Hoja1

DISEO DE LINEA DE CONDUCCIN

xxxx xTRAMO (m) COTA DEL TERRENO (m.s.n.m)CAUDAL DE DISEO (lps)PENDIENTE (0/00)LONGITUD DEL TRAMO. (m) DIAMETRO (PULG) DIAMETRO COMERCIAL (PULG)VELOCIDAD (m/s) PERDIDA DE CARGACOTA PIEZOMETRICAPRESION FINAL CLASEINICIAL FINAL UNIT. (/00) TRAMO (m)

CAPTACIONCRP 14027.603985.701.87159.50262.701.27620.920.02016655235.304022.3036.60TUB-CLASE 7.5CRP 1CRP 23985.703944.951.87147.70275.901.29620.920.02016655235.563980.1435.186TUB-CLASE 7.5CRP 2RESERVORIO3944.953902.101.8791.86466.461.42920.920.02016655239.413935.5433.44TUB-CLASE 7.5

DISEO DE LINEA DE ADUCCINX

TRAMO (m) COTA DEL TERRENO (m.s.n.m)CAUDAL DE DISEO PENDIENTE (0/00)LONGITUD DEL TRAMO. (m) DIAMETRO (PULG) DIAMETRO COMERCIAL (PULG)VELOCIDAD (m/s) PERDIDA DE CARGACOTA PIEZOMETRICAPRESION FINAL ESTRUCTURAINICIAL FINAL UNIT. (/00) TRAMO (m)

RESERVORIODISTRIBUCION538.08524.270.9765.27211.501.19420.480.00598759471.27536.8112.54TUB-CLASE 7.5