  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,1DESCRIPCION DE LA PARTIDA:

    UNIDAD: SGCANTIDAD: 1.00

    RENDIMIENTO: 1.000000

    MATERIALES UND CANTIDAD COSTO TOTALSG 1 1500 1,500.00 SG 1 1500 1,500.00

    -

    -

    -

    TOTAL MATERIALES Bs.: 3,000.00 COSTO UNITARIO MATERIALES Bs.: 3,000.00

    UND CANT DEPREC. PRECIO TOTALUND 210.00 1.00 600.00 126,000.00

    MATERIALES DE PLOMERIA

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    EQUIPOS

    CONSTRUCCIN DE CAMPAMENTOS E INSTALACIONES PROVISIONALES.

    TRAILER

    MATERIALES DE ELECTRICIDAD

    UND 210.00 1.00 600.00 126,000.00 UND 420.00 1.00 100.00 42,000.00 UND 210.00 1.00 70.00 14,700.00 UND 210.00 1.00 15.00 3,150.00 UND 210.00 1.00 20.00 4,200.00

    SILLA UND 420.00 1.00 1.50 630.00 ESCRITORIO UND 420.00 1.00 1.50 630.00 COMPUTADORA UND 420.00 1.00 30.00 12,600.00

    UND 1.00 1.00 900.00 900.00 TOTAL EQUIPOS Bs.: 204,810.00

    COSTO UNITARIO EQUIPOS Bs.: 204,810.00

    CANT SALARIO TOTALCAPORAL 1.00 79.37 79.37

    6.00 79.22 475.32 1.00 79.34

    -

    TOTAL MANO DE OBRA Bs.: 554.69 651% PRESTACIONES SOCIALES 3,611.03

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,165.72 COSTO UNITARIO DE MANO DE OBRA Bs.: 4,165.72

    COSTO DIRECTO POR UNIDAD Bs.: 211,975.72 22% ADMINISTRACION 46,634.66

    SUB TOTAL 258,610.38 14% UTILIDAD 36,205.45

    PRECIO UNITARIO Bs.: 294,815.83

    EQUPOS VARIOS

    IMPLEMENTOS DE SEGURIDAD

    CHOFEROBRERO

    CAMION 350

    MANO DE OBRA

    BAOS PORTATILES

    GASTOS MEDICOS

    COMEDORFOTOCOPIADORA

    TRAILER

  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,2DESCRIPCION DE LA PARTIDA:

    UNIDAD: SGCANTIDAD: 1.00

    RENDIMIENTO: 0.500000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    -

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 0.50 1.00 3,000.00 1,500.00 UND 0.50 1.00 2,900.00 1,450.00 UND 0.50 1.00 4,900.00 2,450.00

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    MOVILIZACIN

    EQUIPOSPAYLOADERRETROEXCAVADORATRACTOR D - 9 UND 0.50 1.00 4,900.00 2,450.00 COMPACTADORA DE SUELO UND 0.50 1.00 3,000.00 1,500.00 GRUA TELESCOPICA UND 0.50 1.00 3,200.00 1,600.00

    UND 5 1.00 6,000.00 30,000.00 UND 1 1.00 6,000.00 6,000.00 UND 1 1.00 800.00 800.00

    TOTAL EQUIPOS Bs.: 45,300.00 COSTO UNITARIO EQUIPOS Bs.: 90,600.00

    CANT SALARIO TOTAL5.00 79.34 396.70 1.00 79.37 79.37 3.00 79.34 79.34 6.00 79.22 475.32

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 1,030.73 651% PRESTACIONES SOCIALES 6,710.05

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 7,740.78 COSTO UNITARIO DE MANO DE OBRA Bs.: 15,481.56

    COSTO DIRECTO POR UNIDAD Bs.: 106,081.56 22% ADMINISTRACION 23,337.94

    SUB TOTAL 129,419.51 14% UTILIDAD 18,118.73

    PRECIO UNITARIO Bs.: 147,538.24

    OBREROS

    TRACTOR D - 9

    OPERADOR DE EQUIPOS

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CAMION CHUTO

    CAMIONETA PICK-UP

    MANO DE OBRA

    CAPORALCHOFER

    LOW BOY

  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,3DESCRIPCION DE LA PARTIDA:

    UNIDAD: M2CANTIDAD: 500.00

    RENDIMIENTO: 500.000000

    MATERIALES UND CANTIDAD COSTO TOTALUND 0.05 6 0.30 GL 0.25 160 40.00 M2 0.02 78 1.56

    -

    -

    TOTAL MATERIALES Bs.: 41.86 COSTO UNITARIO MATERIALES Bs.: 41.86

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 500.00 500.00 UND 1.00 1.000 800.00 800.00

    - - - -

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    REPLANTEO Y NIVELACIN.

    ESTACAPINTURACINTA REFLECTIVA

    EQUIPOSEQUIPO DE TOPOGRAFIACAMIONETA PICK-UP

    - - - -

    - -

    -

    TOTAL EQUIPOS Bs.: 1,300.00 COSTO UNITARIO EQUIPOS Bs.: 2.60

    CANT SALARIO TOTAL1.00 220.00 220.00 1.00 79.22 79.22 1.00 79.34 79.34

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 378.56 651% PRESTACIONES SOCIALES 2,464.43

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 2,842.99 COSTO UNITARIO DE MANO DE OBRA Bs.: 5.69

    COSTO DIRECTO POR UNIDAD Bs.: 50.15 22% ADMINISTRACION 11.03

    SUB TOTAL 61.18 14% UTILIDAD 8.56

    PRECIO UNITARIO Bs.: 69.74

    MANO DE OBRATOPOGRAFO

    GASTOS MEDICOS

    IMPLEMENTOS DE SEGURIDAD

    CHOFER AYUDANTE DE TOPOGRAFO

  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,4DESCRIPCION DE LA PARTIDA:

    UNIDAD: SGCANTIDAD: 1.00

    RENDIMIENTO: 0.500000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    -

    -

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 0.50 1.00 3,000.00 1,500.00 UND 0.50 1.00 2,900.00 1,450.00

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    DESMOVILIZACIN

    EQUIPOSPAYLOADERRETROEXCAVADORA UND 0.50 1.00 2,900.00 1,450.00

    UND 0.50 1.00 4,900.00 2,450.00 COMPACTADORA DE SUELO UND 0.50 1.00 3,000.00 1,500.00 GRUA TELESCOPICA UND 0.50 1.00 3,200.00 1,600.00

    UND 5 1.00 6,000.00 30,000.00 UND 1 1.00 800.00 800.00

    -

    TOTAL EQUIPOS Bs.: 39,300.00 COSTO UNITARIO EQUIPOS Bs.: 78,600.00

    CANT SALARIO TOTAL5.00 79.34 396.70 1.00 79.37 79.37 3.00 79.34 79.34 6.00 79.22 475.32

    -

    -

    TOTAL MANO DE OBRA Bs.: 1,030.73 651% PRESTACIONES SOCIALES 6,710.05

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 7,740.78 COSTO UNITARIO DE MANO DE OBRA Bs.: 15,481.56

    COSTO DIRECTO POR UNIDAD Bs.: 94,081.56 22% ADMINISTRACION 20,697.94

    SUB TOTAL 114,779.51 14% UTILIDAD 16,069.13

    PRECIO UNITARIO Bs.: 130,848.64

    MANO DE OBRAOPERADOR DE EQUIPOSCAPORAL

    RETROEXCAVADORA

    CAMION CHUTOCAMIONETA PICK-UP

    TRACTOR D - 9

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CHOFER OBREROS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,5DESCRIPCION DE LA PARTIDA:

    UNIDAD: MLCANTIDAD: 145.00

    RENDIMIENTO: 70.000000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    -

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 1,200.00 1,200.00 UND 1.00 1.000 300.00 300.00

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    DEMOLICIN DE CERCA DE CICLN CON BROCAL, INCLUYECARGA Y BOTE DEL MATERIAL PRODUCTO DE LA DEMOLICIN

    EQUIPOSCAMION VOLTEOEQUIPOS VARIOS UND 1.00 1.000 300.00 300.00

    UND 1.00 1.00 3,000.00 3,000.00 - -

    -

    TOTAL EQUIPOS Bs.: 4,500.00 COSTO UNITARIO EQUIPOS Bs.: 64.29

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 1.00 79.34 79.34 6.00 79.22 475.32

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 653.84 651% PRESTACIONES SOCIALES 4,256.51

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,910.36 COSTO UNITARIO DE MANO DE OBRA Bs.: 70.15

    COSTO DIRECTO POR UNIDAD Bs.: 134.43 22% ADMINISTRACION 29.58

    SUB TOTAL 164.01 14% UTILIDAD 22.96

    PRECIO UNITARIO Bs.: 186.97

    MANO DE OBRACAPORAL

    EQUIPOS VARIOSPAYLOADER

    GASTOS MEDICOS

    IMPLEMENTOS DE SEGURIDAD

    CHOFEROBRERO

    OPERADOR DE EQUIPO

  • ANALISIS DE PRECIOS

    PARTIDA: CI-1,6DESCRIPCION DE LA PARTIDA:

    UNIDAD: MLCANTIDAD: 70.00

    RENDIMIENTO: 47.000000

    MATERIALES UND CANTIDAD COSTO TOTALKG 0.25 25 6.25

    UND 0.5 30 15.00 UND 0.5 20 10.00 SG 1 150 150.00

    -

    TOTAL MATERIALES Bs.: 181.25 COSTO UNITARIO MATERIALES Bs.: 181.25

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 3,200.00 3,200.00 UND 1.00 1.00 6,000.00 6,000.00

    EQUIPOSGRUA TELESCOPICACAMION CHUTO

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    REUBICACIN DE TUBERA DE 2" EXISTENTE EN EL SITIO

    ELECTRODODISCO ESMERILCEPILLO DE ALAMBREMATERIALES VARIOS

    UND 1.00 1.00 6,000.00 6,000.00 UND 1.00 1.00 300.00 300.00 UND 1.00 1.00 250.00 250.00

    -

    TOTAL EQUIPOS Bs.: 9,750.00 COSTO UNITARIO EQUIPOS Bs.: 207.45

    CANT SALARIO TOTAL0.25 79.37 19.84 4.00 79.22 316.88 4.00 79.34 317.36 1.00 79.34 79.34 1.00 79.22 79.22 3.00 79.34 238.02

    -

    TOTAL MANO DE OBRA Bs.: 1,050.66 651% PRESTACIONES SOCIALES 6,839.81

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 7,890.48 COSTO UNITARIO DE MANO DE OBRA Bs.: 167.88

    COSTO DIRECTO POR UNIDAD Bs.: 556.58 22% ADMINISTRACION 122.45

    SUB TOTAL 679.03 14% UTILIDAD 95.06

    PRECIO UNITARIO Bs.: 774.09

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL OBRERO OPERADOR DE EQUIPO

    AYUDANTE DE SOLDADORMONTADOR DE TUBERIA

    GASTOS MEDICOS

    SOLDADOR

    CAMION CHUTOEQUIPOS VARIOSMAQUINA DE SOLDAR

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,1DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 50.00

    RENDIMIENTO: 80.000000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 4,900.00 4,900.00 UND 1.00 1.00 3,000.00 3,000.00

    EQUIPOSTRACTOR D-9PAYLOADER

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    REMOCIN DE LA CAPA VEGETAL, HASTA UNA PROFUNDIDAD DE0.20 M

    UND 1.00 1.00 3,000.00 3,000.00 UND 1.00 1.00 1,200.00 1,200.00 UND 1.00 1.00 300.00 300.00

    -

    TOTAL EQUIPOS Bs.: 9,400.00 COSTO UNITARIO EQUIPOS Bs.: 117.50

    CANT SALARIO TOTAL2.00 79.34 158.68 4.00 79.22 316.88 0.25 79.37 19.84 1.00 79.34 79.34

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 574.74 651% PRESTACIONES SOCIALES 3,741.57

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,316.32 COSTO UNITARIO DE MANO DE OBRA Bs.: 53.95

    COSTO DIRECTO POR UNIDAD Bs.: 171.45 22% ADMINISTRACION 37.72

    SUB TOTAL 209.17 14% UTILIDAD 29.28

    PRECIO UNITARIO Bs.: 238.46

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRAOPERADOR DE EQUIPOOBRERO CAPORAL

    GASTOS MEDICOS

    CHOFER

    PAYLOADERCAMION VOLTEOEQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,2DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 40.00

    RENDIMIENTO: 5.000000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 300.00 300.00 UND 1.00 1.00 1,200.00 1,200.00

    EQUIPOSEQUIPOS VARIOSCAMION VOLTEO

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    EXCAVACIN A MANO DESDE 0,00 MTS HASTA 1,50 MTS. DEPROFUNDIDAD INCLUYE CONFORMACIN DEL FONDO,

    UND 1.00 1.00 1,200.00 1,200.00 UND 0.50 1.00 3,000.00 1,500.00

    - -

    -

    TOTAL EQUIPOS Bs.: 3,000.00 COSTO UNITARIO EQUIPOS Bs.: 600.00

    CANT SALARIO TOTAL0.25 79.37 19.84 5.00 79.22 396.10 1.00 79.34 79.34

    -

    -

    TOTAL MANO DE OBRA Bs.: 495.28 651% PRESTACIONES SOCIALES 3,224.29

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,719.57 COSTO UNITARIO DE MANO DE OBRA Bs.: 743.91

    COSTO DIRECTO POR UNIDAD Bs.: 1,343.91 22% ADMINISTRACION 295.66

    SUB TOTAL 1,639.58 14% UTILIDAD 229.54

    PRECIO UNITARIO Bs.: 1,869.12

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL OBRERO CHOFER

    GASTOS MEDICOS

    CAMION VOLTEOPAYLOADER

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,3DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 90.00

    RENDIMIENTO: 70.000000

    MATERIALES UND CANTIDAD COSTO TOTAL

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 2,900.00 2,900.00 UND 0.50 1.00 3,000.00 1,500.00

    EQUIPOSRETROEXCAVADORAPAYLOADER

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    EXCAVACIN EN TIERRA CON USO DE EQUIPO RETROEXCAVADORPARA ASIENTO DE FUNDACIONES, ZANJAS MOVIMIENTO DE

    UND 0.50 1.00 3,000.00 1,500.00 UND 0.50 1.00 1,200.00 600.00 UND 1.00 1.00 300.00 300.00

    -

    TOTAL EQUIPOS Bs.: 5,300.00 COSTO UNITARIO EQUIPOS Bs.: 75.71

    CANT SALARIO TOTAL1.00 79.34 79.34 4.00 69.22 276.88 0.25 79.37 19.84 1.50 79.34 119.01

    -

    -

    TOTAL MANO DE OBRA Bs.: 495.07 651% PRESTACIONES SOCIALES 3,222.92

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,717.99 COSTO UNITARIO DE MANO DE OBRA Bs.: 53.11

    COSTO DIRECTO POR UNIDAD Bs.: 128.83 22% ADMINISTRACION 28.34

    SUB TOTAL 157.17 14% UTILIDAD 22.00

    PRECIO UNITARIO Bs.: 179.17

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACHOFEROBRERO CAPORAL

    GASTOS MEDICOS

    OPERADOR DE EQUIPOS

    PAYLOADERCAMION VOLTEOEQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,4DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 1,170.00

    RENDIMIENTO: 200.000000

    MATERIALES UND CANTIDAD COSTO TOTALM3 1 16 16.00

    -

    -

    -

    -

    TOTAL MATERIALES Bs.: 16.00 COSTO UNITARIO MATERIALES Bs.: 16.00

    UND CANT DEPREC. PRECIO TOTALUND 0.50 1.00 1,500.00 750.00

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    CONSTRUCCIN DE TERRAPLENES PARA TERRAZAS DESUBESTACIN Y VIALIDAD. INCLUYE MATERIAL DE PRSTAMO,

    MATERIAL DE PRESTAMO

    EQUIPOSCAMION CISTERNA UND 0.50 1.00 1,500.00 750.00 TRACTOR D-9 UND 1.00 1.00 4,900.00 4,900.00 PAYLOADER UND 1.00 1.00 3,000.00 3,000.00 COMPACTADORA DE SUELO UND 1.00 1.00 3,000.00 3,000.00 CAMION VOLTEO UND 2.00 1.00 1,200.00 2,400.00 EQUIPOS VARIOS UND 1.00 1.00 300 300.00

    TOTAL EQUIPOS Bs.: 14,350.00 COSTO UNITARIO EQUIPOS Bs.: 71.75

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 3.00 79.34 238.02 5.00 79.22 396.10

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 733.30 651% PRESTACIONES SOCIALES 4,773.80

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 5,507.10 COSTO UNITARIO DE MANO DE OBRA Bs.: 27.54

    COSTO DIRECTO POR UNIDAD Bs.: 115.29 22% ADMINISTRACION 25.36

    SUB TOTAL 140.65 14% UTILIDAD 19.69

    PRECIO UNITARIO Bs.: 160.34

    OBRERO

    CAMION CISTERNA

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL CHOFER OPERADOR DE EQUIPOS

    GASTOS MEDICOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,5DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 12.30

    RENDIMIENTO: 30.000000

    MATERIALES UND CANTIDAD COSTO TOTALM3 1 320 320.00

    -

    -

    -

    -

    TOTAL MATERIALES Bs.: 320.00 COSTO UNITARIO MATERIALES Bs.: 320.00

    UND CANT DEPREC. PRECIO TOTALUND 3.00 1.00 1,200.00 3,600.00 UND 2.00 1.000 300.00 600.00

    EQUIPOSCAMION VOLTEOEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE PIEDRA PICADA N1, PARA APOYO DE FUNDACIONES.

    PIEDRA PICADA

    UND 2.00 1.000 300.00 600.00

    - -

    -

    TOTAL EQUIPOS Bs.: 4,200.00 COSTO UNITARIO EQUIPOS Bs.: 140.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 5.00 79.22 396.10

    -

    -

    TOTAL MANO DE OBRA Bs.: 653.96 651% PRESTACIONES SOCIALES 4,257.30

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,911.26 COSTO UNITARIO DE MANO DE OBRA Bs.: 163.71

    COSTO DIRECTO POR UNIDAD Bs.: 623.71 22% ADMINISTRACION 137.22

    SUB TOTAL 760.92 14% UTILIDAD 106.53

    PRECIO UNITARIO Bs.: 867.45

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL CHOFER OBRERO

    GASTOS MEDICOS

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,6DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 11.20

    RENDIMIENTO: 30.000000

    MATERIALES UND CANTIDAD COSTO TOTALM3 1 320 320.00

    -

    -

    -

    TOTAL MATERIALES Bs.: 320.00 COSTO UNITARIO MATERIALES Bs.: 320.00

    UND CANT DEPREC. PRECIO TOTALUND 3.00 1.00 1,200.00 3,600.00 UND 2.00 1.000 300.00 600.00

    EQUIPOSCAMION VOLTEOEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE PIEDRA PICADA DE2", COMO BASE DE PISO PARA S/E ELCTRICA.

    PIEDRA PICADA

    UND 2.00 1.000 300.00 600.00 -

    - -

    -

    TOTAL EQUIPOS Bs.: 4,200.00 COSTO UNITARIO EQUIPOS Bs.: 140.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 5.00 79.22 396.10

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 653.96 651% PRESTACIONES SOCIALES 4,257.30

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,911.26 COSTO UNITARIO DE MANO DE OBRA Bs.: 163.71

    COSTO DIRECTO POR UNIDAD Bs.: 623.71 22% ADMINISTRACION 137.22

    SUB TOTAL 760.92 14% UTILIDAD 106.53

    PRECIO UNITARIO Bs.: 867.45

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL CHOFER OBRERO

    GASTOS MEDICOS

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-2,7DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 1,170.00

    RENDIMIENTO: 40.000000

    MATERIALES UND CANTIDAD COSTO TOTALM3 1 15 15.00 M3 1 3 3.00

    -

    -

    TOTAL MATERIALES Bs.: 18.00 COSTO UNITARIO MATERIALES Bs.: 18.00

    UND CANT DEPREC. PRECIO TOTAL1.00 1.00 3,000.00 3,000.00 1.00 1.000 1,200.00 1,200.00

    EQUIPOSCOMPACTADORA DE SUELOCAMION VOLTEO

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COMPACTACIN DE RELLENO CONAPISONADORES DE PERCUSIN CORRESPONDIENTES A LOS

    MATERIAL DE PRESTAMOAGUA

    1.00 1.000 1,200.00 1,200.00 1.00 1.00 1,500.00 1,500.00

    1 1 4,900.00 4,900.00 1 1 300 300.00

    TOTAL EQUIPOS Bs.: 10,900.00 COSTO UNITARIO EQUIPOS Bs.: 272.50

    CANT SALARIO TOTAL0.25 79.37 19.84 2.00 79.34 158.68 2.00 79.34 158.68 4.00 79.22 316.88

    -

    -

    TOTAL MANO DE OBRA Bs.: 654.08 651% PRESTACIONES SOCIALES 4,258.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,912.16 COSTO UNITARIO DE MANO DE OBRA Bs.: 122.80

    COSTO DIRECTO POR UNIDAD Bs.: 413.30 22% ADMINISTRACION 90.93

    SUB TOTAL 504.23 14% UTILIDAD 70.59

    PRECIO UNITARIO Bs.: 574.82

    IMPLEMENTOS DE SEGURIDAD

    EQUIPOS VARIOS

    MANO DE OBRACAPORAL CHOFER OPERADOR DE EQUIPO

    GASTOS MEDICOS

    OBRERO

    CAMION VOLTEOCAMION CISTERNATRACTOR D-9

  • ANALISIS DE PRECIOS

    PARTIDA: C-2,8DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3 x KMCANTIDAD: 23,400.00

    RENDIMIENTO: 1,100.000000

    UND CANTIDAD % DESPER. COSTO TOTAL

    -

    -

    -

    -

    -

    TOTAL MATERIALES Bs.: - COSTO UNITARIO MATERIALES Bs.: -

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 3,000.00 3,000.00 UND 3.00 1.00 1,200.00 3,600.00 UND 0.25 1.00 800.00 200.00 UND 1.00 1.00 300.00 300.00

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    CARGA, TRANSPORTE Y BOTE DE MATERIAL, PROVENIENTE DE EXCAVACIONES,HASTA UNA DISTANCIAS DE 20 KM.

    EQUIPOS

    MATERIALES

    PAYLOADERCAMION VOLTEOCAMIONETA PICK-UPEQUIPOS VARIOS UND 1.00 1.00 300.00 300.00

    -

    TOTAL EQUIPOS Bs.: 7,100.00 COSTO UNITARIO EQUIPOS Bs.: 6.45

    CANT SALARIO TOTAL1.00 79.34 79.34 3.00 79.34 238.02 2.00 79.22 158.44 0.25 69.37 17.34

    -

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 493.14 651% PRESTACIONES SOCIALES 3,210.36

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,703.50 COSTO UNITARIO DE MANO DE OBRA Bs.: 3.37

    COSTO DIRECTO POR UNIDAD Bs.: 9.82 22% ADMINISTRACION 2.16

    SUB TOTAL 11.98 14% UTILIDAD 1.68

    PRECIO UNITARIO Bs.: 13.66

    MANO DE OBRA

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CHOFEROBREROCAPORAL

    OPERADOR DE EQUIPO

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,1DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 10.25

    RENDIMIENTO: 5.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    -

    -

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210 Kg/cm. FUNDACIONES, PEDESTALES Y VIGAS DE RIOSTRA EN

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERACLAVOS

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 300.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,339.22

    COSTO DIRECTO POR UNIDAD Bs.: 3,356.59 22% ADMINISTRACION 738.45

    SUB TOTAL 4,095.04 14% UTILIDAD 573.31

    PRECIO UNITARIO Bs.: 4,668.35

    IMPLEMENTOS DE SEGURIDAD

    CAPORALALBAILAYUDANTE DE ALBAILOBRERO

    GASTOS MEDICOS

    MANO DE OBRA

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,2DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 1.30

    RENDIMIENTO: 5.000000

    UND CANTIDAD % DESPER. COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    -

    -

    -

    CLAVOS

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 = 210 Kg/cm.PARA COLUMNAS DE MURO CORTA FUEGO. INCLUYE ENCOFRADO,

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERA

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 300.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,339.22

    COSTO DIRECTO POR UNIDAD Bs.: 3,356.59 22% ADMINISTRACION 738.45

    SUB TOTAL 4,095.04 14% UTILIDAD 573.31

    PRECIO UNITARIO Bs.: 4,668.35

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORALALBAILAYUDANTE DE ALBAILOBRERO

    GASTOS MEDICOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,3DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 2.70

    RENDIMIENTO: 5.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    CLAVOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210 Kg/cm. PARA VIGAS DE CARGA EN MURO CORTA FUEGO.

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERA

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 300.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,339.22

    COSTO DIRECTO POR UNIDAD Bs.: 3,356.59 22% ADMINISTRACION 738.45

    SUB TOTAL 4,095.04 14% UTILIDAD 573.31

    PRECIO UNITARIO Bs.: 4,668.35

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    ALBAILAYUDANTE DE ALBAILOBRERO

    MANO DE OBRACAPORAL

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,4DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 43.09

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    CLAVOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210Kg/cm EN TRINCHERAS DE CASETA CCM (VER DETALLES EN

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERA

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 250.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,116.01

    COSTO DIRECTO POR UNIDAD Bs.: 3,083.39 22% ADMINISTRACION 678.35

    SUB TOTAL 3,761.73 14% UTILIDAD 526.64

    PRECIO UNITARIO Bs.: 4,288.38

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORALALBAILAYUDANTE DE ALBAILOBRERO

    GASTOS MEDICOS

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,5DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 203.00

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1100 1,100.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    -

    -

    TOTAL MATERIALES Bs.: 1,417.38 COSTO UNITARIO MATERIALES Bs.: 1,417.38

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.000 300.00 300.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210 Kg./cm, EN PAVIMENTO RGIDO PARA REA DE ACCESO A LA

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERACLAVOS

    UND 1.00 1.000 300.00 300.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 300.00 COSTO UNITARIO EQUIPOS Bs.: 50.00

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 1.00 79.22 79.22 6.00 79.22 475.32

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 653.72 651% PRESTACIONES SOCIALES 4,255.73

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,909.46 COSTO UNITARIO DE MANO DE OBRA Bs.: 818.24

    COSTO DIRECTO POR UNIDAD Bs.: 2,285.62 22% ADMINISTRACION 502.84

    SUB TOTAL 2,788.45 14% UTILIDAD 390.38

    PRECIO UNITARIO Bs.: 3,178.84

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORALALBAIL

    OBREROAYUDANTE DE ALBAIL

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,6DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 27.30

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    -

    -

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210 Kg./cm, EN FUNDACIONES: PARA TRANSFORMADORES.

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERACLAVOS

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 250.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,116.01

    COSTO DIRECTO POR UNIDAD Bs.: 3,083.39 22% ADMINISTRACION 678.35

    SUB TOTAL 3,761.73 14% UTILIDAD 526.64

    PRECIO UNITARIO Bs.: 4,288.38

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    OBRERO

    EQUIPOS VARIOS

    CAPORALALBAILAYUDANTE DE ALBAIL

    MANO DE OBRA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,7DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 8.61

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 24.00

    -

    -

    TOTAL MATERIALES Bs.: 1,729.38 COSTO UNITARIO MATERIALES Bs.: 1,729.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    CLAVOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28 =210 Kg./cm, LOSA DE PISO PARA CASETA DE CCM. INCLUYE

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERA

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 250.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 416.30 651% PRESTACIONES SOCIALES 2,710.13

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,126.43 COSTO UNITARIO DE MANO DE OBRA Bs.: 521.07

    COSTO DIRECTO POR UNIDAD Bs.: 2,500.45 22% ADMINISTRACION 550.10

    SUB TOTAL 3,050.55 14% UTILIDAD 427.08

    PRECIO UNITARIO Bs.: 3,477.62

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORALALBAILAYUDANTE DE ALBAIL

    GASTOS MEDICOS

    OBRERO

    EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,8DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 1.05

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    -

    -

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO RCR: 210Kg./cm, PARA FUNDACIN DE POSTES DE ALUMBRADO. INCLUYE EL

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERACLAVOS

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 250.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,116.01

    COSTO DIRECTO POR UNIDAD Bs.: 3,083.39 22% ADMINISTRACION 678.35

    SUB TOTAL 3,761.73 14% UTILIDAD 526.64

    PRECIO UNITARIO Bs.: 4,288.38

    AYUDANTE DE ALBAILOBRERO

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CAPORALALBAIL

    EQUIPOS VARIOS

    MANO DE OBRA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-3,9DESCRIPCION DE LA PARTIDA:

    UNIDAD: M3CANTIDAD: 5.47

    RENDIMIENTO: 6.000000

    UND CANTIDAD COSTO TOTALM3 1 1400 1,400.00 KG 0.025 15 0.38 M3 0.05 6100 305.00 KG 1 12 12.00

    -

    -

    TOTAL MATERIALES Bs.: 1,717.38 COSTO UNITARIO MATERIALES Bs.: 1,717.38

    UND CANT DEPREC. PRECIO TOTALUND 5.00 1.000 300.00 1,500.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE CONCRETO Rcr28:210 Kg./cm, PARA FUNDACIN DE PRTICO DE LLEGADA. INCLUYE

    MATERIALESCONCRETO Rcr28 = 210 Kg/cm.ALAMBREMADERACLAVOS

    UND 5.00 1.000 300.00 1,500.00 -

    -

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,500.00 COSTO UNITARIO EQUIPOS Bs.: 250.00

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 6.00 79.22 475.32

    -

    TOTAL MANO DE OBRA Bs.: 891.62 651% PRESTACIONES SOCIALES 5,804.46

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,696.08 COSTO UNITARIO DE MANO DE OBRA Bs.: 1,116.01

    COSTO DIRECTO POR UNIDAD Bs.: 3,083.39 22% ADMINISTRACION 678.35

    SUB TOTAL 3,761.73 14% UTILIDAD 526.64

    PRECIO UNITARIO Bs.: 4,288.38

    AYUDANTE DE ALBAILOBRERO

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CAPORALALBAIL

    EQUIPOS VARIOS

    MANO DE OBRA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-4,1DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 208.73

    RENDIMIENTO: 130.000000

    UND CANTIDAD COSTO TOTALKG 1 2.5 2.50 KG 0.25 15 3.75 KG 1 4.16 4.16

    -

    -

    TOTAL MATERIALES Bs.: 10.41 COSTO UNITARIO MATERIALES Bs.: 10.41

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 1,100.00 1,100.00

    EQUIPOSCAMION 750

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE, COLOCACIN Y PREPARACIN DEACERO DE REFUERZO = 3/8". EN INFRAESTRUCTURA

    MATERIALESACERO DE REFUERZOALAMBRETRANSPORTE

    UND 1.00 1.00 1,100.00 1,100.00 UND 5.00 1.000 300.00 1,500.00

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 2,600.00 COSTO UNITARIO EQUIPOS Bs.: 20.00

    CANT SALARIO TOTAL0.25 79.37 19.84 4.00 79.22 316.88 1.00 79.34 79.34 3.00 79.34 238.02

    -

    TOTAL MANO DE OBRA Bs.: 654.08 651% PRESTACIONES SOCIALES 4,258.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,912.16 COSTO UNITARIO DE MANO DE OBRA Bs.: 37.79

    COSTO DIRECTO POR UNIDAD Bs.: 68.20 22% ADMINISTRACION 15.00

    SUB TOTAL 83.20 14% UTILIDAD 11.65

    PRECIO UNITARIO Bs.: 94.85

    CABILLERO

    GASTOS MEDICOS

    MANO DE OBRA

    IMPLEMENTOS DE SEGURIDAD

    CAPORAL OBRERO ACHOFER A

    CAMION 750EQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-4,2DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 528.00

    RENDIMIENTO: 250.000000

    UND CANTIDAD COSTO TOTALKG 1 2.5 2.50 KG 0.25 15 3.75 KG 1 4.16 4.16

    -

    -

    -

    TOTAL MATERIALES Bs.: 10.41 COSTO UNITARIO MATERIALES Bs.: 10.41

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 1,100.00 1,100.00

    EQUIPOSCAMION 750

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE, COLOCACIN Y PREPARACIN DEACERO DE REFUERZO = 1/2" A = 7/8". EN INFRAESTRUCTURA

    MATERIALESACERO DE REFUERZOALAMBRETRANSPORTE

    UND 1.00 1.00 1,100.00 1,100.00 UND 5.00 1.000 300.00 1,500.00

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 2,600.00 COSTO UNITARIO EQUIPOS Bs.: 10.40

    CANT SALARIO TOTAL0.25 79.37 19.84 4.00 79.22 316.88 1.00 79.34 79.34 3.00 79.34 238.02

    -

    TOTAL MANO DE OBRA Bs.: 654.08 651% PRESTACIONES SOCIALES 4,258.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,912.16 COSTO UNITARIO DE MANO DE OBRA Bs.: 19.65

    COSTO DIRECTO POR UNIDAD Bs.: 40.46 22% ADMINISTRACION 8.90

    SUB TOTAL 49.36 14% UTILIDAD 6.91

    PRECIO UNITARIO Bs.: 56.27

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CABILLERO

    CAPORAL OBRERO CHOFER

    CAMION 750EQUIPOS VARIOS

    MANO DE OBRA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-4,3DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 36.34

    RENDIMIENTO: 130.000000

    UND CANTIDAD COSTO TOTALKG 1 2.5 2.50 KG 0.25 15 3.75 KG 1 4.16 4.16

    -

    -

    -

    TOTAL MATERIALES Bs.: 10.41 COSTO UNITARIO MATERIALES Bs.: 10.41

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 1,100.00 1,100.00

    EQUIPOSCAMION 750

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE, COLOCACIN Y PREPARACIN DEACERO DE REFUERZO = 3/8". EN SUPERESTRUCTURA

    MATERIALESACERO DE REFUERZOALAMBRETRANSPORTE

    UND 1.00 1.00 1,100.00 1,100.00 UND 5.00 1.00 300.00 1,500.00

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 2,600.00 COSTO UNITARIO EQUIPOS Bs.: 20.00

    CANT SALARIO TOTAL0.25 79.37 19.84 4.00 79.22 316.88 1.00 79.34 79.34 3.00 79.34 238.02

    -

    TOTAL MANO DE OBRA Bs.: 654.08 651% PRESTACIONES SOCIALES 4,258.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,912.16 COSTO UNITARIO DE MANO DE OBRA Bs.: 37.79

    COSTO DIRECTO POR UNIDAD Bs.: 68.20 22% ADMINISTRACION 15.00

    SUB TOTAL 83.20 14% UTILIDAD 11.65

    PRECIO UNITARIO Bs.: 94.85

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CABILLERO

    CAPORAL OBRERO CHOFER

    CAMION 750EQUIPOS VARIOS

    MANO DE OBRA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-4,4DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 60.83

    RENDIMIENTO: 250.000000

    UND CANTIDAD COSTO TOTALKG 1 3.5 3.50 KG 0.25 15 3.75 KG 1 4.16 4.16

    -

    -

    -

    TOTAL MATERIALES Bs.: 11.41 COSTO UNITARIO MATERIALES Bs.: 11.41

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 1,100.00 1,100.00

    EQUIPOSCAMION 750

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE, COLOCACIN Y PREPARACIN DEACERO DE REFUERZO = 1/2" A = 7/8". EN SUPERESTRUCTURA

    MATERIALESACERO DE REFUERZOALAMBRETRANSPORTE

    UND 1.00 1.00 1,100.00 1,100.00 UND 5.00 1.00 300.00 1,500.00

    -

    -

    -

    TOTAL EQUIPOS Bs.: 2,600.00 COSTO UNITARIO EQUIPOS Bs.: 10.40

    CANT SALARIO TOTAL0.25 79.37 19.84 4.00 79.22 316.88 1.00 79.34 79.34 3.00 79.34 238.02

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 654.08 651% PRESTACIONES SOCIALES 4,258.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 4,912.16 COSTO UNITARIO DE MANO DE OBRA Bs.: 19.65

    COSTO DIRECTO POR UNIDAD Bs.: 41.46 22% ADMINISTRACION 9.12

    SUB TOTAL 50.58 14% UTILIDAD 7.08

    PRECIO UNITARIO Bs.: 57.66

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL

    CABILLERO

    GASTOS MEDICOS

    CAMION 750EQUIPOS VARIOS

    OBRERO CHOFER

  • ANALISIS DE PRECIOS

    PARTIDA: CI-4,5DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 25.00

    RENDIMIENTO: 210.000000

    UND CANTIDAD COSTO TOTALM2 1 14 14.00 KG 0.25 15 3.75

    -

    -

    -

    TOTAL MATERIALES Bs.: 17.75 COSTO UNITARIO MATERIALES Bs.: 17.75

    UND CANT DEPREC. PRECIO TOTALUND 1.00 1.00 300.00 300.00

    EQUIPOSEQUIPOS VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE MALLA TIPOTRUCKSON DE 100x100x4 mm.

    MATERIALESMALLA TIPO TRUCKSON 100x100x4 mm.ALAMBRE

    UND 1.00 1.00 300.00 300.00 UND 1.00 1.00 1,100.00 1,100.00

    -

    -

    -

    -

    -

    -

    TOTAL EQUIPOS Bs.: 1,400.00 COSTO UNITARIO EQUIPOS Bs.: 6.67

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 3.00 79.22 237.66

    -

    -

    -

    -

    TOTAL MANO DE OBRA Bs.: 336.84 651% PRESTACIONES SOCIALES 2,192.84

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 2,529.69 COSTO UNITARIO DE MANO DE OBRA Bs.: 12.05

    COSTO DIRECTO POR UNIDAD Bs.: 36.46 22% ADMINISTRACION 8.02

    SUB TOTAL 44.48 14% UTILIDAD 6.23

    PRECIO UNITARIO Bs.: 50.71

    OBRERO

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    EQUIPOS VARIOS

    MANO DE OBRA

    CAMION 750

    CAPORAL CHOFER

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,1DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 440.86

    RENDIMIENTO: 200.000000

    UND CANTIDAD COSTO TOTALKG 1 18 18.00

    UND 0.25 55 13.75 KG 0.12 25 3.00

    UND 0.005 270 1.35 UND 0.003 170 0.51 UND 0.1 150 15.00

    TOTAL MATERIALES Bs.: 51.61 COSTO UNITARIO MATERIALES Bs.: 51.61

    UND CANT DEPREC. PRECIO TOTALUND 3.00 1.00 300.00 900.00

    EQUIPOSMAQUINA DE SOLDAR

    FONDO ANTICORROSIVOPINTURA ESMALTEMATERIALES VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE ESTRUCTURASMETLICAS PARA COLUMNAS EN CASETA DE CCM (VER. DETALLE

    MATERIALESPERFIL IPEA 140PERNOS DE ANCLAJEELECTRODO

    UND 3.00 1.00 300.00 900.00 UND 5.00 1.000 300.00 1,500.00 UND 1.00 1.000 1100 1,100.00 UND 2 1.000 125 250.00

    -

    -

    -

    TOTAL EQUIPOS Bs.: 3,750.00 COSTO UNITARIO EQUIPOS Bs.: 18.75

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 2.00 79.22 158.44 1.00 79.34 79.34 2.00 79.34 158.68

    -

    TOTAL MANO DE OBRA Bs.: 812.76 651% PRESTACIONES SOCIALES 5,291.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,103.85 COSTO UNITARIO DE MANO DE OBRA Bs.: 30.52

    COSTO DIRECTO POR UNIDAD Bs.: 100.88 22% ADMINISTRACION 22.19

    SUB TOTAL 123.07 14% UTILIDAD 17.23

    PRECIO UNITARIO Bs.: 140.30

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL SOLDADORAYUDANTE DE SOLDADOROBRERO

    PINTOR

    GASTOS MEDICOS

    CHOFER

    CAMION 750EQUIPO DE PINTURA

    MAQUINA DE SOLDAREQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,2DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 1,330.19

    RENDIMIENTO: 230.000000

    UND CANTIDAD COSTO TOTALKG 1 18 18.00

    UND 0.25 55 13.75 KG 0.12 25 3.00

    UND 0.005 270 1.35 UND 0.003 170 0.51 UND 0.1 150 15.00

    TOTAL MATERIALES Bs.: 51.61 COSTO UNITARIO MATERIALES Bs.: 51.61

    UND CANT DEPREC. PRECIO TOTALUND 3.00 1.00 300.00 900.00

    EQUIPOSMAQUINA DE SOLDAR

    FONDO ANTICORROSIVOPINTURA ESMALTEMATERIALES VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE ESTRUCTURASMETLICAS PARA VIGAS DE CARGA Y AMARRE EN CASETA DE

    MATERIALESPERFIL IPEA 160PERNOS DE ANCLAJEELECTRODO

    UND 3.00 1.00 300.00 900.00 UND 5.00 1.000 300.00 1,500.00 UND 1.00 1.000 1100 1,100.00 UND 2.00 1.000 125 250.00

    -

    -

    -

    TOTAL EQUIPOS Bs.: 3,750.00 COSTO UNITARIO EQUIPOS Bs.: 16.30

    CANT SALARIO TOTAL0.25 79.37 19.84 2.00 79.34 158.68 2.00 79.22 158.44 2.00 79.22 158.44 1.00 79.34 79.34 2.00 79.34 158.68

    -

    TOTAL MANO DE OBRA Bs.: 733.42 651% PRESTACIONES SOCIALES 4,774.58

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 5,508.00 COSTO UNITARIO DE MANO DE OBRA Bs.: 23.95

    COSTO DIRECTO POR UNIDAD Bs.: 91.86 22% ADMINISTRACION 20.21

    SUB TOTAL 112.07 14% UTILIDAD 15.69

    PRECIO UNITARIO Bs.: 127.76

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL SOLDADORAYUDANTE DE SOLDADOROBRERO

    PINTOR

    GASTOS MEDICOS

    CHOFER

    CAMION 750EQUIPO DE PINTURA

    MAQUINA DE SOLDAREQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,3DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 80.00

    RENDIMIENTO: 310.000000

    UND CANTIDAD COSTO TOTALKG 1 18 18.00

    UND 0.25 42 10.50 KG 0.12 25 3.00

    UND 0.005 270 1.35 UND 0.003 170 0.51 UND 0.1 150 15.00

    TOTAL MATERIALES Bs.: 48.36 COSTO UNITARIO MATERIALES Bs.: 48.36

    UND CANT DEPREC. PRECIO TOTALUND 3.00 1.00 300.00 900.00

    EQUIPOSMAQUINA DE SOLDAR

    FONDO ANTICORROSIVOPINTURA ESMALTEMATERIALES VARIOS

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE ESTRUCTURASMETLICAS EN COLUMNAS Y VIGAS PARA SOPORTES DE EQUIPOS

    MATERIALESPERFIL IPN 120PERNOS DE ANCLAJEELECTRODO

    UND 3.00 1.00 300.00 900.00 UND 5.00 1.000 300.00 1,500.00 UND 1.00 1.000 1100 1,100.00 UND 2 1.000 125 250.00

    -

    -

    TOTAL EQUIPOS Bs.: 3,750.00 COSTO UNITARIO EQUIPOS Bs.: 12.10

    CANT SALARIO TOTAL0.25 79.37 19.84 3.00 79.34 238.02 2.00 79.22 158.44 2.00 79.22 158.44 1.00 79.34 79.34 2.00 79.34 158.68

    -

    TOTAL MANO DE OBRA Bs.: 812.76 651% PRESTACIONES SOCIALES 5,291.08

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 6,103.85 COSTO UNITARIO DE MANO DE OBRA Bs.: 19.69

    COSTO DIRECTO POR UNIDAD Bs.: 80.15 22% ADMINISTRACION 17.63

    SUB TOTAL 97.78 14% UTILIDAD 13.69

    PRECIO UNITARIO Bs.: 111.47

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL SOLDADORAYUDANTE DE SOLDADOROBRERO

    PINTOR

    GASTOS MEDICOS

    CHOFER

    CAMION 750EQUIPO DE PINTURA

    MAQUINA DE SOLDAREQUIPOS VARIOS

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,4DESCRIPCION DE LA PARTIDA:

    UNIDAD: UNDCANTIDAD: 4.00

    RENDIMIENTO: 27.000000

    UND CANTIDAD COSTO TOTALUND 1 320 320.00 UND 0.25 55 13.75 KG 0.12 25 3.00

    UND 0.005 270 1.35 UND 0.003 170 0.51 UND 0.1 150 15.00

    TOTA MATERIALES Bs.: 353.61 353.61

    UND CANT DEPREC. PRECIO TOTALUND 1 1.00 800.00 800.00 UND 1.00 1.00 300.00 300.00

    COSTO UNITARIO MATERIALES Bs.:

    PINTURA ESMALTE

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE PLANCHA BASE DE200x200x6 mm. (VER. DETALLE PLANO N DC41102)

    MATERIALESPLANCHA BASE DE 200x200x6 mm. PERNO DE ANCLAJE

    EQUIPOSCAMIONETA PICK-UPMAQUINA DE SOLDAR

    ELECTRODO

    MATERIALES VARIOS

    FONDO ANTICORROSIVO

    UND 1.00 1.00 300.00 300.00 UND 3.00 1.00 300.00 900.00 UND 1.00 1.00 1100 1,100.00 UND 1 1.00 125 125.00

    -

    TOTAL EQUIPOS Bs.: 3,225.00 COSTO UNITARIO EQUIPOS Bs.: 119.44

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 1.00 79.22 79.22 2.00 79.22 158.44 1.00 79.34 79.34 1.00 79.34 79.34

    -

    TOTAL MANO DE OBRA Bs.: 495.52 651% PRESTACIONES SOCIALES 3,225.85

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,721.37 COSTO UNITARIO DE MANO DE OBRA Bs.: 137.83

    COSTO DIRECTO POR UNIDAD Bs.: 610.88 22% ADMINISTRACION 134.39

    SUB TOTAL 745.28 14% UTILIDAD 104.34

    PRECIO UNITARIO Bs.: 849.62

    IMPLEMENTOS DE SEGURIDAD

    MANO DE OBRACAPORAL SOLDADORAYUDANTE DE SOLDADOROBRERO

    PINTOR

    GASTOS MEDICOS

    MAQUINA DE SOLDAR

    CHOFER

    EQUIPO DE PINTURA

    EQUIPOS VARIOSCAMION 750

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,5DESCRIPCION DE LA PARTIDA:

    UNIDAD: UNDCANTIDAD: 12.00

    RENDIMIENTO: 27.000000

    UND CANTIDAD COSTO TOTALUND 1 320 320.00 UND 0.25 55 13.75 KG 0.12 25 3.00

    UND 0.005 270 1.35 UND 0.003 170 0.51 UND 0.1 150 15.00

    TOTAL MATERIALES Bs.: 338.61 COSTO UNITARIO MATERIALES Bs.: 338.61

    UND CANT DEPREC. PRECIO TOTALUND 1 1.00 800.00 800.00

    MATERIALES VARIOS

    EQUIPOSCAMIONETA PICK-UP

    SUBESTACIN ELCTRICA PARA LA ESTACIN DE FLUJO MOR-1, DISTRITO MORICHAL DIVISIN CARABOBO

    SUMINISTRO, TRANSPORTE Y COLOCACIN DE PLANCHA BASE DE250x250x6 mm. (VER. DETALLE PLANO N DC44101)

    MATERIALESPLANCHA BASE DE 250x250x6 mm. PERNO DE ANCLAJEELECTRODOFONDO ANTICORROSIVOPINTURA ESMALTE

    UND 1 1.00 800.00 800.00 UND 1.00 1.00 300.00 300.00 UND 3.00 1.00 300.00 900.00 UND 1.00 1.00 1100 1,100.00 UND 1 1.00 125 125.00

    -

    TOTAL EQUIPOS Bs.: 3,225.00 COSTO UNITARIO EQUIPOS Bs.: 119.44

    CANT SALARIO TOTAL0.25 79.37 19.84 1.00 79.34 79.34 1.00 79.22 79.22 2.00 79.22 158.44 1.00 79.34 79.34 1.00 79.34 79.34

    -

    TOTAL MANO DE OBRA Bs.: 495.52 651% PRESTACIONES SOCIALES 3,225.85

    -

    -

    TOTAL MANO DE OBRA DIRECTA Bs.: 3,721.37 COSTO UNITARIO DE MANO DE OBRA Bs.: 137.83

    COSTO DIRECTO POR UNIDAD Bs.: 595.88 22% ADMINISTRACION 131.09

    SUB TOTAL 726.98 14% UTILIDAD 101.78

    PRECIO UNITARIO Bs.: 828.75

    GASTOS MEDICOSIMPLEMENTOS DE SEGURIDAD

    CAPORAL SOLDADORAYUDANTE DE SOLDADOROBREROCHOFERPINTOR

    MANO DE OBRA

    CAMIONETA PICK-UPMAQUINA DE SOLDAREQUIPOS VARIOSCAMION 750EQUIPO DE PINTURA

  • ANALISIS DE PRECIOS

    PARTIDA: CI-5,6DESCRIPCION DE LA PARTIDA:

    UNIDAD: KGCANTIDAD: 12.70

    RENDIMIENTO: 310.000000

    UND CANTIDAD COSTO TOTALKG 1 18 18.00 KG 0.025 25 0.63