PARTIDAS UND PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL ALBAÑILERIA Muros KING BLOCK E=0.12m m2 468.51 468.51 0.00 937.02 Muro de 15 cm ladrillo kk 18 huecos m2 448.78 448.78 379.49 1,277.05 Muro de 20 cm ladrillo kk 18 huecos m2 0.00 0.00 43.45 43.45 Muro de 25 cm ladrillo kk 18 huecos m2 379.54 379.54 96.40 855.48 TARRAJEOS Y DERRAMES PLACAS m2 440.39 440.39 219.04 1,099.82 COLUMNAS m2 45.14 45.14 47.58 137.86 MUROS m2 3,051.65 3,051.65 796.93 6,900.23 VIGAS m2 458.49 458.49 127.96 1,044.94 ACARREO DE ALBAÑILERIA m2 1,296.83 1,296.83 519.34 3,113.00 DERRAMES ml 424.90 424.90 187.05 1,036.85 COLUMNETAS CONCRETO m3 21.39 21.39 2.14 44.92 ENCOFRADO kg 321.93 321.93 32.19 676.05 ACERO m2 3,233.50 3,233.50 323.35 6,790.35 CURADO m2 321.93 321.93 32.19 676.05 VIGAS DE AMARRE CONCRETO m3 14.11 14.11 1.41 29.62 ENCOFRADO kg 146.19 146.19 14.62 306.99 ACERO m2 1,416.02 1,416.02 141.60 2,973.64 CURADO m2 146.19 146.19 14.62 306.99

description

aaa

Transcript of Resumen de Metradoss

Page 1: Resumen de Metradoss

PARTIDAS UND PRIMER PISO SEGUNDO PISO TERCER PISO TOTAL

ALBAÑILERIA

Muros KING BLOCK E=0.12m m2 468.51 468.51 0.00 937.02

Muro de 15 cm ladrillo kk 18 huecos m2 448.78 448.78 379.49 1,277.05

Muro de 20 cm ladrillo kk 18 huecos m2 0.00 0.00 43.45 43.45

Muro de 25 cm ladrillo kk 18 huecos m2 379.54 379.54 96.40 855.48

TARRAJEOS Y DERRAMES

PLACAS m2 440.39 440.39 219.04 1,099.82

COLUMNAS m2 45.14 45.14 47.58 137.86

MUROS m2 3,051.65 3,051.65 796.93 6,900.23

VIGAS m2 458.49 458.49 127.96 1,044.94

ACARREO DE ALBAÑILERIA m2 1,296.83 1,296.83 519.34 3,113.00

DERRAMES ml 424.90 424.90 187.05 1,036.85

COLUMNETAS

CONCRETO m3 21.39 21.39 2.14 44.92

ENCOFRADO kg 321.93 321.93 32.19 676.05

ACERO m2 3,233.50 3,233.50 323.35 6,790.35

CURADO m2 321.93 321.93 32.19 676.05

VIGAS DE AMARRE

CONCRETO m3 14.11 14.11 1.41 29.62

ENCOFRADO kg 146.19 146.19 14.62 306.99

ACERO m2 1,416.02 1,416.02 141.60 2,973.64

CURADO m2 146.19 146.19 14.62 306.99