 10,00 3,30 M11med1 h. Barrenadora rotación 0,015 14,57 0,22 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 %medaux % Medios auxiliares 0,030 26,52 0,80 %costind % Costes indirectos 0,020 27,32 0,55 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 27,87 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 205: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 27,87 VEINTISIETE EUROS CON OCHENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.13 E06nervios02 m3 SUSTITUCIÓN DE NERVIOS de las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, rehechos en 1929 con mortero de cemento, por otros de pie- dra arenisca de Ciudad Rodrigo, seca, sana y selec- cionada, incluyendo el perfecto apeo completo de la zona afectada, tanto nervios como plementería, el pi- cado del cemento y si la D.F. no decide rehacerlos con mortero "Petratex", proceder a la toma de planti- llas y preparación de injertos e incluso piezas com- pletas si fuera el caso, perfectamente adoveladas o acuñadas según la profundidad, y en cualquier caso cosidas con varillas de acero inoxidable de diferentes diametros según zona de actuación, empleando mortero de cal hidráulica y acabando la superficie con mortero teñido de cal, CPA "M8", con p.p. de medios auxiliares y costes indirectos. Partida aplica- ble a otros nervios, bien de formeros, perpiaños, oji- vas, etc. Incluyendo en cualquier caso la labra según modelo original. O01OA010 h. Encargado 0,500 21,50 10,75 O01OB070 h. Oficial cantero 16,500 18,00 297,00 O01OA060 h. Peón especializado 10,500 16,20 170,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,200 77,48 15,50 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 1,150 1.015,25 1.167,54 P01var1 m. Varilla roscada acero inox. D=4 a 8 inc. 1,580 3,89 6,15 P01var2 m. Varilla roscada acero inox D=12 mm. 0,750 5,15 3,86 P01var3 m. Varilla vidrio-epoxi D=4 mm 1,500 4,74 7,11 P01var4 m. Varilla vidrio-epoxi D=6 mm. 0,750 5,20 3,90 P01var5 ud Boquilla inyección resinas/cal hid 8,000 0,10 0,80 P01DW050 m3 Agua 0,060 0,80 0,05 P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 3,000 10,00 30,00 M11PI020 h. Eq. de inyección manual resinas 0,100 4,96 0,50 M11med1 h. Barrenadora rotación 0,050 14,57 0,73 %medaux % Medios auxiliares 0,030 1.713,99 51,42 %costind % Costes indirectos 0,020 1.765,41 35,31 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.800,72 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.800,72 MIL OCHOCIENTOS EUROS CON SETENTA Y DOS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.14 E06nervios03 m. SUSTITUCIÓN DE NERVIOS (formaletes) de las bóvedas del Claustro de la Catedral de Ciudad Ro- drigo, rehechos en 1929 con mortero de cemento, que será picado para ser sustituido por un mortero de cal teñido, tipo "Petratex", incluyendo el perfecto apeo completo de la zona afectada, tanto nervios co- mo plementería, el picado del cemento y si la D.F. no decide rehacerlos piedra, proceder a la toma de plantillas y preparación del soporte, realización de cosidos en diferentes diametros, devolviendo la geo- metría original con el mortero PETRATEX" o similar indicado, procediendo al patinado del elemento. To- do con p.p. de medios auxiliares y costes indirectos. Medido a cinta corrida por el intradós del nervio cen- tral saliente. O01OC280 h. Restaurador de piedra 4,000 19,75 79,00 P33MORpetratex kg. Mortero de restaruación "Petratex" o similar 10,000 2,20 22,00 P01DW210 kg Pigmentos de tierra natural 0,350 2,50 0,88

Page 206: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01fot1 ud Reportaje fotográfico 3 copias -10 fotos- 0,100 10,00 1,00 P01DW050 m3 Agua 0,500 0,80 0,40 %medaux % Medios auxiliares 0,030 103,28 3,10 %costind % Costes indirectos 0,020 106,38 2,13 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 108,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 108,51 CIENTO OCHO EUROS CON CINCUENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.15 E06pat01 m2 Patinado de las juntas de mortero de cemento y re- llenos efectuados en las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, fundamentalmente las ejecutadas en 1929 y no considerando su retirada para no dañar la piedra que "lo soporta", en tono adecuado, previa realización de pruebas y elección de muestra por parte de la D.F., según criterios ge- nerales de intervención, memoria, planos etc. con p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, ojivas, nervios, claves, es- cudos y otros elementos decorativos así como cas- cos de plementería. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,550 19,75 10,86 O01OA060 h. Peón especializado 0,050 16,20 0,81 A01A010 m3 PASTA DE CAL APAGADA AMASADA 0,010 91,06 0,91 P01DW210 kg Pigmentos de tierra natural 0,080 2,50 0,20 P01DW050 m3 Agua 0,050 0,80 0,04 %costind % Costes indirectos 0,020 12,93 0,26 %medaux % Medios auxiliares 0,030 13,19 0,40 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,59 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,59 TRECE EUROS CON CINCUENTA Y NUEVE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.16 E06pat02 m2 Patinado de fábricas de piedra qeu conforman bóve- das y todos sus elementos incluidos los decorativos, tallas, nervios, perpiaños, formeros, ojivas, claves, escudos, etc. en la intervención de este proyecto, a base de agua de cal grasa con pigmentos inorgáni- cos, previa elección sobre muestras según dirección facultativa, con p.p. protección de elementos y lim- pieza final, de costes indirectos y medios auxiliares. Unicamente en las zonas a determinar por la D.F. E03fab05 m2 PATINADO DE FÁBRICAS 1,470 8,12 11,94 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11,94 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11,94 ONCE EUROS CON NOVENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.17 E06bov04 m2 Formación de encamisado de bóveda de la Catedral de Ciudad Rodrigo, según memoria, a base de una capa de mortero de cal hidráulica NHL 3,5 de 8 cm. de espesor mínimo, incluyendo la preparación del soporte y la colocación de un mallazo conformado de redondos de díametro 12 y malla #15/15cm. gal- vanizado en caliente, adaptado al trazado del extra- dós, incluyendo p.p. de anclajes y formación de asientos para conseguir el trabajo solidario del con- junto de nervios y plementería. Medido en proyec-

Page 207: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ción horizontal, con p.p. de medios auxiliares y cos- tes indirectos. O01OB070 h. Oficial cantero 0,420 18,00 7,56 O01OA060 h. Peón especializado 0,350 16,20 5,67 A02C001 m3 MORTERO CAL NHL ESTRUCT. 0,100 126,80 12,68 P06mallazo m2 Mallazo r12#15/15 galvan. + anclajes encamisa 1,100 24,50 26,95 %medaux % Medios auxiliares 0,030 52,86 1,59 %costind % Costes indirectos 0,020 54,45 1,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 55,54 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 55,54 CINCUENTA Y CINCO EUROS CON CINCUENTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.18 E06bov05 m2 Partida para la restauración de bóveda del Claustro de la Catedral de Ciudad Rodrigo, incluyendo el apuntalamiento sobre plataforma multidireccional metálica, homologada, y formación de cimbra para apeo de los arcos formeros-perpiaños, las ojivas y resto de nervios, así como el escudo en el caso de la bóveda marcada en planos con el nº16, previa toma de datos y reportaje fotográfico, con numeráción de todas las piezas para su escrupulosa recolocación, previa corrección del trazado, modificando la "tirantez" según las condiciones mínimas que asegu- ren la estabilidad del conjunto, incluyendo trabajos de carpinteros en montaje y desmontaje de cimbras y apeos, y de cantero en labores de desmontaje y montaje, incluyendo la adaptación de piezas y en su caso rectificación de encuentros, anclajes, entregas, uniones, formación de asientos entre plementería y nervios, cosidos necesarios a parte de los indicados en la restauración del escudo, así como labores de rejuntado y retacado, con inclusión mínima de pie- zas puntuales de piedra arenisca de Ciudad Rodrigo que será patinada, en caso de no poder recuperar algún elemento o bien por que el trazado lo aconse- je, siempre bajo supervisión y aprobación previa de la D.F., con p.p. de medios auxiliares y costes indi- rectos. Medida en proyección horizontal según plo- mo de elementos no desmontados. O01OB070 h. Oficial cantero 3,150 18,00 56,70 O01OA050 h. Ayudante 3,150 16,06 50,59 E06cim01 m2 APEO/CIMBRA BÓVEDA CLAUSTRO 1,000 97,14 97,14 C.RODRIGO E06bov02 m2 RETACADO y REJUNTADO BÓVEDAS CAL 1,150 19,13 22,00 NHL+CPA "M8" P01calNHL t Cal hidráulica NHL 3,5 CE FYM o similar 0,010 174,00 1,74 P01ET005 m3 Tabla encf pino 10-20cm L=2m 0,010 223,95 2,24 P01ET080 m2 Ripia 15x3,5 cm s/cepillar 0,150 8,94 1,34 M12T010 h. Taladro eléctrico 0,150 2,50 0,38 %medaux % Medios auxiliares 0,020 232,13 4,64 %costind % Costes indirectos 0,020 236,77 4,74 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 241,51 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 241,51 DOSCIENTOS CUARENTA Y UN EUROS CON CINCUENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

07.19 E06bov06 m2 Picado de rellenos y configuraciones no deseables con mortero de cemento en las bóvedas de la Cate- dral de Ciudad Rodrigo, afectando a elementos sin- gulaes (resto incluidos en partida de descarnado de juntas), como por ejemplo en trabajos para la restau-

Page 208: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ración del escudo de la bóveda marcada con el nº16 -plano 49-, consistente en eliminar cuidadosamente cualquier resto de mortero de cemento, para coser el mismo con 4 varillas de acero inoxidable corrugado de diámetro 12 mm. a través del vástago de cuelgue y del espesor de la bóveda, para posteriormente rea- lizar el resto de cosidos, etc. Medido en proyección horizontal con p.p. de medios auxiliares y costes indi- rectos. O01OC280 h. Restaurador de piedra 0,850 19,75 16,79 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,100 9,00 0,90 %medaux % Medios auxiliares 0,030 18,50 0,56 %costind % Costes indirectos 0,020 19,06 0,38 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 19,44 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 19,44 DIECINUEVE EUROS CON CUARENTA Y CUATRO CENTIMOS

Page 209: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

08 UNIDAD VII: CARPINTERÍAS DE PASO .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.01 E07cerr01 ud Suministro y colocación de cerradura de plastón "Mottura" o similar , a colocar en la puerta de entrada al Museo, en acabado cromado mate, con llaves maestradas de borjas -3 copias- con ruleta interior y cinco bulones, incluso anclaje con 8 tirafondos M/5/70 mm. perforando la hoja y enrasando el cerco en toda la altura de la puerta con el contramarco, re- cibido del cerradero con escudo exterior en torno al bombillo, de acero inoxidable mate de 7 cm. de día- metro y 5 mm. de espesor mínimo (nunca retran- queado respecto el frente del bombillo), con p.p.de pequeño material y el no descrito, medios auxiliares y costes indirectos. Medida la unidad completamente colocada y funcionando correctamente O01OB130 h. Oficial 1ª cerrajero 1,500 18,20 27,30 P07cerr1 ud Cerradura seguridad "Mottura" o similar 5 bul 1,000 185,00 185,00 P07cerr2 ud Bombillo cerradura Mottura 1,000 85,00 85,00 %medaux % Medios auxiliares 0,030 297,30 8,92 %costind % Costes indirectos 0,020 306,22 6,12 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 312,34 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 312,34 TRESCIENTOS DOCE EUROS CON TREINTA Y CUATRO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.02 E07puerta1 ud Intervención en puerta nº1, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. intervención consistente en: Retirada de cerraduras modernas de plastón. Retirada del pasador inferior. Lijado y decapado. Cajeado para colocación de cerradura de seguridad embutida con bocallave de forja redonda lisa. Colocación de prótesis en la barra inferior de las ho- jas. Tapado de orificios y faltas. Ajustado de las hojas. Reparación de la cerradura antigua incluso fabrica- ción de dos llaves artesanas de forja. Limpieza del pasador superior primitivo y de la reja del óculo para acabarlos en aceite de linaza. Limpieza del vidrio, colocando nuevos listones de su- jeción 20/20 mm. Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. Colocación de un nuevo pasador inferior, de forja. Medios auxiliares y costes indirectos En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestra- miento que todas las puertas colocadas en la IV Fa-

Page 210: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

se. P07puerta1 ud Intervención completa puerta 1 s/memoria-D.F 1,000 750,00 750,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 750,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 750,00 SETECIENTOS CINCUENTA Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.03 E07puerta2 ud Intervención en puerta nº2, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Retirada de cerraduras modernas de plastón. Retirada de la inadecuada argolla de la aldaba de se- guridad existente en la hoja fija. Lijado y decapado. Cajeado para colocación de dos cerraduras de se- guridad embutidas con bocallaves de forja redondas lisas. Cegado de huecos de antiguas cerraduras. Limpieza de herrajes para su acabado. Colocación de una nueva argolla de forja en sustitu- ción de la retirada para recibir la aldaba. Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. P07puerta2 ud Intervención completa puerta 2 s/memoria-DF 1,000 360,00 360,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 360,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 360,00 TRESCIENTOS SESENTA Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.04 E07puerta3 ud Intervención en puerta nº3, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Eliminación de los soportes modernos de cortina existentes en el interior, fuera de uso. Eliminación de las dos cerraduras modernas de plas- tón. Lijado y decapado. Sustitución de la hoja de paso pequeña por otra de 50 mm de espesor, reduciendo el diente del "cerco", colgándola de pernios de forja. Tapado de las faltas dejadas por las cerraduras reti- radas, dejando los orificios donde estuvo anclada en su día una reja hacia el Claustro. Colocación de dos nuevas cerraduras de seguridad

Page 211: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

embutidas con bocallaves de forja redondas lisas. Limpieza de los herrajes para su acabado. La reja moderna existente tras el óculo, una vez limpia, se acabará en "Oxiron" negro forja. Limpieza del vidrio impreso del óculo. Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. P07puerta3 ud Intervención completa puerta 3 s/memo y DF. 1,000 1.050,00 1.050,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.050,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.050,00 MIL CINCUENTA Euros .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.05 E07puerta4 ud Intervención en puerta nº4, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Desmontaje de la puerta. Desmontaje y restauración de herrajes. Retirada de la malla de plástico verde existente tras los barrotes. Retirada de las tablas que tapan la falta de dos plafo- nes. Lijado y decapado. Restauración de los cuatro plafones abiertos de la mitad superior de las hojas. Restauración de faltas y partes inferiores dañadas, cajeando y ensamblando prótesis encoladas. Colocación de dos plafones nuevos, dotados de molduraje perimetral igual al existente, sin parte cen- tral labrada. Limpieza del pasador primitivo inferior y de los barro- tes para acabarlos igual que el resto de herrajes en aceite de linaza. Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. Colocación detrás de los barrotes de una malla de nylon anti pájaros Ø 1/30/30 mm sujeta entre dos lis- tones perimetrales 10/20 mm clavados interiormente al cerco del hueco. Recolocación de las hojas y puesta en funciona- miento colocando un pasador de forja, acabado en aceite de linaza, que asegure su cierre fuera de las horas de visitas, para asegurar la estabilidad del ele- mento. P07puerta4 ud Intervención completa puerta 4 s/memo y DF 1,000 2.490,00 2.490,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 2.490,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 2.490,00

Page 212: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

DOS MIL CUATROCIENTOS NOVENTA Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.06 E07puerta7 ud Intervención en puerta nº7, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Desmontado de la hoja y cerramiento provisional con tablero aglomerado de 30 mm para escuadrarla mediante presión y colocación de un refuerzo peri- metral de platabanda continua de 5 mm de espesor acabada en "Oxiron" negro forja en cajeado y atorni- llada al bastidor de la puerta que servirá, a su vez, para la fijación del nuevo herraje de colgar, de forja. Retirada de las dos cerraduras de plastón. Limpieza y acabado del pasador y de la aldaba de forja existentes. Tapado de huecos y faltas. Colocación de una cerradura de seguridad embuti- da. Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. Colocación de dos trancas en el interior, construida tanto en sus barras como en sus perfiles de sujeción con pletina 50/10 mm acabadas en "Oxiron" negro forja. P07puerta7 ud Intervención completa puerta 7 s/memo y DF 1,000 1.200,00 1.200,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.200,00 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.200,00 MIL DOSCIENTOS Euros ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.07 E07puerta8 ud Intervención en puerta nº8, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Retirada de las dos anillas para paso de cadena del candado actual. Lijado y decapado. Saneado y colocación de prótesis de madera, me- diante cajeado y ensamblado de láminas de madera encolada. Ajustado y emplastecido de prótesis antiguas. Estando ahora mismo encomendada la seguridad de la puerta al diente existente entre las hojas, colo- cación de otra aldaba de seguridad de forja en la ho- ja que no la tiene, recibiendo sendas anillas del mis- mo material en la hoja y en la fábrica de piedra de la mocheta.

Page 213: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Tratamiento de la madera con producto antixilófa- gos. Acabado de la madera, si el resultado tras el decapa- do lo permite, con una veladura marrón oscuro y en caso contrario con pintura en base oleosa en el mis- mo tono, rematando a la cera. P07puerta8 ud Intervención puerta 8, s/memoria y DF 1,000 530,00 530,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 530,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 530,00 QUINIENTOS TREINTA Euros .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.08 E07puerta9 ud Intervención en puerta nº9, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de lina- za y, si son de acero, esto es, modernos, se acaba- rán en "Oxiron" negro forja para diferenciarlos clara- mente; En caso de colocar cerradura será de seguri- dad "MCM" o similar serie superior INOX con bombi- llos "ISEO" cromados mate, dotados de igual amaes- tramiento que todas las puertas colocadas en la IV Fase. Retirada de la puerta de acero existente, teniendo preparada la de madera que la sustituirá para su co- locación en el día. La nueva puerta de madera será de roble americano "Prime" con el mismo tono de acabado en roble os- curo que se le dio en su día a la de la Torre de Cam- panas y a la del Portillo del Alba. Contará con una cerradura similar a las dos a colocar en el acceso al Museo, con llave amaestreada con ellas, variando el escudo exterior, definido en planos. La hoja se le- vantará 3 cm del umbral, lo cual unido a las amplias aberturas de la puerta del Coro proporcionará la ven- tilación cruzada necesaria para poder cegar los dos huecos del husillo. P07puerta9 ud Intervención completa puerta 9 s/memo y DF 1,000 848,00 848,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 848,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 848,00 OCHOCIENTOS CUARENTA Y OCHO Euros .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

08.09 E07puerta10 ud Intervención en puerta nº10, previa lijado en su caso y limpios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se aca- barán en "Oxiron" negro forja para diferenciarlos cla- ramente; En caso de colocar cerradura será de se- guridad "MCM" o similar serie superior INOX con bombillos "ISEO" cromados mate, dotados de igual amaestramiento que todas las puertas colocadas en la IV Fase. Desmontado, ajuste y sustitución de herrajes por otros de acero inoxidable similares a los existentes que permitan la corrección de alabeos y deformacio- nes. P07puerta10 ud Intervención puerta 10 s/memoria y DF 1,000 380,00 380,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 380,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 380,00 TRESCIENTOS OCHENTA Euros

Page 214: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 215: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

09 UNIDAD VIII: CAPILLA DE SAN JERÓNIMO ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.01 E08lev01 m2 Picado de solado de mortero de cemento existente en la Capilla de San Jerónimo y su Sacristía, o zonas asimilables, por medios manuales y mecánicos, pro- tegiendo paramentos y elementos que puedan verse afectados, limpiándo la superficie y valorando el ca- jeado del terreno para un posible saneado, eliminan- do cualquier resto de mortero de cemento que pu- diera aparecer sobre los muros perimetrales, inclu- yendo la retirada del escombro generado a zona de carga o a contenedor para transporte a vertedero y limpieza final con p.p. de plataformas de protección para evacuación de escombros, tanto en umbral co- mo en recorrido, así como protección de la carpinte- ría de acceso -puerta 4- y p.p. de medios auxiliares y costes indirectos. O01OA060 h. Peón especializado 0,500 16,20 8,10 M06MI020 h. Martillo manual picador eléctrico 11kg 1,100 3,01 3,31 %medaux % Medios auxiliares 0,030 11,41 0,34 %costind % Costes indirectos 0,020 11,75 0,24 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 11,99 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 11,99 ONCE EUROS CON NOVENTA Y NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.02 E08lev02 m3 Partida en previsión para el posible cajeado, si pro- cede y a determinar por la D.F., de la base del sola- do existente en la Capilla de San Jerónimo y su Sa- cristía, según niveles a determinar en función de los estratos que aparezcan, incluso limpieza de restos ajenos, con supervisión arqueológica incluida, inclu- yendo la carga de escombro a zona exterior para su posterior retirada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirectos. E01levan3 m3 CAJEADO SUB-BASE MANUAL 1,050 22,09 23,19 c/SUPERV.ARQUEO _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 23,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 23,19 VEINTITRES EUROS CON DIECINUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.03 E08pic01 m2 Picado de los restos de mortero de cal de la bóveda de ladrillo de la Capilla de San Jerónimo en la Cate- dral de Ciudad Rodrigo, tanto enfoscados como re- tacados y rejuntados, para proceder a su limpieza y saneado, o en su defecto para volver a enfoscar, se- gún valoración en obra por parte de la D.F., con p.p. de retirada de escombros, limpieza y medios auxilia- res y costes indirectos. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,380 18,00 6,84 O01OA060 h. Peón especializado 0,150 16,20 2,43 %medaux % Medios auxiliares 0,030 9,49 0,28 %costind % Costes indirectos 0,020 9,77 0,20 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,97 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,97 NUEVE EUROS CON NOVENTA Y SIETE CENTIMOS

Page 216: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.04 E03fab02 m2 Limpieza de fábricas de sillería incluso p.p. de ele- mentos labrados que la conforman, contemplados en este Proyecto de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deteriora- das no susceptible de consolidación previa y el pica- do de restos aislados de mortero de cemento o ele- mentos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labra- dos, dejando las superficies acabadas o en su caso listas para el tratamiento correspondiente (rejuntado, consolidación, impermeabilización etc.) incluso aspi- rado y/o soplado. Medida en proyección vertical se- gún planos, con p.p. de desarrollo de molduras, ni- chos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios auxi- liares. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,050 16,20 0,81 M06CH030 h. Compresor portátil eléctrico 7 m3/min. 0,150 9,00 1,35 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 %medaux % Medios auxiliares 0,030 8,35 0,25 %costind % Costes indirectos 0,020 8,60 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,77 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,77 OCHO EUROS CON SETENTA Y SIETE CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.05 E05lim01 m2 Limpieza de muros de sillería y o fábricas de ladrillo, bóvedas, etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Todo in- cluido con p.p. de medios auxiliares y costes indirec- tos. O01OA010 h. Encargado 0,005 21,50 0,11 O01OC280 h. Restaurador de piedra 1,500 19,75 29,63 O01OA060 h. Peón especializado 0,200 16,20 3,24 P33A130 l. Adhesivo de nylón soluble 1,320 2,50 3,30 P33P100 kg Pulpa papel p/humedecer 3,200 2,15 6,88 P01DW050 m3 Agua 0,008 0,80 0,01 P33XB100 kg Hidróxido de bario 0,050 20,50 1,03 P33I140 l. Alcohol etílico 0,400 1,90 0,76 P33J170 l. Agua desionizada no polarizada 1,000 0,11 0,11 P33J050 kg Atapulgita celulósica 0,550 6,89 3,79 P33P180 ud Conductivímetro 0,010 220,69 2,21 P33A120 kg Adhesivo Calatón CA disol. 70/30 0,350 7,68 2,69 %medaux % Medios auxiliares 0,030 53,76 1,61 %costind % Costes indirectos 0,020 55,37 1,11 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 56,48 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 56,48 CINCUENTA Y SEIS EUROS CON CUARENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.06 E03fab03a m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos:

Page 217: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

1,- DESCARNADO de juntas de fábricas de sillería y elementos de piedra contemplados en esta interven- ción, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de cemento (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicacio- nes de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior Criterio de medición: superficie ejecutada por pro- yección vertical perpendicular a paño de fachada completo, o proyección horizontal en caso de ele- mentos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,300 19,75 5,93 O01OA060 h. Peón especializado 0,180 16,20 2,92 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 9,30 0,28 %costind % Costes indirectos 0,020 9,58 0,19 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 9,77 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 9,77 NUEVE EUROS CON SETENTA Y SIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.07 E03fab03b m2 Tratamiento en juntas de fábrica de silleria, con inco- poración de elementos labrados, impostas, salientes, botaaguas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 2,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 3% de la superficie trata- da. Resto en partida independiente. Criterio de medición: superficie ejecutada por pro- yección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo huecos. O01OA010 h. Encargado 0,003 21,50 0,06

Page 218: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OC280 h. Restaurador de piedra 0,450 19,75 8,89 O01OA060 h. Peón especializado 0,050 16,20 0,81 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,006 77,48 0,46 P01CPA8 kg. Cal CPA "M8" 2,900 0,75 2,18 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,050 2,95 0,15 M03HH020 h. Hormigonera 200 l. gasolina 0,070 1,80 0,13 %medaux % Medios auxiliares 0,030 12,72 0,38 %costind % Costes indirectos 0,020 13,10 0,26 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 13,36 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 13,36 TRECE EUROS CON TREINTA Y SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.08 E08fab01 m2 Tratamiento en juntas de FÁBRICA DE LADRILLO en bóvedas, con incoporación puntual de algún ele- mento labrado de sillería de piedra incluyendo los si- guientes trabajos: 1,- DESCARNADO de juntas de fábricas de ladrillo macizo, incluyendo el picado de las sueltas y/o aque- llas que su estado lo recomiende, o las ejecutadas con mortero de cemento previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, espátu- las, cucharilla, etc-, sin dañar en ningún caso la fábri- ca a restaurar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior Criterio de medición: superficie según proyección proyección horiz. Con p.p. de medios auxiliars y cos- tes indirectos. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,450 19,75 8,89 O01OA060 h. Peón especializado 0,380 16,20 6,16 M11W010 h. Equipo chorro aire presión 0,190 2,95 0,56 %medaux % Medios auxiliares 0,030 15,76 0,47 %costind % Costes indirectos 0,020 16,23 0,32 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 16,55 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 16,55 DIECISEIS EUROS CON CINCUENTA Y CINCO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.09 E08fab02 m2 Tratamiento en juntas en BÓVEDAS DE LADRILLO MACIZO incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su re- juntado posterior 2,- RETACADOS o RELLENOS puntuales, em- pleando mortero de cal y arena seleccionada y tami- zada, con aglomerante según casos, cal grasa apa- gada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgá- nicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARACIÓN DE SOPORTE, controlan- do grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes.

Page 219: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Todo con limpieza final incluida, repasos, medios au- xiliares y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS míni- ma, estimando no más del 3% de la superficie trata- da. Resto en partida independiente. Criterio de medición: proyección horizontal, medido al 100% en caso de trabajos para dejar visto el ladri- llo, y en caso de ejecutar trabajos de retacado única- mente para posteriormente enfoscar, un 30% sobre el total. O01OA010 h. Encargado 0,007 21,50 0,15 O01OC280 h. Restaurador de piedra 0,870 19,75 17,18 O01OA060 h. Peón especializado 0,870 16,20 14,09 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,018 77,48 1,39 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,005 111,68 0,56 P01CPA8 kg. Cal CPA "M8" 3,750 0,75 2,81 P01DW050 m3 Agua 0,050 0,80 0,04 M11W010 h. Equipo chorro aire presión 0,150 2,95 0,44 M03HH020 h. Hormigonera 200 l. gasolina 0,400 1,80 0,72 %medaux % Medios auxiliares 0,030 37,38 1,12 %costind % Costes indirectos 0,020 38,50 0,77 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 39,27 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 39,27 TREINTA Y NUEVE EUROS CON VEINTISIETE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.10 E08enf01 m2 Revoco de paramentos en trabajos de restauración a base de aplicación de diferentes morteros de cal grasa y arenas seleccionadas en tres capas de la si- guiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosificación 1:4 empleando arena limpia selecciona- da y de tamiz 2,5 mm previo descarnado, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de tes- tigos para regleteado. 2.- Una segunda capa de espesor 6 ó 7 mm., de do- sificación 1:2, empleando arena limpia seleccionada de tamiz 1,2 mm. extendida con fratás. 3.- Una tercera y última capa de espesor 3 mm., de dosificación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y con- trol de retracciones. Se empleará cal grasa para realización de morteros y se pigmentarán con tierras naturales, realizando muestras para elección por parte de la dirección fa- cultativa, incluso teniendo en cuenta un patinado fi- nal para conseguir tono adecuado (según criterios establecidos en memoria) empleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosificaciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un co- rrecto agarre y p.p. de medios auxiliares y costes in- directos. Según memoria y criterios generales esta- blecidos para la intervención. Incluso ensayos de hu- medad de paramentos previos a la aplicación, para su posterior comprobación, incluso realización de ensayos de dosificaciones y tipos de arena y cal. O01OA010 h. Encargado 0,005 21,50 0,11 O01OB910 h. Oficial 1ª revocador 1,450 18,50 26,83

Page 220: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OB920 h. Ayudante revocador 1,350 18,00 24,30 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,045 71,27 3,21 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,015 111,68 1,68 A02C040 m3 MORTERO DE CALGRASA 1/1 0,035 160,24 5,61 P01DW050 m3 Agua 0,030 0,80 0,02 %medaux % Medios auxiliares 0,030 61,76 1,85 %costind % Costes indirectos 0,020 63,61 1,27 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 64,88 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 64,88 SESENTA Y CUATRO EUROS CON OCHENTA Y OCHO CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.11 E08sol01 m2 Preparación de base de solado de la Capilla de San Jerónimo y su Sacristía, incluyendo el drenaje a de- terminar en función del estado, la aportación de tie- rras especiales y su estabilización con cal mediante técnicas tradicionales, incluso capa separadora, api- sonado, todo para un espesor según condiciones del terreno entre 10-20 cm., dejando la superficie lis- ta para la colocación de nuevo solado, con p.p. de costes indirectos y medios auxiliares. O01OA010 h. Encargado 0,750 21,50 16,13 O01OA060 h. Peón especializado 0,850 16,20 13,77 P01CL030 t. Cal hidratada en sacos S 0,020 155,00 3,10 P01AG130 m3 Grava 40/80 mm. 0,050 17,56 0,88 P01AF040 t. Zahorra natural 0,100 8,52 0,85 M08RI010 h. Pisón vibrante 70 kg. 0,350 2,04 0,71 %medaux % Medios auxiliares 0,030 35,44 1,06 %costind % Costes indirectos 0,020 36,50 0,73 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 37,23 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 37,23 TREINTA Y SIETE EUROS CON VEINTITRES CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.12 E08sol02 m2 Solado de la Capilla de San Jerónimo y su Sacristía, o zonas asimilables, con baldosas de piedra arenisca de Ciudad Rodrigo, seca y sana, de espesor 10 cm. y medidas 50x50, con acabado apomazado, incluso formación de juntas de 1 cm. , base de mortero seco sobre arena seca apisonada, y rejuntado con morte- ro de cal teñido (arena seleccionada y tamizada) pre- via realización de muestras, con protección de para- mentos y zonas que pudieras verse afectadas, lim- pieza final y retirada de material sobrante y selección en contenedores, costes indirectos y medios auxilia- res. O01OA030 h. Oficial primera 0,500 17,62 8,81 O01OA070 h. Peón ordinario 0,500 14,50 7,25 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,050 71,27 3,56 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,013 111,68 1,45 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,105 1.015,25 106,60 P01AA020 m3 Arena de río 0/6 mm. 0,980 16,80 16,46 P01DW210 kg Pigmentos de tierra natural 8,980 2,50 22,45 M11C010 h. Bailarín mecánico abujardado/apomazado 1,000 2,75 2,75 %medaux % Medios auxiliares 0,030 169,33 5,08 %costind % Costes indirectos 0,020 174,41 3,49 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 177,90 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 177,90 CIENTO SETENTA Y SIETE EUROS CON NOVENTA CENTIMOS

Page 221: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.13 E08elec01 ud Partida para la ejecución de los trabajos de albañile- ría completos para poder instalar los puntos de ilumi- nación y control en la Capilla de San Jerónimo y su Sacristía, así como las reparaciones en la zona de acometida marcadas en planos, incluyendo la forma- ción de acometida a la red existente en Sala conti- gua del Museo (caja de enchufe en suelo), incluyen- do las rozas necesarias tanto en solado, paramen- tos, muros (perforación para un grosor estimado de 1,50 metros y 1,10 m.), bóveda, etc. para poder ins- talar una manguera de 2x1,5+1,5 mm2, incluso re- mates, tanto de la Capilla y su Sacristía como la zo- na necesaria afectada del Museo, con p.p. de me- dios auxiliares y costes indirectos. O01OA030 h. Oficial primera 4,000 17,62 70,48 O01OA070 h. Peón ordinario 4,000 14,50 58,00 A02C030 m3 MORTERO DE CAL GRASA 1/4 0,150 71,27 10,69 A02C010 m3 MORTERO DE CAL GRASA 1/2 TEÑIDO 0,190 111,68 21,22 P33pieCR m3 Piedra arenisca Ciudad Rodrigo escuadrada 0,050 1.015,25 50,76 M11med1 h. Barrenadora rotación 3,000 14,57 43,71 %medaux % Medios auxiliares 0,030 254,86 7,65 %costind % Costes indirectos 0,020 262,51 5,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 267,76 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 267,76 DOSCIENTOS SESENTA Y SIETE EUROS CON SETENTA Y SEIS CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.14 E08elec02 ud Suministro y montaje de proyector foco led, de la marca "LEDBOX" mod. "Lexus" o similar, de 9 w, in- cluyendo p.p. de línea a base de manguera 2x1,5+1,5 mm2, conexiones, acometida, regletas y linea de control por detector, material auxiliar, acce- sorios y el no descrito, mano de obra, medios auxi- liars y costes indirectos. Medida la unidad colocada y funcionando O01OB200 h. Oficial 1ª electricista 2,850 17,51 49,90 P08elec1 m. Manguera arm 2x1,5x1,5 libre halógenos + acce 4,500 3,50 15,75 P08elec2 ud Proyector "Ledbox Nexus" o similar 9w 1,000 65,50 65,50 %medaux % Medios auxiliares 0,030 131,15 3,93 %costind % Costes indirectos 0,020 135,08 2,70 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 137,78 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 137,78 CIENTO TREINTA Y SIETE EUROS CON SETENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.15 E08elec03 ud Suministro y montaje de DETECTOR DE PRESEN- CIA tipo "Orbise Prosimat PRO CR" o similar, con 360º de ángulo de captación, campo de detección: Hasta ø 30 m. a 3,5 m de altura, instalación en techo a altura máxima de 7 m. o en pared, con led de fun- cionamiento, programable con Mando a Distancia CR ( accesorio), el cual permite cambiar con gran ra- pidez, facilidad y precisión los parámetros regulables y funciones especiales de los detectores de proximi- dad CR ya instalados, con un alcance de aproxima- damente 8 metros que permita una rápida y precisa programación sin necesidad de herramientas ni es- caleras, incluyendo p.p. de línea a base de mangue- ra 2x1,5+1,5 mm2, conexiones, acometida, regletas y material auxiliar, accesorios y el no descrito, mano de obra, medios auxiliars y costes indirectos. Medida la unidad colocada y funcionando

Page 222: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

O01OB200 h. Oficial 1ª electricista 3,000 17,51 52,53 P08elec1 m. Manguera arm 2x1,5x1,5 libre halógenos + acce 7,000 3,50 24,50 P08elec3 ud Detector "Orbise Prosimat PRO CR" o similar 1,000 116,35 116,35 %medaux % Medios auxiliares 0,030 193,38 5,80 %costind % Costes indirectos 0,020 199,18 3,98 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 203,16 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 203,16 DOSCIENTOS TRES EUROS CON DIECISEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

09.16 E08alab1 ud Cerramiento de hueco con alabrastro, previa aproba- ción de muestra por parte de la D.F. incluyendo el suministro, corte y montaje, con p.p. de preparación de hueco, adaptación, formación de mochetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxiliares y costes indirectos. En Capilla de San Jerónimo. O01OA010 h. Encargado 0,010 21,50 0,22 O01OB070 h. Oficial cantero 0,300 18,00 5,40 O01OC280 h. Restaurador de piedra 2,000 19,75 39,50 O01OA060 h. Peón especializado 0,500 16,20 8,10 A02C020 m3 MORTERO DE CAL GRASA 1/3 TEÑIDO 0,009 77,48 0,70 P01alab1 m2 Alabastro seleccionado a elegir 0,850 110,50 93,93 P01CPA8 kg. Cal CPA "M8" 0,350 0,75 0,26 P01DW050 m3 Agua 0,009 0,80 0,01 M11W010 h. Equipo chorro aire presión 0,100 2,95 0,30 %medaux % Medios auxiliares 0,030 148,42 4,45 %costind % Costes indirectos 0,020 152,87 3,06 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 155,93 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 155,93 CIENTO CINCUENTA Y CINCO EUROS CON NOVENTA Y TRES CENTIMOS

Page 223: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

10 SEGURIDAD Y SALUD ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

10.01 E09SyS01 ud Partida alzada basada en el Estudio de Seguridad y Salud redactado por el Arquitecto Técnico Fernando Polo González, anejo a este Proyecto - apartado 3- P09SYS01 ud Coste Total Seguridad y Salud según Estudio F 1,000 30.218,25 30.218,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 30.218,25 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 30.218,25 TREINTA MIL DOSCIENTOS DIECIOCHO EUROS CON VEINTICINCO CENTIMOS

Page 224: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

11 GESTIÓN DE RESIDUOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.01 E10GRes1 m3 Carga de tierras a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que exten- derá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera basculante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxi- liares. M05EN030 h. Excav.hidráulica neumáticos 100CV 0,035 50,00 1,75 M07CB030 h. Camión basculante 6x4 20 t. 0,080 36,00 2,88 M07N060 m3 Canon vertedero 1,000 0,82 0,82 P10gest1 ud Tasa/m3 sustancia no peligrosa en camión 1,000 2,90 2,90 %medaux % Medios auxiliares 0,010 8,35 0,08 %costind % Costes indirectos 0,020 8,43 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,60 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,60 OCHO EUROS CON SESENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.02 E10GRes2 m3 Carga de escombro según tipo codigo LER a ca- mión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este pro- yecto, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con ca- mión bañera basculante cargado a mediante maqui- na retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. M05EN030 h. Excav.hidráulica neumáticos 100CV 0,035 50,00 1,75 M07CB030 h. Camión basculante 6x4 20 t. 0,080 36,00 2,88 M07N060 m3 Canon vertedero 1,000 0,82 0,82 P10gest1 ud Tasa/m3 sustancia no peligrosa en camión 1,000 2,90 2,90 %medaux % Medios auxiliares 0,010 8,35 0,08 %costind % Costes indirectos 0,020 8,43 0,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 8,60 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 8,60 OCHO EUROS CON SESENTA CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.03 E10GRes3 m3 Carga de madera y similares a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la direc- ción facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera bas- culante cargado a mediante maquina retro, de dife- rente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. M07CB030 h. Camión basculante 6x4 20 t. 0,100 36,00 3,60 M07N060 m3 Canon vertedero 1,000 0,82 0,82 P10gest1 ud Tasa/m3 sustancia no peligrosa en camión 1,000 2,90 2,90

Page 225: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

%medaux % Medios auxiliares 0,010 7,32 0,07 %costind % Costes indirectos 0,020 7,39 0,15 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,54 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 7,54 SIETE EUROS CON CINCUENTA Y CUATRO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.04 E10GRes4 m3 Carga de MATERIAL CERÁMICO SOBRANTE a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este pro- yecto, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con ca- mión bañera basculante cargado a mediante maqui- na retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. M07CB030 h. Camión basculante 6x4 20 t. 0,100 36,00 3,60 M07N060 m3 Canon vertedero 1,000 0,82 0,82 P10gest1 ud Tasa/m3 sustancia no peligrosa en camión 1,000 2,90 2,90 %medaux % Medios auxiliares 0,030 7,32 0,22 %costind % Costes indirectos 0,020 7,54 0,15 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 7,69 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 7,69 SIETE EUROS CON SESENTA Y NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.05 E10cont01 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 1,000 12,50 12,50 %costind % Costes indirectos 0,020 96,05 1,92 %medaux % Medios auxiliares 0,030 97,97 2,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 100,91 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 100,91 CIEN EUROS CON NOVENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.06 E10cont02 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 1,000 12,50 12,50 %costind % Costes indirectos 0,020 96,05 1,92 %medaux % Medios auxiliares 0,030 97,97 2,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 226: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 100,91 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 100,91 CIEN EUROS CON NOVENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.07 E10cont03 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 1,000 12,50 12,50 %medaux % Medios auxiliares 0,030 96,05 2,88 %costind % Costes indirectos 0,020 98,93 1,98 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 100,91 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 100,91 CIEN EUROS CON NOVENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.08 E10cont04 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4a ud Tasas y certificado contenedor 11 m3 bitumino 1,000 15,50 15,50 %medaux % Medios auxiliares 0,030 99,05 2,97 %costind % Costes indirectos 0,020 102,02 2,04 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 104,06 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 104,06 CIENTO CUATRO EUROS CON SEIS CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.09 E10cont05 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4b ud Tasas y certificado Gestor homol. plomo/cobre 1,000 18,00 18,00 %medaux % Medios auxiliares 0,030 101,55 3,05 %costind % Costes indirectos 0,020 104,60 2,09 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 106,69 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 106,69 CIENTO SEIS EUROS CON SESENTA Y NUEVE CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.10 E10cont06 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili-

Page 227: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4c ud Tasas y certificado Gestor homologado Cables 1,000 16,85 16,85 %medaux % Medios auxiliares 0,030 100,40 3,01 %costind % Costes indirectos 0,020 103,41 2,07 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 105,48 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 105,48 CIENTO CINCO EUROS CON CUARENTA Y OCHO CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.11 E10cont07 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 1,000 12,50 12,50 %costind % Costes indirectos 0,020 96,05 1,92 %medaux % Medios auxiliares 0,030 97,97 2,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 100,91 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 100,91 CIEN EUROS CON NOVENTA Y UN CENTIMOS ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.12 E10cont08 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05 P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res4 ud Tasas y certificado Gestor homologado LER var 1,000 12,50 12,50 %costind % Costes indirectos 0,020 96,05 1,92 %medaux % Medios auxiliares 0,030 97,97 2,94 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 100,91 _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 100,91 CIEN EUROS CON NOVENTA Y UN CENTIMOS .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.13 E10cont09 ud Gestión de Residuos a base de instalación de conte- nedor, carga de residuos y retirada a lugar de reutili- zación, reciclaje o vertederos, según casos por Ges- tor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. todo según normativa, con p.p. medios auxilares y costes indirectos. Para el código indicado, o en su defecto asimilable. O01OA060 h. Peón especializado 0,250 16,20 4,05

Page 228: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.2.3 CUADRO DE PRECIOS DESCOMPUESTOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NºOrden Código Descripción Rendimiento Precio Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

P01cont1 ud Contenedor 11 m3 1,000 69,50 69,50 P01res3 ud Canón vertedero contenedor 11 m3 1,000 10,00 10,00 P01res5 ud Tasas y certif. Gestor Homolog. mat.peligroso 1,000 20,20 20,20 %costind % Costes indirectos 0,020 103,75 2,08 %medaux % Medios auxiliares 0,030 105,83 3,17 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 109,00 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 109,00 CIENTO NUEVE Euros .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

11.14 E10cont10 ud Partida para la manipulación de materiales con amianto, principalmente pilón en patio central, tube- rías de fibrocemento y otros, incluso otros potencial- mente peligrosos (disolventes, aditivos, resinas, resi- duos varillas vidrio-epoxi, etc. con contenidos de hi- drocarburos, etc.) incluyendo el desmontaje y retira- da de obra, selección, carga y transporte a vertedero homologado, incluyendo todo el tratamiento regula- do según RD 396/2006 y normativa vigente. Para un volumen máximo de 17 m3, con p.p. de certificados, cánon de vertedero, etc. Todo según normativa, con p.p. de costes indirectos y medios auxiliares. O01OA010 h. Encargado 5,000 21,50 107,50 O01OA060 h. Peón especializado 3,000 16,20 48,60 P01res1 ud Tratam. completo resid.amianto <15 m3 homol. 1,000 980,00 980,00 %costind % Costes indirectos 0,020 1.136,10 22,72 %medaux % Medios auxiliares 0,030 1.158,82 34,76 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Costes directos 1.193,58 __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Coste total 1.193,58 MIL CIENTO NOVENTA Y TRES EUROS CON CINCUENTA Y OCHO CENTIMOS

Page 229: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 01 TRABAJOS PREVIOS y MEDIOS AUXILIARES

01.001 115,85 m. VALLADO DE OBRA TIPO 1 22,47 2.603,15 1.- Vallado ciego con placas metálicas de acero galvaniza- do plegado sustentadas por pies derechos formados con perfiles laminados, con puertas de acceso. La altura de di- chos paneles será de un mínimo de 2 m. cuando se colo- quen de forma horizontal en la zona prevista para limitar la zona de talleres y/o de trabajo, los locales de obra, la zona de almacenaje y acopios y la zona para gestión de resi- duos y de altura 3,5 m. o superior cuando se adosen al an- damiaje a colocar en la Fachada Este del Claustro, para li- mitar el posible acceso de ladrones y/o maleantes al inte- rior del bien. Todo incluido, montaje, desmontaje y limpie- za. El exterior deberá estar rematado en tono según indi- caciones del Ayuntamiento o la Comisión de Patrimonio correspondiente, pudiendo sustituirse en dicho caso por material adecuado que cumpla las funciones de seguridad necesarias. Medios auxiliares y costes indirectos incluidos, incluso carga de escombros generados y gestión de resi- duos. 01.002 43,47 m. VALLADO DE OBRA TIPO 2 12,64 549,46 2.- Vallado de paneles enrejados 80x150 prefabricados de acero galvanizado, de 3.50x2,00 m. de altura, D=8 mm. de espesor, soldado a tubos de D=40 mm. y 1,50 mm. de es- pesor, autoportantes sobre soportes de hormigón prefabri- cado separados cada 3,50 m., previstos para aquella zona que bien por motivos de seguridad bien por motivos de operatividad o bien por motivos de respeto al bien (Atrio de Amayuelas, en donde se evitarán anclajes innecesarios) se pretenda dejar vista desde el exterior. 01.003 3.140,80 m2 MONTAJE y DESMONTAJE ANDAMIO FACHADA 5,85 18.373,68 M2. Andamio TUBULAR "EUROPEO" para "MARCOS O FACHADAS", homologado, de acero o duraluminio, apto para trabajos hasta una altura de 16 m., consistente en: suministro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, amarres a hue- cos mediante husillos con tacos de madera contrachapada y control periodico de su tensión y amarres a fábricas o elementos resistentes con tacos de expansión, químicos , especiales para piedra, coincidiendo en zona de juntas de mortero de cal, colocados según normas con un mínimo de 1 anclaje cada 12m2, con suficiente resistencia a trac- ción, red de protección para caida de materiales, prepara- ción de base, placas de apoyo al suelo sobre tacos de ma- dera y/o durmientes a base de tablones de 7 cm. especial- mente en aquellas zonas indicadas, y siempre de acuerdo con la capacidad de carga de la base, incluso accesos de plataformas con trampilla y escaleras abatibles en su inte- rior (en número suficiente que garantice una evacuación con una distancia máxima de recorrido de 15 metros), ba- randilla exterior con dos barras y rodapie, barandilla inte- rior con 1 o 2 barras, plataformas de descarga y/o eleva- ción, plataformas según niveles, puntales, codales, torna- puntas, refuerzos, etc, todo según detalle de planos de montaje y la normativa de obligado cumplimiento sobre an- damiajes. Criterios de medición: 75% al montaje y 25% una vez retirado el andamio y restaurado los puntos de an- claje. No se admitirá en ningún caso medición superior a la expresada en proyecto, en base a valoraciones de orga- nización, etc. 01.004 3.082,71 m3 MONTAJE Y DESMONTAJE ANDAMIO MULTIDIRECCIONAL 4,46 13.748,89 M3. Andamio tubular tipo MULTIDIRECCIONAL homologa-

Page 230: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

do, de acero o duraluminio, apto para trabajos hasta una altura de 15 m., consistente en: suministro en alquiler, montaje y desmontaje,separación al paramento de 15 cm. aproximadamente, amarres a huecos mediante husillos con tacos de madera contrachapada y control periodico de su tensión y amarres a fábricas o elementos resistentes con tacos de expansión, químicos , especiales para pie- dra, coincidiendo en zona de juntas de mortero de cal, co- locados según normas con un mínimo de 1 anclaje cada 12m2, con suficiente resistencia a tracción, red de protec- ción para caida de materiales, preparación de base, pla- cas de apoyo al suelo sobre tacos de madera y/o durmien- tes a base de tablones de 7 cm. especialmente en aque- llas zonas indicadas, y siempre de acuerdo con la capaci- dad de carga de la base, incluso accesos de plataformas con trampilla y escaleras abatibles en su interior (en núme- ro suficiente que garantice una evacuación con una distan- cia máxima de recorrido de 15 metros), barandilla exterior con dos barras y rodapie, barandilla interior con 1 o 2 ba- rras, plataformas de descarga y/o elevación, plataformas según niveles, puntales, codales, tornapuntas, refuerzos y p.p. de cimbras en su caso, etc todo según detalle de pla- nos de montaje y la normativa de obligado cumplimiento sobre andamiajes. Criterios de medición: 75% al montaje y 25% una vez retirado el andamio y restaurado los puntos de anclaje. 01.005 428.823,02 m2 ALQUILER/día ANDAMIO FACHADA 0,03 12.864,69 M2 Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio Europeo descrito en partida anterior, con todos sus elementos y accesorios, in- cluidas escaleras de acceso, todo incluido. Se valorará su puesta según criterios de la dirección facultativa, adecuan- dose en cualquier caso a un uso razonable dentro de la or- ganización optimizada de una obra, no admitiendose en ningún caso la puesta innecesaria o por motivos de falta de organización de la empresa constructora, no habiendo lugar a reclamación de mayor plazo que el establecido en este proyecto, independientemente de las causas que lo motiven. 01.006 465.532,71 m3 ALQUILER/día ANDAMIO MULTIDIRECCIONAL 0,04 18.621,31 M3/Alquiler diario, después del montaje y hasta el día de aviso de desmontaje, de andamio tipo MULTIDIRECCIO- NAL con p.p. de refuerzos y piezas especiales para apeo y cimbrado de las bóvedas objeto, así como de las escale- ras, 1 por panda, incorporadas, y todo lo necesario para acceder a las bóvedas y elementos singulares de la inter- vención, con todos sus elementos y accesorios, todo in- cluido. Se valorará su puesta según criterios de la direc- ción facultativa, adecuandose en cualquier caso a un uso razonable dentro de la organización optimizada de una obra, no admitiendose en ningún caso la puesta innecesa- ria o por motivos de falta de organización de la empresa constructora, no habiendo lugar a reclamación de mayor plazo que el establecido en este proyecto, independiente- mente de las causas que lo motiven. 01.007 1,00 ud MONTAJE/DESMONTAJE GRÚA TORRE <50 m. 4.441,46 4.441,46 Ud. Montaje y desmontaje de grua-torre eléctrica, hasta 69 m. de altura con brazo de 40 a 48 m., arriostrado conve- nientemente, con proyecto técnico completo y dirección de montaje por ingeniero técnico, permisos (p.p. incluido en alquiler por meses) y montaje de elementos auxiliares, cuadro eléctrico, ...etc. con p.p. de medios auxiliares (gruás telescopicas), ocupación de vía pública, costes indi- rectos, etc. Medida la unidad en un 50% al montaje y un

Page 231: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

50% al desmontaje. 01.008 1,00 ud TOTAL AYUDA ALQUILER GRÚA TORRE 11.970,24 11.970,24 Ud. Alquiler por mes de grua-torre eléctrica, hasta 69 m. de altura con brazo de 35 a 48 m., con p.p. de elementos auxiliares, proyecto, permisos, cuadro eléctrico, ...etc. Total Capítulo 01 83.172,88

Page 232: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 02 UNIDAD I: PATIO CENTRAL

02.001 1,00 ud RETIRADA DE TINAJAS 142,13 142,13 Retirada del conjunto de tinajas y otros elementos en la zona de intervención de esta unidad, con acopio y protec- ción en zona adecuada a determinar, para su posterior re- colocación en lugar según indicaciones D.F. con p.p. de medios auxiliares y costes indirectos. 02.002 1,00 ud LEVANTADO DE BANCO CORRIDO FACHADA ESTE 301,30 301,30 Levantado de banco corrido adosado a fachada este del Claustro de la Catedral para poder ejecutar la cámara de aireación y drenaje proyectada, incluyendo p.p. de toma de datos, numeración de piezas, reportaje fotográfico y desmontaje, traslado de piezas a zona de acopio adecua- da y protegida, limpieza y retirada de escombros a conte- nedor, medios auxiliares y costes indirectos. 02.003 1,00 ud LEVANTADO ESCALINATA FACHADA ESTE 248,66 248,66 Levantado de ESCALINATA de acceso a la "puerta en es- viaje" de acceso al Claustro de la Catedral por su cara es- te, necesaria para poder ejecutar la cámara de aireación y drenaje proyectada, incluyendo p.p. de toma de datos, nu- meración de piezas, reportaje fotográfico y desmontaje, traslado de piezas a zona de acopio adecuada y protegida, limpieza y retirada de escombros a contenedor, medios auxiliares y costes indirectos. 02.004 168,00 m2 RETIRADA DE CAPA DE GRAVA FACHADA ESTE 1,70 285,60 Retirada de la capa de grava existente enn la Plazuela y que afecta a la zona de intervención de la fachada este, acopiandola para su posterior reutilización en la formación de rellenos contra la cara exterior de las cámaras bufas, o en formación de canales de drenaje del Patio Central, con p.p. de medios auxiliares y costes indirectos. 02.005 1,00 ud AYUDA ALBAÑILERA TRABAJOS RETIRADA FIBROCEMEN 88,83 88,83 Ayuda de albañilería a trabajos de retirada de pilón de fi- brocemento y otros materiales a retirar en obra con amian- to (tuberías), incluyendo únicamente la ayuda, estando in- cluido el resto en partida independiente dentro del capítulo de gestión de residuos. En compensación trabajos ayuda. 02.006 1,00 ud DESMONTAJE PELDAÑOS CALVARIO CENTRAL 243,68 243,68 Desmontaje del Calvario central del Patio del Claustro de la Catedral de Ciudad Rodrigo, así como la repisa escalo- nada sobre la que descansa, liberando su base y limpian- do el pozo de cualquier resto incluidas raices, así como tratamiento a base de agua coloreada para determinar el trazado y desague existente, incluyendo el acopio del ma- terial en lugar seguro, todo previa numeración de piezas, levantamiento de croquis y reportaje fotográfico, 02.007 1,00 ud LIMPIEZA Y TRATAMIENTO DE POZO 195,42 195,42 Limpieza de la conexión a red existente bajo el Calvario y su pozo, retirando elementos ajenos, raices y suciedad y haciendo prueba de comprobación de red con agua colo- reada no contaminante. 02.008 1,00 ud LEVANTAMIENTO PELDAÑOS "PUERTA DE LOS CARROS" 261,48 261,48 Levantamiento del peldañeado existente en la "Puerta de los Carros", interior y exterior, previa toma de datos y foto- grafías, para posterior recolocación, acopiando el material servible en lugar adecuado y retirando el escombro a ver- tedero, dotando a dicho acceso de una pasarela de made- ra con elementos antideslizantes y en su caso pasamanos, con p.p. de medios auxiliares y costes indirectos.

Page 233: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

02.009 646,95 m2 LEVANTAMIENTO DE SOLADO DE GRANITO c/RECUPERA 19,40 12.550,83 Levantado de solado de baldosas de granito del Claustro de la Catedral de Ciudad Rodrigo, con supervisión arqueo- lógica, por medios manuales y mecánicos, acopiándolas en zona preparada, protegiendo paramentos y elementos que puedan verse afectados, limpiándolas superficialmen- te y preparando sus bordes para recolocación de piezas posterior, eliminando cualquier resto de mortero, incluyen- do la retirada de las inservibles y restos generados a con- tenedor para transporte a vertedero, y en su caso acopio en depósito a determinar de las reutilizbles para futuras re- posiciones posibles,incluso limpieza con p.p. de medios auxiliares y costes indirectos. 02.010 85,43 m3 PICADO Y RETIRADA DE SOLERA DE HORMIGÓN 24,29 2.075,09 Picado de solera de hormigón, estimando un espesor de 15 a 20 cm. sobre la que se asienta el solado del patio central del Claustro, por medios mecánicos y manuales, retirando escombro a pie de carga para transporte a verte- dero y limpieza final, 02.011 142,38 m3 RETIRADA DE ENCACHADO BAJO SOLERA 10,66 1.517,77 Retirada del encachado bajo solera en el Patio Central del Claustro, en caso de su existencia, estimando una capa de 15 a 20 cm. de espesor, por medios manuales, con retira- da de escombro a contenedor, 02.012 145,63 m3 CAJEADO SUB-BASE MANUAL c/SUPERV.ARQUEO 22,09 3.216,97 Cajeado de la sub-base del solado existente del patio cen- tral del Claustro, según niveles a definir para alojar zona ajardinada, incluso limpieza de restos ajenos, con ligera supervisión arqueológica incluida, incluyendo la carga de escombro a zona exterior para su posterior retirada me- diante carga a camión, limpieza y p.p. de medios auxiliares y costes indirectos. 02.013 5,00 ud CALICATA ARQUEOLÓGICA tipo 1, 200x200 h=150 1.000,86 5.004,30 Realización de CALICATA TIPO 1, en zona de aproxima- damente 2x2 metros en planta y hasta una profundidad de 1,50 metros máximo, con metodología arqueológica según previsión proyectada tal y como figura en plano, con asis- tencia de arqueólogo director y dos peones especializa- dos, con p.p. de reportaje fotográfico, toma de datos, reti- rada de escombros, protección de elementos, y documen- tación final escrita con copias para dirección facultativa y promotor, según memoria y planos. 02.014 1,00 ud CALICATA ARQUEOLÓGICA tipo 2, 250x250 h=300 1.885,56 1.885,56 Realización de CALICATA TIPO 2, en zona de aproxima- damente 250x250 cm. en planta y hasta una profundidad de 3,00 metros máximo, con metodología arqueológica se- gún previsión proyectada tal y como figura en plano, con asistencia de arqueólogo director y dos peones especiali- zados, con p.p. de reportaje fotográfico, toma de datos, re- tirada de escombros, protección de elementos, y docu- mentación final escrita con copias para dirección facultati- va y promotor, según memoria y planos. 02.015 55,00 m3 EXCAVACIÓN FORMACIÓN ZANJA 13,62 749,10 Excavación de zanjas por medios manuales auxiliados puntualmente por maquinaria de pequeñas dimensiones y herramienta mecánica en su caso, y según criterio de in- tervención indicado en memoria e instrucciones de la D.F. con el objeto fundamental de no dañar el bien intervenido, en formación de cámaras de aireación y drenaje y trabajos análogos, con ligera supervisión arqueológica inicial (en

Page 234: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

caso de no requerise la presencia total del arqueólogo, quedando por tanto a expensas de dictaminar por la D.F. una vez se realicen las catas y comiencen los trabajos) in- cluyendo tanto la retirada de las tierras hasta zona de aco- pio para carga a camión, como el perfilado perimetral, api- sonado de fondo de excavación y la gestión correspon- diente de residuos, con p.p. de medios auxiliares y costes indirectos. 02.016 368,05 m3 EXCAVACIÓN FORMACIÓN ZANJAS c/SUP.ARQUEO. 28,68 10.555,67 Excavación de zanjas CON SUPERVISIÓN ARQUEOLÓ- GICA total, por medios manuales auxiliados puntualmente por maquinaria de pequeñas dimensiones y herramienta mecánica en su caso, y SEGÚN CRITERIO DE INTER- VENCIÓN indicado en la memoria y las instrucciones de la D.F. con el objeto fundamental de no dañar el bien interve- nido, en formación de cámaras de aireación y drenaje y trabajos análogos, con supervisión arqueológica total (presencia de arqueólogo y/o ayudante 100% excavación), incluyendo el perfilado perimetral, apisonado de fondo de excavación y la carga y transporte de tierras hasta zona de acopio y carga para traslado a vertedero, asi como p.p. de reportaje fotográfico y documentación final en su caso. En caso de que la D.F. junto con el arqueólogo responsable de la Administración una vez realizadas las catas previstas e iniciados estos trabajos comprueben no se hace necario la presencia total, sino parcial del equipo de arqueólogos, podrá establecerse un criterio de medición diferente, te- niendo en cuenta la partida anterior y siempre según crite- rio de la D.F. 02.017 15,40 m. CÁMARA DE DRENAJE ZONA CALVARIO 162,22 2.498,19 Formación de cámara de drenaje perimetral en ZONA CENTRAL PATIO, bordeando el peldañeado del Calvario, según detalle de planos e indicaciones de la D.F.incluyendo la formación de solera base de hormigón armado HA-25, de 10 cm. de espesor, con mallazo doble r12#10/10 con barras del díametro 12, fábricas de ladrillo perforado de 1/2 asta, recibida con mortero de cemento y cal M-60 de dosificación aproximada (a determinar) 1:1:6, colocando placa separadora de poliestireno expandido que impida el contacto de la obra nueva con la fábrica existen- te o en su defecto lamina drenante tipo "deltadrain" o simi- lar, y formación de canaleta de desague y sus conexiones con tubo PVC de diámetro 200 mm. tipo "Terrain" o simi- lar, según niveles y pendiente mínima del 1% enfoscada con mortero impereabilizante "Sika Monotop-107 Seal" o similar, dejando la cámara lista para la colocación del sola- do y bordillos de piedra, todo incluido incluso rejilla corrida con marco, tipo "RM-20 C-250" de Benito o similar., y lim- pieza final, retirando el material sobrante a vertedero, con p.p. de medios auxiliares y costes indirectos. Incluida rejilla corrida con marco, tipo "RM-20 C-250" de Benito o similar. 02.018 98,60 m. CÁMARA DE AIREACIÓN Y DRENAJE ANCHO 330 339,29 33.453,99 Formación de cámara de aireación y drenaje, en PATIO CENTRAL CLAUSTRO CATEDRAL DE CIUDAD RODRI- GO, previo apisonado de la zona excavada, siguiendo or- dén de ejecución según CRITERIOS de INTERVENCIÓN reflejados en memoria y e indicaciones de la D.F., y plano de detalle nº29, incluyendo: la formación de una solera ba- se de hormigón armado HA-25 de 15 cm. de espesor, con mallazo doble r12#30/30, fábricas de 1 asta de ladrillo ce- rámico perforado de 9 cm. a la palomera permitiendo ai- reación de fábricas excepto la perimetral maciza, dispues- tas según detalle y recibidas con mortero de cemento y cal M-60, de dosificaicón aprox. a determinar 1:1:6, colocando

Page 235: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

placa separadora de poliestireno expandido que impida el contacto de la obra nueva con la fábrica del claustro, colo- cación de placas nervadas prefabricadas tipo "Phrefor" de diferentes dimensiones según pandas, a modo de encofra- do perdido, para formación de losa superior en la que des- cansará el solado de granito, con hormigón HA-250, de es- pesor medio 11 cm. y armado r12#15/15, con formación de ligera pendiente para posterior colocación del solado, incluyendo la formación de la canaleta de desague adapta- da a pendientes y niveles indicados, con una pendiente mínima del 1%, revestida a base de enfoscado de mortero tipo "Sika Top Seal 107" o similar en dos o mas capas se- gún rendimiento indicado por el fabricante, incluso relleno con grava recuperada del talud exterior, realizando a su vez función drenante o en su defecto relleno de tierras y apisonado, dejando la cámara lista para la colocación del solado y bordillos de piedra (no incluida), y colocación de rejilla con marco tipo "RM-30 C-250" de Benito o similar, todo incluido y limpieza final, retirando el material sobrante a contenedor, con p.p. de medios auxiliares y costes indi- rectos. Para un ancho medio aproximado de 3,30 metros. Medido en su longitud, a lo largo de la canaleta de desa- gue. Según planos y memoria. 02.019 10,78 m. CÁMARA DE AIREACIÓN Y DRENAJE ANCHO 200 217,07 2.340,01 Cámara de aireación y drenaje, según memoria, planos y criterios indicados en partidas anteriores, con la inclusión de rejillas de fundición con marco, costes indirectos y me- dios auxiliares 02.020 16,60 m. CÁMARA DE AIREACIÓN Y DRENAJE ANCHO 110 142,84 2.371,14 Cámara de aireación y drenaje, según memoria, planos y criterios indicados en partidas anteriores, con la inclusión de rejillas de fundición con marco, y formación de pozo pa- ra conexión a nivel inferior, costes indirectos y medios au- xiliares 02.021 1,00 ud FORMACIÓN POZO 1 BOMBEO PATIO d=250 h=3,00 1.483,19 1.483,19 Ejecución de pozo de bombeo, registro e incluso absor- ción, con rebosadero comunicado a red existente actual- mente bajo Calvario en patio central del Claustro de la Ca- tedral de Ciudad Rodrigo, hasta una profundidad aprox. de 3 metros teniendo en cuenta la recogida de aguas del de- sague de la cámara de aireación y drenaje ue comunicará a 1,10 metros de profundidad aproximada, incluyendo en- tre otros: preparación de terreno base, formación de solera base de hormigón armado HA-250 de espesor 15 cm. ar- mada con mallazo doble r12#10/10, de dimensiones en planta 250x250 cm. pudiendo trazarse de forma circular, formación de pozo con fábrica de ladrillo cerámico perfora- do de 1 asta recibido con mortero M-40 según trazado in- dicado en planos, de 2 metros libres de diametro en base y coronado por tapa de fundición de diámetro 80 cm. con su cerco y el revestimiento interior a base de enfoscado impermeabilizante "Sika Monotop-107 Seal" o similar, y so- lera superior de hormigón armado HA-250 de 10 cm. para apoyo de solado, armada con r12/10/10 dejando prevista argollas de redondo de acero inoxidable y/o galvanizado según D.F., incluso el relleno drenante perimetral a base de bolo y/o grava y tierra vegetal compactada. Instalación de bombas en partida independiente. 02.022 1,00 ud FORMACIÓN POZO 2 BOMBEO ATRIO AMAYUELAS 1.252,03 1.252,03 Ejecución de pozo de bombeo, registro e incluso absor- ción, con rebosadero comunicado a red existente en extre- mo del Atrio de Amayuelas, de la Catedral de Ciudad Ro- drigo, hasta la profundidad requerida en función de la cá-

Page 236: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

mara de aireación y drenaje y la red existente, marca en planos, incluyendo entre otros: preparación de terreno ba- se, formación de solera base de hormigón armado HA-250 de espesor 15 cm. armada con mallazo doble r12#10/10, de dimensiones en planta 250x250 cm. pudiendo trazarse de forma circular, formación de pozo con fábrica de ladrillo cerámico perforado de 1 asta recibido con mortero M-40 según trazado indicado en planos, de 2 metros libres de diametro en base y coronado por tapa de fundición de diá- metro 90 cm. con su cerco y el revestimiento interior a ba- se de enfoscado impermeabilizante "Sika Monotop-107 Seal" o similar, y solera superior de hormigón armado HA-250 de 10 cm. para apoyo de solado, armada con r12/10/10 dejando prevista argollas de redondo de acero inoxidable y/o galvanizado según D.F., incluso el relleno drenante perimetral a base de bolo y/o solera para recolo- cación del solado desmontado a recuperar en la posición original, Instalación de bombas en partida independiente. 02.023 31,36 m3 RELLENO ZANJAS GRAVA 20/40/60 25,86 810,97 Relleno del trasdós del murete de las cámaras de airea- ción con grava y bolo de diferente tamaño, y/o en trabajo de compactación o formación de drenaje de zonas con ca- pa superior vegetal, incluyendo p.p. de la grava desmonta- da junto la Fachada Este, en la Plazuela y la que pudiera aparecer bajo la solera de patio central, inlcuyendo p.p. de medios auxialres y costes indirectos. 02.024 1,00 ud CONEXIÓN ACHIQUE-ARQUETA D=63 130,90 130,90 Conexión de arqueta de achique ejecutada en fase IV con arqueta nueva, a base de doble tubo flexible en primer tra- mo y rígido en resto, tipo "Terrain" o similar, con p.p. de ayudas. 02.025 2,00 ud ARQUETA SANEAMIENTO 51/51 114,83 229,66 Arqueta de registro de 51x51x65 cm. de medidas interio- res, construida con fábrica de ladrillo perforado tosco de 1/2 pie de espesor, recibido con mortero de cemento M-5, colocado sobre solera de hormigón en masa HM-20/P/40/I de 10 cm. de espesor, enfoscada y bruñida por el interior con mortero de cemento M-15 redondeando ángulos, lige- ramente armada con mallazo, enfoscada y bruñida por el interior con mortero de cemento M-15, y con tapa y marco de hormigón armado prefabricada, terminada y con p.p. de medios auxiliares, sin incluir la excavación, ni el relleno pe- rimetral posterior, s/ CTE-HS-5. 02.026 23,00 m. ZANJA DESAGÜE PVC "TERRAIN" D=200 9,39 215,97 Formación de zanja para saneamiento, incluyendo la aper- tura, prepración de base, y el relleno posterior, por medios manuales auxiliados puntualmente por maquinaria de pe- queñas dimensiones incluyendo tanto la retirada de las tie- rras sobrantes hasta zona de acopio para carga a camión, como el perfilado perimetral, apisonado de fondo de exca- vación y la gestión correspondiente de residuos, con p.p. de medios auxiliares y costes indirectos. 02.027 1,00 ud ADAPTACIÓN ACOMETIDA DE AGUA POLIET. 20 mm. 92,20 92,20 Unidad de intervención para facilitar la acometida de aguas adecuando el paso una vez se desmonten los pel- daños de la "Puerta de los Carros", sustituyendo el tramo afectado hasta una arqueta de registro con tapa de fundi- ción 30/30 con llave de corte de escuadra, incluso sustitu- ción del tramo y nuevo trazado hasta la toma existente en el actual pilón de fibrocemento, a retirar, incluso formación de paso bajo muro, según memoria, con p.p. de medios auxiliares y costes indirectos.

Page 237: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

02.028 1,00 ud ACOMETIDA RED SANEAMIENTO MUNICIPAL log=14m. 596,81 596,81 Formación de acometida desde arqueta 51/51 junto zona de aparcamiento hasta pozo de entronque reglamentario según Servicio Municipal correspondiente, para una longi- tud entre 13 y 15 metros, incluyendo la rotura del pavimen- to con compresor, excavación manual de zanjas de sanea- miento en terrenos de consistencia dura, colocación de tu- bería de PVC de 200 mm. "Terrain" o similar, con sus uniones, accesorios y obras auxiliares necesarias, cama de arena, tapado posterior de la acometida y reposición del pavimento con hormigón en masa HM-20/P/40/I, y con p.p. de medios auxiliares. 02.029 383,20 m2 REPOSICIÓN SOLADO DE GRANITO RECUPERADO 21,74 8.330,77 Recolocación de solado de baldosas de granito recupera- do, previa limpieza y preparación, seleccionando piezas de dimensiones aproximadas 100x50 cm., colocadas matan- do juntas, sobre cama de arena/cemento recibidas con mortero de cal y cemento gris al 50%, libre de sales, y are- na seleccionada, incluso rejuntado final con posible adic- cion de colorantes naturales según muestras previas a realizar, incluso cortes en formación de encuentros, rema- tes y sellado con mortero tipo "Sikaflex Pro HP" gris o simi- lar, así como cortes de piezas para alojar rejillas de fundi- ción, con rebajes indicados en planos y memoria, con aportación mínima y puntual de elementos de idéntico ma- terial, incluyendo la homogeneización del acabado abujar- dado y limpieza de superficie y lavado final, en formación de solado de patio central y análogos, 02.030 20,00 m2 REPOSICIÓN SOLADO PIEDRA ARENISCA 31,86 637,20 Reposición de solado de piedra arenisca incluyendo el desmontaje y la posterior recolocación, en trabajos de for- mación de canalizaciones y zanjas para instalaciones en zona de intervención, incluyendo la limpieza y preparación de piezas, formación de base de asiento estabilizada, ca- ma de arena y mortero y recibido con mortero de cal, ce- mento y arena seleccionada y rejuntado con aportación de colorantes naturales previa realización de muestras, con p.p. de cortes, formación de encuentros y sellados, según memoria, planos e indicaciones de la D.F., así como me- dios auxiliares y costes indirectos. 02.031 27,22 m. BORDILLO DE GRANITO ABUJARDADO 10/12 EXT. 22,89 623,07 Bordillo de granito con acabado abujardado, de dimensio- nes 10/12, ligeramente biselado en ángulos libres y con formación de cortes para mayor agarre, recibido con hor- migón en masa HM-25, en formación de remate de sola- dos, incluyendo rejuntado con mortero de cal y cemento idem solado, con p.p. de medios auxiliares y costes indi- rectos. 02.032 92,74 m. BORDILLO DE GRANITO ABUJARDADO 10/20 PATIO 26,94 2.498,42 Bordillo de granito con acabado abujardado, de dimensio- nes 10/20, ligeramente biselado en ángulos libres y con formación de cortes para mayor agarre, recibido con hor- migón en masa HM-25, en formación de remate de sola- dos, incluyendo rejuntado con mortero de cal y cemento idem solado, con p.p. de medios auxiliares y costes indi- rectos. 02.033 13,25 m. REPOSICIÓN PELDAÑOS "PUERTA DE LOS CARROS" 72,64 962,48 Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y prepa- ración de la base con mortero de cal y arena, aditivado en su caso, y recolocación de elementos recuperados, con

Page 238: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

aportación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patinada, inclyendo el rejuntado de ele- mentos con mortero de cal y arena seleccionada con apor- tación de pigmentos naturales según pruebas previas, con p.p. de medios auxiliares y costes indirectos. 02.034 1,00 ud REPOSICIÓN PELDAÑOS CALVARIO 370,72 370,72 Reposición del peldañeado desmontado de la base del Calvario, incluyendo la limpieza y preparación de la base con mortero de cal y arena (incluso aportación de cemento o en su defecto hormigón en masa), y recolocación de ele- mentos recuperados, con aportación de nuevas piezas de identico trazado y remate, retirando las grapas metálicas y en su caso realizando anclajes según necesidades, incl- yendo el recibido y rejuntado con mortero de cal y arena seleccionada con aportación de pigmentos naturales se- gún pruebas previas, respetando los aliviaderos de los la- terales y manteniendo su funcionalidad en previsión de desbordamiento de la canaleta perimetral, todo con limpie- za y remates y con p.p. de medios auxiliares y costes indi- rectos. 02.035 1,00 ud REPOSICION ESCALINATA PUERTA EN ESVIAJE 554,02 554,02 Reposición de la ESCALINATA de acceso a la puerta en "esviaje" de la fachada este del Claustro, previamente des- montada, devolviéndola a su estado original en base al le- vantamiento previo realizado, con aportación mínmia de piezas nuevas de piedra arenisca de Ciudad Rodrigo, in- cluyendo la formación de asiento, recibido con mortero de cal, cemento y arena y el rejuntado con arena selecciona- da, cal y pigmentos inorgánicos,según criterios generales de intervención, limpieza, consolidación e impermeabiliza- ción en su caso, con p.p. de medios auxiliares y costes in- directos. 02.036 1,00 ud REPOSICION BANCO CORRIDO FACHADA ESTE 570,31 570,31 Reposición del BANCO CORRIDO de la fachada este del Claustro, previamente desmontado para acometer la cá- mara de aireación, devolviéndola a su estado original en base al levantamiento previo realizado, con aportación mínmia de piezas nuevas de piedra arenisca de Ciudad Rodrigo, incluyendo la formación de asiento, recibido con mortero de cal, cemento y arena y el rejuntado con arena seleccionada, cal y pigmentos inorgánicos,según criterios generales de intervención, limpieza, consolidación e im- permeabilización en su caso, con p.p. de medios auxiliares y costes indirectos. 02.037 1,00 ud RECOLOCACIÓN LINEA PARARRAYOS 110,37 110,37 Recolocación de la toma y linea de pararrayos, según po- sición indicada en unidad IV (ver plano 19), repasando su trazado y tirantez así como su conexión afectada por los trabajos de esta unidad, anclajes, posición de elementos para evitar escorrentias de agua en fachada, etc. con p.p. de medios auxiliares y costes indirectos. 02.038 1,00 ud RESTAURACIÓN CALVARIO CENTRAL 475,26 475,26 Restauración del Calvario central, asegurando en primer lugar su estabilidad, procediendo posteriormente a la lim- pieza de líquenes según criterio general y aplicando un tratamiento de consolidación e impermeabilización en su caso, con p.p. de medios auxiliares y costes indirectos. 02.039 1,00 ud REPOSICIÓN TINAJAS 88,83 88,83 Reposición del conjunto de tinajas previamente retiradas del patio central, previa limpieza de las mismas, traslado y preparación de base y fijación, con p.p. de medios auxilia-

Page 239: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

res y costes indirectos. En lugar a indicar por la D.F. 02.040 102,45 m3 APORTACIÓN CAPA TIERRA VEGETAL 21,42 2.194,48 Aportación de tierra vegetal limpia seleccionada, de prime- ra categoría, en formación de zona ajardinada del Patio Central del Claustro de la Catedral de Ciudad Rodrigo, in- cluyendo la preparación de base con apisonado de prime- ra tongada extendida con ligera pendiente a zona central que permita escorrentia hasta canaleta central, respetando niveles proyectados con p.p. de apisonado, modelado y rastrillado, dejándola lista para posterior plantación e insta- lación de riego, con p.p. de medios auxiliares y costes indi- rectos. 02.041 182,00 ud PLANTACIÓN AROMÁTICAS TIPO 1 4,05 737,10 Suministro y plantación de Aromáticas del tipo 1, a base de Salvia officinalis , Rosmarinus officinalis, Lavandula offi- cinalis y Myrtus communis microphylla, de 40 cm. de altu- ra, suministradas en contenedor y plantación en hoyo, in- cluso apertura del mismo a mano, abonado con humus de lombriz, formación de alcorque y primer riego y resto nece- sarios hasta la entrega de la obra. 02.042 34,00 ud PLANTACIÓN AROMÁTICAS TIPO 2 3,20 108,80 Suministro y plantación de Aromáticas del tipo 2, a base de Thymus Vulgaris de 20 cm. de altura, suministradas en contenedor y plantación en hoyo, incluso apertura del mis- mo a mano, abonado con humus de lombriz, formación de alcorque y primer riego y resto necesarios hasta la entrega de la obra. 02.043 1,00 ud INSTALACIÓN DE RIEGO AUTOMÁTICO 820,71 820,71 Instalación de riego automático, completa, incluyendo el material, mano de obra y medios necesarios, compuesta básicamente de: - LLaves de cierre bola polipropileno 3/4 rosca macho, con p.p. de piezas de unión a tubería. - Tubería PE 20 mm 6bar con p.p.de accesorios e instala- ción - Arqueta 40x27 con doble tapa, la superior en arqueta de fábrica con tapa de fundición. - Boca de riego 3/4 con llave. - Electroválvulas de riego bobina 12V - Reductor de presión 3/4 para goteo - Tuberías de goteo ciego de 16 mm. con p.p. de pieza de goteo según plano. - Programador de riego para zonas. - Accesorios, piezas y material auxiliar no descrito. - Mano de obra incluida y p.p. de medios auxilares y cos- tes indirectos. 02.044 1,00 ud INSTALACIÓN BOMBAS POZO 1 19.641,91 19.641,91 Suministro, instalación y conexionado de bombas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grundfos SE1 100.100.40, 4.51d de 4kW, 1450 rpm 400V - 2 ud Zócalos para autoacoplamientos DN 150. - 4 Interruptores de nivel IFP1 10m. - 9 m. Tubo flexible necesario, de 100 mm. en salidas bombas. - 60 m.Tubería de PVC presión 100 mm. con p.p. de acce- sorios, instalación y ayudas de albañilería. ,- 2 ud Válvula de retención 100 mm. cierre bola - Accesorios, piezas y material no descrito necesario - Mano de obra, incluida las pruebas de funcionamiento. - P.p. de medios auxiliares y costes indirectos.

Page 240: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

02.045 1,00 ud INSTALACIÓN BOMBAS POZO 2 2.949,45 2.949,45 Suministro, instalación y conexionado de bombas del pozo denominado 1, consistente en : ,- 2 ud Instalación de bombas (2) de achique Grundfos AP 35B.50.06.3 de 0,7kW, 2950 rpm 400V - 2 ud Zócalos para autoacoplamientos DN 150. - 4 Interruptores de nivel IFP1 10m. - 7 m. Tubo flexible necesario, de 63 mm. en salidas bom- bas. - 40 m.Tubería de PVC presión 63 mm. con p.p. de acce- sorios, instalación y ayudas de albañilería. ,- 2 ud Válvula de retención 63 mm. cierre bola - Accesorios, piezas y material no descrito necesario - Mano de obra, incluida las pruebas de funcionamiento. - P.p. de medios auxiliares y costes indirectos. 02.046 1,00 ud INSTALACIÓN DE CUADROS ELÉCTRICOS 3.719,18 3.719,18 Instalación eléctrica de cuadros, según memoria, planos e indicaciones de la D.F., consistente en la colocación de: 1ud,- Protección en cuadro general mediante 1 Int. Auto. General de 32A-4P, 1 Int. Auto. Diferencial de 40/4/500 mA, cableado, bornas, accesorios y montaje. 1ud.- Cuadro de protección bajo escalera, con 1 Int. Aut. General 32A-4P, 2 Int. Auto. Dif. 40/4/300 mA, 1 Int Dif. 252/30 mA, 1 Aut. Magn. 20A-4P, 1 16A-4P y uno 10A-2 P 1ud.- Cuadro de protección y mando de 2 bombas de 4 kW "Tipo Grundfos CS 203-10" o similar con alternancia, arranque en cascada, protecciones, pilotos, cableado, bor- nas, accesorios y montaje. 1 ud.- Cuadro de protección y mando de 2 bombas de 0,7 kW "tipo Grundfos cs 203-1,6 " o similar con alternancia, arranque en cascada, protecciones, pilotos, cableado, bor- nas, accesorios y montaje. 02.047 1,00 ud INSTALACIÓN LINEAS ELÉCTRICAS 3.243,63 3.243,63 Instalación eléctrica necesaria para completar las líneas descritas en memoria y planos, básicamente a base de: ,- 40 m. Línea grapada con cable armado CU 5x6 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 80m. Línea enterrada con cable CU 4x4 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y montaje. 95m. Línea enterrada con cable CU 4x2,5 mm2 0,6/1KV li- bre de halógenos con p.p. de bornas, accesorios y monta- je. 120m. Línea enterrada con cable CU 3x1,5 mm2 0,6/1KV libre de halógenos con p.p. de bornas, accesorios y mon- taje. 140 m. Tubo reforzado de pvc de 20 mm. con p.p. de cajas y montaje, incluso acabado en tono a definir en obra, acor- de al edificio. 120 m. Tubo reforzado de pvc de 40 mm. idem anterior. 1 ud. Pequeño material, accesorios y el necesario no des- crito. 1,- Mano de obra, medios auxiliares y costesindirectos in- cluidos. Total Capítulo 02 133.434,16

Page 241: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 03 UNIDAD II: CUBIERTAS

03.001 460,66 m2 PROTECCIÓN 1 DE SOLADO 8,19 3.772,81 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en pa- tio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plástica, vertido de cama de arena se- ca de regulización y coloción de tablero aglomerado de 30 mm. de espesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxi- liares y costes indirectos. 03.002 679,00 m2 DESMONTAJE DE TEJA CURVA C/RECUP. 10,73 7.285,67 Desmontaje con recuperación de TEJAS de cubiertas del Claustro de la Catedral de Ciudad Rodrigo, retirando el material servible a zona de acopio, limpiandolo y seleccio- nándolo y el resto para su reutilización máxima posible, con carga de escombro a contenedor o a zona de acopio y gestión de residuos, con p.p. de otros elementos y rema- tes de la cubierta (llimas, enconstillados, limahoyas, etc.) de medios auxiliares y costes indirectos. Medida la superfi- cie en proyección horizontal'. 03.003 794,43 m2 LONA DE PROTECCIÓN CUBIERTAS 11,02 8.754,62 Colocación de lona de protección de las bóvedas y fábri- cas del Claustro de la Catedral de Ciudad Rodrigo, contra las inclemencias meteorológicas, principalmente lluvia,inmediatamente a la retirada de la teja, anclada tanto a paramentos de fábrica como al propio andamio u otro medio auxiliar adecuado para tal fin, perfectamente atiran- tadas evitando formación de bolsas, incluso colocación y retirada según necesidades (incluyendo siempre que no se esté trabajando en la obra), amortización de lonas y acce- sorios estimada en 7 usos.Medida en proyección horizon- tal (se valora únicamente ayuda a esta partida, debiendo asumirse el resto en el porcentaje de medios y gastos ge- nerales, así como los propios de la empresa ejecutora). 03.004 161,00 m2 DESMONTAJE CARTÓN EMBREADO 3,78 608,58 Retirada de la capa de cartón embreado y/o placa tipo "Onduline" colocada en las cubiertas de la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, y elementos secundarios, fijaciones, uniones etc con acopio en conte- nedor adecuado, para su gestión, inc. p.p. de medios auxi- liares y costes indirectos. Medida la superficie en proyec- ción horizontal'. 03.005 349,00 m2 RETIRADA TELA ASFÁLTICA CUBIERTA 1,84 642,16 Retirada de capa de telas asfálticas colocada sobre table- ro de cubiertas del Claustro, a contenedor espécifico para gestión de residuos, con p.p. de medios auxiliares y costes indirectos. 03.006 469,73 m2 DESMONTAJE TABLERO HORMIG. PREFAB CUBIERTA 6,59 3.095,52 Desmontaje de tablero de cubierta a base placas prefabri- cas de hormigón, colocadas en las cubiertas del Claustro de la Catedral de Ciudad Rodrigo, con retirada de escom- bro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. 03.007 180,83 m2 DESMONTAJE ENTABLADO MADERA PANDA ESTE 4,68 846,28 Desmontaje de estructura de madera de cubierta comple- ta, incluida la tabla base de teja, pares, vigas, tornapuntas

Page 242: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

y demas elementos, con protección previa de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. 03.008 96,30 m2 DEMOLICIÓN TABIQUES LHD PALOMERA CUBIERTA 8,90 857,07 Demolición de tabiques de ladrillo hueco doble y/o tabicón (en este caso la medición se compesará redución un -20%), a la palomera existentes en las cubiertas de las pandas del Claustro de la Catedral de Ciudad Rodrigo, por medios manuales auxiliados mecanicamente, inc.p.p. de protección previa de elementos que puedan verse afecta- dos, limpieza final de restos y retirada de escombro a zona de acopio o contenedor para su posterior gestión, con re- cuperación de materiales para futuro empleo en obra, inc. p.p. de medios auxiliares y costes indirectos. Medida la su- perficie en proyección horizontal' deduciendo un 20% en caso de tratarse de ladrillo tabicón en lugar de hueco do- ble. 03.009 180,83 m2 DESMONTAJE ESTRUCTURA MADERA CUBIERTA PANDA E 5,78 1.045,20 Desmontaje de estructura de madera de cubierta comple- ta, incluida la tabla base de teja, pares, vigas, tornapuntas y demas elementos, con protección previa de elementos afectados, limpieza y retirada de escombro a contenedor para su posterior gestión, inc. p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. 03.010 34,40 m. LEVANTADO TRAMEX PANDA SUR 7,99 274,86 Levantado de los elementos metálicos tipo "Tramex" colo- cados a modo de pasarela sobre la cubierta de la Panda Sur, con retirada a punto de reciclaje o lugar a indicar por la D.F. para posible reutilización, incluida la p.p. de compe- sanción por reciclaje, medios auxiliares y costes indirectos. 03.011 69,40 m. DESMONTAJE LIMAS DE PLOMO PANDA ESTE 11,36 788,38 Desmontaje del plomo que forma limas y baberos existen- tes en la Panda Este, tanto en la posterior junto a la Nave como las transversales, salvo las indicadas en memoria que puedan servir de base para la formación de unas nue- vas, con retirada de escombro a contenedor específico y gestión de residuos según estudio específico, con p.p. de medios auxiliares y costes indirectos. Medida según traza- do en planos. 03.012 622,01 m2 LIMPIEZA EXTRADÓS BÓVEDAS 9,76 6.070,82 Retirada de cascotes sobre bóvedas y material de relleno ajeno a la fábrica original, respetando en todo caso el re- lleno de riñones e incluso si se considera aportándolo, to- do con ligera supervisión arqueológica, (en caso de deter- minar la supervisión exhaustiva, se procederá según parti- da correspondiente en "UNIDAD VI:BÓVEDAS") según in- dicaciones de la dirección facultativa, con carga, retirada y selección de escombro a vertedero, según plan RDC, con p.p. de costes indirectos y medios auxiliares. Medida en proyección horizontal según planos. 03.013 1,00 ud REPLANTEO DE CUBIERTAS 581,20 581,20 Replanteo de las cubiertas proyectadas, una vez desmon- tadas las existentes, marcando pendientes, limas, encuen- tros y situación exacta de pares y correas, para formación de muretes, mechinales, preparación de vigas, etc. todo con p.p. de medios auxiliares y costes indirectos. 03.014 70,00 m2 FORMACIÓN CUBIERTA TABIQUES LAD. PALOMERA 18,06 1.264,20

Page 243: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Formación de cubierta con taquiques de ladrillo hueco do- ble a la palomera, recibidos con mortero bastardo de ce- mento, cal y arena, incluyendo ladrillo, en parte recupera- do y reaprovechable y resto aportado, dejándo la fábrica sólidamente arriostrada y macizada en uniones, incluso re- planteo, protección de bóvedas con lámina de polietileno, formación de maestras, cama de mortero de cemento para asiento de placas, encuentros, humedecido de piezas, cor- tes y desperdicios, limpieza de restos y carga de escom- bros generados a contenedor o punto de acopio, con me- dios auxiliares y costes indirectos. 03.015 34,40 m. FORMACIÓN DE LIMA DE PLOMO TIPO 1 PANDA SUR 198,09 6.814,30 Formación de PESEBRÓN o LIMA POSTERIOR de PLO- MO en la cubierta de la panda Sur del Claustro de la Cate- dral de Ciudad Rodrigo, paralela a la Nave del Evangelio, con plomo tipo PB-2, de espesor 2,5 mm., y desarrollo mí- nimo según planos, adaptándose a las necesidades de obra, incluso formación de soporte y cama de yeso con p.p. de faldones sobre ventanales incluyendo el replanteo, ejecución de rozas sobre fábricas, cama de yeso, y engati- llados longitudinales - tramos nunca superiores a 2,50 me- tros- y transversale, babero recibido a roza, engatillado, pestañas en extremos, etc. y sellado de encuentros plomo-roza y otros posibles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desper- dicios a contenedor especial. Según memoria, planos e in- dicaciones de la D.F.. Medida longitudinalmente en parale- lo a la Nave. 03.016 25,00 m. FORMACIÓN DE LIMAS DE PLOMO TIPO 2 PANDA SUR 195,51 4.887,75 Formación de "LIMA TRANSVERSAL" de PLOMO en la cubierta de la panda Sur del Claustro de la Catedral de Ciudad Rodrigo y/o análogas, con plomo tipo PB-2, de es- pesor 2,5 mm., y desarrollo mínimo según planos, adap- tándose a las necesidades de obra, asegurando un sec- ción de evacuación mínima de 500 cm2, con p.p. de sola- pes de 25 cm. y encuentro con gárgola de cobre, incluyen- do el replanteo, ejecución de rozas sobre fábricas, cama de yeso, y engatillados longitudinales - tramos nunca su- periores a 2,50 metros- y transversales, con formación de pestañas en extremos, etc. y sellado de encuentros plomo-roza y otros posibles con "Sikaflex Pro 2 HP" gris, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cortes y desper- dicios a contenedor especial. Para evitar bolsas o retencio- nes en los solapes se generará una cama de yeso lo sufi- cientemente sólida que permita un rebaje (siempre con caida) en la zona de solape. 03.017 93,69 m. RESTAURACIÓN DE CORNISAS CLAUSTRO 58,58 5.488,36 Restauración de cornisa del muro exterior del Claustro, in- cluyendo la limpieza con cepillo de cerdas suaves, elimina- ción de líquenes, consolidación y en su caso impermeabili- zación según criterios generales de intervención en para- mentos exteriores, con reposición puntual con mortero "Petratex" o similar asegurando nivelación, dejando lista para la colocación de gatos de cobre y formación de nue- vas cubiertas, incluso reintegración en la zona de encuetro de cubiertas con pináculos formando base para colocación de babero de plomo y canalón de cobre, etc, todo con p.p. de medios auxiliares y costes indirectos. 03.018 2,09 m3 CORNISA DE PIEDRA ARENISCA CIUDAD RODRIGO 1.669,09 3.488,40 Sustitución de cornisa de piedra o restitución, en zonas marcadas previamente por la dirección facultativa, inclu-

Page 244: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

yendo el cajeado de piedra necesario para la suplantación de piedra nueva selecciona, arenisca de Ciudad Rodrigo, extraida de cantera o recuperada una vez comprobada su idoneidad, previa selección por parte de la d.f., incluso p.p. de sacado de plantillas, tallado de piedra, preparación de soporte, limpieza, recibido con mortero de cal y anclaje con varillas de fibra y mortero de restauración, rejuntado, sellado y limpieza final, con marcado de piedra nueva se- gún memoria, patinado y limpieza final, costes indirectos y medios auxiliares. Medida el volumen realmente colocado. 03.019 4,00 ud DESMONTAJE y MONTAJE CORONACIÓN CONTRAFUERTES958,55 3.834,20 Trabajos de DESMONTAJE y posterior RECOLOCACIÓN de la coronación de contrafuertes y cornisas aledañas en la fachada exterior de la Panda Sur de la Catedral de Ciu- dad Rodrigo, con el objeto de poder acometer las obras de canalización de desagües de pluviales de la cubierta que protege esa Panda, previa numeración, toma de datos y reportaje fotográfico, y posteriormente al cimbrado de la bóvedas 4,5 y 6, preparando zona adecuada y protegida para el acopio de piezas, retirando cornisas, sillares, pie- zas de remate y elementos necesarios, incluyendo la adaptación y reposición de los elementos según las nue- vas canalizaciones, incluso restaurando cornisas afecta- das según criterios ya indicados, con p.p. de aportación de piedra nueva y su tallado, formación de asientos, recibi- dos, retacados, y rejuntados empleando mortero de cal y arena seleccionada coloreado con pigmentos inorgánicos, limpieza con cepillo de cerdas, consolidación e impermea- bilización y patinado en su caso, con p.p. de medios auxi- liares y costes indirectos, medida la unidad en un 25% a su completo desmontaje y el 75% restante a la finalización y remate del elemento indicado. Se limitará el plazo entre desmontaje y montaje al máximo posible, cargando verti- calmente o en su defecto apuntalando los contrafuertes afectados. 03.020 170,02 m2 RESTAURACIÓN MURO SILLERIA BAJO CUBIERTA 24,09 4.095,78 Restauración de MUROS DE SILLERIA, existentes entre el extradós de bóvedas del Claustro y sus cubiertas, com- puestos por fábricas de SILLERIA y sillarejos con interpo- sición puntual de otros, ladrillo, necesitados de estabiliza- ciones puntuales, retacados, retirada de enfoscados de cemento y los de cal en mal estado, limpieza de juntas, so- plado, descarnados y rejuntados según criterios generales de intervención (uso de materiales y formas de actuación), incluyendo la p.p. de protección de bóvedas con lámina de polietileno y la limpieza final, con retirada de escombros a contenedor, medida la superficie realmente ejecutada compensando medición según criterio de la Dirección Fa- cultativa e igualmente deduciendo la parte de muro inter- venida en la preparación de muros para apoyo de dur- mientes (hasta un máximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cubiertas así como la parte correspondiente al desmontaje de con- trafuertes y cornisas de la Panda Sur, todo con medios au- xiliares y costes indirectos. Los muros de fábrica de silleria o en mejor estado se medirán según partida independien- te. 03.021 423,56 m2 RESTAURACIÓN MURO MAMPOSTERIA BAJO CUBIERTA 28,99 12.279,00 Restauración de MUROS DE MAMPOSTERIA, existentes entre el extradós de bóvedas del Claustro y sus cubiertas, compuestos por fábricas de mampostería de piedra, silla- rejos y/o ladrillo, de pobre factura en general, necesitados de estabilizaciones puntuales, retacados, retirada de en- foscados de cemento y los de cal en mal estado, limpieza

Page 245: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

de juntas, soplado, descarnados y rejuntados según crite- rios generales de intervención (uso de materiales y formas de actuación), incluyendo la p.p. de protección de bóvedas con lámina de polietileno y la limpieza final, con retirada de escombros a contenedor, medida la superficie realmente ejecutada compensando medición según criterio de la Di- rección Facultativa e igualmente deduciendo la parte de muro intervenida en la preparación de muros para apoyo de durmientes (hasta un máximo de 1,00 m2 por m.) a la vista del estado de los mismos, una ver retiradas las cu- biertas así como la parte correspondiente al desmontaje de contrafuertes y cornisas de la Panda Sur, todo con me- dios auxiliares y costes indirectos. Los muros de fábrica de silleria o en mejor estado se medirán según partida inde- pendiente. 03.022 185,00 m2 PICADO DE RELLENOS 8,46 1.565,10 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, ladrillos y elementos ajenos a la fá- brica o en mal estado, etc con p.p. de retirada de escom- bros, limpieza, medios auxiliares y costes indirectos. Medi- da en verdadera magnitud. 03.023 180,00 m2 PICADO DE ENFOSCADOS 7,51 1.351,80 Picado de enfoscados de cemento y/o cal en trabajos de restauración de paramentos, por medios manuales con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. 03.024 90,00 m2 TABLERO CUBIERTA PLACAS HORMIGÓN PREF. 100/50 13,57 1.221,30 Formación de tablero de cubierta a base de piezas de hormgión prefabricado autoportantes, incluso relleno de juntas en encuentros para regularización del tablero, em- pleando placas tipo "Prephor" 100/50, 100/33, recibidas con mortero de cemento y/o pasta de yeso negro s/RY-85 y recomendaciones del fabricante, adaptándose a medidas de tabicones, incluso remates, dejando lista para coloca- ción de placa BTU, con p.p. de pequeño material de aga- rre y fijación, medios auxiliares y costes indirectos. Medida la unidad en proyección horizontal y/o s/criterio D.F. en ba- se a trabajos realizados. En caso de una posible reutiliza- ción de placas, una vez comprobado su estado, se des- contará un 25% sobre medición de obra ejecutada. 03.025 557,01 m2 TABLERO CUBIERTA TABLA MACHIHEMBRADA 1" PINO 24,94 13.891,83 Tarima machihembrada de pino Norte de 23 mm. de espe- sor, seleccionada y tratada en lugar de origen en su caso, i/p.p. replanteo, nivelación, acuñados, recibidos, clavado, acuchillado, lijado y si hace falta cajeados en piedra según detalle, incluso tratamiento con dos manos de Xylamon fondo en todas las caras y cortes y otras dos de "Xylamón roble mate" en sus caras vistas o accesibles, s/NTE-RSR-13, memoria, planos e indicaciones de la D.F., medida en proyección horizontal,, con p.p. de accesorios, medios auxiliares y costes indirectos. 03.026 171,45 m2 CAPA DE MORTERO DE REGULARIZACIÓN BASE BTU 5,51 944,69 Capa de regularización de faldón de cubierta para asegu- rar tanto la alienación como el planeamiento adecuado del mismo, teniendo en cuenta se va a colocar directamente fi- jada una placa BTU, según partida correspondiente, inclu- yendo la formación de encuentros y remates necesarios, teniendo en cuenta el estado del faldón sur actual que cu- bre la Panda Sur del Claustro de la Catedral de Ciudad Rodrigo, con p.p. de medios auxiliares, costes indirectos y retirada de escombros a camión para transporte a vertede-

Page 246: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

ro. 03.027 171,45 m2 PLACA CUBIERTA "BTU Euronit" 230 o similar 17,25 2.957,51 Suministro, colocación y remates de cubierta a base de placa tipo BTU "Euronit" 230 normal o maxi, fijada sobre faldón de cubierta previamente raseado y alineado, incluso elementos de fijación a base de tornillos de anclaje con arandela expansiva, con p.p. de solapes, encuentros, pro- tección de limas, etc. limpieza final y p.p. de medios auxi- liares y costes indirectos. 03.028 557,01 m2 CHAPA NERVADA GALV+HORMIGÓN ARLITA+MALLA 32,08 17.868,88 Suministro y colocación de CHAPA NERVADA DE ACERO GALVANIZADO perfil tipo "PL 33/07" de "Acelor Mittal" o similar con tirafondos con arandelas de goma sobre las crestas, autoportante, para luces de 100 cm., galvanizado por ambas caras, colocada sobre LÁMÍNA GEOTEXTIL y esta sobre la tarima de madera y clavada a correas, y ver- tido de CAPA DE "MORTERO DE "ARLITA" -mortero ligero de arcilla expandida y cemento- de 4-5 cm. de espesor (cubriendo totalmente la onda y con remate en borde se- gún planos a base de mortero teñido y aditivado con Primal), armada con MALLA DE SIMPLE TORSIÓN GAL- VANIZADA 50/50/1mm. sujeta a la chapa en la cabeza de los tirafondos, i/p.p. de geotextil evitando contactos de ma- teriales incompatibles, lámina anti-impacto, aislamiento, solapes, accesorios de fijación, juntas de estanqueidad, piezas de remate, incluidas las de formación de limas a base de elemento especial adaptable y estanco (ref. "Uraterm" o similar). Todo includio y p.p. de medios auxilia- res y costes indirectos, s/NTE-QTG-7, medida en proyec- ción horizontal.' 03.029 171,45 m2 TEJA CERÁMICA CURVA RECUP. s/BTU 31,04 5.321,81 Cubricción de cubierta sobre placa tipo "BTU Euronit", a base de teja cerámica curva nueva en canales (excepto en remates vistos), a elegir por la dirección facultativa, y teja curva vieja en cobijas, bien recuperada apilada previa lim- pieza y selección bien aportando el resto de teja, de carác- terísticas, calidad y acabado similar, recibidas con adhesi- vo mono-componente de espuma de poliuretano en el late- ral de las canales, MACIZANDO con mortero pobre bastar- do de cal, cemento y arena de rio teñido con pigmentos inorgánicos previa muestra a aprobar por la dirección fa- cultativa (mortero M-20), colocada respetando escrupulo- samente alieaciones de tejas en vertical perpendiculares a canal de desague y en horizontal, macizando según crite- rio indicado en memoria, generando pasos de manteni- miento y o protegiendo las zonas que reciban aguas de cubierta superior, incluso formación de cumbreras, limate- sas, limahoyas y otros encuentros, ganchos de sujección, encuentros, emboquillados y remate que evite entrada de pájaros y otros animales, remate con lucernario y elemen- tos salientes, ventilaciones y remate de borde, todo inclui- do con LIMPIEZA FINAL tanto de la cubierta con cepillo y agua, como de los elementos afectados, y p.p. de medios auxiliares y costes indirectos, con carga de escombros a contenedor. Medida la unidad en proyección horizontal y/o según criterio D.F.' 03.030 557,01 m2 TEJA CERÁMICA CURVA RECUP. s/MORTERO 24,38 13.579,90 Cubricción de cubierta sobre capa de mortero aligerado, a base de teja cerámica curva nueva en canales, a elegir por la dirección facultativa, y teja curva vieja recuperada apila- da previa limpieza y selección aportando teja de carácte- rísticas, calidad y acabado similar según necesidades, re- cibidas con mortero pobre bastardo de cal, cemento y are-

Page 247: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

na de rio teñido con pigmentos inorgánicos previa muestra a aprobar por la dirección facultativa (mortero M-20), colo- cada respetando escrupulosamente alieaciones de tejas en vertical perpendiculares a canal de desague y en hori- zontal mediante el tirado de cuerdas, macizando según se indica en memoria (como creiterio general macizando dos hiladas si y cuatro no en vertical, tres horizontales junto a los muros a parte del encostillado, otras dos junto el cana- lón y las hiladas intermedias horizontales para que nunca queden más de 6 sin macizar, asi como zonas de paso a lucernarios, o zonas que reciban aguas de cubierta supe- rior, y p.p. de macizado en los encuentros con los muros, con mortero de cal impermeabilizado con la adicción "Super Sikalite" o similar, incluso formación de cumbreras, limatesas, limahoyas y otros encuentros, ganchos de su- jección, encuentros, emboquillados y remate que evite en- trada de pájaros y otros animales, remate con lucernario y elementos salientes, ventilaciones y remate de borde, todo incluido con LIMPIEZA FINAL tanto de la cubierta con ce- pillo y agua, como de los elementos afectados, y p.p. de medios auxiliares y costes indirectos, con carga de escom- bro a contenedor. Medida la unidad en proyección horizon- tal y/o según criterio D.F.' 03.031 93,69 m. CANALÓN DE COBRE 1/4 e=0,8 mm. d=125 c/GATOS 70,47 6.602,33 Fabricación, suministro y montaje de canalón de cobre "1/4 duro" de 0,8 mm. de espesor de chapa y díametro 125 mm., con p.p. de gatos de fijación a base de gatos de cobre "1/2 duro" de pletina 3/30 mm. colacados cada 50 cm. entre ejes y siempre uno a cada lado de las gárgolas, anclados a la fábrica con dos tirafondos de acero inoxida- ble 5/50 con taco de plástico, previa preparación de sopor- te, con p.p. de recibidos, soldaduras, conexiones, orificios para montaje de gárgolas, tapas, y conexiones con limas de cubierta y adaptación en encuentros con pináculos, se- llados, etc. con p.p. de medios auxiliares y costes indirec- tos. 03.032 36,00 ud GÁRGOLA DE COBRE s/DETALLE 196,94 7.089,84 Fabricación, suministro y colocación de gárgola de cobre incluso soporte de fijación, todo según detalle, con tubo de cobre idem canalón, y soporte formado por angular de co- bre "1/2 duro" de 2 mm. de espesor , con base superior de 12x15 cm., y faldón vertical de 12x6 cm., con taladros para recibido mediante tirafondos de acero inoxidable 5/50 y ta- cos plasticos, y formación de angular en bucle para sujec- ción de pletina 2/20, costillas de cobre 4/2 mm., envolven- te de 0,8 mm , remates, conexiones con canalón y con li- mas de plomo, sellados, etc. todo según detalle constructi- vo e indicaciones de la d.f, incluso tratamiento y protección del cobre en su caso, preparación del soporte y colocación de elementos auxiliares, todo según memoria, planos e in- dicaciones de la D.F., con p.p. de medios auxiliares y cos- tes indirectos. 03.033 32,79 m2 BABERO DE COBRE 1/2 e=0,8 mm. 63,66 2.087,41 Formación de babero y/o remate de cubierta en encuentro faldón-canalón, con formación de pestaña y entrega sobre canalón perfectamente alineada, empleando bandejas de cobre "1/2 duro" de 8 mm. de espesor, incluso cortes y ta- ladros, fijado a la fábrica con dos tirafondos de acero inoxi- dable y tacos de material plástico, cada 50 cm., solapes y sellados, según memoria y planos, Medida la superficie en proyección, con p.p. de formación de pestaña y remates, limpieza, medios auxiliares y costes indirectos. 03.034 557,01 m2 RETIRADA DE CAPA DE TIERRA APOYO TEJA 1,37 763,10

Page 248: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Retirada de capa de tierra de apoyo de teja en cubierta de Claustro de la Catedral de Ciudad Rodrigo, con retirada de escombro a contenedor o zona de acopio de esombros, con p.p. de medios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. 03.035 448,33 m2 RETIRADA DE LÁMINA ÁSFALTICA SOBRE TABLERO 3,81 1.708,14 Retirada de la lámina asfáltica colocada en las cubiertas del Claustro de la Catedral de Ciudad Rodrigo, con acopio en contenedor adecuado para su gestión, inc. p.p. de me- dios auxiliares y costes indirectos. Medida la superficie en proyección horizontal'. 03.036 159,29 m. RETIRADA DE CANALÓN Y GÁRGOLAS CHAPA 3,32 528,84 Retirada de canalón y gárgolas existentes, con carga a contenedor o hasta zona de acopio de escombros, para su gestión, con p.p. de medios auxiliares y costes indirectos. 03.037 373,43 m2 DEMOLICION TABIQUE PALOMERA LH "BILBAO" 12,46 4.652,94 Demolición de tabique de tabiques a la palormera en for- mación de cubierta, a base de ladrillo "HUECO BILBAO", con carga a contenedor o hasta zona de acopio de escom- bros, para su gestión, con p.p. de medios auxiliares y cos- tes indirectos. Medida la superficie en proyección horizontal'. 03.038 24,83 m3 RETIRADA DE ZUNCHO DE HORMIGÓN 94,53 2.347,18 Partida en previsión para la retirada de los posibles zun- chos de hormigón existentes según intervenciones relati- vamente recientes, previa consideración, evaluación y au- torización de la D.F. especialmente en los casos en que su posicionamiento interfiera en la cubierta proyectada, o bien por su inadecuado estado, funcionalidad, etc, procedien- dose en cualquier caso al picado cuidadoso con martillos de poca potencia, procurando previamente la desolidariza- ción con las fábricas que los acojen en la medida de lo po- sible, evitando vibracciones, con p.p. de retirada de esom- bros a contendero, medios auxiliares y costes indirectos. 03.039 25,00 ud FORMACIÓN MECHINAL EN FÁBRICA DE PIEDRA 45,37 1.134,25 Formación de mechinal en fábrica maciza de piedra are- nisca de Ciudad Rodrigo, para apoyo de elementos estruc- turales proyectados, dejando previsto el apoyo mediante cama de mortero de cal a nivel, y lámina de neopreno de 1 cm. regularizando el hueco que será de al menos 25 cm. de ancho, 03.040 77,86 m. PREPARACIÓN MUROS APOYO ESTRIBO 69,47 5.408,93 Preparación de muros para apoyo de durmiente, a base de cajeado de muro existente, y/o recrecidos, según casos dejando formada una cama de asiento con mortero de cal incluyendo como p.p. los rellenos, retacados y/o refuerzos necesarios que aseguren su estabilidad, empleando pie- dra arenisca y/o ladrillo de tejar o el recuperado si la D.F. lo estimada, así como preparación de la coronación de muros para el asiento en su caso de la tabla o chapa de protección a base retacados de mortero de cal, empleando mortero de cal y arena, perfectamente nivelada para asiento de durmientes de madera, con p.p. de medios au- xiliares y costes indirectos. 03.041 3,88 m3 ESTRIBO DE ROBLE FRANCÉS 24/20 2.128,10 8.257,03 Fabricación, suministro, colocación, tratamiento previo y acabado de durmientes de madera de ROBLE FRANCES -ME1- de escuadría 24x20 cm. con encuentros entre dur- mientes a media madera y anclajes de los durmientes a muros mediante varillas de acero inoxidable de 20 mm. de

Page 249: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

díametro recibidas con "Sikadur 42" o similar en orificios de 30 mm. de díametro realizados por rotación con una entrega a fábrica mínima de 50 cm. situados cada 1,50 metros - ó según planos e indicaciones de la D.F.- y al tresbolillo, con doble tuerca superior y arandela, todo en acero inoxidable, incluyendo replanteo, preparación, tacos especiales para unión entre piezas, cortes, rebajes, en- cuentros, empalmes y obra necesaria, cepillado y lijado previo de la madera y tratamiento en taller, presentación, asiento, montaje total y tratamiento en obra en todas las caras y cortes con dos manos de "Xylamon fondo" o simi- lar todo con p.p. de medios auxiliares y costes indirectos. 03.042 9,95 m3 PARES DE MADERA LAMINADA 1.724,23 17.156,09 Fabricación suministro y montaje de madera laminada tipo GL24, de Picea Abies, según memoria y planos, en forma- ción de PARES y similares, incluso p.p. de herrajes de acero con su tornillería y accesorios de ensamblaje, así como cuñas y otros elementos necesarios, todo según pla- nos, replanteo, cortes, tratamiento previo de la madera y acabado protector en obra en todas sus caras y cortes con dos manos de Xyladecor roble mate, totalmente colocada y rematada, con p.p. cajeados puntuales necesararios y/o apoyos en fábrica, sean de piedra o ladrillo, incluso inter- posición de elementos separadores o formando juntas de trabajo, limpieza, con p.p. de medios auxiliares y costes in- directos. Medido en obra según criterio D.F. Según norma DIN 1052, asegurando una estabilidad mínima al fuego s/CTE. 03.043 16,30 m3 CORREA MADERA LAMINADA 12/20 1.548,73 25.244,30 Fabricación suministro y montaje de madera laminada tipo GL24c, de Picea Abies, según memoria y planos, en for- mación de CORREAS y similares, colocadas sin herrajes, en hendiduras, salvo puntualmente bajo aprobación de la D.F. siendo en tal caso de acero con su tornillería y acce- sorios de ensamblaje, así como cuñas y otros elementos necesarios, todo según planos, replanteo, cortes, trata- miento previo de la madera y acabado protector en obra en todas sus caras y cortes con dos manos de Xyladecor roble mate, totalmente colocada y rematada, con p.p. ca- jeados puntuales necesararios y/o apoyos en fábrica, sean de piedra o ladrillo hueco (por ejem. en apoyo junto contra- fuerte antigua Capilla de los Hierros y en formación de li- mas con faldón panda sur) limpieza, con p.p. de medios auxiliares y costes indirectos. Según norma DIN 1052, asegurando una estabilidad mínima al fuego s/CTE. Medi- da en verdadera magnitud. 03.044 78,00 m2 ESTRUCTURA RETICULAR SOBRE BÓVEDAS MAD.LAM. 31,00 2.418,00 Formación de estructura reticular sobre bóvedas, en previ- sión, asegurando la separación mínima de 5 cm. entre pa- res, correas y extradós de bóvedas, empleando correas calzadas sobre la fábrica y arriostradas con piezas de ma- dera 10/9, completamente separadas de los pares, em- pleando madera laminada idem anterior en características, calidad y acabado. Medios auxiliares y costes indirectos incluidos. Medida en proyeccion horizontal, incluyendo ta- bla. 03.045 125,95 m. BABERO PLOMO CUBIERTA-FÁBRICA d=50 65,17 8.208,16 Formación de BABERO DE PLOMO ENGATILLADO PB-2 certificado, de 2,5 mm. de espesor y 50 cm. de desarrollo, en formación de ENCUENTRO CUBIERTA-MURO de pie- dra, incluyendo el replanteo, ejecución de roza perfecta- mente alineada sobre fábrica del muro, formación de cama y adaptación al encostillado de teja realizado, recibido a

Page 250: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

roza con pestaña en extremo y sellado con "Sikaflex Pro 2 HP" o similar, de color gris o, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de lim- pieza y carga de cortes y desperdicios a contenedor espe- cial. 03.046 30,21 m. LIMA DE PLOMO SOBRE TABLA d=90 106,00 3.202,26 Formación de LIMAHOYA o similares, de PLOMO ENGA- TILLADO PB-2 certificado, de 2,5 mm. de espesor y 90 cm. de desarrollo, con p.p. de pestañas y engatilldos, en formación de ENCUENTRO entre FALDONES DE CU- BIERTA, incluyendo la formación de una CAMA DE YESO sobre el soporte, incluyendo el replanteo, y sellados pun- tuales en encuentros con "Sikaflex Pro 2 HP" o similar, de color gris o, p.p. de costes indirectos y medios auxiliares. Totalmente rematada, con p.p. de limpieza y carga de cor- tes y desperdicios a contenedor especial. Medida en pro- yección horizontal. 03.047 3,00 ud EXTINTOR EFICACIA 21/113B 84,85 254,55 Suministro y colocación de extintor de eficacia 21A, a colo- car en zona bajo cubierta de Nave del Evangelio, en las proximidades de los lucernacios de acceso, incluyendo p.p. de accesos de cuelgue y fijación, con p.p. de costes indirectos y medios auxiliares. 03.048 3,00 ud LUCERNARIO FUNDICIÓN ADAPTADO 223,54 670,62 Colocación de lucernario de fundición en faldón de cubier- ta, incluyendo recrecido en chapa perforada de 2 mm. de espesor y 5 mm. el díametro de las perforaciones para ventilación continua según modelo empleado en anteriores intervenciones, incluyendo la preparación, tratamiento y colocación del lucernario, con p.p. de material auxilar, me- dios auxiliares y costes indirectos. Segun detalle de pro- yecto. 03.049 1,00 ud CEGADO DE ÓCULO CAPILLA S.JERÓNIMO 71,42 71,42 Cegado del óculo del trasdós de la fachada de la Capilla de San Jerónimo, con fábrica de ladrillo recuperado y mor- tero de cal, incluso p.p. de medios auxiliares y costes indi- rectos, con limpieza final y retirada de escombros a conte- nedor. Total Capítulo 03 233.283,37

Page 251: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 04 UNIDAD III:FACHADA ESTE

04.001 36,11 m2 PROTECCIÓN 1 DE SOLADO 8,19 295,74 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en pa- tio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plástica, vertido de cama de arena se- ca de regulización y coloción de tablero aglomerado de 30 mm. de espesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxi- liares y costes indirectos. 04.002 1,00 ud RETIRADA ELEMENTOS AJENOS 127,37 127,37 Retirada de aquellos elementos ajenos a la fábrica, tales como soporte de antiguas instalaciones, cableados, gra- pas, clavos, etc. previa indicación y aprobación expresa por parte de la D.F., con p.p. de reterida y acopio para gestión de residuos, medios auxiliares y costes indirectos. En intervención de la FACHADA ESTE del CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO. 04.003 17,58 m2 PICADO DE RELLENOS 8,46 148,73 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, ladrillos y elementos ajenos a la fá- brica o en mal estado, etc con p.p. de retirada de escom- bros, limpieza, medios auxiliares y costes indirectos. Medi- da en verdadera magnitud. 04.004 10,38 m2 SUSTITUCIÓN SILLARES EN ZÓCALOS 265,17 2.752,46 Sustitución de sillares de piedra arenisca de Ciudad Rodri- go , en trabajos de RESTAURACIÓN DE ZÓCALOS DE PIEDRA, de fábricas de sillería, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, inclu- yendo el suministro de la piedra (arenisca de Ciudad Rodrigo), cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios genera- les de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e im- permeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta satura- ción y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirec- tos y medios auxiliares. 04.005 2,80 m2 SUSTITUCIÓN SILLARES EN FÁBRICAS 271,11 759,11 Sustitución de sillares de piedra arenisca de Ciudad Rodri- go , en trabajos de RESTAURACIÓN DE FABRICAS DE SILLERÍA, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. se- gún condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, for- mación de cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a

Page 252: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

establecer en obra por D.F., acordes a los criterios genera- les de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e im- permeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta satura- ción y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirec- tos y medios auxiliares. 04.006 1,63 m3 SUSTITUCIÓN FÁBRICAS LABRA TIPO 1 BOTAGUAS 1.757,80 2.865,21 Sustitución de fábricas talladas en piedra arenisca de Ciu- dad Rodrigo , en trabajos de RESTAURACIÓN DE FABRI- CAS TALLADAS, tipo 1 (BOTAAGUAS, IMPOSTAS , RE- MATES de la fachada Este Claustro Catedral de Ciudad Rodrigo y similares), de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, incluyendo el sumi- nistro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, formación de cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presen- tación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxida- ble o fibra de vidrio, y mortero de cal aditivado según con- diciones a establecer en obra por D.F., acordes a los crite- rios generales de intervención, incluyendo el marcado, pa- tinado y consolidación en su caso con "Tegovakon V" pro- tegido con "Tegosivin HL 100" o similares hasta saturación e impermeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta saturación y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar previa aprobación de la D.F., por me- dios manuales con p.p. de costes indirectos y medios auxi- liares. 04.007 0,35 m3 SUSTITUCIÓN FÁBRICAS LABRA TIPO 2 CRESTERÍA 2.117,24 741,03 Sustitución de fábricas talladas en piedra arenisca de Ciu- dad Rodrigo , en trabajos de RESTAURACIÓN DE FABRI- CAS TALLADAS, tipo 2 (para elemento de la CRESTERIA de la fachada Este Claustro Catedral de Ciudad Rodrigo y similares), de escuadria y despiece adaptada al elemento existente, incluyendo únicamente los elementos necesa- rios que garanticen la estabilidad, una vez se compruebe a pie de obra el estado real de la fábrica, con tratamientos idem anterior. 04.008 38,08 m2 RESTAURACIÓN CRESTERÍA FACHADA ESTE 116,56 4.438,60 Restauración de la crestería de la Fachada Este del Claus- tro de la Catedral de Ciudad Rodrigo, por todas sus caras, consistente en asegurar la estabilidad del elemento, reco- locando piezas en su caso, o fijando las sueltas, (y muy puntualmente, previa aprobación de la D.F. con posible in- corporación de piezas nuevas o elementos de piedra are- nisca de Ciudad Rodrigo), empleando cuñas y varillas de vidrio-epoxi de diferentes diametros y longitudes según ne- cesidades, recibiendolas con cal hidráulica natural NHL 3,5 CE de FYM Italcementi Group hasta colmatación, intro- duciendo el extremo de la varilla lo suficiente como para rematar la parte vista con mortero de rejuntado, CPA "M8"= osimilar, limpiando la superficie con cepillo de cer- das, incluso líquenes, musgos y otras costras, descarnan- do y rejuntando juntas, consolidando, impermeabilizando y patinando, todo en su caso previa autorización de la D.F. y siguiendo los criterios generales de intervención, dedu- ciendo proporcionalmente los tratamientos no realizados en base a partidas ya incluidas en este presupuesto, con p.p. de medios auxiliares y costes indirectos.

Page 253: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

04.009 77,83 m2 LIMPIEZA DE LÍQUENES y MUSGOS 13,01 1.012,57 Eliminación de líquenes, musgos y demás costras biogéni- cas sobre piedra arenisca de Ciudad Rodrigo, en facha- das, contrafuertes, albardillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello peróxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecutivas, dejando actuar al menos 10 días, eliminando los restos con cepillos de cer- das de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, limpiando de nuevo la superfi- cie transcurrida una semana con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, limpieza fi- nal , medios auxiliares y costes indirectos. Medida la su- perficie en proyección vertical por su cara exterior. 04.010 351,22 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 8,77 3.080,20 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contemplados en este Proyec- to de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de ce- mento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labrados, dejando las superficies acabadas o en su caso listas para el trata- miento correspondiente (rejuntado, consolidación, imper- meabilización etc.) incluso aspirado y/o soplado. Medida en proyección vertical según planos, con p.p. de desarrollo de molduras, nichos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios au- xiliares. 04.011 351,22 m2 DESCARNADO y REJUNTADO FÁBRICAS 23,50 8.253,67 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos_ 1,- DESCARNADO de juntas de fábricas de sillería y ele- mentos contemplados en esta intervención, incluyendo el picado de las sueltas y/o aquellas que su estado lo reco- miende, previa inspección a pie de obra e indicaciones de la dirección facultativa, empleando material adecuado -cinceles finos, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior 3,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena seleccionada y tamizada, con aglo- merante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 4,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. 5,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, es- timando no más del 4% de la superficie tratada. Resto en

Page 254: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos y estimando un 30% el descarnado de juntas y sopla- do, el 60% a la finalización del rejuntado y el 10% restante a la retirada de los andamios previa autorización por escri- to de la D.F. 04.012 122,93 m2 CONSOLIDACIÓN DE FÁBRICAS 26,15 3.214,62 Tratamiento de consolidación de fábricas de piedra arenis- ca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la pre- paración previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, moldu- ras, etc. 04.013 122,93 m2 PATINADO DE FÁBRICAS 8,12 998,19 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal gra- sa con pigmentos inorgánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de costes indirectos y me- dios auxiliares. 04.014 122,93 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 9,88 1.214,55 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungicidas tipo "Sikaguard 710" o simi- lar en "húmedo sobre húmedo" hasta saturación, con míni- mo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanoparticulas, ambos según indicaciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, mol- duras, etc. Total Capítulo 04 29.902,05

Page 255: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 05 UNIDAD IV: MURO EXTERIOR PANDAS

05.001 298,98 m2 PROTECCIÓN 1 DE SOLADO 8,19 2.448,65 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en pa- tio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plástica, vertido de cama de arena se- ca de regulización y coloción de tablero aglomerado de 30 mm. de espesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxi- liares y costes indirectos. 05.002 170,64 m2 PROTECCIÓN 2 DE SOLADO 2,21 377,11 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en pa- tio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plástica, vertido de cama de arena se- ca de regulización, incluso p.p. de otras protecciones, ac- cesorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxi- liares y costes indirectos. 05.003 1,00 ud RETIRADA MANGUERAS ELÉCTRICIDAD 106,24 106,24 Retirada de las mangueras eléctricas insevibles colocadas en el Claustro de la Catedral de Ciudad Rodrigo, tanto al exterior como al interior, incluyendo la inspección y com- probación previa, corte y remates, retirando el material a contenedor para su gestión correspondiente, con p.p. de medios auxiliares y costes indirectos. 05.004 1,00 ud RETIRADA ANCLAJES Y ELEMENTOS AJENOS 89,83 89,83 Retirada de anclajes modernos y otros elementos ajenos a las fábricas de los muros del Claustro de la Catedral de Ciudad Rodrigo, hasta contenedor para su gestión poste- rior, con p.p. de medios auxiliares y costes indirectos. 05.005 1,00 ud RETIRADA CANALETAS Y PANTALLAS ILUMINACIÓN 177,08 177,08 Retirada de pantallas y canaletas de iluminación existen- tes en el Claustro, acopiándolas y protegiendolas en lugar a determinar, para su posterior recolocación (en lugar aje- no) igualmente en lugar a determinar, con p.p. de medios auxiliares y costes indirectos. 05.006 479,84 m2 LIMPIEZA DE LÍQUENES y MUSGOS 13,01 6.242,72 Eliminación de líquenes, musgos y demás costras biogéni- cas sobre piedra arenisca de Ciudad Rodrigo, en facha- das, contrafuertes, albardillas, impostas, cornisas, y otros elementos de fachadas y cubiertas, empleando para ello peróxido de hidrógeno a través de un pulverizador air-less, en una mano inicial y otras consecutivas, dejando actuar al menos 10 días, eliminando los restos con cepillos de cer- das de nylon, soplando la superficie con equipo air-less de presión controlada y aplicando formalina (formaldehido) al 3% mediante pulverización, limpiando de nuevo la superfi- cie transcurrida una semana con cepillo y equipo de aire, todo incluido con p.p. de carga de escombros, limpieza fi- nal , medios auxiliares y costes indirectos. Medida la su- perficie en proyección vertical por su cara exterior. 05.007 998,63 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 8,77 8.757,99 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contemplados en este Proyec-

Page 256: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

to de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de ce- mento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labrados, dejando las superficies acabadas o en su caso listas para el trata- miento correspondiente (rejuntado, consolidación, imper- meabilización etc.) incluso aspirado y/o soplado. Medida en proyección vertical según planos, con p.p. de desarrollo de molduras, nichos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios au- xiliares. 05.008 998,63 m2 DESCARNADO DE JUNTAS SILLERIA 9,77 9.756,62 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de sillería y ele- mentos de piedra contemplados en esta intervención, in- cluyendo el picado de las sueltas y/o aquellas que su esta- do lo recomiende, o las ejecutadas con mortero de cemen- to (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, espátulas, cu- charilla, etc-, sin dañar en ningún caso la fábrica a restau- rar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fachada completo, o pro- yección horizontal en caso de elementos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 05.009 998,63 m2 REJUNTADO DE FÁBRICAS CPA "M8" 13,36 13.341,70 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena seleccionada y tamizada, con aglo- merante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, es- timando no más del 3% de la superficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección

Page 257: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 05.010 261,08 m2 CONSOLIDACIÓN DE FÁBRICAS 26,15 6.827,24 Tratamiento de consolidación de fábricas de piedra arenis- ca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la pre- paración previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, moldu- ras, etc. 05.011 187,77 m2 PATINADO DE FÁBRICAS 8,12 1.524,69 Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal gra- sa con pigmentos inorgánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de costes indirectos y me- dios auxiliares. 05.012 261,08 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 9,88 2.579,47 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungicidas tipo "Sikaguard 710" o simi- lar en "húmedo sobre húmedo" hasta saturación, con míni- mo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanoparticulas, ambos según indicaciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, mol- duras, etc. 05.013 16,90 m2 IMPERMEABILIZACIÓN "NANOPARTÍCULAS" 8,83 149,23 Tratamiento de IMPERMEABILIZACIÓN y/o hidrofugado de fábricas de piedra arenisca y/o granitica mediante apli- cación de producto base "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanoparticulas, según indica- ciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies trata- das en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección verti- cal y/o horizontal, con p.p. de salientes, cornisas, moldu- ras, etc. 05.014 293,25 m2 RESTAURACIÓN VENTANAL ROMÁNICO 32,73 9.598,07 RESTAURACIÓN DE VENTANAL RÓMANICO del Claus- tro de la Catedral de Ciudad Rodrigo (Salamanca) consis- tente en la limpieza total mediante cepillo de cerdas sua- ves, con soplado y aspiración según casos, y puntualmen- te limpieza de líquenes y musgos, detritus y otras costras, tratamiento de juntas eliminando y/o retirando únicamente las sueltas o en mal estado y rehundiendo las que lo preci- sen, previa aprobación de la D.F. y en su caso rejuntando con mortero de cal teñido; igualmente de forma puntual, reparación de nervios según indicaciones de la D.F. y con- solidación e impermeabilización y en su caso patinado de las superficies que lo requieran, todo siguiendo los crite- rios generales de la intervención. Medida la superficie en proyección vertical desde el borde moldurado en el en- cuentro con el paramento que lo cobija s/criterio D.F., con

Page 258: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

p.p. de desarrollo de basas, repisa, columnillas, pilaretes maineles, pilastras, capiteles, impostas, arquerías, óculos, etc. dejando la únidad totalmente restaurada incluyendo la limpieza final y carga de escombros a contenedor. 05.015 466,45 m2 RESTAURACIÓN VENTANAL GÓTICO 27,54 12.846,03 RESTAURACIÓN DE VENTANAL GÓTICO del Claustro de la Catedral de Ciudad Rodrigo (Salamanca) consistente en la limpieza total mediante cepillo de cerdas suaves, con soplado y aspiración según casos, y puntualmente limpie- za de líquenes y musgos, detritus y otras costras, trata- miento de juntas eliminando y/o retirando únicamente las sueltas, las que estén en mal estado o las advertidas por la D.F., rehundiendo las que lo precisen, previa aprobación de la D.F. y en su caso rejuntando con mortero de cal teñi- do; igualmente de forma puntual, consolidación (fundamentalmente zonas dañadas o con falta de piezas por rotura) e impermeabilización y en su caso patinado de las superficies que lo requieran, todo siguiendo los crite- rios generales de la intervención. Medida la superficie en proyección vertical desde el borde moldurado con el para- mento que lo cobija, con p.p. de desarrollo de basas, repi- sa, columnillas, pilaretes maineles, pilastras, capiteles, im- postas, arquerías, óculos, etc. dejando la únidad totalmen- te restaurada incluyendo la limpieza final y carga de es- combros a contenedor. 05.016 5,00 ud RECOLOCACIÓN DOVELA 242,39 1.211,95 Recolocación de dovelas de arquerías de ventanales, in- cluyendo el apuntalamiento previo y cimbras necesarias, cuñas y tirantes, piezas de estronque e inclusión puntual de injertos de piedra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea necesario para garantizar la estabilidad del elemento, que deberá asegu- rarse, devolviendo la "tirantez" adecuada al arco, incluso el uso de gatos controlados y el recibido de piezas, retirada de apuntalamiento por fases y limpieza final y retirada de escombros a contenedor. El rejuntado del elemento se va- lora en partida independiente.Con p.p. de medios auxilia- res y costes indirectos. 05.017 14,00 ud MICRO-COSIDO NERVIOS DE VENTANALES 81,74 1.144,36 Restauración de NERVIOS ROTOS DE VENTANALES, mediante MICRO-COSIDOS con varillas vidrio-epoxi y/o acero inoxidable según se valore en obra, incluso la inclu- sión puntual de injertos de piedra arenisca - a modo de cu- ñas- previa aprobación de la D.F. y siempre que sea nece- sario para garantizar la estabilidad del elemento, incluyen- do el apuntalamiento del elemento afectado, el estudio y trazado de los cosidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de juntas y la colocación de varillas dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o simila- res, teñidos con pigmentos inorgánicos, limpieza final y re- tirada de escombros a contenedor. Medida la unidad te- niendo en cuenta un doble cosido por unidad, con longitud máxima de 50 cm. por varilla. El rejuntado del elemento se valora en partida independiente. 05.018 33,50 ud COSIDO DE DOVELAS y/O NERVIOS d=12 mm. 52,39 1.755,07 Restauración de arquerías, mediante COSIDO DE DOVE- LAS con varillas de acero inoxidable de díametro 12 (o in- feriores, o en su caso vidrio-epoxi) según determine la D.F. en obra, comprobando la "tirantez" del trazado del elemento incluso la inclusión puntual de injertos de piedra arenisca - a modo de cuñas- previa aprobación de la D.F. y siempre que sea necesario para garantizar la estabilidad

Page 259: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

del elemento, incluyendo el APUNTALAMIENTO del ele- mento afectado, el estudio y trazado de los cosidos, las perforaciones (por rotación y a baja potencia), el soplado y limpieza, el relleno de los huecos y juntas y la colocación de varillas dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pigmentos inorgánicos, limpieza final y retirada de escom- bros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima de 85 cm. por varilla. El rejuntado del elemento se valora en par- tida independiente. 05.019 36,00 ud RETACADO y COSIDO DE FÁBRICAS SILLERÍA d=12 50,94 1.833,84 REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrietadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 metros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replanteo del tala- dro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETACADO de las grietas y oqueda- des con mortero de cal teñido (sustituible por pasta de ye- so que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hi- dráulica natural NHL 3,5 CE de "FYm Italcementi Group" o similar, con implantación de equipo, realizando las perfora- ciones por rotación a baja potencia y controlada, con es- crupuloso soplado y limpieza posterior, colocación de vari- llas -dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pig- mentos inorgánicos- y limpieza final y retirada de escom- bros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima de 90 cm. por varilla. El rejuntado final del elemento se valora en partida independiente. 05.020 79,76 m2 PICADO DE RELLENOS 8,46 674,77 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, ladrillos y elementos ajenos a la fá- brica o en mal estado, etc con p.p. de retirada de escom- bros, limpieza, medios auxiliares y costes indirectos. Medi- da en verdadera magnitud. 05.021 37,00 m2 RETACADO DE FÁBRICAS CON MORTERO DE CAL 17,55 649,35 Retacado de fábricas agrietadas o afectadas por trabajos defectuosos, con cal hidráullica (hasta saturación) y morte- ro de cal, dejándo las juntas rehundidas y acabando las superficies con mortero CPA "M8" o similar o bien con Pe- tratex en función de si afecta puntualmente a elemento de- corativo, según criterios generales de la intervención, en fábricas de silleria ligeramente moldurada, en trabajos de reparación de grietas, de faltas, etc con p.p. de medios au- xiliares y costes indirectos. 05.022 5,13 m2 SUSTITUCIÓN SILLARES EN ZÓCALOS 265,17 1.360,32 Sustitución de sillares de piedra arenisca de Ciudad Rodri- go , en trabajos de RESTAURACIÓN DE ZÓCALOS DE PIEDRA, de fábricas de sillería, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. según condiciones de la fábrica, inclu- yendo el suministro de la piedra (arenisca de Ciudad Rodrigo), cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios genera-

Page 260: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

les de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e im- permeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta satura- ción y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirec- tos y medios auxiliares. 05.023 1,20 m2 SUSTITUCIÓN SILLARES EN FÁBRICAS 271,11 325,33 Sustitución de sillares de piedra arenisca de Ciudad Rodri- go , en trabajos de RESTAURACIÓN DE FABRICAS DE SILLERÍA, de escuadria adaptada a las hiladas y para un fondo mínimo de 12 cm., y hasta un máximo de 20 cm. se- gún condiciones de la fábrica, incluyendo el suministro de la piedra (arenisca de Ciudad Rodrigo), sana y seca, for- mación de cajeados, retirada de fábricas ajenas o rellenos, preparación de piedras y soporte, cortes, presentación, formación de cama y asiento, recibido con mortero de cal y anclaje en su caso con varillas de acero inoxidable o fibra de vidrio, y mortero de cal aditivado según condiciones a establecer en obra por D.F., acordes a los criterios genera- les de intervención, incluyendo el marcado, patinado y consolidación en su caso con "Tegovakon V" protegido con "Tegosivin HL 100" o similares hasta saturación e im- permeabilización mediane tres manos de "Sikaguard 710" o similar aplicadas "humedo sobre húmedo" hasta satura- ción y puntualmente "Tecnodis PRS EFFECT" de "Tecnan" o similar, por medios manuales con p.p. de costes indirec- tos y medios auxiliares. 05.024 6,24 m2 RECOLOCACIÓN FÁBRICAS DE SILLERIA 61,09 381,20 Recolocación de fábricas de sillería en trabajos de restau- ración, incluyendo el trabajo de cantería necesario para re- tirada en su caso de la pieza, preparación del asiento y re- colocación, empleando mortero de cal teñido según los cri- terios generales de la intervención, retacando con cal hi- dráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, repasos, etc 05.025 13,00 ud RESTAURACIÓN DE PINÁCULOS 459,01 5.967,13 Restauración de pináculo del Claustro de la Catedral de Ciudad Rodrigo incluyendo previa colocación de medios auxiliares, la limpieza de líquines y otras costras biogéni- cas, la limpieza con cepillo de cerdas suaves, aspiración y soplado, descarnado únicamente de las juntas que lo re- quieran y rejuntado en su caso, previo soplado y prepara- ción del soporte, incluyendo la posible consolidación, e hi- drofugado de los elementose que lo requieran una vez se comprueba a pie de obra su estado, siempre bajo aproba- ción de la D.F., incluso fijación y anclaje en caso de falta de estabilidad según criterios de intervención generales, colocando protección de cobre idem contrafuertes adapta- da a la geometría con p.p. de formación de encuentros, medios auxiliares y costes indirectos. 05.026 10,00 ud RESTAURACIÓN REMATE CONTRAFUERTES 215,85 2.158,50 Colocación de remate de cobre en coronación de contra- fuertes previa restauración de los mismos a base de LIM- PIEZA de líquenes y vegetación, consolidación en su ca- so, y CAPA DE REGULARIZACIÓN con mortero teñido de cal y arena y pigmentos inorgánicos, incluso p.p. de rema- te de las faltas en bordes devolviendo su geometría par- cialmente con mortero "Petratex", dejando rehundido el plomo 3 cm. según figura en detalle de proyecto, dejando listo para la colocación, también incluida de TAPAS DE COBRE de 0,8 mm. de espesor, rigidizadas mediante ple-

Page 261: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

tinas 30/2 colocadas cada 30 cm. como máximo fijadas ca- da una con tirafondos de acero inoxidable 50/5 y tacos de material plástico, y entregando en finas rozas prácticadas en el paramento posterior o sobre pináculos, incluyendo p.p. de engatillados, formación de bordes rigidizados, se- llado, etc. todo según detalle e indicaciones de la D.F., con p.p. de medios auxilaires y costes indirectos. 05.027 1,00 ud REPOSICIÓN CANALETAS Y PANTALLAS 195,47 195,47 Reposición, en su caso, de las pantallas y canaletas de iluminación previamente retiradas y acopiadas en lugar a determinar, con p.p. de medios auxiliares y costes indirec- tos. Total Capítulo 05 92.479,96

Page 262: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 06 UNIDAD V: MURO INTERIOR

06.001 1,00 ud DESMONTAJE ILUMINACIÓN BOMBILLAS 55,19 55,19 Desmontaje total del conjunto de bombillas con su red y mecanismos así como los soportes de los paramentos in- teriores del Claustro y los interruptores a sustituir, con reti- rada de material inservible a contenedor, acopiando el res- to en lugar a indicar, con p.p. de medios auxiliares y cos- tes indirectos. 06.002 1,00 ud DESMONTAJE CRUCES "VIACRUCIS" P/REPOSICIÓN 59,68 59,68 Desmontaje total del conjunto de cruces de madera que conforman el Viacrucis del Claustro, acopiándolas y prote- giéndolas en lugar seguro para su posterior recolocación, con retirada de material inservible a contenedor, acopian- do el resto en lugar a indicar, con p.p. de medios auxiliares y costes indirectos. 06.003 9,00 ud LEVANTADO LÁPIDA SEPULCRAL 27,42 246,78 Levantado de lápida sepulcral del arcosolio que la cobija, bajo supervisión arqueológica, para su acopio por separa- do y debidamente colocada sobre estructura de madera en lugar seguro y protegido hasta su posterior recolocación en estructura métalica según diseño o en su defecto lugar a determinar por la D.F. o el estudio museístico, incluyen- do la retirada de elementos bajo la misma necesarios reti- rar para la restauración de paramentos, así como la retira- da de escombros o material inservible a contenedor para su posterior gestión, con p.p. de medios auxiliares y costes indirectos. 06.004 1,00 ud RETIRADA DE RESTOS EXPUSTOS EN CLAUSTRO c/REC 203,66 203,66 Retirada del conjunto de restos expuestos en el Claustro de la Catedral de Ciudad Rodrigo y aquellos susceptibles de acopio que aparezcan bajo las lápidas de los arcosolios y otros para su evaluación, con acopio y protección en zo- na adecuada a determinar, incluso su posterior recoloca- ción en lugar según indicaciones D.F. con p.p. de medios auxiliares y costes indirectos. 06.005 1,00 ud RETIRADA DE ANCLAJES MODERNOS 85,21 85,21 Retirada de todos los anclajes modernos y otros elemen- tos ajenos a las fábricas de los muros interiores del Claus- tro de la Catedral de Ciudad Rodrigo, hasta contenedor para su gestión posterior, con p.p. de medios auxiliares y costes indirectos. 06.006 1,00 ud RETIRADA CARPINTERÍAS HUSILLO 46,92 46,92 Retirada de las carpinterías existentes en el husillo de su- bida al Coro de las Viudas, incluida la malla de gallinero, dejando los elementos libres para su posterior intervención y colocación de nuevas carpinterías o tratamientos, con carga de restos a contenedor de escombros y p.p. de me- dios auxiliares y costes indirectos. 06.007 1,00 ud RETIRADA CANALETAS ILUMINACIÓN 82,78 82,78 Retirada de canaletas de iluminación y elementos auxilia- res, dejando la zona de intervención libre de elementos y riesgos eléctricos relativos a dicha instalación, con poste- rior recolocación en su caso, con p.p. de medios auxiliares y costes indirectos. 06.008 1.107,55 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 8,77 9.713,21 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contemplados en este Proyec- to de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas

Page 263: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

suaves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de ce- mento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labrados, dejando las superficies acabadas o en su caso listas para el trata- miento correspondiente (rejuntado, consolidación, imper- meabilización etc.) incluso aspirado y/o soplado. Medida en proyección vertical según planos, con p.p. de desarrollo de molduras, nichos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios au- xiliares. 06.009 22,80 m2 LIMPIEZA DE SALES CON "SEPIOLITA" 56,48 1.287,74 Limpieza de muros de sillería y o fábricas de ladrillo, bóve- das, etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Todo incluido con p.p. de medios auxiliares y costes indirectos. 06.010 99,35 m2 LIMPIEZA DEYECCIONES AVES 19,67 1.954,21 Limpieza de deyecciones de aves, consistente en: 1,-Eliminación primaria en seco, de biodepósitos (acumulaciones de microorganismos, restos orgánicos, ex- crementos de aves etc.) depositados sobre las superficies de muros, actuando manualmente con cepillos de cerda suave, e instrumentos desincrustantes manuales adecua- dos (espátulas, escalpelos etc). Aplicando el tratamiento en las zonas de acumulación, incluso retirada de detritus. La delgada película de material residual se tratarán me- diante lavado con toronda de guata humedecida con agua amoniacal, considerando un grado de dificultada normal ( a determinar en obra). 2,-Limpieza de paramentos descritos en la intervención de las deyecciones de aves mediante agua y detergente, por medios manuales mediante espátulas, escalpelos, etc. protegiendo la zona para no verse afectada, retirando los restos de detritus, (patinando las superficies afectadas s/criterio D.F.) con p.p. de medios auxiliares y costes indi- rectos Medida la unidad un 35% (1 ) y un 65% (2). En caso de in- tervención total (1+2) al 100%. 06.011 43,96 m2 PICADO DE RELLENOS 8,46 371,90 Picado de rellenos y retacados enfoscados con cemento y/o cal en trabajos de restauración de paramentos, incluso retirada de los tejones, ladrillos y elementos ajenos a la fá- brica o en mal estado, etc con p.p. de retirada de escom- bros, limpieza, medios auxiliares y costes indirectos. Medi- da en verdadera magnitud. 06.012 58,46 m2 PICADO RELLENOS ARCOSOLIOS y NICHOS 13,60 795,06 Picado de rellenos, retacados y enfoscados, de cemento y/o cal, en trabajos de RESTAURACIÓN DE ARCOSO- LIOS, respetando las policromias, retirando el material de relleno inadecuado o en mal estado, para su posterior tra- tamiento o simple limpieza, ejecutado manualmente por ESPECIALISTA RESTAURADOR, con p.p. de retirada de escombros, limpieza, medios auxiliares y costes indirectos. Medida en verdadera magnitud. 06.013 14,23 m2 PICADO DE ENFOSCADOS 7,51 106,87 Picado de enfoscados de cemento y/o cal en trabajos de restauración de paramentos, por medios manuales con p.p. de retirada de escombros, limpieza, medios auxiliares

Page 264: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

y costes indirectos. Medida en verdadera magnitud. 06.014 1.252,80 m2 DESCARNADO DE JUNTAS SILLERIA 9,77 12.239,86 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de sillería y ele- mentos de piedra contemplados en esta intervención, in- cluyendo el picado de las sueltas y/o aquellas que su esta- do lo recomiende, o las ejecutadas con mortero de cemen- to (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, espátulas, cu- charilla, etc-, sin dañar en ningún caso la fábrica a restau- rar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fachada completo, o pro- yección horizontal en caso de elementos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 06.015 1.107,55 m2 REJUNTADO DE FÁBRICAS CPA "M8" 13,36 14.796,87 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena seleccionada y tamizada, con aglo- merante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, es- timando no más del 3% de la superficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 06.016 147,81 m2 CONSOLIDACIÓN DE FÁBRICAS 26,15 3.865,23 Tratamiento de consolidación de fábricas de piedra arenis- ca y/o granitica mediante aplicación de "Tegovakon V" o similar, protegiendolo posteriormente con "Tegosivin HL 100", según indicaciones del fabricante, incluyendo la pre- paración previa del soporte y la protección posterior, con p.p. de costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, moldu- ras, etc. 06.017 77,47 m2 PATINADO DE FÁBRICAS 8,12 629,06

Page 265: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Patinado de fábricas de piedra y elementos incluidos en la intervención de este proyecto, a base de agua de cal gra- sa con pigmentos inorgánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de costes indirectos y me- dios auxiliares. 06.018 147,45 m2 IMPERMEABILIZACIÓN DE FÁBRICAS 9,88 1.456,81 Tratamiento de hidrofugado de fábricas de piedra arenisca y/o granitica mediante aplicación de producto base silano-siloxano con fungicidas tipo "Sikaguard 710" o simi- lar en "húmedo sobre húmedo" hasta saturación, con míni- mo de tres manos. A indicaciones de la D. Facultativa se sustituirá y/o combinará con el producto "Tecnadis PRS EFFECT", de "Tecnan" o similar a base de nanoparticulas, ambos según indicaciones del fabricante, incluso p.p. de ensayos y pruebas, protección de elemenos, preparación y limpieza previa del soporte y en caso de lluvia protección de superficies tratadas en las 24 horas siguientes o hasta su secado, costes indirectos y medios auxiliares. Medida en proyección vertical, con p.p. de salientes, cornisas, mol- duras, etc. 06.019 63,33 m2 ENFOSCADO MORTERO DE CAL 3 CAPAS 46,86 2.967,64 Revoco de paramentos en trabajos de restauración a base de aplicación de diferentes morteros de cal grasa y arenas seleccionadas en tres capas de la siguiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosifica- ción 1:4 empleando arena limpia seleccionada y de tamiz 2,5 mm previo descarnado, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de testigos para regleteado. 2.- Una segunda capa de espesor 6 ó 7 mm., de dosifica- ción 1:2, empleando arena limpia seleccionada de tamiz 1,2 mm. extendida con fratás. 3.- Una tercera y última capa de espesor 3 mm., de dosifi- cación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y control de retraccio- nes. Se empleará cal grasa para realización de morteros y se pigmentarán con tierras naturales, realizando muestras pa- ra elección por parte de la dirección facultativa, incluso te- niendo en cuenta un patinado final para conseguir tono adecuado (según criterios establecidos en memoria) em- pleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosificaciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un correcto agarre y p.p. de medios auxiliares y costes indirectos. Se- gún memoria y criterios generales establecidos para la in- tervención. Incluso ensayos de humedad de paramentos previos a la aplicación, para su posterior comprobación, in- cluso realización de ensayos de dosificaciones y tipos de arena y cal. 06.020 15,83 m2 ENFOSCADO MORTERO DE CAL 1 CAPA 15,18 240,30 Revoco de paramentos en trabajos de restauración a base de aplicación de una capa de enfoscado de mortero de cal previa preparación del paño, incluida, empleando mortero de cal grasa teñida con pigmentos naturales, arena selec- cionada y tamizada, para un espesor aproximado de 15 ó 16 mm., de dosificación 1:3 (1:3,5, en función de la arena) empleando arena limpia seleccionada y de tamiz 2,5 mm con sacado de plomos y niveles y colocación de testigos para regleteado y fratasado final, dejando acabado fino.

Page 266: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

06.021 2,30 m2 RECOLOCACIÓN FÁBRICAS DE SILLERIA 61,09 140,51 Recolocación de fábricas de sillería en trabajos de restau- ración, incluyendo el trabajo de cantería necesario para re- tirada en su caso de la pieza, preparación del asiento y re- colocación, empleando mortero de cal teñido según los cri- terios generales de la intervención, retacando con cal hi- dráulica y rejuntando con mortero CPA "M8", incluso corte de piedra, repasos, etc 06.022 6,00 ud RETACADO y COSIDO DE FÁBRICAS SILLERÍA d=12 50,94 305,64 REPARACIÓN DE FÁBRICAS DE SILLERÍA, agrietadas, desplazadas, o con falta de enjarjes mediante COSIDO con varillas roscadas de acero inoxidable de díametro 12 y de 0,90 metros de longitud (variable un 10% en función del trazado a ver en obra), comprendiendo replanteo del tala- dro y cálculo in situ de su trayectoria, según determine la D.F. , el rejuntado y RETACADO de las grietas y oqueda- des con mortero de cal teñido (sustituible por pasta de ye- so que se retirará y limpiará posteriormente) para evitar pérdidas de la lechada de inyección que será de cal hi- dráulica natural NHL 3,5 CE de "FYm Italcementi Group" o similar, con implantación de equipo, realizando las perfora- ciones por rotación a baja potencia y controlada, con es- crupuloso soplado y limpieza posterior, colocación de vari- llas -dejándolas rehundidas para en su caso rematar con mortero Petratex o "CPA M8" o similares, teñidos con pig- mentos inorgánicos- y limpieza final y retirada de escom- bros a contenedor. Medida la unidad teniendo en cuenta un doble cosido por unidad, con longitud máxima de 90 cm. por varilla. El rejuntado final del elemento se valora en partida independiente. 06.023 8,00 ud RECOLOCACIÓN DE LÁPIDA SEPUCRAL 32,31 258,48 Trabajos de recolocación de lápidas, incluyendo el trasla- do por personal cualificado y la colocación en los soportes diseñados para su muestra, en zona a determinar por la D.F., incluso p.p. de trabajos auxiliares de calzo y/o ancla- je en su caso, evitando posibles movimientos o desplaza- mientos de las piezas que pudieran poner en peligro la in- tegridad de las mismas y de los visitantes. 06.024 8,00 ud SOPORTE LÁPIDA SEPULCRAL ACERO CORTEN 253,27 2.026,16 Sorte lápidas, según diseño, fabricación, suministro y mon- taje, incluso protección del acero para evitar manchas en solados y paramentos. 06.025 1,00 ud RECOLOCACIÓN VIRGEN ARCOS. XVIII 66,54 66,54 Recolocación de la escultura -Virgen- existente en el arco- solio nº XVIII, incluyendo la preparación de la base, pre- sentado, repaso y recibido y en su caso anclaje de la mis- ma, empleando mortero de cal, por medios manuales y con p.p. de medios auxiliares y costes indirectos, 06.026 1,00 ud RECOLOCACIÓN ELEMENTOS 241,00 241,00 Partida para la recolocación del conjunto de elementos y motivos arquitectónicos desmontados tanto en el Patio Central como en las Naves del Claustro, anteriormete reti- rados y acopiados, previa preparación y adecuación del lu- gar a determinar por la D.F. y en su caso según el estudio museístico, con p.p. de medios auxiliares y costes indirec- tos. 06.027 13,25 m. REPOSICIÓN PELDAÑOS "PUERTA DE LOS CARROS" 72,64 962,48 Reposición de peldañeado de la "Puerta de los Carros", previamente desmontados, incluyendo la limpieza y prepa- ración de la base con mortero de cal y arena, aditivado en

Page 267: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

su caso, y recolocación de elementos recuperados, con aportación mínima puntual de nueva piedra arenisca de Ciudad Rodrigo patinada, inclyendo el rejuntado de ele- mentos con mortero de cal y arena seleccionada con apor- tación de pigmentos naturales según pruebas previas, con p.p. de medios auxiliares y costes indirectos. 06.028 2,00 ud INTERRUPTOR "MARRÓN" 86,69 173,38 Colocación de interruptor de color en tono marrón oscuro uniforme, de marca y modelo a elegir por la D.F., acorde al edificio, con p.p. de medios auxiliares y costes indirectos. Medida la unidad teniendo en cuenta el trabajo mínimo. 06.029 1,50 m2 TRATAMIENTO REJA CON ACEITE DE LINAZA 60,77 91,16 Tratamiento de rejas y elementos similares a base de acei- te de linaza cruda, (mezclado con betun según casos) apli- cado a muñequilla, previa limpieza del elemento, con p.p. de medios auxiliares y costes indirectos. 06.030 1,00 ud CERRAMIENTO DE HUECO CON ALABASTRO 155,93 155,93 Cerramiento de hueco de husillo del Coro de las Viudas con alabrastro, previa aprobación de muestra por parte de la D.F. incluyendo el suministro, corte y montaje, con p.p. de preparación de hueco, adaptación, formación de mo- chetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxiliares y costes indirectos. 06.031 45,00 m. PROTECTOR "ANTI-PÁJAROS" 13,07 588,15 Sistema de control anti-aves para cornisas, vigas, desa- gües, pretiles y áreas con poca presencia de aves a base de cadenas de espinas formadas por punzones de acero inoxidable de 11,5cm de altura sostenidos en una base de policarbonato transparente. La base se coloca mediante tornillería o pegamento para uso exterior resistente a fac- tores climáticos como lluvia, calor, frío, etc. Medido por metro lineal de cadena, valorado para una longitud entre 1 y 30 m. Total Capítulo 06 56.214,41

Page 268: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 07 UNIDAD VI: BÓVEDAS

07.001 137,00 m2 PROTECCIÓN 1 DE SOLADO 8,19 1.122,03 Protección del solado en trabajos de restauración de la Catedral de Ciudad Rodrigo (Salamanca), consistente en la colocación de una lámina de polietileno de 0,15 mm de espesor o superior sobre el solado bajo bóvedas o en pa- tio central, solapando 30 cm. mínimo, sellando uniones con cinta adhesiva plástica, vertido de cama de arena se- ca de regulización y coloción de tablero aglomerado de 30 mm. de espesor, incluso p.p. de otras protecciones, acce- sorios y pequeño material, solapes, revisiones y retirada de elementos a la finalización de los trabajos, medios auxi- liares y costes indirectos. 07.002 96,80 m2 APEO/CIMBRA BÓVEDA CLAUSTRO C.RODRIGO 97,14 9.403,15 Previa protección del solado, EJECUCIÓN DE APEO Y CIMBRA de madera para bóveda de la Catedral de Ciudad Rodrigo, 4-5-6 y/o 16, y otras similares, con formación de pies derechos, arriostramientos, tirantes y tirantes torna- punteados establecida provisionalmente con el objeto de sostener la construcción hasta que adquiera la consisten- cia necesaria para su estabilidad, construida con madera de pino nacional de clase 2ª en sus partes resistentes y madera de encofrar en tablas y tablones para forma, con la directriz, montea y cuaje, dimensionada para soportar sin deformación las cargas previstas, con diseño no rígido para facilitar en el momento adecuado el afloje para des- cimbrado y de fácil armado y desarmado para diferentes posturas, comprendiendo: apeos, construcción de la cim- bra, con aporte de madera, incluso parte proporcional de mermas, material de unión, cimbrado y posterior descim- brado, por cualquiera de los siguientes procedimientos: acuñado, sacos de arena, cajas de arena, tornillos o gatos y excéntricas, sopandas y puntales, con interposición de elementos metálicos si fuera necesario o en su sustitución, con p.p. de medios auxiliares y costes indirectos. Medida en proyección horizontal. 07.003 689,51 m2 SUPERV. ARQUEOL. EXTRADÓS BÓVEDAS 11,17 7.701,83 Supervisión arqueológica en fase de limpieza de extradós de bóvedas, retirando sólo el material ajeno a la fábrica di- rectamente a camión de transporte a vertedero (ver partida capítulo "UNIDAD II:CUBIERTAS"), respetando en cual- quier caso el relleno de riñones. Medición de partida según criterio de la D.F, teniendo en cuenta el grado de supervi- sión necesario, con p.p. de medios auxiliares y costes indi- rectos. A justificar. 07.004 689,51 m2 LIMPIEZA BÓVEDAS INTRÁDOS CEPILLO CERDAS 15,10 10.411,60 Limpieza de BÓVEDAS de piedra del Claustro de la Cate- dral de Ciudad Rodrigo, incluyendo todos los elementos que la forman, arcos formeros, perpiaños, ojivas, nervios, rosetones, claves, escudos, figuras, elementos decorati- vos, etc, por medios manuales empleando cepillos de cer- das suaves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolida- ción previa y el picado de restos aislados de mortero de cemento o elementos ajenos a la fábrica original, em- pleando aire a presión, que será controlada en función del elemento a limpiar, teniendo especial atención con aque- llas zonas con policromías, marcas etc y/o elementos la- brados, dejando las superficies acabadas o en su caso lis- tas para el tratamiento correspondiente (rejuntado, retaca- do, consolidación, impermeabilización etc según orden a establecer.) incluso aspirado y/o soplado. Medida en pro-

Page 269: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

yección horizontal según planos, con p.p. de desarrollo de dóvelas, nervios, molduras, etc, limpieza final con retirada de escombro generado a vertedero y con p.p. costes indi- rectos y medios auxiliares. 07.005 31,84 m2 LIMPIEZA y TRATAMIENTO HUMEDADES EN BÓVEDAS 56,53 1.799,92 Tratamiento de manchas por humedades en bóvedas, consistente en la limpieza de las señales generadas y la posible existencia de sales (grado bajo-medio, salvo en bóveda 4-5-6 y nervios puntuales) etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Aprovechando el uso de andamiaje montado para la res- tauración general de las bóvedas, iniciando los trabajos lo antes posible para poder ir comprobando la absorción de la humedad y las manchas, y poder en su caso patinar los elementos que se vean notoriamente afectados. Todo in- cluido con p.p. de medios auxiliares y costes indirectos. Criterio de medición, en función del grado (de 1 a 3 ), gra- do 1:50%, grado 2: 75%, grado 3:100%, a determinar pre- viamente por D.F. Medida la superficie en proyección hori- zontal, con p.p. de desarrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. 07.006 487,60 m2 DESCARNADO JUNTAS BÓVEDAS 14,17 6.909,29 Trabajos de restauración de bóvedas con todos sus ele- mentos, arcos formeros, perpiaños, ojivas, nervios, claves, escudos, elementos decorativos, etc consistente en el DESCARNADO DE JUNTAS para su posterior tratamiento/s (rejuntado, retacado, etc.) siguiendo los mis- mos criterios establecidos en este proyecto, por medios manuales incluyendo el soplado con aire a presión contro- lado y por aspiración según casos, con p.p. de medios au- xiliares y costes indirectos.Medida la superficie en proyec- ción horizontal, con p.p. de desarrollos tanto de arcos, ner- vios y otros elementos así como cascos de plementería. 07.007 487,60 m2 RETACADO y REJUNTADO BÓVEDAS CAL NHL+CPA "M8" 19,13 9.327,79 Tratamiento en juntas no pasantes de bóvedas y todos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su retacado y rejuntado posterior 2,- RETACADOS o RELLENOS en las JUNTAS NO PA- SANTES empleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group y arena seleccionada y tamizada. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. Medida la superficie en proyección horizontal, con p.p. de desarrollos tanto de arcos, nervios y otros elementos así como cascos de plementería. 07.008 404,64 m2 RETACADO DE JUNTAS PASANTES C/CAL NHL 12,71 5.142,97 Tratamiento en juntas pasantes de bóvedas y todos sus elementos, del Claustro del Ciudad Rodrigo, incluyendo los siguientes trabajos: 1,- LIMPIEZA DE JUNTAS PASANTES por ASPIRACIÓN mediante equipo a presión y/o aspiración controlada.

Page 270: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

2,- Previo rejuntado que servirá a modo de encofrado, RE- TACADO de las juntas pasantes hasta colmatación em- pleando mortero de cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group y arena seleccionada y tamizada, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. Medida la superficie en proyección horizontal, por el extradós o en su defecto por intradós con p.p. de desarrollos tanto de arcos, nervios y otros elemen- tos así como cascos de plementería. 07.009 64,63 m2 SANEAMIENTO DE PLEMENTERÍA 75,25 4.863,41 Saneamiento de plementería afectada por diversas patolo- gías en conjunto o paño, no puntualmente, principalmente bóvedas 4-5-6 según plano 49 de este proyecto, referente a las de bóvedas del Claustro de la Catedral de Ciudad Rodrigo y consistente en el cosido de los fragmentos rotos que amenacen desprendimiento, con varillas de acero ino- xidable de díametro 12, u otros de menor tamaño en fun- ción de la zona a reparar, incluyendo la limpieza y descar- nado, rejuntado y retacado para saturar en la medida de lo posible la zona de afectada por la inyección, que será de cal NHL, según criterios generales de intervención, memo- ria, planos e indicaciones de la D.F. Medida la unidad con p.p. costes indirectos y medios auxiliares. 07.010 49,00 ud COSIDO DE PLEMENTERÍA D=12 mm./M2 33,54 1.643,46 SANEAMIENTO, a base de limpieza, soplado y prepara- ción de elementos y COSIDO DE PLEMENTERIA en cruz, con doble varilla de díametro 12mm. en diferentes longitu- des, y tenida en cuenta para un máximo de tres plementos por "unidad de cosido", siguiendo criterios generales de in- tervención, con p.p. de medios auxiliares y costes indirec- tos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a mo- do de encofrado. Varilla rehundida para facilitar sellado con mortero de cal CPA "M8" teñido. Medida la unidad pa- ra una superficie de 0,50 m2 o un máximo de tres plemen- tos. 07.011 45,00 ud COSIDO NERVIOS BÓVEDAS D=12 mm. 42,41 1.908,45 Reparación de NERVIOS ROTOS DE BÓVEDAS, incluso sus arcos formeros, perpiaños, ojivas, etc. consistente en la limpieza y preparación del elemento a tratar y el COSI- DO EN CRUZ con doble VARILLA DE ACERO INOXIDA- BLE corrugado DE DIAMETRO 12mm. en diferente longi- tud según casos (incluso podría variar el díametro puntual- mente según se determine a pie de obra por la D.F.), y te- nida en cuenta para un máximo de tres elementos por "unidad de cosido", siguiendo criterios generales de inter- vención, con p.p. de medios auxiliares y costes indirectos, incluyendo el retacado e inyección con cal hidráulica NHL 3,5 CE de FYM o similar y el rejuntado inferior a modo de encofrado, dejando la varilla rehundida para facilitar sella- do de orificio (ejecutado con perforadora por rotación a ba- ja presión libre de vibraciones) con mortero de cal CPA "M8" teñido. Medida la unidad en proyección horizontal s/criterio D.F. Medios auxiliares y costes indirectos inclui- dos. 07.012 63,00 ud COSIDO NERVIOS BÓVEDAS D=6 mm. 27,87 1.755,81 COSIDO DE ELEMENTOS DE BÓVEDAS de la Catedral de Ciudad Rodrigo, bien en reparaciones o afianzamiento, pudiendo afectar tanto a arcos, ojivas, nervios y plemen- tos, consistente en la limpieza y preparación del elemento

Page 271: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

a tratar y el COSIDO EN CRUZ con doble varilla de acero inoxidable corrugado díametro 6mm. en diferente longitud según casos (incluso podría variar el díametro puntual- mente según se determine a pie de obra por la D.F.), si- guiendo criterios generales de intervención, con p.p. de medios auxiliares y costes indirectos, incluyendo el retaca- do e inyección con cal hidráulica NHL 3,5 CE de FYM o si- milar y el rejuntado inferior a modo de encofrado, dejando la varilla rehundida para facilitar sellado de orificio (ejecutado con perforadora por rotación a baja presión li- bre de vibraciones) con mortero de cal CPA "M8" teñido. Medida la unidad en proyección horizontal, s/criterio D.F. Medios auxiliares y costes indirectos incluidos. 07.013 3,70 m3 SUSTITUCIÓN DE NERVIOS DE CEMENTO POR PIEDRA 1.800,72 6.662,66 SUSTITUCIÓN DE NERVIOS de las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, rehechos en 1929 con mortero de cemento, por otros de piedra arenisca de Ciu- dad Rodrigo, seca, sana y seleccionada, incluyendo el per- fecto apeo completo de la zona afectada, tanto nervios co- mo plementería, el picado del cemento y si la D.F. no deci- de rehacerlos con mortero "Petratex", proceder a la toma de plantillas y preparación de injertos e incluso piezas completas si fuera el caso, perfectamente adoveladas o acuñadas según la profundidad, y en cualquier caso cosi- das con varillas de acero inoxidable de diferentes diame- tros según zona de actuación, empleando mortero de cal hidráulica y acabando la superficie con mortero teñido de cal, CPA "M8", con p.p. de medios auxiliares y costes indi- rectos. Partida aplicable a otros nervios, bien de formeros, perpiaños, ojivas, etc. Incluyendo en cualquier caso la la- bra según modelo original. 07.014 16,70 m. SUSTITUCIÓN NERVIOS DE CEMENTO POR "PETRATEX 108,51 1.812,12 SUSTITUCIÓN DE NERVIOS (formaletes) de las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, rehechos en 1929 con mortero de cemento, que será picado para ser sustituido por un mortero de cal teñido, tipo "Petratex", incluyendo el perfecto apeo completo de la zona afectada, tanto nervios como plementería, el picado del cemento y si la D.F. no decide rehacerlos piedra, proceder a la toma de plantillas y preparación del soporte, realización de cosidos en diferentes diametros, devolviendo la geometría original con el mortero PETRATEX" o similar indicado, procedien- do al patinado del elemento. Todo con p.p. de medios au- xiliares y costes indirectos. Medido a cinta corrida por el in- tradós del nervio central saliente. 07.015 434,77 m2 PATINADO JUNTAS MORT.CEMENTO "1929" 13,59 5.908,52 Patinado de las juntas de mortero de cemento y rellenos efectuados en las bóvedas del Claustro de la Catedral de Ciudad Rodrigo, fundamentalmente las ejecutadas en 1929 y no considerando su retirada para no dañar la pie- dra que "lo soporta", en tono adecuado, previa realización de pruebas y elección de muestra por parte de la D.F., se- gún criterios generales de intervención, memoria, planos etc. con p.p. de medios auxiliares y costes indirectos. Me- dida la superficie en proyección horizontal, con p.p. de de- sarrollos tanto de arcos, ojivas, nervios, claves, escudos y otros elementos decorativos así como cascos de plemen- tería. 07.016 65,42 m2 PATINADO BÓVEDAS 11,94 781,11 Patinado de fábricas de piedra qeu conforman bóvedas y todos sus elementos incluidos los decorativos, tallas, ner- vios, perpiaños, formeros, ojivas, claves, escudos, etc. en la intervención de este proyecto, a base de agua de cal

Page 272: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

grasa con pigmentos inorgánicos, previa elección sobre muestras según dirección facultativa, con p.p. protección de elementos y limpieza final, de costes indirectos y me- dios auxiliares. Unicamente en las zonas a determinar por la D.F. 07.017 55,62 m2 ENCAMISADO BÓVEDA r12#15/15 e=8 cm. NHL 3,5 55,54 3.089,13 Formación de encamisado de bóveda de la Catedral de Ciudad Rodrigo, según memoria, a base de una capa de mortero de cal hidráulica NHL 3,5 de 8 cm. de espesor mí- nimo, incluyendo la preparación del soporte y la colocación de un mallazo conformado de redondos de díametro 12 y malla #15/15cm. galvanizado en caliente, adaptado al tra- zado del extradós, incluyendo p.p. de anclajes y formación de asientos para conseguir el trabajo solidario del conjunto de nervios y plementería. Medido en proyección horizontal, con p.p. de medios auxiliares y costes indirectos. 07.018 34,20 m2 DESMONTAJE/MONTAJE BÓVEDA 241,51 8.259,64 Partida para la restauración de bóveda del Claustro de la Catedral de Ciudad Rodrigo, incluyendo el apuntalamiento sobre plataforma multidireccional metálica, homologada, y formación de cimbra para apeo de los arcos formeros-perpiaños, las ojivas y resto de nervios, así como el escudo en el caso de la bóveda marcada en planos con el nº16, previa toma de datos y reportaje fotográfico, con numeráción de todas las piezas para su escrupulosa reco- locación, previa corrección del trazado, modificando la "tirantez" según las condiciones mínimas que aseguren la estabilidad del conjunto, incluyendo trabajos de carpinte- ros en montaje y desmontaje de cimbras y apeos, y de cantero en labores de desmontaje y montaje, incluyendo la adaptación de piezas y en su caso rectificación de encuen- tros, anclajes, entregas, uniones, formación de asientos entre plementería y nervios, cosidos necesarios a parte de los indicados en la restauración del escudo, así como la- bores de rejuntado y retacado, con inclusión mínima de piezas puntuales de piedra arenisca de Ciudad Rodrigo que será patinada, en caso de no poder recuperar algún elemento o bien por que el trazado lo aconseje, siempre bajo supervisión y aprobación previa de la D.F., con p.p. de medios auxiliares y costes indirectos. Medida en pro- yección horizontal según plomo de elementos no desmon- tados. 07.019 8,79 m2 PICADO RELLENOS CEMENTO EN BÓVEDAS -ESCUDO- 19,44 170,88 Picado de rellenos y configuraciones no deseables con mortero de cemento en las bóvedas de la Catedral de Ciu- dad Rodrigo, afectando a elementos singulaes (resto in- cluidos en partida de descarnado de juntas), como por ejemplo en trabajos para la restauración del escudo de la bóveda marcada con el nº16 -plano 49-, consistente en eli- minar cuidadosamente cualquier resto de mortero de ce- mento, para coser el mismo con 4 varillas de acero inoxi- dable corrugado de diámetro 12 mm. a través del vástago de cuelgue y del espesor de la bóveda, para posteriormen- te realizar el resto de cosidos, etc. Medido en proyección horizontal con p.p. de medios auxiliares y costes indirec- tos. Total Capítulo 07 88.673,77

Page 273: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 08 UNIDAD VII: CARPINTERÍAS DE PASO

08.001 2,00 ud CERRADURA DE PLASTÓN "MOTTURA" PUERTA 11 312,34 624,68 Suministro y colocación de cerradura de plastón "Mottura" o similar , a colocar en la puerta de entrada al Museo, en acabado cromado mate, con llaves maestradas de borjas -3 copias- con ruleta interior y cinco bulones, incluso an- claje con 8 tirafondos M/5/70 mm. perforando la hoja y en- rasando el cerco en toda la altura de la puerta con el con- tramarco, recibido del cerradero con escudo exterior en torno al bombillo, de acero inoxidable mate de 7 cm. de díametro y 5 mm. de espesor mínimo (nunca retranqueado respecto el frente del bombillo), con p.p.de pequeño mate- rial y el no descrito, medios auxiliares y costes indirectos. Medida la unidad completamente colocada y funcionando correctamente 08.002 1,00 ud PUERTA 1 750,00 750,00 Intervención en puerta nº1, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. intervención consistente en: Retirada de cerraduras modernas de plastón. Retirada del pasador inferior. Lijado y decapado. Cajeado para colocación de cerradura de seguridad embu- tida con bocallave de forja redonda lisa. Colocación de prótesis en la barra inferior de las hojas. Tapado de orificios y faltas. Ajustado de las hojas. Reparación de la cerradura antigua incluso fabricación de dos llaves artesanas de forja. Limpieza del pasador superior primitivo y de la reja del óculo para acabarlos en aceite de linaza. Limpieza del vidrio, colocando nuevos listones de sujeción 20/20 mm. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. Colocación de un nuevo pasador inferior, de forja. Medios auxiliares y costes indirectos En caso de colocar cerradura será de seguridad "MCM" o similar serie superior INOX con bombillos "ISEO" croma- dos mate, dotados de igual amaestramiento que todas las puertas colocadas en la IV Fase. 08.003 1,00 ud PUERTA 2 360,00 360,00 Intervención en puerta nº2, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase.

Page 274: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Retirada de cerraduras modernas de plastón. Retirada de la inadecuada argolla de la aldaba de seguri- dad existente en la hoja fija. Lijado y decapado. Cajeado para colocación de dos cerraduras de seguridad embutidas con bocallaves de forja redondas lisas. Cegado de huecos de antiguas cerraduras. Limpieza de herrajes para su acabado. Colocación de una nueva argolla de forja en sustitución de la retirada para recibir la aldaba. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. 08.004 1,00 ud PUERTA 3 1.050,00 1.050,00 Intervención en puerta nº3, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Eliminación de los soportes modernos de cortina existen- tes en el interior, fuera de uso. Eliminación de las dos cerraduras modernas de plastón. Lijado y decapado. Sustitución de la hoja de paso pequeña por otra de 50 mm de espesor, reduciendo el diente del "cerco", colgándola de pernios de forja. Tapado de las faltas dejadas por las cerraduras retiradas, dejando los orificios donde estuvo anclada en su día una reja hacia el Claustro. Colocación de dos nuevas cerraduras de seguridad embu- tidas con bocallaves de forja redondas lisas. Limpieza de los herrajes para su acabado. La reja moder- na existente tras el óculo, una vez limpia, se acabará en "Oxiron" negro forja. Limpieza del vidrio impreso del óculo. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. 08.005 1,00 ud PUERTA 4 2.490,00 2.490,00 Intervención en puerta nº4, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Desmontaje de la puerta. Desmontaje y restauración de herrajes. Retirada de la malla de plástico verde existente tras los barrotes. Retirada de las tablas que tapan la falta de dos plafones. Lijado y decapado. Restauración de los cuatro plafones abiertos de la mitad

Page 275: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

superior de las hojas. Restauración de faltas y partes inferiores dañadas, cajean- do y ensamblando prótesis encoladas. Colocación de dos plafones nuevos, dotados de molduraje perimetral igual al existente, sin parte central labrada. Limpieza del pasador primitivo inferior y de los barrotes para acabarlos igual que el resto de herrajes en aceite de linaza. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. Colocación detrás de los barrotes de una malla de nylon anti pájaros Ø 1/30/30 mm sujeta entre dos listones peri- metrales 10/20 mm clavados interiormente al cerco del hueco. Recolocación de las hojas y puesta en funcionamiento co- locando un pasador de forja, acabado en aceite de linaza, que asegure su cierre fuera de las horas de visitas, para asegurar la estabilidad del elemento. 08.006 1,00 ud PUERTA 7 1.200,00 1.200,00 Intervención en puerta nº7, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Desmontado de la hoja y cerramiento provisional con ta- blero aglomerado de 30 mm para escuadrarla mediante presión y colocación de un refuerzo perimetral de plata- banda continua de 5 mm de espesor acabada en "Oxiron" negro forja en cajeado y atornillada al bastidor de la puerta que servirá, a su vez, para la fijación del nuevo herraje de colgar, de forja. Retirada de las dos cerraduras de plastón. Limpieza y acabado del pasador y de la aldaba de forja existentes. Tapado de huecos y faltas. Colocación de una cerradura de seguridad embutida. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. Colocación de dos trancas en el interior, construida tanto en sus barras como en sus perfiles de sujeción con pletina 50/10 mm acabadas en "Oxiron" negro forja. 08.007 1,00 ud PUERTA 8 530,00 530,00 Intervención en puerta nº8, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Retirada de las dos anillas para paso de cadena del can- dado actual. Lijado y decapado.

Page 276: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Saneado y colocación de prótesis de madera, mediante cajeado y ensamblado de láminas de madera encolada. Ajustado y emplastecido de prótesis antiguas. Estando ahora mismo encomendada la seguridad de la puerta al diente existente entre las hojas, colocación de otra aldaba de seguridad de forja en la hoja que no la tie- ne, recibiendo sendas anillas del mismo material en la ho- ja y en la fábrica de piedra de la mocheta. Tratamiento de la madera con producto antixilófagos. Acabado de la madera, si el resultado tras el decapado lo permite, con una veladura marrón oscuro y en caso con- trario con pintura en base oleosa en el mismo tono, rema- tando a la cera. 08.008 1,00 ud PUERTA 9 848,00 848,00 Intervención en puerta nº9, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Retirada de la puerta de acero existente, teniendo prepa- rada la de madera que la sustituirá para su colocación en el día. La nueva puerta de madera será de roble americano "Prime" con el mismo tono de acabado en roble oscuro que se le dio en su día a la de la Torre de Campanas y a la del Portillo del Alba. Contará con una cerradura similar a las dos a colocar en el acceso al Museo, con llave amaes- treada con ellas, variando el escudo exterior, definido en planos. La hoja se levantará 3 cm del umbral, lo cual unido a las amplias aberturas de la puerta del Coro proporciona- rá la ventilación cruzada necesaria para poder cegar los dos huecos del husillo. 08.009 1,00 ud PUERTA 10 380,00 380,00 Intervención en puerta nº10, previa lijado en su caso y lim- pios los distintos herrajes, incluso la cabeza de los clavos, si son de forja, se acabarán en aceite de linaza y, si son de acero, esto es, modernos, se acabarán en "Oxiron" ne- gro forja para diferenciarlos claramente; En caso de colo- car cerradura será de seguridad "MCM" o similar serie su- perior INOX con bombillos "ISEO" cromados mate, dota- dos de igual amaestramiento que todas las puertas colo- cadas en la IV Fase. Desmontado, ajuste y sustitución de herrajes por otros de acero inoxidable similares a los existentes que permitan la corrección de alabeos y deformaciones. Total Capítulo 08 8.232,68

Page 277: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 09 UNIDAD VIII: CAPILLA DE SAN JERÓNIMO

09.001 38,65 m2 PICADO SOLADO MORTERO DE CEMENTO 11,99 463,41 Picado de solado de mortero de cemento existente en la Capilla de San Jerónimo y su Sacristía, o zonas asimila- bles, por medios manuales y mecánicos, protegiendo pa- ramentos y elementos que puedan verse afectados, lim- piándo la superficie y valorando el cajeado del terreno pa- ra un posible saneado, eliminando cualquier resto de mor- tero de cemento que pudiera aparecer sobre los muros pe- rimetrales, incluyendo la retirada del escombro generado a zona de carga o a contenedor para transporte a vertedero y limpieza final con p.p. de plataformas de protección para evacuación de escombros, tanto en umbral como en reco- rrido, así como protección de la carpintería de acceso -puerta 4- y p.p. de medios auxiliares y costes indirectos. 09.002 38,65 m3 CAJEADO SUB-BASE CAPILLA SAN JERÓNIMO 23,19 896,29 Partida en previsión para el posible cajeado, si procede y a determinar por la D.F., de la base del solado existente en la Capilla de San Jerónimo y su Sacristía, según niveles a determinar en función de los estratos que aparezcan, in- cluso limpieza de restos ajenos, con supervisión arqueoló- gica incluida, incluyendo la carga de escombro a zona ex- terior para su posterior retirada mediante carga a camión, limpieza y p.p. de medios auxiliares y costes indirectos. 09.003 69,89 m2 PICADO RESTOS MORTERO BÓVEDA LADRILLO 9,97 696,80 Picado de los restos de mortero de cal de la bóveda de la- drillo de la Capilla de San Jerónimo en la Catedral de Ciu- dad Rodrigo, tanto enfoscados como retacados y rejunta- dos, para proceder a su limpieza y saneado, o en su de- fecto para volver a enfoscar, según valoración en obra por parte de la D.F., con p.p. de retirada de escombros, limpie- za y medios auxiliares y costes indirectos. 09.004 212,12 m2 LIMPIEZA DE FÁBRICAS CEPILLO CERDAS 8,77 1.860,29 Limpieza de fábricas de sillería incluso p.p. de elementos labrados que la conforman, contemplados en este Proyec- to de Restauración del Claustro de la Catedral de Ciudad Rodrigo, incluyendo la limpieza con cepillos de cerdas suaves de nylon, incluso el cuidadoso descamado de las zonas más deterioradas no susceptible de consolidación previa y el picado de restos aislados de mortero de ce- mento o elementos ajenos a la fábrica original, empleando aire a presión, que será controlada en función de elemento a limpiar, teniendo especial atención con aquellas zonas con policromías, vítores, o elementos labrados, dejando las superficies acabadas o en su caso listas para el trata- miento correspondiente (rejuntado, consolidación, imper- meabilización etc.) incluso aspirado y/o soplado. Medida en proyección vertical según planos, con p.p. de desarrollo de molduras, nichos, huecos, arcosolios, etc, descontando huecos mayores 2 m2, con costes indirectos y medios au- xiliares. 09.005 142,09 m2 LIMPIEZA DE SALES CON "SEPIOLITA" 56,48 8.025,24 Limpieza de muros de sillería y o fábricas de ladrillo, bóve- das, etc mediante aplicación de sepiolíta, según método tradicional, protegiendo la zona y repitiendo el proceso hasta la eliminación de las sales. Todo incluido con p.p. de medios auxiliares y costes indirectos. 09.006 98,33 m2 DESCARNADO DE JUNTAS SILLERIA 9,77 960,68 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos:

Page 278: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

1,- DESCARNADO de juntas de fábricas de sillería y ele- mentos de piedra contemplados en esta intervención, in- cluyendo el picado de las sueltas y/o aquellas que su esta- do lo recomiende, o las ejecutadas con mortero de cemen- to (por ejem. "rejuntado de 1911"), previa inspección a pie de obra e indicaciones de la dirección facultativa, em- pleando material adecuado -cinceles finos, espátulas, cu- charilla, etc-, sin dañar en ningún caso la fábrica a restau- rar, por medios manuales. 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie ejecutada por proyección vertical perpendicular a paño de fachada completo, o pro- yección horizontal en caso de elementos de cubricción con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 09.007 98,33 m2 REJUNTADO DE FÁBRICAS CPA "M8" 13,36 1.313,69 Tratamiento en juntas de fábrica de silleria, con incopora- ción de elementos labrados, impostas, salientes, botaa- guas, cornisas, etc, incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena seleccionada y tamizada, con aglo- merante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, es- timando no más del 3% de la superficie tratada. Resto en partida independiente. Criterio de medición: superficie ejecutada por proyección horizontal perpendicular a paño de fachada completo, con p.p. de salientes, pilastras, molduras, etc deduciendo hue- cos. 09.008 48,55 m2 DESCARNADO JUNTAS BÓVEDA LADRILLO 16,55 803,50 Tratamiento en juntas de FÁBRICA DE LADRILLO en bó- vedas, con incoporación puntual de algún elemento labra- do de sillería de piedra incluyendo los siguientes trabajos: 1,- DESCARNADO de juntas de fábricas de ladrillo maci- zo, incluyendo el picado de las sueltas y/o aquellas que su estado lo recomiende, o las ejecutadas con mortero de ce- mento previa inspección a pie de obra e indicaciones de la dirección facultativa, empleando material adecuado -cinceles finos, espátulas, cucharilla, etc-, sin dañar en ningún caso la fábrica a restaurar, por medios manuales 2,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior Criterio de medición: superficie según proyección proyec- ción horiz. Con p.p. de medios auxiliars y costes indirec- tos.

Page 279: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

09.009 48,55 m2 REJUNTADO BÓVEDA LADRILLO 39,27 1.906,56 Tratamiento en juntas en BÓVEDAS DE LADRILLO MACI- ZO incluyendo los siguientes trabajos: 1,- SOPLADO DE JUNTAS mecánico, mediante equipo a compresión dejándolas aptas para su rejuntado posterior 2,- RETACADOS o RELLENOS puntuales, empleando mortero de cal y arena seleccionada y tamizada, con aglo- merante según casos, cal grasa apagada en obra "Castilla" de Codasa o similar y/o cal hidráulica natural NHL 3,5 CE DE FYM Italcementi Group. 3,- REJUNTADO con MORTERO DE CAL "M8" de CPA pigmentado en su caso con pigmentos inorgánicos, por medios manuales incluso ACABADO de superficie según prueba previa a aprobar por la D.F., incluso PREPARA- CIÓN DE SOPORTE, controlando grado de humedad y en su caso hidratando por pulverización y/o protegiendo una vez se proceda al rejuntado la superficie tratada y limpieza de bordes. Todo con limpieza final incluida, repasos, medios auxilia- res y costes indirectos. 4,- ANCLAJE Y RESTAURACIÓN DE PIEZAS mínima, es- timando no más del 3% de la superficie tratada. Resto en partida independiente. Criterio de medición: proyección horizontal, medido al 100% en caso de trabajos para dejar visto el ladrillo, y en caso de ejecutar trabajos de retacado únicamente para posteriormente enfoscar, un 30% sobre el total. 09.010 48,55 m2 ENFOSCADO BÓVEDA DE LADRILLO C/MORTERO DE CAL 64,88 3.149,92 Revoco de paramentos en trabajos de restauración a base de aplicación de diferentes morteros de cal grasa y arenas seleccionadas en tres capas de la siguiente forma: 1.- Una primera capa de espesor 15 ó 16 mm., de dosifica- ción 1:4 empleando arena limpia seleccionada y de tamiz 2,5 mm previo descarnado, retacado y rejuntado necesario de grietas y juntas, dejando la superficie preparada para un nuevo revestimiento, con sacado de plomos y niveles y colocación de testigos para regleteado. 2.- Una segunda capa de espesor 6 ó 7 mm., de dosifica- ción 1:2, empleando arena limpia seleccionada de tamiz 1,2 mm. extendida con fratás. 3.- Una tercera y última capa de espesor 3 mm., de dosifi- cación 1:1 y empleo de arena 0,8 mm. incluso polvo de mármol, con bruñido de la superficie y control de retraccio- nes. Se empleará cal grasa para realización de morteros y se pigmentarán con tierras naturales, realizando muestras pa- ra elección por parte de la dirección facultativa, incluso te- niendo en cuenta un patinado final para conseguir tono adecuado (según criterios establecidos en memoria) em- pleando pátinas a base de agua de cal grasa y pigmentos inorgánicos. Las dosificaciones podrán variar ligeramente en función del arido seleccionado. Con limpieza previa del soporte que asegure un correcto agarre y p.p. de medios auxiliares y costes indirectos. Se- gún memoria y criterios generales establecidos para la in- tervención. Incluso ensayos de humedad de paramentos previos a la aplicación, para su posterior comprobación, in- cluso realización de ensayos de dosificaciones y tipos de arena y cal. 09.011 38,65 m2 PREPARACIÓN BASE SOLADO 37,23 1.438,94 Preparación de base de solado de la Capilla de San Jeró- nimo y su Sacristía, incluyendo el drenaje a determinar en función del estado, la aportación de tierras especiales y su

Page 280: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

estabilización con cal mediante técnicas tradicionales, in- cluso capa separadora, apisonado, todo para un espesor según condiciones del terreno entre 10-20 cm., dejando la superficie lista para la colocación de nuevo solado, con p.p. de costes indirectos y medios auxiliares. 09.012 38,65 m2 SOLADO BALDOSA ARENISCA CR 50/50/10 c/JUNTA 177,90 6.875,84 Solado de la Capilla de San Jerónimo y su Sacristía, o zo- nas asimilables, con baldosas de piedra arenisca de Ciu- dad Rodrigo, seca y sana, de espesor 10 cm. y medidas 50x50, con acabado apomazado, incluso formación de jun- tas de 1 cm. , base de mortero seco sobre arena seca api- sonada, y rejuntado con mortero de cal teñido (arena se- leccionada y tamizada) previa realización de muestras, con protección de paramentos y zonas que pudieras verse afectadas, limpieza final y retirada de material sobrante y selección en contenedores, costes indirectos y medios au- xiliares. 09.013 1,00 ud TRABAJOS ALBAÑILERIA ACOMETIDA ELÉCTRICA 267,76 267,76 Partida para la ejecución de los trabajos de albañilería completos para poder instalar los puntos de iluminación y control en la Capilla de San Jerónimo y su Sacristía, así como las reparaciones en la zona de acometida marcadas en planos, incluyendo la formación de acometida a la red existente en Sala contigua del Museo (caja de enchufe en suelo), incluyendo las rozas necesarias tanto en solado, paramentos, muros (perforación para un grosor estimado de 1,50 metros y 1,10 m.), bóveda, etc. para poder instalar una manguera de 2x1,5+1,5 mm2, incluso remates, tanto de la Capilla y su Sacristía como la zona necesaria afecta- da del Museo, con p.p. de medios auxiliares y costes indi- rectos. 09.014 2,00 ud PROYECTOR LED "LEDBOX NEXUS 9 w" 137,78 275,56 Suministro y montaje de proyector foco led, de la marca "LEDBOX" mod. "Lexus" o similar, de 9 w, incluyendo p.p. de línea a base de manguera 2x1,5+1,5 mm2, conexiones, acometida, regletas y linea de control por detector, mate- rial auxiliar, accesorios y el no descrito, mano de obra, me- dios auxiliars y costes indirectos. Medida la unidad coloca- da y funcionando 09.015 2,00 ud DETECTOR "ORBISE PROSIMAT PRO CR" 203,16 406,32 Suministro y montaje de DETECTOR DE PRESENCIA tipo "Orbise Prosimat PRO CR" o similar, con 360º de ángulo de captación, campo de detección: Hasta ø 30 m. a 3,5 m de altura, instalación en techo a altura máxima de 7 m. o en pared, con led de funcionamiento, programable con Mando a Distancia CR ( accesorio), el cual permite cam- biar con gran rapidez, facilidad y precisión los parámetros regulables y funciones especiales de los detectores de proximidad CR ya instalados, con un alcance de aproxima- damente 8 metros que permita una rápida y precisa pro- gramación sin necesidad de herramientas ni escaleras, in- cluyendo p.p. de línea a base de manguera 2x1,5+1,5 mm2, conexiones, acometida, regletas y material auxiliar, accesorios y el no descrito, mano de obra, medios auxi- liars y costes indirectos. Medida la unidad colocada y fun- cionando 09.016 1,00 ud ALABASTRO EN HUECO CAPILLA 155,93 155,93 Cerramiento de hueco con alabrastro, previa aprobación de muestra por parte de la D.F. incluyendo el suministro, corte y montaje, con p.p. de preparación de hueco, adap- tación, formación de mochetas en su caso y junta para empotramiento, con p.p. de junta perimetral, medios auxi-

Page 281: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

liares y costes indirectos. En Capilla de San Jerónimo. Total Capítulo 09 29.496,73

Page 282: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 10 SEGURIDAD Y SALUD

10.001 1,00 ud SEGURIDAD Y SALUD s/ESTUDIO ESPECÍFICO 30.218,25 30.218,25 Partida alzada basada en el Estudio de Seguridad y Salud redactado por el Arquitecto Técnico Fernando Polo Gonzá- lez, anejo a este Proyecto - apartado 3- Total Capítulo 10 30.218,25

Page 283: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

Capítulo: 11 GESTIÓN DE RESIDUOS

11.001 1.005,03 m3 CARGA Y TRANSPORTE CAMIÓN TIERRAS 8,60 8.643,26 Carga de tierras a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certifica- dos correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera bas- culante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y ca- non en su caso de vertedero y con p.p. de medios auxilia- res. 11.002 180,13 m3 CARGA Y TRANSPORTE CAMIÓN ESCOMBRO LER.17.01 8,60 1.549,12 Carga de escombro según tipo codigo LER a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondientes al deposi- tario, que a su vez deberá facilitar a la dirección facultati- va, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera basculante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. 11.003 47,88 m3 TRASPORTE CAMIÓN ESCOMBRO MADERA 7,54 361,02 Carga de madera y similares a camión y transporte al pun- to de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondientes al depositario, que a su vez deberá facilitar a la dirección facultativa, a una distan- cia aprox. de 20 km., considerando ida y vuelta, con ca- mión bañera basculante cargado a mediante maquina re- tro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, ta- sas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. 11.004 499,50 m3 TRANSPORTE CAMIÓN LADRILLO/TEJA 7,69 3.841,16 Carga de MATERIAL CERÁMICO SOBRANTE a camión y transporte al punto de gestión de residuos, que será como para el resto de partidas de este proyecto, homologado y que extenderá los certificados correspondientes al deposi- tario, que a su vez deberá facilitar a la dirección facultati- va, a una distancia aprox. de 20 km., considerando ida y vuelta, con camión bañera basculante cargado a mediante maquina retro, de diferente volumen según necesidades, incluso p.p. de adaptación y protección de la zona en las labores, tasas, permisos y canon en su caso de vertedero y con p.p. de medios auxiliares. 11.005 16,00 ud CONTENEDOR RESIDUOS E.17.01.01 MORTEROS 100,91 1.614,56 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.006 2,00 ud CONTENEDOR RESIDUOS E.17.01.02 CERAMICA 100,91 201,82 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado

Page 284: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.007 2,00 ud CONTENEDOR RESIDUOS E.17.02.01 MADERA 100,91 201,82 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.008 7,00 ud CONTENEDOR RESIDUOS E.17.03 BITUMINOSOS 104,06 728,42 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.009 1,00 ud CONTENEDOR RESIDUOS E.17.04 COBRE/PLOMO 106,69 106,69 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.010 2,00 ud DEPÓSITO/CONT. RESIDUOS E.17.04.10 CABLES 105,48 210,96 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.011 9,00 ud CONTENEDOR RESIDUOS E.17.05.04 TIERRAS 100,91 908,19 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.012 1,00 ud CONTENDOR RESIDUOS E.17.08 PINT./BARN. 100,91 100,91 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble. 11.013 5,00 ud CONTENEDOR RESIDUOS OTROS 109,00 545,00 Gestión de Residuos a base de instalación de contenedor, carga de residuos y retirada a lugar de reutilización, reci- claje o vertederos, según casos por Gestor Homologado con p.p. de permisos de ocupación, canon y tasas, etc. to- do según normativa, con p.p. medios auxilares y costes in- directos. Para el código indicado, o en su defecto asimila- ble.

Page 285: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.3 VALORACIÓN Código Cantidad Ud Descripción Precio Subtotal Importe

11.014 1,00 ud MANIPULACIÓN Y RETIRADA MAT.AMIANTO 1.193,58 1.193,58 Partida para la manipulación de materiales con amianto, principalmente pilón en patio central, tuberías de fibroce- mento y otros, incluso otros potencialmente peligrosos (disolventes, aditivos, resinas, residuos varillas vidrio-epoxi, etc. con contenidos de hidrocarburos, etc.) in- cluyendo el desmontaje y retirada de obra, selección, car- ga y transporte a vertedero homologado, incluyendo todo el tratamiento regulado según RD 396/2006 y normativa vi- gente. Para un volumen máximo de 17 m3, con p.p. de certificados, cánon de vertedero, etc. Todo según normati- va, con p.p. de costes indirectos y medios auxiliares. Total Capítulo 11 20.206,51

Total Presupuesto 805.314,77

Page 286: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.4. RESUMEN POR CAPITULOS __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Descripción Importe __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01 TRABAJOS PREVIOS Y MEDIOS AUXILIARES ....................................................83.172,88 ........... .... 02 Unidad I: PATIO CENTRAL................................................................................... 133.434,16 ........... .... 03 Unidad II:CUBIERTAS........................................................................................... 233.283,37 ........... .... 04 Unidad III:FACHADA ESTE..................................................................................... 29.902,05 ........... .... 05 Unidad IV: MURO EXTERIOR ................................................................................ 92.479,96 ........... .... 06 Unidad V: MURO INTERIOR................................................................................... 56.214,41 ........... .... 07 Unidad VI: BÓVEDAS ............................................................................................. 88.673,77 ........... .... 08 Unidad VII: CARPINTERÍA DE PASO....................................................................... 8.232,68 ........... .... 09 Unidad VIII: CAPILLA DE SAN JERÓNIMO............................................................ 29.496,73 ........... .... 10 SEGURIDAD Y SALUD........................................................................................... 30.218,25 ........... .... 11 GESTIÓN DE RESIDUOS....................................................................................... 20.206,51 ........... .... __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material................................................. 805.314,77.€ ..........

Page 287: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.5. RESUMEN GENERAL __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO CIUDAD RODRIGO (SALAMANCA) ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material........................................................805.314,77 € Gastos Generales16 %...............................................................................128.850,36.+ Beneficio Industrial6 %................................................................................. 48.318,89.+ _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto Total ..................................................................................982.484,02 € I.V.A. 21 % ..................................................................................................206.321,64.+ _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

TOTAL PRESUPUESTO DE CONTRATA .........................................1.188.805,66 € Asciende el presente presupuesto a la expresada cantidad de: UN MILLON CIENTO OCHENTA Y OCHO MIL OCHOCIENTOS CINCO EUROS CON SESENTA Y SEIS CENTIMOS

Salamanca, mayo de 2013 Fdo.:José Elías Díez Sánchez Arquitecto

Page 288: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

3.5 RESUMEN GENERAL __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRAL DE CIUDAD RODRIGO CIUDAD RODRIGO (SALAMANCA)

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Descripción Importe ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

01 TRABAJOS PREVIOS Y MEDIOS AUXILIARES.................................................... 83.172,88............ ... . 02 Unidad I: PATIO CENTRAL .................................................................................. 133.434,16............ ... . 03 Unidad II: CUBIERTAS ......................................................................................... 233.283,37............ ... . 04 Unidad III: FACHADA ESTE ................................................................................... 29.902,05............ ... . 05 Unidad IV: MURO EXTERIOR ................................................................................ 92.479,96............ ... . 06 Unidad V: MURO INTERIOR ................................................................................. 56.214,41............ ... . 07 Unidad VI: BÓVEDAS ............................................................................................. 88.673,77............ ... . 08 Unidad VII: CARPINTERÍA DE PASO ...................................................................... 8.232,68............ ... . 09 Unidad VIII: CAPILLA DE SAN JERÓNIMO ........................................................... 29.496,73............ ... . 10 SEGURIDAD Y SALUD .......................................................................................... 30.218,25............ ... . 11 GESTIÓN DE RESIDUOS ...................................................................................... 20.206,51............ ... . ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución Material ...........................................805.314,77 €............. Gastos Generales 16% .............................................................................128.850,36.+ .............. Beneficio Industrial 6%.............................................................................. 48.318,89.+ .............. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto Total .......................................................................982.484,02 €............. I.V.A. 21 % ..................................................................................................206.321,64.+ .............. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Presupuesto de Ejecución por Contrata................................1.188.805,66 €............. Asciende el presente presupuesto a la expresada cantidad de: UN MILLON CIENTO OCHENTA Y OCHO MIL OCHOCIENTOS CINCO EUROS CON SESENTA Y SEIS CENTIMOS En Salamanca, mayo de 2013 Fdo.: José Elías Díez Sánchez Arquitecto

Page 289: PROYECTO DE RESTAURACIÓN DEL CLAUSTRO DE LA …servicios4.jcyl.es/Duero/Publicacion_E/A2016_001068/ZJCYL01A92D… · U N I D A D E S DIMENSIONES ... chos formados con perfiles laminados,

PROYECTO: RESTAURACIÓN DEL CLAUSTRO DE LA CATEDRALDE CIUDAD RODRIGO (SALAMANCA

HOJA RESUMEN DE PRESUPUESTO

Presupuesto de Ejecución Material................................................... 775.096,52 €

16%Gastos generales 124.015,44 €6% Beneficio Industrial...................................................................... 46.505,79 €

SUMA 945.617,75 € I.V.A. 21% .................................. 198.579,73 €

TOTAL PRESUPUESTO DE OBRA .............................................. 1.144.197,48 €

P.E.M. de Seguridad y Salud............................................................ 30.218,25 €16% Gastos Generales..................................................................... 4.834,92 €6% Benefício Industrial...................................................................... 1.813,10 €

SUMA 36.866,27 € I.V.A. 21% .................................. 7.741,91 €

TOTAL PRESUPUESTO SEGURIDAD Y SALUD 44.608,18 €

TOTAL PRESUPUESTO DE CONTRATA ..................................... 1.188.805,66 €

Salamanca, mayo de 2013

Fdo.: José Elías Díez SánchezArquitecto