PROYECTO FORMULACIÓN BALANCE DE PRESUPUESTOS UNITARIOS # ACTIVIDAD UNIDAD DE MEDIDA CANTIDA D VR UNITARIO VR T/CASA VR T PROYEC 1 DESCAPOTE A MAQUINA M3 27.8845 $ 15,600.00 $ 434,998.20 $ 4,349,982.00 2 LOZA MACIZA M2 79.67 $ 71,787.40 $ 5,719,302.16 $ 57,193,021.58 3 VIGA DE AMARRE EN CONCRETO "CIMENTACIÓN Y CONTRAPISO" M3 7.99 $ 467,151.82 $ 3,732,543.04 $ 37,325,430.42 4 COLUMNAS M3 2.81 $ 580,884.02 $ 1,632,284.10 $ 16,322,840.96 5 MURO EN BLOQUE No. 4 "PRIMER PISO Y SEGUNDO PISO" M2 214.6 $ 28,353.70 $ 6,084,704.75 $ 60,847,047.50 6 ESCALERA MACIZA M3 0.94 $ 678,377.62 $ 637,674.96 $ 6,376,749.63 7 PAÑETE LISO MUROS M2 266.456 $ 11,573.38 $ 3,083,796.54 $ 30,837,965.41 8 LOZA MACIZA CONTRAPISO M2 67.15 $ 254,428.84 $ 17,084,896.6 $ 170,848,966.06 AREA PLACA CONTRA PISO PRIMER PISO 79.67 m2 AREA DE MUROS PRIMER PISO 127.01 m2 AREA PLACA CONTRA PISO SEGUNDO PISO 67.15 m2 AREA DE MUROS SEGUNDO PISO 104.81 m2 VOLUMEN VIGAS DE CIMENTACIÓN 6.16 m3 VOLUMEN DE VIGAS 1.83 m3 VOLUMEN DE COLUMNAS 2.81 m3

description

BALANCE DE PRESUPUESTOS PROYECTO

Transcript of Balance de Presupuestos Proyecto

AREA PLACA CONTRA PISO PRIMER PISO 79.67m2

AREA DE MUROS PRIMER PISO 127.01m2

AREA PLACA CONTRA PISO SEGUNDO PISO 67.15m2

AREA DE MUROS SEGUNDO PISO 104.81m2

VOLUMEN VIGAS DE CIMENTACIN6.16m3

VOLUMEN DE VIGAS1.83m3

VOLUMEN DE COLUMNAS 2.81m3

PROYECTO FORMULACIN BALANCE DE PRESUPUESTOS UNITARIOS

#ACTIVIDADUNIDAD DE MEDIDACANTIDADVR UNITARIOVR T/CASAVR T PROYEC

1DESCAPOTE A MAQUINAM327.8845 $ 15,600.00 $ 434,998.20 $ 4,349,982.00

2LOZA MACIZAM279.67 $ 71,787.40 $ 5,719,302.16 $ 57,193,021.58

3VIGA DE AMARRE EN CONCRETO "CIMENTACIN Y CONTRAPISO"M37.99 $ 467,151.82 $ 3,732,543.04 $ 37,325,430.42

4COLUMNASM32.81 $ 580,884.02 $ 1,632,284.10 $ 16,322,840.96

5MURO EN BLOQUE No. 4 "PRIMER PISO Y SEGUNDO PISO"M2214.6 $ 28,353.70 $ 6,084,704.75 $ 60,847,047.50

6ESCALERA MACIZAM30.94 $ 678,377.62 $ 637,674.96 $ 6,376,749.63

7PAETE LISO MUROSM2266.456 $ 11,573.38 $ 3,083,796.54 $ 30,837,965.41

8LOZA MACIZA CONTRAPISOM267.15 $ 254,428.84 $ 17,084,896.61 $ 170,848,966.06

9MARCOS PUERTAS LMINAUN11 $ 42,832.00 $ 471,152.00 $ 4,711,520.00

10HOJA DE PUERTA MADERAUN11 $ 129,024.10 $ 1,419,265.10 $ 14,192,651.00

11VENTANA ALUMINIOM221.534 $ 140,000.00 $ 3,014,760.00 $ 30,147,600.00

12ESTUCO Y VINILO 3 MANOSM2266.456 $ 10,691.00 $ 2,848,681.10 $ 28,486,810.96

13CLOSET FORRADOM22.9714 $ 132,689.23 $ 394,272.78 $ 3,942,727.78

14CAJA CONTADORES DE AGUAUN2 $ 26,617.00 $ 53,234.00 $ 532,340.00

15ACOMETIDA 1" 3No. 10 + 12M12 $ 40,627.00 $ 487,524.00 $ 4,875,240.00

16REGISTROS DE 1/2UN2 $ 47,738.90 $ 95,477.80 $ 954,778.00

17INSTALACIONES SANITARIAS Y LAVAMANOS CON GRIFERIAUN3 $ 232,844.80 $ 698,534.40 $ 6,985,344.00

18INSTALACION DUCHAUN3 $ 31,892.67 $ 95,678.00 $ 956,780.00

19INTERRUPTOR SENCILLOUN6 $ 13,219.45 $ 79,316.70 $ 793,167.00

20INTERRUPTOR DOBLEUN11 $ 13,875.00 $ 152,625.00 $ 1,526,250.00

21TOMACORREINETEUN21 $ 13,019.45 $ 273,408.45 $ 2,734,084.50

22ROSETAUN24 $ 10,049.45 $ 241,186.80 $ 2,411,868.00

23TOMA TELEFONO + COAXIALUN5 $ 24,619.45 $ 123,097.25 $ 1,230,972.50

24JUEGOS DE INCRUSTARUN3 $ 128,236.00 $ 384,708.00 $ 3,847,080.00

25REJILLA SIFONUN8 $ 12,568.90 $ 100,551.20 $ 1,005,512.00

26REJILLA VENTILACIN 20 X 20UN3 $ 25,548.90 $ 76,646.70 $ 766,467.00

27PUNTO AGUA CALIENTE CPVC 1/2"UN3 $ 22,011.33 $ 66,033.98 $ 660,339.75

28PUNTO AGUA FRIA PVC 1/2"UN5 $ 22,011.33 $ 110,056.63 $ 1,100,566.25

29SALIDA SANITARIA 4"UN3 $ 26,665.45 $ 79,996.35 $ 799,963.50

30TUBERIA DE DESAGE PVC 4"M35 $ 23,252.00 $ 813,820.00 $ 8,138,200.00

31INSTALACION DE GAS A TODO COSTOUN1 $ 495,000.00 $ 495,000.00 $ 4,950,000.00

32ESTRUCTURA EN MADERA TEJA FIBROCEMENTOM83 $ 32,115.50 $ 2,665,586.50 $ 26,655,865.00

33CABALLETE ARTICULADO TEJA FIBROCEMENTOM23.6 $ 18,597.62 $ 66,951.43 $ 669,514.32

34TEJA FIBROCEMENTO No 4M281.52 $ 23,035.80 $ 1,877,878.42 $ 18,778,784.16

35LOZA MACIZAM22.25 $ 71,787.40 $ 161,521.65 $ 1,615,216.50

36CONEXIN TANQUE ELEVADO PVCUN1 $ 436,783.00 $ 436,783.00 $ 4,367,830.00

37MARCO PORTONUN1 $ 110,530.00 $ 110,530.00 $ 1,105,300.00

38HOJA DE PORTON MADERAUN1 $ 398,524.10 $ 398,524.10 $ 3,985,241.00

39MALLA ELECTROSOLDADA UN4.72 $ 66,900.00 $ 315,768.00 $ 3,157,680.00

40ACERO DE REFUERZO KG1000.552 $ 1,800.00 $ 1,800,993.60 $ 18,009,936.00

41PISOS CON LOSA DE 40*40M2145.82 $ 20,997.82 $ 3,061,901.87 $ 30,619,018.69

42CIELO RASO DRYWALLM2136.72 $ 44,893.19 $ 6,137,796.94 $ 61,377,969.37

TOTAL $ 68,019,462 $ 680,194,621

BALANCE DE INSUMOS

#INSUMOUNIDADCANTIDAD POR CASACANTIDAD POR PROYECYO

1ACERO 60000 PSIKg1000.55210005.52

2ADAPTADOR 1/2"Und11110

3AGUALt1278.988812789.888

4ANDAMIO TUBULARDD0.5625.62

5ARENA DE PEAm37.9936879.9368

6BISAGRA AL. EXTERIOR 2"Und49.130246491.30246

7BLOQUE No. 4Und2848.76228487.62

8CABALLETE ETERNIT PF/7 FIJOUnd3.636

9CAOLIN * 40 KGBto23.98104239.8104

10CARGADOR FRONTALDD0.2788452.78845

11CEMENTO BLANCOKg6.1861.8

12CEMENTO GRISKg2099.7441620997.4416

13CODO CPVC 1/2"Und660

14CODO GALV 1/2" Und10100

15CODO PVC 1/2"Und660

16CODO PVC 2" Und220

17CODO PVC 4" SANITUnd6.1861.8

18CONCRETO 3000 PSIm381.3796813.796

19FORMALETA ENTREPISO (ALQUILER)ms127.42461274.246

20HERRAMIENTA MENOR%6706700

21INTERRUPTOR CONM. DOBLEUnd11110

22LAMINA COLL ROLED CAL 18 DE 2*1Und9.7197.1

23LAVAMANOS ACUACER PEDESTAL BLANCOUnd330

24LIJAUnd5.3291253.2912

25LISTON ORDINARIOml172.32511723.251

26MADERA CEDRO CAQUETA PIEZAUnd1.7828417.8284

27MADERA PLANCHON ORDINARIO 3 Mml62.25622.5

28MORTERO 1:4m34.29242.92

29PEGANTE PARA MADERAKg0.742857.4285

30PINTURA ANTICORROSIVOGal0.333.3

31PINTURA VINILTEXGal18.7916187.916

32PUERTA PIZANO ECO. 1.00Und12.1121

33PUNTILLA CON CABEZA 2'Lb61.8139618.139

34PUNTILLA SIN CABEZA 2"Lb1.485714.857

35REGISTRO RW 1/2"Und3.0530.5

36REJILLAS SIFON 20*20 ALUMINIOUnd880

37REJILLAS VENTILACION 20*20 ALUMINIOUnd330

38SOLDADURA ELECTRICAKg2.4924.9

39SOLDADURA LIQUIDA PVC 1/4"Gal2.525

40TABLA BURRA Ml196.54321965.432

41TEFLNRll7.4974.9

42TEJA ETERNIT No 4Und82.3352823.352

43TOMA ELECTRICA (DOBLE)Und21210

44TORNILLO M 2*8Und11.43989114.3989

45TUBO CPVC 1/2"Und7.575

46TUBO PVC 1/2" RDE9Und18.5185

47TUBO PVC 2" RDE21 Und5.1551.5

48TUBO PVC 4" SANITUnd39.14391.4

49TUBO PVC CONDUIT 1"ml12120

50UNIVERSAL GALVANIZADA 1"Und220

51VENTANA ALUMINIO CORREDIZAm21.534215.34

52VIBRADOR A GASOLINADD1.960319.603

53VOLQUETA 3 M3Viaje10.317265103.17265

54YESO GRISBto2.6645626.6456

55MANO DE OBRA HC1089.94555410899.45554

56PARAL TELESCOPICO CORTO (150 M)MS5.53655.36

57ACPMGal0.20682.068

58BOMBEO CONCRETOM368.4656684.656

59VALVULA DE BOLA 2"UN1.0510.5

60TAPON ROSCADO 1/2 10 UND DE PRESION, PAVCOUN880

61TAPON DE PRUEBA 4" SANITARIA, PAVCOUN330

62ABRAZADERA TIPO PERA 4"UN15.75157.5

63CABLE N 12 COBRE DESNUDOMl12120

64INTERRUPTOR SENCILLO CONMUTABLE UN660

65CABLE N 12 COBRE DESNUDOMl36360

66ACOFLEX SANITARIOUN330

67ROSETAUN24240

68TOMA TELEFONO + COAXIALUN550

69JUEGO DE INCRUSTACIONESUN3.0930.9

70ADAPATADOR MACHO CPVC 1/2"UN330

71INSTALACION DE GAS A TODO COSTOUN1.111

72TORNILLO FIJADOR DE ALAUN7.272

73GANCHO GALVANIZADO PARA MADERAUN81.52815.2

74ADAPATADOR MACHO PVC 2"UN110

75FLANCHE TANQUE ROSCAXROSCA 2"UN110

76PUERTA DE 2.94UN3.5535.5

78Malla electrosoldadaUN4.7247.2

79CIELO RASO DRYWALLM2136.721367.2

BALANCE DE MAQUINARIA

MAQUINARIAUNIDAD CANT.VLR. UNITVALOR TOTAL

Cargador FrontalD0.75$ 450,000$ 337,500

Volqueta 6mHR 2$ 35,000$ 70,000

Mezcladora a Gasolina(1.5 Bultos)D3$ 49,655$ 148,965

Vibrador a GasolinaD5$ 40,000$ 200,000

RanaD1$ 63,937$ 63,937

Carretilla UN4$ 89,900$ 359,600

BaldeUN6$ 2,600$ 15,600

palasUN4$ 18,900$ 75,600

Herramienta MenorGLB30$ 2,000$ 60,000

$ 1,331,202

BALANCE DE OBRAS FSICASSALA DE VENTAS

AREA 20m^2

profundidad0.2m

ACTIVIDADUMCANTIDADVR UNITARIOVR TOTAL

DESCAPOTE A MAQUINAM34 $ 15,600.00 $ 62,400.00

LOZA MACIZA CONTRAPISOM220 $ 254,428.84 $ 5,088,576.80

MURO EN SUPERBOARDM236 $ 55,872.58 $ 2,011,412.74

MARCOS PUERTAS LMINAUN1 $ 42,832.00 $ 42,832.00

PUERTA ALUMINIOUN1 $ 415,024.10 $ 415,024.10

VENTANA ALUMINIOM24 $ 140,000.00 $ 560,000.00

ESTRUCTURA EN MADERA TEJA FIBROCEMENTOM24 $ 32,115.50 $ 770,772.00

TEJA FIBROCEMENTO No 4M220 $ 23,035.80 $ 460,716.00

CERAMICA ALFA 20 X 20M220 $ 33,368.05 $ 667,361.00

TOTAL $ 10,079,094.64

VALOR m^2 $ 503,954.73

CACINO

ACTIVIDADUMCANTIDADVRVT

DESCAPOTEm34 $ 15,600.00 $ 62,400.00

PLACA CONTRA PISO m20 $ 278,428.84 $ 5,568,576.80

MURO m19.2 $ 29,193.98 $ 560,524.48

MARCOS PUERTAUN1 $ 42,832.00 $ 42,832.00

PUERTAUN1 $ 415,024.10 $ 415,024.10

VENTANASm7 $ 39,028.00 $ 273,196.00

ESTRUCTURA TEJAM24 $ 33,773.00 $ 810,552.00

TEJAm20 $ 23,035.80 $ 460,716.00

PUNTO AGUAUN1 $ 33,439.20 $ 33,439.20

TUBERIA DESAGUEM1 $ 68,458.20 $ 68,458.20

INSTALACION DE GASUN1 $ 495,000.00 $ 495,000.00

ACOMETIDAUN1 $ 250,112.70 $ 250,112.70

REJILLA SIFONUN1 $ 12,568.90 $ 12,568.90

GRANITOm20 $ 95,504.00 $ 1,910,080.00

INTERRUMPOR SENCILLOUN1 $ 13,219.45 $ 13,219.45

PAETE LISO MUROSm19.2 $ 11,573.38 $ 222,208.90

TOTAL $ 11,198,908.73

VALOR m $ 260,439.74

BAO

#ACTIVIDADUNIDAD DE MEDIDACANTIDADVR UNITARIOVR TOTAL

1DESCAPOTE A MAQUINAm30.45 $ 15,600.00 $ 7,020.00

2MURO EN BLOQUE No. 4m210 $ 28,353.70 $ 283,537.03

3LOZA MACIZA CONTRAPISOm22.25 $ 278,428.84 $ 626,464.89

4INSTALACIONES SANITARIAS Y LAVAMANOS CON GRIFERIAunidad1 $ 232,844.80 $ 232,844.80

5INSTALACION DUCHAunidad1 $ 31,892.67 $ 31,892.67

6INTERRUPTOR SENCILLOunidad1 $ 13,219.45 $ 13,219.45

7PUERTA ALUMINIOunidad1 $ 415,024.10 $ 415,024.10

8MARCOS PUERTAS LMINAunidad1 $ 42,832.00 $ 42,832.00

9TEJA FIBROCEMENTO No 4m22.25 $ 23,035.80 $ 51,830.55

10ESTRUCTURA EN MADERA TEJA FIBROCEMENTOm6 $ 32,115.50 $ 192,693.00

11JUEGOS DE INCRUSTARunidad1 $ 128,236.00 $ 128,236.00

12REJILLA SIFONunidad2 $ 12,568.90 $ 25,137.80

13REJILLA VENTILACIN 20 X 20unidad1 $ 25,548.90 $ 25,548.90

14PUNTO AGUA CALIENTE CPVC 1/2"unidad1 $ 22,011.33 $ 22,011.33

15PUNTO AGUA FRIA PVC 1/2"unidad1 $ 22,011.33 $ 22,011.33

16SALIDA SANITARIA 4"unidad1 $ 26,665.45 $ 26,665.45

17TUBERIA DE DESAGE PVC 4"m3 $ 23,252.00 $ 69,756.00

TOTAL $ 2,216,725.29

VALOR M^2 $ 246,302.81

BALANCE DE PERSONAL

DURACION DEL PROYECTO 20MESES

S.M.M.L.V616000

CARGOSEORA DEL ASEOING RESIDENTEING DIRECTOR

CANTIDAD111

SALARIOS14.58

TRANSPORTE $ 72,000.00 00

SALARIO ANUAL $ 8,370,666.67 $ 33,726,000.00 $ 59,957,333.33

PRESTACIONES

CESANTIAS $ 825,600.00 $ 3,326,400.00 $ 5,913,600.00

INTERES DE CESANTIAS $ 99,072.00 $ 399,168.00 $ 709,632.00

VACACIONES $ 308,000.00 $ 1,386,000.00 $ 2,464,000.00

PRIMA $ 688,000.00 $ 2,772,000.00 $ 4,928,000.00

PENSION $ 899,360.00 $ 4,047,120.00 $ 7,194,880.00

SALUD $ 637,046.67 $ 2,866,710.00 $ 5,096,373.33

DOTACION $ 300,000.00 $ - $ -

RIESGOSLABORALES $ 521,628.80 $ 2,347,329.60 $ 4,173,030.40

ICBF $ 224,840.00 $ 1,011,780.00 $ 1,798,720.00

SENA $ 149,893.33 $ 674,520.00 $ 1,199,146.67

CAJA DE COMESACIN $ 299,786.67 $ 1,349,040.00 $ 2,398,293.33

ASIGNACION UNITARIA $ 13,395,896.13 $ 53,906,073.10 $ 95,833,018.07

ASIGNACION TOTAL $ 13,395,896.13 $ 53,906,073.10 $ 95,833,018.07

CARGOCANTIDADASIGNACION UNITARIAASIGNACION TOTALASIGNACION TOTAL POR DURACION DEL PROYEC

SEORA DEL ASEO1 $ 13,395,896.13 $ 13,395,896.13 $ 22,326,493.56

ING RESIDENTE1 $ 53,906,073.10 $ 53,906,073.10 $ 89,843,455.17

ING DIRECTOR1 $ 95,833,018.07 $ 95,833,018.07 $ 159,721,696.78

$ 163,134,987.30 $ 271,891,645.50