IE - METRADO ELÉCTRICO (3)

138
Colegio: I.E. "REPUBLICA ARGENTINA" Ubicación: NUEVO CHIMBOTE - SANTA - ANCASH Proyecto: INSTALACIONES ELECTRICAS Objeto: CALCULO DE LA POTENCIA INSTALADA, MAXIMA DEMANDA Y CARGA A CONTR Pabellon Descripcion Tablero Area Densidad Potencia Potencia Factor Carga Instalada Instalada Demanda w/m² w w % TG-A H Aulas de TD-A-1 384 50 19,200 20,981 75% Primaria 178 10 1,781 100% SSHH TD-A-4 181 10 1,814 8,414 100% Ascensor 6.6 KW 6,600 80% I Aulas de TD-A-2 256 50 12,800 13,648 75% Primaria 85 10 848 100% Aulas de TD-A-3 256 50 12,800 14,160 75% Primaria 136 10 1,360 100% Existente Aulas de TD-A-5 225 50 11,250 11,566 75% Primaria 32 10 316 100% Aulas de TD-A-6 338 50 16,875 17,349 75% Primaria 47 10 474 100% SSHH existente TD-A-7 62 10 624 624 100% Postes alumbrado 6 postes x 70 w/poste 452 452 100% TOTAL 87,193 TG-B G Laboratorios TD-B-1 378 50 18,924 26,036 75% 51 10 512 100% Ascensor 6.6 KW 6,600 80% CRT TD-B-2 120 50 5,991 20,695 75% 30 10 304 100% 48 compu. x 300 w/comp. 14,400 80% CRT TD-B-3 120 50 5,991 20,695 75% 30 10 304 100% 48 compu. x 100 w/comp. 14,400 80% L Cafeteria TD-B-4 212 30 6,360 6,680 75% 32 10 320 100% Postes alumbrado 3 postes x 70 w/poste 226 226 100% Tablero bloque

Transcript of IE - METRADO ELÉCTRICO (3)

Page 1: IE - METRADO ELÉCTRICO (3)

Colegio: I.E. "REPUBLICA ARGENTINA"

Ubicación: NUEVO CHIMBOTE - SANTA - ANCASH

Proyecto: INSTALACIONES ELECTRICAS

Objeto: CALCULO DE LA POTENCIA INSTALADA, MAXIMA DEMANDA Y CARGA A CONTRATAR

Pabe

llon

Descripcion TableroArea

Densidad Potencia Potencia Factor Maxima Maxima

Carga Instalada Instalada Demanda Demanda Demanda

m² w/m² w w % w w

TG-A

H

Aulas de TD-A-1384 50 19,200

20,98175% 14,400

12,945Primaria 178 10 1,781 100% 1,781

SSHH TD-A-4181 10 1,814

8,414100% 1,814

5,676Ascensor 6.6 KW 6,600 80% 5,280

I

Aulas de TD-A-2256 50 12,800

13,64875% 9,600

8,358Primaria 85 10 848 100% 848

Aulas de TD-A-3256 50 12,800

14,16075% 9,600

8,768Primaria 136 10 1,360 100% 1,360

Exis

tent

e

Aulas de TD-A-5225 50 11,250

11,56675% 8,438

7,003Primaria 32 10 316 100% 316

Aulas de TD-A-6338 50 16,875

17,34975% 12,656

10,504Primaria 47 10 474 100% 474

SSHH existente TD-A-7 62 10 624 624 100% 624 499

Postes alumbrado 6 postes x 70 w/poste 452 452 100% 452 452

TOTAL 87,193 43,363

TG-B

G

Laboratorios TD-B-1378 50 18,924

26,03675% 14,193

15,98851 10 512 100% 512

Ascensor 6.6 KW 6,600 80% 5,280

CRT TD-B-2120 50 5,991

20,69575% 4,493

13,05430 10 304 100% 304

48 compu. x 300 w/comp. 14,400 80% 11,520

CRT TD-B-3120 50 5,991

20,69575% 4,493

13,05430 10 304 100% 304

48 compu. x 100 w/comp. 14,400 80% 11,520

L Cafeteria TD-B-4212 30 6,360

6,68075% 4,770

4,07232 10 320 100% 320

Postes alumbrado 3 postes x 70 w/poste 226 226 100% 226 226

Tabl

ero

bloq

ue

Page 2: IE - METRADO ELÉCTRICO (3)

TG-B

TOTAL 74,332 37,115TG

-C

E

Aulas de TD-C-1384 50 19,200

20,92075% 14,400

12,896Secundaria 172 10 1,720 100% 1,720

Aulas de TD-C-2384 50 19,200

20,92075% 14,400

12,896Secundaria 172 10 1,720 100% 1,720

SSHH TD-C-5 138 10 1,380 1,380 100% 1,380 1104

C

Aulas de TD-C-3384 50 19,200

20,92075% 14,400

12,896Secundaria 172 10 1,720 100% 1,720

Aulas de TD-C-4384 50 19,200

20,92075% 14,400

12,896Secundaria 172 10 1,720 100% 1,720

SSHH TD-C-6138 10 1,380

7,980100% 1,380

5,328Ascensor 6.6 KW 6,600 80% 5,280

F Adminstracion TD-C-7624 50 31,208

33,466100% 31,208

26,321226 10 2,258 75% 1,694

A SUM y TD-C-8448 50 22,400

23,80675% 16,800

14,565Aula Musica 141 10 1,406 100% 1,406

B Aula de TD-C-994 50 4,700

5,06075% 3,525

3,108Artes 36 10 360 100% 360

Postes alumbrado 7 postes x 70 w/poste 527 527 100% 527 527

TOTAL 155,897 82,028

TG-D

TD-D-1128 50 6,400

9,82475% 4,800

5,97942 10 424 100% 424

Electrodomesticos cocina 3,000 75% 2,250

TD-D-2128 50 6,400

9,82475% 4,800

5,97942 10 424 100% 424

Maquinas coser 3,000 75% 2,250

D

TD-D-3256 50 12,800

17,64575% 9,600

10,75685 10 845 100% 845

Maquinas Herramientas 4,000 75% 3,000

TD-D-4256 50 12,800

16,22175% 9,600

9,81742 10 421 100% 421

Instrumentos de belleza 3,000 75% 2,250

TD-D-5256 50 12,800

17,22175% 9,600

10,41742 10 421 100% 421

Instrumentos electricos 4,000 75% 3,000

O Capilla y Guardiania TD-D-6 106 30 3,171 3,171 100% 3,171 2537

Electrobombas TD-D-78 30 225

3,582100% 225

1,970

Taller de Industria Alimentaria

Talleres de Confecciones

Aula y Taller de Carpinteria

Metalica

Taller de Cosmetologia

Taller de Electricidad y Electronica

Page 3: IE - METRADO ELÉCTRICO (3)

TG-D

Electrobombas TD-D-7Electrobomba (3x1.5 HP) 3,357

3,58267% 2,238

1,970

Postes alumbrado 4 postes x 70 w/poste 301 301 100% 301 301

TOTAL 77,789 38,205

TG-E

Administracion TD-E-196 50 4,800

5,44075% 3,600

3,392Inicial 64 10 640 100% 640

NAula Inicial

TD-E-279 50 3,950

4,14075% 2,963

2,5223 años 19 10 190 100% 190

JAula Incial

TD-E-3166 50 8,320

8,84075% 6,240

5,4084 y 5 años 52 10 520 100% 520

Postes alumbrado 4 postes x 70 w/poste 301 301 100% 301 301

TOTAL 18,721 11,623

TG-F

M

Gimnasio TD-F-1231 30 6,937

13,53775% 5,203

8,386Ascensor 6.6 KW 6,600 80% 5,280

Polideportivo TD-F-2 30 reflec. x 400 w/reflec. 13,20015,501

100% 13,20011,941

230 10 2301 75% 1726

Piscina TD-F-3

20 reflec. x 400 w/reflec. 8,800

17,815

100% 8,800

12,718230 10 2,301 75% 1,726

Bombas recirculacion 4,476 80% 3,581

Camara bombeo desague 2,238 80% 1,790

Postes alumbrado 10 postes x 70 w/poste 753 753 100% 753 753

TOTAL 47,606 33,797

SERV

ICIO

S CO

MU

NES

Cancha de futbol TD-FUTBOL 48 reflec. x 2x 400 w/reflec. 41,280 41,280 100% 41,280 41,280

Losa deportiva 1 8 reflec. X 400 w/reflec. 3,520 3,520 100% 3,520 3,520

Losa deportiva 2 8 reflec. X 400 w/reflec. 3,520 3,520 100% 3,520 3,520

Losa deportiva 3 8 reflec. X 400 w/reflec. 3,520 3,520 100% 3,520 3,520

TOTALES 513,378 297,971

TOTA

LES

Potencia Instalada 513 KW

Maxima Demanda 298 KW

Factor simultaneidad 0.5

Page 4: IE - METRADO ELÉCTRICO (3)

TOTA

LES

Carga a solicitar 149 KW

Page 5: IE - METRADO ELÉCTRICO (3)

Colegio: I.E. "REPUBLICA ARGENTINA"

Ubicación: NUEVO CHIMBOTE - SANTA - ANCASH

Proyecto: INSTALACIONES ELECTRICAS

Objeto: CALCULO DE LA POTENCIA INSTALADA, MAXIMA DEMANDA Y CARGA A CONTRATAR

PARAMETROS ELECTRICOS

Tension V 220

Factor de potencia 0.80

Resistividad (cobre) Ω.mm²/m 0.01724

TG-G TG-A TD-A-1 TD-A-2 TD-A-3 TD-A-4 TD-A-5 TD-A-6 TD-A-7

Maxima Demanda W 297,971 43,363 12,945 8,358 8,768 5,676 7,003 10,504 499

Corriente nominal A 977 142 42 27 29 32 23 34 3

Longitud del cable m 29 58 50 30 51 60 40 35 56

Seccion del cable 480 120 16 16 16 16 10 10 6

Caida de tension V 1.41 1.64 3.17 1.23 2.19 3.34 2.20 2.88 0.63

Caida de tension % de V 0.64 0.75 1.44 0.56 1.00 1.52 1.00 1.31 0.29

Caida de tension total V 1.41 3.05 6.22 4.28 5.24 6.39 5.25 5.93 3.69

Caida de tension total % de V 0.64 1.39 2.83 1.95 2.38 2.90 2.39 2.70 1.68

TG-G TG-B TD-B-1 TD-B-2 TD-B-3 TD-B-4

Maxima Demanda W 297,971 37,115 15,988 13,054 13,054 4,072

Corriente nominal A 977 122 52 43 43 13

Longitud del cable m 29 120 56 14 63 66

Seccion del cable 480 120 25 25 25 10

Caida de tension V 1.41 2.91 2.81 0.57 2.58 2.11

Caida de tension % de V 0.64 1.32 1.28 0.26 1.17 0.96

Caida de tension total V 1.41 4.32 7.13 4.89 6.90 6.43

Caida de tension total % de V 0.64 1.96 3.24 2.22 3.13 2.92

TG-G TG-C TD-C-1 TD-C-2 TD-C-3 TD-C-4 TD-C-5 TD-C-6 TD-C-7 TD-C-8 TD-C-9

Maxima Demanda W 297,971 82,028 12,896 12,896 12,896 12,896 1,104 5,328 26,321 14,565 3,108

Corriente nominal A 977 269 42 42 42 42 4 17 86 48 10

Longitud del cable m 29 183 38 62 46 93 65 47 93 88 95

Seccion del cable 480 240 35 35 35 50 6 16 95 50 35

Caida de tension V 1.41 4.90 1.10 1.79 1.33 1.88 0.94 1.23 2.02 2.01 0.66

Caida de tension % de V 0.64 2.23 0.50 0.81 0.60 0.85 0.43 0.56 0.92 0.91 0.30

Caida de tension total V 1.41 6.31 7.41 8.10 7.64 8.19 7.25 7.54 8.33 8.32 6.97

mm²

mm²

mm²

Page 6: IE - METRADO ELÉCTRICO (3)

Caida de tension total % de V 0.64 2.87 3.37 3.68 3.47 3.72 3.30 3.43 3.79 3.78 3.17

TG-G TG-D TD-D-1 TD-D-2 TD-D-3 TD-D-4 TD-D-5 TD-D-6 TD-D-7

Maxima Demanda W 297,971 38,205 5,979 5,979 10,756 9,817 10,417 2,537 1,970

Corriente nominal A 977 125 20 20 35 32 34 8 6

Longitud del cable m 29 232 18 31 26 29 52 67 93

Seccion del cable 480 360 25 16 25 25 50 16 16

Caida de tension V 1.41 1.93 3.68 4.25 4.22 4.23 4.32 4.30 4.38

Caida de tension % de V 0.64 0.88 1.67 1.93 1.92 1.92 1.96 1.96 1.99

Caida de tension total V 1.41 3.34 7.02 7.59 7.56 7.57 7.66 7.64 7.72

Caida de tension total % de V 0.64 1.52 3.19 3.45 3.43 3.44 3.48 3.47 3.51

TG-G TG-E TD-E-1 TD-E-2 TD-E-3

Maxima Demanda W 297,971 11,623 3,392 2,522 5,408

Corriente nominal A 977 38 11 8 18

Longitud del cable m 29 190 52 62 111

Seccion del cable 480 50 10 10 16

Caida de tension V 1.41 3.46 1.38 1.23 2.94

Caida de tension % de V 0.64 1.57 0.63 0.56 1.34

Caida de tension total V 1.41 4.87 6.25 6.10 7.81

Caida de tension total % de V 0.64 2.21 2.84 2.77 3.55

TG-G TG-F TD-F-1 TD-F-2 TD-F-3

Maxima Demanda W 297,971 33,797 8,386 11,941 12,718

Corriente nominal A 977 111 28 39 42

Longitud del cable m 29 275 52 31 50

Seccion del cable 480 240 16 25 25

Caida de tension V 1.41 3.03 2.14 1.16 1.99

Caida de tension % de V 0.64 1.38 0.97 0.53 0.91

Caida de tension V 1.41 4.45 6.58 5.61 6.44

Caida de tension % de V 0.64 2.02 2.99 2.55 2.93

TG-G TD-FUT-P1 TD-FUT-P2 TD-FUT-P3 TD-FUT-P4 TD-FUT-P5 TD-FUT-P6 TD-LD1 TD-LD2 TD-LD3

Maxima Demanda W 297,971 6,880 6,880 6,880 6,880 6,880 6,880 3,520 3,520 3,520

Corriente nominal A 977 23 23 23 23 23 23 12 12 12

Longitud del cable m 29 168 142 142 93 123 153 59 100 119

Seccion del cable 480 25 25 25 25 25 25 10 10 10

Caida de tension V 1.41 3.62 3.06 3.06 2.01 2.65 3.30 1.63 2.76 3.28

Caida de tension % de V 0.64 1.65 1.39 1.39 0.91 1.21 1.50 0.74 1.25 1.49

Caida de tension V 1.41 5.03 4.47 4.47 3.42 4.06 4.71 3.04 4.17 4.69

Caida de tension % de V 0.64 2.29 2.03 2.03 1.55 1.85 2.14 1.38 1.90 2.13

mm²

mm²

mm²

mm²

H83
user:
I83
user:
J83
user:
K83
user:
L83
user:
M83
user:
Page 7: IE - METRADO ELÉCTRICO (3)

7 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

ESTRUCTURAS7,720,458.56 7,720,458.56 0.00

01.00 860,022.58 860,022.58 0.00

01.01 OBRAS PROVISIONALES 216,677.06 216,677.06 0.00

01.01.01 glb 1.00 15,381.88 15,381.88 1.00 15,381.88 15,381.88 0.00 15,381.88 0.00

01.01.02 OFICINAS, ALMACEN Y VESTUARIO PROVISIONAL m2 120.00 65.90 7,908.00 120.00 65.90 7,908.00 0.00 65.90 0.00

01.01.03 SERVICIOS HIGIENICOS PROVISIONALES (03 UND) mes 12.00 945.00 11,340.00 12.00 945.00 11,340.00 0.00 945.00 0.00

01.01.04 SUMINISTRO DE ENERGIA ELECTRICA Y AGUA POTABLE mes 12.00 1,550.00 18,600.00 12.00 1,550.00 18,600.00 0.00 1,550.00 0.00

01.01.05 CERCO PROVISIONAL DE ESTERAS DURANTE LA OBRA m 720.30 9.62 6,929.29 720.30 9.62 6,929.29 0.00 9.62 0.00

01.01.06 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x2.40M und 1.00 1,041.30 1,041.30 1.00 1,041.30 1,041.30 0.00 1,041.30 0.00

01.01.07 TRANSPORTE DE AULAS PREFABRICADAS vje 15.00 2,273.27 34,099.05 15.00 2,273.27 34,099.05 0.00 2,273.27 0.00

01.01.08 INSTALACION DE AULAS PREFABRICADAS(MOD. 02 AULAS) und 15.00 2,533.59 38,003.85 15.00 2,533.59 38,003.85 0.00 2,533.59 0.00

01.01.09 und 17.00 474.59 8,068.03 17.00 474.59 8,068.03 0.00 474.59 0.00

01.01.10 m3 119.70 629.12 75,305.66 119.70 629.12 75,305.66 0.00 629.12 0.00

01.02 TRABAJOS PRELIMINARES 566,050.75 566,050.75 0.00

01.02.01 DESMONTAJE DE PUERTAS m2 138.60 4.35 602.91 138.60 4.35 602.91 0.00 4.35 0.00

01.02.02 DESMONTAJE DE VENTANAS m2 1,586.30 5.43 8,613.61 1,586.30 5.43 8,613.61 0.00 5.43 0.00

01.02.03 DESMONTAJE DE ARTEFACTOS ELECTRICOS und 526.00 11.54 6,070.04 526.00 11.54 6,070.04 0.00 11.54 0.00

01.02.04 DESMONTAJE DE TECHO CALAMINA m2 5,795.10 4.17 24,165.57 5,795.10 4.17 24,165.57 0.00 4.17 0.00

01.02.05 DESMONTAJE DE PORTONES METALICOS und 2.00 35.72 71.44 2.00 35.72 71.44 0.00 35.72 0.00

01.02.06 DEMOLICION DE MUROS DE ALBAÑILERIA m2 1,586.00 4.87 7,723.82 1,586.00 4.87 7,723.82 0.00 4.87 0.00

01.02.07 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO m3 210.40 67.66 14,235.66 210.40 67.66 14,235.66 0.00 67.66 0.00

01.02.08 DEMOLICION DE SOBRECIMIENTOS m3 2,361.75 29.10 68,726.93 2,361.75 29.10 68,726.93 0.00 29.10 0.00

01.02.09 DEMOLICION DE CIMIENTOS CORRIDOS m3 1,993.20 43.66 87,023.11 1,993.20 43.66 87,023.11 0.00 43.66 0.00

01.02.10 DEMOLICION DE FALSO PISO, E=4" m2 5,151.20 3.78 19,471.54 5,151.20 3.78 19,471.54 0.00 3.78 0.00

01.02.11 DEMOLICION DE LOSA, E=0.10M m2 2,021.40 5.65 11,420.91 2,021.40 5.65 11,420.91 0.00 5.65 0.00

01.02.12 DEMOLICION DE LOSA ALIGERADA H=0.20M m2 1,287.80 6.28 8,087.38 1,287.80 6.28 8,087.38 0.00 6.28 0.00

01.02.13 DEMOLICION DE MUROS DE CONCRETO SIMPLE m2 1,475.38 9.43 13,912.83 1,475.38 9.43 13,912.83 0.00 9.43 0.00

01.02.14 TRAZO, NIVELES Y REPLANTEO m2 8,646.86 2.01 17,380.19 8,646.86 2.01 17,380.19 0.00 2.01 0.00

01.02.15 LIMPIEZA DEL TERRENO MANUAL m2 8,608.96 0.45 3,874.03 8,608.96 0.45 3,874.03 0.00 0.45 0.00

01.02.16 m3 8,846.08 31.05 274,670.78 8,846.08 31.05 274,670.78 0.00 31.05 0.00

01.03 SEGURIDAD Y SALUD 77,294.76 77,294.76 0.00

01.03.01 glb 1.00 11,970.00 11,970.00 1.00 11,970.00 11,970.00 0.00 11,970.00 0.00

01.03.02 mes 12.00 1,357.48 16,289.76 12.00 1,357.48 16,289.76 0.00 1,357.48 0.00

01.03.03 CAPACITACION EN SEGURIDAD Y SALUD mes 12.00 3,800.00 45,600.00 12.00 3,800.00 45,600.00 0.00 3,800.00 0.00

01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 875.00 875.00 1.00 875.00 875.00 0.00 875.00 0.00

01.03.05 glb 1.00 2,560.00 2,560.00 1.00 2,560.00 2,560.00 0.00 2,560.00 0.00

02.00 MOVIMIENTO DE TIERRAS 565,615.13 565,615.13 0.00

02.01 EXCAVACION DE ZANJA Y ZAPATAS, HASTA 1.60M DE PROF. m3 4,770.54 33.42 159,431.45 4,770.54 33.42 159,431.45 0.00 33.42 0.00

02.02 m3 753.62 4.62 3,481.72 753.62 4.62 3,481.72 0.00 4.62 0.00

02.03 CORTE MASIVO DE TERRENO CON EQUIPO MECANICO m3 1,084.35 4.36 4,727.77 1,084.35 4.36 4,727.77 0.00 4.36 0.00

02.04 m3 248.20 24.88 6,175.22 248.20 24.88 6,175.22 0.00 24.88 0.00

02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,175.70 25.57 55,632.65 2,175.70 25.57 55,632.65 0.00 25.57 0.00

02.06 m2 4,050.00 8.47 34,303.50 4,050.00 8.47 34,303.50 0.00 8.47 0.00

02.07 m3 4,473.98 25.17 112,610.08 4,473.98 25.17 112,610.08 0.00 25.17 0.00

02.08 m3 5,674.58 31.05 176,195.71 5,674.58 31.05 176,195.71 0.00 31.05 0.00

02.09 m2 5,202.01 2.51 13,057.05 5,202.01 2.51 13,057.05 0.00 2.51 0.00

03.00 OBRAS DE CONCRETO SIMPLE 300,254.36 300,254.36 0.00

OBRAS PROVISIONALES,TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

DESINSTALACION DE AULAS PREFABRICADAS(MOD. 02 AULAS)

LOSA DE CONCRETOF'C= 175 KG/CM2,PARA AULAS PREFABRICADAS

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10KM

ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD

EQUIPOS DE SEGURIDAD PERSONAL Y PROTECCION COLECTIVA

RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL TRABAJO

EXCAVACION DE ESTRUCTURAS ESPECIALES, HASTA 4.0M. PROF.

RELLENO COMPACTADO C/MATERIAL DE BASE GRANULAR C/MAQUINARIA

RELLENO CON MATERIAL GRANULAR H=0.20 PARA CAMPO DEPORTIVO

ACARREO DE MATERIAL EXCEDENTE PARA ELIMINACION DMAX <=50M MANUAL

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=10KM

ESCARIFICADO Y COMPACTACION EN TERRENO NATURAL H=0.05CM

Page 8: IE - METRADO ELÉCTRICO (3)

8 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

03.01 SOLADO CONCRETO POBRE C:H: 1:8 E=0.10M m2 384.10 21.74 8,350.33 384.10 21.74 8,350.33 0.00 21.74 0.00

03.02 m3 380.94 173.99 66,279.75 380.94 173.99 66,279.75 0.00 173.99 0.00

03.03 m3 275.81 257.75 71,090.03 275.81 257.75 71,090.03 0.00 257.75 0.00

03.04 m2 612.90 21.54 13,201.87 612.90 21.54 13,201.87 0.00 21.54 0.00

03.05 CONCRETO P/SOBRECIMIENTOS 1:8, (C:H)+ 25%P.M.(MAX 3") m3 102.79 198.36 20,389.42 102.79 198.36 20,389.42 0.00 198.36 0.00

03.06 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 1,139.48 27.83 31,711.73 1,139.48 27.83 31,711.73 0.00 27.83 0.00

03.07 FALSO PISO F'C=140 KG/CM2, E=10CM m2 3,387.67 26.34 89,231.23 3,387.67 26.34 89,231.23 0.00 26.34 0.00

04.00 OBRAS DE CONCRETO ARMADO 5,994,566.49 5,994,566.49 0.00

04.01 CIMIENTOS CORRIDOS 135,262.29 135,262.29 0.00

04.01.01 m3 270.90 264.65 71,693.68 270.90 264.65 71,693.68 0.00 264.65 0.00

04.01.02 m2 1,083.59 27.23 29,506.16 1,083.59 27.23 29,506.16 0.00 27.23 0.00

04.01.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 9,281.32 3.67 34,062.44 9,281.32 3.67 34,062.44 0.00 3.67 0.00

04.02 ZAPATAS CORRIDAS 435,552.61 435,552.61 0.00

04.02.01 m3 1,139.99 264.65 301,698.35 1,139.99 264.65 301,698.35 0.00 264.65 0.00

04.02.02 m2 1,266.84 27.34 34,635.41 1,266.84 27.34 34,635.41 0.00 27.34 0.00

04.02.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 27,035.11 3.67 99,218.85 27,035.11 3.67 99,218.85 0.00 3.67 0.00

04.03 VIGA DE CIMENTACION 589,769.87 589,769.87 0.00

04.03.01 m3 633.69 264.65 167,706.06 633.69 264.65 167,706.06 0.00 264.65 0.00

04.03.02 ENCOFRADO Y DESENCOFRADO P/VIGAS DE CIMENTACION m2 3,818.66 33.82 129,147.08 3,818.66 33.82 129,147.08 0.00 33.82 0.00

04.03.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 82,744.84 3.54 292,916.73 82,744.84 3.54 292,916.73 0.00 3.54 0.00

04.04 SOBRECIMIENTO ARMADO 258,636.24 258,636.24 0.00

04.04.01 m3 386.60 279.36 108,000.58 386.60 279.36 108,000.58 0.00 279.36 0.00

04.04.02 m2 2,824.55 33.82 95,526.28 2,824.55 33.82 95,526.28 0.00 33.82 0.00

04.04.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 15,016.18 3.67 55,109.38 15,016.18 3.67 55,109.38 0.00 3.67 0.00

04.05 PLACAS 226,356.23 226,356.23 0.00

04.05.01 m3 241.30 374.17 90,287.22 241.30 374.17 90,287.22 0.00 374.17 0.00

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 1,845.03 46.50 85,793.90 1,845.03 46.50 85,793.90 0.00 46.50 0.00

04.05.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 13,698.94 3.67 50,275.11 13,698.94 3.67 50,275.11 0.00 3.67 0.00

04.06 PISCINA OLIMPICA 87,681.98 87,681.98 0.00

04.06.01 m3 160.82 285.25 45,873.91 160.82 285.25 45,873.91 0.00 285.25 0.00

04.06.02 ENCOFRADO Y DESENCOFRADO DE PISCINA m2 176.18 36.17 6,372.43 176.18 36.17 6,372.43 0.00 36.17 0.00

04.06.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 9,655.49 3.67 35,435.65 9,655.49 3.67 35,435.65 0.00 3.67 0.00

04.07 COLUMNAS Y PLACAS 2,017,277.11 2,017,277.11 0.00

04.07.01 m3 1,295.53 285.25 369,549.93 1,295.53 285.25 369,549.93 0.00 285.25 0.00

04.07.02 m2 16,228.92 44.29 718,778.87 16,228.92 44.29 718,778.87 0.00 44.29 0.00

04.07.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 253,119.43 3.67 928,948.31 253,119.43 3.67 928,948.31 0.00 3.67 0.00

04.08 VIGAS Y DINTELES 1,372,738.36 1,372,738.36 0.00

04.08.01 m3 1,402.30 279.36 391,746.53 1,402.30 279.36 391,746.53 0.00 279.36 0.00

04.08.02 ENCOFRADO Y DESENCOFRADO P/VIGAS Y DINTELES m2 9,912.15 38.69 383,501.08 9,912.15 38.69 383,501.08 0.00 38.69 0.00

04.08.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 162,804.02 3.67 597,490.75 162,804.02 3.67 597,490.75 0.00 3.67 0.00

04.09 LOSAS ALIGERADAS 782,498.86 782,498.86 0.00

04.09.01 m3 730.64 264.65 193,363.88 730.64 264.65 193,363.88 0.00 264.65 0.00

04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL P/LOSA LIGERADA m2 7,872.80 28.83 226,972.82 7,872.80 28.83 226,972.82 0.00 28.83 0.00

04.09.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 44,073.32 3.67 161,749.08 44,073.32 3.67 161,749.08 0.00 3.67 0.00

04.09.04 und 49,854.00 4.02 200,413.08 49,854.00 4.02 200,413.08 0.00 4.02 0.00

04.10 ESCALERAS 28,700.62 28,700.62 0.00

04.10.01 m3 36.61 274.94 10,065.55 36.61 274.94 10,065.55 0.00 274.94 0.00

04.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA m2 151.95 55.46 8,427.15 151.95 55.46 8,427.15 0.00 55.46 0.00

04.10.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 2,781.45 3.67 10,207.92 2,781.45 3.67 10,207.92 0.00 3.67 0.00

04.11 TRIBUNAS 60,092.32 60,092.32 0.00

CIMIENTOS CORRIDOS CONCRETO C.H:- 1:10 + 30% P.G. (MAX 6")

CIMIENTOS CORRIDOS CONCRETO F'C=175 KG/CM2+25% PM(MAX 3")

ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS CORRIDOS

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/CIMIENTOS CORRIDOS -CEMENTO TIPO I

ENCOFRADO Y DESENCOFRADO PARA CIMIENTOS CORRIDOS

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/ZAPATAS CORRIDAS -CEMENTO TIPO I

ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS CORRIDAS

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/VIGAS DE CIMENTACION-CEMENTO TIPO I

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/SOBRECIMIENTOS CORRIDOS -CEMENTO TIPO I

ENCOFRADO Y DESENCOFRADO NORMAL P/SOBRECIMIENTO ARMADO

CONCRETO F'C = 210 KG/CM2 P/PLACAS -(CEMENTO PORTLAND TIPO I)

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/PISCINA -CEMENTO TIPO I

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/COLUMNAS -CEMENTO TIPO I

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS Y PLACAS

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/VIGAS -CEMENTO TIPO I

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/LOSAS ALIGERADAS -CEMENTO TIPO I

LADRILLO DE ARCILLA P/TECHO DE 30 x 30 x 15 CM-PROVISION Y COLOCACION

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/ESCALERAS -CEMENTO TIPO I

Page 9: IE - METRADO ELÉCTRICO (3)

9 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

04.11.01 m3 77.69 268.78 20,881.52 77.69 268.78 20,881.52 0.00 268.78 0.00

04.11.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA TRIBUNAS m2 369.15 46.38 17,121.18 369.15 46.38 17,121.18 0.00 46.38 0.00

04.11.03 ACERO ESTRUCTURAL FY= 4200 KG/CM2 kg 6,018.97 3.67 22,089.62 6,018.97 3.67 22,089.62 0.00 3.67 0.00

ARQUITECTURA 6,601,921.36 6,601,921.36 0.00

05.00 MUROS TABIQUES DE ALBAÑILERIA 613,114.62 613,114.62 0.00

05.01 m2 391.00 97.97 38,306.27 391.00 97.97 38,306.27 0.00 97.97 0.00

05.02 m2 1,147.00 64.79 74,314.13 1,147.00 64.79 74,314.13 0.00 64.79 0.00

05.03 m2 517.68 53.01 27,442.22 517.68 53.01 27,442.22 0.00 53.01 0.00

05.04 m2 7,079.40 60.16 425,896.70 7,079.40 60.16 425,896.70 0.00 60.16 0.00

05.05 kg 13,245.87 3.56 47,155.30 13,245.87 3.56 47,155.30 0.00 3.56 0.00

06.00 REVOQUES Y ENLUCIDOS 483,276.78 483,276.78 0.00

06.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5 m2 2,342.44 17.40 40,758.46 2,342.44 17.40 40,758.46 0.00 17.40 0.00

06.02 m2 12,118.39 17.27 209,284.60 12,118.39 17.27 209,284.60 0.00 17.27 0.00

06.03 m2 570.90 17.78 10,150.60 570.90 17.78 10,150.60 0.00 17.78 0.00

06.04 m2 794.95 27.10 21,543.15 794.95 27.10 21,543.15 0.00 27.10 0.00

06.05 SOLAQUEO EN MUROS EXTERIORES m2 313.42 18.71 5,864.09 313.42 18.71 5,864.09 0.00 18.71 0.00

06.06 TARRAJEO DE MURO EXTERIOR CON MICROCEMENTO m2 524.30 48.42 25,386.61 524.30 48.42 25,386.61 0.00 48.42 0.00

06.07 m 5,538.00 13.26 73,433.88 5,538.00 13.26 73,433.88 0.00 13.26 0.00

06.08 m 13,777.44 7.03 96,855.40 13,777.44 7.03 96,855.40 0.00 7.03 0.00

07.00 CIELO RASOS 270,049.58 270,049.58 0.00

07.01 CIELO RASO CON MEZCLA CEMENTO ARENA 1:5,E=10CM m2 7,983.16 30.54 243,805.71 7,983.16 30.54 243,805.71 0.00 30.54 0.00

07.02 FALSO CIELO RASO DE DRWALL m2 566.70 46.31 26,243.88 566.70 46.31 26,243.88 0.00 46.31 0.00

08.00 PISOS Y PAVIMENTOS 1,949,597.90 1,949,597.90 0.00

08.01 m2 8,527.38 69.69 594,273.11 8,527.38 69.69 594,273.11 0.00 69.69 0.00

08.02 PISO CERAMICO ANTIDESLIZANTE 30X30 CM m2 879.51 52.41 46,095.12 879.51 52.41 46,095.12 0.00 52.41 0.00

08.03 m2 40.00 48.58 1,943.20 40.00 48.58 1,943.20 0.00 48.58 0.00

08.04 m2 2,781.82 26.31 73,189.68 2,781.82 26.31 73,189.68 0.00 26.31 0.00

08.05 PISO DE CEMENTOPULIDO Y BRUÑADO E=5.0 CM m2 8.20 23.89 195.90 8.20 23.89 195.90 0.00 23.89 0.00

08.06 PISO DE CEMENTO PULIDO COLOR E=5.0 CM m2 7.80 22.52 175.66 7.80 22.52 175.66 0.00 22.52 0.00

08.07 PISO DE ADOQUIN DE CONCRETO 10X20CM COLOR ROJO m2 6,164.63 50.35 310,389.12 6,164.63 50.35 310,389.12 0.00 50.35 0.00

08.08 PISO MACHIHEMBRADO DE MADERA TIPO SHIHUAHUACO m2 403.50 125.73 50,732.06 403.50 125.73 50,732.06 0.00 125.73 0.00

08.09 PISO SINTETICO VINILICO COLOR GRIS E=2.5MM-PVC m2 479.10 32.74 15,685.73 479.10 32.74 15,685.73 0.00 32.74 0.00

08.10 PISO DE PIEDRA NATURAL DE 0.40X0.40 m2 620.48 146.13 90,670.74 620.48 146.13 90,670.74 0.00 146.13 0.00

08.11 PISO DE TERRAZO LAVADO m2 57.51 61.98 3,564.47 57.51 61.98 3,564.47 0.00 61.98 0.00

08.12 CONTRAPISO DE 48MM MEZCLA C:,1:5 m2 3,129.25 22.95 71,816.29 3,129.25 22.95 71,816.29 0.00 22.95 0.00

08.13 SARDINEL H=0.40M F'C=175 KG/CM2,ACABADO 1:1 m 211.90 125.54 26,601.93 211.90 125.54 26,601.93 0.00 125.54 0.00

08.14 SARDINEL H=0.45M F'C=175 KG/CM2,ACABADO 1:2 m 915.24 137.66 125,991.94 915.24 137.66 125,991.94 0.00 137.66 0.00

08.15 SARDINEL A=25CM, H=0.65M, F'C=175 KG/CM2,ACABADO 1:3 m 531.75 163.94 87,175.10 531.75 163.94 87,175.10 0.00 163.94 0.00

08.16 ACERO ESTRUCTURAL FY= 4200 KG/CM2, PARA SARDINEL kg 2,756.52 3.67 10,116.43 2,756.52 3.67 10,116.43 0.00 3.67 0.00

08.17 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 1,352.73 18.24 24,673.80 1,352.73 18.24 24,673.80 0.00 18.24 0.00

08.18 m2 2,634.20 45.33 119,408.29 2,634.20 45.33 119,408.29 0.00 45.33 0.00

08.19 m2 6,187.70 40.88 252,953.18 6,187.70 40.88 252,953.18 0.00 40.88 0.00

08.20 m2 464.20 40.88 18,976.50 464.20 40.88 18,976.50 0.00 40.88 0.00

08.21 m3 34.19 262.51 8,975.22 34.19 262.51 8,975.22 0.00 262.51 0.00

08.22 ENCOFRADO Y DESENCOFRADO P/ESCALERA APOYADA m2 85.47 45.91 3,923.93 85.47 45.91 3,923.93 0.00 45.91 0.00

08.23 m3 315.90 38.21 12,070.54 315.90 38.21 12,070.54 0.00 38.21 0.00

09.00 ZOCALOS Y CONTRAZOCALOS 532,096.10 532,096.10 0.00

09.01 ZOCALO DE BALDOSA CERAMICO 60 X 60 cm m2 22.90 58.05 1,329.35 22.90 58.05 1,329.35 0.00 58.05 0.00

09.02 ZOCALO DE BALDOSA CERAMICO 30 X 30 cm m2 1,660.70 54.63 90,724.04 1,660.70 54.63 90,724.04 0.00 54.63 0.00

09.03 ZOCALO DE MADERA RONDON 3/4" H VARIABLE m2 635.05 72.12 45,799.81 635.05 72.12 45,799.81 0.00 72.12 0.00

CONCRETO PREMEZCADO F'C=210 KG/CM2 P/TRIBUNAS -CEMENTO TIPO I

MUROS DE CABEZA CON LADRILLO KING KONG TIPO IV 9X13X24 CM

MUROS DE SOGA CON LADRILLO KING KONG TIPO IV 9X13X24 CM

MUROS DE BLOQUE HUECO DE CONCRETO E=15 CM MEZCLA 1.5

MUROS DE BLOQUE HUECO DE CONCRETO E=20 CM MEZCLA 1.5

ACERO DE REFUERZO HORIZONTAL ENTRE MUROS FY=4200 KG/CM2

TARRAJEO EN MURO INTERIOR Y EXTERIOR , E=1.5CM, C:A= 1:5

TARRAJEO EN MURO EXTERIOR , E=1.5CM, C:A= 1:5 A PARTIR DEL 2° PISO

TARRAJEO EN MURO C/IMPERMEABILIZANTE, E=1.5CM, C:A= 1:5

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

BRUÑAS EN MUROS,COLUMNAS Y VIGAS,SEGUN DETALLE 1CMX1CM

PISO DE PORCELANATO 60X60 CM ANTIDESLIZANTE COLOR GRIS

PISO PEPELMA CERAMICA VITRIFICADA ANTIDES 30X30 COLOR

PISO DE CEMENTO FROTACHADO Y BRUÑADO E=2" S/COLOREAR

CONCRETO F'C=175 KG/CM2 E=12.5CM FROT Y BRUÑADO,EN LOSA DEPORTIVA

CONCRETO F'C=175 KG/CM2 E=4" FROT Y BRUÑADO,PARA VEREDAS

CONCRETO F'C=175 KG/CM2 E=4" FROT Y BRUÑADO,PARA RAMPAS

CONCRETO F'C=175 KG/CM2 EN ESCALERAS - CEMENTO PORTLAND TIPO I

AFIRMADO COMPACTADO PARA VEREDAS ,LOSAS Y PATIOS, E=8"

Page 10: IE - METRADO ELÉCTRICO (3)

10 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

09.04 m2 77.40 120.38 9,317.41 77.40 120.38 9,317.41 0.00 120.38 0.00

09.05 CONTRAZOCALO DE PORCELANATO COLOR GRIS ,H=15 CM m 4,014.40 19.99 80,247.86 4,014.40 19.99 80,247.86 0.00 19.99 0.00

09.06 m2 334.00 33.99 11,352.66 334.00 33.99 11,352.66 0.00 33.99 0.00

09.07 m2 322.00 28.71 9,244.62 322.00 28.71 9,244.62 0.00 28.71 0.00

09.08 ENCHAPE CON PIEDRA TRAVERTINO m2 1,764.40 156.81 276,675.56 1,764.40 156.81 276,675.56 0.00 156.81 0.00

09.09 ENCHAPEEN MURO C/GRANALLA COLOR m2 178.00 41.60 7,404.80 178.00 41.60 7,404.80 0.00 41.60 0.00

10.00 COBERTURAS 1,002,843.71 1,002,843.71 0.00

10.01 TEJA PLANA DE CONCRETO 20X40 CM COLOR LADRILLO m2 4,394.80 23.96 105,299.41 4,394.80 23.96 105,299.41 0.00 23.96 0.00

10.02 m2 435.70 100.00 43,570.00 435.70 100.00 43,570.00 0.00 100.00 0.00

10.03 m2 2,619.06 306.05 801,563.31 2,619.06 306.05 801,563.31 0.00 306.05 0.00

10.04 m2 342.70 32.61 11,175.45 342.70 32.61 11,175.45 0.00 32.61 0.00

10.05 COBERTURA DE PANEL METALICO DE CHAPA ONDULADA m2 705.70 50.44 35,595.51 705.70 50.44 35,595.51 0.00 50.44 0.00

10.06 m 29.70 189.90 5,640.03 29.70 189.90 5,640.03 0.00 189.90 0.00

11.00 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS 59,921.96 59,921.96 0.00

11.01 m2 227.90 23.68 5,396.67 227.90 23.68 5,396.67 0.00 23.68 0.00

11.02 m2 227.90 73.64 16,782.56 227.90 73.64 16,782.56 0.00 73.64 0.00

11.03 m2 311.00 95.59 29,728.49 311.00 95.59 29,728.49 0.00 95.59 0.00

11.04 m2 208.00 38.53 8,014.24 208.00 38.53 8,014.24 0.00 38.53 0.00

12.00 CARPINTERIA DE MADERA Y METALICA 832,834.82 832,834.82 0.00

12.01 CARPINTERIA DE MADERA 246,900.17 246,900.17 0.00

12.01.01 PUERTA CONTRAPLACADA 45 mm TRIPLAY m2 14.28 202.72 2,894.84 14.28 202.72 2,894.84 0.00 202.72 0.00

12.01.02 ESTRUCTURA DE MADERA, SOPORTE DE VIDRIOS m2 70.70 217.23 15,358.16 70.70 217.23 15,358.16 0.00 217.23 0.00

12.01.03 CELOSIA DE MADERA TRABAJADA m2 657.30 15.53 10,207.87 657.30 15.53 10,207.87 0.00 15.53 0.00

12.01.04 PERGOLAS DE MADERA m2 266.40 443.10 118,041.84 266.40 443.10 118,041.84 0.00 443.10 0.00

12.01.05 ESTRUCTURA DE MADERA,SOL Y SOMBRA .CAFETERIA m2 302.80 282.49 85,537.97 302.80 282.49 85,537.97 0.00 282.49 0.00

12.01.06 ESTRADO DE MADERA QUINILLA DE 19 CM DE ESPESOR m2 110.90 133.99 14,859.49 110.90 133.99 14,859.49 0.00 133.99 0.00

12.02 CARPINTERIA METALICA Y HERRERIA 585,934.65 585,934.65 0.00

12.02.01 und 2.00 1,848.75 3,697.50 2.00 1,848.75 3,697.50 0.00 1,848.75 0.00

12.02.02 PUERTA METALICA DE INGRESO PERSONAL(0.90X2.60M) und 1.00 764.58 764.58 1.00 764.58 764.58 0.00 764.58 0.00

12.02.03 m2 14.40 774.32 11,150.21 14.40 774.32 11,150.21 0.00 774.32 0.00

12.02.04 PUERTA DE HOJA METALICA CONTRAPLACADA m2 469.60 434.60 204,088.16 469.60 434.60 204,088.16 0.00 434.60 0.00

12.02.05 VENTANA BATIENTE CON MARCO DE ALUMINIO m2 281.36 121.73 34,249.95 281.36 121.73 34,249.95 0.00 121.73 0.00

12.02.06 VENTANA DE ALUMINIO PROYECTANTE m2 179.58 119.48 21,456.22 179.58 119.48 21,456.22 0.00 119.48 0.00

12.02.07 m2 159.50 164.56 26,247.32 159.50 164.56 26,247.32 0.00 164.56 0.00

12.02.08 MANPARA DE ALUMINIO CON MARCO FIJO E=10MM m2 13.00 156.18 2,030.34 13.00 156.18 2,030.34 0.00 156.18 0.00

12.02.09 DIVISION DE VIDRIO DE 8MM TEMPLADO/INC.INSTALACION m2 110.02 155.07 17,060.80 110.02 155.07 17,060.80 0.00 155.07 0.00

12.02.10 CELOSIA DE ALUMINIO HORIZONTAL < 5 CM m2 614.88 164.49 101,141.61 614.88 164.49 101,141.61 0.00 164.49 0.00

12.02.11 CELOSIA DE ALUMINIO HORIZONTAL > 5 CM m2 134.00 200.37 26,849.58 134.00 200.37 26,849.58 0.00 200.37 0.00

12.02.12 m2 146.40 64.42 9,431.09 146.40 64.42 9,431.09 0.00 64.42 0.00

12.02.13 CERRAMIENTO METALICO CON MALLA DE FIERRO ESTRUIDA m2 66.41 138.48 9,196.46 66.41 138.48 9,196.46 0.00 138.48 0.00

12.02.14 PASAMANO DE F° 2", CON ANCLAJE C/METRO m 1,552.67 53.24 82,664.15 1,552.67 53.24 82,664.15 0.00 53.24 0.00

12.02.15 PASAMANO DE F° 3", CON ANCLAJE C/METRO m 31.60 83.64 2,643.02 31.60 83.64 2,643.02 0.00 83.64 0.00

12.02.16 CANTONERA CON PERFIL ESTRIADO DE F°, 2"X1"X1/8" m 636.60 34.71 22,096.39 636.60 34.71 22,096.39 0.00 34.71 0.00

12.02.17 m 6.30 97.50 614.25 6.30 97.50 614.25 0.00 97.50 0.00

12.02.18 ESCALERA DE ALUMINIO P/PISCINA -SEGUN DISEÑO und 14.00 179.97 2,519.58 14.00 179.97 2,519.58 0.00 179.97 0.00

12.02.19 TUBO 15CMX4CM P/PISCINA und 4.21 46.11 194.12 4.21 46.11 194.12 0.00 46.11 0.00

12.02.20 REJILLA METALICA SOBRE CUNETA ANCHO =0.25M und 4.21 178.25 750.43 4.21 178.25 750.43 0.00 178.25 0.00

12.02.21 SOPORTE METALICA P/TANQUE ALTO und 12.00 178.49 2,141.88 12.00 178.49 2,141.88 0.00 178.49 0.00

12.02.22 PUERTA METALICA m2 8.64 572.57 4,947.00 8.64 572.57 4,947.00 0.00 572.57 0.00

13.00 CERRAJERIA 37,144.00 37,144.00 0.00

13.01 BISAGRA ALUMIN.DE 4"X4" PESADA EN PUERTA und 1,062.00 9.18 9,749.16 1,062.00 9.18 9,749.16 0.00 9.18 0.00

CONTRAZOCALO DE PORCELANATO ANTIDESLIZANTE DE 60x60 GRIS CLARO

CONTRAZOCALO DE CEMENTO PULIDO H= VARIABLE ,E=1.5 CM

CONTRAZOCALO DE CEMENTO FROTACHADO H= VARIABLE ,E=1.5 CM

COBERTURA METALICA CON SUPERBOAR Y MANTO ASFALTICO CUMBRERA DE TEJA ROJA ANDINA

COBERTURA TENSO ESTRUCTURAL MENBRANA DE PVC (INCLUYE ESTRUCTURA METALICA)

COBERTURA C/PANEL METALICO GALVANIZADO Y ZINCADO, TIPO ACANALADO

CLARABOYA METALICA CON COBERTURA DE POLICARBONATO

FORJADO Y REVESTIM. DE GRADAS Y ESCALERAS DE CEM. Y FROTACHADA

FORJADO Y REVESTIMIENTO DE PASOS Y CONTRAPASOS DE ESCALERA EN GRANALLA

FORJADO Y REVESTIMIENTO DE PASOS Y CONTRAPASOS DE ESCALERA EN PORCELANATO

FORJADO Y REVESTIMIENTO DE PASOSCON CEMENTO PULIDO

PUERTA METALICA PRINCIPAL DE INGRESO EN PORTADA(3.0X2.60M)

PUERTA ENRROLLABLE METALICA,APERTURA MANUAL INC. ACABADO

MANPARA ALUMINIO SEGUN DISEÑO P/VIDRIO TEMPLADO DE 6.0MM INC SUMIN. E INSTALACION

CERRAMIENTO METALICO CON MALLA DE FIERRO TIPO COCADA C/ALAMBRE N° 12

ESCALERA DE GATO DE TUBO F°G° DE 1 1/2" Y 1", C/INSTALACION

Page 11: IE - METRADO ELÉCTRICO (3)

11 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

13.02 CERRADURA DE MANIJA TIPO PALANCA pza 459.00 53.10 24,372.90 459.00 53.10 24,372.90 0.00 53.10 0.00

13.03 CERRADURA DOS GOLPES EN PUERTA, CON TIRADOR pza 5.00 53.10 265.50 5.00 53.10 265.50 0.00 53.10 0.00

13.04 pza 177.00 13.00 2,301.00 177.00 13.00 2,301.00 0.00 13.00 0.00

13.05 TIRADOR DE BRONCE PARA PUERTAS und 10.00 35.75 357.50 10.00 35.75 357.50 0.00 35.75 0.00

13.06 BARRA ANTIPANICO und 2.00 48.97 97.94 2.00 48.97 97.94 0.00 48.97 0.00

14.00 VIDRIOS,CRISTALES Y SIMILARES 59,767.48 59,767.48 0.00

14.01 VIDRIO TEMPLADO E=6MM-INC. INSTALACION m2 731.77 78.00 57,078.06 731.77 78.00 57,078.06 0.00 78.00 0.00

14.02 VIDRIO TEMPLADO E=10MM-INC. INSTALACION m2 13.00 141.42 1,838.46 13.00 141.42 1,838.46 0.00 141.42 0.00

14.03 ESPÉJO EMPOTRADO E=4MM BISELADO m2 6.60 57.83 381.68 6.60 57.83 381.68 0.00 57.83 0.00

14.04 ESPEJO BASCULANTE BLANCO INC.10" m2 7.00 67.04 469.28 7.00 67.04 469.28 0.00 67.04 0.00

15.00 PINTURA 161,018.76 161,018.76 0.00

15.01 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS INT/EXT m2 13,979.02 6.16 86,110.76 13,979.02 6.16 86,110.76 0.00 6.16 0.00

15.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNAS m2 10,827.75 6.04 65,399.61 10,827.75 6.04 65,399.61 0.00 6.04 0.00

15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 14.28 9.53 136.09 14.28 9.53 136.09 0.00 9.53 0.00

15.04 PINTURA DE LINEAS EN LOSA DEPORTIVA m 587.50 1.82 1,069.25 587.50 1.82 1,069.25 0.00 1.82 0.00

15.05 m2 623.82 13.31 8,303.04 623.82 13.31 8,303.04 0.00 13.31 0.00

16.00 CAMPO DEPORTIVO 600,255.66 600,255.66 0.00

16.01 m2 4,050.00 142.46 576,963.00 4,050.00 142.46 576,963.00 0.00 142.46 0.00

16.02 ARCO DE FUTBOL. METALICO und 2.00 2,299.97 4,599.94 2.00 2,299.97 4,599.94 0.00 2,299.97 0.00

16.03 und 8.00 2,336.59 18,692.72 8.00 2,336.59 18,692.72 0.00 2,336.59 0.00

INSTALACIONES SANEAMIENTO825,651.69 1,320,914.73 495,039.40

17.00 SISTEMAS DE AGUA FRIA 92,230.12 177,951.97 85,721.85

17.01 TRABAJOS PRELIMINARES 1,554.00 2,639.04 1,085.04

17.01.01 TRAZO Y REPLANTEO INICIAL m 925.00 1.68 1,554.00 1,570.86 1.68 2,639.04 645.86 1.68 1,085.04

17.02 MOVIMIENTO DE TIERRAS 39,414.25 66,934.34 27,520.09

17.02.01 EXCAVACION DE ZANJAS PARA TUBERIAS m 925.00 14.63 13,532.75 1,570.86 14.63 22,981.68 645.86 14.63 9,448.93

17.02.02 m 925.00 4.48 4,144.00 1,570.86 4.48 7,037.45 645.86 4.48 2,893.45

17.02.03 CAMA DE ARENA P/TUBERIA DE DESAGUE m 925.00 10.01 9,259.25 1,570.86 10.01 15,724.31 645.86 10.01 6,465.06

17.02.04 m 925.00 11.05 10,221.25 1,570.86 11.05 17,358.00 645.86 11.05 7,136.75

17.02.05 m 925.00 2.44 2,257.00 1,570.86 2.44 3,832.90 645.86 2.44 1,575.90

17.03 TUBERIA PVC CLASE-10 15,763.22 49,049.12 33,285.90

17.03.01M TUBERIA DE PVC CL-10 ROSCADO D=4" m 0.00 682.06 55.00 37,513.30 682.06 55.00 37,513.30

17.03.01 TUBERIA DE PVC CL-10 ROSCADO D=3" m 447.35 24.49 10,955.60 99.86 24.49 2,445.57 -347.49 24.49 -8,510.03

17.03.02 TUBERIA DE PVC CL-10 ROSCADO D=2 1/2" m 126.70 9.88 1,251.80 54.07 9.88 534.21 -72.63 9.88 -717.58

17.03.03 TUBERIA DE PVC CL-10 ROSCADO D=2 " m 209.80 10.13 2,125.27 180.62 10.13 1,829.68 -29.18 10.13 -295.59

17.03.04 TUBERIA DE PVC CL-10 ROSCADO D=1 1/2 " m 114.45 11.12 1,272.68 174.68 11.12 1,942.44 60.23 11.12 669.76

17.03.05 TUBERIA PVC SAP CLASE A-10 DE 1 1/4" m 16.08 5.85 94.07 247.98 5.85 1,450.68 231.90 5.85 1,356.61

17.03.05M TUBERIA DE PVC CL-10 ROSCADO D=1" m 0.00 65.67 6.00 394.02 65.67 6.00 394.02

17.03.06 TUBERIA PVC SAP CLASE A-10 DE 3/4" m 10.58 6.03 63.80 130.47 6.03 786.73 119.89 6.03 722.94

17.03.06M TUBERIA DE PVC CL-10 ROSCADO D=1/2" m 0.00 391.36 5.50 2,152.48 391.36 5.50 2,152.48

17.04 ACCESORIOS 2,175.78 29,578.13 27,402.35

17.04.01M CODO DE PVC CL-10 ROSCADO DE 4" x 90° und 0.00 38.00 49.00 1,862.00 38.00 49.00 1,862.00

17.04.01 CODO DE PVC CL-10 ROSCADO DE 3" x 90° und 5.00 33.30 166.50 8.00 33.30 266.40 3.00 33.30 99.90

17.04.02 CODO DE PVC CL-10 ROSCADO DE 3" x45° und 3.00 32.54 97.62 0.00 32.54 0.00 -3.00 32.54 -97.62

17.04.03 CODO DE PVC CL-10 ROSCADO DE 2 1/ 2" x 90° und 4.00 27.91 111.64 7.00 27.91 195.37 3.00 27.91 83.73

17.04.04 CODO DE PVC CL-10 ROSCADO DE 2" x 90° und 4.00 25.84 103.36 11.00 25.84 284.24 7.00 25.84 180.88

17.04.05 CODO DE PVC CL-10 ROSCADO DE 1 1/ 2" und 7.00 19.21 134.47 70.00 19.21 1,344.70 63.00 19.21 1,210.23

17.04.05M CODO DE PVC CL-10 ROSCADO DE 1" x 1/4"° und 0.00 207.00 18.50 3,829.50 207.00 18.50 3,829.50

17.04.06M CODO DE PVC CL-10 ROSCADO DE 1" x 90° und 0.00 25.00 17.50 437.50 25.00 17.50 437.50

17.04.06 CODO DE PVC CL-10 ROSCADO DE 3/4" x 90° und 1.00 16.26 16.26 114.00 16.26 1,853.64 113.00 16.26 1,837.38

CERROJO "SAPITO" 2" PARA PUERTAS EN CUBICULOS DE SS.HH.

SELLADO DE CONCRETO EXPUESTO EN COLUMNAS Y PLACAS

SUM. E INSTAL. DE GRASS SINTETICO, SEGUN ESPECIFICACIONES TECNICAS

ARCO Y TABLERO DE FULBITO-BASQUET(METALICO-MADERA)

REFINE Y NIVELACIÓN DE FONDO DE ZANJA P/TUBERIA DE DESAGUE

RELLENO COMPACTADO C/MAT. PROPIO DE ZANJA P/TUBERIAS DE DESAGUE

ELIMINACIÓN DE MATERIAL EXCEDENTE DE ZANJA P/TUBERIA DE DESAGUE

Page 12: IE - METRADO ELÉCTRICO (3)

12 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

17.04.07M CODO DE PVC CL-10 ROSCADO DE 1/2" x 90° und 0.00 260.00 15.25 3,965.00 260.00 15.25 3,965.00

17.04.07 REDUCCION DE PVC CL-10 ROSCADO DE 3" A 2" und 3.00 31.63 94.89 3.00 31.63 94.89 0.00 31.63 0.00

17.04.08M REDUCCION DE PVC CL-10 ROSCADO DE 2 1/2'' A 2'' und 0.00 1.00 32.00 32.00 1.00 32.00 32.00

17.04.08 REDUCCION DE PVC CL-10 ROSCADO DE 2 1/2" A 1 1/2" und 3.00 33.29 99.87 1.00 33.29 33.29 -2.00 33.29 -66.58

17.04.09 REDUCCION DE PVC CL-10 ROSCADO DE 2" A 1 1/2" und 8.00 38.01 304.08 1.00 38.01 38.01 -7.00 38.01 -266.07

17.04.10 REDUCCION DE PVC CL-10 ROSCADO DE 2" A 1" und 3.00 29.64 88.92 0.00 29.64 0.00 -3.00 29.64 -88.92

17.04.10M1 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 1 1/4" und 0.00 23.00 29.00 667.00 23.00 29.00 667.00

17.04.08M2 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 1" und 0.00 3.00 29.00 87.00 3.00 29.00 87.00

17.04.10M2 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 3/4" und 0.00 6.00 28.25 169.50 6.00 28.25 169.50

17.04.08M3 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 1/2" und 0.00 2.00 28.00 56.00 2.00 28.00 56.00

17.04.10M3 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4" A 1" und 0.00 88.00 27.50 2,420.00 88.00 27.50 2,420.00

17.04.08M4 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4'' A 3/4'' und 0.00 5.00 26.00 130.00 5.00 26.00 130.00

17.04.10M4 REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4" A 1/2" und 0.00 24.00 24.00 576.00 24.00 24.00 576.00

17.04.11 REDUCCION DE PVC CL-10 ROSCADO DE 1 " A 3/4" und 1.00 22.78 22.78 32.00 22.78 728.96 31.00 22.78 706.18

17.04.11M REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4" A 1/2" und 0.00 38.00 21.00 798.00 38.00 21.00 798.00

17.04.12M TEE DE PVC CL-10 ROSCADO DE 4" und 0.00 12.00 75.00 900.00 12.00 75.00 900.00

17.04.12 TEE DE PVC CL-10 ROSCADO DE 3" und 3.00 57.86 173.58 6.00 57.86 347.16 3.00 57.86 173.58

17.04.13 TEE DE PVC CL-10 ROSCADO DE 3" x 2" und 10.00 59.82 598.20 0.00 59.82 0.00 -10.00 59.82 -598.20

17.04.14 TEE DE PVC CL-10 ROSCADO DE 2 1/2" und 2.00 36.59 73.18 5.00 36.59 182.95 3.00 36.59 109.77

17.04.15 TEE DE PVC CL-10 ROSCADO DE 2 " und 1.00 30.94 30.94 4.00 30.94 123.76 3.00 30.94 92.82

17.04.16 TEE DE PVC CL-10 ROSCADO DE 1 1/2 " und 3.00 19.83 59.49 28.00 19.83 555.24 25.00 19.83 495.75

17.04.17M TEE DE PVC CL-10 ROSCADO DE 1 1/4 " und 0.00 89.00 19.00 1,691.00 89.00 19.00 1,691.00

17.04.18M TEE DE PVC CL-10 ROSCADO DE 1 " und 0.00 18.00 18.00 324.00 18.00 18.00 324.00

17.04.19M TEE DE PVC CL-10 ROSCADO DE 3/4 " und 0.00 18.00 17.00 306.00 18.00 17.00 306.00

17.04.20M TEE DE PVC CL-10 ROSCADO DE 1/2 " und 0.00 62.00 16.00 992.00 62.00 16.00 992.00

17.04.21M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 3" A 2'' und 0.00 0.00 59.82 0.00 0.00 59.82 0.00

17.04.22M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 3" A 1 1/2'' und 0.00 7.00 59.82 418.74 7.00 59.82 418.74

17.04.23M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 3'' A 3/4'' und 0.00 6.00 59.82 358.92 6.00 59.82 358.92

17.04.24M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 2 1/2'' A 2'' und 0.00 2.00 36.59 73.18 2.00 36.59 73.18

17.04.25M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 2'' A 1 1/2'' und 0.00 5.00 30.94 154.70 5.00 30.94 154.70

17.04.26M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 2'' A 1 1/4'' und 0.00 3.00 30.94 92.82 3.00 30.94 92.82

17.04.27M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 2'' A 3/4'' und 0.00 3.00 30.94 92.82 3.00 30.94 92.82

17.04.28M und 0.00 17.00 19.83 337.11 17.00 19.83 337.11

17.04.29M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/2" A 1'' und 0.00 11.00 19.83 218.13 11.00 19.83 218.13

17.04.30M und 0.00 12.00 19.83 237.96 12.00 19.83 237.96

17.04.31M und 0.00 8.00 19.83 158.64 8.00 19.83 158.64

17.04.32M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/4" A 1'' und 0.00 1.00 19.00 19.00 1.00 19.00 19.00

17.04.33M und 0.00 7.00 19.00 133.00 7.00 19.00 133.00

17.04.34M und 0.00 12.00 19.00 228.00 12.00 19.00 228.00

17.04.35M TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 3/4" A 1/2'' und 0.00 17.00 17.00 289.00 17.00 17.00 289.00

17.04.36M TAPON MACHO DE 1" und 0.00 43.00 25.00 1,075.00 43.00 25.00 1,075.00

17.04.37M TAPON MACHO DE 3/4" und 0.00 16.00 25.00 400.00 16.00 25.00 400.00

0 VÁLVULAS EN REDES GENERALES 2,089.66 3,831.90 1,742.24

17.05.01M VALVULA COMPUERTA EN CAJUELA D=3'' und 0.00 6.00 450.00 2,700.00 6.00 450.00 2,700.00

17.05.01 VALVULA COMPUERTA EN CAJUELA D=2 1/2" und 6.00 180.71 1,084.26 180.71 0.00 -6.00 180.71 -1,084.26

17.05.02 VALVULA COMPUERTA EN CAJUELA D=2" und 4.00 226.38 905.52 5.00 226.38 1,131.90 1.00 226.38 226.38

17.05.03 VALVULA COMPUERTA EN CAJUELA D=1/2 " und 1.00 99.88 99.88 0.00 99.88 0.00 -1.00 99.88 -99.88

17.06 VÁLVULAS EN AMBIENTE 9,390.97 8,331.96 -1,059.01

17.06.01 VALVULA COMPUERTA D=1 1/2 " und 16.00 128.66 2,058.56 20.00 128.66 2,573.20 4.00 128.66 514.64

17.06.02 VALVULA COMPUERTA D=1 1/4" und 37.00 102.81 3,803.97 30.00 102.81 3,084.30 -7.00 102.81 -719.67

17.06.03 VALVULA DE COMPUERTA D=3/4" und 38.00 55.82 2,121.16 20.00 55.82 1,116.40 -18.00 55.82 -1,004.76

TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/2" A 1 1/4''

TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/2" A 3/4''

TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/2" A 1/2''

TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/4" A 3/4''

TEE DE PVC CL-10 ROSCADO CON REDUCCION DE 1 1/4" A 1/2''

Page 13: IE - METRADO ELÉCTRICO (3)

13 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

17.06.04 VALVULA COMPUERTA D= 1/2 " und 28.00 50.26 1,407.28 31.00 50.26 1,558.06 3.00 50.26 150.78

17.07 SALIDA DE PUTO DE AGUA FRIA 20,231.66 15,976.89 -4,254.77

17.07.01 SALIDA P/INODORO D=1 1/4" pto 81.00 100.41 8,133.21 64.00 100.41 6,426.24 -17.00 100.41 -1,706.97

17.07.02 SALIDA P/INODORO D=1 " pto 25.00 71.75 1,793.75 2.00 71.75 143.50 -23.00 71.75 -1,650.25

17.07.02M SALIDA P/URINARIO D=1 " pto 71.75 0.00 21.00 71.75 1,506.75 21.00 71.75 1,506.75

17.07.03 SALIDA P/LAVATORIO D=1/2" pto 99.00 67.65 6,697.35 86.00 67.65 5,817.90 -13.00 67.65 -879.45

17.07.04 SALIDA P/LAVADERO COCINA D=1/2" pto 4.00 67.65 270.60 1.00 67.65 67.65 -3.00 67.65 -202.95

17.07.05 SALIDA P/BOTADERO D=1/2" pto 11.00 67.65 744.15 4.00 67.65 270.60 -7.00 67.65 -473.55

17.07.06 SALIDA P/BEBEDERO D=1/2" pto 14.00 67.65 947.10 10.00 67.65 676.50 -4.00 67.65 -270.60

17.07.07 SALIDA P/DUCHA D=1/2" pto 30.00 54.85 1,645.50 17.00 54.85 932.45 -13.00 54.85 -713.05

17.07.07M SALIDA P/THERMA D=1/2" pto 67.65 0.00 2.00 67.65 135.30 2.00 67.65 135.30

17.08 CONEXION DOMICILIARIA DE AGUA POTABLE 1,610.58 1,610.58 0.00

17.08.01 CONEXIÓN DOMICILIARIA DE AGUA POTABLE D=2" und 1.00 1,610.58 1,610.58 1.00 1,610.58 1,610.58 0.00 1,610.58 0.00

18.00 SISTEMAS DE AGUA CALIENTE 10,511.54 11,407.82 896.28

18.01 RED DE AGUA CALIENTE 465.40 1,192.78 727.38

18.01.01 TUBERIA CPVC SAP CLASE A-10 DE 1/2" - AGUA CALIENTE m 32.00 6.10 195.20 138.35 6.10 843.94 106.35 6.10 648.73

18.01.02 TUBERIA CPVC SAP CLASE A-10 DE 3/4" - AGUA CALIENTE m 28.00 9.65 270.20 36.15 9.65 348.85 8.15 9.65 78.65

18.02 ACCESORIOS 731.90 900.80 168.90

18.02.01 TEE C-PVC C/REDUCCION DE 3/4" A 1/2" und 12.00 28.15 337.80 0.00 28.15 0.00 -12.00 28.15 -337.80

18.02.02 CODO C-PVC DE 3/4"x90° pza 4.00 28.15 112.60 16.00 28.15 450.40 12.00 28.15 337.80

18.02.03 REDUCCION 3/4/" A 1/2" und 10.00 28.15 281.50 16.00 28.15 450.40 6.00 28.15 168.90

18.03 CALETADORES ELECTRICOS 7,668.74 7,668.74 0.00

18.03.01 CALENTADOR ELECTRICO 150 LITROS und 4.00 1,582.89 6,331.56 4.00 1,582.89 6,331.56 0.00 1,582.89 0.00

18.03.02 CALENTADOR ELECTRICO 80 LITROS und 2.00 668.59 1,337.18 2.00 668.59 1,337.18 0.00 668.59 0.00

18.04 SALIDA PARA PUNTOS DE AGUA CALIENTE 1,645.50 1,645.50 0.00

18.04.01 SALIDA P/DUCHA D=1/2" pto 30.00 54.85 1,645.50 30.00 54.85 1,645.50 0.00 54.85 0.00

19.00 SISTEMA DE DESAGUE 200,142.19 300,771.22 100,405.39

19 TRABAJOS PRELIMINARES 3,299.69 4,376.58 1,076.90

19.01.01 TRAZO Y REPLANTEO INICIAL m2 1,964.10 1.68 3,299.69 2,605.11 1.68 4,376.58 641.01 1.68 1,076.90

19.02 MOVIMIENTO DE TIERRAS 83,690.30 111,003.74 27,313.44

19.02.01 EXCAVACION DE ZANJAS PARA TUBERIAS m 1,964.10 14.63 28,734.78 2,605.11 14.63 38,112.76 641.01 14.63 9,377.98

19.02.02 m 1,964.10 4.48 8,799.17 2,605.11 4.48 11,670.89 641.01 4.48 2,871.72

19.02.03 CAMA DE ARENA P/TUBERIA DE DESAGUE m 1,964.10 10.01 19,660.64 2,605.11 10.01 26,077.15 641.01 10.01 6,416.51

19.02.04 m 1,964.10 11.05 21,703.31 2,605.11 11.05 28,786.47 641.01 11.05 7,083.16

19.02.05 m 1,964.10 2.44 4,792.40 2,605.11 2.44 6,356.47 641.01 2.44 1,564.06

19.03 TUBERIA PVC SAP 43,221.50 47,388.50 4,167.00

19.03.01 TUBERIA DE PVC SAP 6" m 441.00 41.22 18,178.02 390.54 41.22 16,098.06 -50.46 41.22 -2,079.96

19.03.02 TUBERIA DE PVC SAP 4" m 1,522.40 16.45 25,043.48 747.46 16.45 12,295.72 -774.94 16.45 -12,747.76

19.03.02 TUBERIA DE PVC SAP 3" m 0.00 374.77 14.25 5,340.47 374.77 14.25 5,340.47

19.03.02 TUBERIA DE PVC SAP 2" m 0.00 1,092.34 12.50 13,654.25 1,092.34 12.50 13,654.25

19.04 ACCESORIOS 96.33 52,533.29 52,436.96

19.04.01 CODO DE PVC SAL DE 4" x 90° pza 1.00 30.11 30.11 13.00 30.11 391.43 12.00 30.11 361.32

19.03.02 CODO PVC SAL 3'' X 45° m 0.00 474.00 27.50 13,035.00 474.00 27.50 13,035.00

19.03.02 CODO PVC SAL 2'' X 45° m 0.00 52.00 22.50 1,170.00 52.00 22.50 1,170.00

19.03.02 CODO PVC SAL 1'' X 45° m 0.00 2.00 15.25 30.50 2.00 15.25 30.50

19.04.02 CODO PVC SAL 4"X45° pza 2.00 33.11 66.22 51.00 33.11 1,688.61 49.00 33.11 1,622.39

19.03.02 CODO PVC SAL 3'' X 45° und 0.00 20.00 27.50 550.00 20.00 27.50 550.00

19.03.02 CODO PVC SAL 2'' X 45° und 0.00 165.00 22.50 3,712.50 165.00 22.50 3,712.50

19.03.02 CODO PVC SAL 1'' X 45° und 0.00 1.00 15.25 15.25 1.00 15.25 15.25

19.03.02 REDUCCION DE PVC SAL DE 4'' A 3'' und 0.00 7.00 40.00 280.00 7.00 40.00 280.00

19.03.02 REDUCCION DE PVC SAL DE 4'' A 2'' und 0.00 18.00 40.00 720.00 18.00 40.00 720.00

REFINE Y NIVELACIÓN DE FONDO DE ZANJA P/TUBERIA DE DESAGUE

RELLENO COMPACTADO C/MAT. PROPIO DE ZANJA P/TUBERIAS DE DESAGUE

ELIMINACIÓN DE MATERIAL EXCEDENTE DE ZANJA P/TUBERIA DE DESAGUE

I341
DANIEL: REVISAR QUE HAYAN CONSIDERADO TODAS LAS LLAVES, INCLUSO EL PABELLÓN EXISTENTE
Page 14: IE - METRADO ELÉCTRICO (3)

14 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

19.03.02 REDUCCION DE PVC SAL DE 3'' A 2'' und 0.00 17.00 35.00 595.00 17.00 35.00 595.00

19.03.02 CRUZ DE PVC SAL DE 2'' und 0.00 12.00 35.00 420.00 12.00 35.00 420.00

19.03.02 TEE DE PVC SAL DE 4'' und 0.00 6.00 65.00 390.00 6.00 65.00 390.00

19.03.02 TEE DE PVC SAL DE 3'' und 0.00 1.00 55.00 55.00 1.00 55.00 55.00

19.03.02 TEE DE PVC SAL DE 2'' und 0.00 135.00 45.00 6,075.00 135.00 45.00 6,075.00

19.03.02 TEE DE PVC SAL CON REDUCCION DE 4'' A 2'' und 0.00 10.00 65.00 650.00 10.00 65.00 650.00

19.03.02 TEE SANITARIA DE PVC SAL DE 4'' und 0.00 4.00 65.00 260.00 4.00 65.00 260.00

19.03.02 YEE DE PVC SAL DE 4'' und 0.00 51.00 65.00 3,315.00 51.00 65.00 3,315.00

19.03.02 YEE DE PVC SAL DE 3'' und 0.00 55.00 0.00 0.00 55.00 0.00

19.03.02 YEE DE PVC SAL DE 2'' und 0.00 73.00 45.00 3,285.00 73.00 45.00 3,285.00

19.03.02 YEE DE PVC SAL CON REDUCCION DE 4'' A 3'' und 0.00 1.00 65.00 65.00 1.00 65.00 65.00

19.03.02 YEE DE PVC SAL CON REDUCCION DE 4'' A 2'' und 0.00 62.00 65.00 4,030.00 62.00 65.00 4,030.00

19.03.02 YEE DE PVC SAL CON REDUCCION DE 3'' A 2'' und 0.00 56.00 55.00 3,080.00 56.00 55.00 3,080.00

19.03.02 YEE DOBLE DE PVC SAL DE 4'' und 0.00 10.00 95.00 950.00 10.00 95.00 950.00

19.03.02 YEE DOBLE DE PVC SAL DE 2'' und 0.00 12.00 65.00 780.00 12.00 65.00 780.00

19.03.02 YEE DOBLE DE PVC SAL CON REDUCCION DE 4'' A 2'' und 0.00 6.00 120.00 720.00 6.00 120.00 720.00

19.03.02 TRAMPA TIPO "P" DE 2'' und 0.00 66.00 95.00 6,270.00 66.00 95.00 6,270.00

19.05 CAJAS Y REGISTROS 14,141.18 36,732.68 22,591.50

19.05.01 CAJA DE REGISTRO DE DESAGUE 24" X 24" pza 18.00 289.89 5,218.02 16.00 289.89 4,638.24 -2.00 289.89 -579.78

19.05.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 34.00 207.18 7,044.12 30.00 207.18 6,215.40 -4.00 207.18 -828.72

19.05.03 BUZON ESTÁNDAR D=1.20m. und 1.00 1,879.04 1,879.04 1.00 1,879.04 1,879.04 0.00 1,879.04 0.00

19.05.03 TRAMPA DE GRASA und 0.00 2.00 7,500.00 15,000.00 2.00 7,500.00 15,000.00

19.05.03 CAMARA DE REJAS und 0.00 2.00 4,500.00 9,000.00 2.00 4,500.00 9,000.00

19.06 CONEXION DOMICILIARIA DE AGUA POTABLE 4,286.84 5,358.55 1,071.71

19.06.01 CONEXIÓN DOMICILIARIA DE AGUA POTABLE D=6" und 4.00 1,071.71 4,286.84 5.00 1,071.71 5,358.55 1.00 1,071.71 1,071.71

19.07 SALIDAS P/PUNTOS DE DESAGUE 51,406.35 43,377.88 -8,252.11

19.07.01 SALIDA DE DESAGUE P/INODORO D=4" pto 81.00 114.82 9,300.42 65.00 114.82 7,463.30 -16.00 114.82 -1,837.12

19.07.02 SALIDA DE DESAGUE P/URINARIO D=2" pto 27.00 89.09 2,405.43 21.00 89.09 1,870.89 -6.00 89.09 -534.54

19.07.03 SALIDA DE DESAGUE P/LAVATORIO D=2" pto 99.00 89.09 8,819.91 83.00 89.09 7,394.47 -16.00 89.09 -1,425.44

19.07.04 SALIDA P/BOTADERO D=2" pto 11.00 100.24 1,102.64 13.00 100.24 1,303.12 2.00 100.24 200.48

19.07.05 SALIDA P/BEBEDERO D=2" pto 14.00 100.24 1,403.36 10.00 100.24 1,002.40 -4.00 100.24 -400.96

19.07.06 SALIDA DE DESAGUE P/DUCHA D=2" pto 30.00 89.09 2,672.70 33.00 89.09 2,939.97 3.00 89.09 267.27

19.07.07 SALIDA DE DESAGUE P/TERMA D=2" pto 6.00 89.09 534.54 6.00 89.09 534.54 0.00 89.09 0.00

19.07.08 SALIDA DE DESAGUE P/LAVADERO DE COCINA D=2" pto pto 4.00 89.09 356.36 4.00 145.00 580.00 0.00 145.00 0.00

19.07.09 SALIDA DE DESAGUE P/SUMIDERO D=3" pto 0.00 5.00 89.09 445.45 5.00 89.09 445.45

19.07.09 SALIDA DE DESAGUE P/SUMIDERO D=2" pto 100.00 89.09 8,909.00 75.00 89.09 6,681.75 -25.00 89.09 -2,227.25

19.07.09 SALIDA DE DESAGUE P/SUMIDERO CON REJILLA D=2" pto 0.00 21.00 120.00 2,520.00 21.00 120.00 2,520.00

21907.10 SALIDA DE DESAGUE P/REGISTRO D=2" pto 58.00 89.09 5,167.22 24.00 89.09 2,138.16 -34.00 89.09 -3,029.06

19.07.11 SALIDA DE DESAGUE P/REGISTRO D=4" pto 31.00 104.03 3,224.93 7.00 104.03 728.21 -24.00 104.03 -2,496.72

19.07.12 SALIDA DE DESAGUE P/REGISTRO D=3" pto 9.00 92.01 828.09 39.00 92.01 3,588.39 30.00 92.01 2,760.30

19.07.13 SALIDA DE DESAGUE P/VENTILACION D=2" pto 75.00 89.09 6,681.75 47.00 89.09 4,187.23 -28.00 89.09 -2,494.52

20.00 SISTEMA DE AGUAS PLUVIALES 57,156.84 137,507.16 80,350.32

20.00M TRABAJOS PRELIMINARES 0.00 877.82 877.82

17.01.01 TRAZO Y REPLANTEO INICIAL m 1.68 0.00 522.51 1.68 877.82 522.51 1.68 877.82

20.00M2 MOVIMIENTO DE TIERRAS 0.00 22,264.15 22,264.15

17.02.01 EXCAVACION DE ZANJAS PARA TUBERIAS m 14.63 0.00 522.51 14.63 7,644.32 522.51 14.63 7,644.32

17.02.02 m 4.48 0.00 522.51 4.48 2,340.84 522.51 4.48 2,340.84

17.02.03 CAMA DE ARENA P/TUBERIA DE DESAGUE m 10.01 0.00 522.51 10.01 5,230.33 522.51 10.01 5,230.33

17.02.04 m 11.05 0.00 522.51 11.05 5,773.74 522.51 11.05 5,773.74

17.02.05 m 2.44 0.00 522.51 2.44 1,274.92 522.51 2.44 1,274.92

20.01 TUBERIA PVC SAL 36,088.14 65,138.08 29,049.94

REFINE Y NIVELACIÓN DE FONDO DE ZANJA P/TUBERIA DE DESAGUE

RELLENO COMPACTADO C/MAT. PROPIO DE ZANJA P/TUBERIAS DE DESAGUE

ELIMINACIÓN DE MATERIAL EXCEDENTE DE ZANJA P/TUBERIA DE DESAGUE

I400
DANIEL: DEBE EXISTIR EN LA CAFETERIA
Page 15: IE - METRADO ELÉCTRICO (3)

15 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

20.01.01 TUBERIA DE PVC SAP 4" m 0.00 36.60 150.00 5,490.00 36.60 150.00 5,490.00

20.01.01 TUBERIA DE PVC SAP 3" m 392.00 82.14 32,198.88 479.67 82.14 39,400.09 87.67 82.14 7,201.21

20.01.02 TUBERIA DE PVC SAP 2" m 93.00 41.82 3,889.26 484.17 41.82 20,247.99 391.17 41.82 16,358.73

20.01 TUBERIA FG 0.00 830.95 830.95

20.01.01 TUBERIA DE F°G° DE 2" m 0.00 9.35 45.00 420.75 9.35 45.00 420.75

20.01.01 TUBERIA DE F°G° DE 3" m 0.00 5.86 70.00 410.20 5.86 70.00 410.20

20.02 ACCESORIOS 1,833.15 13,208.78 11,375.63

20.02.01 CODO DE PVC SAP DE 4"x90° und 0.00 2.00 55.00 110.00 2.00 55.00 110.00

20.02.01 CODO DE PVC SAP DE 3"x90° und 23.00 21.94 504.62 45.00 21.94 987.30 22.00 21.94 482.68

20.02.02 CODO DE PVC SAP DE 3x45° pza 16.00 24.49 391.84 73.00 24.49 1,787.77 57.00 24.49 1,395.93

20.02.03 CODO DE PVC SAP DE 2x90° pza 18.00 20.04 360.72 64.00 20.04 1,282.56 46.00 20.04 921.84

20.02.04 CODO DE PVC SAP DE 2x45° pza 10.00 20.04 200.40 49.00 20.04 981.96 39.00 20.04 781.56

20.02.05 YEE DE PVC CON REDUCCION DE2" pza 0.00 7.00 27.50 192.50 7.00 27.50 192.50

20.02.05 YEE DE PVC CON REDUCCION DE 3"x2" pza 13.00 28.89 375.57 21.00 28.89 606.69 8.00 28.89 231.12

20.02.05 TRAMPA TIPO "P" DE 3'' pza 0.00 8.00 105.00 840.00 8.00 105.00 840.00

20.02.05 TRAMPA TIPO "P" DE 2'' pza 0.00 16.00 75.00 1,200.00 16.00 75.00 1,200.00

20.02.05 TRANSICION DE F°G° A PVC DE 2'' pza 0.00 10.00 115.00 1,150.00 10.00 115.00 1,150.00

20.02.05 TRANSICION DE F°G° A PVC DE 3'' pza 0.00 23.00 145.00 3,335.00 23.00 145.00 3,335.00

20.02.05 CODO DE F°G° DE 2''x90° pza 0.00 10.00 35.00 350.00 10.00 35.00 350.00

20.02.05 CODO DE F°G° DE 3''x90° pza 0.00 11.00 45.00 495.00 11.00 45.00 495.00

20.03 CANALETAS METALICAS 19,235.55 35,187.38 15,951.83

20.03.01 CANALETAS METALICAS PARA AGUA DE LLUVIA m 615.00 16.37 10,067.55 530.65 16.37 8,686.74 -84.35 16.37 -1,380.81

20.03.02 SOPORTES Y ABAZADERAS und 300.00 30.56 9,168.00 144.00 30.56 4,400.64 -156.00 30.56 -4,767.36

20.03.02 DRENAJE DE FONDO DE 1M X 1M und 0.00 34.00 650.00 22,100.00 34.00 650.00 22,100.00

21.00 SISTEMA DE EQUIPAMIENTO DE PISCINA 292,848.08 292,908.93 60.85

21.01 EQUIPOS DE CALENTADORES SOLARES 71,736.70 71,797.55 60.85

21.01.01 m2 481.20 76.06 36,600.07 482.00 76.06 36,660.92 0.80 76.06 60.85

21.01.02 THERMA SOLAR DE TUBOS AL VACIO DE 1000 L und 3.00 11,712.21 35,136.63 3.00 11,712.21 35,136.63 0.00 11,712.21 0.00

21.02 EQUIPO DE BOMBEO Y OTROS 137,626.60 137,626.60 0.00

21.02.01 GLB 1.00 6,094.54 6,094.54 1.00 6,094.54 6,094.54 0.00 6,094.54 0.00

21.02.02 GLB 1.00 111,616.45 111,616.45 1.00 111,616.45 111,616.45 0.00 111,616.45 0.00

21.02.03 GLB 1.00 5,270.07 5,270.07 1.00 5,270.07 5,270.07 0.00 5,270.07 0.00

21.02.04 GLB 1.00 8,096.62 8,096.62 1.00 8,096.62 8,096.62 0.00 8,096.62 0.00

21.02.05 und 1.00 6,548.92 6,548.92 1.00 6,548.92 6,548.92 0.00 6,548.92 0.00

20.03.02 TANQUE DE COMPENSACION DE 2000 GLS und 0.00 1.00 0.00 1.00 0.00 0.00

21.03 OTROS ELEMENTOS DE PISCINA 83,484.78 83,484.78 0.00

21.03.01 CANALETA DE CONCRETO PARA DESAGUE DE PISCINA m 178.00 206.28 36,717.84 178.00 206.28 36,717.84 0.00 206.28 0.00

21.03.02 m 178.00 182.38 32,463.64 178.00 182.38 32,463.64 0.00 182.38 0.00

21.03.03 GLB 1.00 14,303.30 14,303.30 1.00 14,303.30 14,303.30 0.00 14,303.30 0.00

21.00 SISTEMA DE DRENAJE EN CAMPO DEPORTIVO 0.00 241,708.16 241,708.16

17.01 TRABAJOS PRELIMINARES 0.00 1,777.44 1,777.44

17.01.01 TRAZO Y REPLANTEO INICIAL m 1.68 0.00 1,058.00 1.68 1,777.44 1,058.00 1.68 1,777.44

17.02 MOVIMIENTO DE TIERRAS 0.00 73,118.38 73,118.38

17.02.01 EXCAVACION DE ZANJAS PARA TUBERIAS m 14.63 0.00 1,058.00 14.63 15,478.54 1,058.00 14.63 15,478.54

17.02.02 m 4.48 0.00 1,058.00 4.48 4,739.84 1,058.00 4.48 4,739.84

17.02.03 CAMA DE ARENA P/TUBERIA DE DESAGUE m 10.01 0.00 1,058.00 10.01 10,590.58 1,058.00 10.01 10,590.58

17.02.04 m 11.05 0.00 1,058.00 11.05 11,690.90 1,058.00 11.05 11,690.90

17.02.05 m 2.44 0.00 1,058.00 2.44 2,581.52 1,058.00 2.44 2,581.52

20.03.02 GEOTEXTIL PARA DRENAJE m 0.00 1,058.00 12.00 12,696.00 1,058.00 12.00 12,696.00

20.03.02 GRAVILLA PARA DRENAJE m 0.00 1,058.00 14.50 15,341.00 1,058.00 14.50 15,341.00

MALLA DE MICROTUBOS DE PLASTICO NEGRO (CALENTADOR SOLAR)

SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO PARA AGUA POTABLE EN CISTERNA i/Accesorios, i/Tablero, s/Planos

SUMINISTRO E INSTALACION DE EQUIPO DE RECICULACION P PISCINA EN POLIDEPORTIVO

SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO P AGUA DESAGUE EN CAMARA DE BOMBEO EN POLIDEPORTIVO

SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO DE DESAGUE EN CAMPO DEPORTIVO

CLORINADOR AUTOMATICO FUERA DE LINEA (600 m3 de agua, 13,60 kg de capacidad)

REJILLA METALICA SOBRE CANALETA DE PISCINA ANCHO = 0,25 m

SISTEMA DE FILTRADO, RECIRCULADO Y ACCESORIOS DE PISCINA

REFINE Y NIVELACIÓN DE FONDO DE ZANJA P/TUBERIA DE DESAGUE

RELLENO COMPACTADO C/MAT. PROPIO DE ZANJA P/TUBERIAS DE DESAGUE

ELIMINACIÓN DE MATERIAL EXCEDENTE DE ZANJA P/TUBERIA DE DESAGUE

Page 16: IE - METRADO ELÉCTRICO (3)

16 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

17.02 TUBERIA PVC SAP 0.00 5,308.46 5,308.46

17.02.01 TUBERIA DE D=110 MM PVC SAP CLASE 10 m 0.00 88.00 35.00 3,080.00 88.00 35.00 3,080.00

17.02.02 TUBERIA DE PVC SAP D=3'' m 82.14 0.00 27.13 82.14 2,228.46 27.13 82.14 2,228.46

17.02 TUBERIA PVC SAP PERFORADA 0.00 158,700.00 158,700.00

17.02.01 m 0.00 1,058.00 150.00 158,700.00 1,058.00 150.00 158,700.00

17.02 TUBERIA PVC SAP PERFORADA 0.00 2,803.88 2,803.88

17.02.01 CODO DE D=100 MM PVC SAP CLASE 10 und 0.00 23.00 55.00 1,265.00 23.00 55.00 1,265.00

17.02.01 CODO DE PVC DE D=3'' und 21.94 0.00 2.00 21.94 43.88 2.00 21.94 43.88

17.02.01 TEE DE D=100 X 100 MM PVC SAP CLASE 10 und 0.00 23.00 65.00 1,495.00 23.00 65.00 1,495.00

22.00 APARATOS SANITARIOS 172,762.92 158,659.47 -14,103.45

22.01 INODORO DE LOSA VITRIFICADA TOP PIECE P/FLUXOMETRO und 65.00 669.40 43,511.00 56.00 669.40 37,486.40 -9.00 669.40 -6,024.60

22.02 und 9.00 567.68 5,109.12 13.00 567.68 7,379.84 4.00 567.68 2,270.72

22.03 INODORO BLANCO CON TANQUE BAJO pza 10.00 464.46 4,644.60 0.00 464.46 0.00 -10.00 464.46 -4,644.60

22.04 und 70.00 230.28 16,119.60 64.00 230.28 14,737.92 -6.00 230.28 -1,381.68

22.05 und 19.00 183.78 3,491.82 9.00 183.78 1,654.02 -10.00 183.78 -1,837.80

17.02.01 LAVATORIO DE CERAMICA VITRIFICADA CON PEDESTAL und 0.00 14.00 250.00 3,500.00 14.00 250.00 3,500.00

22.06 pza 1.00 515.32 515.32 2.00 515.32 1,030.64 1.00 515.32 515.32

22.07 LAVADERO DE ACERO INOXIDABLE DE 01 POZA DE 21" x 25" pza 12.00 314.42 3,773.04 12.00 314.42 3,773.04 0.00 314.42 0.00

22.08 pza 25.00 542.48 13,562.00 21.00 542.48 11,392.08 -4.00 542.48 -2,169.92

22.09 m 6.30 167.63 1,056.07 8.00 167.63 1,341.04 1.70 167.63 284.97

22.10 m2 6.60 162.54 1,072.76 5.00 162.54 812.70 -1.60 162.54 -260.06

22.11 BARRA CROMADA PARA MINUSVALIDOS und 30.00 199.55 5,986.50 16.00 199.55 3,192.80 -14.00 199.55 -2,793.70

22.12 CANALETA METALICA 1/2 CAÑA PARA EVACUACION PLUVIAL m 669.60 26.55 17,777.88 669.60 26.55 17,777.88 0.00 26.55 0.00

22.13 DRENAJE VERTICAL DE FIERRO GALVANIZADO DE 4" m 369.10 90.79 33,510.59 369.10 90.79 33,510.59 0.00 90.79 0.00

22.14 GRIFERIA C/TEMPORIZADOR - OVALIN pza 89.00 227.92 20,284.88 83.00 227.92 18,917.36 -6.00 227.92 -1,367.52

22.15 LLAVE TIPO CISNE P/LAVADERO pza 14.00 97.29 1,362.06 12.00 97.29 1,167.48 -2.00 97.29 -194.58

22.16 pto 24.00 41.07 985.68 24.00 41.07 985.68 0.00 41.07 0.00

INSTALACIONES ELECTRICAS 1,577,180.74 1,932,621.79 355,441.05

23.00 INSTALACIONES ELECTRICAS EXTERNAS 1,404,881.10 1,438,756.24 33,875.14

23.01 BUZONETA 21,107.79 21,107.79 0.00

23.01.01 BUZON DE CONCRETO und 27.00 781.77 21,107.79 27.00 781.77 21,107.79 0.00 781.77 0.00

23.02 CABLES ALIMENTADORES 469,399.66 431,520.23 -37,879.43

23.02.01 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 120 MM2 m 5,718.00 49.63 283,784.34 5,781.00 49.63 286,911.03 63.00 49.63 3,126.69

23.02.02 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 95 MM2 m 279.00 39.99 11,157.21 276.00 39.99 11,037.24 -3.00 39.99 -119.97

23.02.03 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 70 MM2 m 1,790.00 28.93 51,784.70 1,815.00 28.93 52,507.95 25.00 28.93 723.25

23.02.04 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 50 MM2 m 1,362.00 20.63 28,098.06 1,370.00 20.63 28,263.10 8.00 20.63 165.04

23.02.05 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 35 MM2 m 723.00 15.55 11,242.65 699.00 15.55 10,869.45 -24.00 15.55 -373.20

23.02.06 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 25 MM2 m 3,747.00 11.73 43,952.31 1,275.00 11.73 14,955.75 -2,472.00 11.73 -28,996.56

23.02.07 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 16 MM2 m 3,125.00 7.84 24,500.00 2,239.00 7.84 17,553.76 -886.00 7.84 -6,946.24

23.02.08 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 10 MM2 m 2,191.00 5.18 11,349.38 1,334.00 5.18 6,910.12 -857.00 5.18 -4,439.26

23.02.09 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 6 MM2 m 896.00 3.61 3,234.56 613.00 3.61 2,212.93 -283.00 3.61 -1,021.63

23.02.10 CABLE IGUAL O SIMULAR A NHX-90 DE INDECO, DE 4 MM2 m 121.00 2.45 296.45 122.00 2.45 298.90 1.00 2.45 2.45

23.03 DUCTOS Y/O TUBERIAS 48,504.06 42,559.02 -5,945.04

23.03.01 80 MM DIAM. PVC-P m 1,906.00 14.74 28,094.44 1,927.00 14.74 28,403.98 21.00 14.74 309.54

23.03.02 65 MM DIAM. PVC-P m 93.00 7.86 730.98 92.00 7.86 723.12 -1.00 7.86 -7.86

23.03.03 50 MM DIAM. PVC-P m 423.00 8.96 3,790.08 426.00 8.96 3,816.96 3.00 8.96 26.88

23.03.04 40 MM DIAM. PVC-P m 1,207.00 7.09 8,557.63 510.00 7.09 3,615.90 -697.00 7.09 -4,941.73

23.03.05 35 MM DIAM. PVC-P m 658.00 6.55 4,309.90 656.00 6.55 4,296.80 -2.00 6.55 -13.10

23.03.06 25 MM DIAM. PVC-P m 467.00 6.46 3,016.82 184.00 6.46 1,188.64 -283.00 6.46 -1,828.18

23.03.07 20 MM DIAM. PVC-P m 1.00 4.21 4.21 122.00 4.21 513.62 121.00 4.21 509.41

23.04 TABLEROS 13,943.46 13,943.46 0.00

TUBERIA DE D=110 MM PVC SAP CLASE 10, NTP 399-002 PERFORADA

INODORO P/VALVULA FLUXOMETRO C/VALVULA FLUX IMPORTADA CON SALIDA A PARED

LAVATORIO OVALIN SOBREPONER GRANDE BLANCO STANDARD

LAVATORIO DE LOSA VITRIFICADA BLANCO C/ANCLAJE PARED

LAVADERO DE ACERO INOXIDABLE DE 02 POZAS C/ESCURRIDERO

URINARIO PICO DE LORO DE LOSA VITRIFICADA C/FLUX STANDARD

BEBEDERO MULTIPLE, SEGÚN DISEÑO, REVESTIDO CON MAYOLICA (M)

DIVISION DE VIDRIO DE 8 mm TEMPLADO ARENADO INLC. INSTALACION

TOMA DE GAS CON PITON PARA CONEXIÓN DE MANGA DE 1/4"

Page 17: IE - METRADO ELÉCTRICO (3)

17 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

23.04.01 TG-G TABLERO GENERAL und 1.00 4,846.36 4,846.36 1.00 4,846.36 4,846.36 0.00 4,846.36 0.00

23.04.02 TG-A und 1.00 2,068.78 2,068.78 1.00 2,068.78 2,068.78 0.00 2,068.78 0.00

23.04.03 TG-B und 1.00 1,586.18 1,586.18 1.00 1,586.18 1,586.18 0.00 1,586.18 0.00

23.04.04 TG-C und 1.00 2,197.78 2,197.78 1.00 2,197.78 2,197.78 0.00 2,197.78 0.00

23.04.05 TG-F und 1.00 3,244.36 3,244.36 1.00 3,244.36 3,244.36 0.00 3,244.36 0.00

23.05 SISTEMA PUESTA A TIERRA 23,344.96 23,344.96 0.00

23.05.01 POZO CONEXION A TIERRA und 11.00 1,776.94 19,546.34 11.00 1,776.94 19,546.34 0.00 1,776.94 0.00

23.05.02 CABLE DE COBRE DESNUDO DE 50 MM2. m 10.00 30.84 308.40 10.00 30.84 308.40 0.00 30.84 0.00

23.05.03 CABLE DE COBRE DESNUDO DE 35 MM2. m 104.00 26.47 2,752.88 104.00 26.47 2,752.88 0.00 26.47 0.00

23.05.04 35 MM DIAM. PVC-P m 10.00 6.55 65.50 10.00 6.55 65.50 0.00 6.55 0.00

23.05.05 25 MM DIAM. PVC-P m 104.00 6.46 671.84 104.00 6.46 671.84 0.00 6.46 0.00

23.06 RED DE DATA 16,921.00 17,248.92 327.92

23.06.01 EXCAVACION Y RELLENO COMPACTADO DE ZANJA 4,367.92 4,552.48 184.56

23.06.01.01 m3 71.00 29.26 2,077.46 74.00 29.26 2,165.24 3.00 29.26 87.78

23.06.01.02 m3 71.00 32.26 2,290.46 74.00 32.26 2,387.24 3.00 32.26 96.78

23.06.02 BUZONETA 9,381.24 9,381.24 0.00

23.06.02.01 BUZON DE CONCRETO - BUZONETA und 12.00 781.77 9,381.24 12.00 781.77 9,381.24 0.00 781.77 0.00

23.06.03 DUCTOS Y/O TUBERIAS 3,171.84 3,315.20 143.36

23.06.03.01 50 MM DIAM. PVC-P m 354.00 8.96 3,171.84 370.00 8.96 3,315.20 16.00 8.96 143.36

23.07 811,660.17 889,031.86 77,371.69

23.07.01 CABLES ALIMENTADORES 8,713.48 59,781.21 51,067.73

23.07.01.01 CABLE ELECTRICO NYY 3-1* 6 mm2 m 511.00 7.27 3,714.97 8,223.00 7.27 59,781.21 7,712.00 7.27 56,066.24

23.07.01.02 CABLE ELECTRICO NYY 2-1* 6 mm2 m 459.00 10.89 4,998.51 0.00 10.89 0.00 -459.00 10.89 -4,998.51

23.07.02 DUCTOS Y/O TUBERIAS 5,346.52 19,222.60 13,876.08

23.07.02.01 25 MM DIAM. PVC-P m 318.00 6.46 2,054.28 2,657.00 6.46 17,164.22 2,339.00 6.46 15,109.94

23.07.02.02 20 MM DIAM. PVC-P m 148.00 4.21 623.08 50.00 4.21 210.50 -98.00 4.21 -412.58

23.07.02.03 EMPALME PARA CABLE DE 6 MM2 und 52.00 51.33 2,669.16 36.00 51.33 1,847.88 -16.00 51.33 -821.28

23.07.03 POSTES DE ALUMBRADO 105,715.75 113,035.30 7,319.55

23.07.03.01 und 29.00 1,045.65 30,323.85 36.00 1,045.65 37,643.40 7.00 1,045.65 7,319.55

23.07.03.02 und 10.00 2,255.64 22,556.40 10.00 2,255.64 22,556.40 0.00 2,255.64 0.00

23.07.03.03 und 10.00 117.43 1,174.30 10.00 117.43 1,174.30 0.00 117.43 0.00

23.07.03.04 und 6.00 8,461.26 50,767.56 6.00 8,461.26 50,767.56 0.00 8,461.26 0.00

23.07.03.05 und 6.00 148.94 893.64 6.00 148.94 893.64 0.00 148.94 0.00

23.07.04 ALUMBRADO EXTERIOR 37,712.71 42,821.04 5,108.33

23.07.04.01 und 19.00 300.49 5,709.31 36.00 300.49 10,817.64 17.00 300.49 5,108.33

23.07.04.02 und 12.00 349.39 4,192.68 12.00 349.39 4,192.68 0.00 349.39 0.00

23.07.04.03 und 48.00 579.39 27,810.72 48.00 579.39 27,810.72 0.00 579.39 0.00

23.07.05 EQUIPOS ELECTRICOS, MECANICOS Y ESPECIALES 654,171.71 654,171.71 0.00

23.07.05.01 und 5.00 93,524.41 467,622.05 5.00 93,524.41 467,622.05 0.00 93,524.41 0.00

23.07.05.02 SUB ESTACION ELECTRICA POR AUMENTO DE CARGA und 1.00 186,549.66 186,549.66 1.00 186,549.66 186,549.66 0.00 186,549.66 0.00

24.00 INSTALACIONES ELECTRICAS INTERIORES 145,661.48 467,227.39 321,565.91

24.00M TABLEROS DISTRIBUCIÓN INTERNOS 0.00 74,250.00 74,250.00

24.00.01M TD-A-1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.01M TD-A-2 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.02M TD-A-3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.03M TD-A-4 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.04M TD-A-5 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.05M TD-A-6 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.06M TD-A-7 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.07M TD-B-1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

EXCAVACION DE ZANJA DE 0.40 M. ANCHO * 0.50 M. PROFUNDIDAD

RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO

ALUMBRADO EXTERIOR, LOSAS DEPORTIVAS Y CAMPO DEPORTIVO

POSTE DE CONCRETO ARMADO CENTRIFUGADO DE 7 M (7/200/120/225)

POSTE DE CONCRETO ARMADO CENTRIFUGADO DE 9 M (9/300/150/285)

CRUCETA DE CONCRETO ARMADO (Z/1.5/400 CON AGUJERO DE 185 MM D)

POSTE DE CONCRETO ARMADO CENTRIFUGADO DE 21 M (21/700/2/270/525)

CRUCETA DE CONCRETO ARMADO (Z/2.4/600 CON AGUJERO DE 275 MM D)

REFLECTOR JP DE JOSFEL, UNA LAMPARA DE VAPOR DE SODIO DE 70 VATIOS, AFP

REFLECTOR RL - 40 E DE JOSFEL, CON UNA LAMPARA DE 400 VATIOS DE HALOGENO METALICO, AFP

REFLECTOR RL - 70 E DE JOSFEL, CON DOS LAMPARAS DE 400 VATIOS DE HALOGENO METALICO, AFP

SUM. E INSTAL. DE ASCENSORES DE 02 PARADAS INC. ACCESORIOS DE INSTALACION

Page 18: IE - METRADO ELÉCTRICO (3)

18 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

24.00.08M TD-B-2 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.09M TD-B-3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.10M TD-B-2-1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.11M TD-B-3-1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.12M TD-B-4 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.13M TD-C-1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.14M TD-C-2 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.15M TD-C-5 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.16M TD-C-3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.17M TD-C-4 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.18M TD-C-5 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.19M TD-C-7 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.20M TD-C-8 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.21M TD-C-9 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.22M TD - D - 3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.23M TD - D - 4 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.24M TD - D - 5 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.25M TD-D-6 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.26M TD-E - 1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.27M TD-E - 2 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.28M TD-E - 3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.29M TD-F - 1 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.30M TD-F - 2 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.31M TD-F - 3 und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.00.32M TD-BOMBAS PISCINA und 0.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00

24.01 SALIDAS 145,661.48 218,327.39 72,665.91

24.01.01 SALIDA DE CENTRO DE ALUMBRADO pto 746.00 85.42 63,723.32 746.00 85.42 63,723.32 0.00 85.42 0.00

24.01.02 SALIDA DE ALUMBRADO EN PARED (BRAQUETE) pto 24.00 81.99 1,967.76 24.00 81.99 1,967.76 0.00 81.99 0.00

24.01.03 SALIDA DE CENTRO DE ALUMBRADO EMPOTRADO pto 175.00 85.42 14,948.50 175.00 85.42 14,948.50 0.00 85.42 0.00

24.01.04 SALIDA DE TOMACORRIENTE DOBLE CON TIERRA pto 456.00 96.68 44,086.08 456.00 96.68 44,086.08 0.00 96.68 0.00

24.01.05 SALIDA TRIFASICA pto 15.00 82.74 1,241.10 15.00 82.74 1,241.10 0.00 82.74 0.00

24.01.06 SALIDA DE DATA pto 122.00 80.64 9,838.08 122.00 80.64 9,838.08 0.00 80.64 0.00

24.01.07 CABLEADO DE SALIDA DE CENTRO DE ALUMBRADO pto 48.00 47.71 2,290.08 794.00 47.71 37,881.74 746.00 47.71 35,591.66

24.01.08 pto 12.00 50.47 605.64 187.00 50.47 9,437.89 175.00 50.47 8,832.25

24.01.09 CABLEADO DE SALIDA DE ALUMBRADO EN PARED pto 7.00 44.35 310.45 31.00 44.35 1,374.85 24.00 44.35 1,064.40

24.09.10 pto 21.00 59.60 1,251.60 477.00 59.60 28,429.20 456.00 59.60 27,177.60

24.01.11 SALIDA DE CENTRO DE ALUMBRADO EN TIJERALES pto 50.00 93.00 4,650.00 50.00 93.00 4,650.00 0.00 93.00 0.00

24.01.12 3-1X16 MM2 + 1X10 - 25 MM D PVC-P m 26.00 26.98 701.48 26.00 26.98 701.48 0.00 26.98 0.00

24.01.13 INTERRUPTOR TERMOMAGNETICO DE 2 X 20 A pza 1.00 47.39 47.39 1.00 47.39 47.39 0.00 47.39 0.00

24.02M SALIDAS 0.00 174,650.00 174,650.00

24.02.01M BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFPund

0.00 581.00 150.00 87,150.00 581.00 150.00 87,150.00

24.01.02M BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFPund

0.00 131.00 100.00 13,100.00 131.00 100.00 13,100.00

24.01.03M BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFPund

0.00 41.00 95.00 3,895.00 41.00 95.00 3,895.00

24.01.04M CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFPund

0.00 45.00 95.00 4,275.00 45.00 95.00 4,275.00

24.01.05M RSP de Josfel, una lampara vapor sodio de 70 vatios, AFPund

0.00 31.00 165.00 5,115.00 31.00 165.00 5,115.00

24.01.06M ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFPund

0.00 187.00 145.00 27,115.00 187.00 145.00 27,115.00

24.01.07Mund

0.00 50.00 680.00 34,000.00 50.00 680.00 34,000.00

25 RED EXTERIOR ELECTRICA 26,638.16 26,638.16 0.00

25.01 EXCAVACION Y RELLENO COMPACTADO DE ZANJA 26,638.16 26,638.16 0.00

25.01.01 m3 433.00 29.26 12,669.58 433.00 29.26 12,669.58 0.00 29.26 0.00

25.01.02 m3 433.00 32.26 13,968.58 433.00 32.26 13,968.58 0.00 32.26 0.00

CABLEADO DE SALIDA DE CENTRO DE ALUMBRADO EMPOTRADO

CABLEADO DE SALIDA DE TOMACORRIENTES DOBLE CON TIERRA

Reflector MER-H-400 de Josfel, con lampara de 400 vatios de halogenuro metalico, AFP

EXCAVACION DE ZANJA DE 0.60 M. ANCHO * 0.60 M. PROFUNDIDAD

RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO

Page 19: IE - METRADO ELÉCTRICO (3)

19 de 112

O I N F E

ESTUDIO DE ADICIONAL

LICITACION PUBLICA PROCESO ESPECIAL Nº 0070-2012-ED/EU 108O B R A OBRA DE ADECUACIÓN. MEJORAMIENTO Y SUSTITUCIÓN DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. REPUBLICA ARGENTINA, UBICADO EN EL DISTRITO DE NUEVO CHIMBOTE- SANTA- ANCASH.

CONSORCIO REPÚBLICA DE ARGENTINADANIEL GONZÁLEZ NICOLÁSING. JOSE PACHECO MORALES

SIN IGV SIN IGV SIN IGV

DESCRIPCION UND.PRESUPUESTO REAL ADICIONAL DE METRADOS

METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP. METRADO P. UNIT. PRESUP.

COSTO DIRECTO SIN IGV 16,725,212.36 C. DIREC 17,575,916.45 C. DIREC 850,480.45

GASTOS GENERALES 10.00% 1,672,521.24 C.INDIR 1,757,591.64 C.INDIR 85,048.04

UTILIDAD 10.00% 1,672,521.24 1,757,591.64 85,048.04

SUB TOTAL 20,070,254.84 TOTAL 21,091,099.73 TOTAL 1,020,576.53

FACTOR RELACION 1.00 1.0000 20,070,254.84 21,091,099.73 1,020,576.53

I.G.V 18% 3,612,645.87 3,796,397.95 183,703.78

COSTO TOTAL 23,682,900.71 24,887,497.68 1,204,280.31

RESULTADO RESULTADO

100.00% 2,591,800.98 23,866,921.15

SIN IGV CON IGV CON IGV

TOTAL ESTRUCTURAS 7,720,458.56 TOTAL ESTRUCTURAS 7,720,458.56 TOTAL ESTRUCTURAS -

TOTAL ARQUITECTURA 6,601,921.36 TOTAL ARQUITECTURA 6,601,921.36 TOTAL ARQUITECTURA -

TOTAL SANITARIA 825,651.69 TOTAL SANITARIA 1,320,914.73 TOTAL SANITARIA 495,039.40

TOTAL INSTALACIONES 1,577,180.74 TOTAL INSTALACIONES 1,932,621.79 TOTAL INSTALACIONES 355,441.05

TOTAL DIRECTOS 16,725,212.36 TOTAL DIRECTOS 17,575,916.45 TOTAL DIRECTOS 850,480.45

TOTAL INDIRECTOS 3,345,042.47 TOTAL INDIRECTOS 3,515,183.29 TOTAL INDIRECTOS 170,096.09

TOTAL OBRA 20,070,254.82876 TOTAL OBRA 21,091,099.73592 TOTAL OBRA 1,020,576.53916

Page 20: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO TOTAL

N° DESCRIPCION

REDES ELECTRICAS EXTERIORES

1.0 Excavacion y relleno1.1 Excavacion de zanja de 0.60 m ancho x 0.60 m profundidad1.2 Relleno y compactado de zanja con material propio

2.0 Buzon2.1 Buzon de concreto

Tapa de concreto de 0.66x0.66x0.15 m: 1 und

Tapa de concreto de 0.66x0.66x0.15 m: 1 und

3.0 Cables alimentadoresA TG-G y Tableros Generales BloqueCable igual o simular a NHX-90 de Indeco, de:

3.13.2 95 mm²3.3 70 mm²3.43.53.63.73.83.9

3.10 4 mm

4.0 Electroductos (tuberías)4.1 80 mm Ø PVC-P4.24.3

Excavacion de terreno: 1.00 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.80 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³Excavacion de terreno: 1.00 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.80 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³

120 mm²

50 mm²35 mm²25 mm²16 mm²10 mm²6 mm²

65 mm Ø PVC-P50 mm Ø PVC-P

Page 21: IE - METRADO ELÉCTRICO (3)

4.44.5 35 mm Ø PVC-P4.64.7 20 mm Ø PVC-P

5.0 Tableros5.1 TG-G, Tablero General

Gabinte autosoportado, 220 voltios, tres barras de cobre, barra decobre para puesta a tierra y equipado con interruptores termomagneticosiguales o similares a los modelos de Schneider Electric1 de 3x1250 A1 de 3x350 A1 de 3x200 A2 de 3x175 A1 de 3x150 A1 de 3x60 A6 de 3x40 A3 de 3x25 A

5.2 TG-AGabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similares a los modelos de Schneider Electric1 de 3x175 A1 de 3x60 A1 de 3x50 A3 de 3x40 A2 de 3x30 A1 de 3x20 A

5.3 TG-BGabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similares a los modelos de Schneider Electric1 de 3x150 A1 de 3x70 A2 de 3x60 A1 de 3x40 A1 de 3x20 A

5.4 TG-CGabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similaresa a los modelos de Schneider Electric1 de 3x300 A1 de 3x125 A5 de 3x60 A1 de 3x50 A1 de 3x40 A1 de 3x30 A1 de 3x20 A

40 mm Ø PVC-P

25 mm Ø PVC-P

Page 22: IE - METRADO ELÉCTRICO (3)

5.5 TG-FGabinte metalico para empotrar, 380/200 voltios, cuatro barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similaresa a los modelos de Schneider Electric1 de 4x250 A, modelo NS250H1 de 4x80 A, modelo C120H1 de 4x63 A, modelo C60H3 de 4x50 A, modelo C60H3 de 4x40 A, modelo C60H3 de 4x30 A, modelo C60H

6.0 Sistema de puesta a tierra6.1 Pozo puesta a tierra

Dosis quimica para tratamiento de terreno: 6 dosisCaja de registro con tapa, de concreto: 1 undCable de cobre desnudo de:

6.26.36.46.5 Tuberia 25 mm Ø PVC-P

7.0 REDES DE DATA

7.1 Excavacion y relleno7.2 Excavacion de zanja de 0.40 m ancho x 0.50 m profundidad7.3 Relleno y compactado de zanja con material propio

8.0 Buzoneta8.1 Buzon de concreto

Tapa de concreto de 0.60x0.60x0.15 m: 1 und

8.3 Tuberia8.4

9.0 ALUMBRADO EXTERIOR, LOSAS DEPORTIVAS Y CAMPO DEPORTIVO

Cables9.19.2 Cable NYY 2-1x6 mm²

Tuberia PVC-P

Excavacion de terreno: 2.50 m³Relleno y compactacion con tierra de chacra: 2.5 m³Varilla de cobre de ¾"Ø x 2.40 m: 1 undCable de cobre desnudo de 50 mm²: 15 m

50 mm²35 mm²Tuberia 35 mm Ø PVC-P

Excavacion de terreno: 0.90 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.70 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³

Tuberia 50 mm Ø PVC-P

Cable NYY 3-1x6 mm²

Page 23: IE - METRADO ELÉCTRICO (3)

9.39.49.5

Poste de alumbrado9.6 Poste de concreto armado centrifugado de 7 m (7/200/120/225)9.7 Poste de concreto armado centrifugado de 9 metros (9/300/150/285)9.89.9 Poste de concreto armado centrifugado de 21 metros (21/700/2/270/525)

9.10 Cruceta de concreto armado (Z/2.40/600 con agujero de 275 mm Ø)

9.11 Artefacto de alumbrado9.12 Reflector JP de Josfel, una lampara de vapor de sodio de 70 vatios, AFP9.13 Reflector RL-40E de Josfel, con una lampara de 400 vatios de halogenuro metalico, AFP9.14 Reflector RL-70E de Josfel, con dos lamparas de 400 vatios de halogenuro metalico, AFP

INSTALACIONES ELECTRICAS INTERIORES

10.0 Tableros10.1 TD-A-1

1 de 3x50 A2 de 2X20 A5 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.2 TD-A-21 de 3x30 A2 de 2X20 A4 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.3 TD-A-31 de 3x30 A2 de 2X20 A4 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.4 TD-A-41 de 3x30 A1 de 3x25 A4 de 2x15 A2 Int. Horaio de 2x16 A

10.5 TD-A-51 de 3x30 A3 de 2X20 A4 de 2x15 A3 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

25 mm Ø20 mm ØEmpalme para cable de 6 mm²

Cruceta de concreto armado (Z/1.50/400 con agujero de 185 mm Ø)

Page 24: IE - METRADO ELÉCTRICO (3)

10.6 TD-A-61 de 3x40 A4 de 2X20 A5 de 2x15 A3 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.7 TD-A-71 de 3x20 A2 de 2X15 ATD-B-11 de 3x60 A1 de 3x30 A3 de 2X20 A3 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

10.8 TD-B-21 de 3x50 A1 de 3x40 A9 de 3x20 A3 de 2x15 A9 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

10.9 TD-B-31 de 3x50 A1 de 3x40 A9 de 3x20 A3 de 2x15 A9 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

10.10 TD-B-2-11 de 3x30 A8 de 3x20 A8 Int. Diferencial de 2x25 A

10.11 TD-B-3-11 de 3x30 A8 de 3x20 A8 Int. Diferencial de 2x25 A

10.12 TD-B-41 de 3x40 A4 de 2X20 A2 de 2x15 A4 Int. Diferencial de 2x25 A

10.13 TD-C-11 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A

Page 25: IE - METRADO ELÉCTRICO (3)

2 Int. Horaio de 2x16 A10.14 TD-C-2

1 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.15 TD-C-51 de 3x30 A1 de 3X25 A4 de 2x15 A2 Int. Horaio de 2x16 A

10.16 TD-C-31 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horario de 2x16 A

10.17 TD-C-41 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horario de 2x16 A

10.18 TD-C-51 de 3x30 A4 de 2x15 A2 Int. Horaio de 2x16 A

10.19 TD-C-71 de 3x100 A6 de 2X20 A8 de 2x15 A6 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

10.20 TD-C-81 de 3x50 A2 de 2X20 A5 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

10.21 TD-C-91 de 3x30 A1 de 2X20 A2 de 2x15 A

10.22 1 Int. Diferencial de 2x25 A TD - D - 31 de 3x50A3 de 2X20 A

Page 26: IE - METRADO ELÉCTRICO (3)

3 de 2x15 A3 Int. Diferencial de 2x25 A

10.23 1 Int. Horario de 2x16 ATD - D - 41 de 3x50A1 de 3x20A3 de 2x20 A2 de 2x15 A1 Int. Diferencial Trifasico de 3x25 A3 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

10.24 TD - D - 51 de 3x30A2 de 2x20 A2 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

10.25 TD-D-61 de 3x30 A3 de 2X20 A4 de 2x15 A3 Int. Diferencial de 2x25 A

10.26 TD-E - 11 de 3x30 A2 de 2X20 A2 de 2x15 A2 Int. Diferencial de 2x25 A

10.27 TD-E - 21 de 3x30 A3 de 2X20 A2 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

10.28 TD-E - 31 de 3x30 A3 de 2X20 A2 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. HoraRio de 2x16 A

10.29 TD-F - 11 de 3x40 A1 de 3x25 A3 de 2X20 A5 de 2x15 A3 Int. Diferencial de 2x25 A

10.30 TD-F - 21 de 3x50 A2 de 2X20 A

Page 27: IE - METRADO ELÉCTRICO (3)

4 de 2x15 A2 Int. Diferencial de 2x25 A

10.31 TD-F - 31 de 3x80 A1 de 3x40 A2 de 2X20 A25 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

10.32 TD-BOMBAS PISCINA1 de 3x40 A1 de 3X30 A1 de 3x20 A1 de 2x20 A1 de 2X15 A

11.0 Salidas11.1 Salida de centro de alumbrado11.2 Salida de alumbrado en pared (braquete)11.3 Salida de centro de alumbrado empotrado11.4 Salida de tomacorriente doble con tierra11.5 Salida trifasica11.6 Salida de data11.7 Cableado de salida de centro de alumbrado11.8 Cableado de salida de centro de alumbrado empotrado11.9 Cableado de salida de alumbrado en pared

11.10 Cableado de salida de alumbrado en pared11.11 Cableado de salida de tomacorriente doble con tierra11.12 Salida de centro de alumbrado en tijerales11.1311.14 Interruptor termomagnetico de 2x20 A

12.0 Artefactos de alumbrado12.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP12.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFP12.3 BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFP12.4 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP12.5 RSP de Josfel, una lampara vapor sodio de 70 vatios, AFP12.6 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP12.7 Reflector MER-H-400 de Josfel, con lampara de 400 vatios de halogenuro metalico, AFP

3-1x16 mm² + 1x10 mm² - 25 mm Ø PVC-P

Page 28: IE - METRADO ELÉCTRICO (3)

UND CANTIDAD

433m³ 433

und 27

ml 5,718ml 279ml 1,790ml 1,362ml 723ml 1,284ml 2,254ml 1,357ml 618ml 121

ml 1,906ml 93ml 423

Page 29: IE - METRADO ELÉCTRICO (3)

ml 528658

ml 189

und 1

und 1

und 1

und 1

Page 30: IE - METRADO ELÉCTRICO (3)

und 1

und 11

ml 10ml 104ml 10ml 104

71m³ 71

und 12

m 354

m 511m 459

Page 31: IE - METRADO ELÉCTRICO (3)

m 318m 148

und 52

und 29und 10und 10und 6und 6

und 29und 12und 48

und 1

und 1

und 1

und 1

und 1

Page 32: IE - METRADO ELÉCTRICO (3)

und 1

und 1

und 1

und 1

und 1

und 1

und 1

und 1

und 1

Page 33: IE - METRADO ELÉCTRICO (3)

und 1

und 1

und 1

und 1

und 1

und 1

und 1

und 1

und 1

Page 34: IE - METRADO ELÉCTRICO (3)

und 1

und 1

und 1

und 1

und 1

und 1

und 1

und 1

Page 35: IE - METRADO ELÉCTRICO (3)

und 1

und 1

pto 746pto 24pto 175pto 456pto 15pto 122pto 48pto 12pto 5pto 2pto 21pto 50ml 26

und 1

und 581und 131und 41und 45und 31und 187und 50

Page 36: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO DE EXTERIORES

TG-G TG-AN° DESCRIPCION UND

REDES ELECTRICAS EXTERIORES

1.0 Excavacion y relleno1.1 Excavacion de zanja de 0.60 m ancho x 0.60 m profundidad1.2 Relleno y compactado de zanja con material propio m³

2.0 Buzon2.1 Buzon de concreto und

Tapa de concreto de 0.66x0.66x0.15 m: 1 und

Tapa de concreto de 0.66x0.66x0.15 m: 1 und

3.0 Cables alimentadoresA TG-G y Tableros Generales BloqueCable igual o simular a NHX-90 de Indeco, de:

3.1 ml 348 174336 168

3.2 95 mm² ml

3.3 70 mm² ml 5856

3.4 ml

3.5 ml

3.6 ml

3.7 ml

3.8 ml

Excavacion de terreno: 1.00 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.80 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³Excavacion de terreno: 1.00 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.80 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³

120 mm²

50 mm²

35 mm²

25 mm²

16 mm²

10 mm²

Page 37: IE - METRADO ELÉCTRICO (3)

3.9 ml

3.10 4 mm ml

4.0 Electroductos (tuberías)

4.1 80 mm Ø PVC-P ml 116 58112 56

4.2 ml

4.3 ml

4.4 ml

4.5 35 mm Ø PVC-P

4.6 ml

4.7 20 mm Ø PVC-P

6.0 Tableros6.1 TG-G, Tablero General und 1

Gabinte autosoportado, 220 voltios, tres barras de cobre, barra decobre para puesta a tierra y equipado con interruptores termomagneticosiguales o similares a los modelos de Schneider Electric1 de 3x1250 A1 de 3x350 A1 de 3x200 A2 de 3x175 A1 de 3x150 A1 de 3x60 A6 de 3x40 A3 de 3x25 A

6.2 TG-A und 1Gabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similares a los modelos de Schneider Electric1 de 3x175 A1 de 3x60 A1 de 3x50 A3 de 3x40 A2 de 3x30 A1 de 3x20 A

6.3 TG-B undGabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similares a los modelos de Schneider Electric

6 mm²

65 mm Ø PVC-P

50 mm Ø PVC-P

40 mm Ø PVC-P

25 mm Ø PVC-P

Page 38: IE - METRADO ELÉCTRICO (3)

1 de 3x150 A1 de 3x70 A2 de 3x60 A1 de 3x40 A1 de 3x20 A

6.4 TG-C undGabinte metalico para empotrar, 220 voltios, tres barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similaresa a los modelos de Schneider Electric1 de 3x300 A1 de 3x125 A5 de 3x60 A1 de 3x50 A1 de 3x40 A1 de 3x30 A1 de 3x20 A

6.5 TG-F undGabinte metalico para empotrar, 380/200 voltios, cuatro barras de cobre,barra de cobre para puesta a tierra y equiapado con interruptores termo-neticos iguales o similaresa a los modelos de Schneider Electric1 de 4x250 A, modelo NS250H1 de 4x80 A, modelo C120H1 de 4x63 A, modelo C60H3 de 4x50 A, modelo C60H3 de 4x40 A, modelo C60H3 de 4x30 A, modelo C60H

Sistema de puesta a tierra8.0 Pozo puesta a tierra und 1 1

Dosis quimica para tratamiento de terreno: 6 dosisCaja de registro con tapa, de concreto: 1 undCable de cobre desnudo de:

108.1 ml 10

158.2 ml 108.3 ml 108.4 Tuberia 25 mm Ø PVC-P ml 10

Excavacion de terreno: 2.50 m³Relleno y compactacion con tierra de chacra: 2.5 m³Varilla de cobre de ¾"Ø x 2.40 m: 1 undCable de cobre desnudo de 50 mm²: 15 m

120 mm²50 mm²

35 mm²Tuberia 35 mm Ø PVC-P

Page 39: IE - METRADO ELÉCTRICO (3)

Metrado comprobado

TG-A TG-B TG-B TG-C TG-CTD-A-1TD-A-2TD-A-3TD-A-4TD-A-5TD-A-6TD-A-7 TD-B-1TD-B-2TD-B-3TD-B-4 TD-C-1TD-C-2TD-C-3

360 1098360 1110

120 366120 370

114 186 138102 186 126

168 42 189168 42 189

150 90 153 180 56 14 63 38 62 46159 90 162 174 56 12 59 34 62 4250 30 51 60 120 105 198

Page 40: IE - METRADO ELÉCTRICO (3)

53 30 54 58 114 102 18940 35 168 6638 34 165 63

5655

120 366120 370

56 14 63 38 62 4656 12 59 34 62 42

50 30 51 60 6653 30 54 58 63

40 3538 34

5655

1

Page 41: IE - METRADO ELÉCTRICO (3)

1

5 1

54 10

54 10

Page 42: IE - METRADO ELÉCTRICO (3)

TG-C TG-D TG-D TG-E TG-ETD-C-4TD-C-5TD-C-6TD-C-7TD-C-8TD-C-9 TD-D-1TD-D-2TD-D-3TD-D-4TD-D-5TD-D-6TD-D-7 TD-E-1

20882115

279276

696705

279 93 264 156 570279 92 267 153 579

285285

93 88 54 78 87 52 19093 89 45 69 81 51 193

141 95 18 93 26 29 201 279132 95 15 84 23 27 204 27947 31 67 93 156

Page 43: IE - METRADO ELÉCTRICO (3)

44 28 68 93 153195 52201 516567

696705

9392

93 88 52 19093 89 51 193

95 18 26 2995 15 23 27

47 31 67 9344 28 68 93

5251

6567

Page 44: IE - METRADO ELÉCTRICO (3)

1 1

10 10

10 10

Page 45: IE - METRADO ELÉCTRICO (3)

TG-E TG-F TG-FTD-E-2TD-E-3 TD-F-1TD-F-2TD-F-3

1,6501692

550564

93 150 504 426 426 279 369 459105 150

333 156 31 168 142 142 93 123 153327 168 35

186 111 52 177 300 357

TD-FUT-P1

TD-FUT-P2

TD-FUT-P3

TD-FUT-P4

TD-FUT-P5

TD-FUT-P6

TD-LD1

TD-LD2

TD-LD3

Page 46: IE - METRADO ELÉCTRICO (3)

183 109 5662 59 100 11961

550564

31 50 168 | 142 93 123 15335 50

111 52109 56

62 59 100 11961

Page 47: IE - METRADO ELÉCTRICO (3)

1

1

10

10

Page 48: IE - METRADO ELÉCTRICO (3)

METRADO

433433

27

5,7185,781279276

1,7901,8151,3621,370723699

1,284 3,747 845 8,13,141,2752,254 3,0752,2391,357 2,191

Page 49: IE - METRADO ELÉCTRICO (3)

1,334618 896613121122

1,9061,927

9392

423426528 1,207510658656189 467184121 40 9,15122

1

1

1

Page 50: IE - METRADO ELÉCTRICO (3)

1

1

11

10

10410

104

Page 51: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS - ALUMBRADO EXTERIOR

N° DESCRIPCION UND

1. Cables1.1 m

Cable NYY 2-1x6 mm² m1.2 Tuberia PVC-P

mm

1.3 und

2. Poste de alumbrado2.1 Poste de concreto armado centrifugado de 7 m und

Poste C.A.C. 7/200/120/225

3. Artefacto de alumbrado3.1 Reflector JP de Josfel, una lampara de vapor de sodio de 70 vatios, und

Cable NYY 3-1x6 mm²

25 mm Ø20 mm ØEmpalme para cable de 6 mm²

Page 52: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

511 511 190 570 10459 459 280 560 11

318 318 190 8,13,14148 148 110 9,1552 52 52

29 29 36

29 29 36

J16
Tmbes: 36 (exteriores) de 6 mm2, 6 (cancha de futbol) de 25 mm2 y 10 (losas deportivas) de 10 mm2
Page 53: IE - METRADO ELÉCTRICO (3)

Metrado comprobado

TG-G TG-A TG-B TG-C TG-D TG-E TG-F

579 173 586 182 527 610 2657

9 4 7 4 6 6 36

Page 54: IE - METRADO ELÉCTRICO (3)

82237971 8223

2657

36

36

36

Page 55: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - RED DE DATA

N° DESCRIPCION UND

REDES ELECTRICAS EXTERIORES

1.0 Excavacion y relleno1.1 Excavacion de zanja de 0.40 m ancho x 0.50 m profundidad1.2 Relleno y compactado de zanja con material propio m³

2.0 Buzoneta und2.1 Buzon de concreto

Tapa de concreto de 0.60x0.60x0.15 m: 1 und

3. Tuberia3.1 m

Excavacion de terreno: 0.90 m³Concreto de 210 Kg/cm², fierro 3/8"Ø: 0.70 m³Platina F° de 2½x2½x¼": 6.00 m

Grava tamaño maximo 1": 0.20 m³

Tuberia 50 mm Ø PVC-P

Page 56: IE - METRADO ELÉCTRICO (3)

Metrado comprobado

TOTAL

71 7471 74

12 12

354 370

Page 57: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS - LOSAS DEPORTIVAS

N° DESCRIPCION UND

1. Postes1.1 Poste de concreto armado centrifugado de 9 metros und

Poste C.A.C. 9/300/150/2851.2 Cruceta de concreto armado und

2. Artefacto de alumbrado2.1 Reflector RL-40E de Josfel, con una lampara de 400 vatios de und

Cruceta Z/1.50/400 con agujero de 185 mm Ø

Page 58: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

10 10

10 10

12 12

Page 59: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS - CAMPO DEPORTIVO

N° DESCRIPCION UND 1° PISO

1. Postes1.1 Poste de concreto armado centrifugado de 21 metros und 6

Poste C.A.C. 21/700/2/270/5251.2 Cruceta de concreto armado und 6

2. Artefacto de alumbrado2.1 Reflector RL-70E de Josfel, con dos lamparas de 400 vat und 48

Cruceta Z/2.40/600 con agujero de 275 mm Ø

Page 60: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

6

6

48

Page 61: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON A

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-C-8 und 1

1 de 3x50 A2 de 2X20 A5 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto 422.2 Salida de alumbrado en pared (braquete) pto 72.3 Salida de tomacorriente doble con tierra pto 23

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatio und 323.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios und 83.2 CIR 132 de Josfel, una lampara fluorescente 32 vatios, und 23.3 RSP de Josfel, una lampara vapor sodio de 70 vatios, A und 7

Page 62: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

427

23

32827

Page 63: IE - METRADO ELÉCTRICO (3)

1.1.1

2.2.12.22.3

3.3.13.23.2

Page 64: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON B

DESCRIPCION

TablerosTD-C-91 de 3x30 A1 de 2X20 A2 de 2x15 A1 Int. Diferencial de 2x25 A

SalidasSalida de centro de alumbradoSalida de alumbrado en pared (braquete)Salida de tomacorriente doble con tierra

Artefactos de alumbradoBE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFPBE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFPRSP de Josfel, una lampara vapor sodio de 70 vatios, AFP

Page 65: IE - METRADO ELÉCTRICO (3)

UND 1° PISO 2° PISO TOTAL

und 1 1

pto 12 12pto 5 5pto 10 10

und 9 9und 3 3und 5 5

Page 66: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON C (SECUNDARIA)

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-C-3 und 1

1 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horario de 2x16 A

1.2 TD-C-4 und 11 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horario de 2x16 A

1.3 TD-C-5 und 11 de 3x30 A4 de 2x15 A2 Int. Horaio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto 442.2 Salida de centro de alumbrado empotrado pto 182.3 Salida de tomacorriente doble con tierra pto 122.4 Salida trifasica pto 1

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 v und 363.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 va und 23.2 BE 1/40 de Josfel, una lampara fluorescentes 36 vat und 43.4 CIR 132 de Josfel, una lampara fluorescente 32 vati und 43.5 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 v und 18

Page 67: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

1

1

44 8825 4312 24

1

36 722 42 64 8

25 43

Page 68: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON C´ (TALLERES)

N° DESCRIPCION UND

1. Tableros1.1 TD - C´- 1 und

1 de 3x50A2 de 2X20 A2 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

1.2 TD - C´- 2 und1 de 3x50A2 de 2X20 A2 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A und

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.5 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

Page 69: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

0

12 12 246 6 129 10 19

12 12 246 6 12

Page 70: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON D (TALLERES)

N° DESCRIPCION UND

1. Tableros1.1 TD - D - 3 und

1 de 3x50A3 de 2X20 A3 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

1.2 TD - D - 4 und1 de 3x50A1 de 3x20A3 de 2x20 A2 de 2x15 A1 Int. Diferencial Trifasico de 3x25 A3 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

1.3 TD - D - 5 und1 de 3x30A2 de 2x20 A2 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida de tomacorriente trifasico con tierra pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.5 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

Page 71: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

1 1

23 23 4610 10 2019 32 51

2 2

23 23 4610 10 20

Page 72: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON E (SECUNDARIA)

N° DESCRIPCION UND

1. Tableros1.1 TD-C-1 und

1 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

1.2 TD-C-2 und1 de 3x50 A2 de 2X20 A6 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

1.3 TD-C-5 und1 de 3x30 A1 de 3X25 A4 de 2x15 A2 Int. Horaio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida trifasica pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFP und3.2 BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFP und3.4 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.5 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

Page 73: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

1 1

44 44 8818 25 4312 12 241 1

36 36 722 2 44 2 64 4 8

18 25 43

Page 74: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON F (ADMINISTRACION)

N° DESCRIPCION UND

1. Tableros1.1 TD-C-7 und

1 de 3x100 A6 de 2X20 A8 de 2x15 A6 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida de data pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFP und3.2 BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFP und3.4 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.5 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

Page 75: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

32 32 649 12 21

37 22 5916 14 30

29 30 592 2

1 11 1 29 12 21

Page 76: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON G

N° DESCRIPCION UND

1. Tableros1.1 TD-B-1 und

1 de 3x60 A1 de 3x30 A3 de 2X20 A3 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

1.2 TD-B-2 und1 de 3x50 A1 de 3x40 A9 de 3x20 A3 de 2x15 A9 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

1.3 TD-B-3 und1 de 3x50 A1 de 3x40 A9 de 3x20 A3 de 2x15 A9 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

1.4 TD-B-2-1 und1 de 3x30 A8 de 3x20 A8 Int. Diferencial de 2x25 A

1.5 TD-B-3-1 und1 de 3x30 A8 de 3x20 A8 Int. Diferencial de 2x25 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida de data pto2.5 Salida trifasica pto

Page 77: IE - METRADO ELÉCTRICO (3)

2.6 ml

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFP und3.3 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.4 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

3-1x16 mm² + 1x10 mm² - 25 mm Ø PVC-P

Page 78: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

1 1

1 1

1 1

36 34 700 4 4

42 98 14092 92

1 1

Page 79: IE - METRADO ELÉCTRICO (3)

26 26

33 26 593 6 90 2 20 4 4

Page 80: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON H

N° DESCRIPCION UND

1. Tableros1.1 TD-A-1 und

1 de 3x50 A2 de 2X20 A5 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

1.2 TD-A-4 und1 de 3x30 A1 de 3x25 A4 de 2x15 A2 Int. Horaio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de centro de alumbrado empotrado pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida trifasica pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 1/40 de Josfel, una lampara fluorescentes 36 vatios, AFP und3.2 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.4 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und

Page 81: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

26 26 5213 11 246 6 121 1

18 18 364 4 84 4 8

13 11 24

Page 82: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON I

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-A-2 und 1

1 de 3x30 A2 de 2X20 A4 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

1.2 TD-A-3 und 11 de 3x30 A2 de 2X20 A4 de 2x15 A2 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto 242.2 Salida de centro de alumbrado empotrado pto 102.3 Salida de tomacorriente doble con tierra pto 8

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und 243.4 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und 10

Page 83: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

1

24 4810 208 16

24 4810 20

Page 84: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON J (INICIAL)

N° DESCRIPCION UND 1° PISO 2° PISO

1. Tableros1.1 TD-E - 2 und 1

1 de 3x30 A3 de 2X20 A2 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. Horaio de 2x16 A

1.2 TD-E - 3 und 11 de 3x30 A3 de 2X20 A2 de 2x15 A3 Int. Diferencial de 2x25 A 1 Int. HoraRio de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto 452.2 Salida de tomacorriente doble co pto 21

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas und 363.2 BE 2/40 de Josfel, dos lamparas und 9

Page 85: IE - METRADO ELÉCTRICO (3)

TOTAL

1

1

4521

369

Page 86: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON K (INICIAL)

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-E - 1 und 1

1 de 3x30 A2 de 2X20 A2 de 2x15 A2 Int. Diferencial de 2x25 A

2. Salidas2.1 Salida de centro de alumbrado pto 152.2 Salida de tomacorriente doble con tierra pto 14

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescente und 93.2 BE 1/40 de Josfel, una lampara fluorescente 3 und 6

Page 87: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

1514

96

Page 88: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON L (CAFETERIA)

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-B-4 und 1

1 de 3x40 A4 de 2X20 A2 de 2x15 A4 Int. Diferencial de 2x25 A

2. Salidas2.1 Salida de centro de alumbrado pto 312.2 Salida de tomacorriente doble con tierra pto 24

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatio und 123.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios und 19

Page 89: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

3124

1219

Page 90: IE - METRADO ELÉCTRICO (3)

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON M (POLIDEPORTIVO)

N° DESCRIPCION UND

1. Tableros1.2 TD-F - 1 und

1 de 3x40 A1 de 3x25 A3 de 2X20 A5 de 2x15 A3 Int. Diferencial de 2x25 A

1.3 TD-F - 2 und1 de 3x50 A2 de 2X20 A4 de 2x15 A2 Int. Diferencial de 2x25 A

1.1 TD-F - 3 und1 de 3x80 A1 de 3x40 A2 de 2X20 A25 de 2x15 A2 Int. Diferencial de 2x25 A 1 Int. Horario de 2x16 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de alumbrado en pared (braquete) pto2.3 Salida de tomacorriente doble con tierra pto2.4 Salida de centro de alumbrado en tijerales pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFP und3.3 BE 1/40 de Josfel, una lampara fluorescente 36 vatios, AFP und3.4 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.5 RSP de Josfel, una lampara vapor sodio de 70 vatios, AFP und3.5 Reflector MER-H-400 de Josfel, con lampara de 400 vatios de halogenuro metalico, und

Page 91: IE - METRADO ELÉCTRICO (3)

1° PISO 2° PISO TOTAL

1 1

1 1

1 1

76 54 1308 8

24 2450 50

8 31 3956 21 772 2

12 128 8

50 50

Page 92: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON O (CAPILLA) Y GUARDIANIA

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 TD-D-6 und 1

1 de 3x30 A3 de 2X20 A4 de 2x15 A3 Int. Diferencial de 2x25 A

2. Salidas2.1 Salida de centro de alumbrado pto 122.2 Salida de alumbrado en pared (braquete) pto 42.3 Salida de tomacorriente doble con tierra pto 10

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes und 103.2 BE 1/40 de Josfel, una lampara fluorescentes 3 und 13.2 CIR 132 de Josfel, una lampara fluorescente 32 und 13.4 RSP de Josfel, una lampara vapor sodio de 70 v und 4

Page 93: IE - METRADO ELÉCTRICO (3)

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON O (CAPILLA) Y GUARDIANIA

2° PISO TOTAL

1

124

10

10114

Page 94: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON AULAS EXISTENTES PRIMARIA

N° DESCRIPCION UND

1. Tableros1.1 TD-A-5 und

1 de 3x30 A3 de 2X20 A4 de 2x15 A3 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

1.2 TD-A-6 und1 de 3x40 A4 de 2X20 A5 de 2x15 A3 Int. Diferencial de 2x25 A 2 Int. Horaio de 2x16 A

2. Salidas2.1 Cableado de salida de centro de alumbrado pto2.2 Cableado de salida de centro de alumbrado empotrado pto2.3 Cableado de salida de alumbrado en pared pto2.4 Cableado de salida de tomacorriente doble con tierra pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, AFP und3.2 BE 1/40 de Josfel, una lampara fluorescente 36 vatios, AFP und3.3 ELA 2/20 de Josfel, dos lamparas fluorescentes 18 vatios, AFP und3.4 RSP de Josfel, una lampara vapor sodio de 70 vatios, AFP und

Page 95: IE - METRADO ELÉCTRICO (3)

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON AULAS EXISTENTES PRIMARIA

1° PISO 2° PISO TOTAL

1 1

1 1

22 20 4212 12

5 511 10 21

20 20 402 2

12 125 5

Page 96: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON SSHH EXISTENTE PRIMARIA

N° DESCRIPCION UND

1. Tableros1.1 TD-A-7 und

1 de 3x20 A2 de 2X15 A

2. Salidas2.1 Cableado de salida de centro de alumbrado pto2.2 Cableado de salida de alumbrado en pared pto

3. Artefactos de alumbrado3.1 BE 2/40 de Josfel, dos lamparas fluorescentes 36 vatios, AFP und3.2 CIR 132 de Josfel, una lampara fluorescente 32 vatios, AFP und3.3 RSP de Josfel, una lampara vapor sodio de 70 vatios, AFP und

Page 97: IE - METRADO ELÉCTRICO (3)

METRADO - INSTALACIONES ELECTRICAS INTERIORES - PABELLON SSHH EXISTENTE PRIMARIA

1° PISO 2° PISO TOTAL

1 1

6 62 2

4 42 22 2

Page 98: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - CUARTO DE BOMBAS DE PISCINA

N° DESCRIPCION UND

1. Tableros1.1 TD-BOMBAS PISCINA und

1 de 3x40 A1 de 3X30 A1 de 3x20 A1 de 2x20 A1 de 2X15 A

2. Salidas2.1 Salida de centro de alumbrado pto2.2 Salida de tomacorriente doble con tierra pto2.3 Salida trifasica pto

3. Artefactos de alumbrado3.1 BE 3/40 de Josfel, tres lamparas fluorescentes 36 vatios, A und

Page 99: IE - METRADO ELÉCTRICO (3)

METRADO - INSTALACIONES ELECTRICAS INTERIORES - CUARTO DE BOMBAS DE PISCINA

1° PISO 2° PISO TOTAL

1 1

2 23 36 6

2 2

Page 100: IE - METRADO ELÉCTRICO (3)

I.E. "REPUBLICA ARGENTINA"

NUEVO CHIMBOTE - SANTA - ANCASH

INSTALACIONES ELECTRICAS

METRADO - INSTALACIONES ELECTRICAS INTERIORES - CASETA BOMBAS

N° DESCRIPCION UND 1° PISO

1. Tableros1.1 Interruptor termomagnetico de 2x20 A und 1

2. Salidas2.1 Salida de centro de alumbrado pto 12.3 Salida de tomacorriente doble con tierra pto 1

salida trifasica pto 3

3. Artefactos de alumbrado3.1 BE 2/40 de Josfel, dos lamparas fluorescentes 36 und 1

Page 101: IE - METRADO ELÉCTRICO (3)

2° PISO TOTAL

1

113

1

Page 102: IE - METRADO ELÉCTRICO (3)

NOTACION DE LOS CABLES ALIMENTADORES Y ELECTRODUCTOS

Notacion Tipo Seccion Tuberia

1 NHX-90

2 NHX-90

3 NHX-90

4 NHX-90

5 NHX-90

6 NHX-90

7 NHX-90

8 NHX-90

9 NHX-90

10 NYY

11 NYY (directamnente enterrado)

12 NYY

13 NYY (directamnente enterrado)

14 cobre desnudo

15 cobre desnudo 1x50 mm²

16 cobre desnudo 1x25 mm²

17 cobre desnudo 1x16 mm²

3-1x120 mm² 80 mm Ø PVC-P

3-1x120 mm² + 1x70 mm²/T 80 mm Ø PVC-P

3-1x95 mm² + 1x50 mm²/T 65 mm Ø PVC-P

3-1x50 mm² + 1x25 mm²/T 50 mm Ø PVC-P

3-1x35 mm² + 1x16 mm²/T 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T 40 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T 35 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T 25 mm Ø PVC-P

3-1x6 mm² + 1x4 mm²/T 20 mm Ø PVC-P

3-1x6 mm² 25 mm Ø PVC-P

3-1x6 mm²

2-1x6 mm² 25 mm Ø PVC-P

2-1x6 mm²

1x120 mm² 35 mm Ø PVC-P

25 mm Ø PVC-P

20 mm Ø PVC-P

20 mm Ø PVC-P

Page 103: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-G

3x200 ATGG-1 Alimentador a TG-A

3x175 ATGG-2 Alimentador a TG-B

3x350 ATGG-3 Alimentador a TG-C

3x175 ATGG-4 Alimentador a TG-D

3x60 ATGG-5 Alimentador a TG-E

3x150 ATGG-6 Alimentador a TG-F

3x40 ATGG-7 Alimentador - Cancha Futbol - Poste 1

3x40 A3x1250 A TGG-8 Alimentador - Cancha Futbol - Poste 2

3x40 A(al tablero de la Subestacion existente) TGG-9 Alimentador - Cancha Futbol - Poste 3

3x40 ATGG-10 Alimentador - Cancha Futbol - Poste 4

3x40 ATGG-11 Alimentador - Cancha Futbol - Poste 5

3x40 ATGG-12 Alimentador - Cancha Futbol - Poste 6

3x25 ATGG-13 Alimentador - Losa Deportiva 1

3x25 ATGG-14 Alimentador - Losa Deportiva 2

3x25 ATGG-15 Alimentador - Losa Deportiva 3

TGG-16 RESERVA

TGG-17 RESERVA

TGG-18 RESERVA

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3-1x50 mm² + 1x25 mm²/T - 50 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P4 ( 3-1x120 mm² )

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

1x70 mm² cobre desnudo - 35 mm Ø PVC-P

Page 104: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-A

3x60 ATGA-1 Alimentador a TD-A-1

3x40 ATGA-2 Alimentador a TD-A-2

3x40 ATGA-3 Alimentador a TD-A-3

3x40 ATGA-4 Alimentador a TD-A-4

3x30 A3x175 A TGA-5 Alimentador a TD-A-5

3x50 A(TGG-1 de TG-G) TGA-6 Alimentador a TD-A-6

3x30 ATGA-7 Alimentador a TD-A-7

3x20 ATGA-8 Alimentador postes de alumbrado

TGA-9 RESERVA

TGA-10 RESERVA

TGA-11 RESERVA

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x6 mm² + 1x4 mm²/T - 25 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x50 mm² cobre desnudo - 25 mm Ø PVC-P

Page 105: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-B

3x70 ATGB-1 Alimentador a TD-B-1

3x60 ATGB-2 Alimentador a TD-B-2

3x60 ATGB-3 Alimentador a TD-B-3

3x150 A 3x40 ATGB-4 Alimentador a TD-B-4

(TGG-2 de TG-G) 3x20 ATGB-5 Alimentador postes de alumbrado

TGB-6 RESERVA

TGB-7 RESERVA

TGB-8 RESERVA

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P 3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x50 mm² cobre desnudo - 25 mm Ø PVC-P

Page 106: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-C

3x60 ATGC-1 Alimentador a TD-C-1

3x60 ATGC-2 Alimentador a TD-C-2

3x60 ATGC-3 Alimentador a TD-C-3

3x60 ATGC-4 Alimentador a TD-C-4

3x30 ATGC-5 Alimentador a TD-C-5

3x50 ATGC-6 Alimentador a TD-C-6

3x125 ATGC-7 Alimentador a TD-C-7

3x60 A3x300 A TGC-8 Alimentador a TD-C-8

3x40 A(TGG-3 de TG-G) TGC-9 Alimentador a TD-C-9

3x20 ATGC-10 Alimentador postes de alumbrado

TGC-11 RESERVA

TGC-12 RESERVA

TGC-13 RESERVA

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3-1x50 mm² + 1x25 mm²/T - 50 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P2 ( 3-1x120 mm² + 1x70 mm² - 80 mm Ø PVC-P )

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x50 mm² cobre desnudo - 25 mm Ø PVC-P

Page 107: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-D

3x40 ACGD-1 Alimentador a TD-D-1

3x40 ACGD-2 Alimentador a TD-D-2

3x50 ACGD-3 Alimentador a TD-D-3

3x40 A3x150 A CGD-4 Alimentador a TD-D-4

3x50 A(TGG-4 de TG-G) CGD-5 Alimentador a TD-D-5

3x40 ACGD-6 Alimentador a TD-D-6

3x40 ACGD-7 Alimentador a TD-D-7

3x20 ACGD-8 Alimentador postes de alumbrado

CGD-9 RESERVA

CGD-10 RESERVA

CGD-11 RESERVA

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )3 ( 3-1x120 mm² + 1x70 mm² - 80 mm Ø PVC-P )

3-1x50 mm² + 1x25 mm²/T - 50 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm²/T - 80 mm Ø PVC-P )

3-1x25 mm² + 1x16 mm²/T - 40 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x50 mm² cobre desnudo - 25 mm Ø PVC-P

Page 108: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-E

3x40 ACGE-1 Alimentador a TD-E-1

3x40 ACGE-2 Alimentador a TD-E-2

3x50 A 3x40 ACGE-3 Alimentador a TD-E-3

(TGG-5 de TG-G) 3x20 ACGE-4 Alimentador postes de alumbrado

CGE-5 RESERVA

CGE-6 RESERVA

CGE-7 RESERVA

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x50 mm² + 1x25 mm² - 50 mm Ø PVC-P 3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x50 mm² cobre desnudo - 25 mm Ø PVC-P

Page 109: IE - METRADO ELÉCTRICO (3)

Diagrama Unifilar de TG-F

3x40 ACGF-1 Alimentador a TD-F-1

3x50 ACGF-2 Alimentador a TD-F-2

3x125 A 3x60 ACGF-3 Alimentador a TD-F-3

(TGG-6 de TG-G) 3x20 ACGF-4 Alimentador postes de alumbrado

CGF-5 RESERVA

CGF-6 RESERVA

CGF-7 RESERVA

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

3-1x10 mm² + 1x6 mm²/T - 25 mm Ø PVC-P

2 ( 3-1x120 mm² + 1x70 mm² - 80 mm Ø PVC-P ) 3-1x16 mm² + 1x10 mm²/T - 35 mm Ø PVC-P

NYY 3-1x6 mm² - 25 mm Ø PVC-P

1x70 mm² cobre desnudo - 35 mm Ø PVC-P

Page 110: IE - METRADO ELÉCTRICO (3)

TG-G

1417

1250

TG-A 206 200TG-B 177 175TG-C 390 350TG-D 182 175TG-E 55 60TG-F 161 150

FUT-P1 33 40FUT-P2 33 40FUT-P3 33 40FUT-P4 33 40LOSA 1 17 25LOSA 2 17 25LOSA 3 17 25

TG-A

206

175

TD-A-1 62 60TD-A-2 40 40TD-A-3 42 40TD-A-4 47 40TD-A-5 33 30TD-A-6 50 50TD-A-7 4 30

P. ALUM. 20

TG-B

177

150

TD-B-1 76 70TD-B-2 62 60TD-B-3 62 60TD-B-4 19 40

P. ALUM. 20

TG-C

390

300

TD-C-1 61 60TD-C-2 61 60TD-C-3 61 60TD-C-4 61 60TD-C-5 5 30TD-C-6 25 50TD-C-7 125 125TD-C-8 69 60TD-C-9 15 40

P. ALUM. 20

TG-D

182

150

TD-D-1 28 40TD-D-2 28 40TD-D-3 51 50TD-D-4 47 40TD-D-5 50 50TD-D-6 12 40TD-D-7 9 40

P. ALUM. 20

TG-E

55 50

TD-E-1 16 40TD-E-2 12 40TD-E-3 26 40

P. ALUM. 20

TG-F

161

125

TD-F-1 40 40TD-F-2 57 50TD-F-3 60 60

P.ALUM. 20

Page 111: IE - METRADO ELÉCTRICO (3)

PLANO DESCRIPCION PABELLON PISO

IEG-01 REDES ELECTRICAS EXTERIORESIEG-02 TABLERO GENERAL Y TABLEROS GENERALES BLOQUE IEG-03 DETALLESIEG-04 RED EXTERIOR DE DATAIE-I1 ALUMBRADO I 1° PISOIE-I2 TOMACORRIENTE I 1° PISOIE-I3 ALUMBRADO I 2° PISOIE-I4 TOMACORRIENTE I 2° PISOIE-H1 ALUMBRADO H 1° PISOIE-H2 TOMACORRIENTE H 1° Y 2° PISOSIE-H3 ALUMBRADO H 2° PISOIE-EX1 ALUMBRADO Y TOMACORRIENTE EXISTENTE PRIMARIA 1° Y 2° PISOSIE-EX2 ALUMBRADO EXISTENTE SSHH 1° PISOIE-G1 ALUMBRADO G 1° PISOIE-G2 TOMACORRIENTE G 1° PISOIE-G3 ALUMBRADO G 2° PISOIE-G4 TOMACORRIENTE G 2° PISOIE-G5 DATA G 2° PISOIE-G6 TABLEROS Y LEYENDA G 1° Y 2° PISOSIE-L1 ALUMBRADO L 1° PISOIE-L2 TOMACORRIENTE L 2° PISOIE-C1 ALUMBRADO C 1° PISOIE-C2 TOMACORRIENTE C 1° Y 2° PISOSIE-C3 ALUMBRADO C 2° PISOIE-E1 ALUMBRADO E 1° PISOIE-E2 TOMACORRIENTE E 1° PISOIE-E3 ALUMBRADO E 2° PISOIE-E4 TOMACORRIENTE E 2° PISO

IE-AB1 ALUMBRADO A-B 1° PISOIE-AB2 TOMACORRIENTE A-B 1° PISOIE-F1 ALUMBRADO F 1° PISOIE-F2 TOMACORRIENTE F 1° PISOIE-F3 DATA F 1° PISOIE-F4 ALUMBRADO F 2° PISOIE-F5 TOMACORRIENTE F 2° PISOIE-F6 DATA F 2° PISOIE-F7 TABLEROS Y LEYENDA F 1° Y 2° PISOS

IE-CT1 ALUMBRADO C´ 1° PISOIE-CT2 TOMACORRIENTE C´ 1° PISOIE-CT3 ALUMBRADO C´ 2° PISOIE-CT4 TOMACORRIENTE C´ 2° PISOIE-D1 ALUMBRADO D 1° PISOIE-D2 TOMACORRIENTE D 1° PISOIE-D3 ALUMBRADO D 2° PISOIE-D4 TOMACORRIENTE D 2° PISOIE-O1 ALUMBRADO Y TOMACORRIENTE O 1° PISOIE-CB ALUMBRADO, TOMACORRIENTE Y FUERZA CUARTO BOMBAS 1° PISOIE-K1 ALUMBRADO, TOMACORRIENTE Y DATA K 1° PISOIE-J1 ALUMBRADO J 1° PISOIE-J2 TOMACORRIENTE J 1° PISO

IE-M1 ALUMBRADO M - POLIDEPORTIVO 1° PISOIE-M2 TOMACORRIENTE M - POLIDEPORTIVO 1° PISOIE-M3 ALUMBRADO M - POLIDEPORTIVO 2° PISOIE-M4 ALUMBRADO, TOMACORRIENTE Y FUERZA CUARTO BOMBAS PISCINA 1° PISO

Page 112: IE - METRADO ELÉCTRICO (3)

Notacion Tipo Dimensiones

A F°G° tipo pesado 150 x 150 x 100 mm

B F°G° tipo pesado 200 x 200 x 150 mm