HOJA DE CALCULO DE LA LINEA DE CONDUCCION
Departamento: LA LIBERTAD Provincia: SANCHEZ CARRION
Distrito PUENTE PIEDRA Localidad: CASUMACAHecho por: ING. JOSE LUIS RIOS VARGAS Revisado: ING. JOSE LUIS RIOS VARGAS
VERIFICADOR DE SISTEMAS ABIERTOS DE AGUA POTABLESegn datos proporcionados por la Municipalidad Provincial de Sanchez Carrion
CANT. LOTES 130.00 Lotes CASUMACA130.00 TOTAL DE LOTES
DENS. POB. 5.00 Hab/Lote
A.- POBLACION ACTUALPOBLACION TOTAL 650
B.- TASA DE CRECIMIENTO (%) 0.84 C.- PERIODO DE DISEO (AOS) 20 D.- POBLACION FUTURA 768
POBLACION TOTAL 768
E.- DOTACION (LT/HAB/DIA) 50
F.- CONSUMO PROMEDIO ANUAL (LT/SEG) Q = Pob.* Dot./86,400 0.44 0.44
G.- CONSUMO MAXIMO DIARIO (LT/SEG) Qmd = 1.30 * Q 0.58 0.58
H.- CAUDAL DE LA FUENTE (LT/SEG) 0.70
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
Pf = Po * ( 1+ r )t
-
HOJA DE CALCULO DE LA LINEA DE CONDUCCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
I.- VOLUMEN DEL RESERVORIO (M3)V = 0.30 * Q*86400/1000 11.53
11.53
Volumen a Utilizar= 15.00
Volumen a Utilizar= 15.00
J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh = 2.0 * Q 0.89 0.89
K.- DISEO DE LINEA DE CONDUCCION
-
HOJA DE CALCULO DE LA LINEA DE CONDUCCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
COTA DEL TERRENO
CAP_CRP6-01 10.0 746.17 560.00 0.58 3250.23 3209.67 40.56 0.00 40.56CRP6-01_ CRP6-02 10.0 477.76 920.00 0.58 3209.67 3181.29 28.38 0.00 28.38CRP6-02_ Inicio PA 01 10.0 633.56 1160.00 0.58 3181.29 3122.90 58.39 0.00 58.39Inicio PA 01_ Fin PA 01(VP 01) 10.0 100.00 1260.00 0.58 3181.29 3120.27 61.02 0.00 61.02Fin PA 01_ V.Aire 01 10.0 1174.12 2340.00 0.58 3120.27 3160.14 -39.87 0.00 -39.87V.Aire 01_ V.Purga 02 10.0 161.15 2500.00 0.58 3160.14 3158.54 1.60 0.00 1.60V.Purga 02_ CRP6 03 10.0 120.83 2600.00 0.58 3158.54 3165.07 -6.53 0.00 -6.53CRP6 03_ V.Purga 03 10.0 804.93 3140.00 0.58 3165.07 3108.07 57.00 0.00 57.00V.Purga 03_ V.Aire 02 10.0 212.40 3340.00 0.58 3108.07 3113.59 -5.52 0.00 -5.52V.Aire 02_ V.Purga 04 10.0 212.05 3520.00 0.58 3113.59 3102.85 10.74 0.00 10.74V.Purga 04_ V.Aire 03 10.0 1019.84 4420.00 0.58 3102.85 3142.76 -39.91 0.00 -39.91V.Aire 03_ Reservorio 10.0 104.33 4522.22 0.58 3142.76 3140.56 2.20 0.00 2.20
5767.14
LONGITUD TOTAL DE LINEA DE CONDUCCION = 5,767.14 mTUBERIA 2" C-10 5,767.14 m
Nota: Se han considerado distancias inclinadas para realizar los metrados correspondientes.
TRAMO (*)
CLASE DE TUBERIACLASE
Longitud Parcial
Inclinada
(m)
Progresiva(m)
Caudal (Qmd)
(l/s)
Desnivel de Terreno
(m)
Presin residual deseada
(m)Desnivel
(m)Inicial
m.s.n.m.Final
m.s.n.m
-
HOJA DE CALCULO DE LA LINEA DE CONDUCCION
Datos de Campo
tiempo en seg 4.58 32.08 h 15.00 cmR 10.00 cmr 6.25 cmV= 3166.14 cm3V en lt= 3.17 V en lt/seg= 0.7
hab. CASUMACA
hab.hab. CASUMACA
TOTALCASUMACA
OK. TOTALCASUMACA
SEGN AFORO
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
-
HOJA DE CALCULO DE LA LINEA DE CONDUCCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
M3 TOTALM3 CASUMACA
M3 CASUMACA
M3 TOTAL
TOTALCASUMACA
-
HOJA DE CALCULO DE LA LINEA DE CONDUCCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTADCOTA DE PIEZOMETRICA
0.0544 1.1 2.00 0.29 0.0023 1.71 3250.23 3248.52 38.80.0594 1.0 2.00 0.29 0.0023 1.10 3209.67 3208.57 27.30.0922 1.0 2.00 0.29 0.0023 1.46 3181.29 3179.83 56.90.6102 0.6 2.00 0.29 0.0023 0.23 3179.83 3179.60 59.3-0.0340 1.2 2.00 0.29 0.0023 2.70 3179.60 3176.91 16.80.0099 1.5 2.00 0.29 0.0023 0.37 3176.91 3176.54 18.0-0.0540 1.1 2.00 0.29 0.0023 0.28 3176.54 3176.26 11.20.0708 1.0 2.00 0.29 0.0023 1.85 3165.07 3163.22 55.2-0.0260 1.2 2.00 0.29 0.0023 0.49 3163.22 3162.73 49.10.0506 1.1 2.00 0.29 0.0023 0.49 3162.73 3162.24 59.4-0.0391 1.1 2.00 0.29 0.0023 2.34 3162.24 3159.90 17.10.0211 1.3 2.00 0.29 0.0023 0.24 3159.90 3159.66 19.1
PendienteDiametros
considerados (D)
(Pulg)
Diametros seleccionado
(D)(Pulg)
Velocidad V m/s
Perdida de carga unitaria hf m/m
Perdida de carga tramo
Hf (m)Presin Final
(m) Inicial(msnm)
Final(msnm)
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Departamento: LA LIBERTAD Provincia: SANCHEZ CARRION
Distrito PUENTE PIEDRA Localidad: CASUMACAHecho por: ING. JOSE LUIS RIOS VARGAS Revisado: ING. JOSE LUIS RIOS VARGAS
VERIFICADOR DE SISTEMAS ABIERTOS DE AGUA POTABLESegn datos proporcionados por la Municipalidad Provincial de Sanchez Carrion
CANT. LOTES 130.00 Lotes CASUMACA130.00 TOTAL DE LOTES
DENS. POB. 5.00 Hab/Lote
A.- POBLACION ACTUALPOBLACION TOTAL 650
B.- TASA DE CRECIMIENTO (%) 0.84 C.- PERIODO DE DISEO (AOS) 20 D.- POBLACION FUTURA 768
POBLACION TOTAL 768
E.- DOTACION (LT/HAB/DIA) 50
F.- CONSUMO PROMEDIO ANUAL (LT/SEG) Q = Pob.* Dot./86,400 0.44 0.44
G.- CONSUMO MAXIMO DIARIO (LT/SEG) Qmd = 1.30 * Q 0.58 0.58
H.- CAUDAL DE LA FUENTE (LT/SEG) 0.70
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
Pf = Po * ( 1+ r )t
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
I.- VOLUMEN DEL RESERVORIO (M3)V = 0.30 * Q*86400/1000 11.53
11.53
Volumen a Utilizar= 15.00
Volumen a Utilizar= 15.00
J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh = 2.0 * Q 0.89 0.89
K.- DISEO DE RED DE DISTRIBUCION
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
COTA DEL TERRENO
RED DE DISTRIBUCION N 01RESERVORIO -a 10.0 44.00 44.00 0.89 3140.55 3134.00 6.55 0.00 6.55a-b 10.0 240.90 284.90 0.08 3134.00 3130.00 4.00 0.00 4.00b-CRP7 N 01 10.0 157.30 442.20 0.08 3130.00 3090.00 40.00 0.00 40.00CRP7 N 01 - c 10.0 103.40 545.60 0.08 3090.00 3064.00 26.00 0.00 26.00b-d 10.0 225.50 771.10 0.08 3130.00 3126.00 4.00 0.00 4.00d-e 10.0 169.40 940.50 0.08 3126.00 3124.00 2.00 0.00 2.00d-f 10.0 121.00 1061.50 0.08 3126.00 3120.00 6.00 0.00 6.00f-g 10.0 91.30 1152.80 0.08 3120.00 3110.00 10.00 0.00 10.00f-h 10.0 185.90 1338.70 0.08 3120.00 3112.00 8.00 0.00 8.00h-i 10.0 156.20 1494.90 0.08 3112.00 3106.00 6.00 0.00 6.00i-j 10.0 224.40 1719.30 0.08 3106.00 3098.00 8.00 0.00 8.00
RED DE DISTRIBUCION N 02a-k 10.0 75.90 75.90 0.81 3134.00 3120.00 14.00 0.00 14.00k-l 10.0 60.50 136.40 0.22 3120.00 3110.00 10.00 0.00 10.00l-m 10.0 77.00 213.40 0.22 3110.00 3100.00 10.00 0.00 10.00l-CRP7 N 02 10.0 83.60 297.00 0.22 3110.00 3090.00 20.00 0.00 20.00CRP7 N 02-n 10.0 104.50 401.50 0.22 3090.00 3085.00 5.00 0.00 5.00n-o 10.0 106.70 508.20 0.22 3085.00 3076.00 9.00 0.00 9.00CRP7 N 02-p 10.0 33.00 541.20 0.22 3090.00 3085.00 5.00 0.00 5.00p-q 10.0 188.10 729.30 0.22 3085.00 3066.00 19.00 0.00 19.00q-r 10.0 94.60 823.90 0.22 3066.00 3060.00 6.00 0.00 6.00q-rr 10.0 163.90 987.80 0.22 3066.00 3058.00 8.00 0.00 8.00p-s 10.0 99.00 1086.80 0.22 3085.00 3085.00 0.00 0.00 0.00s-t 10.0 82.50 1169.30 0.22 3085.00 3076.00 9.00 0.00 9.00
TRAMO (*)
CLASE DE TUBERIACLASE
Longitud Parcial
Inclinada
(m)
Longitud acumulada
(m)
Caudal (Qmd)
(l/s)
Desnivel de Terreno
(m)
Presin residual deseada
(m)Desnivel
(m)Inicial
m.s.n.m.Final
m.s.n.m
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTADt-u 10.0 118.80 1288.10 0.22 3076.00 3062.00 14.00 0.00 14.00t-v 10.0 127.60 1415.70 0.22 3076.00 3074.00 2.00 0.00 2.00v-w 10.0 271.70 1687.40 0.22 3074.00 3040.00 34.00 0.00 34.00
COTA DEL TERRENO
RED DE DISTRIBUCION N 03k-x 10.0 236.50 236.50 0.59 3120.00 3104.00 16.00 0.00 16.00x-y 10.0 73.70 310.20 0.12 3104.00 3104.00 0.00 0.00 0.00y-CRP7 N03 10.0 273.90 584.10 0.12 3104.00 3090.00 14.00 0.00 14.00CRP7 N03-z 10.0 81.40 665.50 0.12 3090.00 3085.00 5.00 0.00 5.00z-aa 10.0 86.90 752.40 0.12 3085.00 3082.00 3.00 0.00 3.00z-bb 10.0 118.80 871.20 0.12 3085.00 3080.00 5.00 0.00 5.00
RED DE DISTRIBUCION N 04x-cc 10.0 47.30 47.30 0.47 3104.00 3104.00 0.00 0.00 0.00cc-CRP7 N04 10.0 123.20 170.50 0.47 3104.00 3090.00 14.00 0.00 14.00CRP7 N04-dd 10.0 326.70 497.20 0.12 3090.00 3082.00 8.00 0.00 8.00CRP7 N04-ee 10.0 202.40 699.60 0.35 3090.00 3080.00 10.00 0.00 10.00ee-ff 10.0 698.50 1398.10 0.35 3080.00 3080.00 0.00 0.00 0.00cc-gg 10.0 315.70 1713.80 0.12 3104.00 3104.00 0.00 0.00 0.00gg-hh 10.0 207.90 1921.70 0.12 3104.00 3100.00 4.00 0.00 4.00hh-ii 10.0 639.10 2560.80 0.12 3100.00 3092.00 8.00 0.00 8.00
LONGITUD TOTAL DE RED DE DISTRIBUCION= 6,838.70 m
TRAMO (*)
CLASE DE TUBERIACLASE
Longitud Parcial
Horizontal
(m)
Longitud acumulada
(m)
Caudal (Qmd)
(l/s)
Desnivel de Terreno
(m)
Presin residual deseada
(m)Desnivel
(m)Inicialm.s.n.m.
Finalm.s.n.m
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Proyecto: INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTADTUBERIA 2" C-10 119.90 mTUBERIA 1 1/2" C-10 1,811.70TUBERIA 1" C-10 4,907.10 m
Nota: Se han considerado distancias inclinadas para realizar los metrados correspondientes.
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
Datos de Campo
tiempo en seg 4.58 32.08 h 15.00 cmR 10.00 cmr 6.25 cmV= 3166.14 cm3V en lt= 3.17 V en lt/seg= 0.7
hab. CASUMACA
hab.hab. CASUMACA
TOTALCASUMACA
OK. TOTALCASUMACA
SEGN AFORO
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
M3 TOTALM3 CASUMACA
M3 CASUMACA
M3 TOTAL
TOTALCASUMACA
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTADCOTA DE PIEZOMETRICA
0.1489 1.0 2.00 0.44 0.0051 0.22 3140.55 3140.33 6.30.0166 0.6 1.00 0.16 0.0018 0.44 3140.33 3139.89 9.90.2543 0.4 1.00 0.16 0.0018 0.28 3139.89 3139.60 49.60.2515 0.4 1.00 0.16 0.0018 0.19 3090.00 3089.81 25.80.0177 0.6 1.00 0.16 0.0018 0.41 3139.89 3139.48 13.50.0118 0.7 1.00 0.16 0.0018 0.31 3139.48 3139.17 15.20.0496 0.5 1.00 0.16 0.0018 0.22 3139.48 3139.26 19.30.1095 0.4 1.00 0.16 0.0018 0.17 3139.26 3139.10 29.10.0430 0.5 1.00 0.16 0.0018 0.34 3139.26 3138.93 26.90.0384 0.5 1.00 0.16 0.0018 0.28 3138.93 3138.64 32.60.0357 0.6 1.00 0.16 0.0018 0.41 3138.64 3138.24 40.2
0.1845 0.9 2.00 0.40 0.0043 0.32 3134.00 3133.68 13.70.1653 0.6 1.50 0.19 0.0015 0.09 3133.68 3133.58 23.60.1299 0.6 1.00 0.43 0.0111 0.86 3133.58 3132.73 32.70.2392 0.5 1.50 0.19 0.0015 0.13 3133.58 3133.45 43.50.0478 0.8 1.00 0.43 0.0111 1.16 3090.00 3088.84 3.80.0843 0.7 1.00 0.43 0.0111 1.19 3088.84 3087.65 11.70.1515 0.6 1.50 0.19 0.0015 0.05 3090.00 3089.95 4.90.1010 0.6 1.00 0.43 0.0111 2.09 3089.95 3087.86 21.90.0634 0.7 1.00 0.43 0.0111 1.05 3087.86 3086.81 26.80.0488 0.8 1.00 0.43 0.0111 1.82 3087.86 3086.04 28.00.0000 1.00 0.43 0.0111 1.10 3089.95 3088.85 3.80.1091 0.6 1.00 0.43 0.0111 0.92 3088.85 3087.93 11.9
PendienteDiametros
considerados (D)
(Pulg)
Diametros seleccionado
(D)(Pulg)
Velocidad V m/s
Perdida de carga unitaria hf m/m
Perdida de carga tramo
Hf (m)Presin Final
(m) Inicial(msnm)
Final(msnm)
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD0.1178 0.6 1.00 0.43 0.0111 1.32 3087.93 3086.61 24.60.0157 1.0 1.00 0.43 0.0111 1.42 3087.93 3086.51 12.50.1251 0.6 1.00 0.43 0.0111 3.02 3086.51 3083.49 43.5
COTA PIEZOMETRICA
0.0677 1.0 1.50 0.52 0.0096 2.28 3133.68 3131.40 27.40.0000 1.00 0.24 0.0038 0.28 3131.40 3131.12 27.10.0511 0.6 1.00 0.24 0.0038 1.05 3131.12 3130.07 40.10.0614 0.6 1.00 0.24 0.0038 0.31 3090.00 3089.69 4.70.0345 0.6 1.00 0.24 0.0038 0.33 3089.69 3089.35 7.40.0421 0.6 1.00 0.24 0.0038 0.46 3089.69 3089.23 9.2
0.0000 1.50 0.41 0.0062 0.29 3131.40 3131.11 27.10.1136 0.8 1.50 0.41 0.0062 0.77 3131.11 3130.34 40.30.0245 0.7 1.50 0.11 0.0005 0.17 3090.00 3089.83 7.80.0494 0.9 1.50 0.30 0.0036 0.73 3090.00 3089.27 9.30.0000 1.50 0.30 0.0036 2.51 3089.27 3086.77 6.80.0000 1.00 0.24 0.0037 1.15 3131.11 3129.95 26.00.0192 0.7 1.00 0.24 0.0037 0.76 3129.95 3129.19 29.20.0125 0.8 1.00 0.24 0.0037 2.34 3129.19 3126.86 34.9
PendienteDiametros
considerados (D)
(Pulg)
Diametros seleccionado
(D)(Pulg)
Velocidad V m/s
Perdida de carga unitaria hf m/m
Perdida de carga tramo
Hf (m)Presin Final
(m) Inicial(msnm)
Final(msnm)
-
HOJA DE CALCULO DE LA RED DE DISTRIBUCION
INSTALACION DEL SISTEMA DE AGUA POTABLE Y LETRINAS SANITARIAS EN EL CASERIO PUENTE PIEDRA SECTOR CASUMACA, DEL DISTRITO DE HUAMACHUCO, PROVINCIA DE SANCHEZ CARRION LA LIBERTAD
cond. y reservred distribucion