MATERIAL CANTIDAD UNIDAD PRECIO UNITARIO (Bs) fierro 1/2" 58 u 66.5 fierro 3/8 40 u 41.5 fierro 1/4 100 u 16.5 alambre 1 quintal calamina 9 u 51.67 clavo 1 Kg
-
Upload
betto-orlando -
Category
Documents
-
view
217 -
download
2
description
costos de material
Transcript of Costos de Material
MATERIAL CANTIDAD UNIDAD PRECIO UNITARIO (Bs)fierro 1/2" 58 u 66.5fierro 3/8 40 u 41.5fierro 1/4 100 u 16.5alambre 1 quintalcalamina 9 u 51.67clavo 1 Kg
PRECIO TOTAL (Bs)385716601650 7167
400465.03
14 8046.03