Metrados William

17
7/18/2019 Metrados William http://slidepdf.com/reader/full/metrados-william 1/17 SUSTENTO DE METRADOS 1.00.00 OBRAS PROVISIONALES 1.03.00 DEPOSITO PARAAGUA UND UND SUB TOTAL 1 VECES SUB TOTAL 2 1.00 1.00 1.00 1.00 TOTAL 1.00 2.00.00 OBRAS PRELIMINARES 2.01.00 LIMPIEZA DE TERRENO MANUAL M2 LONGITUD ANCHO SUB TOTAL 1 VECES SUB TOTAL 2 200.00 1.00 200.00 TOTAL 200.00 2.02.00 TRAZO, NIVEL Y REPLANTEO DURANTE OBRA M2 LONGITUD ANCHO SUB TOTAL 1 VECES SUB TOTAL 2 AREA TERRENO  23.00 10.00 230.00 1.00 230.00 TOTAL 230.00 3.00.00 MOVIMIENTO DE TIERRAS 3.01.00 EXCAVACION DE ZANJAS MANUAL H= 1.30m. !"m#$. M3 LONGITUD ANCHO ALTURA SUB TOTAL 1 VECES SUB TOTAL 2 CIMIENTOS CORTE 1-1  19.23 0.6 1.05 12.11 1.00 12.11 CORTE 2-2  6.88 0.7 1.05 5.06 1.00 5.06 ZAPATAS ZAPATA -1  1.8 1 1.05 1.89 1.00 1.89 ZAPATA -2  1.20 1.20 1.05 1.512 8.00 12.096 ZAPATA-3  1.50 1.00 1.05 1.575 2.00 3.15 ZAPATA-4  0.60 0.60 1.05 0.378 2.00 0.756 ESCALERA  1.00 0.55 0.8 0.44 1.00 0.44 TOTAL 3%.%0

description

planilla de metrados

Transcript of Metrados William

Page 1: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 1/17

SUSTENTO DE METRADOS

1.00.00 OBRAS PROVISIONALES

1.03.00 DEPOSITO PARA AGUA UND

UND SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00 1.00

TOTAL 1.00

2.00.00 OBRAS PRELIMINARES

2.01.00 LIMPIEZA DE TERRENO MANUAL M2

LONGITUD ANCHO SUB TOTAL 1 N° VECES SUB TOTAL 2

200.00 1.00 200.00

TOTAL 200.00

2.02.00 TRAZO, NIVEL Y REPLANTEO DURANTE OBRA M2

LONGITUD ANCHO SUB TOTAL 1 N° VECES SUB TOTAL 2

AREA TERRENO   23.00 10.00 230.00 1.00 230.00

TOTAL 230.00

3.00.00 MOVIMIENTO DE TIERRAS

3.01.00 EXCAVACION DE ZANJAS MANUAL H= 1.30m. !"m#$. M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CIMIENTOS

CORTE 1-1   19.23 0.6 1.05 12.11 1.00 12.11

CORTE 2-2   6.88 0.7 1.05 5.06 1.00 5.06

ZAPATAS

ZAPATA -1   1.8 1 1.05 1.89 1.00 1.89

ZAPATA -2   1.20 1.20 1.05 1.512 8.00 12.096

ZAPATA-3   1.50 1.00 1.05 1.575 2.00 3.15

ZAPATA-4   0.60 0.60 1.05 0.378 2.00 0.756

ESCALERA   1.00 0.55 0.8 0.44 1.00 0.44

TOTAL 3%.%0

Page 2: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 2/17

3.02.00 CORTE HASTA EL NIVEL DE SUBRASANTE EN VEREDAS & INC. U'AS( Y PISOS M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDAS

veredas   21.00 0.10 2.10 1.00 2.10

UÑA   15.00 0.15 0.35 0.79 2.00 1.58

TOTAL 3.)*

3.02.00 COMPACTACION EN SUB RASANTE DE VEREDA Y PISOS MANUAL M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDAS

VEREDAS EN AREA COMERCIAL   9.53 9.53 1.00 9.53

PISO 59.38 59.38 1.00 59.38

TOTAL )*.+1

3.03.00 RELLENO CON MATERIAL TRANSPORTADO AIRMADO M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDAS 9.3 !.1 1.429 1 1.429

PISOS 9.3" !.1 ".9!# 1 ".9!#

CIMIENTOS

CORTE 1-1   19.23 0.6 0.2 12.11 1.00 12.11

CORTE 2-2   6.88 0.7 0.2 0.96 1.00 0.96

ESCALERA   1.00 0.55 0.2 0.11 1.00 0.11

TOTAL 23.%2

3.04.00 RELLENO CON MATERIAL TRANSPORTADO HORMIGON M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CORTE 1-1   19.23 0.6 0.2 2.31 1.00 2.31

CORTE 2-2   6.88 0.7 0.2 0.96 1.00 0.96

TOTAL 3.2-

3.05.00 RELLENO COMPACTADO CE/UIPO, MATERIAL PROPIO M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CIMIENTOS

CORTE 1-1   19.23 0.6 0.15 1.73 1.00 1.73

CORTE 2-2   6.88 0.7 0.15 0.72 1.00 0.72

ZAPATAS

ZAPATA -1   1.8 1 0.15 0.27 1.00 0.27

ZAPATA -2   1.20 1.20 0.15 0.216 8.00 1.728

ZAPATA-3   1.50 1.00 0.15 0.225 2.00 0.45

ZAPATA-4   0.60 0.60 0.15 0.054 2.00 0.108

PISOS

SALA COMEDOR   34.33 0.15 5.15 1.00 5.15

COCINA   11.44 0.15 1.72 1.00 1.72

SS.$$   4.18 0.15 0.63 1.00 0.63

ESTUDIO 9.43 0.15 1.41 1.00 1.41

TOTAL 13.92

FACTOR ESPON. 1.25

TOTAL 1-.0

Page 3: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 3/17

3.06.00 ELIMINACION DE MATERIAL EXEDENTE CON E/UIPO M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

E%CAVACION   35.50 1.00 35.50

CORTE 3.68 1.00 3.68

RELLENO CON MATERIAL PROPIO   17.40 !1.00 !17.40

TOTAL 21.78

FACTOR ESPON. 1.25

TOTAL

2-.22

4.00.00 OBRAS DE CONCRETO SIMPLE

4.01.00  CONCRETO 110 30 P.G. CIMIENTO CORRIDO M2

LONITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CIMIENTOS

CORTE 1-1   19.23 0.6 0.7 8.08 1.00 8.08

CORTE 2-2   6.88 0.7 0.7 3.37 1.00 3.37

ESCALERA   1.00 0.55 0.8 0.44 1.00 0.44

TOTAL 11.*+

4.02.00  ALSO PISO MEZCLA 1* & CH( , #=4 M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PISOS

AREA   59.38 59.38 1.00 59.38

TOTAL %+.3*

4.03.00 SOLADO DE CONCRETO 112 CH #=0.10 m M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

ZAPATAS

ZAPATA -1   1.8 1 1.8 1.00 1.8

ZAPATA -2   1.20 1.20 1.44 8.00 11.52

ZAPATA-3   1.50 1.00 1.5 2.00 3

ZAPATA-4   0.60 0.60 0.36 2.00 0.72

TOTAL 1-.0

4.04.02 CONCRETO 567=10897m2 E=0.1%M EN U'AS M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDAS

VEREDAS   15.00 0.15 0.45 1.01 2.00 2.03

TOTAL 2.03

4.04.03 ENCORADO Y DESENCORADO U'AS M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDAS

VEREDAS   15.00 0.45 6.75 4.00 27.00

TOTAL 2-.00

Page 4: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 4/17

5.00.00 OBRAS DE CONCRETO ARMADO

5.02.01 CONCRETO 67=1-% 897m2 ZAPATAS M3

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

ZAPATA -1   1.8 1 0.5 0.90 1.00 0.9

ZAPATA -2   1.20 1.20 0.5 0.72 8.00 5.76

ZAPATA-3   1.50 1.00 0.5 0.75 2.00 1.5

ZAPATA-4   0.60 0.60 0.5 0.18 2.00 0.36

TOTAL *.%2

5.02.02 ACERO 6:=200 897m2 ; ZAPATAS 8G

LONGUITUD N" DE ELE#ENTOS FACTOR $G%# SUB TOTAL 1 N° VECES SUB TOTAL 2

ZAPATA 1   1.80 9.00 1.02 16.52 1.00 16.52

1.00 5.00 1.02 5.10 1.00 5.10

ZAPATA 2   1.20 6.00 1.02 7.34 8.00 58.75

ZAPATA 3   1.50 7.50 1.02 11.48 2.00 22.95

1.00 5.00 1.02 5.10 1.00 5.10

ZAPATA 4   0.60 3.00 1.02 1.84 2.00 3.67

TOTAL 112.10

Page 5: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 5/17

5.03.01 CONCRETO 7=1-% <97m2 SOBRECIMIENTO M3

LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CIMIENTOSCORTE 1-1   19.23 0.15 0.6 1.73 1.00 1.73

CORTE 2-2   6.88 0.15 0.6 0.62 1.00 0.62

TOTAL 2.3%

5.03.02 ENCORADO Y DESENCORADO SOBRECIMIENTO M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

CORTE 1-1   19.23 0.15 0.6 11.54 2.00 23.08

CORTE 2-2   6.88 0.15 0.6 4.13 2.00 8.26

TOTAL 31.33

5.03.03 ACERO 6:=200 897m2 ; SOBRECIMIENTO 8G

LONGUITUD N" DE ELE#ENTOS FACTOR $G%# SUB TOTAL 1 N° VECES SUB TOTAL 2

CORTE 1-1   19.23 6.00 0.56 64.61 1.00 64.61

1.45 96 0.25 34.85 1.00 34.85

CORTE 2-2   6.88 6.00 0.56 23.12 1.00 23.12

1.45 34 0.25 12.47 1.00 12.47

TOTAL 13%.0%

5.04.01 CONCRETO 7=210 <97m2 COLUMNAS M3

LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER & SE'UNDO PISO

C - 1   0.15 0.15 7.10 0.16 10.00 1.60

C - 2   0.30 0.15 7.10 0.32 2.00 0.64

C - 3   7.10

C - 4   0.60 0.15 7.10 0.64 3.00 1.92

C -   0.50 0.15 7.10 0.53 3.00 1.60

C - (   0.80 0.80 7.10 4.54 2.00 9.09

C - #   0.30 0.10 7.10 0.21 1.00 0.21 TERCER PISO

C - 1   0.25 0.25 2.80 0.18 3.00 0.53

C - 2   0.40 0.15 2.80 0.17 15.00 2.52

COLUMNETAS DEL SE'UNDO PISO   0.20 0.15 2.80 0.08 5.00 0.42

COLUMNETAS DEL TERCER PISO   0.20 0.15 2.80 0.08 5.00 0.42

TOTAL 1*.+

5.04.02 ENCORADO Y DESENCORADO COLUMNAS M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER & SE'UNDO PISO

C - 1   0.25 0.25 7.15 7.15 4.00 28.60

C - 2   0.40 0.15 7.15 5.72 17.00 97.24

C - 3

C - 4   0.30 0.15 4.00 2.40 8.00 19.20

C -   0.50 0.15 4.00 5.20 1.00 5.20

C - (   0.50 0.10 4.00 4.80 1.00 4.80

C - #   0.30 0.10 4.00 3.20 1.00 3.20

C - "   0.20 0.15 2.00 1.40 1.00 1.40

 TERCER PISO

C - 1  0.25 0.25 2.80 2.80 3.00 8.40

C - 2   0.40 0.15 2.80 2.24 15.00 33.60

COLUMNETAS DEL SE'UNDO PISO   0.20 0.15 2.80 1.12 5.00 5.60

COLUMNETAS DEL TERCER PISO   0.20 0.15 2.80 1.12 5.00 5.60

TOTAL 212.*

Page 6: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 6/17

5.04.03 ACERO 6:=200 897m2 COLUMNAS 8G

LONGITUD N° DE ELE#ENTOS $G SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER & SE'UNDO PISO

C - 1   8.25 4.00 1.55 51.15 4.00 204.60

ESTRIVO   0.95 56.00 0.56 29.79 4.00 119.17

C - 2   8.25 6.00 1.02 50.49 17.00 858.33

ESTRIVO   1.05 56.00 0.56 32.93 17.00 559.78

C - 3   5.10 4.00 1.02 20.81 2.00 41.62

ESTRIVO  0.85 38.00 0.25 8.08 2.00 16.15

C - 4   5.10 4.00 0.56 11.42 8.00 91.39

ESTRIVO   0.85 38.00 0.25 8.08 8.00 64.60

C -   5.10 6.00 1.02 31.21 1.00 31.21

ESTRIVO   1.15 38.00 0.25 10.93 1.00 10.93

C - (   5.10 6.00 1.02 31.21 1.00 31.21

ESTRIVO   1.05 38.00 0.25 9.98 1.00 9.98

C - #   5.10 4.00 0.56 11.42 1.00 11.42

ESTRIVO   0.75 38.00 0.25 7.13 1.00 7.13

C - "   3.10 4.00 0.56 6.94 1.00 6.94

ESTRIVO   0.65 38.00 0.25 6.18 1.00 6.18

PRIMER & SE'UNDO PISO   0.00

C - 1   4.00 4.00 1.55 24.80 3.00 74.40

ESTRIVO   0.95 28.00 0.56 14.90 3.00 44.69

C - 2   4.00 6.00 1.02 24.48 15.00 367.20

ESTRIVO   1.05 28.00 0.56 16.46 15.00 246.96

COLUMNETA DEL 2 PISO   3.10 4.00 0.56 6.94 5.00 34.72

ESTRIVO   0.65 23.00 0.25 3.74 5.00 18.69

COLUMNETA DEL 3 PISO   3.10 4.00 0.56 6.94 5.00 34.72

ESTRIVO   0.65 23.00 0.25 3.74 5.00 18.69

TOTAL 2+10.)+

5.05.01 CONCRETO 7=210 <97m2 ; VIGAS M3

 

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO & SE'UNDO PISO

V-1!1)2!1   3.70 0.25 0.25 0.23 2.00 0.46

V-1!2)2!2   26.77 0.15 0.40 1.61 2.00 3.21

V-1!3)2!3   5.00 0.25 0.20 0.25 2.00 0.50

V-1!4)2!4   14.05 0.25 0.20 0.70 2.00 1.41

V-1!)2!   18.02 0.15 0.30 0.81 2.00 1.62

V-1!()2!(   15.75 0.20 0.20 0.63 2.00 1.26

V-1!#)2!#   12.45 0.15 0.20 0.37 2.00 0.75

V-1!"   16.75 0.15 0.25 0.63 1.00 0.63

V-1!9   1.60 0.10 0.25 0.04 1.00 0.04

PRIMER TERCER PISO

V-3!1   3.70 0.25 0.25 0.23 1.00 0.23

V-3!2   22.95 0.15 0.40 1.38 1.00 1.38

V-3!3   2.20 0.25 0.20 0.11 1.00 0.11

V-3!4   11.55 0.25 0.20 0.58 1.00 0.58

V-3!   16.62 0.15 0.30 0.75 1.00 0.75

V-3!(   11.36 0.20 0.20 0.45 1.00 0.45

V-3!#   8.40 0.15 0.20 0.25 1.00 0.25

TOTAL 13.)3

Page 7: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 7/17

5.05.02 ENCORADO Y DESENCORADO VIGAS M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO & SE'UNDO PISO

V-1!1)2!1   3.70 0.25 0.25 2.78 2.00 5.55

V-1!2)2!2   26.77 0.15 0.40 25.43 2.00 50.86

V-1!3)2!3   5.00 0.25 0.20 3.25 2.00 6.50

V-1!4)2!4   14.05 0.25 0.20 9.13 2.00 18.27

V-1!)2!   18.02 0.15 0.30 8.1 2.00 16.22

V-1!()2!(   15.75 0.20 0.20 6.30 2.00 12.60

V-1!#)2!#   12.45 0.15 0.20 4.36 2.00 8.72

V-1!"  16.75 0.15 0.25 10.89 1.00 10.89

V-1!9   1.60 0.10 0.25 0.96 1.00 0.96

PRIMER TERCER PISO   0.00 0.00

V-3!1   3.70 0.25 0.25 2.78 1.00 2.78

V-3!2   22.95 0.15 0.40 12.6 1.00 12.62

V-3!3   2.20 0.25 0.20 0.88 1.00 0.88

V-3!4   11.55 0.25 0.20 5.20 1.00 5.20

V-3!   16.62 0.15 0.30 7.48 1.00 7.48

V-3!(   11.36 0.20 0.20 6.82 1.00 6.82

V-3!#   8.40 0.15 0.20 4.62 1.00 4.62

TOTAL 1-0.+%

5.05.03 ACERO 6:=200 897m2 ; VIGAS 8G

LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER & SE'UNDO PISO

V-1!1   4.30 4.00 1.55 26.66 2.00 53.32

ESTRIVOS   0.83 30 0.56 13.99 2.00 27.98

V-1!2   29.16 4.00 1.02 118.97 2.00 237.95

ESTRIVOS   1.15 204 0.56 131.45 2.00 262.91

V-1!3   5.60 6.00 1.02 34.27 2.00 68.54

ESTRIVOS   0.85 39 0.56 18.66 2.00 37.32

V-1!4   15.25 5.00 1.02 77.78 2.00 155.55

ESTRIVOS   0.85 107 0.56 50.81 2.00 101.63

V-1!   19.22 4.00 1.02 78.42 2.00 156.84

ESTRIVOS   1.05 135 0.25 35.32 2.00 70.63

V-1!(   17.55 4.00 1.02 71.60 2.00 143.21

ESTRIVOS   0.95 123 0.56 65.36 2.00 130.71

V-1!#   13.65 4.00 0.56 30.58 2.00 61.15

ESTRIVOS   0.65 96 0.25 15.53 2.00 31.05

V-1!"   18.55 4.00 1.02 75.68 1.00 75.68

ESTRIVOS   0.75 130 0.25 24.35 1.00 24.35

V-1!9   2.20 4.00 1.02 8.98 1.00 8.98

ESTRIVOS   0.65 15 0.25 2.50 1.00 2.50

 TERCER PISO

V-3!1   4.30 4.00 1.55 26.66 1.00 26.66

ESTRIVOS   0.83 30 0.56 13.99 1.00 13.99

V-3!2   25.35 4.00 1.02 103.43 1.00 103.43

ESTRIVOS   1.15 177 0.56 114.28 1.00 114.28

V-3!3   3.40 6.00 1.02 20.81 1.00 20.81

ESTRIVOS   0.85 24 0.56 11.33 1.00 11.33

V-3!4   12.15 5.00 1.02 61.97 1.00 61.97

ESTRIVOS   0.85 85 0.56 40.48 1.00 40.48

V-3!   18.42 4.00 1.02 75.15 1.00 75.15

ESTRIVOS   1.05 129 0.25 33.85 1.00 33.85

V-3!(   13.13 4.00 1.02 53.57 1.00 53.57

ESTRIVOS   0.85 92 0.56 43.75 1.00 43.75

V-3!#   9.00 4.00 0.56 20.16 1.00 20.16

ESTRIVOS   0.65 63 0.25 10.24 1.00 10.24

TOTAL 22-+.+)

5.06.01 CONCRETO EN LOSAS ALIGERADAS 6C=2108GCM2 M3

 AREA #3%#2 SUB TOTAL 1 N° VECES SUB TOTAL 2

1 & 2 * NIVEL   120.10 0.0875 10.51 2.00 21.02

3* NIVEL   25.50 0.0875 2.23 1.00 2.23

TOTAL 23.2%

5.06.02 ENCORADO Y DESENCORADO LOSA ALIGERADA M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1 & 2 * NIVEL   120.10 120.10 2.00 240.20

3* NIVEL   25.50 25.50 1.00 25.50

TOTAL 2)%.-0

5.06.03 ACERO 6:=200 897m2 ; VIGUETAS LOSA ALIGERADA 8G

LONGITUD N" DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER & SEUNDO PISO

A+er, ,s/v,   0.85 3 1.02 2.17 2 4.34

A+er, 0ea/v,   1.5 3 1.02 4.59 2 9.18

A+er, Teera/ra   1.00 3 0.25 0.85 2.00 1.70

A+er, ,s/v,   6.74 18 1.02 120.31 2 240.62

A+er, 0ea/v,   4.2 12 1.02 51.41 2 102.82

A+er, Teera/ra   7.00 27 0.25 47.18 2.00 94.36

A+er, ,s/v,   0.87 5 1.02 4.22 2 8.43

A+er, 0ea/v,   1.07 5 1.02 5.18 2 10.37

A+er, Teera/ra   1.90 3 0.25 1.65 2.00 3.31

A+er, ,s/v,   3.91 5 1.02 20.44 2 40.88

A+er, 0ea/v,   2.1 5 1.02 10.98 2 21.96

A+er, Teera/ra   2.05 16 0.25 8.02 2.00 16.03

A+er, ,s/v,   3.8 14 1.02 53.39 2 106.78

A+er, 0ea/v,   3.44 14 1.02 48.33 2 96.67

A+er, Teera/ra   5.51 15 0.25 20.94 2.00 41.88

Page 8: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 8/17

 TERCER PISO

A+er, ,s/v,   0.85 3 1.02 2.17 1 2.17

A+er, 0ea/v,   1.5 3 1.02 4.59 1 4.59

A+er, Teera/ra   1.00 3 0.25 0.85 1.00 0.85

A+er, ,s/v,   5.4 6 1.02 32.36 1 32.36

A+er, 0ea/v,   3.45 6 1.02 21.11 1 21.11

A+er, Teera/ra   2.35 22 0.25 12.69 1.00 12.69

A+er, ,s/v,   5.4 7 1.02 37.18 1 37.18

A+er, 0ea/v,   4.11 7 1.02 28.30 1 28.30

A+er, Teera/ra   2.70 22 0.25 14.58 1.00 14.58

A+er, ,s/v,   3.95 5 1.02 20.65 1 20.65

A+er, 0ea/v,   2.1 5 1.02 10.98 1 10.98

A+er, Teera/ra   2.05 16 0.25 8.10 1.00 8.10

A+er, ,s/v,   6.74 5 1.02 36.95 1 36.95

A+er, 0ea/v,   4.2 12 1.02 51.41 1 51.41

A+er, Teera/ra   2.15 27 0.25 14.49 1.00 14.49

A+er, ,s/v,   3.8 6 1.02 23.26 1 23.26

A+er, 0ea/v,   3.44 6 1.02 21.05 1 21.05

A+er, Teera/ra   2.40 15 0.25 9.12 1.00 9.12

TOTAL 11+.1

Page 9: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 9/17

5.06.04 COLOCACION DE LADRILLO DE TECHO 30X1%X30 UND

 AREA LADRILL%#2 SUB TOTAL 1 N° VECES SUB TOTAL 2

AREA TOTAL   145.60 8.33 1212.85 1.00 1212.85

TOTAL 1212.*%

5.07.01 CONCRETO 6C= 1-% 8GCM2 LOSA DE ARMADA M3

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

LOSA   6.70 0.60 0.10 0.40 1.00 0.40

1.50 1.00 0.10 0.15 1.00 0.15

0.95 0.65 0.10 0.06 1.00 0.06

CISTERNA   2.05 2.05 0.10 0.42 1.00 0.42

TOTAL 1.03

5.07.02 ENCORADO Y DESENCORADO LOSA DE ARMADA M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

LOSA DE C   6.70 0.60 4.02 1.00 4.02

1.50 1.00 1.50 1.00 1.50

0.95 0.65 0.62 1.00 0.62

CISTERNA   2.05 2.05 4.20 1.00 4.20

TOTAL 10.3

5.07.03 ACERO 6Y= 200 8GCM2 LOSA DE ARMADA 8G

LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2

9.15 15 0.56 76.86 1.00 76.86

2.25 61 0.56 76.86 1.00 76.86

1.80 12 0.56 12.10 2.00 24.19

TOTAL 1--.+1

5.07.01 CONCRETO 7=210 <97m2 ; ESCALERA M3

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1er Tra,   0.56 1.00 0.56 1.00 0.56

2" Tra,   0.39 1.00 0.39 3.00 1.17

4# TRAMO   0.50 1.00 0.50 2.00 1.00

3(9 Tra,   0.48 1.00 0.48 3.00 1.44

TOTAL .1-

5.07.02 ENCORADO Y DESENCORADO ESCALERA M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1er Tra,   1.90 1.00 1.90 1.00 1.90

2" Tra,   2.31 1.000 2.31 3.00 6.93

4# TRAMO   2.50 1.00 2.50 2.00 5.00

3(9 Tra,   2.27 1.000 2.27 3.00 6.81

1.93 1.93 1.00 1.93

0.18 0.18 52.00 9.10

TOTAL 31.)-

5.07.03 ACERO 6:=200 897m2 ; ESCALERA 8G

LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2

1er Tra,   3.58 5 0.56 10.02 2 20.05

1 18 0.56 10.08 2 20.16

2" Tra,   2.86 5 0.56 8.01 6 48.05

1 15 0.56 8.40 6 50.40

4# TRAMO   3.23 5 0.56 9.04 4 36.18

1.00 17 0.56 9.52 4 38.08

3(9 Tra,   3.03 5 0.56 8.48 6 50.90

1.00 17 0.56 9.52 6 57.12

TOTAL 320.+

Page 10: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 10/17

6.00.00 MUROS DE ALBAÑILERIA

6.01.00 MUROS DE LADRILLLO DE ARCILLA 88 DE SOGA M".C". &1( M2

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO

MUROS 37.68 2.9 109.27 1.00 109.27

SE'UNDO PISO

MUROS 50.93 2.7 137.51 1.00 137.51

 TERCER PISO

MUROS 32.64 2.7 88.13 1.00 88.13

PARAPETOS   0.90 0.00 1.00 0.00

CISTERNA 8.20 2.00 16.40 1.00 16.40

VANOS

VENTANAS

M1   2.05 2.50 5.13 !1.00 !5.13

M3   3.20 2.50 8.00 !3.00 !24.00

M4   3.05 2.50 7.63 !1.00 !7.63

M   2.30 2.50 5.75 !1.00 !5.75

M"   2.95 2.50 7.38 !1.00 !7.38

V1   2.15 1.40 3.01 !1.00 !3.01

V2   0.90 1.40 1.26 !1.00 !1.26

V3   2.65 1.40 3.71 !1.00 !3.71

V4   2.20 1.40 3.08 !2.00 !6.16

V   2.20 1.40 3.08 !2.00 !6.16

V(   0.45 1.40 0.63 !1.00 !0.63

V#   1.70 1.40 2.38 !1.00 !2.38

V9   3.05 1.40 4.27 !1.00 !4.27

PUERTAS

P1   1.00 2.50 2.50 !1.00 !2.50

P2   3.00 2.50 7.50 !1.00 !7.50

P3   0.90 2.10 1.89 !6.00 !11.34

P4   0.80 2.10 1.68 !4.00 !6.72

P

P(TOTAL 2%.-+

7.00.00 REVOQUES Y ENLUCIDOS

7.01.00 TARRAJEO RAYADO PRIMARIO, M". 1 #=1.% 7m. M2

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

S.S.$$ PRIMER PISO (.1   1.55 9.46 1.00 9.46

COCINA #.   1.55 11.70 1.00 11.70

S.S.$$ SE'UNDO PISO5 sa de d,s 6a7,s8 12.9   2.1 27.09 1.00 27.09

S.S.$$ TERCER PISO .1   2.1 10.82 1.00 10.82

LAVANDERIA 2.3   2.1 4.83 1.00 4.83

CONTRAZOCALOS 22(.3"   0.1 22.64 1.00 22.64

TOTAL *).%3

7.02.00 TARRAJEO EN SUPERICIES INTERIORES Y EXTERIORES , M". 1 #=1.% 7m. M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISOEE A ) EE D   10.15 2.5 25.38 1.00 25.38

EE :;   2.7 2.5 6.75 1.00 6.75

EE :   0.5 2.5 1.25 1.00 1.25

ENTRE EE :-EE C;   2.3 1.72 3.96 1.00 3.96

EE C;   1.9 2.5 4.75 1.00 4.75

EE C   2.05 1.86 3.81 1.00 3.81

EE D   4 2.5 10.00 1.00 10.00

EE 1   4.5 2.5 11.25 1.00 11.25

EE 1;   1 2.5 2.50 1.00 2.50

EE 2  6.96 2.5 17.40 1.00 17.40

EE 3   5.43 2.5 13.58 1.00 13.58

EE 3;   0.3 2.5 0.75 1.00 0.75

EE 4   2.65 2.5 6.63 1.00 6.63

EE 4;   2.3 2.5 5.75 1.00 5.75

SEGUNDO PISO

EE A   8.65 2.6 22.49 1.00 22.49

ENTRE EE A; - EE :;   2.95 2.6 7.67 1.00 7.67

EE :;   3.35 2.6 8.71 1.00 8.71

ENTRE EE :;-EE :   1.5 2.6 3.90 1.00 3.90

EE C   3.05 2.6 7.93 1.00 7.93

EE D;   8.15 2.6 21.19 1.00 21.19

EE 1;;   4.04 2.6 10.50 1.00 10.50

EE 2   3.9 2.6 10.14 1.00 10.14

ENTRE EE 2 - EE 3   2.9 2.6 7.54 1.00 7.54

2.93 2.6 7.62 1.00 7.62

EE 3   2.55 2.6 6.63 1.00 6.63

EE 3;   1.34 2.6 3.48 1.00 3.48

ENTRE EE 3; - EE 4   2.03 2.6 5.28 1.00 5.28

  EE 4;   3.75 2.6 9.75 1.00 9.75

  EE   4.34 2.6 11.28 1.00 11.28

TERCER PISO

EE A   8.65 2.6 22.49 1.00 22.49

EE A; 0.94 2.6 2.44 1.00 2.44

EE :;   3.35 2.6 8.71 1.00 8.71

ENTRE EE A -EE :;   2.35 2.6 6.11 1.00 6.11

EE :;   3.7 2.6 9.62 1.00 9.62

ENTRE EE : - EE C;   3.35 2.6 8.71 1.00 8.71

EE C   2.15 2.6 5.59 1.00 5.59

EE D;   8.25 2.2 18.15 1.00 18.15

EE 1;;   4.04 2.6 10.50 1.00 10.50

EE 2   3.9 2.6 10.14 1.00 10.14

ENTRE EE 2 - EE 3   4.54 2.6 11.80 1.00 11.80

EE 3;   7.78 2.6 20.23 1.00 20.23

EE 4   4 2.6 10.40 1.00 10.40

  EE   4.34 2.2 9.55 1.00 9.55

VANOS

Page 11: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 11/17

MANPARAS

M1   3.65 2.60 9.49 !2.00 !18.98

M4   1.90 2.60 4.94 !1.00 !4.94

VENTANAS

V   1.90 1.50 2.85 !1.00 !2.85

V(   1.60 2.00 3.20 !1.00 !3.20

V11   1.15 1.50 1.73 !4.00 !6.90

V13   0.80 0.50 0.40 !12.00 !4.80

V1   0.43 0.50 0.22 !1.00 !0.22

PUERTAS

P3   1.20 2.10 2.52 !1.00 !2.52

P   1.00 2.60 2.60 !1.00 !2.60

P(   0.90 2.60 2.34 !3.00 !7.02

P#   0.90 2.10 1.89 !1.00 !1.89

P"   0.85 2.60 2.21 !3.00 !6.63

P9   0.80 2.60 2.08 !1.00 !2.08

P1!   0.70 2.60 1.82 !1.00 !1.82

P11   0.65 2.60 1.69 0.70 1.18

 TARRAEO PRIMARIO 86.53 1.00 86.53

COLUMNAS   133.95 1.00 133.95

TOTAL 220.*

7.02.00 TARRAJEO EN SUPERICIES DE VIAS Y COLUMNAS , M". 1 #=1.% 7m. M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

COLUMNAS 212.84 212.84 1.00 212.84

VI'AS   170.95 170.95 1.00 170.95

TOTAL 3*3.-+

7.03.00 DERRAME DE VANOS, M". 1 #=1.% 7m. ML

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VENTANAS

V   1.90 1.50 2.85 !1.00 !2.85

V(   1.60 2.00 3.20 !1.00 !3.20

V11   1.15 1.50 1.73 !4.00 !6.90

V13   0.80 0.50 0.40 !12.00 !4.80

V1   0.43 0.50 0.22 !1.00 !0.22

PUERTAS

P3   1.20 2.10 2.52 !1.00 !2.52

P   1.00 2.60 2.60 !1.00 !2.60

P(   0.90 2.60 2.34 !3.00 !7.02

P#   0.90 2.10 1.89 !1.00 !1.89

P"   0.85 2.60 2.21 !3.00 !6.63

P9   0.80 2.60 2.08 !1.00 !2.08

P1!   0.70 2.60 1.82 !1.00 !1.82

P11   0.65 2.60 1.69 0.70 1.18

TOTAL ;1.3

8.00.00 PISO Y CONTRAPISOS

8.01.00 CONTRAPISO C". 1% #=2.% 7m M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO   59.38 59.38 1.00 59.38

SEUNDO PISO   72.97 72.97 1.00 72.97

 TERCER PISO   33.29 33.29 1.00 33.29

TOTAL 1)%.)

8.03.00 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO COLOR 30 30 7m 1ERA.> 1 M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

AREA DE PISOS   120.95 120.95 1.00 120.95

TOTAL 120.+%

8.03.00 PISO PORCELANATO ANTIDESLIZANTE COLOR %0 %0 7m 1ERA.> 1 M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

AREA DE PISOS   44.69 44.69 1.00 44.69

TOTAL .)+

8.03.00 PISO DE CEMENTO PULIDO E=2.% CM M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

AREA DE AZOTEA & TENDAL   35.72 35.72 1.00 35.72

TOTAL 3%.-2

Page 12: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 12/17

8.03.00 PISO DE BLO/UETA X10X20 CM M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

VEREDA 9.50 9.50 1.00 9.50

TOTAL +.%0

.00.00 !OCALOS Y CONTRA!OCALOS

.01.00 CONTRAZOCALO CERAMICO H=0.10M ML

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO   202.19 202.19 1.00 202.19

TOTAL 202.1+

.01.00 CONTRAZOCALO PORCELANATO H=0.10M ML

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

PRIMER PISO   24.19 24.19 1.00 24.19

TOTAL 2.1+

0.02.00 ZOCALO CERAMICO DE 20X207m 1ERA.> 1 M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

 TARRAEO PRIMARIO 63.89 63.89 1.00 63.89

TOTAL )3.*+

10.00.00 REVESTIMIENTOS

10.01.00 PROTECCION CRODOPLAST ML

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

20.00 1.00 20.00

TOTAL 20.00

10.02.00 CIELORASO CON YESO M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

265.70 1.00 265.70

TOTAL 2)%.-0

10.03.00 IMPERMEABILIZANTE PTECHOS 12,# = 0.02m M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

 TEC$OS 68.53 1.00 68.53

CISTERNA   9.73 1.00 9.73

TOTAL -*.2)

11.00.00 CARPINTERIA DE MADERA

11.01.00 SUMINISTRO E INSTALACION PUERTAS DE MADERA CONTRAPLACADA INC. ACCES. Y PINTURA M2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

P1   1.00 2.10 2.10 1.00 2.1

P2   5.00 2.40 12.00 1.00 12

P3   1.00 2.60 2.60 1.00 2.6

P4   0.90 2.10 1.89 9.00 17.01

P   0.90 2.10 1.89 1.00 1.89

P(   0.70 2.10 1.47 5.00 7.35

TOTAL 2.+%

Page 13: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 13/17

12.00.00 CERRA"ERIA

12.01.00 COLOCACION DE CERRADURA PUERTA EXTERIOR 2 GOLPES UND

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

12.02.00 COLOCACION DE CERRADURA PUERTA INTERIOR PERILLA UNA LLAVE BOTON UND

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

17.00 1.00 17.00

12.03.00 CCOLOCACION DE BISAGRA A" CAPUCHINA 34 UND

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

54.00 1.00 54.00

13.00.00 CARPINTERIA METALICA Y ALUMINIO

13.01.00 SUMINISTRO E INSTALACION VENTANAS DE ALUMINIO INC. ACCES. PINTURA ANTICORROSIVO M2

LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

V1   2.00 1.70 3.40 1.00 3.40

V2   1.00 3.60 3.60 1.00 3.60

V3   1.00 3.60 3.60 1.00 3.60

V4   1.50 1.60 2.40 5.00 12.00

V   1.90 1.60 3.04 2.00 6.08

V(   0.85 1.60 1.36 1.00 1.36

V#   0.80 0.50 0.40 4.00 1.60

V"   0.80 0.50 0.40 1.00 0.40

V9   1.50 1.10 1.65 1.00 1.65

V1!   0.40 0.40 0.16 5.00 0.80

3.+

13.02.00 SUMINISTRO E INSTALACION DE MAMPARA DE ALUMINIO M2

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

M1   3.85 2.60 10.01 1.00 10.01

M2   2.00 2.60 5.20 3.00 15.60

TOTAL 2%.)1

13.03.00 SUMINISTRO E INSTALACION DE TUBO CROMADO DE 24 E=1.%MM ML

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

35.96 35.96 2.00 71.92

1.00 1.00 18.00 18.00

TOTAL *+.+2

14.00.00 VIDRIOS#CRISTALES Y SIMILARES

14.01.00 VIDRIO TEMPLADO GRIS, PROVISION Y COLOCACION P2

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

V1   2.00 1.70 3.40 1.00 3.40

V2   1.00 3.60 3.60 1.00 3.60

V3   1.00 3.60 3.60 1.00 3.60

V4   1.50 1.60 2.40 5.00 12.00

V   1.90 1.60 3.04 2.00 6.08

V(   0.85 1.60 1.36 1.00 1.36

V#   0.80 0.50 0.40 4.00 1.60

V"   0.80 0.50 0.40 1.00 0.40

V9   1.50 1.10 1.65 1.00 1.65

V1!   0.40 0.40 0.16 5.00 0.80

M1   3.85 2.60 10.01 1.00 10.01

M2   2.00 2.60 5.20 3.00 15.60

TOTAL )-.3

15.00.00 PINTURA LATE$ 2 MANOS EN CIELORRASO# MUROS#VIGAS Y COLUMNAS

15.01.00 APLICACI?N DE PINTURA LATEX DEL TIPO DECORATIVO EN CIELORRASO &LIMPIEZA, LIJADO Y RASPADO( CBASE IMPRIMANTE M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

265.70 265.70 1.00 265.7

TOTAL 2)%.-0

Page 14: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 14/17

Page 15: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 15/17

18.07.02 SUMIDERO DE B! 24 UND

UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

5.00 1.00 5.00

TOTAL %.00

18.07.03 CONEXI?N PARA RED DE DESAGUE, INC. ACCESORIOS UND

UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

TOTAL 1.00

18.08.00 SISTEMA DE AGUA RIA

18.08.01 SALIDA DE AGUA RIA PVC PTO

UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

18.00 1.00 18.00

TOTAL 1*.00

18.0.00 LLAVES Y VALVULAS

18.0.01 VALVULA CHEC8 B! 124 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

2.00 1.00 2.00

TOTAL 2.00

18.0.02 VALVULA CHEC8 B! 14 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

2.00 1.00 2.00

TOTAL 2.00

18.0.03 VALVULA COMPUERTA B! 124 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

7.00 1.00 7.00

TOTAL -.00

18.0.04 VALVULA COMPUERTA B! 34 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

4.00 1.00 4.00

TOTAL .00

18.0.05 VALVULA COMPUERTA B! 14 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

4.00 1.00 4.00

TOTAL .00

18.10.00 ACCESORIOS

18.10.01 TAN/UE ELEVADO DE POLIETILENO 1100 LTS INC. ACCESORIOS UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

TOTAL 1.00

18.10.02 CISTERNA DE POLIETILENO INCY ACCESORIOS UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

TOTAL 1.00

18.10.03 CODO DE .G. @ 124 ; +0 UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

18.00 1.00 18.00

TOTAL 1*.00

18.10.04 CONEXION E INSTALACION DE RED DE AGUA INC.MEDIDOR UND

LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

TOTAL 1.00

1.00.00 INSTALACIONES ELECTRICAS

1.01.00 SALIDA O CENTRO DE LUZ PTO

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

35.00 35.00 1.00 35.00

TOTAL 3%.00

1.02.00 ARTEACTO LUOR. CREJILLA ALUMINIO 2X0 ATTS UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

12.00 12.00 1.00 12.00

TOTAL 12.00

1.03.00 ARTEACTOS ELEC.TCON PANTALLA ACRIL CIRCULAR 1 3) UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

14.00 14.00 1.00 14.00

TOTAL 1.00

Page 16: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 16/17

1.04.00 ARTEACTOS ELEC.SPOT LIGHT UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

9.00 9.00 1.00 9.00

TOTAL +.00

1.05.00 INTERRUPTOR,SIMPLE 1)A,2%0, )0H

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

20.00 20.00 1.00 20.00

TOTAL 20.00

1.06.00 INTERRUPTOR,DOBLE 1)A,2%0, )0H UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

2.00 2.00 1.00 2.00

TOTAL 2.00

1.06.00 INTERRUPTOR,TRIPLE 1)A,2%0, )0H UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00 1.00

TOTAL 1.00

1.08.00 TOMACORRI#NTE BIPOLAR,DOBLE,PBA/UELITA, 1%A, 220V UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

35.00 35.00 1.00 35.00

TOTAL 3%.00

1.0.00  TABLERO GENERAL &TG( UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00 1.00

TOTAL 1.00

1.0.00 SUB TABLERO TERMOMANGNETICO&TD1( UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

3.00 3.00 1.00 3.00

TOTAL 3.00

1.10.00 POZO A TIERRA ; INCLUYE CAJA CON TAPA, DE CONCRETO UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

1.00 1.00 1.00

TOTAL 1.00

Page 17: Metrados William

7/18/2019 Metrados William

http://slidepdf.com/reader/full/metrados-william 17/17

1.11.00 RED DATA

1.11.02 SALIDA PARA TELEONO E INTERCOMUNICADORES 7PLACA DE ALUMINIO UND

PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

7.00 1.00 7.00

TOTAL -.00

20.00.00 OTROS

20.01.00 CAJA DE MADERA 1%2% CM VALVULA UND

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

11.00 1.00 11.00

TOTAL 11.00

20.02.00 BAJADA DE EVACUACION PLUVIAL CON TUBERIA DE 34 PTO

LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

4.00 1.00 4.00

TOTAL .00

20.03.00 LIMPIEZA GENERAL DE OBRA M2

 AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2

200.00 1.00 200.00

TOTAL 200.00