3
09 AREAS VERDES, CONSTRUCCION DE BANCAS DE CONCRETO S10 METRADOS Und. Metrado 11 AREAS VERDES 11.01 AREAS VERDES m2 100.00 12 CONCRETO ARMADO 12.01 BANCAS DE CONCRETO u 10.00 COSTO DIRECTO SON : SEIS MIL CUATROCIENTOS SIETE Y 00/100 NUEVOS SOLES REHABILITACION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MANUEL FIDENCIO HIDALGO FLORES

description

9

Transcript of 9

Page 1: 9

09 AREAS VERDES, CONSTRUCCION DE BANCAS DE CONCRETO

S10 METRADOS Und. Metrado

11 AREAS VERDES

11.01 AREAS VERDES m2 100.00

12 CONCRETO ARMADO

12.01 BANCAS DE CONCRETO u 10.00

COSTO DIRECTO

SON : SEIS MIL CUATROCIENTOS SIETE Y 00/100 NUEVOS SOLES

REHABILITACION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. MANUEL FIDENCIO HIDALGO FLORES

Page 2: 9

29.07

350.00

6,407.00

Page 3: 9

009

2,907.00

2,907.00

3,500.00

3,500.00