HOJA DE METRADOSOBRA: CONSTRUCCION DE SANAMIENTO BASICO INTEGRAL DEL C.P. AMBATO Y CASTILLA PATA - YAULI HVCA.

FECHA MAYO DEL 2008ITEM PARTIDAS LARGO ANCHO ALTO N. V.

1.00.00 TRABAJOS PRELIMINARES

1.01.00 LIMPIEZA DE TERRENO M2 AREA CAD = 45.36 1.00

1.02.00 TRAZO Y REPLANTEO M2 AREA CAD = 45.36 1.00

2.00.00 MOVIMIENTO DE TIERRAS

2.01.00 EXCAVACION MASIVA MANUAL M3 AREA CAD = 45.36 0.50

2.02.00 ELIMINACION MATERIAL EXCEDENTE + 20 % DE ESPONJ. M3 22.68 1.20

2.03.00 REFINE, NIVELAC. Y COMPAC. EN TERRENO NORMAL M2 45.36 1.00

3.00.00 OBRAS DE CONCRETO SIMPLE

3.01.00 CONCRETO PARA SOLADOS M3 45.36 1.00

4.00.00 OBRAS DE CONCRETO ARMADO

4.01.00 CONCRETO F'C=175 KG/CM2. M3 45.36 0.25 1.00

1.60 0.99 0.10 1.00

1.40 1.05 0.15 1.00

1.10 1.05 0.15 2.00

22.61 2.50 0.20 1.00

0.35 41.85 1.00

1.10 0.75 0.05 1.00

EN VIGA 21.99 0.25 0.25 1.00

4.02.00 ENCOFRADO Y DESENCOFRADO M2 22.62 2.50 2.00

AREA CAD 36.31 1.00

3.45 1.05 2.00

22.93 0.25 2.00

1.00 1.40 1.00

4.03.00 ACERO FY=4200KG/CM2 KG N. Varri. Long Peso N. V.

114.00 3.30 1.02 2.00

114.00 3.95 0.56 1.00

114.00 3.80 0.56 1.00

16.00 19.12 0.56 1.00

34.00 22.88 0.56 1.00

1.72 112.00 1.02 1.00

25.00 5.60 0.56 2.00

4.00 1.34 1.02 1.00

153.00 0.95 0.56 1.00

114.00 0.70 1.02 1.00

57.00 7.70 0.56 1.00

1.00 171.48 0.56 1.00

114.00 0.70 1.02 1.00

1.00 130.00 0.56 2.00

5.00.00 REVOQUESY ENLUCIDOS

5.01.00 TARRAJEO CON IMPERMEABILIZANTE M2 AREA CAD 36.31 1.00

21.36 2.75 2.00

5.02.00 TARRAJEO DE MUROS DE CEMENTO-ARENA M2 22.93 2.75 1.00

3.43 1.05 1.00

41.85 1.00

6.00.00 PINTURA

6.01.00 PINTURA EN EXTERIORES M2 22.93 2.75 1.00

3.43 1.05 1.00

41.85 1.00

7.00.00 SUMINISTRO E INSTALACION DE ACCESORIOS

7.01.00 SUMINISTRO Y COLOCACION DE HIPOCLORADOR UND 1.00

7.02.00 SUMINISTRO E INST. DE ACCESORIOS EN RESERVORIO GLB 1.00

8.00.00 OTROS

8.01.00 ESCALERA DE GATO SEGUN DISEÑO h=1.20M UND 1.00

8.02.00 TAPA METALICA SEGUN DISEÑO UND 2.00

9.00.00 PRUEBA HIDRAULICA

9.01.00 PRUEBA HIDRAULICA GLB 1.00

FORMULA: RESERVORIO DE 85.00 M3.

Page 2: Metrado Reservorio de 85 m3

HOJA DE METRADOSCONSTRUCCION DE SANAMIENTO BASICO INTEGRAL DEL C.P. AMBATO Y CASTILLA PATA - YAULI HVCA.

PARC. TOTAL

45.36 45.36

45.36 45.36

22.68 22.68

27.22 27.22

45.36 45.36

45.36 45.36

11.34 39.43

0.16

0.22

0.35

11.31

14.65

0.04

1.37

113.10 169.52

36.31

7.25

11.47

1.40

Parcial Total

767.45 2959.50

252.17

242.59

171.32

435.64

196.49

156.80

5.45

81.40

81.40

245.78

96.03

81.40

145.60

36.31 153.79

117.48

63.06 108.51

3.60

41.85

63.06 108.51

3.60

41.85

1.00 1.00

1.00 1.00

1.00 1.00

2.00 2.00

1.00 1.00