PROJECT UPDATEJune 8, 2015
-
8/21/2019 Sarasota Lift Station 87 Presentation
2/58
Agenda: What led to this point?
• Project Backgrond
• !atest "indings
• Risk #anage$ent
• Alternate Rotes
• %e&t 'teps
2
-
8/21/2019 Sarasota Lift Station 87 Presentation
3/58
Goals, design process, preliminary workPROJECT BAC()ROU%D
3
-
8/21/2019 Sarasota Lift Station 87 Presentation
4/58
Project )oals: Trst * Transparenc+
• En,iron$ental stewardship
• "iscall+ responsible approach
• #anage project risks
• #ini$i-e impacts to the public
4
-
8/21/2019 Sarasota Lift Station 87 Presentation
5/58
Project histor+ to date
5
#alcol$ Pirnie pril 200!
"elocate to #ormerhigh school parking lot
'tantec pril 200$
%uke &ood 'ark andin(erted siphon under)udson *ayou *ridge
Bo+le . AECO# pril 200+
%uke &ood 'ark andmicrotunnel under )udson
*ayou *ridge
-
8/21/2019 Sarasota Lift Station 87 Presentation
6/58
Project 'tats
2011Constrction
begins
6
,sp
rey(e-
.-/- 1 2012Work stops due tomicrotunnel issues
AECO# terminated o(ember 2012
#c(i$ * Creed retained ugust 201
!i/t 'tation 0sses
• perational
• /tructural
• /a#ety
-
8/21/2019 Sarasota Lift Station 87 Presentation
7/58
%e1 'ccessor Engineer o/ Record
"e(iew e3isting design
'er#orm supplemental in(estigations
4reate technical memorandums
'resent to city and public
"estart project time o# the essence
7
-
8/21/2019 Sarasota Lift Station 87 Presentation
8/58
#c(i$ * Creed Reco$$endation
6icrotunnel under bridge within the right o# way
Phase 0 'cope o/ Work
8
2dson Ba+o Crossing Phases
Approved by City Commission Jan. 21, 2014
• 6icrotunnel under e3isting bridge as designed or at re(isedele(ations
• )ori7ontal irectional rill under the e3isting bridge as in(ertedsiphon
• 6icrotunnel under bayou on either side o# bridge 9alternatealignment:
-
8/21/2019 Sarasota Lift Station 87 Presentation
9/58
#c(i$ * Creed Reco$$endation
)urricane storm surge protection
Phase 00 'cope o/ Work
9
City Commission direction April 21, 2014
• ;inali7e microtunnel design 9
-
8/21/2019 Sarasota Lift Station 87 Presentation
10/58
10
*ene#its
• 6aintenance o# =ra##ic
• ccess to *usinesses
• %ess ./ 1 >mpacts
Crrent Design Rote
)udson *ayou,s
prey(e
.-/- 1
Crrentalignment
6icrotunnel jacking pit
6icrotunnelrecei(ing pit
6icrotunnel jacking pit
Alternatealignment
-
8/21/2019 Sarasota Lift Station 87 Presentation
11/58
11
2dson Ba+o Crossing
6icrotunnel under bridge
e(eloped by /taheli =renchless
'eer re(iewed by tkins
ppro(ed by 4ity 4ommission
lternate alignment accepted by /ta##
-
8/21/2019 Sarasota Lift Station 87 Presentation
12/58
ew studies, inspection data and analysis!ATE'T "0%D0%)'
12
-
8/21/2019 Sarasota Lift Station 87 Presentation
13/58
-
8/21/2019 Sarasota Lift Station 87 Presentation
14/58
Assess$ent o/ Bridge A
-
8/21/2019 Sarasota Lift Station 87 Presentation
15/58
North to
Mound St.
)eotechnical '$$ar+
15
Original pipe=op o# pipe
ele(ationB
-
8/21/2019 Sarasota Lift Station 87 Presentation
16/58
esigns, data and assessmentsR0'( #A%A)E#E%T
16
-
8/21/2019 Sarasota Lift Station 87 Presentation
17/58
Risk Assess$ent o/ Designs
17
• Original design %essons learned
• #c(i$ * Creed design *e#ore bridge in(estigation
• #c(i$ * Creed design #ter bridge in(estigation
-
8/21/2019 Sarasota Lift Station 87 Presentation
18/58
Medium
Risk Register and Criteria
18
Pro
-
8/21/2019 Sarasota Lift Station 87 Presentation
19/58
What is a Risk Register?
19
-
8/21/2019 Sarasota Lift Station 87 Presentation
20/58
Anal+sis o/ $icrotnneling
20
• 2igh jacking /orce i-e- Istuck machine
• En,iron$ental i$pact to 2dson Ba+o
• #i&ed /ace conditions hard soils on part o# machine, so#t on another
• Une&pected geotechnical conditions
• !ine and grade de,iations otside o/ tolerances
• Pipe
-
8/21/2019 Sarasota Lift Station 87 Presentation
21/58
Risk E&a$ple: 2igh Jacking "orce
21
'robability 3 >mpact K Risk 'core
%ote: )igh Jacking ;orce happened twice during initial construction-
-
8/21/2019 Sarasota Lift Station 87 Presentation
22/58
Relati,e Riskscore =total>
Original design 534
#c(i$ * Creed design'rior to bridge inspection
8
#c(i$ * Creed design'ost bridge inspection
36
4urrent design reduces risk signi#icantly #rom original design
22
Risk #anage$ent Reslts
-
8/21/2019 Sarasota Lift Station 87 Presentation
23/58
23
Additional /actors considered
*athymetric /ur(eysettles 9201: !
-
8/21/2019 Sarasota Lift Station 87 Presentation
24/58
6ethods, plans and other considerationsA!TER%ATE ROUTE'
24
-
8/21/2019 Sarasota Lift Station 87 Presentation
25/58
Open Ct ,s #icrotnnelingL(aluate options to re
-
8/21/2019 Sarasota Lift Station 87 Presentation
26/58
Alternate Rotes: Control Ele,ations
26
)udson *ayou
.-/- 1
=op o#;oundation
6aterial=974>
>n#luent 6)
>n(ert=954@>
&etwell
>n(ert=9563>
,sprey(e-
-
8/21/2019 Sarasota Lift Station 87 Presentation
27/58
Reglator+ Considerations
27
'
-
8/21/2019 Sarasota Lift Station 87 Presentation
28/58
lternate "oute 1
574 !incoln Dri,e
28
.-/- 1
,sprey(e-
0 #anhole
!A
0A
%e1 ease$ent isrupts home
'ermits needed
isrupts condos
-
8/21/2019 Sarasota Lift Station 87 Presentation
29/58
lternate "oute 2
5@35 !incoln Dri,e
29
)udson *ayou
.-/- 1
0 #anhole
!A
0A2A
%e1 ease$ent
ew acMuisition
'ermits needed
isrupts condos
-
8/21/2019 Sarasota Lift Station 87 Presentation
30/58
lternate "oute
East o/ Bridge
30
)udson *ayou
.-/- 1
0 #anhole
!A
0A2A
%e1 ease$ent
'ermits needed
isrupts home
isrupts park
-
8/21/2019 Sarasota Lift Station 87 Presentation
31/58
Open Ct Considerations
31
• Ease$ents and land acisition reired • Reglator+ per$its
< ;L'?/arasota 4ounty< /o(ereign /ubmerged %ands
< Ln(ironmental "esource 'ermit< ;L'?4L Nariances
• En,iron$entalocumented %ead 4ontamination 92001 *oyle "eport:
• )eotechnical 0n,estigations*orings?*athymetric
• 'chedle
-
8/21/2019 Sarasota Lift Station 87 Presentation
32/58
Operational 0$pacts
32
• Period s
-
8/21/2019 Sarasota Lift Station 87 Presentation
33/58
%or$al Operating Conditions
Open Ct
33
Lle(ation
-
8/21/2019 Sarasota Lift Station 87 Presentation
34/58
'rcharge ConditionsExisting Wetwell Design
34
Lle(ation
-
8/21/2019 Sarasota Lift Station 87 Presentation
35/58
Upgrades 1ill still
-
8/21/2019 Sarasota Lift Station 87 Presentation
36/58
Planning le,el co$paranch 9'hase 1: F11-0 6 F!-5 6
%i#t /tation 8$ 9'hase 2: F1!-0 6 F1- 6
2 >nch 9'hase : F5-0 6 F5-0 6
%and cMuisitionO %egal
< F-0 6
Ln(ironmental < F!-2 6
%uke &ood 'ark"estoration
< F1-0 6
Total Esti$ate 34 # 84 #
Open Ct notes: )udson *ayou crossing assumes (ariance #rom state and #ederal regulation reMuirementsP %and cMuisition O %egal estimated based on city inputP Ln(ironmental #rom 2001 )udson *ayou /tormwater /tudy
36
-
8/21/2019 Sarasota Lift Station 87 Presentation
37/58
Anal+sis o/ project costsPre,ios Bid
January 2011
Pre,ios Bid
inde3ed to 2015
Crrent
esti$ate
Di//erence
8 0nch=Phase 5>
F1-5 6 F1-$ 6 F11-0 6 F+- 6
!i/t 'tation @=Phase 3>
F5- 6 F!-1 6 F1!-0 6 F+-+ 6
3 0nch=Phase >
F2-$ 6 F-0 6 F5-0 6 F2-0 6
Total Esti$ate F+-! 6 F10-8 6 34 # F21-2 6
%ote: 2011 bid inde3ed to 2015 dollars based on industry
-
8/21/2019 Sarasota Lift Station 87 Presentation
38/58
• "eplacement o# asbestos cement water mainsQ• >nstallation o# reclaimed water mainsQ• >nstallation o# new sewer mains 9'omelo 'lace:• >nstallation o# new water main 9lta Nista to *ahia Nista:• ;ull roadway restoration• %andscaped %i#t /tation $ site
4 #: Project Enhance$ents
F sprey, lta Nista, 'omelo, and?or 'omelo 'lace
• Ruotes #rom recent negotiation attempts7 #: 8 0nch =#icrotnnel>
Anal+sis o/ di//erences
38
-
8/21/2019 Sarasota Lift Station 87 Presentation
39/58
• 4ategory storm surge protection• perating redundancies• =otally enclosed #or all operation O maintenance acti(ities
• /a#e working en(ironment #or sta## • 4limate change pro(isions• eeper wetwell?operational e##iciencies• /ite preparation
@7 #: Upgrades
Anal+sis o/ di//erences
39
-
8/21/2019 Sarasota Lift Station 87 Presentation
40/58
"esol(ing design issues, communicating challenges%EGT 'TEP'
40
-
8/21/2019 Sarasota Lift Station 87 Presentation
41/58
'eencing o/Constrction
41
)udson *ayou
.-/- 1
Additional
Ad,antages
"isk 6anagement
6inimi7e isruption toL3isting .tilities
4ost 4ontrols
6aintenance o# =ra##ic
•
•
•
•
-
8/21/2019 Sarasota Lift Station 87 Presentation
42/58
4onstruction 'lan
ThreePhases
42
Phase 3%/ 8$ construction
Phase 5! inch pipe
!i/t 'tation
emolition o#%i#t /tation $and parkrestoration
Phase 2 inch pipe
-
8/21/2019 Sarasota Lift Station 87 Presentation
43/58
Constrction Challenges
43
• !i$ited site access• Constrction -one restrictions
• #ini$i-e i$pacts to !ke Wood Park
• #aintenance o/ tra//ic
• #ini$i-e ser,ice disrptions
-
8/21/2019 Sarasota Lift Station 87 Presentation
44/58
#icrotnneling
Work Hone
44
)udson *ayou
.-/- 1
"ecei(ing sha#twork 7one
%/ sitedri(eway
Jacking sha#twork 7one
Jacking sha#twork 7one
4onstructionsupport
work 7one
-
8/21/2019 Sarasota Lift Station 87 Presentation
45/58
#icrotnnel Work Hone =Ospre+>
45
J A C K I
N G
S H A F T
MICROT+,,(L -AC.I,G !/AT
$OR. O,(
O S P R E Y
A V E N U E
CR
AN
E
P I P E
C O N
T R
O L
O O T H
A K E R
T A N K
E N
T O
N I T E
M
I ! E R
G E N E R A T O
R
S O I L
S E P A R
A T I O N
P L A N T
S T O R A G E
ST ORA
GE
HU"SON
AYOU
MICROT+,,(L ALIG,M(,T
-
8/21/2019 Sarasota Lift Station 87 Presentation
46/58
#icrotnneling Work Hone =!' @>
46
U S # $
P I P E
C O N
T R O L
O O
T H
A K E R
TA N K
E N T O
N I T E
M I ! E R
G E N E R
A T
O R
S O I L
S E P A
R A T I O
N
P L A N
T
S T O R
A G
E
-AC.I,G
!/AT(+IPM(,T
PIPESTORAGEAREA
OFFICE
TRAILER
MICROT+,,(L ALIG,M(,T
JA C K I N
G
S HA F T
C RA N
EL! !IT(RI($A
Y
-
8/21/2019 Sarasota Lift Station 87 Presentation
47/58
Bilding Work Hone
47
U S # $
APPROIMAT
((CAATIO,LIMIT!
APPRO(!IT( PLA,
-
8/21/2019 Sarasota Lift Station 87 Presentation
48/58
'chedling and Ti$e/ra$es
48
Lstimates subject to #inal engineering decisions
Bid Phase 'tart "inish
3456 3458 345 345@ 3457 3434
R1?2
R?
R1?2
R?
R1?2
R?
R1?2
R?
R1?2
R?
R1?2
R?
Cr rentDes
ign
! inch9'hase 1:
July2015
June201$
%i#t /tation9'hase 2:
/ept-201!
June201+
2 inch9'hase :
Jan-201+
ug-2020
-
8/21/2019 Sarasota Lift Station 87 Presentation
49/58
49
• En,iron$ental ste1ardship< >mpro(e ser(ice and system reliability< /torm protection 94ategory hurricane:< ##set potable water demands with reclaimed water
• "iscall+ responsi
-
8/21/2019 Sarasota Lift Station 87 Presentation
50/58
Path to the %e&t Phase
50
-
8/21/2019 Sarasota Lift Station 87 Presentation
51/58
Cit+ Co$$ission Direction ctions to mo(e the project #orward
• Pre9ali/+ specialt+ contractors6icrotunnel under the bridge
• Prse alternate align$entLasements will be necessary
51
-
8/21/2019 Sarasota Lift Station 87 Presentation
52/58
Discssion
-
8/21/2019 Sarasota Lift Station 87 Presentation
53/58
!i/t 'tation @ "nding Options
• 345 Rate '//icienc+ Anal+sis
• Annal Rate 0ncrease
53
-
8/21/2019 Sarasota Lift Station 87 Presentation
54/58
Option 54ash while maintaining 4>' #unding le(el
• De/ers 34 $illion o/ 0n/rastrctre projects*etween 2015 and 2020
54
-
8/21/2019 Sarasota Lift Station 87 Presentation
55/58
Option 3*ond debt while maintaining 4>' #unding le(el
• One ti$e rate increase in 345>n addition to planned D
• %o in/rastrctre projects de/erred
• Rate increase to /nd de
-
8/21/2019 Sarasota Lift Station 87 Presentation
56/58
Option *ond debt while maintaining 4>' #unding le(el
• %o rate increase related to !i/t 'tation @ nnual D rate increase is necessary
• De/er so$e in/rastrctre projectsF1-8 million per year until loan is satis#ied
56
-
8/21/2019 Sarasota Lift Station 87 Presentation
57/58
'ta// Reco$$endationOption *ond debt while maintaining 4>' #unding le(el
• %o rate increase related to !i/t 'tation @ nnual D rate increase is necessary
• De/er so$e in/rastrctre projectsF1-8 million per year until loan is satis#ied
"inance and Utilit+ Depart$ents 1ill re,ie11ith rate s//icienc+ consltant
• >denti#y and de(elop best (alue option
• 'resent to 4ommission 57
-
8/21/2019 Sarasota Lift Station 87 Presentation
58/58
Discssion