Ajuste de La Formula Polinomica

4
ESTRUCTURA 204,441.38 204,659.86 218.48 ARQUITECTURA 243,836.83 243,815.32 -21.51 INSTALACIONES ELECTRICAS 49,153.94 49,137.64 -16.30 INSTALACIONES SANITARIAS 21,080.74 21,078.97 -1.77 OBRAS EXTERIORES 180,174.58 180,171.83 -2.75 MOBILIARIO Y EQUIPAMIENTO 17,035.00 17,035.00 0.00 715,722.47 715,898.62 176.15 738000 1 999366091 745,671.31 29,772.69 2 975675954 745,671.60 3 -0.29

description

MODELO DE AJUSTE FORMULA POLINOMICA

Transcript of Ajuste de La Formula Polinomica

Page 1: Ajuste de La Formula Polinomica

ESTRUCTURA 204,441.38 204,659.86 218.48ARQUITECTURA 243,836.83 243,815.32 -21.51INSTALACIONES ELECTRICAS 49,153.94 49,137.64 -16.30INSTALACIONES SANITARIAS 21,080.74 21,078.97 -1.77OBRAS EXTERIORES 180,174.58 180,171.83 -2.75MOBILIARIO Y EQUIPAMIENTO 17,035.00 17,035.00 0.00

715,722.47 715,898.62 176.15 738000 22,101.38

1 999366091745,671.31 29,772.69 2 975675954745,671.60 3

-0.29

Page 2: Ajuste de La Formula Polinomica

CALCULO DE PRESUPUESTO MODIFICADO SEGÚN INDICE UNIFICADO

K = 0.240*(Mr / Mo) + 0.143*(MFr / MFo) + 0.317*(Pr / Po) + 0.251*(Cr / Co) + 0.064*(BVCr / BVCo)

Nº DESCRIPCION I.U. I.U. JUNIO 2013 I.U. OCTUBRE 2015 FACTOR COEF1 MANO DE OBRA CALIFICADO 47.00 485.48 544.59 0.240 0.269222 FLETE TERRESTRE 32.00 484.28 468.30 0.143 0.138283 PERFIL DE ACERO LIVIANO 51.00 281.42 295.54 0.317 0.332914 CEMENTO PORTLAND TIPO I 21.00 412.37 410.96 0.251 0.250145 VIDRIO INCOLORO NACIONAL 79.00 450.03 474.15 0.064 0.06743

1.05795

PRESUPUESTO INICIAL 820,449.65

867,995.02

DIFERENCIA 47,545.37

PRESUPUESTO MODIFICADO = COEF x PRESUPUESTO INICIAL