 S10 1 Página : CCCEIC 18/07/2015 12:16:06p.m. Fecha : Prec ios cantid ades de insumo s re uerid os Obra 0802004 RELAVES Fórmula 01 CONSTRUCCI ON DE POSA DE RELAVES Fecha 23/05/2015 Unidad Precio Cant. Re uerida Des cri ció n insumo Códi o Parcial Presuuestado MANO DE OBRA 470022 OPERADOR DE EQUIPO LIVIANO 16.41 124.56 2,043.32 HH 2,044.03 470023 OPERADOR DE EQUIPO PESADO 17.15 1,147.91 19,768.81 HH 19,686.66 470101 CAPATAZ 17.48 28.25 549.53 HH 493.81 470102 OPERARIO 16.42 636.08 10,424.21 HH 10,444.43 470103 OFICIAL 14.73 492.78 7,291.61 HH 7,258.65 470104 PEON 13.29 2,961.34 39,446.66 HH 39,356.21 79,524.14 79,283.79 MATERIALES 018002 LUBRICANTE PARA TUBERIA CPT-SP 42.25 19.71 832.95 GLN 832.75 020007 ALAMBRE NEGRO RECOCIDO # 16 4.50 236.30 1,063.35 KG 1,063.35 020105 CLAVOS PARA MADERA C/C 3" 4.50 177.23 797.51 KG 797.54 020106 CLAVOS PARA MADERA C/C 3/4" 4.50 54.87 274.33 KG 246.92 030202 A CERO CORRUGADO 0 3/8" 6.20 65.84 384.06 KG 408.21 040000 ARENA FINA 90.00 53.50 4,814.96 M3 4,815.00 050004 PIEDRA CHANCADA DE 3/4" 90.00 0.06 5.31 M3 5.40 050022 GRAVA CANTO RODADO 90.00 166.71 15,003.99 M3 15,003.90 050103 ARENA DE RIO 75.00 4.79 359.55 M3 359.25 050104 ARENA GRUESA 85.00 135.00 11,475.65 M3 11,475.00 050305 PIEDRA CHANCADA DE 3/4" 85.00 108.27 9,203.21 M3 9,202.95 053084 MATERIAL DE RELLENO CLASIFICADO PARA PRESA 110.00 521.46 57,360.44 M3 57,360.60 055202 BENTONITA 120.00 121.14 14,536.08 M3 14,536.80 170006 LADRILLO K.K. 18 HUECOS 9x12x24 CM PIRAMIDE 1.20 6.00 7.20 UND 7.20 210000 CEMENTO PORTLAND TIPO I (42.5KG) 21.40 2,815.87 60,259.62 BOL 60,259.62 210092 CEMENTO PORTLAND TIPO I (EN FCA.)S-PUB 21.40 0.44 9.37 BOL 9.42 210093 CEMENTO PORTLAND TIPO I (42.5KG) PUESTO EN OBRA 21.40 87.78 1,865.42 BOL 1,878.49 291191 GEOTEXTIL NO TEJIDO 4.60 6,568.04 30,212.98 M2 30,212.98 291351 GEOMEMBRANA (HDPE e= 2mm) 15.20 6,618.71 100,604.39 M2 100,604.39 295096 SELLADO ELASTICO 13.60 661.87 9,001.45 GLN 9,001.43 305504 NIVEL 21.00 21.95 438.92 DIA 460.95 320104 TRANSPORTE DE AGUA 7.85 30.06 240.45 M3 235.97 380004 HORMIGON (PUESTO EN OBRA) 85.00 27.43 2,359.20 M3 2,331.55 390500 AGUA 5.15 2,191.30 11,320.60 M3 11,285.20 390620 TIZA 17.50 54.87 987.57 BOL 960.23 430025 MADERA NACIONAL P/ENCOFRADO-CARP 5.00 3,544.57 17,722.83 P2 17,722.85 440016 MADERA TORNILLO CEPILLADA 5.00 54.87 274.33 P2 274.35 491516 LIMNIMETRO ELECTRONICO PORTATIL 358.00 1.00 358.00 UND 358.00 497202 PIEZOMETRO 256.00 1.00 256.00 UND 256.00 500381 MARCO Y TAPA GALBANIZADA DE 0.6x0.6 125.00 1.00 125.00 UND 125.00 720037 TUB. PVC SAP PRESION C-15 EC DE 1" x 5m 14.00 1.80 25.20 UND 25.20 729302 TUBERIA CRIBADA CPT-SP DE DIAMETRO 3" 13.05 39.41 514.35 M 514.30 729304 ANILLOS DE GOMA TUB. SP CPT DE 3" 2.50 3.94 9.85 M 9.85 352,704.12 352,640.63 EQUIPOS 290491 ESTACION TOTAL 14.75 87.78 1,316.76 HM 1,294.76 375722 MARTILLO ELECTRICO 5 HP 11.58 124.56 1,443.49 HM 1,442.40 480436 CAMION VOLQUETE 16 M3 161.50 32.84 5,322.38 M3 5,303.66 481201 CAMION CISTERNA 4X2 (AGUA) 1,500 GAL. 66.50 59.67 3,943.40 HM 3,968.06 490301 COMPACTADOR VIBR. TIPO PLANCHA 4 HP 25.60 177.33 4,510.09 HM 4,539.65 490322 RODILLO NEUMATICO AUTOP 60-80 HP 3-5 TON 132.00 68.97 9,092.18 HM 9,104.04 490406 CARGADOR RETROEXCAVADOR 62 HP 1 YD3 162.20 24.37 3,952.85 HM 3,952.81 490414 CARGADOR S/LLANTAS 260-300 HP 5-5.5 YD3 180.00 158.37 28,481.13 HM 28,506.60 490433 TRACTOR DE ORUGAS DE 140-160 HP 252.00 52.72 13,288.25 HM 13,285.44 490434 TRACTOR DE ORUGAS DE 190-240 HP 252.00 244.77 61,605.35 HM 61,682.04 490459 CARGADOR S/LLANTAS 260-300 HP 5-5.5 YD3 180.00 2.75 550.05 DIA 495.00 490701 VIBRADOR DE CONCRETO 4 HP 1.35" 10.20 87.85 896.37 HM 896.07 490911 MOTONIVELADORA DE 85-120 HP 162.00 63.79 10,328.75 HM 10,333.98 491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 12.00 87.85 1,053.42 HM 1,054.20 491011 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 12.00 40.76 489.14 HM 489.12 491851 EQUIPO DE TERMOFUSION 20.15 117.41 2,374.62 HM 2,365.81

description

insumos 10

Transcript of Insumos y Precios

  • S10 1Pgina :CCCEIC 18/07/2015 12:16:06p.m.Fecha :

    Precios y cantidades de insumos requeridosObra 0802004 RELAVESFrmula 01 CONSTRUCCION DE POSA DE RELAVESFecha 23/05/2015

    Unidad Precio Cant. RequeridaDescripcin insumoCdigo Parcial Presupuestado

    MANO DE OBRA470022 OPERADOR DE EQUIPO LIVIANO 16.41 124.56 2,043.32HH 2,044.03

    470023 OPERADOR DE EQUIPO PESADO 17.15 1,147.91 19,768.81HH 19,686.66

    470101 CAPATAZ 17.48 28.25 549.53HH 493.81

    470102 OPERARIO 16.42 636.08 10,424.21HH 10,444.43

    470103 OFICIAL 14.73 492.78 7,291.61HH 7,258.65

    470104 PEON 13.29 2,961.34 39,446.66HH 39,356.21

    79,524.1479,283.79MATERIALES

    018002 LUBRICANTE PARA TUBERIA CPT-SP 42.25 19.71 832.95GLN 832.75

    020007 ALAMBRE NEGRO RECOCIDO # 16 4.50 236.30 1,063.35KG 1,063.35

    020105 CLAVOS PARA MADERA C/C 3" 4.50 177.23 797.51KG 797.54

    020106 CLAVOS PARA MADERA C/C 3/4" 4.50 54.87 274.33KG 246.92

    030202 ACERO CORRUGADO 0 3/8" 6.20 65.84 384.06KG 408.21

    040000 ARENA FINA 90.00 53.50 4,814.96M3 4,815.00

    050004 PIEDRA CHANCADA DE 3/4" 90.00 0.06 5.31M3 5.40

    050022 GRAVA CANTO RODADO 90.00 166.71 15,003.99M3 15,003.90

    050103 ARENA DE RIO 75.00 4.79 359.55M3 359.25

    050104 ARENA GRUESA 85.00 135.00 11,475.65M3 11,475.00

    050305 PIEDRA CHANCADA DE 3/4" 85.00 108.27 9,203.21M3 9,202.95

    053084 MATERIAL DE RELLENO CLASIFICADO PARA PRESA 110.00 521.46 57,360.44M3 57,360.60

    055202 BENTONITA 120.00 121.14 14,536.08M3 14,536.80

    170006 LADRILLO K.K. 18 HUECOS 9x12x24 CM PIRAMIDE 1.20 6.00 7.20UND 7.20

    210000 CEMENTO PORTLAND TIPO I (42.5KG) 21.40 2,815.87 60,259.62BOL 60,259.62

    210092 CEMENTO PORTLAND TIPO I (EN FCA.)S-PUB 21.40 0.44 9.37BOL 9.42

    210093 CEMENTO PORTLAND TIPO I (42.5KG) PUESTO EN OBRA 21.40 87.78 1,865.42BOL 1,878.49

    291191 GEOTEXTIL NO TEJIDO 4.60 6,568.04 30,212.98M2 30,212.98

    291351 GEOMEMBRANA (HDPE e= 2mm) 15.20 6,618.71 100,604.39M2 100,604.39

    295096 SELLADO ELASTICO 13.60 661.87 9,001.45GLN 9,001.43

    305504 NIVEL 21.00 21.95 438.92DIA 460.95

    320104 TRANSPORTE DE AGUA 7.85 30.06 240.45M3 235.97

    380004 HORMIGON (PUESTO EN OBRA) 85.00 27.43 2,359.20M3 2,331.55

    390500 AGUA 5.15 2,191.30 11,320.60M3 11,285.20

    390620 TIZA 17.50 54.87 987.57BOL 960.23

    430025 MADERA NACIONAL P/ENCOFRADO-CARP 5.00 3,544.57 17,722.83P2 17,722.85

    440016 MADERA TORNILLO CEPILLADA 5.00 54.87 274.33P2 274.35

    491516 LIMNIMETRO ELECTRONICO PORTATIL 358.00 1.00 358.00UND 358.00

    497202 PIEZOMETRO 256.00 1.00 256.00UND 256.00

    500381 MARCO Y TAPA GALBANIZADA DE 0.6x0.6 125.00 1.00 125.00UND 125.00

    720037 TUB. PVC SAP PRESION C-15 EC DE 1" x 5m 14.00 1.80 25.20UND 25.20

    729302 TUBERIA CRIBADA CPT-SP DE DIAMETRO 3" 13.05 39.41 514.35M 514.30

    729304 ANILLOS DE GOMA TUB. SP CPT DE 3" 2.50 3.94 9.85M 9.85

    352,704.12352,640.63EQUIPOS

    290491 ESTACION TOTAL 14.75 87.78 1,316.76HM 1,294.76

    375722 MARTILLO ELECTRICO 5 HP 11.58 124.56 1,443.49HM 1,442.40

    480436 CAMION VOLQUETE 16 M3 161.50 32.84 5,322.38M3 5,303.66

    481201 CAMION CISTERNA 4X2 (AGUA) 1,500 GAL. 66.50 59.67 3,943.40HM 3,968.06

    490301 COMPACTADOR VIBR. TIPO PLANCHA 4 HP 25.60 177.33 4,510.09HM 4,539.65

    490322 RODILLO NEUMATICO AUTOP 60-80 HP 3-5 TON 132.00 68.97 9,092.18HM 9,104.04

    490406 CARGADOR RETROEXCAVADOR 62 HP 1 YD3 162.20 24.37 3,952.85HM 3,952.81

    490414 CARGADOR S/LLANTAS 260-300 HP 5-5.5 YD3 180.00 158.37 28,481.13HM 28,506.60

    490433 TRACTOR DE ORUGAS DE 140-160 HP 252.00 52.72 13,288.25HM 13,285.44

    490434 TRACTOR DE ORUGAS DE 190-240 HP 252.00 244.77 61,605.35HM 61,682.04

    490459 CARGADOR S/LLANTAS 260-300 HP 5-5.5 YD3 180.00 2.75 550.05DIA 495.00

    490701 VIBRADOR DE CONCRETO 4 HP 1.35" 10.20 87.85 896.37HM 896.07

    490911 MOTONIVELADORA DE 85-120 HP 162.00 63.79 10,328.75HM 10,333.98

    491007 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 12.00 87.85 1,053.42HM 1,054.20

    491011 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 12.00 40.76 489.14HM 489.12

    491851 EQUIPO DE TERMOFUSION 20.15 117.41 2,374.62HM 2,365.81

  • S10 2Pgina :CCCEIC 18/07/2015 12:16:06p.m.Fecha :

    Precios y cantidades de insumos requeridosObra 0802004 RELAVESFrmula 01 CONSTRUCCION DE POSA DE RELAVESFecha 23/05/2015

    Unidad Precio Cant. RequeridaDescripcin insumoCdigo Parcial Presupuestado

    148,648.23148,713.64

    SUB-TOTAL 580,876.49580,638.06INSUMOS COMODIN

    EQUIPOS370101 HERRAMIENTAS MANUALES 2,523.86%MO

    2,523.860.00

    SUB-TOTAL 2,523.860.00

    TOTAL 580,638.06 583,400.35MONTO PARTIDAS ESTIMADAS 0.00

    583,400.35La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que seest utilizando