Post on 01-Oct-2021
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
1.01 UND M2
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 24,978.10 0.74 18,483.79$
Und 6,723.50 0.86 5,782.21$
Und 3,570.00 0.36 1,285.20$
Rollo 8,151.50 0.03 269.00$
Und 200.00 6.00 1,200.00$
Und 100.00 30.00 3,000.00$
cuñete 73,185.00 0.06 4,391.10$
gal 45,196.20 0.10 4,293.64$
und 1,368.50 2.00 2,737.00$
41,441.94$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
Seccion 3,500.00$ 8.000 437.50$
437.50$
66,503.00$
DESCRIPCION
Seccion Andamio tubular 1.5mx1.5m
TOTAL COSTO DIRECTO
Lija de agua 150
DESCRIPCION
Oficial de construccion
Vinilo
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Suministro e instalación de muro en drywall a dos caras e = 0,12 m, incluye
pintura
DESCRIPCION
Lamina Dry-wall 1/2" 1.22x2.44m
Paral galvanizado para drywall 60mm
Canal galvanizado para dry wall 60mm
Cinta tapajuntas fibra de vidrio USG
Tornillo extraplano
Tornillo 1"
Masilla acrilica para interiores Drywall 5gal
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
1.02 UND ML
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 24,978.10 0.44 11,090.28$
Und 6,723.50 0.52 3,469.33$
Und 3,570.00 0.22 771.12$
Rollo 8,151.50 0.02 161.40$
Und 200.00 3.60 720.00$
Und 100.00 18.00 1,800.00$
cuñete 73,185.00 0.04 2,634.66$
gal 45,196.20 0.06 2,576.18$
und 1,368.50 1.20 1,642.20$
24,865.17$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
Seccion 3,500.00$ 8.000 437.50$
437.50$
49,926.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Seccion Andamio tubular 1.5mx1.5m
Canal galvanizado para dry wall 60mm
Cinta tapajuntas fibra de vidrio USG
Tornillo extraplano
Tornillo 1"
Masilla acrilica para interiores Drywall 5gal
Vinilo
Lija de agua 150
DESCRIPCION
Oficial de construccion
Paral galvanizado para drywall 60mm
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Suministro e instalación de muro en drywall a dos caras e = 0,12 m, incluye
pintura
DESCRIPCION
Lamina Dry-wall 1/2" 1.22x2.44m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
1.03 UND ML
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Ml 4,050.00$ 0.700 2,835.00$
Und 120.50$ 2.000 241.00$
Und 25.00$ 2.800 70.00$
3,146.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 0.17 2,424.7$
Ayudante de construccion HH 8,903.00$ 0.17 1,483.8$
Herramienta menor 5% 195.43$
4,103.93$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
7,250.00$
DESCRIPCION
TOTAL COSTO DIRECTO
Oficial de construccion
DESCRIPCION
Tornillo Lenteja 8 x 1/2" Punta/Broca Zin
Chazo Plastico 1/4
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Repisas en madera de refuerzo
DESCRIPCION
Repisa en Madera
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
2.01 UND M2
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Gal 45,196.20$ 0.065 2,937.75$
Roll 8,350.00$ 0.025 208.75$
Roll 25,000.00$ 0.025 625.00$
1% 37.72$
3,809.22$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 0.35 5,091.8$
Ayudante de construccion HH 8,903.00$ 0.35 3,116.1$
Herramienta menor 5% 410.39$
8,618.24$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
Seccion 3,500.00$ 2.800 1,250.00$
1,250.00$
13,677.00$ TOTAL COSTO DIRECTO
Seccion Andamio tubular 1.5mx1.5m
Papel Kraft 1 x 30 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
Cinta de Enmascarar 24 mm x 40 m
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Suministro y aplicación de pintura para interiores a 3 manos bajo placa
DESCRIPCION
Pintura para Interiores Vinilo Tipo 1
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,1 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 765,131.00$ 1.000 765,131.00$
0% -$
765,131.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.10 45,098.8$
Ayudante de construccion HH 8,903.00$ 3.10 27,599.3$
Herramienta menor 5% 3,634.91$
76,333.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
841,464.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,2 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 481,218.00$ 1.000 481,218.00$
0% -$
481,218.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.10 30,550.8$
Ayudante de construccion HH 8,903.00$ 2.10 18,696.3$
Herramienta menor 5% 2,462.36$
51,709.46$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
532,927.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,95 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,95 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,3 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 580,416.00$ 1.000 580,416.00$
0% -$
580,416.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.40 34,915.2$
Ayudante de construccion HH 8,903.00$ 2.40 21,367.2$
Herramienta menor 5% 2,814.12$
59,096.52$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
639,513.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,14 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,14 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,4 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 455,631.00$ 1.000 455,631.00$
0% -$
455,631.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.00 29,096.0$
Ayudante de construccion HH 8,903.00$ 2.00 17,806.0$
Herramienta menor 5% 2,345.10$
49,247.10$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
504,878.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,90 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,90 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,5 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 369,522.00$ 1.000 369,522.00$
0% -$
369,522.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.70 24,731.6$
Ayudante de construccion HH 8,903.00$ 1.70 15,135.1$
Herramienta menor 5% 1,993.34$
41,860.04$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
411,382.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,80 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,80 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,6 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 765,131.00$ 1.000 765,131.00$
0% -$
765,131.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.10 45,098.8$
Ayudante de construccion HH 8,903.00$ 3.10 27,599.3$
Herramienta menor 5% 3,634.91$
76,333.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
841,464.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,7 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 530,474.00$ 1.000 530,474.00$
0% -$
530,474.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.15 31,278.2$
Ayudante de construccion HH 8,903.00$ 2.15 19,141.5$
Herramienta menor 5% 2,520.98$
52,940.63$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
583,415.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,04 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,04 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,8 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 341,973.00$ 1.000 341,973.00$
0% -$
341,973.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.30 18,912.4$
Ayudante de construccion HH 8,903.00$ 1.30 11,573.9$
Herramienta menor 5% 1,524.32$
32,010.62$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
373,984.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4mm de 1,00 x 1,60 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,00 x 1,60 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,9 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 561,671.00$ 1.000 561,671.00$
0% -$
561,671.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.25 32,733.0$
Ayudante de construccion HH 8,903.00$ 2.25 20,031.8$
Herramienta menor 5% 2,638.24$
55,402.99$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
617,074.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,10 x 2,40 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,10 x 2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,10 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 255,864.00$ 1.000 255,864.00$
0% -$
255,864.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
280,488.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 0,80 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 0,80 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,11 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 702,396.00$ 1.000 702,396.00$
0% -$
702,396.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.80 40,734.4$
Ayudante de construccion HH 8,903.00$ 2.80 24,928.4$
Herramienta menor 5% 3,283.14$
68,945.94$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
771,342.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,20 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 1,50 x 2,20 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,12 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 151,057.00$ 1.000 151,057.00$
0% -$
151,057.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 0.70 10,183.6$
Ayudante de construccion HH 8,903.00$ 0.70 6,232.1$
Herramienta menor 5% 820.79$
17,236.49$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
168,293.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,90 x 0,80 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 0,90 x 0,80 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,13 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 405,921.00$ 1.000 405,921.00$
0% -$
405,921.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.50 36,370.0$
Ayudante de construccion HH 8,903.00$ 2.50 22,257.5$
Herramienta menor 5% 2,931.38$
61,558.88$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
467,480.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana fija marco en aluminio con vidrio crudo 4 mm de 2,50 x 0,80 m
DESCRIPCION
Ventana fija marco en aluminio con vidrio crudo 4 mm de 2,50 x 0,80 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,14 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 334,401.00$ 1.000 334,401.00$
0% -$
334,401.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
359,025.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana corrediza marco en aluminio con vidrio crudo 4 mm de 1,28 x 1,20
m
DESCRIPCIONVentana corrediza marco en aluminio con vidrio crudo 4 mm de 1,28 x
1,20 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,15 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 393,394.00$ 1.000 393,394.00$
0% -$
393,394.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
418,018.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana tipo persiana en aluminio de 0,60 x 2,20 m
DESCRIPCION
Ventana tipo persiana en aluminio de 0,60 x 2,20 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,16 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 375,976.00$ 1.000 375,976.00$
0% -$
375,976.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
400,600.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana tipo persiana en aluminio de 0,57 x 2,20 m
DESCRIPCION
Ventana tipo persiana en aluminio de 0,57 x 2,20 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,17 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 254,054.00$ 1.000 254,054.00$
0% -$
254,054.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
Ayudante de construccion HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
278,678.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana tipo persiana en aluminio de 0,40 x 2,20 m
DESCRIPCION
Ventana tipo persiana en aluminio de 0,40 x 2,20 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,18 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,256,185.00$ 1.000 1,256,185.00$
0% -$
1,256,185.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.00 43,644.0$
Ayudante de construccion HH 8,903.00$ 3.00 26,709.0$
Herramienta menor 5% 3,517.65$
73,870.65$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,330,056.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana tipo persiana en aluminio de 1,40 x 3,00 m
DESCRIPCION
Ventana tipo persiana en aluminio de 1,40 x 3,00 m
Desperdicio
DESCRIPCION
Oficial de construccion
DESCRIPCION
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,19 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 765,131.00$ 1.000 765,131.00$
765,131.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.10 45,098.8$
Ayudante de construccion HH 8,903.00$ 3.10 27,599.3$
Herramienta menor 5% 3,634.91$
76,333.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
841,464.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Oficial de construccion
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana en l, esquinera marco en aluminio vidrio crudo 4 mm de 1,50 x 2,40
m
DESCRIPCION
Ventana en l, esquinera marco en aluminio vidrio crudo 4 mm de 1,50 x
2,40 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,1,20 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 143,669.00$ 1.000 143,669.00$
143,669.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
168,293.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Ventana en l, esquinera marco en aluminio vidrio crudo 4 mm de 0,60 x 1,20
m
DESCRIPCION
Ventana en l, esquinera marco en aluminio vidrio crudo 4 mm de 0,60 x
1,20 m
DESCRIPCION
Oficial de construccion
DESCRIPCION
Ayudante de construccion
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,1 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 756,930.00$ 1.000 756,930.00$
756,930.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.00 29,096.0$
HH 8,903.00$ 2.00 17,806.0$
Herramienta menor 5% 2,345.10$
49,247.10$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
806,177.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta sencilla en aluminio con vidrio crudo 4 mm de 0,90 x 2,20 m
DESCRIPCION
Puerta sencilla en aluminio con vidrio crudo 4 mm de 0,90 x 2,20 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,2 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 846,505.00$ 1.000 846,505.00$
846,505.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 2.00 29,096.0$
HH 8,903.00$ 2.00 17,806.0$
Herramienta menor 5% 2,345.10$
49,247.10$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
895,752.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta sencilla en aluminio con vidrio crudo 4 mm de 1,00 x 2,20 m
DESCRIPCION
Puerta sencilla en aluminio con vidrio crudo 4 mm de 1,00 x 2,20 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,3 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,356,870.00$ 1.000 1,356,870.00$
1,356,870.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.10 45,098.8$
HH 8,903.00$ 3.10 27,599.3$
Herramienta menor 5% 3,634.91$
76,333.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,433,203.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta sencilla en aluminio con vidrio crudo 4 mm de 1,60 x 2,20 m
DESCRIPCION
Puerta sencilla en aluminio con vidrio crudo 4 mm de 1,60 x 2,20 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,4 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 2,062,871.00$ 1.000 2,062,871.00$
2,062,871.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.80 55,282.4$
HH 8,903.00$ 3.80 33,831.4$
Herramienta menor 5% 4,455.69$
93,569.49$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
2,156,440.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 2,00 x 2,20
m
DESCRIPCION
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 2,00 x
2,20 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,5 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,643,894.00$ 1.000 1,643,894.00$
1,643,894.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.30 48,008.4$
HH 8,903.00$ 3.30 29,379.9$
Herramienta menor 5% 3,869.42$
81,257.72$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,725,152.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 1,60 x 2,20
m
DESCRIPCION
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 1,60 x
2,20 m
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,6 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,538,535.00$ 1.000 1,538,535.00$
1,538,535.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 3.20 46,553.6$
HH 8,903.00$ 3.20 28,489.6$
Herramienta menor 5% 3,752.16$
78,795.36$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,617,330.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 1,50 x 2,20
m
DESCRIPCION
Puerta doble hoja marco en aluminio con vidrios crudo 4 mm de 1,50 x
2,20 m
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
3,2,7 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 596,425.00$ 1.000 596,425.00$
596,425.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.50 21,822.0$
HH 8,903.00$ 1.50 13,354.5$
Herramienta menor 5% 1,758.83$
36,935.33$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
633,360.00$
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Puertas buitron
DESCRIPCION
Puertas buitron
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
TOTAL COSTO DIRECTO
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.01 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,197,000.00$ 1.000 1,197,000.00$
1,197,000.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 0.51 7,398.5$
HH 8,903.00$ 0.51 4,540.5$
Herramienta menor 5% 596.95$
12,536.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,209,536.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Escritorio esquinero con faldón metálico , tablero fabricado en formica y
madecor con estructura metálica. Ubicacion oficinas directores y oficinas de
docentes
DESCRIPCION
Escritorio esquinero con faldón metálico , tablero fabricado en formica y
madecor con estructura metálica. Ubicacion oficinas directores y oficinas
de docentes
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.02 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 791,904.00$ 1.000 791,904.00$
791,904.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 0.51 7,398.5$
HH 8,903.00$ 0.51 4,540.5$
Herramienta menor 5% 596.95$
12,536.01$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
804,440.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Escritorio, tablero fabricado en formica y madecor con estructura metálica,
con cajonera, Ubicación atencion directores de area
DESCRIPCION
Escritorio, tablero fabricado en formica y madecor con estructura
metálica, con cajonera, Ubicación atencion directores de area
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.03 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 4,384,326.00$ 1.000 4,384,326.00$
4,384,326.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
4,408,950.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Mesón fabricado en madecor recubierto en formica. estructura metálica,
incluye gromets eléctricos, para sala de juntas
DESCRIPCION
Mesón fabricado en madecor recubierto en formica. estructura metálica,
incluye gromets eléctricos, para sala de juntas
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.04 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,475,966.00$ 1.000 1,475,966.00$
1,475,966.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,500,590.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Mesón fabricado en madecor recubierto en formica ,para atencion area de
directores
DESCRIPCION
Mesón fabricado en madecor recubierto en formica, para atencion area de
directores
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.05 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,677,076.00$ 1.000 1,677,076.00$
1,677,076.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,701,700.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Mesón fabricado en madecor recubierto en formica, con entrepaño y 3
gaveteros, oficina de directores
DESCRIPCION
Mesón fabricado en madecor recubierto en formica, con entrepaño y 3
gaveteros, oficina de directores
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.06 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,182,036.00$ 1.000 1,182,036.00$
1,182,036.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,206,660.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Mesón fabricado en madecor recubierto en formica, con entrepaño y 3
gaveteros, para director 01 y director 04
DESCRIPCION
Mesón fabricado en madecor recubierto en formica, con entrepaño y 3
gaveteros, oficina de directores
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.07 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,228,446.00$ 1.000 1,228,446.00$
1,228,446.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,253,070.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Escritorio con faldon metálico , tablero fabricado en formica y madecor con
estructura metálica. Para la secretaria
DESCRIPCION
Escritorio con faldon metálico , tablero fabricado en formica y madecor
con estructura metálica. Para la secretaria
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.08 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 826,226.00$ 1.000 826,226.00$
826,226.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
850,850.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Escritorio con faldon metálico, tablero fabricado en formica y madecor con
estructura metálica. Para la decanatura
DESCRIPCION
Escritorio con faldon metálico , tablero fabricado en formica y madecor
con estructura metálica. Para la secretaria
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
4.09 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
Und 1,290,326.00$ 1.000 1,290,326.00$
1,290,326.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,548.00$ 1.00 14,548.0$
HH 8,903.00$ 1.00 8,903.0$
Herramienta menor 5% 1,172.55$
24,623.55$
III - EQUIPO
UND TARIFA REND. VALOR/UNIT
-$
1,314,950.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Oficial de construccion
Ayudante de construccion
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Mesón fabricado en madecor recubierto en formica, con entrepaños, 3
gaveteros, para la secretaria
DESCRIPCION
Mesón fabricado en madecor recubierto en formica, con entrepaños, 3
gaveteros, para la secretaria
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,1 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 9,680.00$ 1.00 9,680.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 1,331.00$ 8.00 10,648.00$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
-$
3% 1,627.18$
60,301.18$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.70 10,386.6$
HH 9,645.00$ 0.70 6,751.5$
Herramienta menor 5% 856.91$
17,995$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
78,296.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
Desperdicio
TOMACORRIENTE DOBLE CON POLO A TIERRA - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
CAJA PVC 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica con Polo a Tierra con Alambre #12FN + #14T y
Ducto PVC de 1/2" (con alambre libre de Halógenos Alimentado por Piso o Muro)
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,2 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 9,680.00$ 1.00 9,680.00$
ML 2,738.00$ 10.50 28,749.00$
ML 1,331.00$ 3.50 4,658.50$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
-$
3% 1,234.12$
48,024.62$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.70 10,386.6$
HH 9,645.00$ 0.70 6,751.5$
Herramienta menor 5% 856.91$
17,995$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
66,020.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica con Polo a Tierra con Alambre #10FNT y Ducto
PVC de 1/2" (con alambre libre de Halógenos Alimentado por Piso o Muro - PISO 3)
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
CAJA PVC 4"X2"
TOMACORRIENTE DOBLE CON POLO A TIERRA - LÍNEA FUTURA LEGRAND
CABLE N°10 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,3 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 50,861.00$ 1.00 50,861.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 1,331.00$ 8.00 10,648.00$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
3% 2,985.66$
102,840.66$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.70 10,386.6$
HH 9,645.00$ 0.70 6,751.5$
Herramienta menor 5% 856.91$
17,995$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
120,836.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica con Polo a Tierra GFCI con Alambre #12FN + #14T
y Ducto PVC de 1/2" (con alambre libre de Halógenos Alimentado por Piso o Muro)
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
CAJA PVC 4"X2"
TOMACORRIENTE DOBLE CON POLO A TIERRA TIPO GFCI - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,4 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 16,788.00$ 1.00 16,788.00$
UND 14,157.00$ 1.00 14,157.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 1,331.00$ 8.00 10,648.00$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
-$
3% 2,329.22$
82,268.22$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.70 10,386.6$
HH 9,645.00$ 0.70 6,751.5$
Herramienta menor 5% 856.91$
17,995$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
100,263.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
CURVA PVC DE 1/2" DE RADIO GRANDE
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica Naranja con Polo a Tierra Aislado y Tapa de
Intemperie Instalado en Piso con Alambre #12FN + #14T y Ducto PVC de 1/2" (con
alambre libre de Halógenos) - REGULADOS EN PISO DEL PISO 3
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
CAJA PVC 4"X2"
TOMA MONOFÁSICO DOBLE CON POLO A TIERRA LEVITON NARANJA SIN TAPA
TAPA DE PROTECCIÓN PARA TOMACORRIENTES INSTALADOS A LA INTEMPERIE
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT PVC DE 1/2"
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,5 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 16,788.00$ 1.00 16,788.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 3,630.00$ 8.00 29,040.00$
UND 1,452.00$ 2.00 2,904.00$
UND 908.00$ 2.00 1,816.00$
UND 383.00$ 4.00 1,532.00$
UND 63.00$ 8.00 504.00$
UND 87.00$ 8.00 696.00$
UND 879.00$ 1.00 879.00$
-$
3% 2,486.42$
99,155.42$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.80 11,870.4$
HH 9,645.00$ 0.80 7,716.0$
Herramienta menor 5% 979.32$
20,566$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
119,721.00$ TOTAL COSTO DIRECTO
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
CURVA EMT DE 1/2" DE RADIO GRANDE
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
DESCRIPCION
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
TOMA MONOFÁSICO DOBLE CON POLO A TIERRA LEVITON NARANJA CON TAPA
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"
CHAZO PLÁSTICO DE 1/4"
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
CAJA GALVANIZADA 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica Naranja con Polo a Tierra Aislado Instalado en
Techo con Alambre #12FN + #14T y Ducto EMT de 1/2" (con alambre libre de
Halógenos)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,6 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 16,788.00$ 1.00 16,788.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 1,331.00$ 8.00 10,648.00$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
-$
3% 1,837.80$
67,619.80$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.75 11,128.5$
HH 9,645.00$ 0.75 7,233.8$
Herramienta menor 5% 918.11$
19,280$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
86,900.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
Desperdicio
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica Naranja con Polo a Tierra Aislado Instalado en
Muro con Alambre #12FN + #14T y Ducto PVC de 1/2" (con alambre libre de Halógenos)
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
CAJA PVC 4"X2"
TOMA MONOFÁSICO DOBLE CON POLO A TIERRA LEVITON NARANJA CON TAPA
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,7 UND M
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 0.07 87.12$
ML 1,809.00$ 3.00 5,427.00$
UND 908.00$ 0.05 45.40$
-$
2% 136.56$
5,696.08$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.13 1,928.9$
HH 9,645.00$ 0.13 1,253.9$
Herramienta menor 5% 159.14$
3,342$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
9,038.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
Desperdicio
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Alimentación Monofásica con Alambre #12FNT Instalado en Bandeja y Salida en Ducto
EMT de 1/2" (Con Alambre libre de Halógenos para Circuitos de Tomas Regulados de
los Pisos 1, 2 y 3, Circuitos de Tomas Normales del Piso 3 y Circuitos de Iluminación
de los Pisos 1, 2 y 3. No incluye el Ducto.)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,8 UND M
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 0.05 60.50$
ML 1,809.00$ 3.00 5,427.00$
UND 908.00$ 0.05 45.40$
-$
2% 136.25$
5,669.15$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.13 1,928.9$
HH 9,645.00$ 0.13 1,253.9$
Herramienta menor 5% 159.14$
3,342$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
9,011.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Auxiliar de redes (Ayudante)
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Alimentación Monofásica con Alambre #12FNT Instalado en Bandeja y Salida en Ducto
EMT de 3/4" (Con Alambre libre de Halógenos) - Circuitos de Iluminación del PISO 3.
No incluye el Ducto.
DESCRIPCION
TERMINAL EMT DE 3/4" CON ARANDELA
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,9 UND M
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 0.05 60.50$
ML 2,738.00$ 3.00 8,214.00$
UND 968.00$ 0.05 48.40$
-$
3% 247.39$
8,570.29$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.13 1,928.9$
HH 9,645.00$ 0.13 1,253.9$
Herramienta menor 5% 159.14$
3,342$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
11,912.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Auxiliar de redes (Ayudante)
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Alimentación Monofásica con Alambre #10FNT Instalado en Bandeja y Salida en Ducto
EMT de 1/2" (Con Alambre libre de Halógenos - TOMAS NORMALES DEL PISO 3). No
incluye el Ducto.
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
CABLE N°10 AWG Cu LIBRE DE HALÓGENOS
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°10
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,10 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 242.00$ 2.00 484.00$
UND 1,492.00$ 1.00 1,492.00$
UND 9,680.00$ 1.00 9,680.00$
ML 1,809.00$ 9.00 16,281.00$
ML 1,331.00$ 3.00 3,993.00$
UND 424.00$ 2.00 848.00$
UND 879.00$ 1.00 879.00$
-$
3% 896.64$
34,553.64$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.78 11,573.6$
HH 9,645.00$ 0.78 7,523.1$
Herramienta menor 5% 954.84$
20,052$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
54,605.00$ TOTAL COSTO DIRECTO
CAJA PVC 4"X2"
TOMACORRIENTE DOBLE CON POLO A TIERRA - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
Desperdicio
DESCRIPCION
CURVA PVC DE 1/2" DE RADIO GRANDE
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica con Polo a Tierra con Alambre #12FNT y Ducto
PVC de 1/2" (con alambre libre de Halógenos Alimentado por Piso o Muro)
DESCRIPCION
TERMINAL PVC DE 1/2" CON ARANDELA
DUCTO CONDUIT PVC DE 1/2"
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,1,11 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 1,815.00$ 1.00 1,815.00$
UND 50,861.00$ 1.00 50,861.00$
ML 1,809.00$ 14.00 25,326.00$
ML 1,331.00$ 7.00 9,317.00$
ML 3,630.00$ 8.00 29,040.00$
UND 1,452.00$ 2.00 2,904.00$
UND 383.00$ 4.00 1,532.00$
UND 63.00$ 8.00 504.00$
UND 87.00$ 8.00 696.00$
UND 879.00$ 1.00 879.00$
-$
3% 4,032.86$
129,326.86$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.90 13,354.2$
HH 9,645.00$ 0.90 8,680.5$
Herramienta menor 5% 1,101.74$
23,136$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
152,463.00$ TOTAL COSTO DIRECTO
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
CURVA EMT DE 1" DE RADIO GRANDE
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
TOMACORRIENTE DOBLE CON POLO A TIERRA TIPO GFCI - LÍNEA FUTURA LEGRAND
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"
CHAZO PLÁSTICO DE 1/4"
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
CAJA GALVANIZADA 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Toma Doble Monofásica con Polo a Tierra GFCI con Alambre #12FN + #14T
y Ducto EMT de 1/2" (con alambre libre de Halógenos Alimentado por el Muro del Foso
del Ascensor)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,1 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 2.00 21,630.00$
UND 1,452.00$ 1.00 1,452.00$
UND 20,123.00$ 1.00 20,123.00$
ML 1,809.00$ 8.00 14,472.00$
ML 1,331.00$ 4.00 5,324.00$
ML 3,630.00$ 4.00 14,520.00$
UND 1,150.00$ 3.00 3,450.00$
UND 908.00$ 1.00 908.00$
UND 383.00$ 2.00 766.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
-$
2% 1,421.61$
90,718.61$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.35 20,031.3$
HH 9,645.00$ 1.35 13,020.8$
Herramienta menor 5% 1,652.60$
34,705$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
125,423.00$ TOTAL COSTO DIRECTO
DUCTO CONDUIT EMT DE 1/2"
CONECTOR R/Y DE RESORTE PLUS SCOTCHLOK
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"
CHAZO PLÁSTICO DE 1/4"
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
Desperdicio
DESCRIPCION
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel Descolgado con Kit de Guaya en Techo con Cable Encauchetado
3x12, Empalmes Tipo Resorte, Alambre #12FN + #14T y Ducto EMT 1/2" (Alimentado
con Alambre Libre de Halógenos)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 1/2" DE RADIO GRANDE
KIT DE GUAYA DE 1 MT PARA DESCOLGAR LÁMPARAS
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,2 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 1.00 10,815.00$
UND 1,452.00$ 1.00 1,452.00$
ML 1,809.00$ 8.00 14,472.00$
ML 1,331.00$ 4.00 5,324.00$
ML 3,630.00$ 4.00 14,520.00$
UND 1,150.00$ 3.00 3,450.00$
UND 908.00$ 1.00 908.00$
UND 383.00$ 2.00 766.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
-$
3% 1,689.42$
60,048.42$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.90 13,354.2$
HH 9,645.00$ 0.90 8,680.5$
Herramienta menor 5% 1,101.74$
23,136$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
83,185.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 1/2" DE RADIO GRANDE
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
CONECTOR R/Y DE RESORTE PLUS SCOTCHLOK
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"
CHAZO PLÁSTICO DE 1/4"
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
CAJA GALVANIZADA 4"X4"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel de Sobreponer en Techo con Cable Encauchetado 3x12, Empalmes
Tipo Resorte, Alambre #12FN + #14T y Ducto EMT 1/2" (Alimentado con Alambre Libre
de Halógenos)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,3 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 0.60 6,489.00$
UND 1,452.00$ 1.00 1,452.00$
ML 1,809.00$ 8.00 14,472.00$
ML 1,331.00$ 4.00 5,324.00$
ML 3,630.00$ 4.00 14,520.00$
UND 9,680.00$ 1.00 9,680.00$
UND 3,288.00$ 1.00 3,288.00$
UND 908.00$ 2.00 1,816.00$
UND 383.00$ 2.00 766.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
-$
3% 1,907.78$
68,181.78$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.10 16,321.8$
HH 9,645.00$ 1.10 10,609.5$
Herramienta menor 5% 1,346.57$
28,278$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
96,460.00$ TOTAL COSTO DIRECTO
CHAZO PLÁSTICO DE 1/4"
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
Desperdicio
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DUCTO CONDUIT EMT DE 1/2"
TOMACORRIENTE DOBLE CON POLO A TIERRA - LÍNEA FUTURA LEGRAND
CLAVIJA DE CAUCHO 15A CON POLO A TIERRA
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Lámpara de Emergencia de Sobreponer con Tomacorriente, Clavija con
Polo a Tierra, Cable Encauchetado 3x12, Alambre #12FN + #14T y Ducto EMT 1/2"
(Alimentado con Alambre Libre de Halógenos)
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 1/2" DE RADIO GRANDE
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,4 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,306.00$ 2.00 2,612.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 2.00 21,630.00$
UND 2,904.00$ 1.00 2,904.00$
UND 20,123.00$ 1.00 20,123.00$
ML 1,809.00$ 8.00 14,472.00$
ML 1,331.00$ 4.00 5,324.00$
ML 7,260.00$ 4.00 29,040.00$
UND 1,150.00$ 3.00 3,450.00$
UND 908.00$ 1.00 908.00$
UND 445.00$ 2.00 890.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
-$
3% 3,030.94$
108,615.94$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.05 15,579.9$
HH 9,645.00$ 1.05 10,127.3$
Herramienta menor 5% 1,285.36$
26,993$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
135,608.00$ TOTAL COSTO DIRECTO
CAJA GALVANIZADA 4"X4"
TERMINAL EMT DE 3/4" CON ARANDELA
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel Descolgado con Kit de Guaya en Techo con Cable Encauchetado
3x12, Empalmes Tipo Resorte, Alambre #12FN + #14T y Ducto EMT 3/4" (Alimentado
con Alambre Libre de Halógenos)
DESCRIPCION
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 3/4" DE RADIO GRANDE
KIT DE GUAYA DE 1 MT PARA DESCOLGAR LÁMPARAS
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 3/4"
CONECTOR R/Y DE RESORTE PLUS SCOTCHLOK
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
ABRAZADERA METÁLICA DOBLE OREJA DE 3/4"
CHAZO PLÁSTICO DE 1/4"
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,5 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
CABLE N°3X12 AWG Cu ENCAUCHETADO LIBRE DE HALÓGENOS ML 10,815$ 1 10,815$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,809$ 1 1,809$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,809$ 1 1,809$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,809$ 1 1,809$
DUCTO CONDUIT EMT DE 1/2" ML 3,630$ 3 10,890$
CURVA EMT DE 1/2"" DE RADIO GRANDE UND 1,452$ 2 2,904$
ABRAZADERA METÁLICA DOBLE OREJA DE 1/2"" UND 500$ 4 1,999$
CHAZO PLÁSTICO DE 1/4" UND 63$ 8 504$
TORNILLO PARA CHAZO PLÁSTICO DE 1/4" UND 87$ 8 696$
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS UND 879$ 1 879$
-$
2% 706.33$
34,820.53$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 2.1 31,011.4$
HH 9,645.00$ 2.1 20,158.1$
Herramienta menor 5% 2,558.47$
53,728$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
88,548.00$ TOTAL COSTO DIRECTO
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel de Sobreponer en Techo con Cable Encauchetado 3x12, Empalmes
Tipo Resorte, Alambre #12FNT y Ducto EMT 1/2" (Alimentado con Alambre Libre de
Halógenos)
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,6 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,306.00$ 2.00 2,612.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 2.00 21,630.00$
UND 2,904.00$ 1.00 2,904.00$
UND 20,123.00$ 1.00 20,123.00$
ML 1,809.00$ 12.00 21,708.00$
ML 7,260.00$ 4.00 29,040.00$
UND 1,150.00$ 3.00 3,450.00$
UND 908.00$ 1.00 908.00$
UND 445.00$ 2.00 890.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
-$
2% 2,064.86$
109,561.86$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.1 16,321.8$
HH 9,645.00$ 1.1 10,609.5$
Herramienta menor 5% 1,346.57$
28,278$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
137,840.00$
CONECTOR R/Y DE RESORTE PLUS SCOTCHLOK
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
ABRAZADERA METÁLICA DOBLE OREJA DE 3/4"
CHAZO PLÁSTICO DE 1/4"
TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel Descolgado con Kit de Guaya en Techo con Cable Encauchetado
3x12, Empalmes Tipo Resorte, Alambre #12FNT y Ducto EMT 3/4" (Alimentado con
Alambre Libre de Halógenos)
DESCRIPCION
KIT DE GUAYA DE 1 MT PARA DESCOLGAR LÁMPARAS
TERMINAL EMT DE 3/4" CON ARANDELA
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 3/4" DE RADIO GRANDE
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
Desperdicio
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 3/4"
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,7 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
CABLE N°3X12 AWG Cu ENCAUCHETADO LIBRE DE HALÓGENOS ML 10,815.00$ 1 10,815.00$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,809.00$ 1 1,809.00$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,807.00$ 1 1,807.00$
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS ML 1,809.00$ 1 1,809.00$
DUCTO CONDUIT EMT DE 3/4" ML 7,260.00$ 3 21,780.00$
CURVA EMT DE 3/4" DE RADIO GRANDE UND 2,904.00$ 2 5,808.00$
ABRAZADERA METÁLICA DOBLE OREJA DE 3/4" UND 499.80$ 4 1,999.20$
CHAZO PLÁSTICO DE 1/4" UND 63.00$ 8 504.00$
TORNILLO PARA CHAZO PLÁSTICO DE 1/4" UND 87.00$ 8 696.00$
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS UND 879.00$ 1 879.00$
-$
2% 915.84$
48,822.04$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 2.7 40,507.7$
HH 9,645.00$ 2.7 26,330.9$
Herramienta menor 5% 3,341.93$
70,181$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
119,003.00$ TOTAL COSTO DIRECTO
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Panel de Sobreponer en Techo con Cable Encauchetado 3x12, Empalmes
Tipo Resorte, Alambre #12FNT y Ducto EMT 3/4" (Alimentado con Alambre Libre de
Halógenos)
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,8 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,306.00$ 2.00 2,612.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
ML 10,815.00$ 0.60 6,489.00$
UND 2,904.00$ 1.00 2,904.00$
ML 1,809.00$ 12.00 21,708.00$
ML 7,260.00$ 4.00 29,040.00$
UND 9,680.00$ 1.00 9,680.00$
UND 3,288.00$ 1.00 3,288.00$
UND 908.00$ 2.00 1,816.00$
UND 445.00$ 2.00 890.00$
UND 63.00$ 4.00 252.00$
UND 87.00$ 4.00 348.00$
3% 2,486.41$
86,960.41$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.2 17,805.6$
HH 9,645.00$ 1.2 11,574.0$
Herramienta menor 5% 1,468.98$
30,849$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
117,809.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Lámpara de Emergencia de Sobreponer con Tomacorriente, Clavija con
Polo a Tierra, Cable Encauchetado 3x12, Alambre #12FNT y Ducto EMT 3/4"
(Alimentado con Alambre Libre de Halógenos)
DESCRIPCION
TORNILLO PARA CHAZO PLÁSTICO DE 1/4"
TERMINAL PONCHABLE O BORNA DE OJO ESTAÑADA PARA CABLE N°12
ABRAZADERA METÁLICA DOBLE OREJA DE 3/4"
CHAZO PLÁSTICO DE 1/4"
CABLE ENCAUCHETADO 3X12 AWG CU LIBRE DE HALÓGENOS
CURVA EMT DE 3/4" DE RADIO GRANDE
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 3/4"
TOMACORRIENTE DOBLE CON POLO A TIERRA - LÍNEA FUTURA LEGRAND
CLAVIJA DE CAUCHO 15A CON POLO A TIERRA
Desperdicio
TERMINAL EMT DE 3/4" CON ARANDELA
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,9 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
ML 4,477.00$ 8.00 35,816.00$
UND 906.00$ 6.00 5,436.00$
UND 4,791.00$ 2.00 9,582.00$
UND 4,696.00$ 2.00 9,392.00$
-$
2% 1,472.53$
61,698.53$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.7 9,644.7$
HH 9,645.00$ 0.7 6,269.3$
Herramienta menor 5% 795.70$
16,710$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
78,408.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
TENSOR DE 3/8" PARA GUAYA GALVANIZADA
ANCLAJE Y CANCAMO CERRADO DE 3/8" X 2-1/2"
Desperdicio
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Suministro e Instalación de Guaya Metálica de 3/8" o Superior con Soportes de Anclaje
para Sujeción de Tubería cuando no esté adosada en las vigas o éstas no existan
DESCRIPCION
GUAYA GALVANIZADA DE 3/8"
PERRO O GRILLETE DE 3/8" PARA GUAYA GALVANIZADA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,10 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 189,594.00$ 1.00 189,594.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
190,473.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
190,473.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Lámpara Hermética LED con Tubo T8 de 2x18W
DESCRIPCION
LUMINARIA DE SOBREPONER LED 2X18W HERMÉTICA, 3000 lm, DOS
TUBOS LED T8, IP 65 - IK 7
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,11 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 179,449.00$ 1.00 179,449.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
180,328.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
180,328.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Lámpara Hermética LED con Tubo T8 de 1x18W
DESCRIPCION
LUMINARIA DE SOBREPONER LED 1X18W HERMÉTICA, 3200 lm, UN
TUBO LED T8, IP 65 - IK 7
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,12 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 172,769.00$ 1.00 172,769.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
173,648.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
173,648.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Panel LED de 1,2x0,3 mts de 45W
DESCRIPCION
PANEL LED FLAT RECTANGULAR DE 1,2X0,3 MTS, 45W - 3200 lm
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,13 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 83,651.00$ 1.00 83,651.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
84,530.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
84,530.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Panel LED Redondo de 8" - 18W
DESCRIPCION
PANEL LED FLAT REDONDO DE 8" - 18W, 1080 lm
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,14 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 149,601.00$ 1.00 149,601.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
150,480.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
150,480.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Lámpara de Emergencia Tipo Mickey de 2x2,4W
DESCRIPCION
LUMINARIA DE EMERGENCIA LED TIPO MICKEY DE 2X 2,4W - 2000 lm,
AUTONOMÍA DE 90 MINUTOS
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,15 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 89,744.00$ 1.00 89,744.00$
UND 879.00$ 1.00 879.00$
-$
0% -$
90,623.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.0 -$
HH 9,645.00$ 0.0 -$
Herramienta menor 5% -$
-$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
90,623.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Caporal o jefe de cuadrilla electrica
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Aviso de Salida de Emergencia de 1,6W
DESCRIPCION
LUMINARIA DE SEÑALIZACIÓN DE AVISO DE SALIDA 1,8W - 8 lm
IDENTIFICACIÓN DE CIRCUITOS EN TOMACORRIENTES Y LÁMPARAS
Desperdicio
DESCRIPCION
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,16 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 1.00 1,210.00$
UND 242.00$ 2.00 484.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 8,349.00$ 1.00 8,349.00$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 3.00 3,993.00$
ML 3,630.00$ 3.00 10,890.00$
ML 1,331.00$ 3.00 3,993.00$
UND 424.00$ 1.00 424.00$
UND 1,452.00$ 1.00 1,452.00$
-$
3% 1,414.90$
48,510.90$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.7 9,867.3$
HH 9,645.00$ 0.7 6,413.9$
Herramienta menor 5% 814.06$
17,095$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
65,606.00$ TOTAL COSTO DIRECTO
DESCRIPCION
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
Desperdicio
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
INTERRUPTOR SENCILLO - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
CURVA EMT DE 1/2" DE RADIO GRANDE
TERMINAL PVC DE 1/2" CON ARANDELA
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida Interruptor Sencillo con Ducto PVC y EMT de 1/2", y Alambre #12 (Fase y
Retorno) + #14T Libre de Halogenos
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,17 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 1.00 1,210.00$
UND 242.00$ 2.00 484.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 10,527.00$ 1.00 10,527.00$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 3.00 3,993.00$
ML 3,630.00$ 3.00 10,890.00$
ML 1,331.00$ 3.00 3,993.00$
UND 424.00$ 1.00 424.00$
UND 1,452.00$ 1.00 1,452.00$
-$
3% 1,331.42$
50,605.42$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.8 11,128.5$
HH 9,645.00$ 0.8 7,233.8$
Herramienta menor 5% 918.11$
19,280$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
69,886.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
Desperdicio
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
INTERRUPTOR DOBLE - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
CURVA EMT DE 1/2" DE RADIO GRANDE
TERMINAL PVC DE 1/2" CON ARANDELA
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida Interruptor Doble con Ducto PVC y EMT de 1/2", y Alambre #12 (Fase y Retorno)
+ #14T Libre de Halogenos
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,18 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 1.00 1,210.00$
UND 242.00$ 2.00 484.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 14,963.24$ 1.00 14,963.24$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 3.00 3,993.00$
ML 3,630.00$ 3.00 10,890.00$
ML 1,331.00$ 3.00 3,993.00$
UND 424.00$ 1.00 424.00$
UND 1,452.00$ 1.00 1,452.00$
-$
3% 1,509.53$
55,219.77$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 0.8 11,128.5$
HH 9,645.00$ 0.8 7,233.8$
Herramienta menor 5% 918.11$
19,280$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
74,500.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
Desperdicio
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
INTERRUPTOR TRIPLE - LÍNEA FUTURA LEGRAND
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
CURVA EMT DE 1/2" DE RADIO GRANDE
TERMINAL PVC DE 1/2" CON ARANDELA
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida Interruptor Triple con Ducto PVC y EMT de 1/2", y Alambre #12 (Fase y Retorno)
+ #14T Libre de Halogenos
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,19 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 4.00 4,840.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 94,386.00$ 1.00 94,386.00$
ML 1,809.00$ 10.00 18,090.00$
ML 1,331.00$ 4.00 5,324.00$
ML 3,630.00$ 4.00 14,520.00$
UND 1,452.00$ 2.00 2,904.00$
-$
3% 4,470.93$
149,981.93$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.15 17,063.7$
HH 9,645.00$ 1.15 11,091.8$
Herramienta menor 5% 1,407.77$
29,563$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
179,545.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Caporal o jefe de cuadrilla electrica
Auxiliar de redes (Ayudante)
DESCRIPCION
CURVA EMT DE 1/2" DE RADIO GRANDE
Desperdicio
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
SENSOR DE MOVIMIENTO CON ALCANCE DE 6 METROS Y RADIO DE
360°
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 1/2"
CAJA GALVANIZADA 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Sensor de Movimiento de Techo con Alcance de 6 Metros y Acción de 360°,
Ducto EMT 1/2" y Alambre #12FNT Libre de Halogenos - PASILLOS
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,20 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,306.00$ 4.00 5,224.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 94,386.00$ 1.00 94,386.00$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 5.00 6,655.00$
ML 7,260.00$ 8.00 58,080.00$
UND 2,904.00$ 2.00 5,808.00$
-$
2% 3,462.00$
189,916.00$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.2 17,805.6$
HH 9,645.00$ 1.2 11,574.0$
Herramienta menor 5% 1,468.98$
30,849$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
220,765.00$ TOTAL COSTO DIRECTO
DESCRIPCION
Auxiliar de redes (Ayudante)
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
SENSOR DE MOVIMIENTO CON ALCANCE DE 6 METROS Y RADIO DE
360°
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
DUCTO CONDUIT EMT DE 3/4"
CURVA EMT DE 3/4" DE RADIO GRANDE
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
CAJA GALVANIZADA 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Sensor de Movimiento de Techo con Alcance de 6 Metros y Acción de 360°,
Ducto EMT 3/4" y Alambre #12FNT Libre de Halogenos - PASILLOS
DESCRIPCION
TERMINAL EMT DE 3/4" CON ARANDELA
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,21 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 2.00 2,420.00$
UND 242.00$ 2.00 484.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 80,526.00$ 1.00 80,526.00$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 4.00 5,324.00$
ML 1,331.00$ 4.00 5,324.00$
UND 424.00$ 2.00 848.00$
-$
2% 2,595.50$
113,822.50$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.15 17,063.7$
HH 9,645.00$ 1.15 11,091.8$
Herramienta menor 5% 1,407.77$
29,563$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
143,386.00$ TOTAL COSTO DIRECTO
Desperdicio
DESCRIPCION
Auxiliar de redes (Ayudante)
DUCTO CONDUIT PVC DE 1/2"
CURVA PVC DE 1/2" DE RADIO GRANDE
DESCRIPCION
Caporal o jefe de cuadrilla electrica
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Sensor de Movimiento de Pared con Alcance de 3,6 Metros y Acción de
360°, Ducto PVC 1/2" y Alambre #12FNT Libre de Halogenos - ESCALERAS
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA
TERMINAL PVC DE 1/2" CON ARANDELA
CAJA GALVANIZADA 4"X2"
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
SENSOR DE MOVIMIENTO CON ALCANCE DE 3,6 METROS Y RADIO DE 360°
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
Fecha:
No. De Contrato:
Objeto:
Contratista:
Interventor:
5,2,22 UND UND
I - MATERIALES
UND V. UNIT CANT VALOR/UNIT
UND 1,210.00$ 4.00 4,840.00$
UND 1,815.00$ 1.00 1,815.00$
UND 2,662.00$ 1.00 2,662.00$
UND 970.00$ 1.00 970.00$
UND 696,388.00$ 1.00 696,388.00$
ML 1,809.00$ 6.00 10,854.00$
ML 1,331.00$ 3.00 3,993.00$
DUCTO CONDUIT EMT DE 1/2" ML 3,630.00$ 3.00 10,890.00$
CURVA EMT DE 1/2" DE RADIO GRANDE UND 1,452.00$ 2.00 2,904.00$
-$
3% 22,553.29$
757,869.29$
II - MANO DE OBRA
UND JORNAL T. REND. VALOR/UNIT
HH 14,838.00$ 1.20 17,805.6$
HH 9,645.00$ 1.20 11,574.0$
Herramienta menor 5% 1,468.98$
30,849$
III - EQUIPO
UND CANTIDAD TARIFA REND. VALOR/UNIT
-$
-$
-$
788,718.00$ TOTAL COSTO DIRECTO
Auxiliar de redes (Ayudante)
DESCRIPCION
Desperdicio
DESCRIPCION
Caporal o jefe de cuadrilla electrica
CAJA GALVANIZADA 4"X4"
SUPLEMENTO METÁLICO PARA CAJA 4"X4"
SENSOR DE MOVIMIENTO ULTRASÓNICO CON ALCANCE DE 10
CABLE N°12 AWG Cu LIBRE DE HALÓGENOS
CABLE N°14 AWG Cu LIBRE DE HALÓGENOS
CAJA GALVANIZADA 4"X2"
ANALISIS DE PRECIOS UNITARIOS OFICINA DE PLANEACIÓN
CONSTRUCCION FASE 3 DEL EDIFICIO DE INGENIERIAS EN LA SEDE EL ALGODONAL EN LA
UNIVERISDAD FRANCISCO DE PAULA SANTANDER SECCIONAL OCAÑA.
Salida para Sensor de Movimiento ULTRASÓNICO de Techo con Alcance de 10 Metros
y Acción de 360°, Ducto EMT 1/2" y Alambre #12FN + #14T Libre de Halogenos - BAÑOS
DESCRIPCION
TERMINAL EMT DE 1/2" CON ARANDELA