INDEX Introduction / Overview Company at a Glance Area of Business Resources Capability & Clientele Equipment, Vehicles & Facilities Highlights Contract Features Project Organogram & Work Flow Diagram Mobilization Plan Your Feed Back
INTRODUCTION / OVERVIEW SISCO is a 100% Saudi Owned Limited Liability Company
established in the year 1990, growing with 30% CAGR
Strategically located Offices, Laydown Yards and Camps
An ISO 9000 accredited company, executing projects in Plant Construction, Piping, Pipe Line & Maintenance
With 2000 skilled manpower; 700 light & heavy equipment and vehicles, SISCO operates in CMEI areas in Oil & Gas Sector – Refineries, Petrochemical, Fertilizer and Utility Plants
COMPANY AT A GLANCE
INDUSTRIAL CONSTRUCTION
SHUTDOWN, OPERATION & MAINTENANCE
CROSS COUNTRY PIPELINE & IN-PLANT PIPING PROJECTS
ENGINEERING & TECHNICAL SUPPORT
AREA OF BUSINESS / SECTORS Civil, Mechanical, Electrical & Instrumentation on LSTK basis
Cross-country Pipeline, In-Plant Piping & Industrial Construction
Plant - Operation, Maintenance & Turn Around
Refineries, Petrochemical, Fertilizer & GOSPs
Power, Water & Civil Infrastructure
RESOURCES
Employees
Equipment & Vehicles
Laydown Yard
Block Visas
Camp Facilities
Jubail Rahima YanbuKhafji Jeddah Riyadh
Camp & Office Locations
2000 Nos.
700 Nos.
50,000 SqM at Jubail & Ras Tanura
Accommodate Over 4,500 Senior & Junior Staff
400 Nos.
SAUDI ARAMCO
SABIC
SATORP
SADARA
KJO
CAPABILITIES
Pipe Erection & Welding 35,000 Ø Inch / Month
Steel Fabrication & Erection 300 Ton / Month
Reinforced Concreting 1,500 CM / Month
TASNEE
SAUDI CHEVRON
MA’ADEN
JANA
MARAFIQ
CLIENTELE JESCO
APPC
SIPCHEM
SASREF
SAHARA
EQUIPMENT & VEHICLES
FACILITIES
HIGHLIGHTS SAUDI ARAMCO
1. Northern Area (NAPD) 2005-12 : General Construction Services2. RT Terminal 2011-16 : General Maintanence of Onshore Plants 3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping)6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl) 8. Southern Area : Flare Up-gradation of 29 GOSPs 9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System10. Riyadh Refinery Chlorination & Condensate System Upgrade 11. FCV Piping Replacement Work at Abu-Ali Plant12. Plant-471 Shutdown Activities @ Berri Gas Plant13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area
HIGHLIGHTS SATORP (JV SAUDI ARAMCO & TOTAL)
1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6”Ø - 36”Ø CS Pipelines Included 300,000 Ø Inch Welding
2. 150 KM Heat Tubes Installation 3. Repair / Replace 6.5 KM X 36ӯ Crude Oil Pipe Line4. Piping & Structural Works at KFIP Sea-Port, JUBAIL5. 8" & 6" Propylene Line from JERP to APPC & TASNEE6. 6" Benzene Line at Saudi Chevron Site, JUBAIL7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF
SADARA (JV SAUDI ARAMCO & DOW CHEMICALS)1. PE LSPB-1, Train-01, Aboveground Piping Erection Works2. In Plant Work Support Services (2014-2016)3. M E I Construction of RO Plant Facilities (DOW/FLUOR)
SABIC (SAUDI BASIC INDUSTRIES CORPORATION)1. IBN-BAYTAR : Installation & Commissioning of HD Crusher2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown) 4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers
HIGHLIGHTS
TASNEE 1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer2. Install Duplex Filters & Replace Slice Gate @ SW Return3. Install Ammonia & Water Pumps
JANA1. LSTK Civil & MEI Works for New NACL Incinerator Plant 2. Electrical & Instrumentation work for CCL Plant 3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -
SABIC (Contin’d…)5. SAFCO: M Port Deducting System Modification in truck unloading Section 6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013)9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009)10. SHARQ Shipping & Logistics Support (1996-2014)11. Global Contract Mobile Workforce (2007-14)12. UNITED Golden Sand Housing Maint (2007-14)
ISO CERTIFICATE
CREDENTIALS
CREDENTIALS
CREDENTIALS
CREDENTIALS
CREDENTIALS
Contract Title : SABIC General Construction Services (Global Contract)
Client : All SABIC Affiliates
Project Duration : 5 Years (From 22 July 2014 To 21 July 2019)
Scope of Work : Civil, Structural, Mechanical, Piping, Static & Rotating Equipment, Electrical, Instrumentation
Painting & Insulation including Material supply.
Mode of Contract : Work Unit Rates, Material, Time Unit Rates and Equipment Rates for undertaking construction activities in all SABIC affiliates.
Other : Special Material & Services as may be required
CONTRACT FEATURES
PROJECT ORGANOGRAM
Project Manager
Construction Manager
(Civil)
Proj. Engr. (Civil) Nos. to Depend on
the Workload
Supervisor Civil
Work Permit Receiver
Surveyor
Mason-1Carpenter-1Steel Fixer-1Plumber-1Helper-1
Supervisor Structural
Work permit Receiver
Structural Fabricator-1
Erector-1Fitter-1
Helper-2
Construction Manger (Mech.)
Proj. Engr. (Mech.) Nos. to Depend
on Workload
Supervisor Piping
Work permit Receiver
Pipe Fabricator-1 Welder-4 (CS/ SS/AS/Monel)Pipe Fitter-1RTR Fitter-1
RTR Bonder-1Rigger-1Helper-2
Supervisor Static Eqpt.
Work permit Receiver
Millwright-1Helpers-2
Supervisor Rotat’g Eqpt
Work Permit Receiver
Millwright-1Helpers-2
Supervisor Paint/Insul’n
Work Permit Receiver
Sand Blaster-2
Spray Painter-1
Brush Painter-1
Insulators-2Helpers-2
Construction Manager
(E&I)
Proj. Engr. (E&I) Nos. to Depend on
Workload
Supervisor Electrical
Work Permit Receiver
Industrial Elctrician-2Electrical
Technician-2Fitter-1
Helpers-2
Supervisor Instrument’n
Work Permit Receiver
Instrument Technician-2Instr. Fitter-2
Splicers-2Helpers-2
QC Manager
Civil & Structural
Inspectors - 2
Mech. QC – 2 Piping QC – 2
Welding QC - 2
E & I Inspectors - 2
HSE Manager
Safety Supervisor -2
Safety Officer - 6
Fire Watch /Flag man
Planning & Coordination
Planning Engineer
Documentation/ Document
Controller - 2
Quantity Surveyor
PRO ID Coordinator
Procurement Manager
Procurement Coordination
Material Coordinator
Store Keeper
WORK FLOW DIAGRAM
Introduction/Marketing(BD/PM)
Assignment in Estimation Dept.
(Biju/John)
Recieve Scope(PM/CM/CD)
Job Ex / Site Visit(Est./Exec. Dept.)
Preparation of BOQ
Approval From
Client (SABIC)
Sub-Contracts Rates/
Quotations Recieving
Budget Preparation &Manpower &
Equip. Finalzation
If Not Approved By Client the process
will repeat
Preparation Tech. Documents & Mobilization
Activites
Specific Project Quality
Plan
SHE Documentation
Qualifying SHE Personnel
Planning & Scheduling
Direct & Indirect
Manpower Allocation
Equipment Inspection &
Approval
Material Approval & Placing P.O
Materials Store in
Central Store
ID Processing
Approved & Service Order
Release
Mobilization
Hand Over of Site & QC Dossier Submission &
Approval
Execution of Works as per Scope
QC Inspections
Punch List Clearence &
Approval of Work
Invoicing(Incl.Retention &
Warranty)
End of Work Flow and repeats for every S.O
BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT
Variations & Change orders
(If Any)
G C S PROJECTS IN PROGRESSAffiliate AF # Project Title Value (SR)HADEED AF-1221089 Upgrade Power Stack Fan for DR
Module A/B 17,950,000.00
KEMYA AF-1215004 Alkyl Waste Handling Project 3,318,751.93
AF-1315021 Install Higher Capacity Fuel Gas Knock-Out Drum (TD-12A)
1,626,752.06
AF-1315032 Medium Pressue Steam to Condensate Pump
95,404.79
SHARQ AF-1112020 AF-1212057
Replace Drip Vessels in EG 1&3 1,650,693.08
AF-1112033 SHARQ Ethylene Sulfur Guard Bed in EG-4
2,650,000.00
SAUDI KAYAN
AF-1219022 Spare Guard Dryer Tie-In Installation 716,861.70
AF-1319001 Butane Line (Mercury bed) Tie-in 169,547.75
AF-1219038 Offload/Preserve Cold Box 160,171.60
Current Manpower : 2000 Nos. Engineers 500, Skilled 700
Block Visa Availability : 400 Nos.
Mobilization Phase-1 : 350 Employees Currently Working
Phase-2 : 150 Employees throgh Demobilization
Phase-3 : 200 Employees by 01 February 2015
Phase-4 : Fresh Recruits depending on Additional Visa Recommendation from SABIC
Equipment : Adequate Vehicles & Equipment available for mobilization (Phase1 & 2).
We are capable to meet any additional Requirements as and when required.
MOBILIZATION PLAN
How will the Affiliate utilize this Contract?
Affiliates Planned Work Load for Next Two (2) Years
Provision for Office, Laydown & Fabrication Facility
Suggestions for effective utilization of this Contract
Any Comments / Recommendations !
YOUR FEED BACK
We Continually Strive to Improve our Performance
for the Betterment of all the Stakeholders.
Thank You!
Top Related