Presupuesto Total Precio unitario Cantidad Unidad Descripción Clave L 255,866.09 salon principal 1 L 105,557.16 Preliminares 1.1.1 L 173.11 L 4.86 35.6200 m2 CHAPEO Y LIMPIEZA, PARA EDI (INC/ACA 1.1.1.3 L 83,806.80 L 399.08 210.0000 m2 RELLENO Y COMPACTADO CON MATERIA 1.1.1.1 L 18,581.97 L 374.41 49.6300 m3 EXCAVACION CIMENTACION 1.1.1.2 L 2,995.28 L 374.41 8.0000 m3 EXCAVACION HIDRO-SANITARIA 1.1.1.4 L 26,435.69 Cimentaciones 2.2 L 12,553.14 L 1,348.35 9.3100 m3 CIMENTACION MAMPOSTERIA, MORTERO 2.2.1 L 13,882.55 L 504.82 27.5000 mL SOLERAS 2.2.2 L 106,624.17 Estructuras 3.1 L 7,328.25 L 488.55 15.0000 mL VIGAS 3.1.1 L 66,611.30 L 309.82 215.0000 m2 LOSAS 3.1.2 L 32,684.62 L 503.46 64.9200 m2 PAREDES 3.1.3 L 17,249.07 Albañileria 4.1 L 12,138.55 L 377.56 32.1500 mL CASTILLO 4.1.1 L 3,776.84 L 435.12 8.6800 mL JAMBA 4.1.2 L 1,333.68 L 666.84 2.0000 und CAJA DE REGISTRO 4.1.3 L 0.00 ACABADOS 5.1 L 0.00 L 0.00 0.0000 m2 PISO DE PORCELANATO 5.1.1 L 0.00 L 0.00 0.0000 m2 PINTURA BASE AGUA 5.1.2 L 255,866.09 Total de Presupuesto You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

description

presupuesto de obra civil

Transcript of Xtra Report 2

Page 1: Xtra Report 2

Presupuesto

TotalPrecio unitarioCantidadUnidadDescripciónClave

L 255,866.09salon principal1L 105,557.16Preliminares1.1.1

L 173.11L 4.8635.6200m2CHAPEO Y LIMPIEZA, PARA EDI (INC/ACA 1.1.1.3L 83,806.80L 399.08210.0000m2RELLENO Y COMPACTADO CON MATERIA1.1.1.1L 18,581.97L 374.4149.6300m3EXCAVACION CIMENTACION1.1.1.2

L 2,995.28L 374.418.0000m3EXCAVACION HIDRO-SANITARIA1.1.1.4L 26,435.69Cimentaciones2.2

L 12,553.14L 1,348.359.3100m3CIMENTACION MAMPOSTERIA, MORTERO 2.2.1L 13,882.55L 504.8227.5000mLSOLERAS2.2.2

L 106,624.17Estructuras3.1L 7,328.25L 488.5515.0000mLVIGAS3.1.1

L 66,611.30L 309.82215.0000m2LOSAS3.1.2L 32,684.62L 503.4664.9200m2PAREDES3.1.3

L 17,249.07Albañileria4.1L 12,138.55L 377.5632.1500mLCASTILLO4.1.1

L 3,776.84L 435.128.6800mLJAMBA4.1.2L 1,333.68L 666.842.0000undCAJA DE REGISTRO4.1.3

L 0.00ACABADOS5.1L 0.00L 0.000.0000m2PISO DE PORCELANATO5.1.1L 0.00L 0.000.0000m2PINTURA BASE AGUA5.1.2

L 255,866.09Total de Presupuesto