METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURAPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870FECHA: JULIO 2010
06.00.00 ALBAILERIAUBICACIN CANTIDAD LONGITUD ALTO
06.01.00 MUROS DE SOGAMUROS EXTERIORESEJE A 1 5.33 1.60EJE C 1 8.33 1.60MUROS INTERIORESEJE D 1 3.83 2.70EJE 2 1 2.46 2.70EJE 2 1 2.46 1.00EJE 2 1 1.56 2.70EJE 2 1 1.56 0.69
06.02.00 MUROS DE CABEZAEJE 1-3-4 6 2.46 2.70EJE 1-3-4 6 2.46 1.00
07.00.00 TARRAJEO EN MUROSUBICACIN CANTIDAD LONGITUD ALTO
07.01.00 TARRAJEO EXTERIOR E INTERIORESFROTALMUROS EXTERIORESEJE A 2 5.33 1.60EJE C 2 8.33 1.60MUROS INTERIORESEJE D 2 3.83 2.70EJE 2 2 2.46 2.70EJE 2 2 2.46 1.00EJE 2 2 1.56 2.70EJE 2 2 1.56 0.69
08.00.00 CARPINTERIA DE MADERA CEDRO 08.01.00 VENTANAS
UBICACIN CANTIDAD LONGITUD ALTOTIPO V20 1 1.98 1.15TIPO V21 1 1.35 1.15TIPO V22 1 2.00 1.15TIPO V23 1 2.98 0.60TIPO V24 1 2.35 0.60TIPO V25 1 3.00 1.15
METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURAPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870FECHA: JULIO 2010
08.02.00 PUERTATIPO P - 1 3 1 2.67TIPO P - 12 2 0.8 2.67
09.00.00 VIDRIOS (0,0929M2/P2)VENTANAS (VER CARPINTERIA DE MADERA)PUERTA 3 1.00 0.75
10.00.00 VEREDASUBICACIN CANTIDAD LONGITUD ALTO
10.01.00 VEREDA - CONCRETOposterior 1 10.93 1.20
frontal 1 10.93 1.20lateral 2 5.67 1.00
10.02.00 VEREDA - ENCOFRADOposterior 1 10.93 0.35
frontal 1 10.93 0.35lateral 2 5.67 0.35
10.03.00 JUNTA ASFALTICAposterior 1 7.00
frontal 1 7.00lateral 2 4.00
11.00.00 ZOCALOS Y CONTRAZOCALOSUBICACIN CANTIDAD LONGITUD ALTO
11.01.00 ZOCALO DE CEMENTO PULIDO h=0.30 - INTERIOREJE 1-3-4 12 2.46 0.30
EJE 2 2 4.02 0.30EJE A 2 5.33 0.30EJE C 2 8.33 0.30EJE D 2 3.83 0.30
METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
PARCIAL TOTAL (M2)
8.53 8.5313.33 13.33
10.34 10.346.64 6.641.23 1.234.21 4.211.07 1.07
TOTAL M2 45.35
3.32 19.931.23 7.38
TOTAL M2 27.31
PARCIAL TOTAL (M2)
8.53 17.0613.33 26.66
10.34 20.686.64 13.282.46 4.924.21 8.421.07 2.14
TOTAL M2 93.16
PARCIAL TOTAL (M2)2.28 2.281.55 1.552.30 2.301.79 1.791.41 1.413.45 3.45
TOTAL M2 12.78
METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
2.67 8.012.136 4.27
TOTAL M2 12.28
137.540.75 24.22
TOTAL P2 161.76
PARCIAL TOTAL
13.12 13.1213.12 13.125.67 11.34
TOTAL M2 37.57
3.83 3.833.83 3.831.98 3.97
TOTAL M2 11.62
7.007.008.00
TOTAL ML 22.00
PARCIAL TOTAL
0.74 8.861.21 2.411.60 3.202.50 5.001.15 2.30
21.76TOTAL ML
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTO
CONSTRUCCIN AMBIENTES DIRECCION, SECRETARIA Y TOPICO
02.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO MANUAL
1 5.67 9.33
02.02.00 TRAZO NIVEL Y REPLANTEO1 5.67 9.33
03.00.00 MOVIMIENTO DE TIERRAS03.01.00 EXCAVACIONES 03.01.01 CIMIENTOS CORRIDOS
EJE 1-3-4 3 5.67 0.45EJE 2 1 4.52 0.60
EJE A-C 2 9.33 0.60EJE D 1 3.83 0.60
03.01.02 ZAPATASEJE A 4 1.50 1.00EJE B 4 1.50 1.00EJE C 4 1.50 1.00
03.02.00 ELIMINACION DE MATERIAL EXCEDENTE03.02.01 CIMIENTOS CORRIDOS
EJE 1-3-4 3 5.67 0.45EJE 2 1 4.52 0.60
EJE A-C 2 9.33 0.60EJE D 1 3.83 0.60
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTO03.02.03 ZAPATAS
EJE A 4 1.50 1.00EJE B 4 1.50 1.00EJE C 4 1.50 1.00
03.03.00 RELLENO CON MATERIAL AFIRMADO:03.03.01 PISOS DE DIRECCION 1 4.07 3.0303.03.02 ESPERA DE SECRETARIA 1 4.07 2.403.03.03 TOPICO 1 5.37 3.0003.03.04 BAO DIRECCION 1 3.03 1.1503.03.05 BANO SECRETARIA 1 2.40 1.15
03.04.00 RELLENO CON MATERIAL OVER h = 0.4003.04.01 CIMIENTOS CORRIDOS
EJE 1-3-4 3 5.67 0.40EJE 2 1 4.27 0.60EJE D 1 3.83 0.60EJE A 1 5.54 0.60EJE C 1 9.33 0.60
04.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 SOLADO E=4" mezcla 1:10
CIMIENTOS CORRIDOSEJE 1-3-4 3 5.67 0.60EJE 2 1 4.27 0.45EJE A 1 5.54 0.45EJE C 1 9.33 0.45
ZAPATASEJE 1-3-4 9 1.00 1.50
EJE 2 2 1.00 1.50EJE A 1 1.00 1.50
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTO04.01.00 CONCRETO CICLOPEO 1:10 + 30% PG
CIMIENTOS CORRIODOSEJE 1-3-4 3 5.67 0.45EJE 2 1 4.52 0.60EJE A-C 2 9.33 0.60EJE D 1 3.83 0.60
05.00.00 OBRAS DE CONCRETO ARMADO05.01.00 ZAPATAS 05.01.01 CONCRETO 210K/cm2 12 1.00 1.50
05.01.02 ACERO Fy=4200 Kg/cm2EJE 1-2-3-4 12
05.02.00 SOBRECIMIENTO ARMADO (VC)05.02.01 CONCRETO 175K/cm2
EJE 1-3-4 6 2.46 0.25 0.30EJE 2 1 4.02 0.15 0.30EJE A 1 5.33 0.15 0.30EJE C 1 8.33 0.15 0.30
05.02.02 ENCOFRADOEJE 1-3-4 12 2.46 0.30
EJE 2 2 4.02 0.30EJE A 2 5.33 0.30EJE C 2 8.33 0.30
05.02.03 ACERO Fy=4200 Kg/cm2EJE 1-3-4 acero principal 6EJE 1-3-4 estribos 6
EJE 2 acero principal 1
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTOEJE 2 estribos 1EJE 2 acero principal 1EJE 2 estribos 1EJE A acero principal 1EJE A estribos 1EJE A acero principal 1EJE A estribos 1EJE A acero principal 1EJE A estribos 1EJE C acero principal 1EJE C estribos 1EJE C acero principal 1EJE C estribos 1EJE C acero principal 1EJE C estribos 1EJE D acero principal 1EJE D estribos 1EJE D acero principal 1EJE D estribos 1
05.03.00 COLUMNAS 05.03.01 CONCRETO 210K/cm2
EJE B C1 4 0.25 0.25 3.70EJE A-C C1 8 0.25 0.25 3.20
05.03.02 ENCOFRADOEJE B C1 8 0.25 3.20
EJE A-C CI 16 0.25 2.70
05.03.03 ACERO Fy=4200 Kg/cm2EJE B C1 principal 4EJE B C1 estribos 4
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTOEJE A-C C1 principal 8EJE A-C C1 estribos 8
05.04.00 VIGAS05.04.01 CONCRETO 210K/cm2
VIGA V- 101 0.25X0.25EJE 1-3-4 V-101 6 2.46 0.25 0.25
VIGA VS (PERIMETRAL) 0.25X0.25EJE 1-2-3-4 VS-102 8 2.46 0.25 0.25EJE A-C VS-103 2 8.33 0.15 0.25
05.04.02 ENCOFRADOVIGA V- 101EJE 1-3-4 V-101 12 2.46 0.25VIGA VS (PERIMETRAL)EJE 1-2-3-4 VS-102 16 2.46 0.25EJE A-C VS-103 2 8.33 0.25
05.04.03 ACERO Fy=4200 Kg/cm2VIGA V- 101EJE 1-3-4 V-101 principal 6EJE 1-3-4 V-101 estribos 6VIGA VS (PERIMETRAL)EJE 1-2-3-4 VS-102 principal 8EJE 1-2-3-4 VS-102 estribos 8ENTRE EJE 1-2 VS-103 principal 2ENTRE EJE 1-2 VS-103 estribos 2ENTRE EJE 2-3 VS-103 principal 2ENTRE EJE 2-3 VS-103 estribos 2ENTRE EJE 3-4 VS-103 principal 2ENTRE EJE 3-4 VS-103 estribos 2
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURA
CANTIDAD DIMENSIONES MLITEM UBICACIN ELEMENTO MEZCLA DE ALTO
ELEMENTO LARGO ANCHO ELEMENTO05.05.00 LOSA ALIGERADA h=0.20m. (Ladrillo 0.15x0.30x0.30)
AREA 1 9.73 7.67
05.05.01 CONCRETO 175K/cm2 1 0.0875
05.05.02 LADRILLO 0.15X0.30X0.30 8,33/M2 =
05.05.03 ENCOFRADOTECHO FALTA
VIGUETA VT-2 2 9.73 0.10 0.20VT-1 2 7.67 0.10 0.20
05.05.04 ACERO Fy=4200 Kg/cm2TECHO (+) 23
(-) 23(-) 23
VIGUETA VT-2 2VT-1 2
1TEMPERATURA
1
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD
52.90 52.90TOTAL M2 52.90
52.90 52.90TOTAL M2 52.90
0.80 2.04 6.12 2.550.80 2.17 2.170.80 4.48 8.960.80 1.84 1.84
TOTAL M3 19.09
0.80 1.20 4.800.80 1.20 4.800.80 1.20 4.80
TOTAL M3 14.40
0.80 2.04 6.120.80 2.17 2.170.80 4.48 8.960.80 1.84 1.84
TOTAL M3 19.09 0.00
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD
0.80 1.20 4.800.80 1.20 4.800.80 1.20 4.80
TOTAL M3 14.40
12.33 12.339.77 9.77
16.11 16.113.48 3.482.76 2.76
TOTAL M2 44.45
0.40 0.91 2.720.40 1.02 1.020.40 0.92 0.920.40 1.33 1.330.40 2.24 2.24
TOTAL M3 8.23
3.40 10.211.92 1.922.49 2.494.20 4.20
TOTAL M2 18.82
1.50 13.501.50 3.001.50 1.50
TOTAL M2 18.00
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD
0.80 2.04 6.120.80 2.17 2.170.80 4.48 8.960.80 1.84 1.84
TOTAL M3 19.09
0.80 1.20 14.40 M3
1/2 1.02 17.00
0.18 1.110.18 0.180.24 0.240.37 0.37
TOTAL M3 1.90
0.74 8.861.21 2.411.60 3.202.50 5.00
TOTAL M2 19.46
3/8 0.58 4.00 1/4 0.25 10.00 3/8 0.58 4.00
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD 1/4 0.25 6.00 3/8 0.58 4.00 1/4 0.25 10.00 3/8 0.58 4.00 1/4 0.25 8.00 3/8 0.58 4.00 1/4 0.25 5.00 3/8 0.58 4.00 1/4 0.25 8.00 3/8 0.58 4.00 1/4 0.25 12.00 3/8 0.58 4.00 1/4 0.25 9.00 3/8 0.58 4.00 1/4 0.25 12.00 3/8 0.58 4.00 1/4 0.25 9.00 3/8 0.58 4.00 1/4 0.25 6.00
0.23 0.930.20 1.60
TOTAL M3 2.53
0.80 6.400.68 10.80
TOTAL M2 17.20
5/8 1.60 4.00 3/8 0.58 24.00
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD 5/8 1.60 4.00 3/8 0.58 22.00
0.15 0.92
0.15 1.230.31 0.62
TOTAL M3 2.78
0.62 7.38
0.62 9.842.08 4.17
TOTAL M2 21.39
5/8 1.60 4.00 3/8 0.58 10.00
5/8 1.60 4.00 3/8 0.58 10.00 5/8 1.60 4.00 3/8 0.58 12.00 5/8 1.60 4.00 3/8 0.58 9.00 5/8 1.60 4.00 3/8 0.58 12.00
METRADO CONSTRUCCIN AMBIENTE DIRECCIN, SECRETARIA Y TOPICOSPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FECHA: JULIO 2,010
DIMENSIONES ML TOTAL AREA VOLUMEN EN M3 FIERRO ALTO EXCAVACION CONCRETO POR ELEMENTO
EXCAV. ML. ELEM. TOTAL POR ELEM. TOTAL POR ELEM. TOTAL O/ KG/ML CANTIDAD
74.63 74.63TOTAL AREA 74.63
74.63 TOTAL M3 6.53
VOLUMEN DE CONCRETO POR M2 DE TECHO: VOLUMEN TOTAL DE CONCRETO EN TECHO (AREA TOTAL x Volumen C /m2): 6.53
621.91 415.60 622.00 UNID
74.63 74.632.92 5.842.30 4.60 10.44
TOTAL M2 85.07
1/2 1.02 2.00 1/2 1.02 4.00 1/2 1.02 2.00
1/2 1.02 2.00 1/2 1.02 2.00 1/4 0.25 276.00
1/4 0.25 101.50
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL
1.50 26.01 312.12TOTAL KG 312.12
2.46 5.71 34.241.60 4.00 24.001.56 3.62 3.62
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL1.60 2.40 2.402.46 5.71 5.711.60 4.00 4.001.98 4.59 4.591.60 3.20 3.201.35 3.13 3.131.60 2.00 2.002.00 4.64 4.641.60 3.20 3.202.98 6.91 6.911.60 4.80 4.802.35 5.45 5.451.60 3.60 3.603.00 6.96 6.961.60 4.80 4.802.23 5.17 5.171.60 3.60 3.601.60 3.71 3.711.60 2.40 2.40
TOTAL KG 142.15
3.70 23.68 94.721.20 16.70 66.82
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL3.20 20.48 163.841.20 15.31 122.50
TOTAL KG 447.87
2.46 15.74 94.461.60 9.28 55.68
2.46 15.74 125.951.602.98 19.07 38.141.60 11.14 22.272.35 15.04 30.081.60 8.35 16.703.00 19.20 38.401.60 11.14 22.27
TOTAL KG 443.97
PROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870
FIERRO POR ELEMENTO CANTID.
LONGITUD PARCIAL TOTAL
30.50 62.22 1,431.063.05 12.44 286.211.85 3.76 86.57
26.99 55.05 110.119.95 20.29 40.580.25 16.91 16.91
9.46 239.92 239.92
TOTAL KG 2,211.35
METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURAPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870FECHA: JULION 2010
12.00.00 REVOQUES ENLUCIDOS Y MOLDURASUBICACIN CANTIDAD LONGITUD
12.01.00 TARRAJEO EN VIGAS (=ENCOFRADO)VIGAS
12.02.00 TARRAJEO EN COLUMNAS (=ENCOFRADO)COLUMNAS
12.03.00 DERRAMES e=0.15m. EN MUROEJE A 3 5.34EJE D 2 5.34EJE 2 1 1.80
13.00.00 PISOS Y PAVIMENTOSUBICACIN CANTIDAD LONGITUD
13.01.00 PISO (VER RELLENO CON MATERIAL AFIRMADO)PISOS DE DIRECCIONESPERA DE SECRETARIATOPICOBAO DIRECCIONBANO SECRETARIA
13.02.00 FALSO PISOPISOS DE DIRECCIONESPERA DE SECRETARIATOPICOBAO DIRECCIONBANO SECRETARIA
14.00.00 PINTURA FALTAUBICACIN CANTIDAD LONGITUD
14.01.00 PINTURA INTERIOR EXTERIOMURO EXTERIOR FRONTALEJE A 1 5.33MURO EXTERIOR POSTERIOREJE C 1 5.33EJE C 1 3.00COLUMNASFRONTAL EXTERIORES 12 0.25POSTERIORES EXTERIORES 12 0.25LATERALES EXTERIORES 2 0.25EJE B 3 0.45EJE B 3 0.25INTERIORES EJE A - C 1 7.15MURO LATERALESEJE 1-4 4 2.46EJE 1-4 4 2.46
MUROS INTERIORESEJE 1-3-4 8 2.46EJE 1-3-4 8 2.46EJE A 1 5.33EJE C 1 5.33EJE C 1 3.00EJE D 1 3.83EJE 2 1 2.46EJE 2 1 2.46EJE 2 1 1.56EJE 2 1 1.56VIGASEXTERIORES EJE A-C 2 8.33EXTERIORES EJE 1-4 4 2.46INTERIORES EJE A-C 2 8.33INTERIORES EJE 1-2-3-4 12 2.46
14.03.00 PINTURA CONTRAZOCALOVER ZOCALOS Y CONTRAZOCALOS
METRADO 03 AULAS PRIMARIAPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURAPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870FECHA: DICIEMBRE 2,008
14.04.00 PINTURAVENTANAPUERTA (dos caras) 3
15.00.00 CURADO QUIMICO15.01.00 VIGAS
COLUMNAS LOSA ALIGERADA
METRADO AMBIENTES DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
ALTO PARCIAL TOTAL
21.39TOTAL M2 21.39
17.20TOTAL M2 17.20
1.10 6.44 19.320.80 6.14 12.282.67 4.47 4.47
TOTAL ML 36.07
ALTO PARCIAL TOTAL
12.339.77
16.113.482.76
TOTAL M2 44.45
12.339.77
16.113.482.76
TOTAL M2 44.45
ALTO PARCIAL TOTAL
1.60 8.53 8.53
2.10 11.19 11.191.55 4.65 4.65
3.15 0.79 9.453.15 0.79 9.454.34 1.09 2.174.34 1.95 5.864.34 1.09 3.263.15 22.52 22.52
2.70 6.64 26.571.00 1.23 4.92
2.70 6.64 53.141.00 1.23 9.841.60 8.53 8.532.10 11.19 11.191.55 4.65 4.652.70 10.34 10.342.70 6.64 6.641.00 1.23 1.232.70 2.11 2.110.72 1.12 1.12
0.25 2.08 4.170.25 0.62 2.460.25 2.08 4.170.25 0.62 7.38
TOTAL M2 235.52
TOTAL ML 21.76
METRADO 03 AULAS PRIMARIAPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION
12.782.64 12.28
TOTAL M2 25.06
21.3917.2074.63
TOTAL M2 113.21
METRADO AMBIENTE DIRECCION, SECRETARIA Y TOPICOPROYECTO: AMPLIACION Y MEJORAMIENTO DE LA IE. 20133, PROGRAMA DE HABILITACION URBANA FELIPE COSSIO DEL POMAR, CASTILLA-PIURAUBICACIN: URB. FELIPE COSSIO DEL POMAR. CASTILLA PIURAPROYECTISTA: Ing ADOLFO M. QUISPE MOSCOL - CIP 98870FECHA: JULIO 2010
17.00.00 INSTALACIONES ELCTRICAS
17.01.00 SALIDASUBICACIN CANTIDAD UNIDADES LONGITUD ALTO
17.01.01 CENTRO DE LUZ 1 6.0017.01.02 INTERRUPTORES SIMPLES 1 5.0017.01.03 PARA TOMACORRIENTE BIPOLAR DOBLE 1 6.00
17.02.00 ARTEFACTOSUBICACIN CANTIDAD UNIDADES LONGITUD ALTO
17.02.011 10.00
17.02.02 SOQUETE CON FOCO (EXTERIOR) 1 6.00
17.03.00 CANALIZACIONES Y/O TUBERASUBICACIN CANTIDAD UNIDADES LONGITUD ALTO
17.03.01 C-1 PVC SEL D=15MM ALUMBRADO 1 40.30C-2 PVC SEL D=15MM ALUMBRADO 1 0.00C-3 PVC SEL D=15MM ALUMBRADO 1 43.30C-4 PVC SEL D=15MM TOMACORRIENTES 1 61.80
17.04.00 CONDUCTORES Y/O CABLESUBICACIN CANTIDAD UNIDADES LONGITUD ALTO
17.04.01 C-1, 2-2.5MM2 ALUMBRADO 1 40.30C-2, 2-2.5MM2 ALUMBRADO 1 0.00C-3, 2-2.5MM2 ALUMBRADO 1 43.30
17.04.02 C-4, 2-4.0MM2 TOMACORRIENTES 1 61.80
FLUORESCENTE CAJA C/REJILLA ARA CON 02 LAMPARAS 40W (INTERIOR)
METRADO AMBIENTE DIRECCION, SECRETARIA Y TOPICO
PARCIAL TOTAL6.005.006.00
PARCIAL TOTAL
10.006.00
PARCIAL TOTAL40.30 40.300.00 0.00
43.30 43.3061.80 61.80
TOTAL ML 145.40
PARCIAL TOTAL40.30 40.300.00 0.00
43.30 43.30TOTAL ML 83.60
61.80 61.80TOTAL ML 61.80
murosconcretostarraj-pisos-pinturaelectricas