OBRA COSTO
1 CAPTACION 0.3 0.11 10,500,000.00 16
LINEA DE CONDUCCION 0.4 0.11 4,500,000.00 13
PLANTA DE TRATAMIENTO 0.5 0.11 45,200,000.00 11
LINEA DE IMPULSION 0.5 0.11 4,850,000.00 11
RESERVORIO 0.7 0.11 28,000,000.00 6
REDES DE DISTRIBUCION 0.6 0.11 44,200,000.00 8137,250,000.00
FACTOR DE ESCALA ( ʠ )
COSTO DE OPORTUNIDAD (i)
PERIODO DE DISEÑO ECONOMICO OPTIMO (Xo)
% COSTO PONDERADO PONDERADO
7.65 1.21 20 1.53
3.28 0.44 17 0.56
32.93 3.58 14 4.70
3.53 0.38 14 0.50
20.40 1.25 9 1.78
32.20 2.73 11 3.70100.00 9.60 12.77
9 AÑOS 12 AÑOS
PERIODO OPTIMO DE DISEÑO CON DEFICIT
(Xi)