PRECIOS
TOÑO ABARCA ahuatepec ABRIL MAT CRUZ
CLAVE MATERIAL U COSTO MARCA COSTO2 MARCA COSTO 3 MARCA COSTO MARCA COSTO MARCA ELECCION
MAT001 CEMENTO TON $2,100.00 CONSTRURAMA $2,060.00 $2,000.00 CRUZ A $2,040.00 $1,800.00
MAT002 MORTERO $1,480.00
MAT003 CAL TON $1,364.00 $940.00 $1,250.00 $1,363.64 $40.00 $1,364.00
MAT004 ARENA M3 $166.67 $620.00 $166.67 $150.00 $166.67
MAT005 GRAVA M3 $216.67 $261.67 $216.67 $200.00 $216.67
MAT006 PIEDRA M3 $166.67 $1,300.00 $166.67
MAT007 BLOCK PZA $5.50 $5.40 $5.40 $5.60 $5.00
MAT008 TABIQUE PZA $1.80 $2.20 $1.60 $1.70 $1.80
MAT009 VARILLA #2 PZA $92.60 $150.00 $155.00
MAT010 VARILLA #3 PZA $85.00 $168.00 $85.00 $84.00 $7.10
MAT011 ARMEX 10X10 M $105.00 $17.50
MAT012 ARMEX 10X15 M $17.50 $20.00 $16.67 $16.33 $17.50
MAT013 PANEL #2 $340.00
MAT014 PANEL #3 PZA $350.00 $360.00
MAT015 MALLA PISO MT $45.00 $40.00 $45.00
MAT016 MALLA LOSA MT $80.00 $77.50 $80.00
MAT017 ESTRIBOS KG $20.00 $19.00 $17.00 $17.00 $20.00
MAT018 ALAMBRE QUEMADO KG $19.00 $17.00 $16.00 $22.00
MAT019 CLAVO KG $20.00 $20.00 $20.00
MAT020 AGUA M3 $0.30
DUELA DE 10"X 2.5MTS PZA $85.00
POLIN 10X10 PZA $100.00
ACEITE QUEMADO $5.00
MICROLASTI $75.00
FESTERFELT $160.00
MANO DE OBRACLAVECUA00 PEON $180.00CUA11 ALBAÑIL $220.00CUA001 2 PEONES $360.00CUA002 PEON , ALBAÑIL $580.00
PRECIOS
CUA003 CABO DE OFICIOS $500.00
PRECIOS
OBSERVACIONES
3 mtrs3
85 12MTS
MULTIPLICAR X 6 PRECIO PZA
PRESUPUESTO
Partida No Concepto U C PU importe
preliminares1 Limpieza M2 110.00 $5.44 $598.162 Trazo M2 110.00 $2.55 $280.113 Excavacion en terreno tipo B a mano de 0 a 2 mts de profundidad. M3 88.00 $188.31 $16571.36
SUBTOTAL $17449.64
Albañilería
4 Plantilla de cimentación con concreto de 100kg/cm2 y 2cm de espesor. M2 77.00 $76.40 $5882.875 Cimentación de mampostería. M3 55.00 $923.41 $50787.686 Relleno de cepas con material producto de excavación. M3 30.80 $108.32 $3336.267 Cadena de desplante de 15X20cm con concreto de 150kg/cm2. M2 110.00 $219.75 $24172.928 Impermeavilización de cadena de desplante de 15X20cm. M 60.50 $133.21 $8058.989 Muro de tabique. M2 275.00 $124.23 $34163.13
10 Cadena de 15X20cm con concreto de 150kg/cm2. M 110.00 $105.44 $11597.9011 Castillo de 10X10 con concreto de 150kg/cm2. M 96.00 84.64596 $8126.01
subtotal $126401.84
total $143851.47
MORTEROSLOGOTIPO
CONCEPTO Elaboración de mortero cemento arena prop. 1:5UNIDAD M3
FECHACLAVE MORT001 REALIZO:TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD P.U. IMPORTE
MATERIALES
Cemento Gris TON 0.260 $2,000.00 $520.00Arena M3 1.200 $150.00 $180.00Agua M3 0.285 $0.30 $0.09
SUBTOTAL $700.09$0.00
SUBTOTAL $0.00
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.000 $0.00
SUBTOTAL $0.00C.I.
TOTAL $700.09
MORTEROSLOGOTIPO
CONCEPTO: Elaboración de mortero cemento cal-arena- prop. 1:1:8UNIDAD M3
FECHACLAVE MORT001 REALIZO:TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD P.U. IMPORTE
MATERIALES
Cemento Gris TON 0.193 $2,000.00 $385.20Cal TON 0.114 $1,250.00 $142.88Arena M3 1.192 $150.00 $178.79Agua M3 0.331 $0.30 $0.10
SUBTOTAL $706.96
MANO DE OBRA$0.00
SUBTOTAL $0.00
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.000 $0.00
SUBTOTAL $0.00C.I.
TOTAL $706.96
MANO DE OBRA
CONCRETOSLOGOTIPO
CONCEPTO: Elavoración de concreto con resistencia de 150kg/cm2.UNIDAD M3
FECHACLAVE MORT001 REALIZOTIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE
MATERIALES
MAT001 Cemento Gris TON 0.323 $2,000.00 $646.00MAT003 Grava M3 0.480 $216.67 $104.00
Arena M3 0.670 $150.00 $100.50Agua M3 0.210 $0.30 $0.06
SUBTOTAL $850.56
MANO DE OBRA$0.00
SUBTOTAL $0.00
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.000 $0.00
SUBTOTAL $0.00C.I.
TOTAL $850.56
CONCRETOSLOGOTIPO
CONCEPTO: ELABORACION CONCRETO DE RESISTENCIA DE 100 KG/CM2UNIDAD M3
FECHACLAVE CONC001 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANIDAD P.U. IMPORTE
MATERIALES
MAT001 Cemento Gris TON 0.260 $2,000.00 $520.00MAT003 Grava TON 0.680 $216.67 $147.33
Arena M3 0.500 $150.00 $75.00Agua M3 0.195 $0.30 $0.06
SUBTOTAL $742.39
MANO DE OBRA$0.00
SUBTOTAL $0.00
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.000 $0.00
SUBTOTAL $0.00
C.I.TOTAL $742.39
CIMBRASLOGOTIPO
CONCEPTO: Cimbra para dadenas y castillos con acabado común.UNIDAD M
FECHACLAVE CIMB001 REALIZO:TIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE
MATERIALES
Duela de 10" X2.5m. PZA 0.140 $85.00 $11.90Polín PZA 0.010 $100.00 $1.00Alambre quemado KG 0.129 $22.00 $2.84Clavos de 2 1/2" KG 0.050 $20.00 $1.00Aceite quemado LTS 0.020 $5.00 $0.10
SUBTOTAL $16.84MANO DE OBRA $0.00
SUBTOTAL $0.00
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.000 $0.00
SUBTOTAL $0.00C.I.
TOTAL $16.84
CUADRILLASLOGOTIPO
CONCEPTO: Cuadrilla de PeonesUNIDAD J
FECHACLAVE CUA 001 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
JOGPO000 Cuadrilla de Peones J 1.000 $306.000 $306.000
JOGPO000 Cabo de Oficio J 0.100 $680.000 $68.000
TOTAL $374.00
CUADRILLASLOGOTIPO
CONCEPTO: Cuadrilla de AlbañilesUNIDAD J
FECHACLAVE CUA 002 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
JOGPO000 Cuadrilla de Peones J 1.000 $306.000 $306.000
JOGPO000 Albañil J 1.000 $374.000 $374.000
JOGPO000 Cabo de Oficio J 0.100 $680.000 $68.000
TOTAL $748.00
MANO DE OBRA
MANO DE OBRA
MANO DE OBRACLAVE OCUPACION COSTO SDBPEO1 Peon $180.00 $306.00ALB1 Albañil $220.00 $374.00CABO1 cabo de Oficio $400.00 $680.00
LOGOTIPO
CONCEPTO: UNIDAD
FECHACLAVE CIMB001 REALIZO:TIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE
MATERIALES
MANO DE OBRA
SUBTOTAL
HERRAMIENTA
SUBTOTALC.I.
TOTAL
LIMPIEZA
LOGOTIPO
CONCEPTO: UNIDAD M2
FECHACLAVE PRE001 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD precio IMPORTE
MATERIALES $0.00SUBTOTAL $0.00
CUA001 Cuadrilla de Peones J 0.012 $360.00 $4.32
SUBTOTAL $4.32
HERRAMIENTA Medios manuales y/o herramientas % 3.00 $4.32 $0.13
CD $4.45C.I. (10%) 0.445
SUBTOTAL $4.89FINANCIADA (1%) $0.05
SUBTOTAL $4.94UTLDD. (10%) $0.49
TOTAL $5.44
TRAZO Y NIVELACIONLOGOTIPO CONCEPTO: UNIDAD M2
CLAVE PRE002 REALIZO FECHATIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
MATERIALES
MAT003 Calhidra TON 0.0002 $940.00 $0.19Barrote de 1 1/2" X 4 " X 8' PT 0.0027 $6.10 $0.02Duela de 3/4 " x 4 " x 8´ PT 0.018 $7.10 $0.13Hilo plastico M 0.350 $0.10 $0.03Varilla 1/2" TON 0.0002 $3690.00 $0.74
SUBTOTAL $1.11CUA002 Cuadrilla de Albail J 0.001 $748.00 $0.898
SUBTOTAL $0.90
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $0.027 $0.08
CD $2.08C.I. (10%) $0.21
SUBTOTAL $2.29FINANCIADA (1%) $0.02
SUBTOTAL $2.31UTLDD. (10%) $0.23
TOTAL $2.55
Limpieza y deshierbe en terreno con maleza de hasta 1 metro de altura incluye apile de hierba y material en lugar.
MANO DE OBRA
Trazo y nivelación en terreno plano por medios maniales, para desplante de estructura, estableciendo ejes auxiliares pasos y
referencias. incluye material y mano de obra.
MANO DE OBRA
EXCABACIÓNLOGOTIPO
CONCEPTO: UNIDAD M3
FECHACLAVE CIM001 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
MATERIALES $0.00SUBTOTAL $0.00
CUA000 Cuadrilla de peones J 0.400 $374.00 $149.60
SUBTOTAL $149.60
HERRAMIENTAMedios manuales y/o herramient % 3.00 $149.600 $4.49
CD $154.09C.I. (10%) $15.41
SUBTOTAL $169.50FINANCIADA (1%) $1.69
SUBTOTAL $171.19UTLDD. (10%) $17.12
TOTAL $188.31
Excavación a mano n terreno tipo "B" seco en cepas de hasta 2m. D e altura; incluye afloje, extracción, amacice, limpieza
de plantilla y taludes, medida en banco.
MANO DE OBRA
PLANTILLA DE CIMENTACIONLOGOTIPO
CONCEPTO: UNIDAD M2
FECHACLAVE ALB001 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTEMATERIALES CONC001 Concreto 100 kg /cm2 M3 0.051 $742.39 $37.86
SUBTOTAL $37.86CUA002 Albañiles J 0.032 $748.00 $23.936
SUBTOTAL $23.94
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $23.936 $0.72
CD $62.52C.I. (10%) $6.25
SUBTOTAL $68.77FINANCIDA (1%) $0.69
SUBTOTAL $69.46UTLDD. (10%) $6.95
TOTAL $76.40
CIMIENTO DE MAMPOSTERIALOGOTIPO
CONCEPTO: UNIDAD M3
FECHACLAVE ALB002 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALES MORT001 Mortero 1:1:6 M3 0.315 700.09 220.53MAT006 Piedra brasa de 3ra M3 1.500 166.67 250.01
SUBTOTAL $470.53CUA002 Albañiles J 0.370 $748.000 $276.760
SUBTOTAL $276.76
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $276.760 $8.30
CD $755.59C.I. (10%) $75.56
SUBTOTAL $831.15FINANCIDA (1%) $8.31
SUBTOTAL $839.47UTLDD. (10%) $83.95
TOTAL $923.41
Plantilla de cimentación de 100kg/cm2 con agregado de 3/4 y un espesor de 2cm, incluye material y mano de obra.
MANO DE OBRA
Cimentación de piedra brasa asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estación.
MANO DE OBRA
RELLENO DE CEPAS LOGOTIPO
CONCEPTO: UNIDAD M3
FECHACLAVE ALB003 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTEMATERIALES Agua M3 0.113 $0.30 $0.03
SUBTOTAL $0.03CUA 001 Peones J 0.230 $374.00 $86.020
SUBTOTAL $86.02HERRAMIENTA Medios manuales y/o herramientas % 3.00 $86.020 $2.58
CD $88.63C.I. (10%) $8.86
SUBTOTAL $97.50FINANCIDA (1%) $0.97
SUBTOTAL $98.47UTLDD. (10%) $9.85
TOTAL $108.32
CADENA DE DESPLANTELOGOTIPO
CONCEPTO: UNIDAD M
FECHACLAVE ALB004 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
MATERIALES
CONC001 Concreto 150kg/cm2 M3 0.03 $850.56 $25.52MAT002 Agua M 0.05 $0.30 $0.02MAT012 Armex para cadena M 1.100 $17.50 $19.25
Cimbra de madera M 1.000 $16.84 $16.84SUBTOTAL $44.78
CUA 002 Albañiles J 0.085 $748.00 $63.58
SUBTOTAL $63.58
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $63.580 $3.03
CD $111.39C.I. (10%) $111.49
SUBTOTAL $222.88FINANCIDA (1%) $2.23
SUBTOTAL $225.11UTLDD. (10%) $22.51
TOTAL $219.75
Relleno de cepas con material producto de excavación compactado con pizón a mano en capas de 10cm. I ncluye
volteo con pala.
MANO DE OBRA
Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 con agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos
del no.2 a cada 20cm.
MANO DE OBRA
IMPERMEABILIZACION DE CADENA DE DESPLANTELOGOTIPO
CONCEPTO: UNIDAD M2
FECHACLAVE ALB005 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALESMicrolastic LTS 0.35 $75.00 $26.25Festerfelt PZA 0.48 $160.00 $76.80
$0.00SUBTOTAL $103.05
CUA 002 Albañiles J 0.008 $748.00 $5.775
SUBTOTAL $5.77
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $5.775 $0.17
CD $109.00C.I. (10%) $10.90
SUBTOTAL $119.90FINANCIDA (1%) $1.20
SUBTOTAL $121.10UTLDD. (10%) $12.11
TOTAL $133.21
MURO DE TABIQUE LOGOTIPO
CONCEPTO: UNIDAD M2
FECHACLAVE ALB005 REALIZOTIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALES
MAT008 Tabique rojo de 5X11.5X23 M2 12 $1.70 $20.40MORT002 Mortero prop. 1:1:8 M3 0.0358 $706.96 $25.31MAT002 Agua M3 0.048 $0.30 $0.01
Andamios USO 0.036 $8.28 $0.30SUBTOTAL $45.72
CUA 002 Albañil y peón J 0.085 $580.00 $49.30CUA003 Cabo de Oficio J 0.010 $500.00 $5.00
SUBTOTAL $54.30HERRAMIENTA Medios manuales y/o herramientas % 3.00 $54.30 $1.63
CD $101.65C.I. (10%) $10.17
SUBTOTAL $111.82FINANCIDA (1%) $1.12
SUBTOTAL $112.94
Impermeavilización de cadena de desplante de 15X20 a base de 2 capas de emulsión asfaltica y 1 capa de fieltro asfáltico
con riego de arena, incluye limpieza y acarreos a 1ra estción.
MANO DE OBRA
Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de espesor, inc. material y acarreo hasta 1er estación.
MANO DE OBRA
UTLDD. (10%) $11.29TOTAL $124.23
CADENA LOGOTIPO
CONCEPTO: UNIDAD M
FECHACLAVE ALB004 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
MATERIALES
CONC001 Concreto 150 kg/cm2 M3 0.03 $850.56 $25.52MAT002 Agua M3 0.05 $0.30 $0.02MAT012 Armex para cadena M 1.100 $17.50 $19.25CIMB001 Cimbra acabado común M 1.000 $16.84 $16.84
SUBTOTAL $61.62CUA 002 Albañiles J 0.032 $748.00 $23.94
SUBTOTAL $23.94
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $23.94 $0.72
CD $86.27C.I. (10%) $8.63
SUBTOTAL $94.90FINANCIADA (1%) $0.95
SUBTOTAL $95.85UTLDD. (10%) $9.59
TOTAL $105.44
CASTILLOLOGOTIPO
CONCEPTO: UNIDAD M
FECHACLAVE ALB004 REALIZOTIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
MATERIALES
CONC001 Concreto de 100kg/cm2 M3 0.01 $850.56 $8.51MAT002 Agua M3 0.05 $0.30 $0.02MAT012 Armex para castillo M 1.100 $17.50 $19.25CIMB001 Cimbra acabado común M 1.000 $16.84 $16.84
SUBTOTAL $44.61CUA 002 Albañiles J 0.032 $748.00 $23.94
SUBTOTAL $23.94
HERRAMIENTAMedios manuales y/o herramientas % 3.00 $23.936 $0.72
CD $69.26C.I. (10%) $6.93
Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.
MANO DE OBRA
Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero de armex colocado a cada 3m. Aprox.
MANO DE OBRA
SUBTOTAL $76.19FINANCIDA (1%) $0.76
SUBTOTAL $76.95UTLDD. (10%) $7.70
TOTAL $84.65
EXPLOSIÓN DE INSUMOS
CONCEPTO CODIGO CANTIDAD RENDIMIENTO PRECIOPRELIMINARES CUA001 330 0.012 $374.00 $1,481.04
CUA002 330 0 $500.00 $0.00% 330 $0.13 $42.77
$1,523.81TRAZO MAT003 110.00 0.0002 $940.00 $20.68
CUA002 110.00 0.0012 $748.00 $98.74CUA003 110.00 0 $500.00 $0.00
110.00 $0.08 $8.89$128.30
EXCAVACION CUA001 88.00 0.4 $360.00 $12,672.00CUA003 88.00 0 $500.00 $0.00% 88.00 $4.49 $394.94
$13,066.94
PLANTILLA CONCRETO MAT001 2.20 0.323 $1,800.00 $1,279.08MAT005 2.20 0.48 $216.67 $228.80MAT004 2.20 0.67 $166.67 $245.67MAT020 2.20 0.21 $0.30 $0.14
MO CUA002 77.00 0.032 $580.00 $1,429.12CUA003 77.00 0 $500.00 $0.00% 77.00 $0.72 $55.29
$3,238.10
CIMIENTO MAMPOSTEPIEDRA MAT006 55.00 1.5 $166.67 $13,750.28MORTERO MAT001 14.52 0.26 $1,800.00 $6,795.36
MAT003 14.52 Err:509 $1,364.00 Err:509MAT004 14.52 1.2 $166.67 $2,904.01
MO CUA002 55.00 0.37 $580.00 $11,803.00CUA003 55.00 0 $500.00 $0.00% 55.00 $8.30 $456.65
Err:509
EXPLOSIÓN DE INSUMOS
CONCEPTO CODIGO CANTIDAD RENDIMIENTO PRECIORELLENO DE CEPAS MAT020 30.80 0.113 $0.30 $1.04
CUA001 30.80 0.23 $360.00 $2,550.24CUA003 30.80 0 $500.00 $0.00% 30.80 $2.58 $79.48
$2,630.77
CADENAS DESPLANTE CONCRETO MATOO1 3.30 0.323 $1,800.00 $1,918.62MAT005 3.30 0.48 $216.67 $343.20MAT004 3.30 0.67 $166.67 $368.50MAT020 3.30 0.21 0.3 $0.21CUA002 110.00 0.085 $580.00 $5,423.00CUA003 110.00 0 $500.00 $0.00%
ALBAÑILERIA CODIGO CANTIDA RENDIMIENTO PRECIO TOTAL
CEMENTOCALGRAVAARENAAGUAPIEDRATABIQUEARMEX CADENAARMEX CASTILLOALAMBRE QUEMADOPEONALBAÑIL2 PEONESPEON, ALBAÑIL
EXPLOSIÓN DE INSUMOS
CABO DE OFICIOSHERRAMIENTAS
EXPLOSIÓN DE INSUMOS
Partida No Concepto U C PU importepreliminares 1 limpieza M2 330 10.1588 3352.404
2 trazo M2 110 11.39184 1253.1024
3 Excavacion en terreno tipo M3 88 83.93 7385.84
EXPLOSIÓN DE INSUMOS
SUBTOTAL 11991.3464ALBAÑILERIA 4 PLANTILLA DE CIMENTACIOM2 110 33.19251 3651.176232
5 CIMIENTO DE MAMPOSTERM3 48.4 845.3306 40913.999666 RELLENO CON MATERIAL P M3 30.8 95.7359 2948.665727 CADENA DE DESPLANTE DE M2 110 121.7945 13397.394648 IMPERMEABILIZACION DE CM 60.5 140.6306 8508.1503329 MURO DE TABIQUE M2 275 192.5777 52958.87175
10 CADENA DE 15X 20 CONCREM 110 105.1259 11563.8486411 CASTILLO DE 10X10 CONCRM 96 76.2309 7318.166294
subtotal 122378.2583
EXPLOSIÓN DE INSUMOS
13subtotal 27277.61105
total 161647.2158
GENERADORESPROY. LOCALIZACION
NO. CONCEPTO U EJE TRAMO LARGO ANCHO ALTO No PIEZAS RESULTADO
M2
A 1-2 25 1 25B 1-2 25 1 251 A-B 30 1 302 A-B 30 1 30
TOTAL 110
M2
A 1-2 25 1 25
B 1-2 25 1 25
1 A-B 30 1 30
2 A-B 30 1 30TOTAL 110
M3
A 1-2 25 1 0.8 20B 1-2 25 1 0.8 201 A-B 30 1 0.8 242 A-B 30 1 0.8 24
TOTAL 88
M2
A 1-2 25 0.7 0.05 17.5B 1-2 25 0.7 0.05 17.51 A-B 30 0.7 0.05 212 A-B 30 0.7 0.05 21
TOTAL 77
M3
A 1-2 25 0.5 12.5B 1-2 25 0.5 12.51 A-B 30 0.5 152 A-B 30 0.5 15
TOTAL 55
M3
A 1-2 25 0.28 7B 1-2 25 0.28 71 A-B 30 0.28 8.42 A-B 30 0.28 8.4
TOTAL 30.8
M3
A 1-2 25 1 25B 1-2 25 1 251 A-B 30 1 302 A-B 30 1 30
TOTAL 110
M2
A 1-2 25 0.55 13.75
B 1-2 25 0.55 13.75
1 A-B 30 0.55 16.5
2 A-B 30 0.55 16.5TOTAL 60.5
M2
A 1-2 25 2.5 62.5
B 1-2 25 2.5 62.5
1 A-B 30 2.5 75
2 A-B 30 2.5 75TOTAL 275
Limpieza y deshierbe en terreno con maleza de hasta 1 metro de altura incluye apile de hierba y material en lugar.
Trazo y nivelación en terreno plano por medios maniales, para desplante
de estructura, estableciendo ejes auxiliares pasos y referencias.
incluye material y mano de obra.
Excavación a mano n terreno tipo "B" seco en cepas de hasta 2m. D e altura; incluye afloje, extracción, amacice, limpieza de plantilla y
taludes, medida en banco.
Plantilla de cimentación de 100kg/cm2 con agregado de 3/4 y un espesor de 2cm, incluye material y mano de obra.
Cimentación de piedra brasa asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estación.
Relleno de cepas con material producto de excavación compactado con pizón a mano en capas de 10cm. I ncluye volteo con pala.
Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 con
agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos del no.2 a
cada 20cm.
Impermeavilización de cadena de desplante de 15X20 a base de 2
capas de emulsión asfaltica y 1 capa de fieltro asfáltico con riego de
arena, incluye limpieza y acarreos a 1ra estción.
Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de
espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de
espesor, inc. material y acarreo hasta 1er estación.
M2
A 1-2 25 1 25B 1-2 25 1 251 A-B 30 1 302 A-B 30 1 30
TOTAL 110
M
A 1-2 3 7 21B 1-2 3 7 211 A-B 3 9 272 A-B 3 9 27
TOTAL 96
Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.
Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero de armex colocado a cada 3m. Aprox.
Programa de ObraCódigo Concepto U. Cant. P.U. Imprte. Rndmto. Inicia
PRE001 m2 110 $5.44 $598.16 83.333 10/17/2011
PRE002 m2 110 $2.55 $280.11 833.33 10/18/2011
CIM001 m3 88 $188.31 $16,571.36 7.5 10/19/2011
ALB001 m2 77 $76.40 $5,882.87 31.25 11/29/2011
ALB002 m3 55 $923.41 $50,787.68 5.405 11/2/2011
ALB003 m3 30.8 $108.32 $3,336.26 4.348 11/24/2011
ALB004 m 110 $219.75 $24,172.92 11.765 11/14/2011
ALB005 m2 60.5 $133.21 $8,058.98 129.534 11/23/2011
Limpieza y deshierbe en terreno con maleza de hasta 1 metro de altura incluye apile de hierba y material en lugar.
Trazo y nivelación en terreno plano por medios maniales, para desplante de estructura, estableciendo ejes auxiliares pasos y referencias. incluye material y mano de obra.
Excavación a mano n terreno tipo "B" seco en cepas de hasta 2m. D e altura; incluye afloje, extracción, amacice, limpieza de plantilla y taludes, medida en banco.
Plantilla de cimentación de 100kg/cm2 con agregado de 3/4 y un espesor de 2cm, incluye material y mano de obra.
Cimentación de piedra brasa asentada con mortero cemento cal.arena prop. 1:1:6, incluye acarreo a 1ra estación.
Relleno de cepas con material producto de excavación compactado con pizón a mano en capas de 10cm. I ncluye volteo con pala.
Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 con agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos del no.2 a cada 20cm.
Impermeavilización de cadena de desplante de 15X20 a base de 2 capas de emulsión asfaltica y 1 capa de fieltro asfáltico con riego de arena, incluye limpieza y acarreos a 1ra estción.
ALB006 m2 275 $124.23 $34,163.13 23.529 11/24/2011
ALB008 m 96 $84.65 $8,126.01 31.25 11/24/2011
ALB007 m 110 $105.44 $11,597.90 31.25 12/6/2011
$163,575.4
Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de espesor acabado comun hasta 3.5 m. de altura, junta de 2cm aprox. de espesor, inc. material y acarreo hasta 1er estación.
Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de acero de armex colocado a cada 3m. Aprox.
Cadena de cerramiento de 15x20cm con concreto de 150 kg/cm2 con agregado de 3/4 y refuerzo de armex de 10X15cm.
Programa de Obra
Fin Duración Fza. Tbjo. Periódo 1 Periódo 2 Periódo 3 Periódo 4 Periódo 5 Periódo 6 Periódo 7L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L MM
10/18/2011 1.3 1 CUA001
10/18/2011 0.13 1 CUA002
11/30/2011 12 3CUA001
11/4/2011 2 1CUA002
11/21/2011 10 2CUA002
12/1/2011 7 1CUA001
11/22/2011 9 1CUA002
11/23/2011 0.47 1CUA002
12/7/2011 12 2CUA001
11/27/2011 3.1 1 CUA002
12/9/2011 4 1CUA002
$5,021.11 $8,285.68 $30,340.78 $32,855.37 $22,922.01 $35,882.99 $28,264.69
Programa de ObraPeriódo 7
J V S
$28,264.69 $163,572.63
Estimación 1 Periódo del: 17/10/20011 al: 10/22/2011Esta estimación
Descripción U Cntdd. P.U. Imprte. Cant. % Imprt.
m2 110 7.19 791 110 100.00 791.26
m2 110 68.96 7585.54 110 100.00 7585.54
m3 88 258.43 22741.42 15 17.05 255.68
Estimación 2 Periódo del: 21/10/20011 al:
2
m3 88 258.43 22741.42 45 51.136364 2301.14
Limpieza, deshierve y desenraice del terreno con maleza de 1m de altura, incluyematerial y apile de hierba en el lugar
Trazo y nivelación en terreno plano por medios manuales, para desplante de estructura, estableciendo ejes auxiliares, pasos y referencias, incluye material y mano de obra.
Excabación a mano en terreno tipo B seco en cepas de hasta 2 m de profundidad, incluye afloje, estracción, amacice,limpieza de plantilla y taludes, medida en banco.
Excabación a mano en terreno tipo B seco en cepas de hasta 2 m de profundidad, incluye afloje, estracción, amacice,limpieza de plantilla y taludes, medida en banco.
10/22/2011Acumulado Por Ejercer
Cant. % Imprt. Cant. % Imprt.
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 73.00 82.95 6055.6818
al: 11/3/2011