METRADO ESTRUCTURAS PLANTA Procesadora de Lacteos Coata

23
PLANILLA DE METRADO DE ACERO OBRA: FECHA: DESCRIPCION DIAM. 1/4" 3/8" 1/2" 5/8" 3/4" 1" 0.25 0.56 0.99 1.55 2.24 3.97 # de Elem. Iguales # de Piezas por Elem. Long. por Pieza PESO PARCIAL Kg PESO TOTAL Kg

description

metrados en estructuras

Transcript of METRADO ESTRUCTURAS PLANTA Procesadora de Lacteos Coata

borradorPLANILLA DE METRADO DE ACEROOBRA:FECHA:DESCRIPCIONDIAM.# de Elem. Iguales# de Piezas por Elem.Long. por Pieza1/4"3/8"1/2"5/8"3/4"1"PESO PARCIAL KgPESO TOTAL Kg0.250.560.991.552.243.97Tramo 03127.421/2"184.481.0236.561/2"182.001.0216.321/2"181.961.0215.991/2"181.571.0212.811/2"181.721.0214.041/2"1221.101.0224.683/8"1111.100.587.02Tramo 04119.591/2"184.001.0232.641/2"182.001.0216.321/2"181.801.0214.691/2"181.421.0211.591/2"181.551.0212.651/2"1221.101.0224.683/8"1111.100.587.02CISTERNAS SUBTERRANEAS738.35Losa Techo152.983/8"141.100.582.553/8"150.500.581.451/2"1113.971.0244.541/2"1113.881.0243.533/8"2153.500.5860.90Muros347.031/2"2112.911.0265.301/2"2112.881.0264.633/8"2113.500.5844.661/2"2152.681.0282.011/2"2151.421.0243.453/8"294.500.5846.98Losa Piso238.341/2"1112.241.0225.131/2"1112.971.0233.321/2"1111.521.0217.051/2"1110.701.027.851/2"1111.541.0217.281/2"2154.501.02137.70

metradosPLANILLA DE METRADOS - ESTRUCTURAS PRIMER NIVELOBRA : CONSTRUCCION DEL TEMPLO DE LA C.C. CHINGARANI - TIQUILLACAPROPIETARIO : MUNICIPALIDAD DISTRITAL DE TIQUILLACAFECHA : JUNIO DEL 2012ITEMDESCRIPCIONUND.CANT.MEDIDASSUB TOT.TOTALLARGOANCHOALTO01.00.00OBRAS PROVISIONALES01.01.00Construcciones Provisionales01.01.02Cartel de 3.60 x 2.40Pza11.001.0002.00.00TRABAJOS PRELIMINARES02.01.00Limpieza de Terreno02.02.00Trazo, Niveles y Replanteo280.8802.02.01trazo, niveles y replanteo preliminarM21A=280.88280.8803.00.00MOVIMIENTO DE TIERRAS03.01.00Excavacion de zanjasM361.63Zapata tipo 1M322.501.401.409.80Zapata tipo 2M322.301.401.409.02Zapata tipo 3M361.401.401.4016.46Zapata tipo 4M360.800.801.405.38Zapata tipo 5M321.001.001.402.80Cimiento Corrido ( Eje B - C )M323.350.600.602.41Cimiento Corrido ( Eje 1 - 3 )M323.600.600.602.59Cimiento Corrido ( Eje C - D - E - F )M363.350.600.607.24Cimiento Corrido ( Eje 2 - 2")M321.600.600.601.15Cimiento Corrido ( Eje 2" - 3)M321.660.600.601.20Cimiento Corrido ( Eje 3 - 4)M312.950.600.601.06Cimiento Corrido ( Eje 2" - 4")M317.000.600.602.5203.02.00Eliminacin de material excedenteM330.66Zapata tipo 1M322.501.400.503.50Zapata tipo 2M322.301.400.503.22Zapata tipo 3M361.401.400.505.88Zapata tipo 4M360.800.800.501.92Zapata tipo 5M321.001.000.501.00Cimiento Corrido ( Eje B - C )M323.350.600.502.01Cimiento Corrido ( Eje 1 - 3 )M323.600.600.502.16Cimiento Corrido ( Eje C - D - E - F )M363.350.600.506.03Cimiento Corrido ( Eje 2 - 2")M321.600.600.500.96Cimiento Corrido ( Eje 2" - 3)M321.660.600.501.00Cimiento Corrido ( Eje 3 - 4)M312.950.600.500.89Cimiento Corrido ( Eje 2" - 4")M317.000.600.502.1003.03.00Nivelacin Interior y Apisonado del terreno previo al pisoM2280.881A=280.8804.00.00OBRAS DE CONCRETO SIMPLE04.01.00Concreto de Cimiento Corrido 1:10 + 30% PG 8"18.17Cimiento Corrido ( Eje B - C )M323.350.600.602.41Cimiento Corrido ( Eje 1 - 3 )M323.600.600.602.59Cimiento Corrido ( Eje C - D - E - F )M363.350.600.607.24Cimiento Corrido ( Eje 2 - 2")M321.600.600.601.15Cimiento Corrido ( Eje 2" - 3)M321.660.600.601.20Cimiento Corrido ( Eje 3 - 4)M312.950.600.601.06Cimiento Corrido ( Eje 2" - 4")M317.000.600.602.5204.02.00Solado para Zapatas e=4" mezcla 1:12 cemento-hormigonM231.04Zapata tipo 1M322.501.407.00Zapata tipo 2M322.301.406.44Zapata tipo 3M361.401.4011.76Zapata tipo 4M360.800.803.84Zapata tipo 5M321.001.002.0004.03.00Sobrecimientos 1:8 + 25% PMM33.79Cimiento Corrido ( Eje B - C )M323.350.250.300.50Cimiento Corrido ( Eje 1 - 3 )M323.600.250.300.54Cimiento Corrido ( Eje C - D - E - F )M363.350.250.301.51Cimiento Corrido ( Eje 2 - 2")M321.600.250.300.24Cimiento Corrido ( Eje 2" - 3)M321.660.250.300.25Cimiento Corrido ( Eje 3 - 4)M312.950.250.300.22Cimiento Corrido ( Eje 2" - 4")M317.000.250.300.5304.04.00Encofrado y Desencofrado de SobrecimientosM27.57Cimiento Corrido ( Eje B - C )M343.350.250.301.01Cimiento Corrido ( Eje 1 - 3 )M343.600.250.301.08Cimiento Corrido ( Eje C - D - E - F )M3123.350.250.303.02Cimiento Corrido ( Eje 2 - 2")M341.600.250.300.48Cimiento Corrido ( Eje 2" - 3)M341.660.250.300.50Cimiento Corrido ( Eje 3 - 4)M322.950.250.300.44Cimiento Corrido ( Eje 2" - 4")M327.000.250.301.0504.05.00Concreto en GradasM33.05Ingreso PrincipalM3130.460.103.0504.06.00Encofrado y Desencofrado de GradasM28.80Ingreso Principal 1er peldaoM2130.460.206.09Ingreso Principal 2do peldaoM2113.550.202.7105.00.00OBRAS DE CONCRETO ARMADO05.01.00Zapatas05.01.01Concreto en Zapatas f'c=210 kg/cm2M315.52Zapata tipo 1M322.501.400.503.50Zapata tipo 2M322.301.400.503.22Zapata tipo 3M361.401.400.505.88Zapata tipo 4M360.800.800.501.92Zapata tipo 5M321.001.000.501.0005.01.02Acero en Zapatas fy=4200 Kg/cm2 grado 60KG353.43353.4305.02.00Columnas05.02.01Concreto en Columnas f'c = 210 kg/cm2M31.54Columnas Tipo C-1M320.250.253.910.49Columnas Tipo C-2M320.053.950.42Columnas Tipo C-3M320.250.253.300.41Columnas Tipo C-4M320.042.500.2205.02.02Encofrado y Desencofrado en ColumnasM224.98Columnas Tipo C-1M221.003.917.82Columnas Tipo C-2M220.783.956.16Columnas Tipo C-3M221.003.306.60Columnas Tipo C-4M220.882.504.4005.02.03Acero en Columnas fy=4200 Kg/cm2 grado 60KG220.03220.0305.03.00Vigas05.03.01Concreto en Vigas f'c=210 kg/cm2M329.83Viga VI - 1 ,Eje A-AM3211.690.300.604.21Viga VI - 1 ,Eje B-BM3211.690.300.604.21Viga VI - 1 ,Eje C-CM3211.690.300.604.21Viga VI - 2 ,Eje C-CM3210.050.300.503.02Viga VI - 2 ,Eje D-DM3210.050.300.503.02Viga VI - 2 ,Eje E-EM3210.050.300.503.02Viga VI - 2 ,Eje F-FM3210.050.300.503.02Viga ,Eje A-A y Eje B - B y F - FM337.330.300.503.30Viga Cumbrera Eje A - B - CM316.300.300.300.57Viga Cumbrera Eje C - D - E - FM3114.250.300.301.2805.03.02Encofrado y Desencofrado en VigasM2308.57Viga VI - 1 ,Eje A-AM3411.690.6028.06411.690.3014.03Viga VI - 1 ,Eje B-BM3411.690.6028.06411.690.3014.03Viga VI - 1 ,Eje C-CM3411.690.6028.06411.690.3014.03Viga VI - 2 ,Eje C-CM3410.050.5020.10410.050.3012.06Viga VI - 2 ,Eje D-DM3410.050.5020.10410.050.3012.06Viga VI - 2 ,Eje E-EM3410.050.5020.10410.050.3012.06Viga VI - 2 ,Eje F-FM3410.050.5020.10410.050.3012.06Viga ,Eje A-A y Eje B - B y F - FM367.330.5021.9967.330.3013.19Viga Cumbrera Eje A - B - CM326.300.303.7816.300.301.89Viga Cumbrera Eje C - D - E - FM3214.250.308.55114.250.304.2805.03.03Acero en Vigas fy=4200 Kg/Cm2 grado 60KG2014.782014.7805.04.00Losas Maciza05.04.01Concreto en Losas Maciza f'c=210 kg/cm2M324.17Losa en Ingreso PrincipalM323.552.150.152.29M312.151.570.150.51Losa Maciza al Costado del IngresoM329.851.550.154.58Losa Maciza al costado de la nave de ingresoM324.752.570.153.66Losa Maciza al costado de la nave de ingresoM364.752.570.1510.99Losa Maciza en Cruz de ingresoM314.501.780.151.20Losa Maciza en Cruz de ingresoM321.780.500.150.27Losa Maciza en Cruz de ingresoM324.500.500.150.6805.04.02Encofrado y Desencofrado en Losas MacizaM2161.13Losa en Ingreso PrincipalM223.552.1515.27M212.151.573.38Losa Maciza al Costado del IngresoM229.851.5530.54Losa Maciza al costado de la nave de ingresoM224.752.5724.42Losa Maciza al costado de la nave de ingresoM264.752.5773.25Losa Maciza en Cruz de ingresoM214.501.788.01Losa Maciza en Cruz de ingresoM221.780.501.78Losa Maciza en Cruz de ingresoM224.500.504.5005.04.03Acero en Losas Maciza fy=4200 Kg/Cm2 grado 60KG1324.991324.9905.05.00Cobertura05.05.01Concreto en Escaleras f'c=210 kg/cm2M32.23Primer NivelM32.23Tramo 01M311.201.200.150.22M311.501.200.150.27M340.251.200.180.11Tramo 02M311.201.200.150.22M311.251.200.150.23M330.251.200.180.08Tramo 03M311.201.200.150.22M311.501.200.150.27M340.251.200.180.11Tramo 04M311.201.200.150.22M311.251.200.150.23M330.251.200.180.0805.05.02Encofrado y Desencofrado en EscalerasM226.27Primer NivelM226.27Tramo 01M212.201.202.64M250.201.201.20M211.950.300.59Tramo 02M213.701.204.44M240.201.200.96M214.000.301.20Tramo 03M215.101.206.12M250.201.201.20M214.400.301.32Tramo 04M213.701.204.44M240.201.200.96M214.000.301.2005.05.03Acero en Escaleras fy=4200 Kg/Cm2 grado 60KG1324.9905.06.00Cisternas subterraneas ( Estructuras especiales )05.06.01Concreto en Cisternas f'c=210 kg/cm2M311.12TechoM312.702.400.301.94M311.700.700.300.36MurosM3111.600.301.505.22PisoM314.003.000.303.6005.06.02Encofrado y Desencofrado en CisternasM237.07TechoM212.702.406.48M211.700.701.19MurosM2111.601.5017.40PisoM214.003.0012.0005.06.03Acero en Cisternas fy=4200 Kg/Cm2 grado 60KG753.1206.00.00MUROS Y TABIQUES DE ALBAILERIA06.01.00Muro de Ladrillo King Kong de Arcilla de CabezaM2200.00Primer NivelM2200.00Eje 1-1M220.711.401.99M220.383.002.28M212.351.401.65M240.503.006.00M230.801.403.36M211.881.402.63Eje 2-2M212.200.400.88M211.001.401.40Entre ejes 2-3 y A-BM214.531.406.34Eje 3-3M214.533.0013.59M211.001.401.40Entre ejes 3-4 y A-BM213.731.405.22Eje 4-4M214.533.0013.59M214.403.0013.20M213.403.0010.20Eje A-AM213.403.0010.20M224.673.0028.02Eje B-BM230.501.402.10M213.473.0010.41M211.473.004.41M212.973.008.91Eje D-DM213.403.0010.20M210.773.002.31M212.703.008.10M213.173.009.51Eje E-EM211.931.402.70M213.173.009.51Despues Eje E-E y 2-3M221.851.405.18M211.573.004.7106.02.00Muro de Ladrillo King Kong de Arcilla de SogaM245.34Primer NivelM245.34Entre ejes 2-3 y D-EM213.753.0011.25M211.402.002.80Eje 3-3 y D-EM211.453.004.35Entre ejes 3-4 y D-EM212.453.007.35Eje 4-4 y D-EM214.533.0013.59Entre ejes D-E y 2-3M212.003.006.00

Pgina &PBj:

aceroPLANILLA DE METRADO DE ACERO PRIMER NIVELOBRA : CONSTRUCCION DEL TEMPLO DE LA C.C. CHINGARANI - TIQUILLACAFECHA : JUNIO DEL 2012DESCRIPCIONDIAM.# de Elem. Iguales# de Piezas por Elem.Long. por Pieza1/4"3/8"1/2"5/8"3/4"1"PESO PARCIAL KgPESO TOTAL Kg0.250.560.991.552.243.97ZAPATAS353.43Tipo 1 Vertical1/2"292.400.9942.77Tipo 1 Horizontal1/2"2161.300.9941.18Tipo 2 Vertical1/2"292.200.9939.20Tipo 2 Horizontal1/2"2151.300.9938.61Tipo 3 Vertical1/2"691.300.9969.50Tipo 3 Horizontal1/2"691.300.9969.50Tipo 4 Vertical1/2"450.700.9913.86Tipo 4 Horizontal1/2"450.700.9913.86Tipo 5 Vertical1/2"270.900.9912.47Tipo 5 Horizontal1/2"270.900.9912.47COLUMNAS220.03C-1 0.30 4.83 0.301/2"245.430.9943.01C-1 ESTRIBOS1/4"2241.000.2512.00C - 21/2"245.430.9943.01C-2 ESTRIBOS1/4"2241.000.2512.00C - 31/2"244.790.9937.94C-3 ESTRIBOS1/4"2211.000.2510.50C - 41/2"264.300.9951.08C-4 ESTRIBOS1/4"2211.000.2510.50VIGAS2014.78Viga VI - 1 ,Eje A-A5/8"2412.21.55151.285/8"214.101.5512.715/8"214.101.5512.71Estribos1/4"2671.600.2553.60Viga VI - 1 ,Eje B-B5/8"2412.21.55151.285/8"214.101.5512.715/8"214.101.5512.71Estribos1/4"2671.600.2553.60Viga VI - 1 ,Eje C-C5/8"2412.21.55151.285/8"214.101.5512.715/8"214.101.5512.71Estribos1/4"2671.600.2553.60Viga VI - 2 ,Eje C-C5/8"2411.141.55138.145/8"213.811.5511.815/8"214.191.5512.99Estribos1/4"2601.600.2548.00Viga VI - 2 ,Eje D-D5/8"2411.141.55138.145/8"213.811.5511.815/8"214.191.5512.99Estribos1/4"2601.600.2548.00Viga VI - 2 ,Eje E-E5/8"2411.141.55138.145/8"213.811.5511.815/8"214.191.5512.99Estribos1/4"2601.600.2548.00Viga VI - 2 ,Eje F-F5/8"2411.141.55138.145/8"213.811.5511.815/8"214.191.5512.99Estribos1/4"2601.600.2548.00Viga Horizontal Eje A- A148.980.9935.56111.900.991.88121.260.992.49Estribos2140.900.256.30Estribos1251.420.258.88Viga Horizontal Eje B- B148.980.9935.56111.900.991.88121.260.992.492140.900.256.301251.420.258.88Viga Horizontal Eje F- F148.980.9935.56111.900.991.88121.260.992.492140.900.256.301251.420.258.88Viga VI - 2 ,Eje E-E146.820.9927.011415.070.9959.68Estribos4251.000.2525.00Estribos1121.000.253.00Viga en ingreso principal428.600.9968.11429.601.55119.04413.430.567.68412.360.565.29LOSA MACIZA1324.99Losa Maciza de Ingreso (Puerta)3/8"2163.690.5666.123/8"2221.760.5643.373/8"1161.520.5613.623/8"1222.050.5625.26Losa maciza al costado del ingreso3/8"289.850.5688.263/8"2601.550.56104.16losa Maciza en la Cruz de Ingreso3/8"1156.110.5651.323/8"1263.210.5646.74Losa Maciza Inclinada Costado de la Nave3/8"2343.300.56125.663/8"2165.350.5695.87Losa Maciza Inclinada Costado de la Nave3/8"6343.300.56376.993/8"6165.350.56287.62Tramo 03127.421/2"184.481.0236.561/2"182.001.0216.321/2"181.961.0215.991/2"181.571.0212.811/2"181.721.0214.041/2"1221.101.0224.683/8"1111.100.587.02Tramo 04119.591/2"184.001.0232.641/2"182.001.0216.321/2"181.801.0214.691/2"181.421.0211.591/2"181.551.0212.651/2"1221.101.0224.683/8"1111.100.587.02CISTERNAS SUBTERRANEAS738.35Losa Techo152.983/8"141.100.582.553/8"150.500.581.451/2"1113.971.0244.541/2"1113.881.0243.533/8"2153.500.5860.90Muros347.031/2"2112.911.0265.301/2"2112.881.0264.633/8"2113.500.5844.661/2"2152.681.0282.011/2"2151.421.0243.453/8"294.500.5846.98Losa Piso238.341/2"1112.241.0225.131/2"1112.971.0233.321/2"1111.521.0217.051/2"1110.701.027.851/2"1111.541.0217.281/2"2154.501.02137.70

resumen aceroRESUMEN DE PLANILLA DE METRADOS DE ACEROOBRA : CONSTRUCCION DEL TEMPLO DE LA C.C. CHINGARANI - TIQUILLACAFECHA : JUNIO DEL 2012ITEMDESCRIPCIONDIAM.Peso Total kgZAPATAS05.01.02Acero Zapatas1/2"353.43TOTAL353.43COLUMNAS05.02.03Acero Columnas5/8"Acero Columnas1/2"Acero Columnas3/8"TOTALVIGAS05.03.03Acero Vigas5/8"Acero Vigas1/2"Acero Vigas3/8"Acero Vigas1/4"TOTALLOSAS05.04.03Acero Losas aligeradas1/2"Acero Losas aligeradas1/4"TOTALESCALERAS05.05.03Acero Escaleras1/2"Acero Escaleras3/8"TOTALCISTERNAS05.06.03Acero Cistrenas Subterraneas1/2"Acero Cistrenas Subterraneas3/8"TOTAL

FLETECALCULO DE FLETE TERRESTREDESCRIPCIONUNIDADCANTIDADPESO X UND. O PESO ESPECIFICOTOTAL PESO KGAlambre Negro Nacional # 16KG79.4779.47Alambre Negro Nacional # 8KG68.4568.45Clavos de 1"KG8.908.90Clavos de 3.5" con cabezaKG70.5770.57Clavos de 3" con cabezaKG59.1759.17Clavos de 2 1/2"KG15.6215.62Clavos de Calamina con espiralKG43.2143.21Acero Corrugado 1/2" G- 60 para zapatasKG127.15127.15Acero Corrugado 3/8" G- 60 para columnasKG124.02124.02Acero Corrugado 1/2" G- 60 para columnasKG288.32288.32Acero Corrugado 5/8" G- 60 para columnasKG199.74199.74Acero Corrugado 1/2" G- 60 para vigasKG696.43696.43Acero Liso de 1/4" para vigasKG332.54332.54Acero Liso de 1/4" para columnasKG166.98166.98Acero Liso de 1/4" para murosKG28.3128.31YesoKG33.0033.00BreaKG260.40260.40Cemento Portland Tipo I para C.C.BL60.8342.52585.31Cemento Portland Tipo I para s/c.BL22.4542.5954.00Cemento Portland Tipo I para ZapataBL56.1042.52384.30Cemento Portland Tipo I para ColumnaBL60.6242.52576.35Cemento Portland Tipo I para VigasBL89.8042.53816.68Cemento Portland Tipo I para MurosBL34.8942.51482.63Cemento Portland Tipo I para AcabadosBL50.4242.52142.85Cemento Portland Tipo I para Falso PisoBL65.1042.52766.75Cemento Portland Tipo I para VeredasBL23.9242.51016.58Clavo acerado de 2 .5"UND154.200.034.626Clavo acerado de 4"UND18.00GROSORANCHOLARGOVOLUMNEPESO ESP0.040.72Perno de 1/2" x 12" con tuerca y volandaUND26.000.1253.25Perno de 3/8" x 3.5" con tuerca y volandaUND754.000.0537.7Cartela de Platina 0.45 x 0.35 x 1/8"UND52.000.526.00Cartela de Platina 0.40 x 0.25 x 1/8"UND52.000.526.00Cartela de Platina 0.80x 0.40 x 1/8"UND26.000.513.00Cartela de Platina 0.50x 0.35 x 1/8"UND52.000.526.00Platina 2" x 5" x 3/16"UND39.000.519.50Abrazadera de Canaleta Agua Pluvial inc. tornillosUND52.270.210.45Zocalo de madera Aguano 3/4"x 4" x 10'UND28.530.020.103.050.0059610.00003.60102.66Madera Aguano 2"x6"x10'para TijeralesUND39.000.050.153.050.0236611.000014.42562.30Madera Aguano 2"x4"x10' para TijeralesUND78.000.050.103.050.0157612.00009.63750.96Madera Aguano 2"x3"x10'UND364.670.050.053.050.0079613.00004.821758.32Madera Aguano 2" x 3"x10' (durmientes machimbrado)UND71.610.050.053.050.0079614.00004.83345.85Madera Aguano 2" x 2" x 10' (cuas machimbrado)UND52.080.050.053.050.0079615.00004.84251.93Madera Aguano 2"x2"x10' (cielo razo con tripley)UND147.190.050.053.050.0079616.00004.85713.18Ladrillo Corriente de 6 x 12 x 24UND7,100.33214200.67Lijar de FierroUND143.400.057.17SiliconaUND6.530.251.63Puerta Tipo 1UND3.0040120.00Chapa 3 golpes ForteUND6.00212.00Bisagras capuchinas de 4" x 1/2" aluminizadoUND18.000.050.90Ventana Metalica Tipo 1UND3.001545.00Ventana Metalica Tipo 2UND3.001236.00Ventana Metalica Tipo 3UND6.0030180.00Codos 90 grad. PVC SAP 3"UND12.000.010.12Curva PVC SEL 3/4"UND12.500.010.13Interruptor Simple marca TicinoUND15.660.010.16Caja Rectangular Liviana 4"x2"UND48.570.010.49Caja Octogonal Liviana 4"UND21.000.010.21Artefacto Fluorescente 2x40 wUND16.000.010.16Artefacto Fluorescente 1x40 wUND5.000.010.05Tomacorriente Doble de Baquelita REMAUND17.000.010.17Llave Tipo Cuchilla 30 amp.UND2.000.010.02Llave Tipo Cuchilla 40 amp.UND1.000.010.01Caja MetalicaUND1.000.010.01Mesas 0.50 x 0.50UND90.007.5675.00Sillas 0.30 x 0.35UND90.004360.00Escritorio 1.00 x 0.60UND3.001545.00Silla 0.40 x 0.40UND3.00618.00Estante de Madera 1.20 x 1.70UND3.002060.00Tripode para PapelografoUND3.00618.00LetrinaUND6.0080480.00Pintura Latex CPPGL13.03452.10Pintura Acrilica CPPGL10.64442.54Pintura ImprimanteGL11.75447.00Pintura para PizarraGL0.8543.40PetroleoGL13.02452.08Barniz TransparenteGL11.78447.11Thiner NormalGL4.85419.40Pegamento para Tuberia PVCGL1.0344.13Tecnopor de 1"PL13.88227.75Tripley 4mmPL65.045325.19Calamina 11 canales SIDERP. 0.25mmPL176.402.92515.10Madera Machiembrada 1"x4"x10' x 10 pzPQ58.590.030.103.050.079610.0048.012813.07Calanaleta para evacuacion agua pluvialML49.94149.94Tizero de MaderaML7.50322.50Madera Tornillo para EncofradoP21,118.141.451621.30Madera CorrienteP241.811.4560.62Vidrio Transparenrte SemidobleP2457.341.45663.14Tuberia PVC SEL. 3/4" x 3mTB51.13151.13Tuberia PVC SAP 3"TB14.28457.12CableTW N 14 100m INDECORLL4.65523.23Cinta Aislante 3Mx 40mRLL5.750.10.58Cable TW N 10 * 100m INDECORLL0.2551.2549,740.750.052487.03738152510.0330.0170.05Flete terrestreUND1.00COSTO TOTAL DIRECTOGASTOS GENERALES + UTILIDADESCOSTO TOTAL