Elementos EstructuralesMetrados
Encofrado Vaciado AceroPlacas 151.56 17.18 1964.56Vigas 96.69 15.45 3092.45Losas 138.21 12.09 382.62Sectores 3.00
Encofrado Sector 1 Sector 2 Sector 3Placas 47.46 54.70 49.40Vigas 32.80 32.50 31.39Losas 46.60 45.70 45.91
Vaciado Sector 1 Sector 2 Sector 3Placas 6.52 5.30 5.36Vigas 5.24 5.18 5.03Losas 4.08 4.00 4.01
Acero Sector 1 Sector 2 Sector 3Placas 630.40 560.10 774.10Vigas 992.68 1070.77 1029.00Losas 136.60 128.72 117.30
Ladrillo Sector 1 Sector 2 Sector 3Losas 388.56 380.70 382.00
II.EE. Sector 1 Sector 2 Sector 3Centros de Luz 9.00 8.00 7.00Brackets 3.00 3.00 3.00Tubera Alumbrado 0.00 76.40 0.00Salida Tomacorriente 12.00 3.00 1.00Tubera Tomacorriente 0.00 74.44 0.00
II.SS. Sector 1 Sector 2 Sector 3Tub. PVC 2" Tendido 7.17 7.17 7.17Tub. PVC 2" montan. 2.65 0.00 2.65Tub. PVC 3" montan. 0.00 7.95 0.00
Tub. PVC 4" montan. 2.67 0.00 2.67Tubera PVC clase 10 1/2" (T) 22.04 22.04 22.04
TUBERIA PVC CLASE 10 2" (M) 2.67 2.67 2.67CODO 90 PVC DE 1/2" 7.00 7.00 7.00T PVC DE 1/2" 5.67 5.67 5.67TUBERIA CPVC CLASE 10 1/2" 19.16 19.16 19.16CODO 90 CPVC DE 1/2" 5.00 5.00 5.00T CPVC DE 1/2" 2.33 2.33 2.33
SECTORIZACINMetrados Metrados x Sector
Ladrillo II.EE. II.SS. Encofrado Vaciado Acero50.52 5.73 654.8532.23 5.15 1030.82
1151.26 46.07 4.03 127.54
Total151.5696.69
138.21
Total17.1815.4512.09
Total1964.603092.45382.62
Total1151.26
Total24.009.0076.4016.0074.44
Total21.515.307.955.3466.128.0121.0017.0157.4815.006.99
Metrados x SectorLadrillo II.EE. II.SS.
383.75
TREN DE ACTIVIDADES
ACTIVIDADES 1 2 3Acero de placas S1 S2Encofrado de placas S1Encofrado de vigasVaciado de placasAcero de vigasVaciado de vigasEncofrado de losaLadrillo de losaInstalaciones ElctricasAcero de losa% Instalaciones SanitariasVaciado de losa y % de instalaciones sanitarias
TREN DE ACTIVIDADES
4 5 6 8 9 10 11 12 13S3S2 S3S1 S2 S3
S1 S2 S3S1 S2 S3
S1 S2 S3S1 S2 S3S1 S2 S3
S1 S2 S3S1 S2 S3S1 S2 S3
S1 S2 S3
SECTORIZACINTREN DE ACTIVIDADES
Top Related