Business Sectors
Power Generations Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services
Environmental Protections TotalSolutions
Thermal power plant by burning urbangarbage
Ethonol Vinasse treatment
7/31/2019 Gne Presentation 201009
3/20
Power Generation-Thermal
Steam Boiler CFB/PC/Bagasse/Biomass
Steam Turbine Condensing/Extraction/Back Pressure
Turbo Generator Direct Coupling/Gearbox, Air/Hytrogen
Cooling Total Controls
DCS/PLC, Instrumentations
7/31/2019 Gne Presentation 201009
4/20
Hydro Turbine Axial Inflow/Intrusion/Pressure
Inflow Hydro Generator
Single Shaft/Gearbox Total Controls
DCS/PLC, Instrumentations
Power Generation-Hydro
7/31/2019 Gne Presentation 201009
5/20
Business Associated with: CNIEC, CHEC GXYA China Science Group Hualan Engineering Top Brands of Manufacturers
Power Generation-Thermal
7/31/2019 Gne Presentation 201009
6/20
Sound Track
Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mwmajor boiler, turbine, generator plus auxiliaries, 3 sets
Heat and Power Plants for Sugar Mills bagasse boiler 35-85t/h, turbogenerator 3-12mw major boiler, turbine, generator plus auxiliaries, 5 sets
Heat and Power Plants for Textile, Chemical Mills CFB/PC boiler 35-120t/hturbo generator 3-15mw major boiler, turbine, generator plus auxiliaries, 2sets
Thermal Power Plants of Burning Urban Garbage CFB boiler 35-65t/h, turbogenerator 6-15mw major boiler, turbine, generator plus auxiliaries, 2 sets
Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment600t/d
Auto Controls: DCS, PLC, Instrumentations: 60 sets
Hydro Power Plant 3-10mw: major boiler, turbine, generator plus auxiliaries,2 sets
7/31/2019 Gne Presentation 201009
7/20
Typical Thermal Power Plant
Huaxing Power Plant, Baise, China Boiler 1*220t/h CFB, 9.81MPa, 540 Turbo Generator: 1*50MW, 9.0MPa,
500 Completion: Dec., 2004 Notes: Second hand turbo generator,
made in 1959
Total Plant
Turbo Generator
Control Room DCS Operator Station Feed Pumps
7/31/2019 Gne Presentation 201009
8/20
Captive Power Plant (1)
Deyongjia Garment Plant, Dongguan,China
Boiler 4 75t/h, CFB, 3.98MPa, 450 Turbine 15MW 3.5MPa 435 DCS BTG synchronized auto controls
Date of Completion: May, 2001
Total Plant
TG Set
Control Room Power Panels Coal Conveying
7/31/2019 Gne Presentation 201009
9/20
1 2 3 4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China Honeywell HC-900 DCS system
All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber
flow meters
Captive Power Plant (2)
7/31/2019 Gne Presentation 201009
10/20
Power Plant Burning Garbage
Dongguan Garbage Power Plant, 2 151 12mw, 1200t/d garbage handling,Guangdong, China
Ningbo Garbage Power Plant, 2 15mw, 800t/dgarbage handling, Zhejiang, China
Boiler 65t/h CFB, 3.98MPa 450 Turbo Generator 15mw, 3.5MPa, 435 Date of Completion Dongguan-March, 2005,
Ningbo-Dec., 2005
Dongguan Plant
Ningbo Plant
Control Room CFB Boiler Turbo Generator
7/31/2019 Gne Presentation 201009
11/20
International Projects
AA Group, 300t/h, CFB Biomass,Thailand
Boiler 300t/h, CFB, 9.8MPa, 540 Date of Completion under construction,
to commissioning in Oct. 2008
Signing Ceremony
Technical AgreementSigning
Site Survey Site Survey China Representatives
7/31/2019 Gne Presentation 201009
12/20
International Projects
SSYPL, 2*35t/h, CFB 2*7.5MW STG, India
2009.04.25 Signing of contract with SSYPL
Signing Ceremony
7/31/2019 Gne Presentation 201009
13/20
Lhoknga 2 16MW Power Plant EP Project , Indonesia Boiler 75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 15MW, 3.5MPa, 435 Associated with CHEC, 2006
Used plant package supplied to Indonesia, 2008 . Boiler: 2 75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 2 15MW, 3.5MPa, 435
HFO DG Sets, 4 10MW, 2008, package supplied to Indonesia 4 10MW, HFO DG Sets Associated with GD Imp/Exp Corp.
International Projects
7/31/2019 Gne Presentation 201009
14/20
International Projects
India KPPL 2 25MW thermal power plant EP Project Boiler 2 130t/h, PC Boiler, 3.9MPa, 450 Steam turbine and generator 2 25MW, 3.5MPa, 435
Contract Signing
7/31/2019 Gne Presentation 201009
15/20
SSYPL, Surat, India
- Boiler: CFB, 2x35t/h, 3.82MPa, 450
- TG: 2x7.5MW, 3.82MPa, 435
Typical International Projects
7/31/2019 Gne Presentation 201009
16/20
DCS Applications
Typical DCS installed
XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell
7/31/2019 Gne Presentation 201009
17/20
Typical PLC installed
S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi
PLC Applications
7/31/2019 Gne Presentation 201009
18/20
Drum leveler
PressureTransmitters
TempratureProbe
Generator Hydrogen
Cooling
50MW TurboGenerator
IndustrialMonitors
Speed Sensors
Sony Video Camera
Installed Instrumentations
7/31/2019 Gne Presentation 201009
19/20
1 2 3 4 Boiler auto controls, Baiganhua, Baise, China
Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls
EJA series pressure transmitters, ZKZ series control valves ,Wayleber flow meters
Typical Projects
7/31/2019 Gne Presentation 201009
20/20
Guo Neng Electricals Ltd.Addr.: Rm1612, Xincheng Intl Bldg, No.92 -1,
Nanning, Guangxi, 530028 ChinaTel: 0771 5511310 5501300Fax 0771 5511852Email: [email protected]