PROVENT SERVICIOS GENERALES SRLTDA Pag. 1 de 4 VALORIZACION DE OBRA N°01 Obra : MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR TOMEQUE-TOMEQUILLO DEL DISTRITO DE MORO, PROVINCIA DEL SANTA-ANCASH. Sub Presupuesto 0CANAL DE REGADIO Propietario MUNICIPALIDAD DISTRITAL DE MORO Contratista CONSORCIO TOMEQUE Residente de Obra MONTO CONTRACTUAL ### Supervisor de Obra VALOR REFERENCIAL ### Fecha : DEL 20 AL 30 DE NOVIEMBRE DEL 2009 FACTOR DE RELACION 1.00000 AVANCE SALDO ITEM DESCRIPCION PARTIDA Und. Metrado P. Unit Total ANTERIOR ACTUAL ACUMULADO S/. S/. Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/. % 01 CANAL DE CONCRETO 01.01 TRABAJOS PRELIMINARES 01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA u 1.00 969.14 969.14 0.00 0.00 - 1.00 969.14 100.00 1.00 969.14 100.00 0.00 0.00 0.00 01.01.02 CASETA DE ALMACEN Y/O GUARDIANIA glb 1.00 6,000.00 6,000.00 0.00 0.00 - 1.00 6,000.00 100.00 01.01.03 ELIMINACION DE MATERIAL NOCIVA EN CA m2 4,050.00 1.86 7,533.00 0.00 0.00 - 2000.00 3,720.00 49.38 2000.00 3,720.00 49.38 2050.00 3,813.00 50.62 01.01.04 TRAZO, NIVELACION Y REPLANTEO EN CAN km 1.04 2,340.31 2,433.92 0.00 0.00 - 1.04 2,433.92 100.00 1.04 2,433.92 100.00 0.00 0.00 0.00 01.01.05 FLETE RURAL kg ### 0.10 6,000.00 0.00 0.00 - 30000.00 3,000.00 50.00 30000.00 3,000.00 50.00 30000.00 3,000.00 50.00 01.01.06 FLETE TERRESTRE glb 1.00 5,000.00 5,000.00 0.00 0.00 - 1.00 5,000.00 100.00 1.00 5,000.00 100.00 0.00 0.00 0.00 01.02 MOVIMIENTO DE TIERRAS 01.02.01 EXCAVACION DE CAJA DE CANAL EN CONGL m3 356.50 30.97 11,040.81 0.00 0.00 - 120.00 3,716.40 33.66 01.02.02 RELLENO COMPACTADO MANUAL MATERIAL m3 328.30 40.39 13,260.04 0.00 0.00 - 120.00 4,846.80 36.55 120.00 4,846.80 36.55 208.30 8,413.24 63.45 01.02.03 REFINE Y NIVELACION EN TERRENO NORMA m2 880.00 2.18 1,918.40 0.00 0.00 - 400.00 872.00 45.45 400.00 872.00 45.45 480.00 1,046.40 54.55 01.02.04 ELIMINACION MATERIAL EXCEDENTE EN CA m3 56.56 18.58 1,050.88 0.00 0.00 - 30.00 557.40 53.04 30.00 557.40 53.04 26.56 493.48 46.96 01.03 CONCRETO SIMPLE 01.03.01 CONCRETO f'c=175 kg/cm2 EN CANALES m3 176.00 349.26 61,469.76 0.00 0.00 - 40.00 13,970.40 22.73 40.00 13,970.40 22.73 136.00 47,499.36 77.27 01.03.02 ENCOFRADO Y DESENCOFRADO CANALES m2 1,100.00 38.94 42,834.00 0.00 0.00 - 500.00 19,470.00 45.45 01.03.03 ENCOFRADO Y DESENCOFRADO PARA CANALE m2 880.00 55.29 48,655.20 0.00 0.00 - 400.00 22,116.00 45.45 400.00 22,116.00 45.45 480.00 26,539.20 54.55 01.04 JUNTAS ASFALTICAS 01.04.01 JUNTAS ASFALTICAS m 438.40 7.03 3,081.95 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 438.40 3,081.95 100.00 01.05 COMPUERTAS METALICAS 01.05.01 COMPUERTA DE PLANCHA METALICA 1/8" u 5.00 263.48 1,317.40 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 5.00 1,317.40 100.00 02 ACUEDUCTO DE CONCRETO 02.01 CONCRETO f'c=210 kg/cm2 EN ACUEDUCTO m3 5.64 354.04 1,996.79 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 5.64 1,996.79 100.00 02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS ACU m2 35.40 55.53 1,965.76 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 35.40 1,965.76 100.00 02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 375.20 6.04 2,266.21 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 375.20 2,266.21 100.00 03 TUBERIAS 03.01 MOVIMIENTO DE TIERRAS 03.01.01 EXCAVACION DE ZANJAS MANUAL EN CONGL m 241.00 26.54 6,396.14 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 6,396.14 100.00 03.01.02 REFINE Y NIVELACION EN TERRENO NORMA m 241.00 1.55 373.55 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 373.55 100.00 03.01.03 RELLENO CON MATERIAL PROPIO SELECCIO m 241.00 21.27 5,126.07 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 5,126.07 100.00 03.01.04 RELLENO CON MATERIAL PROPIO m 241.00 17.72 4,270.52 0.00 0.00 - 03.01.05 ELIMINACION DE MATERIAL EXCEDENTE D= m3 72.30 15.48 1,119.20 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 72.30 1,119.20 100.00 03.02 TUBERIAS 03.02.01 SUMINISTRO E INSTALACION DE TUBERIA m 241.00 106.73 25,721.93 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 25,721.93 100.00 03.03 CAMARAS DE INSPECCION

description

AAAA

Transcript of Valorizacion Nº 01 Tomeque

Page 1: Valorizacion Nº 01 Tomeque

PROVENT SERVICIOS GENERALES SRLTDA Pag. 1 de 6

VALORIZACION DE OBRA N°01

Obra : MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR TOMEQUE-TOMEQUILLO DEL DISTRITO DE MORO, PROVINCIA DEL SANTA-ANCASH.Sub Presupuesto 01 CANAL DE REGADIOPropietario MUNICIPALIDAD DISTRITAL DE MOROContratista CONSORCIO TOMEQUEResidente de Obra MONTO CONTRACTUAL S/. 147,476.52Supervisor de Obra VALOR REFERENCIAL S/. 147,476.52Fecha : DEL 20 AL 30 DE NOVIEMBRE DEL 2009 FACTOR DE RELACION 1.00000

AVANCESALDOITEM DESCRIPCION PARTIDA Und. Metrado P. Unit Total ANTERIOR ACTUAL ACUMULADO

S/. S/. Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/.01 CANAL DE CONCRETO01.01 TRABAJOS PRELIMINARES01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 969.14 969.14 0.00 0.00 - 1.00 969.14 100.00 1.00 969.14 100.00 0.00 0.0001.01.02 CASETA DE ALMACEN Y/O GUARDIANIA glb 1.00 6,000.00 6,000.00 0.00 0.00 - 1.00 6,000.00 100.00 01.01.03 ELIMINACION DE MATERIAL NOCIVA EN CANAL m2 4,050.00 1.86 7,533.00 0.00 0.00 - 2000.00 3,720.00 49.38 2000.00 3,720.00 49.38 2050.00 3,813.0001.01.04 TRAZO, NIVELACION Y REPLANTEO EN CANALES km 1.04 2,340.31 2,433.92 0.00 0.00 - 1.04 2,433.92 100.00 1.04 2,433.92 100.00 0.00 0.0001.01.05 FLETE RURAL kg 60,000.00 0.10 6,000.00 0.00 0.00 - 30000.00 3,000.00 50.00 30000.00 3,000.00 50.00 30000.00 3,000.0001.01.06 FLETE TERRESTRE glb 1.00 5,000.00 5,000.00 0.00 0.00 - 1.00 5,000.00 100.00 1.00 5,000.00 100.00 0.00 0.0001.02 MOVIMIENTO DE TIERRAS01.02.01 EXCAVACION DE CAJA DE CANAL EN CONGLOMERADO m3 356.50 30.97 11,040.81 0.00 0.00 - 120.00 3,716.40 33.66 01.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 328.30 40.39 13,260.04 0.00 0.00 - 120.00 4,846.80 36.55 120.00 4,846.80 36.55 208.30 8,413.2401.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 880.00 2.18 1,918.40 0.00 0.00 - 400.00 872.00 45.45 400.00 872.00 45.45 480.00 1,046.4001.02.04 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 56.56 18.58 1,050.88 0.00 0.00 - 30.00 557.40 53.04 30.00 557.40 53.04 26.56 493.4801.03 CONCRETO SIMPLE01.03.01 CONCRETO f'c=175 kg/cm2 EN CANALES m3 176.00 349.26 61,469.76 0.00 0.00 - 40.00 13,970.40 22.73 40.00 13,970.40 22.73 136.00 47,499.3601.03.02 ENCOFRADO Y DESENCOFRADO CANALES m2 1,100.00 38.94 42,834.00 0.00 0.00 - 500.00 19,470.00 45.45 01.03.03 ENCOFRADO Y DESENCOFRADO PARA CANALES CARAVISTA m2 880.00 55.29 48,655.20 0.00 0.00 - 400.00 22,116.00 45.45 400.00 22,116.00 45.45 480.00 26,539.2001.04 JUNTAS ASFALTICAS01.04.01 JUNTAS ASFALTICAS m 438.40 7.03 3,081.95 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 438.40 3,081.9501.05 COMPUERTAS METALICAS01.05.01 COMPUERTA DE PLANCHA METALICA 1/8" DE 0.4x0.40m u 5.00 263.48 1,317.40 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 5.00 1,317.4002 ACUEDUCTO DE CONCRETO02.01 CONCRETO f'c=210 kg/cm2 EN ACUEDUCTO m3 5.64 354.04 1,996.79 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 5.64 1,996.7902.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS ACUEDUCTOS CA m2 35.40 55.53 1,965.76 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 35.40 1,965.7602.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 375.20 6.04 2,266.21 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 375.20 2,266.2103 TUBERIAS03.01 MOVIMIENTO DE TIERRAS03.01.01 EXCAVACION DE ZANJAS MANUAL EN CONGLOMERADO HP=1.2 m 241.00 26.54 6,396.14 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 6,396.1403.01.02 REFINE Y NIVELACION EN TERRENO NORMAL m 241.00 1.55 373.55 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 373.5503.01.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m 241.00 21.27 5,126.07 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 5,126.0703.01.04 RELLENO CON MATERIAL PROPIO m 241.00 17.72 4,270.52 0.00 0.00 - 03.01.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 72.30 15.48 1,119.20 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 72.30 1,119.2003.02 TUBERIAS03.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO4435 DN m 241.00 106.73 25,721.93 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 241.00 25,721.9303.03 CAMARAS DE INSPECCION

Page 2: Valorizacion Nº 01 Tomeque

PROVENT SERVICIOS GENERALES SRLTDA Pag. 2 de 6

VALORIZACION DE OBRA N°01

Obra : MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR TOMEQUE-TOMEQUILLO DEL DISTRITO DE MORO, PROVINCIA DEL SANTA-ANCASH.Sub Presupuesto 01 CANAL DE REGADIOPropietario MUNICIPALIDAD DISTRITAL DE MOROContratista CONSORCIO TOMEQUEResidente de Obra MONTO CONTRACTUAL S/. 147,476.52Supervisor de Obra VALOR REFERENCIAL S/. 147,476.52Fecha : DEL 20 AL 30 DE NOVIEMBRE DEL 2009 FACTOR DE RELACION 1.00000

AVANCESALDOITEM DESCRIPCION PARTIDA Und. Metrado P. Unit Total ANTERIOR ACTUAL ACUMULADO

S/. S/. Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/. % Metrado Valoriz. S/.03.03.01 CONCRETO F'C=210 KG/CM2 EN CAMARA DE INSPECCION D=1.2 u 4.00 870.15 3,480.60 0.00 0.00 - 0.0003.03.02 CONCRETO F'C=210 KG/CM2 PARA TECHO DE CAMARAS DE IN u 4.00 663.68 2,654.72 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 4.00 2,654.7203.03.03 CONCRETO F'C=175 KG/CM2 PARA DADOS DE EMPALME A CA u 8.00 132.36 1,058.88 0.00 0.00 - 03.04 CAJAS03.04.01 CONCRETO f'c=210 kg/cm2 EN CAJAS m3 2.60 354.04 920.50 0.00 0.00 - 0.0003.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN CAJA m2 18.00 55.53 999.54 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 18.00 999.5403.04.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 180.00 6.04 1,087.20 0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 180.00 1,087.20

COSTO DIRECTO 272,002.11 0.00 86,672.06 86,672.06 144,911.14GASTOS GENERALES (10%) 10.00% 27,200.21 0.00 8,667.21 8,667.21 14,491.11UTILIDAD (8%) 10.00% 27,200.21 0.00 8,667.21 8,667.21 14,491.11SUB TOTAL 326,402.53 0.00 104,006.48 104,006.48 173,893.36F.R 1.00000 1.0000 1.0000 1.0000 1.00000MONTO CONTRACTUAL 326,402.53 0.00 104,006.48 104,006.48 173,893.36IMPUESTO GENERAL A LAS VENTAS (18%) 58,752.46 0.00 19,761.23 19,761.23 33,039.74COSTO TOTAL 385,154.99 0.00 123,767.71 123,767.71 206,933.10AVANCE FISICO 0.00% 32.13% 32.13% 53.73%

Page 3: Valorizacion Nº 01 Tomeque

PROVENT SERVICIOS GENERALES SRLTDA Pag. 3 de 6

SALDO%

0.00

50.620.00

50.000.00

63.4554.5546.96

77.27

54.55

100.00

100.00

100.00100.00100.00

100.00100.00100.00

100.00

100.00

Page 4: Valorizacion Nº 01 Tomeque

PROVENT SERVICIOS GENERALES SRLTDA Pag. 4 de 6

SALDO%

100.00

100.00100.00

Page 5: Valorizacion Nº 01 Tomeque

RESUMEN DE VALORIZACION N° 1

Obra

Propietario MUNICIPALIDAD DISTRITAL DE MOROContratista CONSORCIO TOMEQUEResidente de Obra 0Supervisor de Obra 0Fecha : DEL 20 AL 30 DE NOVIEMBRE DEL 2009

DESCRIPCIONACUMULADO VALORIZACION

ANTERIOR ACTUAL

A.- CONTRATO PRINCIPAL

0.00 104,006.48

Sub total (A) 0.00 104,006.48

B.- REAJUSTES0.00 0.00

Sub total (B) 0.00 0.00

MONTO DE LA VALORIZACION BRUTA(VB)= A+B 0.00 104,006.48

C.- RETENCION FONDO DE GARANTIA

- FONDO DE GARANTIA (10%) DEL MONTO CONTRACTUAL 0.00 10,400.65

Sub total C 0.00 10,400.65

MONTO DE LA VALORIZACION NETA(VN)= A+B-C 0.00 93,605.83

SUB TOTAL VALORIZACION 0.00 93,605.83IGV 19 % 0.00 17,785.11

MONTO TOTAL DE LA VALORIZACION 0.00 111,390.94

: MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR TOMEQUE-TOMEQUILLO

DEL DISTRITO DE MORO, PROVINCIA DEL SANTA-ANCASH.

: MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR

TOMEQUE-TOMEQUILLO DEL DISTRITO DE MORO, PROVINCIA DEL

SANTA-ANCASH.

Page 6: Valorizacion Nº 01 Tomeque

VALORIZACION ACUMULADO

104,006.48

104,006.48

0.000.00

104,006.48

10,400.65

10,400.65

93,605.83

93,605.8317,785.11

111,390.94

: MEJORAMIENTO DEL CANAL DE REGADIO MISHAN, SECTOR TOMEQUE-TOMEQUILLO