    2

    Outline

    Capabilities and Benefits

    Design Examples Pretensioned (Threaded-Rod) Alternative

    Post-Tensioned Alternative Future Innovations

  • 8/10/2019 puentes Postensado.pdf

    3/39

    3

    Up to 70 strands

    WWR Long span capability Can be P/T

    Super Girder

  • 8/10/2019 puentes Postensado.pdf

    4/39

    CA Wide Flange

    4Pretensioned Post Tensioned

  • 8/10/2019 puentes Postensado.pdf

    5/39

    WF Bottom

    Flange #5 Stirrup

    WWR

    3 5/8 diameterducts

    54 Straight strand

    14 Harped strand

    5

  • 8/10/2019 puentes Postensado.pdf

    6/39

  • 8/10/2019 puentes Postensado.pdf

    7/39

    Non-Composite Section

    7

  • 8/10/2019 puentes Postensado.pdf

    8/39

    Composite Section

    8

    Girder Spacing = 10 ft

  • 8/10/2019 puentes Postensado.pdf

    9/39

    WF Span Capabilities 0.6 Strand

    9

    Simple SpanGirder Spacing = 10 ft

    045.0=S D

  • 8/10/2019 puentes Postensado.pdf

    10/39

  • 8/10/2019 puentes Postensado.pdf

    11/39

  • 8/10/2019 puentes Postensado.pdf

    12/39

  • 8/10/2019 puentes Postensado.pdf

    13/39

    13

    Design Examples

  • 8/10/2019 puentes Postensado.pdf

    14/39

    WF Girder Alternatives

    Threaded Rod Alternative:

    Pretensioned Girders Continuous for deck weight

    Post Tensioned Alternative 2-stage P/T Pretensioned for girder self weight

    14

  • 8/10/2019 puentes Postensado.pdf

    15/39

    15

    Threaded Rod Continuity

  • 8/10/2019 puentes Postensado.pdf

    16/39

    16

    Threaded Rod Continuity

  • 8/10/2019 puentes Postensado.pdf

    17/39

    17

    Threaded Rod Continuity

  • 8/10/2019 puentes Postensado.pdf

    18/39

  • 8/10/2019 puentes Postensado.pdf

    19/39

    19

    Post-tensioned Alternative

  • 8/10/2019 puentes Postensado.pdf

    20/39

    20

    Analysis Considerations

    Elastic behavior no redistribution

    Lump-sum losses Deflections superimposed from each stage

    Sag soffit profile not allowed

    CT Bridge used for live load and P/T

  • 8/10/2019 puentes Postensado.pdf

    21/39

    21

    Threaded Rod Alternative

  • 8/10/2019 puentes Postensado.pdf

    22/39

    22

    P/T Alternative Girder Details

  • 8/10/2019 puentes Postensado.pdf

    23/39

    23

    Girder Post-tensioning

  • 8/10/2019 puentes Postensado.pdf

    24/39

    24

    Midspan Deflections (in)

    Girder + pretension 0.4 in.

    Stage 1 P/T 2.5 in. Deck weight -2.6 in.

    Stage 2 P/T 0.5 in. SDL -0.5 in.

    Total 0.5 in.Note: Positive is upward

  • 8/10/2019 puentes Postensado.pdf

    25/39

    25

    Girder Shear

  • 8/10/2019 puentes Postensado.pdf

    26/39

    26

    MCFT Shear Capacity

    vvc pscn d b f V V V V ++= 25.0

  • 8/10/2019 puentes Postensado.pdf

    27/39

    27

    Girder Shear NCHRP 579

  • 8/10/2019 puentes Postensado.pdf

    28/39

    28

    Abutments

    Post-tensioned Alternative Threaded Rod Alternative

  • 8/10/2019 puentes Postensado.pdf

    29/39

    29

    Bent Cap

  • 8/10/2019 puentes Postensado.pdf

    30/39

    30

  • 8/10/2019 puentes Postensado.pdf

    31/39

  • 8/10/2019 puentes Postensado.pdf

    32/39

  • 8/10/2019 puentes Postensado.pdf

    33/39

  • 8/10/2019 puentes Postensado.pdf

    34/39

    Future Innovations

    0.7 in. Strand

    Full-depth precast deckpanels

    Railroad applications

    Prefabricated substructureconnections

    34

  • 8/10/2019 puentes Postensado.pdf

    35/39

    Pacific Street Bridge over I-680

  • 8/10/2019 puentes Postensado.pdf

    36/39

    36

    10 NU900 girders spaced 10 ft -8 in 30-0.7 in straight strands spaced 2 in horizontally and 2.5 in

    vertically Two spans 98 ft each with TR continuity Opened to traffic in August 2008

    D/S = 0.038