ZAPATA CUADRADA
ZAPATA AISLADA-CUADRADA PARA ESTRUCTURAS DE 10 PISOS1) DATOSTL Columna100cmb40S Columna40cm100D (Muerta)300Tn300,000.00KgCOLUMNAL1 (Viva)60Tn60,000.00KgPu=456Tn
Cap. Port. Terreno2.00Kg/cm2Wconcreto2400Kg/m3He0.00Wsuelo1600Kg/m2S/C0.00Kg/m2H2H-TOTAL0.80m0.800.00H1- ZAPATA 0.80mH20.00mH10.80He0.00md0.70m
2) CALCULOZAPATAARTIFICIO= BAJAR LA CAPACIDAD PORTANTETTerreno
=1.808
ooooo: Terreno = 4kg/cm2-(hzapata*2400*10^-4+ hsuelo*1600*10^-4)=
3.068 kg/cm2Kg/cm21.65Area =D + L=199115.04cm2b100 terrenoREDONDEAR
AL DECIMO403.70L =446.22400cm1.65T430.00
ooooo: RAIZ(AREA)+(T-b)/2RAIZ(AREA) - (T-b)/2cmb370.00cm
4.30Pu =1.2 D + 1.6 L=456Tnqu =1.2 D + 1.6 L=28.66Tn/m2T x S28.66Tn/m2
3) CHEQUEO POR PUNZONAMIENTOPERIMETRO DEL PUNZON vu =373
ooooo: Vu=qu tn/m2*(AreaZapata-AreaPunzon)colocar todo en mtsTnvn
=498
ooooo: Vn=Vu/0.75 Tn1.70vc 1 =731
ooooo: Vc= 1.06*Raiz(210)*b0*db0= perimetro del punzntodo en cmuego
dividir entre mil para convertir a toneladaTnc2+d
ooooo: Vc= 0.53*(1+2/Bc)* Raiz(210)*b0*db0= Perimetro del punzntodo
en cmluego dividir entre mil para convertir a toneladaBc= Lado
Mayor de columna/Lado Menor de
Columna3.70c1S=1.70c240.001.70100.00
Vn1 < Vc1Okc1+d
ooooo: C1= LADO MAYOR DE COLUMNAC2=LADO MENOR DE COLUMNAPERIMETRO
DEL PUNZON= 2C1*d+2C2*dC1+d = 2*100*80=180
1.70
T=4.30RESULTANTE=qu
Vu4.30
3.70
RESULTANTE=qu
4) CHEQUEO POR CORTE TOMANDO 1 METRO EN AMBAS DIRECCIONES
vu 1 =27.23Tnvn 1 =36.30Tnvc 1 =53.76TnVv0.95Vn1 < Vc1OkAREA DE CORTE1.001.00
1.65100
403.701.000.700.951.65
4.301.65
5) CALCULO DE ACERO
INGRESE= (T+L)/2=1.65CALCULO ACEROMu =39.01
ooooo: Mu=( Wu*L*L/2)TnMn =43.35
ooooo: Mn= Mu/0.90Tn-mPRIMER TANTEO5%dAsumir a =3.50
ooooo: 5% DE "d"cmCalculo As =15.12
ooooo: As=( Mn*10^5)/(Fy*(d-a/2))se multiplica por 10^5 para
convertir a kgscm21mtsVerificacion a =3.56
ooooo: a= (As*Fy )/(0.85*F'c*b)cmSEGUNDO TANTEOAsumir a
=3.56cmCalculo As =15.13cm2Verificacion a =3.56cm1.65
ACERO DE TEMPERATURAAs =14.40
ooooo: As= 0.0018*100*HZAPATAtodo en cmcm2UBICACIN DE LA ZAPATASE
TOMA EL MAYOR15.13cm2
Para 1" =5.07cm2s=30Espaciamiento =0.34mts34cms=40
s=20
1.65Mu-= (Wu*L)/2
ZAPATA RECTANGULAR TOMANDO 1 mt
ZAPATA AISLADA-RECTANGULAR PARA ESTRUCTURAS DE 10 PISOS1) DATOSTL Columna100cmb40S Columna40cmBc2.5Cm100D (Muerta)300Tn300,000.00KgCOLUMNAL1 (Viva)60Tn60,000.00KgPu=456Tn
Cap. Port. Terreno2.00Kg/cm2Wconcreto2400Kg/m3He0.25Wsuelo1600Kg/m2S/C0.00Kg/m2H2H-TOTAL2.50m2.501.60H1- ZAPATA 0.90mH21.60mH10.90He0.25md0.80m
2) CALCULOZAPATAARTIFICIO= BAJAR LA CAPACIDAD PORTANTETTerreno
=1.468
ooooo: Terreno = 4kg/cm2-(hzapata*2400*10^-4+ hsuelo*1600*10^-4)=
3.068 kg/cm2Kg/cm22.15Area =D + L=245231.61cm2b100 terrenoREDONDEAR
AL DECIMO404.70L =495.21500.00cm2.15T530.00
ooooo: RAIZ(AREA)+(T-b)/2RAIZ(AREA) - (T-b)/2cmb470.00cm
5.30Pu =1.2 D + 1.6 L=456Tnqu =1.2 D + 1.6 L=18.306Tn/m2T x S18.31Tn/m2
3) CHEQUEO POR PUNZONAMIENTOPERIMETRO DEL PUNZON vu
=416.55
ooooo: Vu=qu tn/m2*(AreaZapata-AreaPunzon)colocar todo en mtsTnvn
=555.40
ooooo: Vn=Vu/0.75 Tn1.80vc 1 =737.32
ooooo: Vc= 1.06*Raiz(210)*b0*db0= perimetro del punzntodo en cmuego
dividir entre mil para convertir a toneladaTnMenor de Vc1 y
Vc2c2+dvc 2 =663.59
ooooo: Vc= 0.53*(1+2/Bc)* Raiz(210)*b0*db0= Perimetro del punzntodo
en cmluego dividir entre mil para convertir a toneladaBc= Lado
Mayor de columna/Lado Menor de ColumnaTn663.594.70c1INGRESE
s40
ooooo: COLOCAR SEGN LA UBICACIN EN EL PLANOs=20s=30s=40
(s*d)/(2*b0)=2.67S=1.20c240.001.20vc 3 =1,351.76
ooooo: Vc= 0.53*(1+(s*d)/(2*b0))*Raiz(210)*b0*d)todo en cmluego
dividir entre mil para convertir a toneladaTn100.00
SE TOMA EL MENOR663.59Tnc1+d
ooooo: C1= LADO MAYOR DE COLUMNAC2=LADO MENOR DE COLUMNAPERIMETRO
DEL PUNZON= 2C1*d+2C2*dC1+d = 2*100*80=180
1.80Vn1 < Vc1Ok
T=5.30RESULTANTE=qu
Vu5.30
4.70
RESULTANTE=qu
4) CHEQUEO POR CORTE TOMANDO 1 METRO EN AMBAS DIRECCIONES
vu 1 =24.72Tnvn 1 =32.96Tnvc 1 =61.44TnVv1.35Vn1 < Vc1OkAREA DE CORTE1.001.00
2.15100
404.701.000.801.352.15
5.302.15
5) CALCULO DE ACERO
INGRESE= (T+L)/2=2.15CALCULO ACEROMu =42.32
ooooo: Mu=( Wu*L*L/2)TnMn =47.02
ooooo: Mn= Mu/0.90Tn-mPRIMER TANTEO5%dAsumir a =4.00
ooooo: 5% DE "d"cmCalculo As =14.35
ooooo: As=( Mn*10^5)/(Fy*(d-a/2))se multiplica por 10^5 para
convertir a kgscm21mtsVerificacion a =3.38
ooooo: a= (As*Fy )/(0.85*F'c*b)cmSEGUNDO TANTEOAsumir a
=3.38cmCalculo As =14.30cm2Verificacion a =3.36cm2.15
ACERO DE TEMPERATURAAs =16.20
ooooo: As= 0.0018*100*HZAPATAtodo en cmcm2UBICACIN DE LA ZAPATASE
TOMA EL MAYOR16.20cm2
Para 1" =5.07cm2s=30Espaciamiento =0.31mts31cms=40
s=20
2.15Mu-= (Wu*L)/2
ZAPATA RECTANGULAR 4 LADOS
ZAPATA AISLADA-RECTANGULAR PARA ESTRUCTURAS DE 10 PISOS1) DATOSTL Columna100cmb40S Columna40cmBc2.5Cm100D (Muerta)300Tn300,000.00KgCOLUMNAL1 (Viva)60Tn60,000.00KgPu=456Tn
Cap. Port. Terreno2.00Kg/cm2Wconcreto2400Kg/m3He0.25Wsuelo1600Kg/m2S/C0.00Kg/m2H2H-TOTAL2.50m2.501.60H1- ZAPATA 0.90mH21.60mH10.90He0.25md0.80m
2) CALCULOZAPATAARTIFICIO= BAJAR LA CAPACIDAD PORTANTETTerreno
=1.468
ooooo: Terreno = 4kg/cm2-(hzapata*2400*10^-4+ hsuelo*1600*10^-4)=
3.068 kg/cm2Kg/cm22.15Area =D + L=245231.61cm2b100 terrenoREDONDEAR
AL DECIMO404.70L =495.21500.00cm2.15T530.00
ooooo: RAIZ(AREA)+(T-b)/2RAIZ(AREA) - (T-b)/2cmb470.00cm
5.30Pu =1.2 D + 1.6 L=456Tnqu =1.2 D + 1.6 L=18.306Tn/m2T x S18.31Tn/m2
3) CHEQUEO POR PUNZONAMIENTOPERIMETRO DEL PUNZON vu
=416.55
ooooo: Vu=qu tn/m2*(AreaZapata-AreaPunzon)colocar todo en mtsTnvn
=555.40
ooooo: Vn=Vu/0.75 Tn1.80c1+dvc 1 =737.32
ooooo: Vc= 1.06*Raiz(210)*b0*db0= perimetro del punzntodo en cmuego
dividir entre mil para convertir a toneladaTnMenor de Vc1 y Vc2vc 2
=663.59
ooooo: Vc= 0.53*(1+2/Bc)* Raiz(210)*b0*db0= Perimetro del punzntodo
en cmluego dividir entre mil para convertir a toneladaBc= Lado
Mayor de columna/Lado Menor de ColumnaTn663.594.70c1INGRESE
s20
ooooo: COLOCAR SEGN LA UBICACIN EN EL PLANOs=20s=30s=40
(s*d)/(2*b0)=1.33S=1.20c240.001.20vc 3 =860.21
ooooo: Vc= 0.53*(1+(s*d)/(2*b0))*Raiz(210)*b0*d)todo en cmluego
dividir entre mil para convertir a toneladaTnc2+d100.00c2+d
SE TOMA EL MENOR663.59Tnc1+d
ooooo: C1= LADO MAYOR DE COLUMNAC2=LADO MENOR DE COLUMNAPERIMETRO
DEL PUNZON= 2C1*d+2C2*dC1+d = 2*100*80=1801.80Vn1 < Vc1Ok
T=5.30RESULTANTE=qu
Vu5.30
4.70
4) CHEQUEO POR CORTE
RESULTANTE=quCHEQUEO POR CORTETOMANDO LADO MAYORvu 1
=131.01
ooooo: Vu=qu tn/m2*(T*((T-L)/2-d))todo en mtsTnvn 1 =174.68
ooooo: Vn1=Vu1/*0.75Tnvc 1 =325.65
ooooo: Vc1=0.53*Raiz(210)*b*dtodo en cmTn
Vn1 < Vc1OkVu5.30
1.35
RESULTANTE=quCHEQUEO POR CORTETOMANDO LADO MENORvu 1
=116.18
ooooo: Vu=qu tn/m2*(T*((T-L)/2-d))todo en mtsTnvn 1 =154.91
ooooo: Vn1=Vu1/0.75Tnvc 1 =288.78
ooooo: Vc1=0.53*Raiz(210)*b*dtodo en cmTn
Vn1 < Vc1OkVu4.70
1.35AREA DE CORTE
2.151.00
0.40d4.70d2.150.801.351.35
5.302.15
5) CALCULO DE ACERO
INGRESE= (T+L)/2=2.15CALCULO ACEROMu =42.32
ooooo: Mu=( (Wu*L^2)/2)TnMn =47.02
ooooo: Mn= Mu/0.90Tn-mPRIMER TANTEO5%dAsumir a =4.00
ooooo: 5% DE "d"cmCalculo As =14.35
ooooo: As=( Mn*10^5)/(Fy*(d-a/2))se multiplica por 10^5 para
convertir a kgscm21mtsVerificacion a =3.38
ooooo: a= (As*Fy )/(0.85*F'c*b)cmSEGUNDO TANTEOAsumir a
=3.38cmCalculo As =14.30cm2Verificacion a =3.36cm2.15
ACERO DE TEMPERATURAAs =16.20
ooooo: As= 0.0018*100*HZAPATAtodo en cmcm2UBICACIN DE LA ZAPATASE
TOMA EL MAYOR16.20cm2
Para 1" =5.07cm2s=30Espaciamiento =0.31mts30cms=40
s=20
2.15Mu-= (Wu*L)/2