    THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION

    PREDICTION OF AXIAL SHORTENING

  • 8/4/2019 Eng. Mamdouh Presentation

    2/41

    April 09 THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 2

    Introduction

    This presentation is intended to

    shed the light on the nature of

    the Shortening criterion in concrete, themethod of prediction

    and application of information.

  • 8/4/2019 Eng. Mamdouh Presentation

    3/41

    April 09 THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 3

    TYPES OF SHORTENING

    Elastic shortening (instant)

    Shrinkage

    - Drying shrinkage (instant)- Autogenous shrinkage(time dependant).

    Creep (time dependant)

  • 8/4/2019 Eng. Mamdouh Presentation

    4/41

    April 09 THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 4

    FACTORS AFFECTING SHORTENING

    1 ELASTIC SHORTENING

    Strength of concrete.

    Age of loading.

    Magnitude of loading

  • 8/4/2019 Eng. Mamdouh Presentation

    5/41

    April 09 THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 5

    FACTORS AFFECTING SHORTENING

    2 SHRINKAGE

    Ambient humidity.

    Dimensions of element.

    Composition of concrete.

    SHRINKAGE DOES NOT DEPEND ON LOADING

  • 8/4/2019 Eng. Mamdouh Presentation

    6/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 6

    FACTORS AFFECTING SHORTENING

    3 CREEP

    Ambient humidity.

    Dimensions of element. Composition of concrete.

    Strength of concrete.

    Magnitude of sustained load.

    Age of loading.

    CREEP IS DEPENDANT ON SUSTAINED LOADING

  • 8/4/2019 Eng. Mamdouh Presentation

    7/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 7

    MONITORED OBJECTS

    Shortening is being predicted

    and monitored for all VerticalStructural Elements,

    That is:

    COLUMNSand

    COREWALL ELEMENTS

  • 8/4/2019 Eng. Mamdouh Presentation

    8/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 8

  • 8/4/2019 Eng. Mamdouh Presentation

    9/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 9

    LETS LOOK AGAIN AT THAT LAST IMAGE.

    Long term Shortening yet to take place AFTER PLACEMENT is the key figure

    to assess impact.

  • 8/4/2019 Eng. Mamdouh Presentation

    10/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 10

    LONG TERM SHORTENING YET TO TAKE PLACE AFTER PLACEMENT

    Long term Cumulative shortening for a column atlevel 30, starts well before placement date.

    Long term cumulative shortening yet to take placeat that point equals:

    Long term cumulative shortening at that point LESSInterim Cumulative Shortening that has alreadytaken place at time of pouring the slab.

  • 8/4/2019 Eng. Mamdouh Presentation

    11/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 11

    WE NEED TO AGREE ON THE DEFINITION OF THE TERMS

    JUST MENTIONED:

    Final floor Shortening: FFSIs the final (30+ years) shortening for a VSE at a given level.

    Final Cumulative Shortening FCS:Is the final (30 + years) and cumulative shortening for all the VSEsunderneath a point at a given level.

    Interim Cumulative Shortening ICS:Is the cumulative shortening for all the VSEs underneath a TargetPoint at a given time.

  • 8/4/2019 Eng. Mamdouh Presentation

    12/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 12

    MORE DEFINITIONS

    LEVEL ADJUSTMENT:

    Floor slab should be constructed to a higher level than that designedsuch that design level would be reached to upon completion of finalshortening.

    Adjustment at a given level should be equal to the Cumulative

    Shortening yet to take place for all columns underneath that levelfrom the date of slab placement and for 30 years to come afterloading completion.

    Level Adjustment = Final (30 Y) Cumulative Shortening at the point lessthe Interim Cumulative Shortening at time of placement = FCS ICS.

  • 8/4/2019 Eng. Mamdouh Presentation

    13/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 13

    WHY DO WE NEED TO PREDICT SHORTENING ?.

    To determine the level adjustment amount.

    To assess the impact on interfacing structures.

    To establish construction tolerance in interfacing

    installations (cladding, pipe risers, vertical railing ..etc).

    To assess the impact of column / core wall differentialshortening on the structure.

  • 8/4/2019 Eng. Mamdouh Presentation

    14/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 14

    CALCULATION METHODOLOGY

    The magnitude of long term elastic,shrinkage and creep strains has been

    calculated as per the provisions of BS EN

    1992-1-1:2004.

  • 8/4/2019 Eng. Mamdouh Presentation

    15/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 15

    PREDICTION METHODOLOGY 1 - ANALYSIS PARAMETERS

    SHORTENING CALCULATIONS TO THE REQUIREMENTS OF "EUROCODE 2, BS EN 1992-1-1:2004

    RH Relative Humidity % age

    HA coefficient depending on the relative

    1.5[1+(.012 RH)18] ho + 250 3 , 35

    t0 Age of concrete at loading

    c Compressive stress applied at age to

    ho Section notional size = 2 Area / Perimeter

    t Age of concrete at the moment)

    t-t0 Non-adjusted duration of loading

    cc(t)Cefficient for the calculation of

    exp{s[1-(28/t)1/2]} = e{s[1-(28/t)]}

    compressive strength fcm(t) at age t

    fcm(t) Compressive strength at age t cc(t). fcm

    Ecm Concrete secant modulus of elasticity 22 (fcm/10)0.3

    Ecm(t) Tangent Modulus of Elasticity at age "t" [fcm(t) / fcm]0.3 .Ecm

  • 8/4/2019 Eng. Mamdouh Presentation

    16/41

    April 09THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 16

    PREDICTION METHODOLOGY 2 - ELASTIC SHORTENING

    et Elastic strain at time "t" c / Ecm(t)

  • 8/4/2019 Eng. Mamdouh Presentation

    17/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 17

    PREDICTION METHODOLOGY 3 - DRYING SHRINKAGE

    RHCoefficient related to relative

    humidity1.55 [1 - (RH/RH

    O)3]

    ds1 Coefficient depends on cement type

    ds2 Coefficient depends on cement type

    cd.0 Basic drying shrinkage strain0.85[(220+110.ds1).

    exp(-ds2.fcm/fcmo)].RH/10

    6

    ds(t,ts)(t-t

    s)

    (t-ts)+0.04

    ho3

    kh Coefficient depending on "ho" Equals 0.7 for ho =>500

    cd (t) Long term drying shrinkage ds(t,ts).kh.cd.0ca () 2.5(fck-10)10

    6

    as(t) 1 - exp(-2t0.5)ca (t) The autogenous shrinkage as(t) . ca ()

    cs Total shrinkage strain cd +ca

  • 8/4/2019 Eng. Mamdouh Presentation

    18/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 18

    PREDICTION METHODOLOGY 4 - CREEP

    Ec Tangent Modulus of Elasticity. 1.05 Ecm

    1 12,3 are coefficients to (35/fcm)0.7

    2 consider the influence of the (35/fcm

    )0.2

    3 concrete strength on the creep strain. (35/fcm

    )0.5

    (to) A factor allowing for age of loading effect. 1 / (0.1 + to0.2)

    (fcm)A factor to allow for the effect of concrete 16.8

    strength on the notional creep coefficient fcm

    (t,to) A coefficient to count time effect [(t-t0) / (H + t - t0)]0.3

    RH A factor to allow for the effect of humidity. [1+(1-RH/100).1/(0.1 ho^0.333)].2

    0 Notional creep coefficient RH . (fcm). ((t0)

    t,to The creep coefficient. . c(t,to)

    cct,to Creep deformation (strain) at time "t" t,tocEc

  • 8/4/2019 Eng. Mamdouh Presentation

    19/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 19

    THE MASTER SPREADSHEET

    Data base for geometric, material and loading information for eachcolumn / corewall element, including the construction schedule,

    has been entered into a Master Spreadsheet.

    Cells of the Master Spreadsheet encapsulate the formulae needed tocalculate the strain in the column corresponding to followingloadings imposed by floor slabs supported by the column:

    SWL : Self Weight Load.

    SDL : Super-imposed Dead Load.

    SLL : Super-imposed Live Load.

  • 8/4/2019 Eng. Mamdouh Presentation

    20/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION 20

    MASTER SPREAD SHEET - INSERTING CONSTRUCTION SCHEDULE

  • 8/4/2019 Eng. Mamdouh Presentation

    21/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 21

    MASTER SPREAD SHEET - INSERTING COLUMN PROPERTIES

  • 8/4/2019 Eng. Mamdouh Presentation

    22/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 22

    MASTER SPREAD SHEET PART 1

  • 8/4/2019 Eng. Mamdouh Presentation

    23/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 23

    MASTER SPREAD SHEET PART 2

    DETAIL A

  • 8/4/2019 Eng. Mamdouh Presentation

    24/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 24

    MASTER SPREAD SHEET DETAIL A

  • 8/4/2019 Eng. Mamdouh Presentation

    25/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 25

    MASTER SPREAD SHEET GETTING A SHORTENING VALUE ON A GIVEN DATE

  • 8/4/2019 Eng. Mamdouh Presentation

    26/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 26

  • 8/4/2019 Eng. Mamdouh Presentation

    27/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 27

    LEVEL ADJUSTMENT ACHIEVED

    To determine the level

    adjustment amount.

  • 8/4/2019 Eng. Mamdouh Presentation

    28/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 28

    MASTER SPREAD SHEET GETTING A COLUMN PROFILE AT A GIVEN LEVEL

    PREDICTED PROFILE FOR C1- L 30 TOP

    -60.00

    -50.00

    -40.00

    -30.00

    -20.00

    -10.00

    0.00

    28-Jan-08

    28-Feb-08

    28-Mar-08

    28-Apr-08

    28-May-08

    28-Jun-08

    28-Jul-08

    28-Aug-08

    28-Sep-08

    28-Oct-08

    28-Nov-08

    28-Dec-08

    28-Jan-09

    28-Feb-09

    28-Mar-09

    28-Apr-09

    28-May-09

    28-Jun-09

    28-Jul-09

    28-Aug-09

    28-Sep-09

    28-Oct-09

    28-Nov-09

    28-Dec-09

    28-Jan-10

    28-Feb-10

    28-Mar-10

    28-Apr-10

    28-May-10

    PREDICTED

    FINALMEASURED

    CHART NO. C3-L30-04009-01 COLUMN C3 POINT AT L 30 DATE 3-Jun-08

    A

    MAS

    PROFILE AT L-1

  • 8/4/2019 Eng. Mamdouh Presentation

    29/41

    April09

    TH

    ELANDMARK

    ABU

    DHABI

    ALHABTOOR

    CCC

    JV

    SHO

    RTENINGPRE

    DICTION

    TERSPRE

    ADSHEETIMP

    ACTOFSHORTE

    NINGONINTERFACINGSTRUCTURES(THEC

    -70.00

    -60.00

    -50.00

    -40.00

    -30.00

    -20.00

    -10.00

    0.00

    9-Feb-08

    9-Mar-08

    9-Apr-08

    9-May-08

    9-Jun-08

    9-Jul-08

    9-Aug-08

    9-Sep-08

    9-Oct-08

    9-Nov-08

    9-Dec-08

    9-Jan-09

    9-Feb-09

    9-Mar-09

    9-Apr-09

    9-May-09

    9-Jun-09

    9-Jul-09

    9-Aug-09

    9-Sep-09

    9-Oct-09

    9-Nov-09

    9-Dec-09

    9-Jan-10

    9-Feb-10

    9-Mar-10

    9-Apr-10

    -140.00

    -120.00

    -100.00

    -80.00

    -60.00

    -40.00

    -20.00

    0.00

    26-Apr-08

    26-May-08

    26-Jun-08

    26-Jul-08

    26-Aug-08

    26-Sep-08

    26-Oct-08

    26-Nov-08

    26-Dec-08

    26-Jan-09

    26-Feb-09

    26-Mar-09

    26-Apr-09

    26-May-09

    26-Jun-09

    26-Jul-09

    26-Aug-09

    26-Sep-09

    26-Oct-09

    26-Nov-09

    26-Dec-09

    26-Jan-10

    26-Feb-10

    26-Mar-10

    26-Apr-10

    A B

    PROFILE AT L-7

    INTERFACING

    STRUCTURE

    LONG

    TERMDIMENSIO

    NALCHANGE

    H=AB

    =4.9mm

    INTERFACING

    INSTALLATION

    14APR

  • 8/4/2019 Eng. Mamdouh Presentation

    30/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 30

    IMPACT ON INTERFACING STRUCTURES ASSESSED.

    To determine the level adjustmentamount.

    To assess the impact on interfacingstructures.

    A

    MASTPROFILE AT L-36 PROFILE AT L-35

  • 8/4/2019 Eng. Mamdouh Presentation

    31/41

    April09

    TH

    ELANDMARK

    ABU

    DHABI

    ALHABTOOR

    CCC

    JV

    SHO

    RTENINGPRE

    DICTION

    TERSPRE

    ADSHEETIMP

    ACTOFSHORTE

    NINGONINTERF

    ACINGINSTALLATIONS(CUR

    -300.00

    -250.00

    -200.00

    -150.00

    -100.00

    -50.00

    0.00

    4-Dec-08

    4-Jan-09

    4-Feb-09

    4-Mar-09

    4-Apr-09

    4-May-09

    4-Jun-09

    4-Jul-09

    4-Aug-09

    4-Sep-09

    4-Oct-09

    4-Nov-09

    4-Dec-09

    4-Jan-10

    4-Feb-10

    4-Mar-10

    4-Apr-10

    4-May-10

    4-Jun-10

    4-Jul-10

    4-Aug-10

    4-Sep-10

    4-Oct-10

    4-Nov-10

    A

    B

    INTERFACING

    STRUCTURE

    LONG

    TERMDIMENSIO

    NALCHANGE

    H=AB

    =2.1mm

    INTERFACING

    INSTALL

    ATION

    COMPLETION

    20APRIL2010

    -350.00

    -300.00

    -250.00

    -200.00

    -150.00

    -100.00

    -50.00

    0.00

    24-Dec-08

    24-Jan-09

    24-Feb-09

    24-Mar-09

    24-Apr-09

    24-May-09

    24-Jun-09

    24-Jul-09

    24-Aug-09

    24-Sep-09

    24-Oct-09

    24-Nov-09

    24-Dec-09

    24-Jan-10

    24-Feb-10

    24-Mar-10

    24-Apr-10

    24-May-10

    24-Jun-10

    24-Jul-10

    24-Aug-10

    24-Sep-10

    24-Oct-10

    A

  • 8/4/2019 Eng. Mamdouh Presentation

    32/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 32

    CONSTRUCTION TOLERANCE IN INTERFACING INSTALLATION VERIFIED

    To determine the level adjustment amount.

    To assess the impact on interfacingstructures.

    To establish construction tolerancein interfacing installations (cladding,pipe risers, vertical railing ..etc) .

  • 8/4/2019 Eng. Mamdouh Presentation

    33/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 33

    THE EXECUTIVE SUMMARY

    Information extracted from various Master Spreadsheets has

    been classified sorted in 5 schedules A through E.

    These schedules were listed in an Implementation Duty

    Matrix along with a listing for their

    functions and concerned parties.

  • 8/4/2019 Eng. Mamdouh Presentation

    34/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 34

  • 8/4/2019 Eng. Mamdouh Presentation

    35/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 35

    SCHEDULE A

    A summary for30 years final

    cumulative

    shortening

  • 8/4/2019 Eng. Mamdouh Presentation

    36/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 36

    SCHEDULE B

    Balance Final

    CumulativeShortening yet

    to take place

    after placement

    of VSEs

  • 8/4/2019 Eng. Mamdouh Presentation

    37/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 37

    SCHEDULE

    C

    Change in

    inter-floor

    height

  • 8/4/2019 Eng. Mamdouh Presentation

    38/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 38

    SCHEDULE D

    Floor level

    adjustment

  • 8/4/2019 Eng. Mamdouh Presentation

    39/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 39

    SCHEDULE E

    Differential

    shorteningbetween

    corewall &

    columns at

    pivots.

  • 8/4/2019 Eng. Mamdouh Presentation

    40/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 40

    COLUMN / COREWALL DIFFERENTIAL SHORTENING COMPUTED.

    To determine the level adjustment amount.

    To assess the impact on interfacingstructures.

    To establish construction tolerance ininterfacing installations (cladding, piperisers, vertical railing ..etc) .

    To assess the impact of column /core wall differential shortening onthe structure.

  • 8/4/2019 Eng. Mamdouh Presentation

    41/41

    April 09

    THE LANDMARK ABU DHABI ALHABTOOR CCC JV

    SHORTENING PREDICTION 41

    THIS IS THE END OF THE PRESENTATION

    Thank you very much for listening..

    I shall be ready for your question after

    viewing a Master Spreadsheet.

    M.H.