    TAKING OFF LIST:1. SITE CLEARANCE m

    2. EXCAVATETOP SOIL m

    3. TURFING AND SEEDING m

    4. PLANTING No

    5. MULCHING (IF ANY) No

    6. STAKING (IF ANY) No

    7. MAINTENANCE ITEM

  • 7/31/2019 Soft Landscape BQs

    2/8

    NO. DESCRIPTION UNIT QTY RATE

    (RM)

    AMOUNT

    (RM)

    A.

    B.

    LANDSCAPE

    SOFT LANDSCAPE

    Site Clearance

    To remove existing trees to contractor owns

    dump and S.O.s approval.

    Close Turfing

    Close turfing (as specified) on level surfaces

    including 50 mm thick bed of black earth as

    specified.

    Planting of the following palms including excavationplanting holes, filling, watering, weeding, support and

    protection

    No

    M

    2

    394

    500.00

    2.50

    1000.00

    985.00

  • 7/31/2019 Soft Landscape BQs

    3/8

    NO. DESCRIPTION UNIT QTY RATE

    (RM)

    AMOUNT

    (RM)

    C.

    D.

    E.

    F.

    G.

    Ravenela madagascariensis (Travellers Palm)

    with trunk height 1800 mm, excavate 1000

    mm x 1000 mm x 1000 mm deep as plantingholes, backfilling with selected top soil and

    well rotted chicken manure in 3:1 ratio by

    volume around plant root in 225 mm thick

    layer, watering each layer until settled including

    all necessary tamping.

    Roystonea regia (Royal Palm) ditto.

    Neodypsis decaryii(Triangle Palm) ditto.

    Ptychosperma macarthuri (Macarthur palm)

    ditto.

    Mulching

    25 mm thick mulching to all around the palms

    and other necessary work.

    No.

    No.

    No.

    No.

    No.

    11

    6

    4

    7

    28

    600.00

    500.00

    700.00

    650.00

    3.50

    6600.00

    3000.00

    2800.00

    4550.00

    98.00

  • 7/31/2019 Soft Landscape BQs

    4/8

    NO. DESCRIPTION UNIT QTY RATE

    (RM)

    AMOUNT

    (RM)

    H.

    I.

    Staking and guying

    Staking and guying from tumbuckles withdouble strand 10 bed wire bed to anchor or

    beedman to support palms.

    Maintenance

    In addition to the Contractor' s obligation

    during the defects liability, the Contractorshall allow here for maintaining all plantings

    for period of 6 months from the date of

    practical completion of the works including

    watering, cultivating, fertilizing, weeding

    pruning, wound dressing, disease and pest

    control and prevention, protective spraying,

    replacement of unacceptable materials,straightening of plants, moving of plants

    and any other procedures necessary to

    ensure vigorous and healthy growth of all

    plants and other operations directed by the

    Landscape Architect.

    No.

    Item

    28 15.00 420.00

    5000.00

  • 7/31/2019 Soft Landscape BQs

    5/8

    NO. DESCRIPTION UNIT QTY RATE

    (RM)

    AMOUN

    T

    (RM)

    The Contractor is to notify the Employeron any existing plants that have died and

    unhealthy plants before proceeding with the

    maintenance work otherwise are to be

    replaced at his own cost. If such plants are

    found during the maintenance inspection by

    Landscape Architect.

    During the maintenance period, the

    Contractor will require to replace any dying

    or vandalized plants to the original sizes and

    true to types at his own cost and it is the

    Contractor's responsibility for the safe

    custody of all trees shrubs and plants, etc

    until it is handed over to the employer after

    the maintenance period expires.

    Total To Collection 24453.00

  • 7/31/2019 Soft Landscape BQs

    6/8

    PLANT TABLE

    BIL PLANT NAME COMMON NAME TRUNKHEIGHT

    CROWN

    (m)UNIT RATE

    (RM)

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.14.

    15.

    TREE

    Samanea saman

    Filicium Decipeins

    Fixus Roxburgii

    Cinnamomun Iners

    Delonix Regia

    PALM

    Roystonea Olerace

    Livistonia Chinensis

    Ravenala Madagascariensis

    Cocus Nucifera

    SHRUBS

    Mussaenda SPHymenogalis Speciosa

    Bourgainvella CV

    Duranta Gold.

    TURF

    Axonapus Compressus.

    Hujan- hujan

    Kiara Payung

    Teen

    Kayu Manis

    Semarak Api

    Cebbage Palm

    Serdang Cina

    Pisang Kapas

    Kelapa Gading

    Janda Kaya PutihSpider lily

    Bunga Kertas Bright Pink

    Duranta

    Cow Grass

    -

    2.5m-3m

    2.5m-3m

    2.0m

    2m-2.5m

    2m-2.5m

    1.0-1.5m

    1.0-1.5m

    1.0-1.5m

    0.7-1.0m

    1m0.3-0.5m

    0.3-0.5m

    0.3-0.5m

    -

    -

    65-75

    65-75

    65-75

    65-75

    65-75

    130-160

    130-160

    130-160

    130-160

    300-400300-400

    300-500

    300-500

    -

    -

    No

    No

    No

    No

    No

    No

    No

    No

    No

    NoNo

    No

    No

    M2

    M2

    225.00

    168.00

    82.00

    65.00

    130.00

    150.00

    850.00

    150.00

    220.00

    12.009.00

    7.00

    3.00

    4.00

    13.00

  • 7/31/2019 Soft Landscape BQs

    7/8

    ITEMNO.

    DESCRIPTION UNIT QTY RATE

    RM CENT

    G.

    H.

    J

    Turfing50mm vegetable soil on prepared flat surface(turfing and top soil (m/s))Spot turfing to flat surface at 300mm centerswith approved turfs as described and wateringand attending until firmly established andreplacing badly grown areas as described.Hard landscape9.14mm x 18.29m x 0.10m thick multi purposevolleyball court including hardcore and all

    necessary as per drawing no PER/ 25F/ PG/1.60mm Diameter kid play components area, withalumunium post, arched rope climber, octagonalcap, crawl tunnel 90, melaka roof, cock screw

    climber, single slide, square deck, step 800,triangle deck, ring trek curve complete with allnecessary.Concrete footpath1200mm x 1200mm x 100mm thick concretefootpath W/BRC A6 and shanghai plaster with25mm x 50mm deep groove to provideexpansion joint at 2000 interval, including toprovide facing brick in creating the form of thewalkway and edging.TO COLLECTION

    M2

    No

    No

  • 7/31/2019 Soft Landscape BQs

    8/8

    A.ITEMNO.

    DESCRIPTION UNIT QTY RATE RM CENT

    A

    B.

    C.

    D.

    E.

    F

    ExcavationSurface Excavation:Excavate over site to reduce level average 150mm deep,commencing from ground level deposit spread to make uplevel and remove surplus excavate material from site as

    directed by S.O.The following plants as described:Mimosups Elengi (Bunga Tanjung), 1830mm height of trunk,50mm diameter trunk, including excavate planting holesaverage1.00m x 1.00m x 1.00m deep with backfilled with soilmixture (m/s) and refilling, removing surplus excavatedmaterial directed by S.O and labeling.Backfilling

    Backfilled with soil mixture225mm thick layers, backfilled with soil mixture (selectedtop soil and well rotted chicken manure in 3:1 ratio byvolume) around plant root, watering each by layer until settleincluding all necessary tamping.

    Staking and guyingStaking and guying to treesSingle tree staking according to spec one the end embeddedto ground at 90 and tied to trunk with rubber hose.

    Maintenance

    MaintenanceAllow for maintenance of all planting as described includingwatering, weeding, fertilizing, preving and prepare insect andpest control and replacement of any dead of sickly plant for a

    period of 12month for all plantTO COLLECTION

    M2

    No

    No

    No

    Item