CALCULO DE FLETE TERRESTRE - LOSA DEPORTIVA POR PESO MATERIAL UNID CANTIDAD ALAMBRE NEGRO RECOCIDO # 16 kg 0.18 1.00 0.18 0.12 0.02 ALAMBRE NEGRO RECOCIDO # 8 kg 115.27 1.00 115.27 0.12 13.83 CLAVOS PARA MADERA CON CABEZA DE 1" kg 11.02 1.00 11.02 0.12 1.32 CLAVOS PARA MADERA CON CABEZA DE 2" kg 22.04 1.00 22.04 0.12 2.64 CLAVOS PARA MADERA CON CABEZA DE 3" kg 65.41 1.00 65.41 0.12 7.85 kg 3.07 1.00 3.07 0.12 0.37 ARENA FINA m3 0.69 1,000.00 686.40 0.12 82.37 PIEDRA CHANCADA DE 3/4" m3 3.92 1,500.00 5,886.00 0.12 706.32 PIEDRA GRANDE DE 8" m3 3.21 1,500.00 4,815.60 0.12 577.87 PIEDRA CHANCADA DE 1/2" m3 2.75 1,500.00 4,125.00 0.12 495.00 ARENA GRUESA DE RIO m3 0.56 1,500.00 835.35 0.12 100.24 ARENA GRUESA m3 4.42 1,200.00 5,300.64 0.12 636.08 ASFALTO RC-250 gal 35.38 5.00 176.89 0.12 21.23 CEMENTO PORTLAND TIPO I (42.5 kg) bls 74.85 42.50 3,181.08 0.12 381.73 YESO EN BOLSAS DE 25 kg bls 16.53 25.00 413.25 0.12 49.59 OCRE IMPORTADO kg 2.76 1.00 2.76 0.12 0.33 THINNER STANDARD gal 1.32 4.50 5.93 0.12 0.71 und 2.00 1,000.00 2,000.00 0.12 240.00 HORMIGON m3 275.50 1,000.00 275,500.00 0.12 33,060.00 LIJA DE FIERRO # 80 pza 4.94 0.01 0.05 0.12 0.01 und 1.00 50.00 50.00 0.12 6.00 MADERA ROBLE NACIONAL p2 2,138.27 3.75 8,018.51 0.12 962.22 CORDEL ml 440.80 0.01 4.41 0.12 0.53 MADERA DE MONTAÑA CORRIENTE p2 137.75 1.50 206.63 0.12 24.80 MADERA ANDAMIAJE p2 5.60 1.50 8.40 0.12 1.01 p2 55.92 3.75 209.71 0.12 25.17 gal 1.48 4.00 5.93 0.12 0.71 PLANCHA DE TECKNOPOR DE 1" X 4' X 8' pl 1.83 4.00 7.31 0.12 0.88 TOTAL 311,656.81 2.- FLETE TERRESTRE FLETE POR PESO = Peso total x Flete por peso. UNIDAD DE TRANSPORTE CAPACIDAD DE CAMION (Kg) 311,656.81 COSTO POR VIAJE MATERIALES 600.00 FLETE POR (Kg) 0.15 CÁLCULO DEL FLETE TOTAL COSTO DE FLETE POR TRANSPORTE (incluido IG 46,748.52 COSTO DE FLETE POR TRANSPORTE (sin IGV) 39,617.39 Son: Treintinueve mil seicientos diecisiete con 39/100 Nuevos Soles OBRA: "AMPLIACIÓN Y MEJORAMIENTO DE LA I.E. N°31042 FRANCISCO BOLOGNESI CERVANTES DE NIVEL PRIMARIO DEL CENTRO POBLADO DE HUAYLLABAMBA, DISTRITO DE CHINCHIHUASI, PROVINCIA DE CHURCAMPA- HUANCAVELICA" Traslado de la Ciudad de Huancayo a la Localidad de Huayllabamba- Chinchihuasi - PESO UNIT. (KG) PESO PARCIAL (KG) PRECIO (KG) COSTO PARCIAL CLAVOS PARA CEMENTO DE ACERO CON CABEZA ARCOS CON TABLERO PARA BASKET INCL. PARANTES Y NET DE BOLEY SEGUN DISEÑO MADERA TORNILLO INCLUYE CORTE PARA PINTURA DE TRAFICO DE ALTO TRANSITO PARA

description

FLETE

Transcript of Flete Losa

Sheet1CALCULO DE FLETE TERRESTRE - LOSA DEPORTIVAOBRA: "AMPLIACIN Y MEJORAMIENTO DE LA I.E. N31042 FRANCISCO BOLOGNESI CERVANTES DE NIVEL PRIMARIO DEL CENTRO POBLADO DE HUAYLLABAMBA, DISTRITO DE CHINCHIHUASI, PROVINCIA DE CHURCAMPA- HUANCAVELICA"Traslado de la Ciudad de Huancayo a la Localidad de Huayllabamba- Chinchihuasi - Churcampa - HuancavelicaPOR PESOMATERIALUNIDCANTIDADPESO UNIT. (KG)PESO PARCIAL (KG)PRECIO (KG)COSTO PARCIALALAMBRE NEGRO RECOCIDO # 16kg0.181.000.180.120.02ALAMBRE NEGRO RECOCIDO # 8kg115.271.00115.270.1213.83CLAVOS PARA MADERA CON CABEZA DE 1"kg11.021.0011.020.121.32CLAVOS PARA MADERA CON CABEZA DE 2"kg22.041.0022.040.122.64CLAVOS PARA MADERA CON CABEZA DE 3"kg65.411.0065.410.127.85CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3"kg3.071.003.070.120.37ARENA FINAm30.691,000.00686.400.1282.37PIEDRA CHANCADA DE 3/4"m33.921,500.005,886.000.12706.32PIEDRA GRANDE DE 8"m33.211,500.004,815.600.12577.87PIEDRA CHANCADA DE 1/2"m32.751,500.004,125.000.12495.00ARENA GRUESA DE RIOm30.561,500.00835.350.12100.24ARENA GRUESAm34.421,200.005,300.640.12636.08ASFALTO RC-250gal35.385.00176.890.1221.23CEMENTO PORTLAND TIPO I (42.5 kg)bls74.8542.503,181.080.12381.73YESO EN BOLSAS DE 25 kgbls16.5325.00413.250.1249.59OCRE IMPORTADOkg2.761.002.760.120.33THINNER STANDARDgal1.324.505.930.120.71ARCOS CON TABLERO PARA BASKET INCL. INSTALACIONund2.001,000.002,000.000.12240.00HORMIGONm3275.501,000.00275,500.000.1233,060.00LIJA DE FIERRO # 80pza4.940.010.050.120.01PARANTES Y NET DE BOLEY SEGUN DISEO INCL. INSTALACION Y PITURA ESMALTEund1.0050.0050.000.126.00MADERA ROBLE NACIONALp22,138.273.758,018.510.12962.22CORDELml440.800.014.410.120.53MADERA DE MONTAA CORRIENTEp2137.751.50206.630.1224.80MADERA ANDAMIAJEp25.601.508.400.121.01MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp255.923.75209.710.1225.17PINTURA DE TRAFICO DE ALTO TRANSITO PARA LOSASgal1.484.005.930.120.71PLANCHA DE TECKNOPOR DE 1" X 4' X 8'pl1.834.007.310.120.88TOTAL311,656.812.- FLETE TERRESTREFLETE POR PESO = Peso total x Flete por peso.UNIDAD DE TRANSPORTECAPACIDAD DE CAMION (Kg)311,656.81COSTO POR VIAJE MATERIALES600.00FLETE POR (Kg)0.15CLCULO DEL FLETE TOTALCOSTO DE FLETE POR TRANSPORTE (incluido IGV)46,748.52COSTO DE FLETE POR TRANSPORTE (sin IGV)39,617.39Son: Treintinueve mil seicientos diecisiete con 39/100 Nuevos Soles