MEZCLAS PARA CONCRETOS
CONCRETO 1 : 2 : 2 CONCRETO 1 : 2 : 2.5Fc = 3500 psi Fc = 3400 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 420.00 8.4 CEMENTO KGR 380.00
ARENA M3 0.67 ARENA M3 0.60
TRITURADO M3 0.67 TRITURADO M3 0.76
AGUA LTR 200.00 AGUA LTR 190.00
CONCRETO 1 : 2 : 3 CONCRETO 1 : 2 : 3.5
Fc = 3150 psi Fc = 3000 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 350.00 CEMENTO KGR 320.00 ARENA M3 0.56 ARENA M3 0.52
TRITURADO M3 0.84 TRITURADO M3 0.90
AGUA LTR 180.00 AGUA LTR 180.00
CONCRETO 1 : 2 : 4 CONCRETO 1 : 2.5 : 4
Fc = 2850 psi Fc = 2700 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 300.00 CEMENTO KGR 280.00
ARENA M3 0.48 ARENA M3 0.56
TRITURADO M3 0.95 TRITURADO M3 0.89
AGUA LTR 170.00 AGUA LTR 170.00
CONCRETO 1 : 2.5 : 4.5 CONCRETO 1 : 3 : 3
Fc = 2500 psi Fc = 2400 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 260.00 5.2 CEMENTO KGR 300.00
ARENA M3 0.52 ARENA M3 0.72
TRITURADO M3 0.94 TRITURADO M3 0.72
AGUA LTR 160.00 AGUA LTR 170.00
CONCRETO 1 : 3 : 4 CONCRETO 1 : 3 : 5
Fc = 2300 psi Fc = 2000 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 260.00 CEMENTO KGR 230.00
ARENA M3 0.63 ARENA M3 0.56
TRITURADO M3 0.83 TRITURADO M3 0.92
AGUA LTR 165.00 AGUA LTR 160.00
CONCRETO 1 : 3 : 6 CONCRETO 1 : 4 : 7
Fc = 1700 psi Fc = 1500 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 210.00 CEMENTO KGR 175.00
ARENA M3 0.50 ARENA M3 0.56
TRITURADO M3 1.00 TRITURADO M3 0.98
AGUA LTR 155.00 AGUA LTR 145.00
8/18/2019 Tablas Para Cantidades Ing. Jan
2/15
8/18/2019 Tablas Para Cantidades Ing. Jan
3/15
7.6
8/18/2019 Tablas Para Cantidades Ing. Jan
4/15
MATERIALES
8/18/2019 Tablas Para Cantidades Ing. Jan
5/15
8/18/2019 Tablas Para Cantidades Ing. Jan
6/15
8/18/2019 Tablas Para Cantidades Ing. Jan
7/15
MEZCLAS PARA MORTEROS
MORTERO 1 : 2 MORTERO 1 : 3
Fc = 4400 psi Fc = 3980 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 626.00 CEMENTO KGR 454.00
ARENA M3 0.97 ARENA M3 1.09
AGUA LTR 250.00 AGUA LTR 220.00
MORTERO 1 : 4 MORTERO 1 : 5
Fc = 3400 psi Fc = 2850 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 364.00 CEMENTO KGR 302.00
ARENA M3 1.16 ARENA M3 1.18
AGUA LTR 185.00 AGUA LTR 170.00
MORTERO 1 : 6 MORTERO 1 : 7
Fc = 2280 psi Fc = 1850 psi
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 260.00 CEMENTO KGR 228.00 ARENA M3 1.20 ARENA M3 1.25
AGUA LTR 150.00 AGUA LTR 140.00
MORTERO 1 : 8 MORTERO 1 : 10
MATERIALES UND CANT MATERIALES UND CANT
CEMENTO KGR 203.00 CEMENTO KGR 166.00
ARENA M3 1.25 ARENA M3 1.25
AGUA LTR 140.00 AGUA LTR 135.00
PRINCIPALES USOS DE MORTEROS
MEZCLA USOS
1:2 PAÑETE EN PISOS Y ANDENES SOMETIDOS A DESGASTE. (USAR ARENA LAVADA)
1:3 - 1:4 MAMPOSTERIA DE LADRILLO COCIDO O PIEDRA. PAÑETE PARA PISOS. (USAR ARENA LAVADA)
8/18/2019 Tablas Para Cantidades Ing. Jan
8/15
1:4 - 1:5 MAMPOSTERIA. PAÑETES EN MUROS INTERIORES Y EXTERIORES. (USAR ARENA COMUN)
1:6 - 1:7 OBRAS TRANSITORIAS
1:8 - 1: 10 OBRAS TRANSITORIAS
FUENTE: Jan Alberto Pabon
TOXEMENT
CATALOGO GENERAL - ESPECIFICIACIONES TECNICAS
8/18/2019 Tablas Para Cantidades Ing. Jan
9/15
PROPIEDADES NOMINALES DE LAS VARILLAS DE ACERO
VARILLA No. DIAMETRO DIAMETRO PESO AREA PERIMETRO
PULGADAS MILIMETROS KGR / M.L. CM2 CMTS.
2 1/4" 6.35 0.25 0.32 1.99
3 3/8" 9.52 0.56 0.71 2.99
4 1/2" 12.70 1.00 1.29 3.99
5 5/8" 15.88 1.55 2.00 4.99
6 3/4" 19.05 2.34 2.84 5.98
7 7/8" 22.22 3.04 3.87 6.98
8 1" 25.40 4.00 5.10 7.98
9 1-1/8" 28.65 5.06 6.45 9.00
10 1-1/4" 32.25 6.40 8.19 10.13
FUENTES: Jan Alberto Pabon
ANALISIS BASICO DE CANTIDADES DE MATERIALES
TOXEMENT
CATALOGO GENERAL - ESPECIFICACIONES TECNICAS
8/18/2019 Tablas Para Cantidades Ing. Jan
10/15
CANTIDAD DE LADRILLOS Y MORTERO POR M2 DE MURO
TIPO DE LADRILLO DIMENSIONES APAREJO ANCHO CANTIDAD CANTIDAD
LADRILLO MURO LADRILLOS MORTERO
(CMTS.) (CMTS.) (UND.) ( M3 )
TOLETE COMUN 7 x 12 x 25 PAPELILLO 7 30 0.016
SOGA 12 48 0.035
TIZON 25 96 0.07
TIZON Y SOGA 37 144 0.105
TOLETE COMUN 7 x 11 x 23 PAPELILLO 7 30 0.01
SOGA 11 50 0.03
TIZON 23 100 0.06
TIZON Y SOGA 34 150 0.09
TOLETE PRENSADO 5.7 x 10.5 x 24 SOGA 10.5 60 0.02
TIZON 24 130 0.05
FAROL No. 5 12.5 x 20 x 30 CANTO 12.5 15 0.02
SOGA 20 23 0.03
FAROL No. 4 9 x 20 x 30 CANTO 9 15 0.01
SOGA 20 31 0.04
HUECO No. 2 5 x 23 x 38 CANTO 5 11 0.007
HUECO No. 4 9 x 23 x 38 CANTO 9 11 0.013
HUECO No. 5 12 x 23 x 38 CANTO 12 11 0.017
HUECO No. 6 15 x 23 x 38 CANTO 15 11 0.021
HUECO No. 8 23 x 23 x 38 CANTO 23 11 0.04
BLOQUE No. 1 20 x 20 x 40 CANTO 20 12 0.028
BLOQUE No. 2 15 x 20 x 40 CANTO 15 12 0.022
BLOQUE No. 3 10 x 20 x 40 CANTO 10 12 0.014
BLOQUE No. 4 5 x 20 x 40 CANTO 5 12 0.007
FUENTES:
Jan Alberto Pabon
8/18/2019 Tablas Para Cantidades Ing. Jan
11/15
ANALISIS BASICO DE CANTIDADES DE MATERIALES
TOXEMENT
CATALOGO GENERAL - ESPECIFICIACIONES TECNICAS
8/18/2019 Tablas Para Cantidades Ing. Jan
12/15
CANTIDAD DE MATERIALES EN POZOS DE INSPECCION
DIAMETRO DIAMETRO ALTURA LADRILLO COMUN MORTERO 1:4 MORTERO 1:3 CCRETO 1:2:4 CCRETO 1:2:4 HIERRO HIER
BASE TAPA TIZON PEGA REPELLO SOLADO TAPA 3/8" 1/4
(M) (M) (M) (UND) (M3) (M3) (M3) (M3) (KGR) (KG
1.00 0.60 1.00 316 0.185 0.083 0.190 0.088 2.70 0.6
1.00 0.60 1.50 474 0.280 0.113 0.190 0.088 2.70 0.6
1.50 0.60 1.50 529 0.310 0.152 0.333 0.088 2.70 0.6
1.50 0.60 2.00 705 0.410 0.185 0.333 0.088 2.70 0.6
1.50 0.60 2.50 882 0.520 0.220 0.333 0.088 2.70 0.6
2.00 0.60 2.00 873 0.512 0.260 0.515 0.088 2.70 0.6
2.00 0.60 2.50 1092 0.640 0.300 0.515 0.088 2.70 0.6
2.00 0.60 3.00 1310 0.770 0.340 0.515 0.088 2.70 0.6
CANTIDAD DE MATERIALES EN CAJAS DE INSPECCION
DIMENSION LADRILLO MORTERO 1:4 MORTERO 1:3 CONCRETO 1:2:4 CONCRETO 1:2:4 HIERRO 3/8" ALAMBRE EXCAVACION
LIBRE COMUN PEGA REPELLO TAPA SOLADO AMARRE
(M) (UND.) (M3) (M3) (M3) (M3) (KGR) (KGR) (M3)
0.30 x 0.30 x 0.30 24 0.013 0.017 0.014 0.018 1.040 0.030 0.144
0.40 x 0.40 x 0.40 39 0.019 0.019 0.023 0.025 1.250 0.030 0.225
0.50 x 0.50 x 0.40 47 0.023 0.026 0.027 0.032 3.220 0.050 0.320
0.50 x 0.50 x 0.50 57 0.027 0.030 0.027 0.032 3.220 0.050 0.320
0.60 x 0.60 x 0.60 82 0.039 0.043 0.035 0.041 3.670 0.050 0.570
0.70 x 0.70 x 0.70 109 0.052 0.059 0.044 0.050 4.120 0.050 0.800
8/18/2019 Tablas Para Cantidades Ing. Jan
13/15
0.80 x 0.80 x 0.80 140 0.067 0.077 0.054 0.061 4.570 0.050 1.090
0.90 x 0.90 x 0.90 175 0.084 0.097 0.065 0.072 6.270 0.050 1.440
1.00 x 1.00 x 1.00 213 0.100 0.120 0.077 0.085 6.830 0.050 1.860
FUENTE: Jan Alberto Pabon
ANALISIS BASICO DE CANTIDADES DE MATERIALES
8/18/2019 Tablas Para Cantidades Ing. Jan
14/15
CANTIDADES )ARILLAS *A)ATAS COLE+IO SOTOMA,
DESCRI)CION VARILLA No.DIAMETRO DIAMETRO
PULGADAS MILIMETROS
PARA FLEES DE COLUMNAS ! "IGAS 3 3/8" 9.52
PARA PARRILLAS #APATAS 4 1/2" 12.70
PARA COLUMNAS $"ARILLA % 6&' 5 5/8" 15.88
*A)ATAS A1-A2-A3-A4 C1-+4 C3
AREA A=2,30x1.0 m A=1.0x1.0 m A=1,20x0.9 mCANTIDAD $ML' 246.4 28 14
*A)ATAS A6-+6 D5-E5-F5 AREA A=1.0x1.4 m A=2.0x2.0 mCANTIDAD $ML' 32 84
8/18/2019 Tablas Para Cantidades Ing. Jan
15/15
R
PESO CANT. CANT.
KGR / M.L. TOTAL (VARx6m) TOTAL (KG)
0.56 134 8001.00 8 5881.55 372 2232
C4
A=1.20x1.20 m A=1.80x0.90 m
16 162
1.28
1.08
A5-C2-D4-D6-E4-E6-F4-F6-
+5