TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3...

20
TRUene CLG Ag Meeting C Project T Venue B Purpose Time Ite No 4.30pm 1 Ite No 2 Ite No 3 Ite No 4 Ite No 5 Ite No 6.30pm 6 ergy Ma enda CLG meeting TRUenergy M Big Hill Rural To provid To introdu em o. 1 Welcom em o. 2 Marulan em o. 3 Introduc em o. 4 Discuss em o. Discussion 5 Other m em o. Discussion 6 Next ste rulan Pr g arulan Fire Service, e an update uce the CLG me and introd n Project Upd Latest news project Questions a cing the TRU Purpose, fu Terms of Re Questions a ion about the points matters Report back points eps, thank yo roject Brayton Roa on the Maru and discuss duction date s about the T and answers Uenergy Maru nction, key r eference and answers e CLG and M k on matters ou and close ad, Brayton ulan Project its purpose, TRUenergy M ulan CLG roles Marulan Proje from last me e function and Marulan ect eeting Ref No. 11 Date W 20 Time 4. d key roles. Presenter Elton Consu Presenter TRUenergy Presenter TRUenergy a Presenter All Presenter TRUenergy Presenter Elton Consu 1/2447 Wednesday 1 011 30pm – 6.30 lting and Elton Co lting 14 th Septemb 0pm onsulting ber

Transcript of TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3...

Page 1: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

TRUene

CLG Ag

Meeting C

Project T

Venue B

Purpose •

Time IteNo

4.30pm 1

IteNo

2

IteNo

3

IteNo

4

IteNo

5

IteNo

6.30pm 6

ergy Ma

enda

CLG meeting

TRUenergy M

Big Hill Rural  

To provid

To introdu

em o.

1 Welcom

em o.

2 Marulan

em o.

3 Introduc

em o.

4 Discuss

em o. Discussion

5 Other m

em o. Discussion

6 Next ste

rulan Pr

g

arulan

Fire Service,

e an update

uce the CLG

me and introd

n Project Upd

Latest newsproject

Questions a

cing the TRU

Purpose, fu

Terms of Re

Questions a

ion about the

points

matters

Report back

points

eps, thank yo

roject

Brayton Roa

on the Maru

and discuss

duction

date

s about the T

and answers

Uenergy Maru

nction, key r

eference

and answers

e CLG and M

k on matters

ou and close

ad, Brayton

ulan Project

its purpose,

TRUenergy M

ulan CLG

roles

Marulan Proje

from last me

e

function and

Marulan

ect

eeting

Ref No. 11

Date W20

Time 4.

d key roles.

Presenter

Elton Consu

Presenter

TRUenergy

Presenter

TRUenergy a

Presenter

All

Presenter

TRUenergy

Presenter

Elton Consu

1/2447

Wednesday 1011

30pm – 6.30

lting

and Elton Co

lting

14th Septemb

0pm

onsulting

ber

Page 2: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

TRUene

CLG Me

Meeting F

Project T

Venue B

Purpose •

Participants

Wayne Urle

John Reyno

Antonia Ste

Catherine F

Wayne Hillie

Elizabeth El

Geoff Kettle

Ken McNally

Guy Fletche

Steven Burg

Marcello Dia

Graham Dow

Brendan Bla

Georgie Wh

Apologies

George Barn

Bernie Budg

Rosemary T

John Nacast

Maree Aboo

Simon Gilmo

Jason Gordo

Rodney Falc

Chris Stewa

ergy Ma

eeting N

First CLG me

TRUenergy M

Big Hill Rural  

To provid

To introdu

olds

phenson

letcher

er

lis

e

y

er

gun

amante

wers

akeley

headon

nett and Joh

gen and Laur

Turner

tri and Maure

od

ore, Phil Ven

on

coner

art and Chris

rulan Pr

ote

eeting

arulan

Fire Service,

e an update

uce the CLG

n McKindley

ren Wilson

een Eddy

nton

Berry

roject

Brayton Roa

on the Maru

and discuss

Big Hill Rur

Landcare G

Dairy Road

Billyrambija

Local reside

Southern V

Mayor, Gou

Dairy Road

Billyrambija

Sydney Uni

TRUenergy

TRUenergy

Elton Consu

Elton Consu

Canyonleigh

Landcare G(represente

Marulan an

Marulan Pro

Office of th

Penrose Co

Wingecarrib

Goulburn F

Goulburn-M

ad, Brayton

ulan Project

its purpose,

ral Fire Brigad

Goulburn Offic

resident and

a Landcare G

ent, Big Hill a

Villages Group

ulburn-Mulwa

resident and

a Landcare G

iversity Land

y

y

ulting

ulting

h Community

Goulburn Officed by John R

d District His

ogress Assoc

he Hawkesbu

ommunity Ass

bee Shire Co

ield Naturalis

Mulwaree Co

function and

de

ce/Catchmen

d Diary Road

Group and loc

and member

p Co-ordinato

arree Council

d Diary Road

Group and loc

care Society

y Association

ce/CatchmenReynolds)

storical Socie

ciation

ry Nepean

sociation (re

ouncil

sts Society

ouncil (repres

Ref No. 11

Date W20

Time 4.

d key roles.

nt Manageme

d Community

cal landowne

of the Big H

or

l

d Community

cal landowne

n

nt Manageme

ety

presented by

sented by Ge

1/2447

Wednesday 1011

30pm – 6.30

ent Authority

y Alliance

er

Hill Fire Briga

y Alliance

er

ent Authority

y Elizabeth E

eoff Kettle, M

14th Septemb

0pm

y

de

y

Ellis)

Mayor)

ber

Page 3: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Chris Stewa

David Hump

Warren DenMal Moloney

Delise Freem

John Bell (Gand John Sh Discussion points

1 We The meeting

2 Int Brendan Blasuggested T Graham Dowthis project, Questions a

art and Chris

phries and Ke

nnis, Fai Moloy

man

General Manahaw (Mayor)

s

elcome and

g commence

Brendan BlaLiaison GrouMarulan comindependen Feedback wgovernmentmeetings ar

troducing th

akeley from ETerms of Ref

wers from TR, i.e. picking

and comment

Q: To confirinformation obligation toA: This is cand would l Q: If approameetings onA: Yes, the Q: In the lastations beistation). Thimpacts. ThA: The omiswith Origin two projectsdevelopmenprocess. Futhe Power Swill likely bethat make s

Berry

en Wray

oney and

ager)

introductio

ed at approxi

akeley from Eup (CLG), exmmunity. Hent facilitators

was sought ont stakeholderre held quart

he TRUener

Elton Consultference and s

RUenergy exup the proje

nts from CLG

rm, the CLG to and from

o respond tocorrect howeike to hear a

ached by a jon a website? minutes from

st meeting ang built at there was the

his issue doesssion of this about our tws are on diffent has attainerthermore, TStation. Origie compressedsharing a pip

Goulburn-M

Marulan an

Marulan Ru

Pejar Local

Upper Lach

on

mately 4:40

Elton Consultxplaining thee explained E

of this proce

n the currentrs). The grouterly.

rgy Marulan

ting gave ansuggested G

xplained thatect with prev

members to

is a group pm the commuo CLG commever TRUenerall types of co

ournalist, do

m CLG meeti

an issue was he same timesuggestion t

s not appearinformation w

wo pipelines erent timelined Project ApTRUenergy’s in has advised to provide

pe not feasibl

Mulwaree Co

d Region Ch

ural Fire Serv

Aboriginal L

hlan Council

pm. Opening

ting welcomeCLG will be

Elton Consultess.

t 4:30pm meup responded

n CLG

overview ofround Rules

t the CLG’s Tvious approva

o TRUenergy

ut together inity, but witents/suggestrgy wish to monstructive f

o we have pe

ings will be p

raised aboute in the samethat TRUener in the previowas not deliincluding sim

nes. TRUenerpprovals whiproject will h

ed that it is dstorage of n

le between t

ouncil (repres

amber of Co

vice

Land Council

g remarks inc

ed the groupTRUenergy’sing have bee

eeting time (d that there

f the CLG out(see attache

Terms of Refeals confirmed

y

in good faithhout “teeth”tions. maintain an ofeedback, eve

ermission to r

publicly availa

t possible cue area (i.e. Trgy should bous minutesberate. TRUe

milarity/dissimrgy’s project ilst Origin hahave a relativdeveloping a natural gas ohe two partie

sented by Ge

mmerce

cluded:

p for the firsts key vehicle en engaged b

which aims tare no objec

tlining its pued PowerPoin

erence reflecd.

by TRUener. That is, the

ongoing relaten when not

refer them to

able on TRUe

mulative impTRUenergy’s be liaising wit. energy has hmilarity of rouis more advas only recentvely short galong distancn the lateral.es.

eoff Kettle, M

t meeting of for interacti

by TRUenerg

to accommodctions to curr

rpose and funt presentati

ct the particu

rgy as a conde company d

tionship witht positive.

o the minute

energy’s web

pacts from twstation and

th Origin abo

had an openiutes. The coanced in thatly started thas pipeline floced large dia. It is these m

Mayor)

the Communng with the gy to be the

date rent timing if

unction, on).

ular situation

duit for oes not have

h the commu

s of these

bsite.

wo gas fired Origin’s

out these

ng discussioonclusion is tht the heir applicatiowing fuel tometer pipe tmain reasons

nity

f

of

e an

nity

n he

on o hat s

Page 4: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

3 D

a) Project

Marcello Dsupply are

A brief his

Questions

Q: Have thenot indicateA: These dis

iscussion a

t overview

Diamante froeas and mark

story of the M

TRUenergsettlementThe currenwith commTRUenergconsultantsite. The prelimdevelopmeconsolidatenvironmevisual impTRUenergonsite andvolumes inthe MarulaTRUenergonsite befpreferred

s and comme

Q: Will yoA: The siteexcluding into a sed Q: What apipelines? A: The preThis amouTRUenergoutlined inQ: What aA: The preenvironmehas taken is engaginlandownera balance environmeTRUenergimpact. Note: A m

ese meetingse they have sscussions we

about the CL

m TRUenergkets (see atta

Marulan proje

y acquired tht and the fornt Project Apmon infrastruy have sincets to develop

minary findingent of 4 E Clted, and the ental impactspact of the sty’s proposal

d incorporatinn the area asan area. y will undert

fore finalisingpipeline rout

ents from CLG

u harvest wae’s permit dothat used inimentation p

are TRUenerg

evious projecunt varies byy’s current pn the Projectare your obligevious sponsental impact into conside

ng directly wirs we have tbetween wh

ental impactsy has tried to

map of the pr

s been held ispoken to TRere held in ea

LG and the

gy gave a brieached Power

ect was then

he Marulan srmal transferpprovals incluucture provise been reviewp a revised co

gs in the Conass turbines constructions (i.e. amounructures on tinvolves acc

ng an evapos the current

take preliming the concepte and will be

LG members t

ater onsite?oes not allowoily areas w

pond for clea

gy’s obligatio

ct sponsors hy a few Ha deproposal invo’s environmegations for thsors completeof the propo

eration propoith affected lried to take

hat has been s from any cho ensure tha

oposed pipel

n the last weRUenergy. arly August w

Marulan pr

ef overview rPoint presen

n given, with

site from Delr occurring ouded two sepsions. wing the devoncept plan

ncept Plan aron the one

n lay down arnt of surrounthe site.

cessing the Sration pond tt approvals re

nary Geotechpt layout. TRUe submitting

to TRUenergy

w TRUenergywhich will be ning before

ons for offset

had negotiateepending on olves having ental assessmhe easemented a detailedosed gas pipeosed vegetatandowners ointo consider approved byhange. As paat any chang

line route wa

eek? In prev

with their De

roject

of the compantation).

the following

ta Energy ann 1 March 20parately own

elopment sitthat benefite

re that the spad. This wirea to sit on nding vegetat

Southern Highto manage require water

study to conUenergy is alpipeline lice

gy

y to harvest wcaptured andbeing release

tting vegetat

ed an offset the final pipto clear less

ment. t with regardd environmeneline corridorion clearing on the pipelinration their ry the Governart of any che either has

as presented

ious convers

evelopment M

any’s custom

g points mad

nd Energy Au011. ned power st

te from a fresed from havin

ite is able to ll enable dupthe unused ption needing

hlands Wateeject water. r and waste t

nfirm the prolso talking to

ence applicati

water onsite.d treated seped into the W

tion clearings

package of aeline route tvegetation t

ds to offsettinntal assessmr. The offset along the pipne route. As equirements

nment, landhange to the a neutral or

in the meet

sations with O

Manager.

mer base, ser

de:

ustralia in lat

tations on ad

sh perspectivng a single o

o accommodaplicate infrastpad reducing to be cleare

er Pipeline to This will redto be trucked

oposal will beo landownerstion shortly.

. All storm wparately) wilWollondilly R

s for both the

approximatethat will be tathan the max

ng vegetationment which in

package alrpeline corridopart of our d

s however weholder requireproposed pippositive env

ting and is in

Origin they d

rvices and

te 2010, with

djoining pads

ve and engagowner of the

ate the tructure to bg the ed) and overa

supply wateduce traffic d in and out

e constructibs to finalise

ater (i.e. l be directed

River.

e site and

ly 45 Ha onsaken. ximum limits

n clearings?cluded the eady in placeor. TRUenergdiscussions we need to strements and tpeline route vironmental

ncluded in the

did

h

s

ging

be

all

er

of

ble

site.

e gy with rike the

e

Page 5: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

b) Next st

Marcello D

• •

• •

• •

Questions

attached p Q: What aA: This is the naturadiameter. finalised. Questionslabelling oA: TRUenimpact onmeeting w Q: What sA: The Higreservoir tthe Powerneeded ascommence The abovelauncher toff-take po Q: Will thistorey comA: TRUenecompressodesigns fo

teps

Diamante fro

issuing puscoping recommenceundertakinengaging and InfrasdiscussingTargeting

s and comme

Q: Under CanyonleigA: The ProcommenceCanyonleiga local gov Q: Could TA: We havother oblig$100,000 the area acommunit

presentation.

are the dimenstill being de

al gas pipe toWe will advi

arose regarof the land ownergy has tak other lando

with a revised

sort of infrastghlands Sourto the Goulbur Station is yes it completee on detailed

e ground facto allow cleanoint where th

s include commpressor houergy will be cor is not requor their Proje

m TRUenerg

ublic notices iequired workes ng preliminaran Independstructure) forg the Concepopening of t

ents from CLG

the current Dgh Road? oject Approves. TRUenerggh road is a vernment res

TRUenergy cve not considgations, for ecommunity g

and working ty.

.

nsions of theetermined aso be within 4se you of the

ding the sidewners represken this issuewners howevd diagram.

tructure will rce Water Pipurn reservoiret to be detes the constru

d design of th

ilities that wining of the phe pipeline w

mpressors anuse. constructing uired at this ct.

gy explained

in local print ks to upgrade

ry geotechnicdent Environmr the Projectt Plan with tthe Marulan

LG members t

DA, does the

als require Tgy will maintpublic accessponsibility.

consider contdered ongoinexample, $30grant to the in the area,

e pipe? s part of the 450-600mm ae final meas

e of the roadsented in Slide on notice. ver we will re

you have to peline has pur. The exact ermined. Furuction and cohe pipeline c

ill be requirepipeline laterawould be con

nd a compre

a flow pipelistage. We a

key project a

media on the Canyonleig

cal surveys tmental Repre. the DepartmeProject webs

to TRUenergy

e company o

TRUenergy totain the roadss road and o

tributing to tng upkeep of0,000 contribUpper Lachlaso the comp

Concept Planand the wateurement at a

d the pipelinede 16 of the We are confeview this an

pump the wumps installedesign of thether work wiommissioningconnection.

ed for the natal and a sma

nnected to th

ssor house?

ine to the Pore not in a p

activities ove

he pipeline lich Road befo

to support thesentative (a

ent of Plannisite by the ne

gy

nly have obli

o seal Canyod for fair weaongoing main

he ongoing mf Canyonleighbution to thean Shire. TR

pany will have

n however wer pipe to be a future CLG

e is on and acPowerPoint pident that thnd will report

water and theed to flow wae equipmentith the Goulbg of their pip

tural gas pipeall shed. Theshe existing M

Origin is talk

ower Station osition to co

er the next th

cence applicare power sta

he proposed approved by

ng ext CLG mee

gations to u

nleigh road bar and tear duntenance of t

maintenanceh Road as a c Big Hill RuraUenergy will e an interest

we expect thee approximate

meeting onc

ccurate reprpresentation

he proposed rt back to the

e gas? ater from thet necessary tburn-Mulwarepeline before

eline would se would be

Moomba-Sydn

king about b

site which momment on O

hree months

ation ation constru

layout and Cthe Departm

eting in Dece

pgrade - but

before consturing construthe road will

e of Canyonlecontribution al Fire Brigad have emplot in supportin

e diameter ofely 150mm ice the design

esentation a. route does ne next CLG

e Wingecarribo flow wateree Council is

e work can

be a scrubbelocated at th

ney gas pipel

uilding a two

means that aOrigin’s plans

will include:

ction

Concept Planment of Plann

ember.

t not upkeep

ruction uction howevcontinue to

eigh Road? as yet but h

de and the oyees living inng the

f n n is

nd

not

bee r to s

er he line.

o

gas or

:

ning

ver be

ave

n

Page 6: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Questions history of

Specific co

Questions

A request follow-up.

4 Oth

Report back

In the previstations. Gr

led to a broflooding and

omments inc

Canyonleigenough toThe most Road. The main easy to reCanyonleigthe heavy Goulburn-CanyonleigCLG memlimit and nper hour iTRUenergTRUenergdeveloping

s and comme Q: How faA: The En150 metrerequireme Q: What isA: ProposeProject Apadded. Q: When iA: We arestill subjec Q: Does thA: The Casite. TRUeconstructio

was made to

her matters

k on matters

ious communaham Dower

A number ocommissionwhere gas wslag and othquestion cainvestigated

ader discussd current use

cluded:

gh Road travo flood proof recent flood

issue with floeplace if damgh Road is a vehicles che

-Mulwaree Cogh Road. bers who resnotify the locs recommeny will be engy will consulg the upgrad

ents from CLG

ar will the panvironmentaes from the Went.

s proposed ted content inpprovals on t

is the start oe targeting Noct to TRUene

hat mean roanyonleigh ro

energy will taon is given.

o consult Go

s

s from last me

nity meeting rs from TRUe

of accidents hning phase ofwas releasedher materialsused five ded by the US G

sion about loce.

verses a floodthe road. Inwas higher

ooding is damaged; when lso a populaecking stationouncil is curr

side along Cacal traffic autded).

gaging a cont with local c

de of Canyon

LG members t

d be from thl AssessmentWollondilly riv

o go on the nclude the CLhe Departme

of constructiootice to Procergy board ap

ad constructoad upgrade arget comple

ulburn-Mulw

meeting

a question wenergy provid

have occurref the stationsd at high press from the coaths (undersGas and Elec

cal knowledg

dplain and isn 22 years, flothan seen in

mage to Cansealed this cr alternative n. rently respon

anyonleigh rothority of cha

sultant to excouncils and nleigh road.

to TRUenergy

he bank of tht supporting ver. TRUene

Marulan webLG meeting ent of Planni

on? ceed for conspproval.

ion starts imneeds to be

etion of the ro

waree Counci

was raised abded the follo

ed in the Units. An explosiossure (calledonstruction pstood to be ectricity Board

ge about Can

s prone to floood events o

n 40 years –

nyonleigh Rocould becomroute for he

nsible for ong

oad felt it imanges to the

xamine Canyothe NSW Ro

gy

he river? the Project A

ergy’s propos

bsite? minutes, prong website.

struction by 3

mmediately? completed boad upgrade

l’s road cons

bout accidenowing respon

ted States, pon occurred

d a blow dowprocess whenemployees/sud, who made

nyonleigh Ro

ooding. It hasoccurred fourwith water o

ad. The roade much more

eavy vehicles

going mainte

mportant to seroad during

onleigh Roadoads & Traffic

Approvals resed concept

oject updatesIn the future

31 March 20

before constre before or ar

sultants whic

ts in USA ganse:

particularly duduring clean

wn within the n a spark occub contractorthe following

oad specifical

s not been er times acrosover parts of

d is currentlye difficult.

s who are see

enance of the

et an appropthe project

d in the comc Authority (

equires the paplan will me

s, and links toe, newsletter

12. However

ruction commround Notice

ch TRUenergy

as turbine ele

uring the ning of the pi

industry) tocurred. The ars) and was g recommen

ly its conditio

elevated far ss the road. Canyonleigh

y gravel whic

eking to avoi

e whole of

priate speed (80 kilometr

ing few weekRTA) when

ad to be at leeet this

o the existingrs may be

r, this date is

mences on the to Proceed

y agreed to

ectricity

ipeline remove accident in

ndations

ons,

h

h is

id

es

ks.

east

g

s

he for

Page 7: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Questions a

– usin– whe– und– Ens

To our knowunderstandiprocess invodebris and sbuilt vent st

and comment

Q: What areA: As we prthe project and or expomanagementhe design i Q: Has a haA: The projdesign is finproject’s co Q: What areMarulan? A: TRUenerTRUenergy in time. Themanagemenfoam supprerural fire sestorages tha Q: I underswill not be mor emergentechnologie A: It is envibe able to roperation caensuring fasbe in a cleacircuit televonsite as barequirement Q: Will you be putting iteam may dA: Once theservices in mand systemprocedures strategies. Tour insurersenvironmen

ng products oen using natdertake ventisure a clear a

wledge an acing that we folved pushinscale. Once ctack by the p

nts from CLG

e your worstrogress the drisks during

osure. This wnt plan. A suis finalised.

azard analysiject’s environnalised a haznstruction an

e your hazar

rgy concept pwill not be p

e concept plant system thaession as reqrvices in moat will be ava

tand from thmanned 24 hcy situationss rely on ele

saged that Trespond to haapability whist reaction rered area, ha

vision cameraack-up in thets.

be able to sn place? As w

draw on us foe design is finmore technics that will bewill comply wThe station iss will do everntal safety. O

other than nural gas, to lng to avoid a

and safe env

ccident of thifollow differeg pipe scrubcleaned the ppipeline oper

members to

case scenardevelopment each stage o

will be develommary of th

s been carrienmental asseard analysis nd operation

d manageme

plan has madprogressing wan includes aat will conforquired. Oncere technical dailable to me

he last meetinhours a day. s if they arosctricity?

TRUenergy eazardous/emch will relay esponses to eve automate

as (CCTV). The event of a l

peak at the nwe are from or support. nalised TRUecal detail the e available towith Australis a very signrything we n

Once we have

natural gas tolimit the amoa hazardous

vironment du

is kind has nent processesbbers (pigs) tpipe was purrator.

o TRUenergy

rios in your pof the Maru

of developmeoped as part he key risks w

ed out? essment incluwill be comp

ns manageme

ent measure

de allowancewith approvaa comprehenrm to Austra

e the design detail the pro

eet potential

ng the plant Where woul

se? This area

mployees wimergency situ

sensor inforemergency e

ed fire proteche final desigloss of auxilia

next meetingemergency

energy will o proposed in

o meet potenan standards

nificant inveseed to do toe determined

o clear the piount coming cloud. ring the clea

ot occurred s in Australiathrough the prged of air us

y

planning for Tlan Project rent and mitigof the Projec

will be presen

uded a hazarpleted and reent plan.

s for storing

e for Diesel toals to use Diesive and aut

alian Standaris finalised Toposed fire mthreats.

will operate d people be has many b

ll be living auations quickrmation to TRevents and action equipmgn will includary power to

g about the eservices in s

utline to the ncident manantial threats.s, will be fulltment on the protect this

d our approa

peline. out

aning process

in Australia aa. At Tallawapipe with comsing natural

TRUenergy Misk registers gation strategct’s constructnted to the C

rd assessmenesults incorpo

diesel onsite

o be stored oesel as a backomated fire sds and includ

TRUenergy wmanagement

with very fecoming from

blackouts - w

nd working ikly. The site wRUenergy oputomated shent and be m

de batteries/so the site for

emergency surrounding v

CLG and theagement systAll hazard any automatic e part of TRUinvestment ch to safety

s.

and it is our rra the cleanmpressed airgas and a pu

Marulan? are created

egies to reduction and opeCLG in the fu

nt. Once TRUorated into t

e at TRUener

onsite howevk-up fuel at tsuppression de both wate

will outline to t system and

ew people onm to managewould monito

n the local awill have rem

peration centhutdowns. Thmonitored bysmall diesel gall emergen

services that villages, your

e local rural ftem water stnd emergencand include

Uenergy andand ensure and emerge

ning r to clean urpose

to identify ce impact erations uture once

Uenergy’s the

rgy

ver this point

er and the local

d water

nsite and hazards ring

area and mote res he site will y closed generators cy

you will r response

fire torages cy mitigation we and public and

ency

Page 8: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Brendan Blagroup would

Res

• Res • Res

procedures emergency Comment frif you are g A: Your com Comment frfire service Therefore thoperation st

Preliminary made.

Q: Is a timeA: The timeimpact on s Q: Can youA: TRUenerbe subject t Q: It is surpwould theseA: The Projeconstruction Q: Did TRUeA: No. TRUa parcel of lwith that or Q: During th100 decibelA: During codecibels quoAustralian Sincludes proapproved byProject App1:00pm on been given impact be re

akeley from Ed like followe

Community land adjace

sponse: This issues, espoption furth

Computer msponse: Comp

Additional insponse: Majo

TRUenergy wservices to d

rom CLG meoing to begin

mment has b

rom Wayne Uin this area ihe company tage (both in

discussions

etable for conetable for constakeholders

u confirm conrgy is targetinto TRUenerg

prising you ae not destroyect Approvaln on the site

energy purchUenergy is noland nearby rganisation a

he constructs? onstruction noted as an eStandards. A ocedures to my the NSW D

provals limits Saturdays unfor Sundays equired loca

Elton Consulted up. Respo

access to thnt to the devland is curre

pecially duringther with the

modelling of tmputer modell

nformation oor constructio

will meet witdo a site orie

mber: With rn constructio

een noted.

Urle, Captainis largely volwill need to

n terms of pr

with TRUene

nstruction avnstruction is will be prese

nstruction wing a notice ty Board App

re going to ty the tar? s clearly stipcan comme

hase the Daiot familiar wiis still owneds to the stat

ion period, w

noise levels mxample. All cConstruction

manage and Director-Gene

constructionnless otherwand public hl residents w

ting asked thonses were:

he river and rvelopment siently leased tng the constru

Community

the build. lling is not av

on the constron milestones

th local stakeentation and

respect thereon so soon.

n, Big Hill Ruunteers and be able to s

rocesses and

ergy indicate

vailable? still developm

ented to the

ill begin in Mto proceed oproval.

tar Canyonle

pulate that Cance.

sy Bank site?ith the Daisyd by Delta Entus of this sit

will the noise

may exceed construction n and Enviromitigate con

eral before con activity to 7wise approvedholidays. Showill be consult

he group if th

riverbank (foite. to a third pa

ruction periodonce constru

vailable at th

ruction phasies will be prov

eholders to dinduction.

e seems to b

ral Fire Brigamost people

suppress fire equipment)

e sufficient pr

ment and anCLG once it

March? n constructio

igh Road bef

anyonleigh r

? y Bank site honergy. You ste.

e level be hig

35 decibels oequipment wnmental Mannstruction noonstruction c7:00am – 6:0d by the Direould out of hoted.

here were an

or recreationa

arty and TRUed. However, Truction activit

his point in th

ng. ovided to CLG

discuss safety

be a lack of d

ade: As previe live away fronsite in bot.

reparations a

n outline of thhas been fin

on by the 31

fore heavy lo

oad will need

owever it is ohould make

her than 35

on occasionswill be silencenagement Plaoise impacts wcan commen00pm on weeector-Generaours work w

ny requests f

al use) throu

energy needsTRUenergy isties are comp

he project.

G meeting on

y. We will als

detail on you

iously explainrom the areath constructi

and planning

he program analised.

March 2011

oaders come

d to be seale

our understayour enquiri

decibels, for

s but not the ed in accordaan (CEMP) thwill be devel

nce on the Sitekdays and 8

al. No approvwhich has a n

for informatio

ugh TRUener

ds to consideris happy to epleted.

nce they have

so invite

r proposal

ned, the a. on and

are being

and its

. This will

in –

ed before

anding that es directly

r example

100 ance with hat loped and te. The 8:00am – val has oise

on that the

gy owned

er safety explore this

ve been

Page 9: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

• Res

5 CloThe meetingand input. A(venue to bThursdays a

finalised.

A Plan of Msponse: A Pla

environmenManageme

Comment frfor Our NatTRUenergy when plann

ose and nexg closed at aA target datebe advised) wat 4:30pm w

anagement fan of Manage

ental impacts ent Plan and

rom Sydney ion) direct seto contact th

ning for the E

xt meeting approximatelye of Thursdaywith a note thill be a suita

for the rehabement can onare known. Twill be prese

University Laeeded part ohe CatchmenEnvironmenta

y 6:20 pm. By 8th Decembhat Wednesdble alternativ

bilitation of tonly be comp

This will formented to the

andcare: Conof the TRUennt Managemeal Manageme

Brendan Blakber has beenday is difficulve regular m

he constructpleted once thm part of theCLG after co

ntractors for ergy owned ent Authorityent Plan.

keley thankedn set by TRUet for some peeting date.

ion zone. he design is fe Project’s Enompletion.

a previous wland. A requ

y and Sydney

d all participaenergy for theople to atte

finalised andnvironmental

wildlife projecuest was mady University L

ants for theihe next meetend. The gro

d all l

ct (Caring de for Landcare

r attendanceting of the C

oup agreed

e LG

Page 10: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

oo

energy

Introducing theTRUenergyMarulan OCGTProject14 September 2OLt

Page 11: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Time

4:30pm

6:30pm

Item No

1

2

3

4

5

6

AGENDA

Topic

Welcome & Introductions

Marulan Project Update

Introducing the TRUenergy Marulan CLG

Discussion about the CLG and MarulanProject

Other Matters

Next Steps, Thank you and Close

PresenterBrendan BlakelyElton Consulting

Marcello DiamanteTRUenergy

Brendan BlakelyTRUenergy

Ail

Brendan BlakelyElton Consulting

TRUenergy - Marulan Community Update

Page 12: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Item 1: Welcome & Introductions

TRUenergy - Marulan Community Update

Page 13: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

4

Item 2= Marulan Project Update

TRUenergy - Marulan Community Update

Page 14: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

TRUenergy OverviewLFG Ei\ D

TRUenergy reta¡l markets

Coal-fired power station

Gas-fired power station(stage A)

Stage B (proposed)

Gas-fired power station

Offtake Coal-firedpower stations

Ofüake Gas-firedpower station

Development & managementof wind assets in Australia

10o/o equity in Paralana project

Proposal for solar powerstation

5

Customers

Yallourn

Tallawarra

Hallett

Delta Western Gentrader(Mt Piper & Wallerawang)

Newport & Jeeralang

Wind farmsWaterlooCathedral Rocks

Petratherm

Mallee Solar Park

2.8 million customer accounts

ÇA

4L,48O

435

500

203

2,400

966

r44

30

180

50lar Flagsh¡ps Program(proposed)

lhermal Power 5t¿tions

Renewables

Upslream Gas

& Gas Slorage

QLD

A_

.- Jeeralang

MelbourneHead Office

- ,tb'TASMÀNIAHobart a

c5MExplorat¡onAcreå9e

Waterloo

lona Gas storageIona gas storage

Eastern Star Gas

Upstream gas

22 PJ gas storage facility

207o permits

Equity in Queensland CSM developments

Newport

RETAIL ASSETS

ELECTRTCITY ASSETS (MW)

GAS ASSETS

TRUenergy - Marulan Commun¡ty Update

Page 15: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Marulan Project DevelopmentProject Background (Recap)

TRUenergy acquired the MarulanDevelopment Site from the State last yearwith formal transfer completed in March20tL.

The Marulan site was originally developed as2 stand alone & separately owned Projects(by Delta Electricity and Energy Australia) onthe same land title.

Site t: 2x OCGT ) Peaking Plant only

Site 2: 2x OCGT à CCGT Conversion

TRUenergy will continue to progressdevelopment of the Project and is conductinga concept review to identify improvementsthat can be made as a single owner of theproject and complete necessary connectionlicences.

II -.\',\.

\{LI

't ..

¡riu¡ulFrr I i1i-1 ri;_.J

.l

TRUenergy - Marulan Community Update

Page 16: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Concept Review r Site LayoutPreliminary Findings

. The existing approved site layout iswide enough to accommodate all 4 E

Class turbines on 1 site.

Benefits

Construction lay down area can sit onsecond site reducing habitat removal.

Second site can accommodateevaporation ponds which can be used toreduce trucking requirements for rejectwater.

Will require slight alteration to theproposed electrical line design but stillwithin the approved corridor.

Improved Visual.

TRUenergy will be discussing thisproposal with DoP once the conceptplan is finalised.

TRUenergy - Marulan Community Update

Page 17: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Concept Review r Services CorridorPrelim ina ry assessmentsindicate that changes to sitelayout can save at least 5 Ha invegetation. Savings generated from

relocating construction laydown area to within the sitelayout

Preliminary Geotech work willbe com pleted to fina liseconcept layout and proposedservices corridor.

TRUenergy will engage a DoPapproved IndependentEnviron menta I Representativebefore construction hascommenced.

)

Page 18: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

Concept Review r GaslWater Pipeline RoutePipeline Routes still being finalisedwith landowners

. Working directly with affectedlandholders on identifying an agreedpipeline route to the Power Station

. Need to strike a balance btwgovern ment a pproved corridor,landholder requirements andenvironmental impact.

TRUenergy to submit pipeline licenceapplication once route is finalised.

. Advertisements will be issued at thetime of application.

TRUenergy - Marulan Community Update

Page 19: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

10

1.

2.

3.

4.

5.

6.

Key Project Activities for next 3 months:

Scope the required works to upgrade Canyonleigh Rd.

Preliminary geotechnical surveys to support concept plan layout and services corridor.

DoP approval of the Independent Environmental Representative (IER).

Discuss concept with DoP.

Complete pipeline licence application.

Arrange Marulan Project website by early December 2011.

Subject to market conditions, TRUenergy is targeting Power Station Commercial Operationin 20L4.

:\.: TRUenergy - Marulan Community Update

Page 20: TRUene rgy Marulan Pr oject CLG Ag - Gas Suppliers · 2016. 12. 28. · 4.30pm 1 Ite No 2 Ite N o 3 Ite N o 4 Ite N o 5 Ite N o 6.30pm 6 rgy Ma enda LG meeting RUenergy M ig Hill

11

Item 3: Marulan CLG

TRUenergy - Marulan Community Update