7/23/2019 GRADERIO TARIMIAT
1/6
DIRECCIN DE OBRAS PBLICAS
INFORME N 36
OBRA: GRADERIO DE MADERA EN LA COMUNIDAD SHUAR TARIMIAT
RESPONSABLE: PEAS ISRAEL
ANEXOS DE OBRA
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
ARREGLO Y LIMPIEZA
M2
17 5 1 1
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
" M2
15 3 1 1
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
3 M3
0.4 0.4 0.8 21
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
# M3
0 1 1 0
TOTAL !
CONTRATADO =
EXCEDENTE =
REPLANTEO YNIVELACION
EXCAVACION EN
SUELO NATURAL
RELLENO
CONPACTADO
7/23/2019 GRADERIO TARIMIAT
2/6
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
$
PILARES Y VIGAS
ML
3.15 012!012 1 "
4.3 012!012 1 "
2.5 015! 010 1 18
2.5 010! 010 1 18
0.#7 010!010 1 55
1.5 010!010 1 18
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
6 ML
3." 1 1 "
3 1 1 18
1.5 1 1 "
1.75 1 1 "
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
%
TA$LONES
U
2.5 025!00# 1 72
TOTAL !
CONTRATADO =
EXCEDENTE =
No. RUBRO UNIDAD LARGO (M) ANCHO (M) ALTO (M) No. PIEZAS
&
CU$IERTA DE ZING
M2
18 4 1 1
TOTAL !
CONTRATADO =
EXCEDENTE =
ELA$ORADO POR%
VARENGAS&CORREAS&
TI'ERAS&TENSORES
FECHA DE INS
7/23/2019 GRADERIO TARIMIAT
3/6
S). ISRAEL PEAS
TECNICO DEL GADDP'
7/23/2019 GRADERIO TARIMIAT
4/6
SUB TOTAL OBSERACIONES
85.00
0.00
0.00
&$.
SUB TOTAL OBSERACIONES
45.00
#$.
SUB TOTAL OBSERACIONES
2.#"
".6*
SUB TOTAL OBSERACIONES
0.00
0.00
.
7/23/2019 GRADERIO TARIMIAT
5/6
SUB TOTAL OBSERACIONES
28.35 PILARES
38.7
45 VIGAS
45
3#.85
27
"".*
SUB TOTAL OBSERACIONES
35.1 VARENGAS
54 TI'ERAS
13.5 CORREAS
15.75 TENSORES
&.3$
SUB TOTAL OBSERACIONES
72
0
%".
SUB TOTAL OBSERACIONES
72
0
%".
PECCIN: 08(04(2015
7/23/2019 GRADERIO TARIMIAT