OBRA: PRESUPUESTO: SUB-PRESUPUESTO: PROPIETARIO: MPL FECHA: Abril 2,015 LARGO ANCHO ALTO AREA VOLUMEN 01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD 01.03 TRABAJOS PRELIMINARES 01.03.01 Demolición y Rotura de Veredas 308.54 m2 (AREA CAD) CALLE SUCRE - VEREDA 1 107.71 107.71 CALLE SUCRE - UÑA 1 50.73 0.30 15.22 CALLE NAYLAMP - VEREDA 1 109.46 109.46 CALLE NAYLAMP - UÑA 1 49.71 0.30 14.91 CALLE GRAU - VEREDA 1 51.17 51.17 CALLE GRAU - UÑA 1 33.57 0.30 10.07 01.04 ELIMINACIONES 01.04.01 Eliminacion de Demoliciones 43.59 m3 (AREA CAD) CALLE SUCRE - VEREDA 1 0.10 107.71 10.77 CALLE SUCRE - UÑA 1 50.73 0.06 3.04 CALLE NAYLAMP - VEREDA 1 0.10 109.46 10.95 CALLE NAYLAMP - UÑA 1 49.71 0.06 2.98 CALLE NAYLAMP - VEREDA 1 0.10 51.17 5.12 CALLE NAYLAMP - UÑA 1 33.57 0.06 2.01 esp 1.25 43.59 02 ESTRUCTURAS 02.01 TRABAJOS PRELIMINARES 02.01.01 Trazos y Replanteo Preliminar 520.38 m2 (AREA CAD) CALLE SUCRE - VEREDA 1 125.89 125.89 CALLE GRAU - VEREDA 1 105.22 105.22 CALLE NAYLAMP - VEREDA 1 159.05 159.05 PASAJE - VEREDA 1 130.22 130.22 02.02 MOVIMIENTO DE TIERRAS 02.02.02 Corte de Terreno para pisos 83.03 m3 (AREA CAD) CALLE SUCRE - VEREDA 1 0.20 125.89 25.18 CALLE NAYLAMP - VEREDA 1 0.20 159.05 31.81 PASAJE - VEREDA 1 0.20 130.22 26.04 02.02.06 Eliminacion de Material Excedente C/Maquina 103.79 m3 Esp. Corte y exc 1.25 83.03 103.79 02.02.08 Relleno Manual con Arena Fina 30.68 m3 (AREA CAD) CALLE GRAU - Tramo hacia el Oeste, Naylamp 1 0.30 11.78 3.53 CALLE GRAU - Tramo hacia el Este, Sucre 1 2.23 0.50 1.12 CALLE GRAU - Tramo central 1 2.52 8.01 20.19 cuchilla entre vereda antigua y obra nueva 1 0.37 15.80 5.85 02.02.09 Relleno con Arena Fina e=0.10m 459.18 m2 VEREDAS (AREA CAD) CALLE SUCRE - VEREDA 1 125.89 125.89 CALLE GRAU - VEREDA 1 44.02 44.02 CALLE NAYLAMP - VEREDA 1 159.05 159.05 PASAJE - VEREDA 1 130.22 130.22 02.02.10 Relleno con Material Granular 520.38 m2 CALLE SUCRE - VEREDA 1 125.89 125.89 CALLE GRAU - VEREDA 1 105.22 105.22 CALLE NAYLAMP - VEREDA 1 159.05 159.05 PASAJE - VEREDA 1 130.22 130.22 SUSTENTO DE METRADOS ADICIONAL N°01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO TOTAL volumen MERCADO DE ABASTOS DEL PUEBLO JOVEN SAN MARTIN - LAMBAYEQUE UND ADICIONAL N°01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO VEREDAS Y RAMPAS PERIMETRALES AL MERCADO 34.87 MEDIDAS PARTIDA N° ESPECIFICACIONES N° DE VECES PARCIAL

description

bueno

Transcript of Metrado-Adicional n1-Veredas y Rampas

  • OBRA:

    PRESUPUESTO:

    SUB-PRESUPUESTO:

    PROPIETARIO: MPL

    FECHA: Abril 2,015

    LARGO ANCHO ALTO AREA VOLUMEN

    01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUD

    01.03 TRABAJOS PRELIMINARES

    01.03.01 Demolicin y Rotura de Veredas 308.54 m2

    (AREA CAD)

    CALLE SUCRE - VEREDA 1 107.71 107.71

    CALLE SUCRE - UA 1 50.73 0.30 15.22

    CALLE NAYLAMP - VEREDA 1 109.46 109.46

    CALLE NAYLAMP - UA 1 49.71 0.30 14.91

    CALLE GRAU - VEREDA 1 51.17 51.17

    CALLE GRAU - UA 1 33.57 0.30 10.07

    01.04 ELIMINACIONES

    01.04.01 Eliminacion de Demoliciones 43.59 m3

    (AREA CAD)

    CALLE SUCRE - VEREDA 1 0.10 107.71 10.77

    CALLE SUCRE - UA 1 50.73 0.06 3.04

    CALLE NAYLAMP - VEREDA 1 0.10 109.46 10.95

    CALLE NAYLAMP - UA 1 49.71 0.06 2.98

    CALLE NAYLAMP - VEREDA 1 0.10 51.17 5.12

    CALLE NAYLAMP - UA 1 33.57 0.06 2.01

    esp

    1.25 43.59

    02 ESTRUCTURAS

    02.01 TRABAJOS PRELIMINARES

    02.01.01 Trazos y Replanteo Preliminar 520.38 m2

    (AREA CAD)CALLE SUCRE - VEREDA 1 125.89 125.89

    CALLE GRAU - VEREDA 1 105.22 105.22

    CALLE NAYLAMP - VEREDA 1 159.05 159.05

    PASAJE - VEREDA 1 130.22 130.22

    02.02 MOVIMIENTO DE TIERRAS

    02.02.02 Corte de Terreno para pisos 83.03 m3

    (AREA CAD)

    CALLE SUCRE - VEREDA 1 0.20 125.89 25.18

    CALLE NAYLAMP - VEREDA 1 0.20 159.05 31.81

    PASAJE - VEREDA 1 0.20 130.22 26.04

    02.02.06 Eliminacion de Material Excedente C/Maquina 103.79 m3

    Esp. Corte y exc

    1.25 83.03 103.79

    02.02.08 Relleno Manual con Arena Fina 30.68 m3

    (AREA CAD)

    CALLE GRAU - Tramo hacia el Oeste, Naylamp 1 0.30 11.78 3.53

    CALLE GRAU - Tramo hacia el Este, Sucre 1 2.23 0.50 1.12

    CALLE GRAU - Tramo central 1 2.52 8.01 20.19

    cuchilla entre vereda antigua y obra nueva 1 0.37 15.80 5.85

    02.02.09 Relleno con Arena Fina e=0.10m 459.18 m2

    VEREDAS (AREA CAD)

    CALLE SUCRE - VEREDA 1 125.89 125.89

    CALLE GRAU - VEREDA 1 44.02 44.02

    CALLE NAYLAMP - VEREDA 1 159.05 159.05

    PASAJE - VEREDA 1 130.22 130.22

    02.02.10 Relleno con Material Granular 520.38 m2

    CALLE SUCRE - VEREDA 1 125.89 125.89

    CALLE GRAU - VEREDA 1 105.22 105.22

    CALLE NAYLAMP - VEREDA 1 159.05 159.05

    PASAJE - VEREDA 1 130.22 130.22

    SUSTENTO DE METRADOS

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    TOTAL

    volumen

    MERCADO DE ABASTOS DEL PUEBLO JOVEN SAN MARTIN - LAMBAYEQUE

    UND

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    34.87

    MEDIDASPARTIDA N ESPECIFICACIONES

    N

    DE

    VE

    CE

    S

    PARCIAL

  • OBRA:

    PRESUPUESTO:

    SUB-PRESUPUESTO:

    PROPIETARIO: MPL

    FECHA: Abril 2,015

    LARGO ANCHO ALTO AREA VOLUMEN

    SUSTENTO DE METRADOS

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    TOTAL

    MERCADO DE ABASTOS DEL PUEBLO JOVEN SAN MARTIN - LAMBAYEQUE

    UND

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    MEDIDASPARTIDA N ESPECIFICACIONES

    N

    DE

    VE

    CE

    S

    PARCIAL

    03 ARQUITECTURA

    03.13 VEREDAS

    03.13.01 VEREDAS DE 4'': f'c=175 kg/cm2 448.90 m2

    CALLE SUCRE - VEREDA 1 125.89 125.89

    CALLE GRAU - VEREDA 1 105.22 105.22

    CALLE NAYLAMP - VEREDA 1 159.05 159.05

    PASAJE - VEREDA 1 130.22 130.22

    AREA DE RAMPAS -1 68.64 -68.64

    AREA DE GRADAS -1 2.84 -2.84

    03.13.02 VEREDAS DE 4'': Encofrado y Desencofrado 64.56 m2

    (AREA CAD)

    PERIMETRO - VEREDA 1 155.82 0.40 62.33

    PASAJE - VEREDA 12 3.00 0.10 3.60

    DSCTO SUCRE RAMPA 10.5% 1 -3.43 0.40 -1.37

    03.13.03 VEREDAS DE 4'': Sellado de Juntas Asflticas 167.36 ml

    (AREA CAD)

    CALLE GRAU - VEREDA 39.20

    Transversales cada 3 ml Tramo hacia el Oeste, Naylamp 2 2.90

    Transversales cada 3 ml Tramo hacia el Este, Sucre 4 2.10

    Transversales cada 3 ml Tramo central 10 2.50

    CALLE SUCRE - VEREDA 38.16

    Transversales cada 3 ml 18 2.12

    NAYLAMP - VEREDA 36.00

    Transversales cada 3 ml 18 2.00

    PASAJE - VEREDA 54.00

    Transversales cada 3 ml 18 3.00

    03.13.04 VEREDAS DE 4'': Acero de Anclaje fy=4,200 kg/cm2 121.09 kg

    Segn Detalle

    03.13.05 Curado de Concreto 480.28 m2

    (AREA CAD)

    CALLE SUCRE - VEREDA 1 125.89 125.89

    CALLE GRAU - VEREDA 1 105.22 105.22

    CALLE NAYLAMP - VEREDA 1 159.05 159.05

    PASAJE - VEREDA 1 130.22 130.22

    AREA DE RAMPAS -1 68.64 -68.64

    AREA DE GRADAS -1 2.84 -2.84

    CALLE GRAU - VEREDA 13.61

    (0.30 m x 0.20m) ua Tramo hacia el Oeste, Naylamp 1 4.10 0.15

    ua Tramo hacia el Este, Sucre 1 11.17 0.15

    (Rampas) ua Tramo central 4.60

    (ancho medio) ua Tramo central 1 11.32

    CALLE SUCRE - VEREDA 7.63

    ua 1 50.87 0.15

    CALLE NAYLAMP - VEREDA 10.14

    ua 1 67.60 0.15

    03.14 RAMPAS

    03.14.01 RAMPAS: f'c=175 kg/cm2 72.99 m2

    RAMPA CALLE SUCRE P=10% 1 1.50 2.90 4.35

    RAMPA CALLE SUCRE P=10.5% 1 3.43 2.20 7.55

    RAMPA CALLE SUCRE P=12%(MARTILLO) 1 1.25 1.00 1.25

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1 1.70 1.00 1.70

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1 2.30 1.00 2.30

    RAMPA PASAJE P=6.3% 1 10.00 3.00 30.00

    GRAU ua Tramo hacia el Oeste, Naylamp 1 5.27 2.80 14.76

    GRAU ua Tramo hacia el Este, Sucre 1 5.20 2.13 11.08

  • OBRA:

    PRESUPUESTO:

    SUB-PRESUPUESTO:

    PROPIETARIO: MPL

    FECHA: Abril 2,015

    LARGO ANCHO ALTO AREA VOLUMEN

    SUSTENTO DE METRADOS

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    TOTAL

    MERCADO DE ABASTOS DEL PUEBLO JOVEN SAN MARTIN - LAMBAYEQUE

    UND

    ADICIONAL N01: ESTACIONAMIENTOS,VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    VEREDAS Y RAMPAS PERIMETRALES AL MERCADO

    MEDIDASPARTIDA N ESPECIFICACIONES

    N

    DE

    VE

    CE

    S

    PARCIAL

    03.14.02 RAMPAS: Encofrado y Desencofrado 15.48 m2

    RAMPA CALLE SUCRE P=10% 2 1.50 0.40 1.20

    RAMPA CALLE SUCRE P=10.5% 1 3.43 0.40 1.37

    RAMPA CALLE SUCRE P=12%(MARTILLO) 2 1.25 0.40 1.00

    GRAU ua Tramo hacia el Oeste, Naylamp 1 5.30 0.69 3.66

    GRAU ua Tramo hacia el Este, Sucre 1 5.20 0.51 2.65

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 2 1.70 0.40 1.36

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 2 2.30 0.40 1.84

    RAMPA PASAJE P=6.3% 2 3.00 0.40 2.40

    03.14.03 RAMPAS: Bruas de 1cm cada 0.15m 475.25 m2

    RAMPA CALLE SUCRE P=10% 10 2.90 29.00

    RAMPA CALLE SUCRE P=10.5% 10 3.45 34.50

    RAMPA CALLE SUCRE P=12%(MARTILLO) 8 1.00 8.00

    GRAU ua Tramo hacia el Oeste, Naylamp 35 2.80 98.00

    GRAU ua Tramo hacia el Este, Sucre 35 2.25 78.75

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 11 1.00 11.00

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 15 1.00 15.00

    RAMPA PASAJE P=6.3% 67 3.00 201.00

    03.14.04 RAMPAS: Curado de Concreto 72.99 m2

    RAMPA CALLE SUCRE P=10% 1 1.50 2.90 4.35

    RAMPA CALLE SUCRE P=10.5% 1 3.43 2.20 7.55

    RAMPA CALLE SUCRE P=12%(MARTILLO) 1 1.25 1.00 1.25

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1 1.70 1.00 1.70

    RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1 2.30 1.00 2.30

    RAMPA PASAJE P=6.3% 1 10.00 3.00 30.00

    GRAU ua Tramo hacia el Oeste, Naylamp 1 5.27 2.80 14.76

    GRAU ua Tramo hacia el Este, Sucre 1 5.20 2.13 11.08

    03.15 GRADAS

    03.15.01 GRADAS:f'c=175 kg/cm2 10.54 m2

    GRADA CALLE SUCRE 1 3.24 1.50 4.86

    GRAU medio 2 2.27 1.25 5.68

    03.15.02 GRADAS: Encofrado y Desencofrado 5.19 m2

    GRADA CALLE SUCRE 2 1.00 0.47 0.93

    3 3.24 0.16 1.56

    GRADA CALLE GRAU 2 0.40 0.80

    5 2.37 0.16 1.90 m2

    03.15.03 GRADAS: Curado de Concreto 10.54 m2

    GRADA CALLE SUCRE 1 3.24 1.50 4.86

    GRAU medio 2 2.27 1.25 5.68