METRADO ESTRUCTURAS

Post on 27-Jan-2016

234 views 1 download

description

metrado de estructuras

Transcript of METRADO ESTRUCTURAS

METRADOS

Obra. VIVIENDA UNIFAMILIAR HECHO POR: QUENTA QUIÑONEZ, JHERSON MARIO

Prop.: CHALCO MALDONADO, B. Juana

Ubicación: DEPART.: LIMA REVISADO: ING. EMILIO AUGUSTO MOLINA CHAVEZ

PROV.: CHORRILLOS FECHA: 9/30/2014

DIST.: TUPAC

METRADO ESPECIALIDAD: ESTRUCTURAS

CODIGO DESCRIPCIÓN CANT.MEDIDAS

LARGO ANCHO ALTURA01.00.00.00 OBRAS PROV. TRABAJOS PRELIM. SEGURIDAD Y SALUD01.01.00.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.01.01.00 CONSTRUCCIONES PROVICIONALES01.01.01.02 Almacén 1 3.00 4.0001.01.01.07 cercos 1 57,31 2.40

01.01.02.00 INSTALACIONES PROVISIONALES01.01.02.01 Agua para la Construcción 101.01.02.02 desague para construccion 101.01.02.03 Energía Electrica provisional 1

01.01.03.00 TRABAJOS PRELIMINARES01.01.03.01 LIMPIEZA DEL TERRENO 20.65 5.70

01.01.04.00 ELIMINACION DE OBSTRUCCIONES01.01.04.03 eliminacion de rocas 1 20.65 5.7001.01.04.04 eliminacion de elementos enterrdos 20.65 5.70

01.01.09.00 TRAZOS, NIVELES Y REPLANTEO01.01.09.01 Trazos, Nvieles y Replanteo Preliminar 20.65 5.70

0.1.02.00.00 SEGURIDAD Y SALUD0.1.02.01.00 ELAB. IMPLENT. Y ADM. DEL PLAN DE SEGURIDAD0.1.02.01.01 equipos para proteccion individual0.1.02.01.02 equipos para proteccion colecctiva

02.00.00.00 ESTRUCTURAS02.01.00.00 MOVIMIENTOS DE TIERRA02.01.01.00 NIVELACION DEL TERRENO02.01.01.02 NIVELACION INTERIOR APISONADO MANUAL 20.65 5.70

02.01.02.00 EXCAVACIONESExcavacion de Cisterna 1.70 1.40 1.70

Excavación de Zapatas

Z-1 3 1.00 1.00 1.10

CODIGO DESCRIPCIÓN CANT.MEDIDAS

LARGO ANCHO ALTURAExcavación de Cimientos CorridosEje 1-1, entre eje A-A y C-C 1 6.00 0.45 0.65Eje 2-2, 3-3,4-4 entre eje B-B y C-C 3 3.20 0.50 1.05Entre eje 2-2, 3-3 y eje A-A, B-B 1 3.25 0.50 1.05eje 5-5 entre eje B-B Y C-C 1 2.47 0.50 1.05eje 5-5 entre eje A-A y B-B 1 2.21 0.45 0.65eje 6-6 entre eje A-A y C-C 1 5.55 0.50 1.05Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 1 4.79 0.50 1.05Eje 8-8 entre eje A-A Y C-C 1 6.01 0.50 0.95Eje C-C entre eje 1-1 y 8-8 1 15.48 0.50 0.95Entre eje B-B, C-C y Eje 2-2,3-3 1 1.60 0.50 1.05Entre eje B-B, C-C y Eje 5-5, 6-6 1.21 0.45 0.75entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 1.65 0.50 1.05Eje B-B entre eje 1-1 y 2-2, 3-3 3.95 0.50 1.05Eje B-B entre eje 2-2 y 3-3 0.60 0.45 0.75Eje B-B entre eje 3-3 y 5-5 4.79 0.50 1.05Eje B-B entre eje 5-5 y 6-6 1 2.41 0.45 0.65Eje B-B entre eje 6-6 y 7-7 1 1.62 0.50 0.80Eje A-A entre eje 1-1 y 8-8 1 17.27 0.50 0.95eje diagonal entre B-B Y C-C 1 1.04 0.50 1.05eje diagonal entre A-A y B-B 1 0.80 0.45 0.65Excavación para cimiento de Escalera 1 1.00 0.50 0.80 Volumen excavado sin EsponjamientoTotal de Volumen + 25% de Esponjamiento

02.01.03.00 RELLENOS02.01.03.01 RELLENO CON MATERIAL PROPIO

Z-1 3 0.50 0.50 0.40Eje 1-1, entre eje A-A y C-C 1 6.00 0.45 0.05Eje 2-2, 3-3,4-4 entre eje B-B y C-C 3 3.20 0.50 0.15Entre eje 2-2, 3-3 y eje A-A, B-B 1 3.25 0.50 0.15eje 5-5 entre eje B-B Y C-C 1 2.47 0.50 0.15eje 5-5 entre eje A-A y B-B 1 2.21 0.45 0.05eje 6-6 entre eje A-A y C-C 1 5.55 0.50 0.15Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 1 4.79 0.50 0.15Eje 8-8 entre eje A-A Y C-C 1 6.01 0.50 0.05Eje C-C entre eje 1-1 y 8-8 1 15.48 0.50 0.05Entre eje B-B, C-C y Eje 2-2,3-3 1 1.60 0.50 0.15Entre eje B-B, C-C y Eje 5-5, 6-6 1.21 0.45 0.15entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 1.65 0.50 0.15Eje B-B entre eje 1-1 y 2-2, 3-3 3.95 0.50 0.15Eje B-B entre eje 2-2 y 3-3 0.60 0.45 0.15Eje B-B entre eje 3-3 y 5-5 4.79 0.50 0.15Eje B-B entre eje 5-5 y 6-6 1 2.41 0.45 0.05Eje B-B entre eje 6-6 y 7-7 1 1.62 0.50 0.15

Eje A-A entre eje 1-1 y 8-8 1 17.27 0.50 0.05eje diagonal entre B-B Y C-C 1 1.04 0.50 0.15eje diagonal entre A-A y B-B 1 0.80 0.45 0.65 Volumen de Relleno sin AsentamientoTotal de Volumen a rellenar con 0,8% asentamiento

CODIGO DESCRIPCIÓN CANT. LARGO ANCHO ALTURA02.01.05.00 NIVELACIÓN INTERIOR Y APISONADO

Vol. Rellenar Interior - Vol. Rellenar cimentación

02.01.05.00 ELIMINACIÓN DE MATERIAL EXCEDENTEVol. De Excavación - Vol de. Relleno

02.02.00.00 OBRAS DE CONCRETO SIMPLE02.02.01.00 CIMIENTOS CORRIDOS 1:10 + 30% PG < 6"

Eje 1-1, entre eje A-A y C-C 1 6.00 0.45 0.60Eje 2-2, 3-3,4-4 entre eje B-B y C-C 3 3.20 0.50 0.90Entre eje 2-2, 3-3 y eje A-A, B-B 1 3.25 0.50 0.90eje 5-5 entre eje B-B Y C-C 1 2.47 0.50 0.90eje 5-5 entre eje A-A y B-B 1 2.21 0.45 0.60eje 6-6 entre eje A-A y C-C 1 5.55 0.50 0.90Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 1 4.79 0.50 0.90Eje 8-8 entre eje A-A Y C-C 1 6.01 0.50 0.90Eje C-C entre eje 1-1 y 8-8 1 15.48 0.50 0.95Entre eje B-B, C-C y Eje 2-2,3-3 1 1.60 0.50 0.90Entre eje B-B, C-C y Eje 5-5, 6-6 1.21 0.45 0.6entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 1.65 0.50 0.90Eje B-B entre eje 1-1 y 2-2, 3-3 3.95 0.50 0.90Eje B-B entre eje 2-2 y 3-3 0.60 0.45 0.60Eje B-B entre eje 3-3 y 5-5 4.79 0.50 0.90Eje B-B entre eje 5-5 y 6-6 1 2.41 0.45 0.60Eje B-B entre eje 6-6 y 7-7 1 1.62 0.50 0.90Eje A-A entre eje 1-1 y 8-8 1 17.27 0.50 0.90eje diagonal entre B-B Y C-C 1 1.04 0.50 0.90eje diagonal entre A-A y B-B 1 0.80 0.45 0.60Total de volumen en cimientos corridos

02.02.01.01 Solado para Cimiento Corrido 39.54 0.50 0.10

02.02.01.02 SOLADO PARA ZAPATAS 1:12Z-1 4 1.20 1.20 0.10Total solado para zapatas mezcla 1:12

02.02.06.00 SOBRECIMIENTOS02.02.06.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS

Eje 2-2, 3-3,4-4 entre eje B-B y C-C 3 3.20 0.15 0.40Entre eje 2-2, 3-3 y eje A-A, B-B 1 3.25 0.15 0.40

eje 5-5 entre eje B-B Y C-C 1 2.47 0.15 0.40eje 6-6 entre eje A-A y C-C 1 5.55 0.15 0.40Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 1 4.79 0.15 0.40Eje 8-8 entre eje A-A Y C-C 1 6.01 0.15 0.40Eje C-C entre eje 1-1 y 8-8 1 15.48 0.15 0.40Entre eje B-B, C-C y Eje 2-2,3-3 1 1.60 0.15 0.40entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 1 1.65 0.15 0.40Eje B-B entre eje 1-1 y 2-2, 3-3 1 3.95 0.15 0.40Eje B-B entre eje 3-3 y 5-5 1 4.79 0.15 0.40Eje B-B entre eje 6-6 y 7-7 1 1.62 0.15 0.40Eje A-A entre eje 1-1 y 8-8 1 17.27 0.15 0.40eje diagonal entre B-B Y C-C 1 1.04 0.15 0.40

02.02.06.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 mEje 2-2, 3-3,4-4 entre eje B-B y C-C 2 3.20 0.40Entre eje 2-2, 3-3 y eje A-A, B-B 2 3.25 0.40eje 5-5 entre eje B-B Y C-C 2 2.47 0.40eje 6-6 entre eje A-A y C-C 2 5.55 0.40Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 2 4.79 0.40Eje 8-8 entre eje A-A Y C-C 2 6.01 0.40Eje C-C entre eje 1-1 y 8-8 2 15.48 0.40Entre eje B-B, C-C y Eje 2-2,3-3 2 1.60 0.40entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 2 1.65 0.40Eje B-B entre eje 1-1 y 2-2, 3-3 2 3.95 0.40Eje B-B entre eje 3-3 y 5-5 2 4.79 0.40Eje B-B entre eje 6-6 y 7-7 2 1.62 0.40Eje A-A entre eje 1-1 y 8-8 2 17.27 0.40eje diagonal entre B-B Y C-C 2 1.04 0.40Total encofrado y desencofrado de sobrecimiento

02.03.00.00 OBRAS DE CONCRETO ARMADO02.03.02.00 ZAPATAS02.03.02.01 Concreto en zapatas f'c=210 kg/cm2

Z-1 3 1.00 1.00 0.70Total concreto armado en zapatas

02.03.07.00 COLUMNAS02.03.07.01 Concreto f'c=210 kg/cm2

C-1 2 0.30 0.15 2.95C-2 1 0.40 0.15 2.95C-1 3 0.30 0.15 3.05C-1 14 0.30 0.15 2.75C-1 3 0.30 0.15 2.85C-3 3 0.30 0.15 2.75C-3 2 0.30 0.15 2.85C-4 4 0.40 0.15 2.85Total concreto f'c=210 kg/cm2

02.03.07.02 Encofrado y DesencofradoC-1 8 0.30 2.95C-2 1 0.40 2.95C-1 12 0.30 3.05C-1 56 0.30 2.75C-1 12 0.30 2.85C-3 12 0.30 2.75C-3 8 0.30 2.85C-4 16 0.40 2.85Total encofrado y desencofrado

02.03.07.03 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

02.03.08.00 VIGAS02.03.08.01 Concreto f'c=210 kg/cm2

VP - A (15*40) 2 3.15 0.15 0.40VP - A (15*40) 3 3.30 0.15 0.40VP - A (15*40) 3 3.20 0.15 0.40VP - A (15*40) 2 2.35 0.15 0.40VP - A (15*40) 1 1.59 0.15 0.40VP - A (15*40) 5 2.00 0.15 0.40VP - A (15*40) 1 2.40 0.15 0.40VP - A (15*40) 1 2.25 0.15 0.40VP - A (15*40) 1 2.10 0.15 0.40VP - A1 (15*20) 1 1.27 0.15 0.20VP - A1 (15*20) 1 2.7 0.15 0.20VP - A1 (15*20) 1 2.00 0.15 0.20VP - A1 (15*20) 1 2.25 0.15 0.20VP - A1 (15*20) 1 1.65 0.15 0.20VP - A1 (15*20) 1 1.88 0.15 0.20VP - A1 (15*20) 1 2.80 0.15 0.20VP - A1 (15*20) 4 0.90 0.15 0.20V-1 (30*20) 7 2.75 0.30 0.20V-1 (30*20) 1 1.92 0.30 0.20V-1 (30*20) 5 2.80 0.30 0.20V-1 (30*20) 1 1.95 0.30 0.20Total concreto en Viga f'c=210 kg/cm2

02.03.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

VP - A (15*40) 1 48.84 0.15VP - A (15*40) 2 48.84 0.40VP - A1 (15*20) 1 37.12 0.15VP - A1 (15*20) 2 18.15 0.20V-1 (30*20) 1 37.12 0.30V-1 (30*20) 2 37.12 0.20Total encofrado y desencofrado en vigas

02.03.08.03 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

02.03.09.00 LOSAS

02.03.09.01 Losas AligeradasConcreto f'c=210 kg/cm21º Piso 79.3 0.20Volumen de concretoNúmero de ladrillos 8.33 79.3Volumen que ocupan ladrillos Volumen totalVolumen de concreto de Losa f'c=210 kg/cm2

02.03.09.02 Encofrado y Desencofrado 1º Piso 70.45

02.03.09.03 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

02.03.10.00 ESCALERAS02.03.10.01 Concreto f'c=210 kg/cm2

Primer Tramo 2 1.00 0.40Segundo Tramo 2 1.30 0.70Tercer Tramo 2 1.00 0.62Volumen Total de concreto f'c=210 kg/cm2

02.03.10.02 Encofrado y DesencofradoTramo 1 (rampa)arranque desde nivel de piso a la rampa 1 0.17 1.00contrapasos 5 1.00 0.17Tramo 2descanso 1 1.30 1.05rampa 1 1.85 1.30contrapasos 7 1.30 0.17Tramo 3descanso 1 1.30 1.00rampa 1 0.97 1.00contrapasos 5 1.00 0.17Total encofrado y Desencofrado

02.03.10.03 ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS

02.03.12.00 Cisternas Subterráneas02.03.12.01 Concreto f'c= 210 kg/cm2

1 2.00 0.15 2.151 2.00 0.15 1.851 2.20 0.15 2.001 2.20 0.15 1.70

Total volumen de concreto 02.03.12.02 Encofrado y Desencofrado

1 2.22 1.551 2.22 1.751 1.70 1.551 1.70 1.751 5.5 4.25

Total encofrado y desencofrado

METRADOS

QUENTA QUIÑONEZ, JHERSON MARIO

ING. EMILIO AUGUSTO MOLINA CHAVEZ

METRADO ESPECIALIDAD: ESTRUCTURAS

PARCIAL TOTAL UND.

12.00 12.00 m3137,5 137,5 Est

1.00 1.00 Glb1.00 1.00 Glb1.00 1.00 Glb

117.71 117.71 m3

117.71 117.71 m3117.71 117.71 m3

117.71 117.71 m2

117.71 117.71 m2

4.05 m3

m3

3.30

PARCIAL TOTAL UND.m3

1.765.041.711.300.652.912.512.857.350.840.410.862.070.202.51 m30.700.658.200.550.230.40 50.66 m3

51.0663.83 m3

0.300.140.720.240.190.050.420.360.150.390.120.080.120.300.040.360.050.12

0.430.080.23

4.896.11 m3

SUB TOTAL TOTAL UND.

m3

57.72 m3

m31.624.321.461.110.602.502.162.707.350.720.330.741.780.162.160.650.737.770.470.21

39.54 m319.77 19.77 m2

,m2

5.765.76 m2

m30.580.20

0.150.330.290.360.930.100.100.240.290.101.040.06

4.74 m3

2.562.601.984.443.834.81

12.381.281.323.163.831.30

13.820.83

58.14

m32.10

2.10 m3

0.270.180.411.730.380.370.260.68

4.02 m3

m27.081.18

10.9846.2010.269.906.84

18.24103.60 m2

m30.38 6.30.59 9.90.58 9.60.28 4.70.10 1.590.60 100.14 2.40.14 2.250.13 2.1 48.840.04 1.270.08 2.70.06 20.07 2.250.05 1.650.06 1.880.08 2.80.11 3.6 18.151.15 19.250.12 1.920.84 140.12 1.95 37.12

5.70 m3m2

7.3339.075.577.26

11.1414.85

85.21 m2

m315.86

15.86660.57

0.01 m38.92 m36.94 m3

m270.45 m2

m30.801.821.24

3.86 m3m2

0.170.85

1.372.411.55

1.300.970.85

9.46 m2

m30.640.560.660.56

2.42 m3m2

3.443.892.642.98

23.38

36.31 m2

PARTIDAESPECIFICACIONES

N° VECESLARGO ANCHO ALTO

03.00.00.00 ARQUITECTURA03.01.00.00 MUROS Y TABIQUES DE ALBAÑILERÍA09.01.00 MUROS DE LADRILLO CORRIENTE DE ARCILLA09.01.02 Muro de Soga con Ladrillo Corriente de 24 x 12 x 6

Primer PisoEje 1-1, entre eje A-A y C-C 1 0.60 2.60Eje 2-2, 3-3 entre B-B y C-C 1 3.20 2.50Eje 4-4 entre eje B-B y C-C 1 2.75 2.50eje 5-5 entre eje A-A Y C-C 1 0.95 2.50eje 6-6 entre eje A-A y C-C 1 1.81 2.50Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 1 2.94 2.50Eje 8-8 entre eje A-A Y C-C 1 6.00 2.50Eje C-C entre eje 1-1 y 2-2 1 3.15 2.60Eje C-C entre eje 2-2 y 8-8 1 10.40 2.50Entre eje B-B, C-C y Eje 2-2,3-3 1 0.60 2.50Entre eje B-B, C-C y Eje 5-5, 6-6 1 0.47 2.50entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 1 2.70 2.50Eje B-B entre eje 1-1 y 2-2 1 3.15 2.60Eje B-B entre eje 2-2, 3-3 1 2.10 2.60Eje B-B entre eje 3-3 y 5-5 1 4.79 2.50Eje B-B entre eje 6-6 y 7-7 1 2.96 2.50Eje A-A entre eje 1-1 y 2-2 1 3.15 2.60Eje A-A entre eje 2-2 y 8-8 1 14.22 2.50eje diagonal entre B-B Y C-C 1 0.96 2.50Entre eje 2-2, 3-3 y eje A-A, B-B ( vent 6) 1 1.90 0.30V3 1 0.70 1.20V4 2 0.60 2.00V5 1 1.50 0.30V1 1 1.60 1.20V2 1 2.00 2.00Total de Muro para ladrillo Corriente

03.02.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS03.02.01.00 TARRAJEO INTERIOR CON MORTERO 1:5 X1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

Eje 1-1, entre eje A-A y C-C 1 0.60 2.70Eje 2-2, 3-3 entre B-B y C-C 2 3.20 2.60Eje 4-4 entre eje B-B y C-C 2 2.75 2.60eje 5-5 entre eje A-A Y C-C 2 0.95 2.60eje 6-6 entre eje A-A y C-C 2 1.81 2.60Entre eje 7-7, 8-8 y eje C-C entre A-A Y B-B 2 2.64 2.60Eje 8-8 entre eje A-A Y C-C 1 5.40 2.60Eje C-C entre eje 1-1 y 2-2 1 3.30 2.70Eje C-C entre eje 2-2 y 8-8 1 13.84 2.60Entre eje B-B, C-C y Eje 2-2,3-3 2 0.60 2.60Entre eje B-B, C-C y Eje 5-5, 6-6 2 0.47 2.60entre B-B, C-C y B-B, A-A entre 7-7 y 8-8 2 2.70 2.60

Eje B-B entre eje 1-1 y 2-2 2 3.45 2.70Eje B-B entre eje 2-2, 3-3 2 2.70 2.70Eje B-B entre eje 3-3 y 5-5 2 5.55 2.60Eje B-B entre eje 6-6 y 7-7 2 3.56 2.60Eje A-A entre eje 1-1 y 2-2 1 3.45 2.70Eje A-A entre eje 2-2 y 8-8 1 16.61 2.60eje diagonal entre B-B Y C-C 2 1.10 2.60Entre eje 2-2, 3-3 y eje A-A, B-B ( vent 6) 1 1.90 0.30V3 1 0.70 1.20V4 2 0.60 2.00V5 1 1.50 0.30V1 1 1.60 1.20V2 1 2.00 2.00Total Areá de Tarrajeo en Interiores con mortero 1:4

03.02.02.00 TARRAJEO EN EXTERIORES MEZCLA 1 : 5 (incluido columnas)EJE 1-1 1.05 2.70EJE 1-1 entre A-A , B-B (dintel) 2.80 0.20EJE 1-1 azotea 6.00 1.35eje C-C entre 1-1 y 2-2 3.45 2.60eje C-C entre 2-2 y 8-8 14.75 2.60eje 8-8 6.01 2.60eje A-A entre 1-1 y 2-2 3.45 2.70eje A-A entre 2-2 y 8-8 17.05 2.60EJE 1-1

03.02.03.00 TARRAJEO DE COLUMNASTarrajeo de Superficie, Mezcla 1:5

C-1 8 0.15 2.75C-1 2 0.45 2.75C-1 9 0.30 2.75C-1 2 0.60 2.75C-1 2 0.75 2.65C-2 1 0.95 2.65C-3 3 0.30 2.65C-3 2 0.45 2.65C-4 2 0.75 2.65C-4 1 0.45 2.65C-4 1 0.5 2.65

03.02.04.00 TARRAJEO DE VIGAS Tarrajeo de Superficies con mezcla 1:5VP - A (15*40) EJE B-B entre 1-1 y 2-2 1 3.15 0.60VP - A (15*40) EJE C-C entre 1-1 y 2-3 1 3.15 0.20VP - A (15*40) eje A-A Y C-C entre 2-2 y 3-3 2 3.30 0.20VP - A (15*40) eje B-B entre 2-2 y 3-3 1 3.30 0.40

VP - A (15*40) eje A-A Y C-C entre 3-3 y 4-4 2 3.20 0.20VP - A (15*40) eje B-B entre 3-3 y 4-4 1 3.20 0.40VP - A (15*40) eje A-A Y C-C entre 4-4 Y 5-5 2 2.35 0.20VP - A (15*40) eje B-B entre 4-4 Y 5-6 1 1.59 0.40VP - A (15*40) eje A-A Y C-C entre 5-5 Y 6-6 2 2.00 0.40VP - A (15*40) eje A-A Y C-C entre 6-6 Y 7-7 2 2.00 0.20VP - A (15*40) eje B-B entre 6-6 Y 7-7 1 2.00 0.40VP - A (15*40) eje C-C entre 7-7 Y 8-8 1 2.40 0.20VP - A (15*40) eje A-A entre 7-7 Y 8-8 1 2.10 0.20VP - A1 (15*20) VOLADIZO entre 2-2 y 3-3 1 2.25 0.40VP - A1 (15*20) VOLADIZO 1 2.8 0.40VP - A1 (15*20) entre eje B-B,C-C entre 2-2,3-3 1 3.53 0.40VP - A1 (15*20) puerta 3 0.90 0.15VP - A1 (15*20) patio serv 1 0.90 0.15VP - A1 (15*20) eje B-B entre 5-5 y 6-6 1 2.70 0.15VP - A1 (15*20) puerta-patio serv 1 0.80 0.15VP - A1 (15*20) 1 1.30 0.15V-1 (30*20) 4 2.75 0.15V-1 (30*20) 3 0.80 0.30V-1 (30*20) 2 2.75 0.30V-1 (30*20) 2 2.80 0.30V-1 (30*20) 1 1.95 0.30V-1 (30*20) 1 1.92 0.15V-1 (30*20) 1 2.00 0.15V-1 (30*20) puerta 1 0.80 0.30V-1 (30*20) 1 1.41 0.15V-1 (30*20) 1 1.35 0.30V-1 (30*20) 1 2.80 0.15

Total de tarrajeo en vigas con mezcla 1:4

03.02.05.00 TARRAJEO CON IMPERMEABILIZANTESTarrajeo con impermeabilizante para cisterna 2 1.55 1.70

2 1.55 2.201 0.15 1.70

Total de tarrajeo con impermeabilizante

03.02.06.00 VESTIDURAS DE DERRAMESvestidura en puertas 1 2.75P4 2 3.50P3 1 2.60P5 1 3.50P1 3 3.40Total vestiduras de puertas

Vestiduras de Ventanas 2 0.601 0.701 1.50

1 1.601 2.601 1.90

Total de Vestiduras de VentanasTotal de Vestiduras

03.02.07.00 TARRAJEO EN FONDO DE ESCALERASVestidura de SuperficiesPrimer Niveltramo1(rampa) 1 0.97 1.00arranque desde nivel de piso a la rampa 1 1.00 0.17tramo2descanso 1 1.30 1.05rampa 1 1.85 1.30tramo3descanso 1 1.30 1.00rampa 1 0.97 1.00Total de Vestiduras de Superficies

03.03.00.00 CIELORASOS03.03.01.00 TARRAJEO EN CIELOS RASOS

eje1-1, 2-2,entre B-B, C-C 1 2.75 3.15eje2-2, 3-3,entre B-B, C-C 1 1.65 1.25eje2-2, 3-3,entre B-B, C-C 1 3.30 1.10eje 2-2,3-3,entre A-A, B-B 1 2.25 0.65eje 2-2,3-3,entre A-A, B-B 1 2.80 0.90eje 3-3, 4-4 entre A-A,C-C 1 5.55 3.20eje 4-4,5-5 entre A-A,C-C 1 4.41 2.35eje 4-4,5-5 entre A-A,C-C 2 2.05 0.58eje 5-5,6-6 entre A-A,C-C 1 2.70 1.50eje 5-5,6-6 entre A-A,C-C 1 2.47 0.58eje 6-6,7-7 entre A-A,C-C 1 5.55 2.00eje 7-7, 8-8 entre B-B ,C-C 1 2.45 2.75eje 7-7, 8-8 entre B-B , A-A 1 2.25 2.80Total Cielorraso con mezcla de cemento arena

03.04.00.00 PISOS Y PAVIMENTOS12.04.01.00 CONTRAPISOS de 48mm03.04.02.00 PISO CERAMICO03.04.02.01 PISO DE CERAMICO DE COLOR 30X30

eje2-2, 3-3,entre B-B, C-C 1 1.65 1.25eje2-2, 3-3,entre B-B, C-C 1 3.30 1.10eje 2-2,3-3,entre A-A, B-B 1 2.25 0.65eje 2-2,3-3,entre A-A, B-B 1 2.80 0.90eje 3-3, 4-4 entre A-A,C-C 1 5.55 3.20eje 4-4,5-5 entre A-A,C-C 1 4.41 2.35eje 4-4,5-5 entre A-A,C-C 2 2.05 0.58eje 5-5,6-6 entre A-A,C-C 1 2.70 1.50

eje 5-5,6-6 entre A-A,C-C 1 2.47 0.58eje 6-6,7-7 entre A-A,C-C 1 5.55 2.00eje 7-7, 8-8 entre B-B ,C-C 1 2.45 2.75eje 7-7, 8-8 entre B-B , A-A 1 2.25 2.80Total de Cerámico de Color 30 x 30 cm.

03.04.02.02 Piso de mayólica de 15x15 cm. Color, mortero 1:4entre eje 1-1, 2-2, entre A-A , B-B 1 3.45 2.80entre eje 5-5, 6-6, entre B-B,C-C 1 2.00 1.92entre eje 1-1, 2-2, entre B-B,C-C 1 4.85 2.75Total de Piso Mayólica de 15x15 cm. De Color

03.05.0 CONTRAZOCALOS03.05.01.00 ZOCALO DE MAYOLICA DE 15 X 15 cm DE COLOR DE 1RA 17.80

03.06.00.00 CARPINTERIA DE MADERA03.06.01.00 PUERTAS

Puertas contraplacadas de 35 mm 5 0.80 2.60 de espesor marco 2"x3" 3 0.70 2.60

3 0.90 2.601 2.75 2.60

Total de madera para puertas

03.07.00.00 CARPINTERIA METÁLICA 19.01.00 VENTANAS DE FIERRO19.01.01 VENTANA DE FIERRO PERFIL DE 1" X 1/8" 1 1.60 1.40

FIJA MARCO "T" DE 1" 1 2 0.61 0.7 1.32 0.6 0.51 1.5 2.21 1.9 2.2

03.08.00.00 CERRAJERIA03.08.01.00 Bisagras para puertas, de color negro 33

20.02.00 CERRADURAS 20.02.03 Cerraduras para puertas interiores de llave interior 10

03.09.00.00 VIDRIOS, CRISTALES Y SIMILARES21.01.02 Vidrios y Cristales Semidobles 1 1.60 1.40

1 2.00 0.601 0.70 1.302 0.60 0.501 1.50 2.201 1.90 2.20

Area en m2 para vidrios y cristales semidoblesArea en p2 para vidrios y cristales semidobles x 10,76

03.10.00 PINTURA

03.10.01 PINTURA A LATEX EN CIELOS RAZOZ

cielo rasos con mezcla, 1:5, E=1.5cm

tarrajeo de fondo de escalera 1:5, E=1.5cm

03.10.02 pintura a latex en muros interiores

03.10.03 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS

03.10.04 PINTURA EN COLUMNAS

03.10.05 PINTURA EN VIGAS

PARCIAL TOTAL UND

m2

1.568.006.882.384.537.35

15.008.19

26.001.501.176.758.195.46

11.987.408.19

35.552.400.570.841.200.451.924.00

177.44 m2

m21.62

16.6414.304.949.41

13.7314.048.91

35.983.122.44

14.04

18.6314.5828.8618.519.32

43.195.720.570.842.400.451.924.00

286.54 m2

m22.840.568.108.97 11.50

38.3515.639.32

44.33128.09 m2

m2

3.32.4757.425

3.33.975

2.51752.3852.3853.975

1.19251.325

34.255

m21.890.631.321.32

1.281.280.940.641.600.800.800.480.420.901.121.410.410.140.410.120.201.650.721.651.680.590.290.300.240.210.410.42

26.24 m2

m25.276.820.26

12.35 m2

m2.757.002.60 3.43.50

10.2026.05

m1.200.701.50

1.602.601.90

9.50 m35.55 m

m2

0.970.17

1.372.41

1.300.97

7.18 m2

m28.662.063.631.462.52

17.7610.362.384.05 1.051.43

11.106.746.30

78.46 m2

85.40 85.40 m2

2.063.631.462.52

17.7610.362.384.05

1.4311.106.746.30

69.80 m2

m29.663.84

13.3426.84 m2

17.80 m2

10.40 m25.467.027.15

30.03 m2

2.24 m21.200.910.603.304.18

12.43

33.00 33.00 Pz

10.00 10.00 Pz

2.24 P21.200.910.603.304.18

12.43133.75 P2

m278.467.18 85.64

m2286.54 286.54

11.5 11.5 m234.26 34.26 m226.24 26.24 m2