PLANILLA DE METRADOS
Obra ____________________________________________________________________________________________
Propietario ____________________________________________________________________________________________
Fecha ____________________________________________________________________________________________
ITEM DESCRIPCION
CANT MEDIDAS
PARCIAL TOTAL UNID.VECES LARGO ANCHO ALTO
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES , SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 CONSTRUCCION PROVISIONAL DE OFICINAS ADMINISTRATIVAS 13.75 M2
OFICINA DEL RESIDENTE 1 3.00 2.50 7.50OFICINA DEL SUPERVISOR 1 2.50 2.50 6.25
0.000.00
01.01.01.02 CONSTRUCCION PROVISIONAL DE CASETA DE GUARDIANIA Y ALMACENES 53.00 M2
CASETA DE GUARDIANIA 1 1.50 1.50 2.25ALMACEN 1 1 10.00 3.50 35.00
ALAMACEN 2 1 4.50 3.50 15.750.00
01.01.01.03 CONSTRUCCION PROVISIONAL DE COMEDOR Y VESTUARIO 44.25 M2
COMEDOR 1 7.50 3.50 26.25VESTUARIO 1 6.00 3.00 18.00
0.000.00
01.01.01.04 SERVICIOS HIGIENICOS PORTATILES 1.00 GLB
DAMAS 1 1.00VARONES 2 2.00
0.000.00
01.01.01.05 CONSTRUCCION PROVISIONAL DE CERCO PERIMETRICO DE CALAMINA h= 1.83M 64.38 ML
POR LA DERECHA 1 22.25 22.25POR LA IZQUIERDA 1 22.25 22.25
POR EL FRENTE 1 9.93 9.93POR EL FONDO 1 9.95 9.95
01.01.01.06 CONSTRUCCION DE CARTEL DE IDENTIFICACION DE LA OBRA 2.40x1.20m 1.00 UND
CARTEL DE OBRA 1 1.000.000.000.00
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 INSTALACION PROVISIONAL DE AGUA POTABLE 4.00 MES
INST AGUA POTABLE 4 4.000.000.000.00
01.01.02.02 INSTALACION PROVISIONAL DE DESAGUE 4.00 MES
INST PROV DE DESAGUE 4 4.000.000.000.00
01.01.02.03 INSTALACION PROVISIONAL DE NERGIA ELECTRICA 4.00 MES
INST ENERGIA ELECTRICA 4 4.000.000.000.00
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 LIMPIEZA DE TERRENO EN FORMA MANUAL 160.78 M2
AREA DEL TERRENO A CONSTRUIR 1 AREA= 160.78 160.780.000.000.00
01.01.04 MOVILIZACION DE MAQUINARIA Y EQUIPO
01.01.04.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS 1.00 GLB
MOVILIZACION Y DESMOVILIZACION 1 1.000.000.000.00
01.01.05 TRAZO NIVELES Y REPLANTEO
01.01.05.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR 28.48 M2
Z-1 3 1.30 1.30 5.07Z-2 2 1.20 1.20 2.88Z-3 9 1.30 0.80 9.36
EJE A 1 2.45 0.40 0.981 0.60 0.50 0.301 1.70 0.50 0.851 1.75 0.50 0.881 1.65 0.50 0.831 5.35 0.40 2.14
EJE B 1 0.75 0.50 0.382 1.70 0.50 1.701 1.75 0.50 0.88
0.000.000.000.00
ENTRE EJES 5 Y 6 1 AREA= 2.23 2.230.00
01.01.05.02 TRAZO DURANTE EL PROCESO DE CONSTRUCCION 300.97 M2
AREA EN CONSTRUCCION DEL NIVEL 1 1 AREA= 160.78 160.78AREA EN CONSTRUCCION DEL NIVEL 2 1 AREA= 89.03 89.03AREA EN CONSTRUCCION DEL NIVEL 3 1 AREA= 51.16 51.16
0.00
01.02 SEGURIDA Y SALUD
01.02.01 ELAB, IMPLEM Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
01.02.01.01 ELAB, IMPLEM Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 1.00 GLB
ELABORACION DEL PLAN 1 1.000.000.000.00
01.02.01.02 IMPLEMENTACION DE EQUIPOS DE SEGURIDAD PERSONAL 1.00 GLB
CASCOS DE SEGURIDAD 12 12.00LENTES DE SEGURIDAD 48 48.00
GUANTES DE CUERO 96 96.00ZAPATOS DE SEGURIDAD 12 12.00
OVEROL 24 24.00
01.02.01.03 EQUIPOS DE PROTECCION COLECTIVA 1.00 GLB
CONOS 6 6.00CINTAS SEÑALIZADORAS 2 2.00
BARANDAS DE 5 MTS 4 4.00MALLAS 2 2.00
0.00
01.02.01.04 CAPACITACION EN SEGURIDAD Y SALUD 1.00 GLB
CAPACITACIONES DIARIAS 104 104.00CAPACITACIONES SEMANALES 16 16.00CAPACITACIONES MENSUALES 4 4.00
0.000.00
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIONES
02.01.01.01 EXCAVACIONES PARA ZAPATAS EN FORMA MANUAL EN TERRENO NORMAL 25.53 M3
Z-1 1 1.30 1.30 1.53 2.59Z-1 1 1.30 1.30 1.48 2.50Z-1 1 1.30 1.30 1.44 2.43Z-2 1 1.20 1.20 1.56 2.25Z-2 1 1.20 1.20 1.39 2.00Z-3 1 1.30 0.80 1.55 1.61Z-3 1 1.30 0.80 1.53 1.59Z-3 1 1.30 0.80 1.48 1.54Z-3 1 1.30 0.80 1.43 1.49Z-3 1 1.30 0.80 1.39 1.45Z-3 1 1.30 0.80 1.53 1.59Z-3 1 1.30 0.80 1.48 1.54Z-3 1 1.30 0.80 1.44 1.50Z-3 1 1.30 0.80 1.39 1.45
02.01.01.02 EXCAVACIONES PARA CIMIENTOS DE VIGA DE CIMENTACION EN FORMA MANUAL 21.89 M3
EJE A 1 0.60 0.50 1.34 0.401 1.70 0.50 1.30 1.111 1.75 0.50 1.26 1.101 1.65 0.50 1.21 1.00
EJE B 1 0.75 0.50 1.34 0.501 1.70 0.50 1.30 1.111 1.70 0.50 1.26 1.071 1.75 0.50 1.21 1.06
EJE C 1 1.75 0.50 1.30 1.141 1.65 0.50 1.26 1.041 1.65 0.50 1.21 1.00
EJE 2 1 2.60 0.50 1.36 1.77EJE 3 1 2.55 0.50 1.33 1.70EJE 4 1 2.55 0.50 1.28 1.63EJE 5 1 2.55 0.50 1.24 1.58
1 2.55 0.50 1.24 1.58EJE 6 1 2.60 0.50 1.19 1.55
1 2.60 0.50 1.19 1.55
02.01.01.03 EXCAVACIONES PARA CIMIENTOS CORRIDOS EN FORMA MANUAL 10.42 M3
CIMIENTOS CORRIDOS CC-2 0.00EJE 4' 1 1.78 0.50 1.27 1.13
1 0.30 0.25 1.27 0.10EJE 4'' 1 2.08 0.50 1.25 1.30
EJE 6' 1 0.55 0.50 1.18 0.321 0.85 0.50 1.18 0.501 0.30 0.20 1.18 0.071 AREA= 0.02 1.18 0.02
0.00ENTRE EJES 5 y 6 1 2.90 0.50 1.21 1.75
1 AREA= 0.12 1.23 0.151 AREA= 0.05 1.20 0.061 AREA= 0.01 1.20 0.01
0.00CIMIENTOS CORRIDOS CC-3 0.00
EJE A 1 2.45 0.40 0.68 0.67 9.05
1 5.35 0.40 0.74 1.58EJE C 1 4.30 0.40 0.67 1.15
1 5.45 0.40 0.74 1.61EJE 1 1 7.20 0.40 0.70 2.02EJE 7 1 7.20 0.40 0.70 2.02
0.00
02.01.01.04 EXCAVACIONES PARA TANQUE CISTERNA EN FORMA MANUAL 7.84 M3
TANQUE CISTERNA 1 1.70 1.50 2.20 5.61CAJA DE VALVULAS 1 0.60 0.45 0.70 0.19
0.00
02.01.02 CORTES DE TERRENO
02.01.02.01 CORTE DE TERRENO EN FORMA MANUAL 2.37 M3
EN SS-HH 1 1.78 0.65 0.34 0.391 0.30 0.25 0.35 0.03
COCHERA 1 4.80 7.20 0.04 1.381 0.55 2.60 0.08 0.111 0.15 0.40 0.08 0.001 0.20 0.70 0.08 0.011 AREA= 0.02 0.08 0.001 0.55 1.25 0.08 0.061 0.25 0.40 0.08 0.01
1 1.65 0.30 0.11 0.051 AREA= 3.01 0.11 0.33
0.00
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO 7.80 M3
INTERIOR DE COCINAAREA SIN EXCAVACION 1 2.10 2.60 0.34 1.86
1 1.65 0.30 0.34 0.171 0.45 2.55 0.32 0.371 1.75 0.35 0.34 0.211 0.05 0.85 0.36 0.021 AREA= 0.79 0.34 0.27
0.00SOBRE ZAPATAS 1 0.50 0.30 1.15 0.17
1 0.40 0.30 1.15 0.141 0.35 0.35 1.15 0.141 0.45 0.40 1.15 0.211 AREA= 0.01 1.15 0.01
SOBRE CIMIENTO DE VC 1 0.13 3.25 1.15 0.491 0.08 3.25 1.15 0.301 2.75 0.25 1.15 0.791 2.75 0.13 1.15 0.411 0.13 0.85 1.15 0.131 AREA 0.24 1.15 0.28
0.00SOBRE VIGAS DE CIMENTACION 1 2.95 0.10 0.65 0.19
1 0.10 2.13 0.65 0.141 0.25 1.50 0.65 0.241 AREA 0.66 0.65 0.431 0.10 3.63 0.65 0.24
0.00SOBRE CIMIENTOS CORRIDOS 1 0.35 0.18 0.65 0.04
1 0.18 0.85 0.65 0.101 AREA 0.12 0.65 0.081 AREA 0.57 0.65 0.37
0.00
02.01.04 ELIMINACION DE MATERIAL
02.01.04.01 ACARREO DE MATERIAL EXCEDENTE D= 30MTS 72.35 M3
EXCAVACIONES PARA ZAPATAS 25.53EXCAVACIONES PARA CIMIENTOS DE VIGA CIMENTACION 21.89
EXCAVACIONES PARA CIMIENTOS CORRIDOS 10.42EXCAVACIONES PARA TANQUE CISTERNA 7.84
65.68RELLENOS CON MATERIAL PROPIO 7.80
7.80SUB TOTAL 57.88 1.25VOLUMEN TOTAL A ACARREAR 72.35
02.01.04.02 ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DEN EXCAVACIONES C/MAQUINARIA 72.35 M3
VOLUMEN DE ACARREO 72.35 72.35
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 CIMIENTOS CORRIDOS
02.02.01.01 CIMIENTOS CORRIDOS MEZC. C-H PROP 1:10 + 30% P.G MAX 6" 0.00 6.93 M3
CIMIENTO PARA VIGA DE CIMENTACION 0.00EJE A (ENTRE EJE 2 - EJE 6) 1 0.60 0.50 0.40 0.12
1 1.70 0.50 0.40 0.341 1.75 0.50 0.40 0.351 1.65 0.50 0.40 0.33
EJE B (ENTRE EJE 2 - EJE 6) 1 0.75 0.50 0.40 0.151 1.70 0.50 0.40 0.341 1.70 0.50 0.40 0.341 1.75 0.50 0.40 0.35
EJE C (ENTRE EJE 3 - EJE 6) 1 1.75 0.50 0.40 0.351 1.65 0.50 0.40 0.331 1.65 0.50 0.40 0.33
EJE 2 (ENTRE A y C) 1 2.60 0.50 0.40 0.52EJE 3 (ENTRE A y C) 1 2.55 0.50 0.40 0.51EJE 4 (ENTRE A y C) 1 2.55 0.50 0.40 0.51EJE 5 (ENTRE A y C) 1 2.55 0.50 0.40 0.51
1 2.55 0.50 0.40 0.51EJE 6 (ENTRE A y C) 1 2.60 0.50 0.40 0.52
1 2.60 0.50 0.40 0.52CIMIENTOS CORRIDOS CC-2 0.00
1 0.13 0.50 0.50 0.031 AREA= 0.78 0.90 0.701 AREA= 0.32 0.50 0.161 AREA= 0.20 0.50 0.101 AREA= 1.63 0.90 1.471 AREA= 0.09 0.50 0.051 AREA= 0.59 0.90 0.531 AREA= 0.23 0.50 0.12
CIMIENTOS CORRIDOS CC-3EJE A 1 2.88 0.40 0.70 0.81 9.52
1 5.88 0.40 0.70 1.65EJE C 1 4.88 0.40 0.70 1.37
1 5.88 0.40 0.70 1.65EJE 1 1 7.20 0.40 0.70 2.02EJE 6 1 7.20 0.40 0.70 2.02
METRADOS DE ACERO DE REFUERZO
Proyecto
Fecha
01
Partida Nro.
Descripción
METRADOS DE ACERO DE REFUERZO
Diseño del Fierro
METRADOS DE ACERO DE REFUERZO
f1/4" 3/8" 1/2" 5/8" 3/4" 1"
f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
0 0Peso Kg/ml 0.25 0.58 1.02 1.56 2.23
Total Kg 0 00.00
Nro.de elementos
iguales
Nro.de piezas por elementos
Longitud x pieza
Longitudes x f
Long. Total x f