Gastos Generales y Supervision

1
1 MES ITEM DESCRIPCION UND INCID. TIEMPO (MES) COSTO TOTAL 1.01 Alquiler de oficina, luz, agua, telefono, mantenimiento MES 1.00 1.00 250.00 250.00 SUB TOTAL 250.00 ITEM DESCRIPCION CANT INCID. TIEMPO (MES) COSTO TOTAL 2.03 1 pers 1.00 1.00 1,100.00 1,100.00 2.06 1 pers 1.00 1.00 850.00 850.00 SUB TOTAL 1,950.00 ITEM UND INCID. TIEMPO (MES) COSTO TOTAL 3.01 GLB 1.00 1.00 250.00 250.00 3.02 GLB 1.00 1.00 250.00 250.00 3.03 GLB 1.00 1.00 150.00 150.00 SUB TOTAL 650.00 S/. 2,850.00 ITEM CANT INCID. TIEMPO (MES) COSTO TOTAL 1.01 1 pers 1.00 1.00 4,250.00 4,250.00 1.03 1 pers 1.00 1.00 1,500.00 1,500.00 1.04 1 pers 1.00 1.00 1,000.00 1,000.00 SUB TOTAL S/. 6,750.00 ITEM UND INCID. CANTIDAD COSTO TOTAL 1.01 EST 1.00 1.00 400.00 400.00 1.04 MES 1.00 1.00 1,500.00 1,500.00 1.05 MES 1.00 1.00 250.00 250.00 1.06 GLB 1.00 1.00 1,000.00 1,000.00 SUB TOTAL 3,150.00 ITEM UND INCID. CANTIDAD COSTO TOTAL 3.01 UND 1.00 5.00 80.00 400.00 3.02 UND 1.00 3.00 300.00 900.00 SUB TOTAL 1,300.00 ITEM UND INCID. CANTIDAD COSTO TOTAL 4.01 MES 1.00 0.50 3,800.00 1,900.00 4.02 EST 1.00 1.00 500.00 500.00 4.03 EST 1.00 1.00 300.00 300.00 SUB TOTAL 2,700.00 ITEM UND INCID. TIEMPO (MES) COSTO TOTAL 6.01 GLB 3.00 1.00 150.00 450.00 6.02 GLB 1.00 1.00 200.00 200.00 SUB TOTAL 650.00 S/. 14,550.00 TIPO DE GASTO TOTAL I.- GASTOS FIJOS S/. 2,850.00 II.- GASTOS VARIABLES S/. 14,550.00 TOTAL GASTOS GENERALES S/. 17,400.00 Gastos de tramites para Exp y contrato DESAGREGADO DE GASTOS GENERALES PLAZO DE EJECUCION : I GASTOS FIJOS 1.00 ALQUILERES Y SERVICIOS 2.00 REMUNERACIONES Y BENEFICIOS SOCIALES 3.00 ARTICULOS DE CONSUMO Administrador Secretaria TOTAL GASTOS VARIABLES PROYECTO: Instalación del Servicio de Protección contra probable inundación que afectará al CPM Pacherrez, por ocurrencia de Fenómeno El Niño en el Distrito de Pucalá - Chiclayo - Lambayeque, en el año 2015 Utiles de Oficina, mobiliario, alquiler eventual de equipo de ingenieria, fotocopias, etc DESCRIPCION CARGO DESCRIPCION 6.00 SEGUROS DESCRIPCION DESCRIPCION TOTAL GASTOS FIJOS II GASTOS VARIABLES 1.00 SUELDOS Y SALARIOS 2.00 GASTOS DE OFICINA Y SERVICIOS 3.00 GASTOS DE CONTROL DE CALIDAD Sueldo de Ingeniero Residente Movilidad local Contra accidentes individuales Contra instalaciones, responsabilidad civil etc. Utiles de escritorio y aseo Gastos para tramites adm. y de gestión del proyecto Rotura de probetas y constancia Gastos en diseño de mezclas 4.00 GASTOS DE LIQUIDACION DESCRIPCION Sueldo de Ingeniero Liquidador Impresiones, Fotocopias Planos de Replanteo Sueldo de Almacenero Alquiler de Camioneta y otros Sueldo de Maestro de Obra Impresiones, Fotocopias

description

FASTER NOW!!

Transcript of Gastos Generales y Supervision

Page 1: Gastos Generales y Supervision

1 MES

ITEM DESCRIPCION UND INCID. TIEMPO (MES) COSTO TOTAL1.01 Alquiler de oficina, luz, agua, telefono, mantenimiento MES 1.00 1.00 250.00 250.00

SUB TOTAL 250.00

ITEM DESCRIPCION CANT INCID. TIEMPO (MES) COSTO TOTAL2.03 1 pers 1.00 1.00 1,100.00 1,100.002.06 1 pers 1.00 1.00 850.00 850.00

SUB TOTAL 1,950.00

ITEM UND INCID. TIEMPO (MES) COSTO TOTAL

3.01 GLB 1.00 1.00 250.00 250.00

3.02 GLB 1.00 1.00 250.00 250.003.03 GLB 1.00 1.00 150.00 150.00

SUB TOTAL 650.00

S/. 2,850.00

ITEM CANT INCID. TIEMPO (MES) COSTO TOTAL

1.01 1 pers 1.00 1.00 4,250.00 4,250.00

1.03 1 pers 1.00 1.00 1,500.00 1,500.00

1.04 1 pers 1.00 1.00 1,000.00 1,000.00

SUB TOTAL S/. 6,750.00

ITEM UND INCID. CANTIDAD COSTO TOTAL

1.01 EST 1.00 1.00 400.00 400.00

1.04 MES 1.00 1.00 1,500.00 1,500.00

1.05 MES 1.00 1.00 250.00 250.00

1.06 GLB 1.00 1.00 1,000.00 1,000.00

SUB TOTAL 3,150.00

ITEM UND INCID. CANTIDAD COSTO TOTAL

3.01 UND 1.00 5.00 80.00 400.00

3.02 UND 1.00 3.00 300.00 900.00

SUB TOTAL 1,300.00

ITEM UND INCID. CANTIDAD COSTO TOTAL

4.01 MES 1.00 0.50 3,800.00 1,900.00

4.02 EST 1.00 1.00 500.00 500.00

4.03 EST 1.00 1.00 300.00 300.00

SUB TOTAL 2,700.00

ITEM UND INCID. TIEMPO (MES) COSTO TOTAL

6.01 GLB 3.00 1.00 150.00 450.00

6.02 GLB 1.00 1.00 200.00 200.00

SUB TOTAL 650.00

S/. 14,550.00

TIPO DE GASTO TOTAL

I.- GASTOS FIJOS S/. 2,850.00

II.- GASTOS VARIABLES S/. 14,550.00

TOTAL GASTOS GENERALES S/. 17,400.00

Gastos de tramites para Exp y contrato

DESAGREGADO DE GASTOS GENERALES

PLAZO DE EJECUCION :

I GASTOS FIJOS

1.00 ALQUILERES Y SERVICIOS

2.00 REMUNERACIONES Y BENEFICIOS SOCIALES

3.00 ARTICULOS DE CONSUMO

AdministradorSecretaria

TOTAL GASTOS VARIABLES

PROYECTO: Instalación del Servicio de Protección contra probable inundación que afectará al CPM Pacherrez, por ocurrencia de Fenómeno El Niño en el Distrito de Pucalá - Chiclayo - Lambayeque, en el año 2015

Utiles de Oficina, mobiliario, alquiler eventual de equipo de ingenieria, fotocopias, etc

DESCRIPCION

CARGO

DESCRIPCION

6.00 SEGUROS

DESCRIPCION

DESCRIPCION

TOTAL GASTOS FIJOS

II GASTOS VARIABLES

1.00 SUELDOS Y SALARIOS

2.00 GASTOS DE OFICINA Y SERVICIOS

3.00 GASTOS DE CONTROL DE CALIDAD

Sueldo de Ingeniero Residente

Movilidad local

Contra accidentes individuales

Contra instalaciones, responsabilidad civil etc.

Utiles de escritorio y aseo

Gastos para tramites adm. y de gestión del proyecto

Rotura de probetas y constancia

Gastos en diseño de mezclas

4.00 GASTOS DE LIQUIDACION

DESCRIPCION

Sueldo de Ingeniero Liquidador

Impresiones, Fotocopias

Planos de Replanteo

Sueldo de Almacenero

Alquiler de Camioneta y otros

Sueldo de Maestro de Obra

Impresiones, Fotocopias