Cimbra comn en_____________________________con seccin de ________
Cimbra comn en_____________________________con seccin de ________Elemento
MATERIALES
MANO DE OBRA
Madera Alambre Clavos
pino (bsico) recocido diesel
Hechura Cimbrado
de y
cimbra descimbra
Zapatas 1 das peralteContratrabes de 20 x 80 cms.
Contratrabes de 25 x 100 cms.
Columna de 20 x 30 cms.
Columna de 30 x 30 cms.
Columna de 50 x 50 cms.
Trabe de 50 x 30 cms.
Trabe de 25 x 40 cms.
Trabe de 40 x 60 cms.
Losa
Muro
Rampa
P.T. KG KG Ltos.12.38** ____ 0.090 0.50
10.50 ** 0.040 0.090 0.50
9.99** 0.040 0.090 0.50 14.2** 0.050 0.090 0.50 15.15** 0.050 0.090 0.50
9.63** 0.050 0.090 0.50
13.05** 0.080 0.210 0.50 11.65** 0.080 0.210 0.50 8.68** 0.080 0.210 0.50 5.5** ____ 0.350 0.50 7.26** 0.15 0.200 0.50 6.43** 0.40 0.100 0.50 M2/5 M2/3100 m3/5 10 m2/5
62.50 8
55.50 8
55.50 855.50 8
55.50 8
55.50 8
55.50 8.55
55.50 8.55
55.50 8.55
77.0 1050.0 9
55.5 7.52
las actividades propias del cimbrado lo llevara a cabo la cuadrilla integrada por: 1 carpintero
1 ayudante
las cantidades empleadas (P.T) estn supeditadas a los valores adoptados en el anlisis del costo bsico es decir: desperdicios, numero de usos, entre otros.