    GREATER KANDY WATER

    SUPPLY PROJECTPRESENTATION

    TO

    GREATER COLOMBO WATER REHABILITATION PROJECT

    STAFF

    THINGS TO DO IN WATER RETAININGRESERVOIR CONSTRUCTION

    18THSEPTEMBER 2009

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    2/23

    INTRODUCTION

    Construction Backwash Recovery Facility

    This Is not a presentation on Design or Construction of Water RetainingStructures

    Very briefly few problems encountered in the administration of theabove contract will be discussed

    Insurance Day works Attendance to contractor Payment for preparation of Method Statements Water Bar in Concrete joints Shoring during Excavation

    Rock Blasting Laying of Hume pipes Use of Collars Marker Tapes Drawing Errors Safety Officer Quality Control Formworks

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    3/23

    INSURANCE

    Contractor shall take full responsibility for care of works andmaterials and plant from commencement until hand over

    Provisional sum or to be quoted in BOQ Employers risks Insurance of works and contractors equipment Scope of cover

    Shall be in the joint names of the contractor and employer

    Shall cover employer and contractor against all loss or damage

    from what ever cause arising until take over

    Third party Insurance Contractor shall insure in the jointnames of employer and contractor

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    4/23

    DAY WORKS

    When ever necessary any varied work may beexecuted on a day work basis on receivinginstruction from the Engineer

    Normally day work schedules for labour, materialsand construction plant is included in the BOQ

    in the NWS&DB it has own standard ratesestablished for Day works. These rates will coveroverheads and profit.

    Generally in most of the other contracts contractoris required to enter the rates for labour,equipments etc. and the contractor will not beentitled to overheads or profits.

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    5/23

    INSTALLATION OF WATER BARS

    In all large concrete water retaining structure it isnecessary to provide construction joints as it maynot be possible to complete concreting in onepouring of any base or wall.

    It is necessary to make the joints watertight. It isthe normal practice to install Water Bars at thejoint to make these watertight.

    General and particular specifications gives the

    approved specifications for water Bars

    Methods statement should describe and explainthe placing of Water Bars

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    6/23

    USE OF BONDING AGENT

    Bonding agents are classified in tocategory of construction chemicals

    These are used to bond two surfaces ofconcrete

    Method statement should Cleary state theuse of Bonding Agent

    These are important points to look for

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    7/23

    Applying Bonding Agent in concrete surfaces

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    8/23

    SHORING

    Shoring is required where ever deep excavations

    are carried out.

    It is found that the specification of shoring isincluded in the specification, but not clearly

    referred in BOQ

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    9/23

    Inadequate Protective System

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    10/23

    Properly Shored Trenches

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    11/23

    ROCK BLASTING

    Proper planning of supply of BlastingMaterials and detonators required.

    Safety Measures

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    12/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    13/23

    MARKER TAPE

    Relevant Specification

    Including as a BOQ item

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    14/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    15/23

    SAFETY AT SITE

    PPE for workers

    Ensuring facilities for prevention ofaccident

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    16/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    17/23

    Inappropriate Safety tools

    No goggles .?No helmets..?

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    18/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    19/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    20/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    21/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    22/23

  • 7/22/2019 17 Sep DWB Presentation-GCWSP Dw

    23/23