Post on 12-Jan-2016
INVERSION TOTAL POR COMPONENTES
ALTERNATIVA 01 - PRECIOS PRIVADO
ITEM RUBROS UND PARCIAL TOTAL
01.00 ESTUDIOS 30,000.00
01.01 EXPEDIENTE TECNICO GLB 30,000.00
02.00 COSTO DIRECTO 1,080,286.55
02.01 OBRAS PROVISIONALES GLB 61,651.16
02.02 OBRAS PRELIMINARES GLB 123,319.96
02.03 DEMOLICIONES GLB 94,934.29
02.04 MOVIMIENTOS DE TIERRAS GLB 509,729.35
02.05 PAVIMENTOS GLB 2,076,270.47
02.06 OBRAS DE ARTE Y DRENAJE GLB 3,733,797.42
02.07 SEÑALIZACION Y SEGURIDAD VIAL GLB 132,148.14
02.08 JARDINERIA Y VARIOS GLB 103,361.83
02.09 MITIGACION AMBIENTAL GLB 41,500.00
03.00 SUPERVISION 37,810.03
03.01 SUPERVISION DE OBRA (6.81%) GLB 37,810.03
04.00 PLAN DE CONTINGENCIA 10,000.00
04.01 PLAN DE CONTINGENCIA GLB 10,000.00
05.00 GASTOS GENERALES 86,422.92
05.01 GASTOS GENERALES (10.97%) GLB 86,422.92
06.00 UTILIDAD 0.00
06.01 UTILIDAD (5%) GLB 0.00
07.00 IGV 0.00
07.01 IGV (18%) GLB 0.00
TOTAL INVERSION 1,244,519.50
INVERSION TOTAL A PRECIOS PRIVADOS
ALTERNATIVA 01
INVERSION
ALTERNATIVA 01
INFRAESTRUCTURA 1,166,709.47
MANO DE OBRA 425,084.66
CALIFICADA 84,374.18
340,710.48
MATERIALES, INSUMOS 552,789.36
EQUIPOS 90,418.58
HERRAMIENTAS 11,993.95
SUBCONTRATOS 0.00
TOTAL COSTO DIRECTO 1,080,286.55
GASTOS GENERALES (8% CD) 86,422.92
UTILIDAD (0% CD) 0.00
SUBTOTAL 1,166,709.47
IGV (0%) 0.00
TOTAL INFRAESTRUCTURA 1,166,709.47
ESTUDIOS 30,000.00
PLAN DE CONTINGENCIA 10,000.00
SUPERVISION (3.5%) 37,810.03
TOTAL INVERSION 1,244,519.50
PRECIOS PRIVADOS
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
NO CALIFICADA*
INVERSION TOTAL A PRECIOS SOCIALES
ALTERNATIVA 01
INVERSION FC
ALTERNATIVA 01
INFRAESTRUCTURA 1,166,709.47 941,413.67
MANO DE OBRA 425,084.66 291,428.10
CALIFICADA 84,374.18 0.91 76,780.50
340,710.48 0.63 214,647.60
MATERIALES O INSUMOS 552,789.36 0.85 469,870.96
EQUIPO 90,418.58 0.85 76,855.79
HERRAMIENTAS 11,993.95 0.85 10,194.86
SUBCONTRATOS 0.00 0.85 0.00
TOTAL COSTO DIRECTO 1,080,286.55 848,349.71
GASTOS GENERALES (8% CD) 86,422.92 93,063.96
UTILIDAD (5% CD) 0.00 0.00
SUBTOTAL 1,166,709.47 941,413.67
IGV (0%) 0.00 0.00
TOTAL INFRAESTRUCTURA 1,166,709.47 941,413.67
30,000.00 1.00 30,000.00
PLAN DE CONTINGENCIA 10,000.00 0.85 8,500.00
SUPERVISION 37,810.03 1.00 37,810.03
TOTAL INVERSION 1,244,519.50 1,017,723.70
PRECIOS DE MERCADO
PRECIOS SOCIALES
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
NO CALIFICADA*
ESTUDIOS (Infraestructura+Plan de Contingencia)
INVERSION TOTAL POR COMPONENTES
ALTERNATIVA 02 - PRECIOS PRIVADO
ITEM RUBROS UND PARCIAL TOTAL
01.00 ESTUDIOS 30,000.00
01.01 EXPEDIENTES TECNICOS GLB 30,000.00
02.00 COSTO DIRECTO 1,114,402.27
02.01 OBRAS PROVISIONALES GLB 61,651.16
02.02 OBRAS PRELIMINARES GLB 123,319.96
02.03 DEMOLICIONES GLB 94,934.29
02.04 MOVIMIENTOS DE TIERRAS GLB 530,207.35
02.05 PAVIMENTOS GLB 2,292,325.01
02.06 OBRAS DE ARTE Y DRENAJE GLB 3,799,864.42
02.07 SEÑALIZACION Y SEGURIDAD VIAL GLB 132,148.14
02.08 JARDINERIA Y VARIOS GLB 112,458.71
02.09 MITIGACION AMBIENTAL GLB 48,000.00
03.00 SUPERVISION 39,004.08
03.01 SUPERVISION DE OBRA (6.57%) GLB 39,004.08
04.00 PLAN DE CONTINGENCIA 10,000.00
04.01 PLAN DE CONTINGENCIA GLB 10,000.00
05.00 GASTOS GENERALES 89,152.18
05.01 GASTOS GENERALES (10.57%) GLB 89,152.18
06.00 UTILIDAD 0.00
06.01 UTILIDAD (5%) GLB 0.00
07.00 IGV 0.00
07.01 IGV (18%) GLB 0.00
TOTAL INVERSION 1,282,558.53
INVERSION TOTAL A PRECIOS PRIVADOS
ALTERNATIVA 02
ALTERNATIVA 02:
INVERSION
INFRAESTRUCTURA 1,203,554.45
MANO DE OBRA 429,047.45
CALIFICADA 88,534.39
340,513.06
MATERIALES O INSUMOS 582,640.04
EQUIPO 90,176.00
HERRAMIENTAS 12,538.79
SUBCONTRATOS 0.00
TOTAL COSTO DIRECTO 1,114,402.27
GASTOS GENERALES (8%) 89,152.18
UTILIDAD (5% CD) 0.00
SUBTOTAL 1,203,554.45
IGV (18%) 0.00
TOTAL INFRAESTRUCTURA 1,203,554.45
30,000.00
PLAN DE CONTINGENCIA 10,000.00
SUPERVISION (3.5%) 39,004.08
TOTAL INVERSION 1,282,558.53
16,486.41
414,041.95
344,867.32
1,205,676.16
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
PRECIOS PRIVADOS
NO CALIFICADA*
ESTUDIOS (Infraestructura+Plan de Contingencia)
INVERSION TOTAL A PRECIOS SOCIALES
ALTERNATIVA 02
INVERSION FC
ALTERNATIVA 02
INFRAESTRUCTURA 1,191,015.67 1,196,862.01
MANO DE OBRA 429,047.45 295,089.52
CALIFICADA 88,534.39 0.91 80,566.29
340,513.06 0.63 214,523.23
MATERIALES O INSUMOS 582,640.04 0.85 495,244.03
EQUIPO 90,176.00 0.85 76,649.60
HERRAMIENTAS 12,538.79 0.85 10,657.97
SUBCONTRATOS 0.00 0.85 0.00
TOTAL COSTO DIRECTO 1,101,863.49 877,641.12
GASTOS GENERALES (8% CD) 89,152.18 92,766.67
UTILIDAD (0% CD) 0.00 43,882.06
SUBTOTAL 1,191,015.67 1,014,289.84
IGV (0%) 0.00 182,572.17
TOTAL INFRAESTRUCTURA 1,191,015.67 1,196,862.01
30,000.00 1.00 30,000.00
PLAN DE CONTINGENCIA 10,000.00 0.85 8,500.00
SUPERVISION 39,004.08 1.00 39,004.08
TOTAL INVERSION 1,260,019.75 1,274,366.09
PRECIOS DE MERCADO
PRECIOS SOCIALES
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
NO CALIFICADA*
ESTUDIOS (Infraestructura+Implementacion)
INVERSION TOTAL A PRECIOS DE MERCADO- ALTERNATIVA 01
ESTUDIOS 30,000
INFRAESTRUCTURA 1,166,709
PLAN DE CONTINGENCIA 10,000
SUPERVISION 37,810
TOTAL PRESUPUESTO 1,244,519
INVERSION TOTAL A PRECIOS DE MERCADO - ALTERNATIVA 02
ESTUDIOS 30,000
INFRAESTRUCTURA 1,203,554
PLAN DE CONTINGENCIA 10,000
SUPERVISION 39,004
TOTAL PRESUPUESTO 1,282,559
INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 01
ESTUDIOS 30,000
INFRAESTRUCTURA 941,414
PLAN DE CONTINGENCIA 8,500
SUPERVISION 37,810
TOTAL PRESUPUESTO 1,017,724
INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 02
ESTUDIOS 30,000
INFRAESTRUCTURA 1,196,862
PLAN DE CONTINGENCIA 8,500
SUPERVISION 39,004
TOTAL PRESUPUESTO 1,274,366