OBRA COSTO

1 CAPTACION 0.3 0.11 10,500,000.00 16

LINEA DE CONDUCCION 0.4 0.11 4,500,000.00 13

PLANTA DE TRATAMIENTO 0.5 0.11 45,200,000.00 11

LINEA DE IMPULSION 0.5 0.11 4,850,000.00 11

RESERVORIO 0.7 0.11 28,000,000.00 6

REDES DE DISTRIBUCION 0.6 0.11 44,200,000.00 8137,250,000.00

FACTOR DE ESCALA ( ʠ )

COSTO DE OPORTUNIDAD (i)

PERIODO DE DISEÑO ECONOMICO OPTIMO (Xo)

Page 2: A Baste Cimiento Ooo 001

% COSTO PONDERADO PONDERADO

7.65 1.21 20 1.53

3.28 0.44 17 0.56

32.93 3.58 14 4.70

3.53 0.38 14 0.50

20.40 1.25 9 1.78

32.20 2.73 11 3.70100.00 9.60 12.77

9 AÑOS 12 AÑOS

PERIODO OPTIMO DE DISEÑO CON DEFICIT

(Xi)