Canter Aaaaa

4
Potencia Aprovechable en Banco (7200 m^3) Material a Eliminar (2400 m^3) Over (2400 m^3)

Transcript of Canter Aaaaa

Page 1: Canter Aaaaa

Potencia Aprovechable en

Banco (7200 m^3)

Potencia Aprovechable en

Banco (7200 m^3)

Material a Eliminar (2400 m^3)

Material a Eliminar (2400 m^3)

Over (2400 m^3)

Page 2: Canter Aaaaa

Datos Obtenidos Area de la Cantera 6000 m^2Profundidad Aprobechable 2 mMaterial a eliminar 0.2 mOver 25 %

MATERIAL EXISTENTE VOLUMEN PORCENTAJE

Potencia bruta en banco 12000 m^3 100%Material a Eliminar 2400 m^3 20%Potencia Neta en Banco 9600 m^3 80%Over 2400 m^3 20%Potencia Aprovechable en Banco 7200 m^3 60%

�^2

Page 3: Canter Aaaaa

Tamiz

4" 101.6 0 0 0

3" 76.2 0 0 0

2 1/2" 63.5 0 0 0

2" 50.8 362 8.9 8.9

1 1/2" 38.1 199 4.9 13.8

1" 25.4 359 8.8 22.6

3/4" 19.05 377 9.3 31.8

1/2" 12.7 439 10.8 42.6

3/8" 9.525 263 6.5 49.1

1/4" 6.35 402 9.9 58.9

#4 4.76 102 2.5 61.4

#8 2.38 415 10.2 71.6

#10 2 83 2.0 73.6

#16 1.19 203 5.0 78.6

#30 0.59 390 9.6 88.2

#40 0.42 129 3.2 91.4

#50 0.297 79 1.9 93.3

#100 0.149 118 2.9 96.2

#200 0.074 31 0.8 97.0

<#201 124 3.0 100

TOTAL 4075

Abertura (mm)

Peso Retenido

% Retenido que pasa

%Retenido Acumulado

Page 4: Canter Aaaaa

% que pasa

100

100

100

91.1

86.2

77.4

68.2

57.4

50.9

41.1

38.6

28.4

26.4

21.4

11.8

8.6

6.7

3.8

3.0

0