361
ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL 01010100 ALMACEN OFICINA Y CASETA DE GUARDIANIA Rendimiento (GLB/día) 8.0000 401.00 Materiales 430102 MADERA TORNILLO - A glb 1.0000 400.00 400.00 400.00 Mano de obra 475003 MANO DE OBRA - A glb 1.0000 1.00 1.00 1.00 01010102 CARTEL DE OBRA 2.40x3.60 Rendimiento (PZA/día) 1.0000 591.78 Materiales 022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.5000 2.39 1.20 0.00 023509 PERNO 1/4" X 7" CON TUERCA und 10.0000 1.48 14.80 0.00 051001 PIEDRA MEDIANA (MAX. 4") m3 0.2520 25.21 6.35 0.00 053501 AGUA m3 0.0820 5.00 0.41 0.00 210101 CEMENTO PORTLAND TIPO I bl 2.3340 15.13 35.31 0.00 380101 HORMIGON m3 0.2520 22.69 5.72 0.00 430101 MADERA TORNILLO 46.9000 2.70 126.63 0.00 436503 LIJA PARA MADERA und 3.0000 1.14 3.42 0.00 440101 TRIPLAY LUPUNA 4 mm x 4' x 8' und 3.0000 16.81 50.43 0.00 541520 PINTURA ESMALTE gal 0.8600 33.61 28.90 0.00 544010 BARNIZ SELLADOR PARA MADERA gal 0.4000 33.61 13.44 286.61 Mano de obra 470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00 470201 OPERARIO H-H 8.0000 12.36 98.88 0.00 470301 OFICIAL H-H 8.0000 11.01 88.08 0.00 470401 PEON H-H 8.0000 9.95 79.60 277.43 Equipo 481001 HERRAMIENTA %MO 10.0000 277.43 27.74 27.74 01010108 CERCO PROVISIONAL DE ESTERAS Rendimiento (M /día) 100.0000 7.87 Materiales 021002 ALAMBRE NEGRO Nro.16 kg 0.1000 2.39 0.24 0.00 022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00 430508 MADERA EUCALIPTO 3" x 2m und 0.3330 4.24 1.41 0.00 434003 ESTERA DE 3X2M und 0.3330 12.71 4.23 6.12 Mano de obra 470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00 470401 PEON H-H 0.1600 9.95 1.59 1.70 Equipo 481001 HERRAMIENTA %MO 3.0000 1.70 0.05 0.05 01010110 SERVICIOS HIGIENICOS Rendimiento (GLB/día) 8.0000 2.00 Materiales 430103 MADERA TORNILLO - SS.HH. glb 1.0000 1.00 1.00 1.00 Mano de obra 475004 MANO DE OBRA - SS.HH. glb 1.0000 1.00 1.00 1.00 01010112 AGUA PARA LA CONSTRUCCION Rendimiento (GLB/día) 8.0000 1.00 Materiales 053502 AGUA glb 1.0000 1.00 1.00 1.00 02010000 LIBERACION DE JUNTAS (PICADO Y RESANE) Rendimiento (M /día) 15.0000 13.37 Materiales 040502 ARENA FINA m3 0.0026 22.69 0.06 0.00 210101 CEMENTO PORTLAND TIPO I bl 0.0156 15.13 0.24 0.00 430101 MADERA TORNILLO 0.0260 2.70 0.07 0.37 Mano de obra 470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00 470201 OPERARIO H-H 0.5333 12.36 6.59 0.00 470401 PEON H-H 0.5333 9.95 5.31 12.62 Equipo 481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38 02010100 PICADO DE TARRAJEO EN MUROS Rendimiento (M2 /día) 18.0000 5.17 Mano de obra 470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00

description

CHICALYO

Transcript of ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

Page 1: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

01010100 ALMACEN OFICINA Y CASETA DE GUARDIANIARendimiento (GLB/día) 8.0000 401.00Materiales

430102 MADERA TORNILLO - A glb 1.0000 400.00 400.00 400.00Mano de obra

475003 MANO DE OBRA - A glb 1.0000 1.00 1.00 1.00

01010102 CARTEL DE OBRA 2.40x3.60Rendimiento (PZA/día) 1.0000 591.78Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.5000 2.39 1.20 0.00023509 PERNO 1/4" X 7" CON TUERCA und 10.0000 1.48 14.80 0.00051001 PIEDRA MEDIANA (MAX. 4") m3 0.2520 25.21 6.35 0.00053501 AGUA m3 0.0820 5.00 0.41 0.00210101 CEMENTO PORTLAND TIPO I bl 2.3340 15.13 35.31 0.00380101 HORMIGON m3 0.2520 22.69 5.72 0.00430101 MADERA TORNILLO p² 46.9000 2.70 126.63 0.00436503 LIJA PARA MADERA und 3.0000 1.14 3.42 0.00440101 TRIPLAY LUPUNA 4 mm x 4' x 8' und 3.0000 16.81 50.43 0.00541520 PINTURA ESMALTE gal 0.8600 33.61 28.90 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.4000 33.61 13.44 286.61

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 8.0000 9.95 79.60 277.43

Equipo481001 HERRAMIENTA %MO 10.0000 277.43 27.74 27.74

01010108 CERCO PROVISIONAL DE ESTERASRendimiento (M /día) 100.0000 7.87Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.1000 2.39 0.24 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00430508 MADERA EUCALIPTO 3" x 2m und 0.3330 4.24 1.41 0.00434003 ESTERA DE 3X2M und 0.3330 12.71 4.23 6.12

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470401 PEON H-H 0.1600 9.95 1.59 1.70

Equipo481001 HERRAMIENTA %MO 3.0000 1.70 0.05 0.05

01010110 SERVICIOS HIGIENICOSRendimiento (GLB/día) 8.0000 2.00Materiales

430103 MADERA TORNILLO - SS.HH. glb 1.0000 1.00 1.00 1.00Mano de obra

475004 MANO DE OBRA - SS.HH. glb 1.0000 1.00 1.00 1.00

01010112 AGUA PARA LA CONSTRUCCIONRendimiento (GLB/día) 8.0000 1.00Materiales

053502 AGUA glb 1.0000 1.00 1.00 1.00

02010000 LIBERACION DE JUNTAS (PICADO Y RESANE)Rendimiento (M /día) 15.0000 13.37Materiales

040502 ARENA FINA m3 0.0026 22.69 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0156 15.13 0.24 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 0.37

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

02010100 PICADO DE TARRAJEO EN MUROSRendimiento (M2 /día) 18.0000 5.17Mano de obra

470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00

Page 2: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.4444 9.95 4.42 5.02Equipo

481001 HERRAMIENTA %MO 3.0000 5.02 0.15 0.15

02010140 PICADO DE GRIETAS EN MUROS Y RESANERendimiento (M /día) 15.0000 14.88Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0013 2.39 0.00 0.00030110 ACERO kg 0.2250 2.19 0.49 0.00040502 ARENA FINA m3 0.0045 22.69 0.10 0.00053501 AGUA m3 0.0015 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0798 15.13 1.21 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 1.88

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

02010180 PICADO DE TARRAJEO EN CIELO RASORendimiento (M2 /día) 15.0000 6.21Mano de obra

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470401 PEON H-H 0.5333 9.95 5.31 6.03

Equipo481001 HERRAMIENTA %MO 3.0000 6.03 0.18 0.18

02010190 PICADO DE MURO Y RESANE (SECCION 10x7.5 cm)Rendimiento (M /día) 15.0000 15.59Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0010 2.39 0.00 0.00030110 ACERO kg 0.2500 2.19 0.55 0.00040502 ARENA FINA m3 0.0068 22.69 0.15 0.00053501 AGUA m3 0.0022 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1197 15.13 1.81 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 2.59

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

02010195 PICADO DE MURO Y RESANE (SECCION 15x5 cm)Rendimiento (M /día) 15.0000 15.59Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0010 2.39 0.00 0.00030110 ACERO kg 0.2500 2.19 0.55 0.00040502 ARENA FINA m3 0.0068 22.69 0.15 0.00053501 AGUA m3 0.0022 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1197 15.13 1.81 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 2.59

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

02010200 PICADO DE LADRILLO PASTELERO EN TECHORendimiento (M2 /día) 40.0000 4.11Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1000 9.95 1.00 3.74

Equipo481001 HERRAMIENTA %MO 10.0000 3.74 0.37 0.37

02010205 PICADO DE MAYOLICASRendimiento (M2 /día) 20.0000 4.66

Page 3: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470401 PEON H-H 0.4000 9.95 3.98 4.52

Equipo481001 HERRAMIENTA %MO 3.0000 4.52 0.14 0.14

02010206 PICADO DE PISO PARA RECIBIR ACABADO e=2"Rendimiento (M2 /día) 60.0000 2.74Mano de obra

470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.0667 9.95 0.66 2.49

Equipo481001 HERRAMIENTA %MO 10.0000 2.49 0.25 0.25

02010208 PICADO Y RESANE DE PISO Y VEREDA DE CONCRETORendimiento (M2 /día) 85.0000 41.25Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0460 22.69 1.04 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0570 35.29 2.01 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8650 15.13 13.09 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 18.15

Mano de obra470101 CAPATAZ H-H 0.0659 13.59 0.90 0.00470201 OPERARIO H-H 0.6118 12.36 7.56 0.00470301 OFICIAL H-H 0.0941 11.01 1.04 0.00470401 PEON H-H 0.9412 9.95 9.36 18.86

Equipo481001 HERRAMIENTA %MO 3.0000 18.86 0.57 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.0235 90.76 2.13 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.0235 10.14 0.24 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.0941 13.84 1.30 4.24

02010210 ROTURA DE LOSA EN VOLADIZORendimiento (M3 /día) 12.0000 16.25Mano de obra

470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.6667 9.95 6.63 15.78

Equipo481001 HERRAMIENTA %MO 3.0000 15.78 0.47 0.47

02010220 RASQUETEO Y DESMANCHADO DE MURO PARA PINTADORendimiento (M2 /día) 100.0000 1.32Materiales

300125 LIJA PARA FIERRO und 0.2500 1.26 0.32 0.32Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470401 PEON H-H 0.0800 9.95 0.80 0.91

Equipo481001 HERRAMIENTA %MO 10.0000 0.91 0.09 0.09

02010270 DESMONTAJE DE PUERTASRendimiento (M2 /día) 60.0000 3.25Mano de obra

470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.1333 9.95 1.33 3.16

Equipo481001 HERRAMIENTA %MO 3.0000 3.16 0.09 0.09

02010320 DESMONTAJE DE VENTANASRendimiento (M2 /día) 100.0000 1.96Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo

Page 4: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.06

02010340 DESMONTAJE DE PORTON (3.0x2.4)Rendimiento (UND/día) 6.0000 68.56Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 2.6667 9.95 26.53 44.82

Equipo481001 HERRAMIENTA %MO 3.0000 44.82 1.34 0.00496050 SOLDADORA A GASOLINA H-M 2.0000 11.20 22.40 23.74

02010360 MONTAJE DE PORTON (3.0x2.4) METALICORendimiento (UND/día) 1.0000 188.91Mano de obra

470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 8.0000 9.95 79.60 139.91

Equipo481001 HERRAMIENTA %MO 3.0000 139.91 4.20 0.00496050 SOLDADORA A GASOLINA H-M 4.0000 11.20 44.80 49.00

02010380 DESMONTAJE DE PISO DE PARQUETRendimiento (M2 /día) 40.0000 2.37Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470401 PEON H-H 0.2000 9.95 1.99 2.26

Equipo481001 HERRAMIENTA %MO 5.0000 2.26 0.11 0.11

02010400 REMOCION DE PISO DE LOSETA EXISTENTERendimiento (M2 /día) 30.0000 4.46Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470401 PEON H-H 0.4000 9.95 3.98 4.25

Equipo481001 HERRAMIENTA %MO 5.0000 4.25 0.21 0.21

02010420 DESMONTAJE DE TABIQUES DE MADERARendimiento (M2 /día) 30.0000 6.50Mano de obra

470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.2667 9.95 2.65 6.31

Equipo481001 HERRAMIENTA %MO 3.0000 6.31 0.19 0.19

02010440 DESMONTAJE DE COLUMNAS DE MADERA H=4 m.Rendimiento (UND/día) 12.0000 23.75Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470401 PEON H-H 2.0000 9.95 19.90 22.62

Equipo481001 HERRAMIENTA %MO 5.0000 22.62 1.13 1.13

02010460 DESMONTAJE TIJERAL DE MADERA L=14 m.Rendimiento (UND/día) 4.0000 168.87Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 12.0000 9.95 119.40 146.84

Equipo481001 HERRAMIENTA %MO 15.0000 146.84 22.03 22.03

02010480 DESMONTAJE TECHO DE ETERNIT/CALAMINARendimiento (M2 /día) 80.0000 1.17Mano de obra

470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470401 PEON H-H 0.1000 9.95 1.00 1.14

Equipo481001 HERRAMIENTA %MO 3.0000 1.14 0.03 0.03

Page 5: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

02010490 DESMONTAJE FALSO CIELO RASO DE CAÑA + YESO DE 2"Rendimiento (M2 /día) 150.0000 2.39Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470401 PEON H-H 0.1600 9.95 1.59 2.32

Equipo481001 HERRAMIENTA %MO 3.0000 2.32 0.07 0.07

02010500 DESMONTAJE DE VIGUETAS DE MADERARendimiento (M2 /día) 80.0000 1.17Mano de obra

470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470401 PEON H-H 0.1000 9.95 1.00 1.14

Equipo481001 HERRAMIENTA %MO 3.0000 1.14 0.03 0.03

02010520 DESMONTAJE DE TECHO/MADERA C/TORTA BARRORendimiento (M2 /día) 150.0000 2.39Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470401 PEON H-H 0.1600 9.95 1.59 2.32

Equipo481001 HERRAMIENTA %MO 3.0000 2.32 0.07 0.07

02010530 DESMONTAJE DE FALSO CIELO RASORendimiento (M2 /día) 90.0000 2.16Mano de obra

470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470401 PEON H-H 0.0889 9.95 0.88 2.10

Equipo481001 HERRAMIENTA %MO 3.0000 2.10 0.06 0.06

02010540 DESMONTAJE TECHO CANALONRendimiento (M2 /día) 130.0000 2.16Mano de obra

470101 CAPATAZ H-H 0.0062 13.59 0.08 0.00470201 OPERARIO H-H 0.0615 12.36 0.76 0.00470401 PEON H-H 0.1231 9.95 1.22 2.06

Equipo481001 HERRAMIENTA %MO 5.0000 2.06 0.10 0.10

02010560 DESMONTAJE TECHO CANALONRendimiento (UND/día) 20.0000 14.11Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 5.0000 13.44 0.67 0.67

02010580 DESMONTAJE DE APARATOS SANITARIOSRendimiento (UND/día) 12.0000 16.25Mano de obra

470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.6667 9.95 6.63 15.78

Equipo481001 HERRAMIENTA %MO 3.0000 15.78 0.47 0.47

02010600 DESMONTAJE DE ESTRUCTURA METALICARendimiento (M2 /día) 50.0000 7.35Mano de obra

470101 CAPATAZ H-H 0.0160 13.59 0.22 0.00470201 OPERARIO H-H 0.1600 12.36 1.98 0.00470301 OFICIAL H-H 0.1600 11.01 1.76 0.00470401 PEON H-H 0.3200 9.95 3.18 7.14

Equipo

Page 6: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 7.14 0.21 0.21

02010622 DEMOLICION DE LOSA ALIGERADA H=0.20mRendimiento (M2 /día) 10.0000 10.86Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470401 PEON H-H 0.8000 9.95 7.96 9.05

Equipo481001 HERRAMIENTA %MO 20.0000 9.05 1.81 1.81

02010640 DESMONTAJE DE MUROS PREFABRICADOS C.A.Rendimiento (M2 /día) 30.0000 9.24Mano de obra

470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.5333 9.95 5.31 8.97

Equipo481001 HERRAMIENTA %MO 3.0000 8.97 0.27 0.27

02010660 ELIMINACION DE ARBOLRendimiento (UND/día) 3.0000 31.66Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470401 PEON H-H 2.6667 9.95 26.53 30.15

Equipo481001 HERRAMIENTA %MO 5.0000 30.15 1.51 1.51

02010680 ELIMINACION DE POSTE DE LUZRendimiento (UND/día) 10.0000 28.50Mano de obra

470101 CAPATAZ H-H 0.2400 13.59 3.26 0.00470401 PEON H-H 2.4000 9.95 23.88 27.14

Equipo481001 HERRAMIENTA %MO 5.0000 27.14 1.36 1.36

02010700 ROTURA DE LOSA EN VOLADIZORendimiento (M3 /día) 12.0000 16.25Mano de obra

470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.6667 9.95 6.63 15.78

Equipo481001 HERRAMIENTA %MO 3.0000 15.78 0.47 0.47

02010720 DEMOLICION DE CIMIENTOS DE CONCRETORendimiento (M3 /día) 15.0000 37.17Mano de obra

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.2667 9.95 2.65 9.96

Equipo481001 HERRAMIENTA %MO 3.0000 9.96 0.30 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.2667 90.76 24.21 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.2667 10.14 2.70 27.21

02010730 DEMOLICION DE CIMIENTOS DE MURO DE ADOBERendimiento (M3 /día) 10.0000 17.20Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 15.0000 14.96 2.24 2.24

02010740 DEMOLICION DE SOBRECIMIENTOSRendimiento (M3 /día) 12.5000 16.67Mano de obra

470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470401 PEON H-H 0.6400 9.95 6.37 15.15

Equipo

Page 7: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 10.0000 15.15 1.52 1.52

02010760 DEMOLICION DE PISO DE CONCRETO INC.F.P.Rendimiento (M2 /día) 75.0000 4.35Mano de obra

470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470401 PEON H-H 0.0533 9.95 0.53 2.00

Equipo481001 HERRAMIENTA %MO 10.0000 2.00 0.20 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.0213 90.76 1.93 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.0213 10.14 0.22 2.35

02010780 DEMOLICION - ROTURA DE CONTRAPISORendimiento (M2 /día) 40.0000 2.37Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470401 PEON H-H 0.2000 9.95 1.99 2.26

Equipo481001 HERRAMIENTA %MO 5.0000 2.26 0.11 0.11

02010800 DEMOLICION COLUMNAS Y VIGAS DE CONCRETORendimiento (M3 /día) 15.0000 51.57Mano de obra

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 1.0667 12.36 13.18 0.00470401 PEON H-H 0.2667 9.95 2.65 16.55

Equipo481001 HERRAMIENTA %MO 10.0000 16.55 1.66 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.3307 90.76 30.01 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.3307 10.14 3.35 35.02

02010820 DEMOLICION DE LOSA CONCRETO e=10cm.Rendimiento (M2 /día) 10.0000 10.86Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470401 PEON H-H 0.8000 9.95 7.96 9.05

Equipo481001 HERRAMIENTA %MO 20.0000 9.05 1.81 1.81

02010828 DEMOLICION DE GRADAS DE CONCRETORendimiento (M3 /día) 12.5000 16.67Mano de obra

470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470401 PEON H-H 0.6400 9.95 6.37 15.15

Equipo481001 HERRAMIENTA %MO 10.0000 15.15 1.52 1.52

02010835 DEMOLICION DE BEBEDERO Y URINARIO DE CONCRETORendimiento (M /día) 8.0000 16.78Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470401 PEON H-H 1.5000 9.95 14.93 16.29

Equipo481001 HERRAMIENTA %MO 3.0000 16.29 0.49 0.49

02010840 DEMOLICION DE MUROS DE CONCRETORendimiento (M3 /día) 6.0000 47.59Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 0.6667 9.95 6.63 24.92

Equipo481001 HERRAMIENTA %MO 10.0000 24.92 2.49 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.2000 90.76 18.15 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.2000 10.14 2.03 22.67

02010940 DEMOLICION MUROS DE LADRILLO KK C/MAQUINARendimiento (M3 /día) 200.0000 13.92Mano de obra

Page 8: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 1.04

Equipo481001 HERRAMIENTA %MO 5.0000 1.04 0.05 0.00491001 CARGADOR S/LLANTAS 110-125 HP H-M 0.0400 144.66 5.79 0.00492517 TRACTOR S/ORUGAS 140/160 HP H-M 0.0400 175.98 7.04 12.88

02010995 DEMOLICION DE CIMIENTOS DE MURO DE ADOBERendimiento (M3 /día) 10.0000 17.20Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 15.0000 14.96 2.24 2.24

02011060 DEMOLICION MUROS DE ADOBE C/MAQUINARendimiento (M3 /día) 400.0000 6.93Mano de obra

470101 CAPATAZ H-H 0.0020 13.59 0.03 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.52

Equipo491001 CARGADOR S/LLANTAS 110-125 HP H-M 0.0200 144.66 2.89 0.00492517 TRACTOR S/ORUGAS 140/160 HP H-M 0.0200 175.98 3.52 6.41

02011080 DEMOLICION DE ROCAS PIZARROSASRendimiento (M3 /día) 10.0000 37.92Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 5.0000 14.96 0.75 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PC H-M 0.2000 90.76 18.15 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.4000 10.14 4.06 22.96

02011100 TRANSPORTE VERTICAL CON WINCHE ELECTRICORendimiento (GLB/día) 8.0000 2.00Materiales

481011 MAQUINARIA - TV glb 1.0000 1.00 1.00 1.00Mano de obra

475011 MANO DE OBRA - TV glb 1.0000 1.00 1.00 1.00

02011120 TRANSPORTE DE EQUIPO Y MAQUINARIARendimiento (GLB/día) 8.0000 2.00Materiales

481002 HERRAMIENTA - T glb 1.0000 1.00 1.00 1.00Mano de obra

475001 MANO DE OBRA - T glb 1.0000 1.00 1.00 1.00

02011140 TRAZO Y REPLANTEO PRELIMINARRendimiento (M2 /día) 600.0000 1.23Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0050 2.39 0.01 0.00300110 CAL (BOLSA X 20 kg) bl 0.0500 6.09 0.30 0.00300132 CORDEL m 0.1900 0.15 0.03 0.00430101 MADERA TORNILLO p² 0.0200 2.70 0.05 0.39

Mano de obra470101 CAPATAZ H-H 0.0013 13.59 0.02 0.00470401 PEON H-H 0.0400 9.95 0.40 0.00470501 TOPOGRAFO H-H 0.0133 14.27 0.19 0.61

Equipo481001 HERRAMIENTA %MO 3.0000 0.61 0.02 0.00497512 TEODOLITO Y MIRA H-M 0.0133 16.00 0.21 0.23

02011160 FLETE TERRESTRERendimiento (GLB/día) 8.0000 2.00Materiales

481010 MAQUINARIA - FT glb 1.0000 1.00 1.00 1.00Mano de obra

475010 MANO DE OBRA - FT glb 1.0000 1.00 1.00 1.00

Page 9: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

03010100 NIVELACION DE TERRENO Y APISONADO C/20cmRendimiento (M2 /día) 100.0000 2.06Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00430101 MADERA TORNILLO p² 0.0300 2.70 0.08 0.10

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.06

03010120 EXCAV.ZANJAS Y ZAPATA RT<2kg/cm2 H=1.0mRendimiento (M3 /día) 4.0000 23.30Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470401 PEON H-H 2.0000 9.95 19.90 22.62

Equipo481001 HERRAMIENTA %MO 3.0000 22.62 0.68 0.68

03010122 EXCAV.ZANJAS Y ZAPATA Rt<2kg/cm2 h=1.5mRendimiento (M3 /día) 3.5000 26.63Mano de obra

470101 CAPATAZ H-H 0.2286 13.59 3.11 0.00470401 PEON H-H 2.2857 9.95 22.74 25.85

Equipo481001 HERRAMIENTA %MO 3.0000 25.85 0.78 0.78

03010124 EXCAV.ZANJAS Y ZAPATA RT<2kg/cm2 H=2.0mRendimiento (M3 /día) 3.0000 31.05Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470401 PEON H-H 2.6667 9.95 26.53 30.15

Equipo481001 HERRAMIENTA %MO 3.0000 30.15 0.90 0.90

03010126 EXCAV.ZANJAS Y ZAPATA RT<2kg/cm2 H=2.5mRendimiento (M3 /día) 2.7500 33.89Mano de obra

470101 CAPATAZ H-H 0.2909 13.59 3.95 0.00470401 PEON H-H 2.9091 9.95 28.95 32.90

Equipo481001 HERRAMIENTA %MO 3.0000 32.90 0.99 0.99

03010140 EXCAV.ZANJAS Y ZAPATA RT>2kg/cm2 H=1.0mRendimiento (M3 /día) 3.5000 26.63Mano de obra

470101 CAPATAZ H-H 0.2286 13.59 3.11 0.00470401 PEON H-H 2.2857 9.95 22.74 25.85

Equipo481001 HERRAMIENTA %MO 3.0000 25.85 0.78 0.78

03010142 EXCAV.ZANJAS Y ZAPATA RT>2kg/cm2 H=1.5mRendimiento (M3 /día) 3.0000 31.05Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470401 PEON H-H 2.6667 9.95 26.53 30.15

Equipo481001 HERRAMIENTA %MO 3.0000 30.15 0.90 0.90

03010144 EXCAV.ZANJAS Y ZAPATA RT>2kg/cm2 H=2.0mRendimiento (M3 /día) 2.7500 33.89Mano de obra

470101 CAPATAZ H-H 0.2909 13.59 3.95 0.00470401 PEON H-H 2.9091 9.95 28.95 32.90

Equipo481001 HERRAMIENTA %MO 3.0000 32.90 0.99 0.99

03010200 EXCAV.MANUAL EN TERRENO NORMAL SATURADORendimiento (M3 /día) 2.5000 94.82

Page 10: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 3.2000 9.95 31.84 40.15

Equipo481001 HERRAMIENTA %MO 3.0000 40.15 1.20 0.00496021 MOTOBOMBA 5 HP, 3" H-M 3.2000 1.97 6.30 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 3.2000 14.74 47.17 54.67

03010210 EXCAV.ZANJAS PARA ENSANCHE DE CIMIENTOSRendimiento (M3 /día) 5.0000 18.63Mano de obra

470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470401 PEON H-H 1.6000 9.95 15.92 18.09

Equipo481001 HERRAMIENTA %MO 3.0000 18.09 0.54 0.54

03010220 EXCAVACION DE ZANJA PARA CISTERNA RT<2kg/cm2Rendimiento (M3 /día) 3.0000 31.05Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470401 PEON H-H 2.6667 9.95 26.53 30.15

Equipo481001 HERRAMIENTA %MO 3.0000 30.15 0.90 0.90

03010300 EXCAVACION MASIVA C/MAQUINARendimiento (M3 /día) 120.0000 7.68Mano de obra

470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470401 PEON H-H 0.1333 9.95 1.33 2.24

Equipo481001 HERRAMIENTA %MO 3.0000 2.24 0.07 0.00492001 RETROEXCAVADORA S/LLANT. 58 HP - 1 H-M 0.0667 80.55 5.37 5.44

03010360 CORTE MASIVO DE TERRENO A MAQUINARendimiento (M3 /día) 100.0000 5.48Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.00492517 TRACTOR S/ORUGAS 140/160 HP H-M 0.0200 175.98 3.52 3.58

03010420 CORTE O RELLENO DE TERRENO HASTA 0.20mRendimiento (M2 /día) 40.0000 2.33Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470401 PEON H-H 0.2000 9.95 1.99 2.26

Equipo481001 HERRAMIENTA %MO 3.0000 2.26 0.07 0.07

03010440 CORTE DE TERRENO EN FORMA MANUALRendimiento (M3 /día) 8.0000 11.65Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470401 PEON H-H 1.0000 9.95 9.95 11.31

Equipo481001 HERRAMIENTA %MO 3.0000 11.31 0.34 0.34

03010450 RELLENO MANUAL CON MATERIAL PROPIORendimiento (M3 /día) 7.0000 13.31Mano de obra

470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470401 PEON H-H 1.1429 9.95 11.37 12.92

Equipo481001 HERRAMIENTA %MO 3.0000 12.92 0.39 0.39

03010460 RELLENO MANUAL CON MATERIAL PRESTAMORendimiento (M3 /día) 7.0000 29.26

Page 11: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales382001 MATERIAL DE RELLENO m3 1.0000 15.95 15.95 15.95

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470401 PEON H-H 1.1429 9.95 11.37 12.92

Equipo481001 HERRAMIENTA %MO 3.0000 12.92 0.39 0.39

03010480 RELLENO CON GRAVA COMPACTADA C/15cmRendimiento (M3 /día) 15.0000 47.93Materiales

050525 GRAVA DIVERSA GRANULOMETRIA m3 1.0000 29.70 29.70 29.70Mano de obra

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.2667 19.60 5.23 5.61

03010500 RELLENO COMPACTADO CON GRAVA E=0.30mRendimiento (M2 /día) 50.0000 18.82Materiales

050525 GRAVA DIVERSA GRANULOMETRIA m3 0.3000 29.70 8.91 8.91Mano de obra

470101 CAPATAZ H-H 0.0160 13.59 0.22 0.00470201 OPERARIO H-H 0.1600 12.36 1.98 0.00470401 PEON H-H 0.1600 9.95 1.59 3.79

Equipo481001 HERRAMIENTA %MO 3.0000 3.79 0.11 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0800 75.07 6.01 6.12

03010510 RELLENO MANUAL CON MATERIAL PRESTAMO (ARENA)Rendimiento (M3 /día) 7.0000 36.00Materiales

040502 ARENA FINA m3 1.0000 22.69 22.69 22.69Mano de obra

470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470401 PEON H-H 1.1429 9.95 11.37 12.92

Equipo481001 HERRAMIENTA %MO 3.0000 12.92 0.39 0.39

03010540 RELLENO CON AFIRMADO DE 3"Rendimiento (M2 /día) 200.0000 4.39Materiales

381001 AFIRMADO m3 0.0760 25.21 1.92 1.92Mano de obra

470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.00470401 PEON H-H 0.0400 9.95 0.40 0.94

Equipo481001 HERRAMIENTA %MO 3.0000 0.94 0.03 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0200 75.07 1.50 1.53

03010560 RELLENO MASIVO C/MAT PROPIO COMPAC.C/EQ.Rendimiento (M3 /día) 400.0000 7.98Mano de obra

470101 CAPATAZ H-H 0.0020 13.59 0.03 0.00470201 OPERARIO H-H 0.0600 12.36 0.74 0.00470401 PEON H-H 0.0200 9.95 0.20 0.97

Equipo481001 HERRAMIENTA %MO 5.0000 0.97 0.05 0.00491001 CARGADOR S/LLANTAS 110-125 HP H-M 0.0200 144.66 2.89 0.00493005 MOTONIVELADORA 125 HP H-M 0.0200 128.64 2.57 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0200 75.07 1.50 7.01

03010580 RELLENO COMPACTADO C/EQUIPO MAT/PROPIORendimiento (M3 /día) 30.0000 11.86Mano de obra

470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00

Page 12: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.2667 9.95 2.65 6.31Equipo

481001 HERRAMIENTA %MO 5.0000 6.31 0.32 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.2667 19.60 5.23 5.55

03010600 RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO AFIRMADORendimiento (M3 /día) 30.0000 37.32Materiales

053501 AGUA m3 0.0500 5.00 0.25 0.00381001 AFIRMADO m3 1.0000 25.21 25.21 25.46

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.2667 9.95 2.65 6.31

Equipo481001 HERRAMIENTA %MO 5.0000 6.31 0.32 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.2667 19.60 5.23 5.55

03010620 RELLENO MASIVO C/MAT PRESTAMO COMP.C/EQ.Rendimiento (M3 /día) 400.0000 26.12Materiales

382001 MATERIAL DE RELLENO m3 1.0000 15.95 15.95 15.95Mano de obra

470101 CAPATAZ H-H 0.0020 13.59 0.03 0.00470201 OPERARIO H-H 0.0600 12.36 0.74 0.00470401 PEON H-H 0.0200 9.95 0.20 0.97

Equipo481001 HERRAMIENTA %MO 5.0000 0.97 0.05 0.00491001 CARGADOR S/LLANTAS 110-125 HP H-M 0.0200 144.66 2.89 0.00493005 MOTONIVELADORA 125 HP H-M 0.0200 128.64 2.57 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0200 75.07 1.50 0.00496521 CAMION CISTERNA 4x2, 122 HP, 1500 GLN H-M 0.0200 109.44 2.19 9.20

03010640 COMPACTACION CON RODILLORendimiento (M2 /día) 200.0000 2.47Mano de obra

470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.00470401 PEON H-H 0.0400 9.95 0.40 0.94

Equipo481001 HERRAMIENTA %MO 3.0000 0.94 0.03 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0200 75.07 1.50 1.53

03010650 ESCARIFICADO Y COMPACTACION CON RODILLO EXTERIORRendimiento (M2 /día) 150.0000 3.16Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470401 PEON H-H 0.1067 9.95 1.06 1.13

Equipo481001 HERRAMIENTA %MO 3.0000 1.13 0.03 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0267 75.07 2.00 2.03

03010651 ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA - INTERIORESRendimiento (M2 /día) 100.0000 3.32Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470401 PEON H-H 0.1600 9.95 1.59 1.70

Equipo481001 HERRAMIENTA %MO 3.0000 1.70 0.05 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0800 19.60 1.57 1.62

03010652 ESCARIFICADO Y COMPACTACION CON RODILLO Y CAL AL 10% E=0.30mRendimiento (M2 /día) 150.0000 9.25Materiales

300110 CAL (BOLSA X 20 kg) bl 1.0000 6.09 6.09 6.09Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470401 PEON H-H 0.1067 9.95 1.06 1.13

Equipo481001 HERRAMIENTA %MO 3.0000 1.13 0.03 0.00493521 RODILLO L.V.AUTOP. 70/100 HP, 7/ 9 TON H-M 0.0267 75.07 2.00 2.03

Page 13: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

03010660 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONESRendimiento (M3 /día) 8.0000 11.65Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470401 PEON H-H 1.0000 9.95 9.95 11.31

Equipo481001 HERRAMIENTA %MO 3.0000 11.31 0.34 0.34

03010682 ACARREO INTERNO, MAT.PROCEDENTE DE DEMOLICION.Rendimiento (M3 /día) 8.0000 11.65Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470401 PEON H-H 1.0000 9.95 9.95 11.31

Equipo481001 HERRAMIENTA %MO 3.0000 11.31 0.34 0.34

03010685 ACARREO INTERNO, MAT.PROCEDENTE DE EXC.DIST.CORTASRendimiento (M3 /día) 14.0000 6.66Mano de obra

470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470401 PEON H-H 0.5714 9.95 5.69 6.47

Equipo481001 HERRAMIENTA %MO 3.0000 6.47 0.19 0.19

03010700 ELIMINACION MATERIAL EXCEDENTE ACARREADORendimiento (M3 /día) 16.0000 19.65Mano de obra

470101 CAPATAZ H-H 0.0500 13.59 0.68 0.68Equipo

481001 HERRAMIENTA %MO 3.0000 0.68 0.02 0.00496501 CAMION VOLQUETE 4x2, 120/140 HP, 4 M3 H-M 0.1500 126.34 18.95 18.97

03010720 ELIMINACION MATERIAL EXCEDENTE C/MAQUINARendimiento (M3 /día) 300.0000 21.50Mano de obra

470101 CAPATAZ H-H 0.0027 13.59 0.04 0.00470201 OPERARIO H-H 0.0267 12.36 0.33 0.00470401 PEON H-H 0.0800 9.95 0.80 1.17

Equipo491001 CARGADOR S/LLANTAS 110-125 HP H-M 0.0267 144.66 3.86 0.00496503 CAMION VOLQUETE 4x2, 140/210 HP, 6 M3 H-M 0.1067 154.34 16.47 20.33

03010740 NIVELACION INTERIOR Y APISONADO PARA F.PISO,PATIO Y VEREDASRendimiento (M2 /día) 100.0000 3.63Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00430101 MADERA TORNILLO p² 0.0300 2.70 0.08 0.10

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0800 19.60 1.57 1.63

03010750 NIVELACION Y COMPACTACION EN AREA(FONDO) DE CIMENTACIONRendimiento (M2 /día) 100.0000 3.63Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00430101 MADERA TORNILLO p² 0.0300 2.70 0.08 0.10

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0800 19.60 1.57 1.63

03010760 NIVELACION Y APISONADO MANUAL DE AREAS LIBRESRendimiento (M2 /día) 120.0000 1.72

Page 14: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00430101 MADERA TORNILLO p² 0.0300 2.70 0.08 0.10

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470401 PEON H-H 0.0667 9.95 0.66 1.57

Equipo481001 HERRAMIENTA %MO 3.0000 1.57 0.05 0.05

03010780 AFIRMADO DE 3" EN INTERIORES,PATIOS Y VEREDASRendimiento (M2 /día) 200.0000 7.36Materiales

381001 AFIRMADO m3 0.0914 25.21 2.30 2.30Mano de obra

470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.00470301 OFICIAL H-H 0.0400 11.01 0.44 0.00470401 PEON H-H 0.3200 9.95 3.18 4.16

Equipo481001 HERRAMIENTA %MO 3.0000 4.16 0.12 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0400 19.60 0.78 0.90

03010790 AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORESRendimiento (M2 /día) 200.0000 8.34Materiales

381001 AFIRMADO m3 0.1300 25.21 3.28 3.28Mano de obra

470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.00470301 OFICIAL H-H 0.0400 11.01 0.44 0.00470401 PEON H-H 0.3200 9.95 3.18 4.16

Equipo481001 HERRAMIENTA %MO 3.0000 4.16 0.12 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0400 19.60 0.78 0.90

03010800 AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORESRendimiento (M2 /día) 180.0000 11.39Materiales

381001 AFIRMADO m3 0.1828 25.21 4.61 4.61Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 0.00470401 PEON H-H 0.4267 9.95 4.25 5.57

Equipo481001 HERRAMIENTA %MO 3.0000 5.57 0.17 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0533 19.60 1.04 1.21

03010810 AFIRMADO DE 8" PARA PISOS,PATIOS Y VEREDAS,COMPACTADO.Rendimiento (M2 /día) 180.0000 11.80Materiales

381001 AFIRMADO m3 0.2438 25.21 6.15 6.15Mano de obra

470101 CAPATAZ H-H 0.0044 13.59 0.06 0.00470201 OPERARIO H-H 0.0444 12.36 0.55 0.00470301 OFICIAL H-H 0.0444 11.01 0.49 0.00470401 PEON H-H 0.3556 9.95 3.54 4.64

Equipo481001 HERRAMIENTA %MO 3.0000 4.64 0.14 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0444 19.60 0.87 1.01

03010815 AFIRMADO DE 12" EN PISOS INTERIOR/EXTERIOR,COMPACTADO.Rendimiento (M2 /día) 150.0000 19.06Materiales

381001 AFIRMADO m3 0.4200 25.21 10.59 10.59Mano de obra

470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.5333 9.95 5.31 6.95

Page 15: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 6.95 0.21 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 H-M 0.0667 19.60 1.31 1.52

03010820 BOMBEO DE NAPA FREAT. EN EXCAV. ZANJASRendimiento (M3 /día) 30.0000 7.07Mano de obra

470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.1333 9.95 1.33 4.99

Equipo481001 HERRAMIENTA %MO 10.0000 4.99 0.50 0.00496021 MOTOBOMBA 5 HP, 3" H-M 0.8000 1.97 1.58 2.08

04010080 SUBCIMIENTO MEZCLA 1:10 + 30 % P.G.Rendimiento (M3 /día) 25.0000 128.80Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.1050 5.00 0.53 0.00210101 CEMENTO PORTLAND TIPO I bl 3.0450 15.13 46.07 0.00380101 HORMIGON m3 0.8700 22.69 19.74 79.05

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.89

04010090 SUBCIMIENTO, SUBZAPATA MEZCLA 1:12 + 30 % P.G.Rendimiento (M3 /día) 25.0000 123.49Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.0900 5.00 0.45 0.00210101 CEMENTO PORTLAND TIPO I bl 2.6500 15.13 40.09 0.00380101 HORMIGON m3 0.9030 22.69 20.49 73.74

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.89

04010120 SUBZAPATA MEZCLA 1:10 + 30 % P.G. (f'c=100 kg/cm2)Rendimiento (M3 /día) 25.0000 128.80Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.1050 5.00 0.53 0.00210101 CEMENTO PORTLAND TIPO I bl 3.0450 15.13 46.07 0.00380101 HORMIGON m3 0.8700 22.69 19.74 79.05

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.89

04010140 SOLADO PARA ZAPATAS e=2", 1:12 CEM/HORMRendimiento (M2 /día) 80.0000 16.79Materiales

053501 AGUA m3 0.0060 5.00 0.03 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1920 15.13 2.90 0.00380101 HORMIGON m3 0.0660 22.69 1.50 4.43

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00

Page 16: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.6000 9.95 5.97 9.68

Equipo481001 HERRAMIENTA %MO 3.0000 9.68 0.29 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.1000 23.94 2.39 2.68

04010160 ENSANCHE DE ZAPATAS CONCRETO 1:10 + 30%PRendimiento (M3 /día) 25.0000 128.80Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.1050 5.00 0.53 0.00210101 CEMENTO PORTLAND TIPO I bl 3.0450 15.13 46.07 0.00380101 HORMIGON m3 0.8700 22.69 19.74 79.05

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.89

04010170 ENSANCHE DE CIMIENTOS CONCRETO F'c=175Kg/cm2Rendimiento (M3 /día) 12.5000 213.88Materiales

040501 ARENA GRUESA m3 0.5100 22.69 11.57 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.7600 35.29 26.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 8.6600 15.13 131.03 170.34

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0320 23.94 0.77 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0320 7.30 0.23 2.24

04010180 DADOS DE CONCRETO 1:8 + 25% P.M.Rendimiento (M3 /día) 12.0000 187.34Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6733 13.84 9.32 11.87

04010200 CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100Kg/cm2Rendimiento (M3 /día) 25.0000 128.80Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.1050 5.00 0.53 0.00210101 CEMENTO PORTLAND TIPO I bl 3.0450 15.13 46.07 0.00380101 HORMIGON m3 0.8700 22.69 19.74 79.05

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.89

Page 17: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

04010213 CIMIENTOS CORRIDOS 175 kg/cm2 + 30 % P.G.Rendimiento (M3 /día) 25.0000 172.72Materiales

040501 ARENA GRUESA m3 0.4000 22.69 9.08 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.4000 35.29 14.12 0.00051002 PIEDRA GRANDE (MAX. 8") m3 0.3150 25.21 7.94 0.00053501 AGUA m3 0.1360 5.00 0.68 0.00210101 CEMENTO PORTLAND TIPO I bl 6.2000 15.13 93.81 125.63

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 40.86

Equipo481001 HERRAMIENTA %MO 3.0000 40.86 1.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.1600 23.94 3.83 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1600 7.30 1.17 6.23

04010214 CIMIENTOS.- CONCRETO 310KG/CM2 (CMTO TIPO V)Rendimiento (M3 /día) 14.0000 335.70Materiales

040501 ARENA GRUESA m3 0.4800 22.69 10.89 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2790 5.00 1.40 0.00230102 CEMENTO PORTLAND TIPO V x 42.5 KG bl 13.3900 19.20 257.09 288.79

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470301 OFICIAL H-H 0.5714 11.01 6.29 0.00470401 PEON H-H 2.2857 9.95 22.74 36.87

Equipo481001 HERRAMIENTA %MO 3.0000 36.87 1.11 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.2857 23.94 6.84 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.2857 7.30 2.09 10.04

04010215 CIMIENTOS CORRIDOS, ENCOF. Y DESENCOF.Rendimiento (M2 /día) 10.0000 28.32Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1000 2.39 0.24 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1500 2.39 0.36 0.00430101 MADERA TORNILLO p² 2.7200 2.70 7.34 7.94

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

04010216 CALZADURA: ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 12.0000 23.18Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.2000 2.39 0.48 0.00430101 MADERA TORNILLO p² 2.0000 2.70 5.40 6.36

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470301 OFICIAL H-H 0.6667 11.01 7.34 16.49

Equipo481001 HERRAMIENTA %MO 2.0000 16.49 0.33 0.33

04010220 MUROS DE CONTENCION, CONCRETO 1:10+30%PGRendimiento (M3 /día) 6.0000 198.27Materiales

051002 PIEDRA GRANDE (MAX. 8") m3 0.5040 25.21 12.71 0.00053501 AGUA m3 0.1050 5.00 0.53 0.00210101 CEMENTO PORTLAND TIPO I bl 3.0450 15.13 46.07 0.00380101 HORMIGON m3 0.8715 22.69 19.77 79.08

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00

Page 18: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 6.6667 9.95 66.33 99.30

Equipo481001 HERRAMIENTA %MO 3.0000 99.30 2.98 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.8000 13.84 11.07 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 19.89

04010240 MUROS DE CONTENCION, ENCOFRADO Y DESENC.Rendimiento (M2 /día) 10.0000 37.48Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0800 2.39 0.19 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.2200 2.39 0.53 0.00430101 MADERA TORNILLO p² 4.1800 2.70 11.29 12.01

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.9600 11.01 10.57 0.00470401 PEON H-H 0.3200 9.95 3.18 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

04010250 MUROS DE CONC. CICLOPEO 1:8+40% PG H=1.8Rendimiento (M3 /día) 10.0000 91.71Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00051005 PIEDRA GRANDE (MAX. 10") m3 0.4000 25.21 10.08 0.00053501 AGUA m3 0.0460 5.00 0.23 0.00210101 CEMENTO PORTLAND TIPO I bl 1.3600 15.13 20.58 0.00380101 HORMIGON m3 0.3100 22.69 7.03 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 38.84

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 46.68

Equipo481001 HERRAMIENTA %MO 3.0000 46.68 1.40 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.2000 23.94 4.79 6.19

04010260 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c >=100Kg/cm2Rendimiento (M3 /día) 12.0000 187.25Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6667 13.84 9.23 11.78

04010280 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 16.0000 22.72Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2600 2.39 0.62 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1300 2.39 0.31 0.00430101 MADERA TORNILLO p² 3.3500 2.70 9.05 9.98

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

04010300 SOBRECIMIENTO, ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

Page 19: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

04010320 BANCAS, CONCRETO 1:8 + 25% P.M.Rendimiento (M3 /día) 12.0000 187.25Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6667 13.84 9.23 11.78

04010340 BANCAS, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 16.0000 22.72Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2600 2.39 0.62 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1300 2.39 0.31 0.00430101 MADERA TORNILLO p² 3.3500 2.70 9.05 9.98

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

04010360 SARDINEL, CONCRETO 1:8+25% P.M.Rendimiento (M3 /día) 12.0000 187.25Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6667 13.84 9.23 11.78

04010380 SARDINEL, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 16.0000 22.72Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2600 2.39 0.62 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1300 2.39 0.31 0.00430101 MADERA TORNILLO p² 3.3500 2.70 9.05 9.98

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

04010400 GRADAS EN PISO CONCRETO CICLOPEORendimiento (M2 /día) 32.0000 25.09Materiales

053501 AGUA m3 0.0240 5.00 0.12 0.00

Page 20: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

210101 CEMENTO PORTLAND TIPO I bl 0.7500 15.13 11.35 0.00370101 BUGGI h-m 0.2500 0.40 0.10 0.00370102 LAMPA h-m 0.2500 0.40 0.10 0.00380101 HORMIGON m3 0.1600 22.69 3.63 15.30

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.5000 9.95 4.98 8.41

Equipo495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.1000 13.84 1.38 1.38

04010409 GRADAS EN PISO, CONCRETO F'c=175 kg/cm2.Rendimiento (M3 /día) 12.5000 222.88Materiales

040501 ARENA GRUESA m3 0.5100 22.69 11.57 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.7600 35.29 26.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 8.6600 15.13 131.03 170.34

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

04010410 GRADAS, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 12.0000 21.35Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0500 2.39 0.12 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00430101 MADERA TORNILLO p² 1.8000 2.70 4.86 5.10

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.6667 9.95 6.63 15.78

Equipo481001 HERRAMIENTA %MO 3.0000 15.78 0.47 0.47

04010441 JARDINERA DE CONCRETO 140 KG/CM2 0.60X0.15 ACABADO 1:2Rendimiento (M /día) 16.0000 25.97Materiales

040501 ARENA GRUESA m3 0.0390 22.69 0.88 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0480 35.29 1.69 0.00053501 AGUA m3 0.0170 5.00 0.09 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6980 15.13 10.56 0.00431001 MADERA CEDRO p² 0.0020 8.50 0.02 13.44

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.2500 11.01 2.75 0.00470401 PEON H-H 0.2500 9.95 2.49 12.10

Equipo495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.0200 13.84 0.28 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0200 7.30 0.15 0.43

04010445 BANCAS, CONCRETO 1:8 + 25% P.M.Rendimiento (M3 /día) 12.0000 187.25Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Page 21: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6667 13.84 9.23 11.78

04010450 BANCAS, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 16.0000 22.72Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2600 2.39 0.62 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1300 2.39 0.31 0.00430101 MADERA TORNILLO p² 3.3500 2.70 9.05 9.98

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

04010480 FALSO PISO MEZCLA 1:8 e=3"Rendimiento (M2 /día) 145.0000 16.98Materiales

053501 AGUA m3 0.0140 5.00 0.07 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4000 15.13 6.05 0.00380101 HORMIGON m3 0.0900 22.69 2.04 8.16

Mano de obra470101 CAPATAZ H-H 0.0166 13.59 0.23 0.00470201 OPERARIO H-H 0.1655 12.36 2.05 0.00470301 OFICIAL H-H 0.0552 11.01 0.61 0.00470401 PEON H-H 0.4414 9.95 4.39 7.28

Equipo481001 HERRAMIENTA %MO 3.0000 7.28 0.22 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0552 23.94 1.32 1.54

04010500 FALSO PISO MEZCLA 1:8 e=4"Rendimiento (M2 /día) 120.0000 21.81Materiales

053501 AGUA m3 0.0180 5.00 0.09 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5330 15.13 8.06 0.00380101 HORMIGON m3 0.1210 22.69 2.75 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 11.17

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.5333 9.95 5.31 8.78

Equipo481001 HERRAMIENTA %MO 3.0000 8.78 0.26 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0667 23.94 1.60 1.86

04010515 FALSO PISO MEZCLA 1:8 e=5"Rendimiento (M2 /día) 120.0000 24.53Materiales

053501 AGUA m3 0.0225 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6662 15.13 10.08 0.00380101 HORMIGON m3 0.1513 22.69 3.43 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 13.89

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.5333 9.95 5.31 8.78

Equipo481001 HERRAMIENTA %MO 3.0000 8.78 0.26 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0667 23.94 1.60 1.86

04010610 DADOS DE CONCRETO EN JUNTA DILATACION PISO C:H 1:10Rendimiento (M3 /día) 15.0000 167.99Materiales

053501 AGUA m3 0.1500 5.00 0.75 0.00210101 CEMENTO PORTLAND TIPO I bl 3.7000 15.13 55.98 0.00380101 HORMIGON m3 1.2500 22.69 28.36 85.09

Mano de obra

Page 22: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 1.0667 12.36 13.18 0.00470301 OFICIAL H-H 1.0667 11.01 11.74 0.00470401 PEON H-H 4.2667 9.95 42.45 68.09

Equipo481001 HERRAMIENTA %MO 3.0000 68.09 2.04 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.5333 23.94 12.77 14.81

04010620 DADOS DE CONCRETO, ENCOF. Y DESENCOF.Rendimiento (M2 /día) 10.0000 28.32Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1000 2.39 0.24 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1500 2.39 0.36 0.00430101 MADERA TORNILLO p² 2.7200 2.70 7.34 7.94

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

05010100 CIMIENTOS REFORZADOS CONCRETO 1:10+25%PMRendimiento (M3 /día) 12.5000 132.23Materiales

051003 PIEDRA MEDIANA (MAX. 6") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1110 5.00 0.56 0.00210101 CEMENTO PORTLAND TIPO I bl 3.2900 15.13 49.78 0.00380101 HORMIGON m3 0.9300 22.69 21.10 82.03

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 8.90

05010120 CIMIENTOS REFORZ. CONCRETO F'c=175 kg/cm2Rendimiento (M3 /día) 12.5000 202.92Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010130 CIMIENTOS REFORZ. CONCRETO F'c = 210 kg/cm2Rendimiento (M3 /día) 12.5000 221.23Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

05010140 CIMIENTOS REFORZADOS ENCOFRADO Y DESENC.

Page 23: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M2 /día) 10.0000 28.32Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1000 2.39 0.24 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1500 2.39 0.36 0.00430101 MADERA TORNILLO p² 2.7200 2.70 7.34 7.94

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

05010150 CIMIENTOS REFORZ. ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010160 ZAPATAS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 12.5000 192.44Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

05010180 ZAPATAS.- CONCRETO 175 kg/cm2Rendimiento (M3 /día) 12.5000 204.16Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

05010200 ZAPATAS.- CONCRETO 210 kg/cm2Rendimiento (M3 /día) 12.5000 221.23Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo

Page 24: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

05010220 ZAPATAS.- CONCRETO 280 kg/cm2Rendimiento (M3 /día) 12.5000 264.33Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5200 35.29 18.35 0.00053501 AGUA m3 0.1980 5.00 0.99 0.00210101 CEMENTO PORTLAND TIPO I bl 12.3000 15.13 186.10 216.56

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.3200 11.01 3.52 0.00470401 PEON H-H 2.5600 9.95 25.47 37.77

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010224 ZAPATAS.- CONCRETO 280 kg/cm2 CEMENTO TIPO MSRendimiento (M3 /día) 12.5000 262.73Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5200 35.29 18.35 0.00053501 AGUA m3 0.1980 5.00 0.99 0.00220101 CEMENTO TIPO MS bl 12.3000 15.00 184.50 214.96

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.3200 11.01 3.52 0.00470401 PEON H-H 2.5600 9.95 25.47 37.77

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010226 ZAPATAS.- CONCRETO 280 kg/cm2 CEMENTO TIPO IIRendimiento (M3 /día) 12.5000 296.80Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5200 35.29 18.35 0.00053501 AGUA m3 0.1980 5.00 0.99 0.00220102 CEMENTO PORTLAND TIPO II x 42.5 KG bl 12.3000 17.77 218.57 249.03

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.3200 11.01 3.52 0.00470401 PEON H-H 2.5600 9.95 25.47 37.77

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010230 ZAPATAS.- CONCRETO 310 kg/cm2Rendimiento (M3 /día) 12.5000 281.96Materiales

040501 ARENA GRUESA m3 0.4800 22.69 10.89 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 13.4000 15.13 202.74 234.19

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.3200 11.01 3.52 0.00470401 PEON H-H 2.5600 9.95 25.47 37.77

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010240 ZAPATAS.- CONCRETO 310 kg/cm2 - CEMENTO TIPO VRendimiento (M3 /día) 12.5000 336.50Materiales

Page 25: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040501 ARENA GRUESA m3 0.4800 22.69 10.89 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00230102 CEMENTO PORTLAND TIPO V x 42.5 KG bl 13.4000 19.20 257.28 288.73

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.3200 11.01 3.52 0.00470401 PEON H-H 2.5600 9.95 25.47 37.77

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 10.00

05010300 ZAPATAS.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 8.0000 38.26Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1000 2.39 0.24 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1500 2.39 0.36 0.00430101 MADERA TORNILLO p² 4.0300 2.70 10.88 11.48

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 0.7000 12.36 8.65 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 0.00470401 PEON H-H 0.5000 9.95 4.98 26.00

Equipo481001 HERRAMIENTA %MO 3.0000 26.00 0.78 0.78

05010320 ZAPATAS.- ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010340 VIGAS DE CIMENT.- CONC. 140 kg/cm2Rendimiento (M3 /día) 10.0000 205.58Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010360 VIGAS DE CIMENT.- CONC. 175 kg/cm2Rendimiento (M3 /día) 10.0000 217.30Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00

Page 26: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010380 VIGAS DE CIMENT.- CONC. 210 kg/cm2Rendimiento (M3 /día) 10.0000 234.37Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010382 VIGAS DE CIMENT.- CONC. 280 kg/cm2Rendimiento (M3 /día) 10.0000 281.14Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 12.3000 15.13 186.10 215.46

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010384 VIGAS DE CIMENT.-CONC. 280kg/cm2 CEMENTO TIPO 1PRendimiento (M3 /día) 10.0000 265.64Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210115 CEMENTO PUZOLANICO TIPO 1P bl 12.3000 13.87 170.60 199.96

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010386 VIGAS DE CIMENT.-CONC. 280kg/cm2 CEMENTO TIPO MSRendimiento (M3 /día) 10.0000 279.54Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00220101 CEMENTO TIPO MS bl 12.3000 15.00 184.50 213.86

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010388 VIGAS DE CIMENT.-CONC. 280kg/cm2 CEMENTO TIPO II

Page 27: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M3 /día) 10.0000 313.61Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00220102 CEMENTO PORTLAND TIPO II x 42.5 KG bl 12.3000 17.77 218.57 247.93

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.05

05010400 VIGAS DE CIMENT.- ENCOF. Y DESENCOFRendimiento (M2 /día) 8.0000 36.07Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3000 2.39 0.72 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.1500 2.39 0.36 0.00430101 MADERA TORNILLO p² 3.0400 2.70 8.21 9.29

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 0.7000 12.36 8.65 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 0.00470401 PEON H-H 0.5000 9.95 4.98 26.00

Equipo481001 HERRAMIENTA %MO 3.0000 26.00 0.78 0.78

05010420 VIGAS DE CIMENT.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010423 FALSO PISO ARMADO CONCRETO f'c=140 kg/cm²Rendimiento (m³ /día) 12.5000 192.44Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0640 13.59 0.87 0.00470201 OPERARIO H-H 0.6400 12.36 7.91 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 2.5600 9.95 25.47 41.30

Equipo481001 HERRAMIENTA %MO 3.0000 41.30 1.24 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.24

05010425 FALSO PISO ARMADO ACERO DE REFUERZO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

Page 28: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

05010430 SOBREC. REF. CONCRETO 1:8+25% P.M.Rendimiento (M3 /día) 12.0000 187.25Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.4200 25.21 10.59 0.00053501 AGUA m3 0.1370 5.00 0.69 0.00210101 CEMENTO PORTLAND TIPO I bl 3.8900 15.13 58.86 0.00380101 HORMIGON m3 0.8900 22.69 20.19 90.33

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 5.3333 9.95 53.07 85.14

Equipo481001 HERRAMIENTA %MO 3.0000 85.14 2.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.6667 13.84 9.23 11.78

05010440 SOBREC. REF. CONCRETO F'c=140 kg/cm2Rendimiento (M3 /día) 10.0000 201.54Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.4000 13.84 5.54 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 10.01

05010450 SOBREC. REF. CONCRETO F'c=175 kg/cm2Rendimiento (M3 /día) 10.0000 213.26Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 3.2000 9.95 31.84 51.63

Equipo481001 HERRAMIENTA %MO 3.0000 51.63 1.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, H-M 0.4000 13.84 5.54 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 10.01

05010462 SOBREC. REF. CONCRETO F'c=280 kg/cm2Rendimiento (M3 /día) 10.0000 346.60Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.1890 5.00 0.95 0.00210101 CEMENTO PORTLAND TIPO I bl 12.3000 15.13 186.10 215.26

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 6.4000 9.95 63.68 103.25

Equipo481001 HERRAMIENTA %MO 3.0000 103.25 3.10 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.09

05010464 SOBREC. REF. F'c=280 kg/cm2 CEMENTO TIPO 1PRendimiento (M3 /día) 10.0000 331.10Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00

Page 29: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.1890 5.00 0.95 0.00210115 CEMENTO PUZOLANICO TIPO 1P bl 12.3000 13.87 170.60 199.76

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 6.4000 9.95 63.68 103.25

Equipo481001 HERRAMIENTA %MO 3.0000 103.25 3.10 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.09

05010466 SOBREC. REF. F'c=280 kg/cm2 CEMENTO TIPO MSRendimiento (M3 /día) 10.0000 345.00Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.1890 5.00 0.95 0.00220101 CEMENTO TIPO MS bl 12.3000 15.00 184.50 213.66

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 6.4000 9.95 63.68 103.25

Equipo481001 HERRAMIENTA %MO 3.0000 103.25 3.10 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.09

05010468 SOBREC. REF. F'c=280 kg/cm2 CEMENTO TIPO IIRendimiento (M3 /día) 10.0000 379.07Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.1890 5.00 0.95 0.00220102 CEMENTO PORTLAND TIPO II x 42.5 KG bl 12.3000 17.77 218.57 247.73

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 6.4000 9.95 63.68 103.25

Equipo481001 HERRAMIENTA %MO 3.0000 103.25 3.10 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.09

05010470 SOBREC. REF. ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 16.0000 22.79Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2600 2.39 0.62 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1600 2.39 0.38 0.00430101 MADERA TORNILLO p² 3.3500 2.70 9.05 10.05

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

05010480 SOBREC. REF.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

Page 30: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

05010500 LOSAS DE CIMENT.- CONC. 140 kg/cm2Rendimiento (M3 /día) 22.0000 199.60Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010520 LOSAS DE CIMENT.- CONC. 175 kg/cm2Rendimiento (M3 /día) 22.0000 211.32Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010540 LOSAS DE CIMENT.- CONC. 210 kg/cm2Rendimiento (M3 /día) 22.0000 228.39Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010550 LOSAS DE CIMENTACION.- CONC. 280 kg/cm2Rendimiento (M3 /día) 22.0000 275.16Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 12.3000 15.13 186.10 215.46

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010552 LOSAS CIMENT.- CONC. 280 kg/cm2 CEMENTO TIPO 1PRendimiento (M3 /día) 22.0000 259.66

Page 31: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210115 CEMENTO PUZOLANICO TIPO 1P bl 12.3000 13.87 170.60 199.96

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010554 LOSAS CIMENT.- CONC. 280 kg/cm2 CEMENTO TIPO MSRendimiento (M3 /día) 22.0000 273.56Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00220101 CEMENTO TIPO MS bl 12.3000 15.00 184.50 213.86

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010556 LOSAS CIMENT.- CONC. 280 kg/cm2 CEMENTO TIPO IIRendimiento (M3 /día) 22.0000 307.63Materiales

040501 ARENA GRUESA m3 0.4500 22.69 10.21 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00220102 CEMENTO PORTLAND TIPO II x 42.5 KG bl 12.3000 17.77 218.57 247.93

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010558 LOSAS CIMENT.- CONC. 310 kg/cm2 CEMENTO TIPO VRendimiento (M3 /día) 22.0000 348.43Materiales

040501 ARENA GRUESA m3 0.4800 22.69 10.89 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00230102 CEMENTO PORTLAND TIPO V x 42.5 KG bl 13.4000 19.20 257.28 288.73

Mano de obra470101 CAPATAZ H-H 0.0727 13.59 0.99 0.00470201 OPERARIO H-H 0.7273 12.36 8.99 0.00470301 OFICIAL H-H 0.7273 11.01 8.01 0.00470401 PEON H-H 2.9091 9.95 28.95 46.94

Equipo481001 HERRAMIENTA %MO 3.0000 46.94 1.41 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3636 23.94 8.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3636 7.30 2.65 12.76

05010560 LOSAS DE CIMENT.- ENCOF. Y DESENCOFRADORendimiento (M2 /día) 20.0000 29.75Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3000 2.39 0.72 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.3300 2.39 0.79 0.00

Page 32: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

430101 MADERA TORNILLO p² 5.9300 2.70 16.01 17.52Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470301 OFICIAL H-H 0.4000 11.01 4.40 0.00470401 PEON H-H 0.2000 9.95 1.99 11.87

Equipo481001 HERRAMIENTA %MO 3.0000 11.87 0.36 0.36

05010580 LOSAS DE CIMENT.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010600 MUROS DE CONTENC.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 5.0000 272.65Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 13.58

05010620 MUROS DE CONTENC.- CONCRETO 175 kg/cm2Rendimiento (M3 /día) 5.0000 284.37Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 13.58

05010628 MUROS DE CONTENC.- CONCRETO 175 kg/cm2 C/ADIT/PLAST/CARAVIRendimiento (M3 /día) 5.0000 291.28Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3072 22.50 6.91 158.53

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00

Page 33: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 13.58

05010640 MUROS DE CONTENC.- CONCRETO 210 kg/cm2Rendimiento (M3 /día) 5.0000 301.44Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 13.58

05010650 MUROS DE CONTENC.- ENCOF. Y DESENCOFRADO (UNA CARA)Rendimiento (M2 /día) 12.0000 31.40Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0800 2.39 0.19 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.2200 2.39 0.53 0.00430101 MADERA TORNILLO p² 3.5000 2.70 9.45 10.17

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 0.2667 9.95 2.65 20.61

Equipo481001 HERRAMIENTA %MO 3.0000 20.61 0.62 0.62

05010660 MUROS DE CONTENC.- ENCOF. Y DESENCOFRADO (DOS CARAS)Rendimiento (M2 /día) 10.0000 35.74Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1200 2.39 0.29 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.2200 2.39 0.53 0.00430101 MADERA TORNILLO p² 3.5000 2.70 9.45 10.27

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.9600 11.01 10.57 0.00470401 PEON H-H 0.3200 9.95 3.18 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

05010662 MUROS DE CONTENC.- ENCOF. Y DESENC. UNA CARAVISTA UNA NORMALRendimiento (M2 /día) 10.0000 45.24Materiales

022004 CLAVOS CON CABEZA DE 4" kg 0.2000 2.39 0.48 0.00023521 PERNO 1/2" X 12" CON TUERCA und 0.0600 2.99 0.18 0.00300158 LACA PROTECTORA ENCOFRADO P/CON gal 0.0433 87.71 3.80 0.00300159 SOLVENTE PARA LACA PROTECTORA gal 0.0233 30.53 0.71 0.00430101 MADERA TORNILLO p² 2.0900 2.70 5.64 0.00440112 TRIPLAY LUPUNA 19 mm x 4' x 8' und 0.1300 68.91 8.96 19.77

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.9600 11.01 10.57 0.00470401 PEON H-H 0.3200 9.95 3.18 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

05010664 MUROS DE CONTENC.- ENCOF. Y DESENC. CARAVISTA (DOS CARAS)Rendimiento (M2 /día) 8.0000 64.88Materiales

022004 CLAVOS CON CABEZA DE 4" kg 0.2000 2.39 0.48 0.00023521 PERNO 1/2" X 12" CON TUERCA und 0.0600 2.99 0.18 0.00300158 LACA PROTECTORA ENCOFRADO P/CON gal 0.0866 87.71 7.60 0.00300159 SOLVENTE PARA LACA PROTECTORA gal 0.0466 30.53 1.42 0.00

Page 34: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

430101 MADERA TORNILLO p² 2.2700 2.70 6.13 0.00440112 TRIPLAY LUPUNA 19 mm x 4' x 8' und 0.2500 68.91 17.23 33.04

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.2000 11.01 13.21 0.00470401 PEON H-H 0.4000 9.95 3.98 30.91

Equipo481001 HERRAMIENTA %MO 3.0000 30.91 0.93 0.93

05010680 MUROS DE CONT.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010685 PLACAS, CONCRETO f'c=175 Kg/cm2-1 PISORendimiento (M3 /día) 5.0000 307.55Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.8000 9.95 87.56 127.13

Equipo481001 HERRAMIENTA %MO 3.0000 127.13 3.81 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.80

05010700 PLACAS, CONCRETO f'c=175 Kg/cm2-2 pisosRendimiento (M3 /día) 5.0000 311.15Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010704 PLACAS, CONCRETO F'c=175 kg/cm.C/ADIT/PLASTIFICANTE-CARARendimiento (M3 /día) 5.0000 317.48Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.2815 22.50 6.33 157.95

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo

Page 35: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010718 PLACAS, CONCRETO f'c=210 Kg/cm2.-1PISORendimiento (M3 /día) 5.0000 324.62Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.8000 9.95 87.56 127.13

Equipo481001 HERRAMIENTA %MO 3.0000 127.13 3.81 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.80

05010720 PLACAS, CONCRETO f'c=210 Kg/cm2.-2PISOSRendimiento (M3 /día) 5.0000 327.87Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5400 35.29 19.06 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.34

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010730 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVISRendimiento (M3 /día) 5.0000 336.01Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3462 22.50 7.79 176.48

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010740 PLACAS, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 10.0000 36.59Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1200 2.39 0.29 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.2200 2.39 0.53 0.00430101 MADERA TORNILLO p² 4.1800 2.70 11.29 12.11

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 0.4000 9.95 3.98 23.77

Equipo

Page 36: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 23.77 0.71 0.71

05010750 PLACAS, ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVORendimiento (M2 /día) 8.5000 49.55Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.1500 2.39 0.36 0.00023521 PERNO 1/2" X 12" CON TUERCA und 0.0600 2.99 0.18 0.00300158 LACA PROTECTORA ENCOFRADO P/CON gal 0.0433 87.71 3.80 0.00300159 SOLVENTE PARA LACA PROTECTORA gal 0.0233 30.53 0.71 0.00430101 MADERA TORNILLO p² 2.5000 2.70 6.75 0.00440112 TRIPLAY LUPUNA 19 mm x 4' x 8' und 0.1300 68.91 8.96 20.76

Mano de obra470101 CAPATAZ H-H 0.0941 13.59 1.28 0.00470201 OPERARIO H-H 0.9412 12.36 11.63 0.00470301 OFICIAL H-H 0.9412 11.01 10.36 0.00470401 PEON H-H 0.4706 9.95 4.68 27.95

Equipo481001 HERRAMIENTA %MO 3.0000 27.95 0.84 0.84

05010760 PLACAS, ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010780 COLUMNAS.- CONCRETO 140 kg/cm2 - 02 pisosRendimiento (M3 /día) 5.0000 299.43Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010790 COLUMNAS - CONCRETO 175 kg/cm² - 01 pisoRendimiento (M³ /día) 5.0000 307.55Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.8000 9.95 87.56 127.13

Equipo481001 HERRAMIENTA %MO 3.0000 127.13 3.81 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.80

05010800 COLUMNAS.- CONCRETO 175 kg/cm2 - 02 pisosRendimiento (M3 /día) 5.0000 311.15Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00

Page 37: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010810 COLUMNAS-CONCRETO 175 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTARendimiento (M3 /día) 5.0000 318.06Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3072 22.50 6.91 158.53

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010818 COLUMNAS - CONCRETO 210 KG/CM² - 1 pisoRendimiento (M³ /día) 5.0000 324.62Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.8000 9.95 87.56 127.13

Equipo481001 HERRAMIENTA %MO 3.0000 127.13 3.81 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.80

05010820 COLUMNAS.- CONCRETO 210 kg/cm2 - 2 pisosRendimiento (M3 /día) 5.0000 328.22Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010828 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVIRendimiento (M3 /día) 5.0000 336.01Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00

Page 38: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3462 22.50 7.79 176.48

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05010840 COLUMNAS.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 10.0000 37.09Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3000 2.39 0.72 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1700 2.39 0.41 0.00430101 MADERA TORNILLO p² 4.2500 2.70 11.48 12.61

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 0.4000 9.95 3.98 23.77

Equipo481001 HERRAMIENTA %MO 3.0000 23.77 0.71 0.71

05010842 COLUMNAS.- ENCOFRADO-DESENCOFRADO CARAVISTA C/ADITIVORendimiento (M2 /día) 9.0000 43.48Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.1500 2.39 0.36 0.00023521 PERNO 1/2" X 12" CON TUERCA und 0.0600 2.99 0.18 0.00300158 LACA PROTECTORA ENCOFRADO P/CON gal 0.0433 87.71 3.80 0.00300159 SOLVENTE PARA LACA PROTECTORA gal 0.0233 30.53 0.71 0.00430101 MADERA TORNILLO p² 2.5000 2.70 6.75 0.00440112 TRIPLAY LUPUNA 19 mm x 4' x 8' und 0.0650 68.91 4.48 16.28

Mano de obra470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470301 OFICIAL H-H 0.8889 11.01 9.79 0.00470401 PEON H-H 0.4444 9.95 4.42 26.41

Equipo481001 HERRAMIENTA %MO 3.0000 26.41 0.79 0.79

05010844 COLUMNAS.- ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05010848 COLUMNAS f'c=175kg/cm2 CERCO TIPO UNI C/ADIT/PLASTRendimiento (M3 /día) 10.0000 231.82Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.2807 22.50 6.32 157.94

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Page 39: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.29

05010850 COLUMNAS ENC. Y DESENC CERCO TIPO UNI ***Rendimiento (M2 /día) 20.0000 13.21Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3000 2.39 0.72 0.72Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.2000 9.95 1.99 7.47

Equipo481001 HERRAMIENTA %MO 3.0000 7.47 0.22 0.00484106 MOLDE METALICO:COLUMNA MUROS PR H-M 0.4000 12.00 4.80 5.02

05010860 COLUMNAS Fy=4200kg/cm2 CERCO TIPO UNI ***Rendimiento (KG /día) 300.0000 3.15Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0027 13.59 0.04 0.00470201 OPERARIO H-H 0.0267 12.36 0.33 0.00470301 OFICIAL H-H 0.0267 11.01 0.29 0.66

Equipo481001 HERRAMIENTA %MO 10.0000 0.66 0.07 0.07

05010900 GARGOLA.- CONCRETO 175 kg/cm2Rendimiento (M3 /día) 10.0000 231.40Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05010910 GARGOLA DE CONCRETO.-TERMINADO S/DISEÑORendimiento (UND/día) 10.0000 55.93Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0420 2.39 0.10 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.0350 2.39 0.08 0.00022002 CLAVOS CON CABEZA DE 2 1/2" kg 0.0570 2.39 0.14 0.00030110 ACERO kg 0.7490 2.19 1.64 0.00040501 ARENA GRUESA m3 0.0051 22.69 0.12 0.00040502 ARENA FINA m3 0.0066 22.69 0.15 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0076 35.29 0.27 0.00053501 AGUA m3 0.0046 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1114 15.13 1.69 0.00430101 MADERA TORNILLO p² 1.4361 2.70 3.88 8.09

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 0.8000 9.95 7.96 46.45

Equipo481001 HERRAMIENTA %MO 3.0000 46.45 1.39 1.39

05010920 GARGOLA.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 9.0000 42.86Materiales

Page 40: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.2400 2.39 0.57 0.00430101 MADERA TORNILLO p² 5.4100 2.70 14.61 15.66

Mano de obra470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470301 OFICIAL H-H 0.8889 11.01 9.79 0.00470401 PEON H-H 0.4444 9.95 4.42 26.41

Equipo481001 HERRAMIENTA %MO 3.0000 26.41 0.79 0.79

05010960 VIGAS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 10.0000 219.68Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05010970 VIGAS.- CONCRETO 175 kg/cm2 - 1 PISORendimiento (M3 /día) 10.0000 229.60Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.4000 9.95 43.78 63.57

Equipo481001 HERRAMIENTA %MO 3.0000 63.57 1.91 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.41

05010980 VIGAS.- CONCRETO 175 kg/cm2 - 2 PISOSRendimiento (M3 /día) 10.0000 231.40Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05010990 VIGAS.- CONCRETO 175 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA)Rendimiento (M3 /día) 10.0000 238.31Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 0.00

Page 41: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3072 22.50 6.91 158.53Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05010995 VIGAS.- CONCRETO 210 kg/cm2 - 1 PISORendimiento (M3 /día) 10.0000 246.67Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.4000 9.95 43.78 63.57

Equipo481001 HERRAMIENTA %MO 3.0000 63.57 1.91 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.41

05011000 VIGAS.- CONCRETO 210 kg/cm2 - 2 PISOSRendimiento (M3 /día) 10.0000 248.47Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05011010 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA)Rendimiento (M3 /día) 10.0000 256.26Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 0.00300201 ADITIVO PLASTIFICANTE Y REDUCTOR D gal 0.3462 22.50 7.79 176.48

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05011020 VIGAS.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 9.0000 42.86Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.2400 2.39 0.57 0.00

Page 42: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

430101 MADERA TORNILLO p² 5.4100 2.70 14.61 15.66Mano de obra

470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470301 OFICIAL H-H 0.8889 11.01 9.79 0.00470401 PEON H-H 0.4444 9.95 4.42 26.41

Equipo481001 HERRAMIENTA %MO 3.0000 26.41 0.79 0.79

05011025 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVORendimiento (M2 /día) 8.0000 48.67Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.3500 2.39 0.84 0.00023521 PERNO 1/2" X 12" CON TUERCA und 0.0200 2.99 0.06 0.00300158 LACA PROTECTORA ENCOFRADO P/CON gal 0.0433 87.71 3.80 0.00300159 SOLVENTE PARA LACA PROTECTORA gal 0.0233 30.53 0.71 0.00430101 MADERA TORNILLO p² 2.9300 2.70 7.91 0.00440112 TRIPLAY LUPUNA 19 mm x 4' x 8' und 0.0600 68.91 4.13 0.00722102 TUBERIA PVC-CLASE 10 SP 3/4" X 5M m 0.3300 1.89 0.62 18.07

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 0.00470401 PEON H-H 0.5000 9.95 4.98 29.71

Equipo481001 HERRAMIENTA %MO 3.0000 29.71 0.89 0.89

05011030 VIGAS.- ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011120 MANGUITO (TUB. PVC SAL 2") EN CONCRETO ARMADORendimiento (M /día) 15.0000 10.50Materiales

722201 TUBO PVC-SAL - 2" (3M) m 1.0300 2.88 2.97 2.97Mano de obra

470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 7.31

Equipo481001 HERRAMIENTA %MO 3.0000 7.31 0.22 0.22

05011130 MANGUITO C/TUB.PVC-SAP 2"L=.15 Y ACERO CORRUG. 5/8" L=0.90MRendimiento (UND/día) 16.0000 11.20Materiales

030103 FIERRO CORRUGADO 5/8" m 0.9000 3.41 3.07 0.00040502 ARENA FINA m3 0.0005 22.69 0.01 0.00722401 TUBERIA PVC-SAP 2" (DESAGUE) m 0.2000 5.27 1.05 4.13

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 6.86

Equipo481001 HERRAMIENTA %MO 3.0000 6.86 0.21 0.21

05011140 LOSAS MACIZAS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 10.0000 219.68Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00

Page 43: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05011150 LOSAS MACIZAS.- CONC.175 kg/cm2 - 1PISORendimiento (M3 /día) 10.0000 229.60Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.4000 9.95 43.78 63.57

Equipo481001 HERRAMIENTA %MO 3.0000 63.57 1.91 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.41

05011160 LOSAS MACIZAS.- CONC.175 kg/cm2 - 2PISOSRendimiento (M3 /día) 10.0000 231.40Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05011170 LOSAS MACIZAS.- CONC.210 kg/cm2-1 PISORendimiento (M3 /día) 10.0000 246.67Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.4000 9.95 43.78 63.57

Equipo481001 HERRAMIENTA %MO 3.0000 63.57 1.91 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.41

05011180 LOSAS MACIZAS.- CONC.210kg/cm2-2 PISOSRendimiento (M3 /día) 10.0000 248.47Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00

Page 44: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 4.0000 9.95 39.80 59.59Equipo

481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 20.19

05011200 LOSAS MACIZAS.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 12.0000 36.98Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.1000 2.39 0.24 0.00022002 CLAVOS CON CABEZA DE 2 1/2" kg 0.1400 2.39 0.33 0.00430101 MADERA TORNILLO p² 5.9300 2.70 16.01 16.58

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470301 OFICIAL H-H 0.6667 11.01 7.34 0.00470401 PEON H-H 0.3333 9.95 3.32 19.81

Equipo481001 HERRAMIENTA %MO 3.0000 19.81 0.59 0.59

05011220 LOSAS MACIZAS.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011240 LOSA ALIGERADA - CONCRETO 140 kg/cm2Rendimiento (M3 /día) 12.5000 215.26Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.1280 13.59 1.74 0.00470201 OPERARIO H-H 0.9600 12.36 11.87 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 3.8400 9.95 38.21 58.87

Equipo481001 HERRAMIENTA %MO 3.0000 58.87 1.77 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.3200 14.74 4.72 16.49

05011250 LOSA ALIGERADA - CONCRETO 175 kg/cm2 - 1 PISORendimiento (M3 /día) 12.5000 225.53Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1280 13.59 1.74 0.00470201 OPERARIO H-H 0.9600 12.36 11.87 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 4.1600 9.95 41.39 62.05

Equipo481001 HERRAMIENTA %MO 3.0000 62.05 1.86 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 11.86

05011260 LOSA ALIGERADA - CONCRETO 175 kg/cm2 - 2 PISOSRendimiento (M3 /día) 12.5000 226.98Materiales

Page 45: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1280 13.59 1.74 0.00470201 OPERARIO H-H 0.9600 12.36 11.87 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 3.8400 9.95 38.21 58.87

Equipo481001 HERRAMIENTA %MO 3.0000 58.87 1.77 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.3200 14.74 4.72 16.49

05011261 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 15.0000 26.41Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.1000 2.39 0.24 0.00022002 CLAVOS CON CABEZA DE 2 1/2" kg 0.1100 2.39 0.26 0.00430101 MADERA TORNILLO p² 3.5600 2.70 9.61 10.11

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470301 OFICIAL H-H 0.5333 11.01 5.87 0.00470401 PEON H-H 0.2667 9.95 2.65 15.83

Equipo481001 HERRAMIENTA %MO 3.0000 15.83 0.47 0.47

05011263 LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011264 LOSA ALIGERADA.- LADR. HUECO 15x30x30Rendimiento (UND/día) 1600.0000 1.52Materiales

171515 LADRILLO PARA TECHO 15x30x30 CM und 1.0500 0.88 0.92 0.92Mano de obra

470101 CAPATAZ H-H 0.0005 13.59 0.01 0.00470201 OPERARIO H-H 0.0050 12.36 0.06 0.00470301 OFICIAL H-H 0.0050 11.01 0.06 0.00470401 PEON H-H 0.0450 9.95 0.45 0.58

Equipo481001 HERRAMIENTA %MO 3.0000 0.58 0.02 0.02

05011280 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 2 PISOSRendimiento (M3 /día) 12.5000 244.05Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1280 13.59 1.74 0.00470201 OPERARIO H-H 0.9600 12.36 11.87 0.00470301 OFICIAL H-H 0.6400 11.01 7.05 0.00470401 PEON H-H 3.8400 9.95 38.21 58.87

Equipo481001 HERRAMIENTA %MO 3.0000 58.87 1.77 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.3200 23.94 7.66 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.3200 14.74 4.72 16.49

Page 46: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

05011320 LOSA ALIGERADA.- ENCOFRADO (DOS SENTIDOS)Rendimiento (M2 /día) 12.0000 32.36Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.1300 2.39 0.31 0.00022002 CLAVOS CON CABEZA DE 2 1/2" kg 0.1300 2.39 0.31 0.00430101 MADERA TORNILLO p² 4.2000 2.70 11.34 11.96

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470301 OFICIAL H-H 0.6667 11.01 7.34 0.00470401 PEON H-H 0.3333 9.95 3.32 19.81

Equipo481001 HERRAMIENTA %MO 3.0000 19.81 0.59 0.59

05011360 LOSA ALIGERADA.- LADR. HUECO 12x30x30Rendimiento (UND/día) 2000.0000 1.35Materiales

171510 LADRILLO PARA TECHO 12x30x30 CM und 1.0500 0.84 0.88 0.88Mano de obra

470101 CAPATAZ H-H 0.0004 13.59 0.01 0.00470201 OPERARIO H-H 0.0040 12.36 0.05 0.00470301 OFICIAL H-H 0.0040 11.01 0.04 0.00470401 PEON H-H 0.0360 9.95 0.36 0.46

Equipo481001 HERRAMIENTA %MO 3.0000 0.46 0.01 0.01

05011400 LOSA ALIGERADA.- LADR. HUECO 20x30x30Rendimiento (UND/día) 1300.0000 2.14Materiales

171520 LADRILLO PARA TECHO 20x30x30 CM und 1.0500 1.34 1.41 1.41Mano de obra

470101 CAPATAZ H-H 0.0006 13.59 0.01 0.00470201 OPERARIO H-H 0.0062 12.36 0.08 0.00470301 OFICIAL H-H 0.0062 11.01 0.07 0.00470401 PEON H-H 0.0554 9.95 0.55 0.71

Equipo481001 HERRAMIENTA %MO 3.0000 0.71 0.02 0.02

05011410 LOSA ALIGERADA.- LADR. HUECO 25x30x30Rendimiento (UND/día) 1300.0000 2.90Materiales

171525 LADRILLO PARA TECHO 25X30X30 CM und 1.0500 2.07 2.17 2.17Mano de obra

470101 CAPATAZ H-H 0.0006 13.59 0.01 0.00470201 OPERARIO H-H 0.0062 12.36 0.08 0.00470301 OFICIAL H-H 0.0062 11.01 0.07 0.00470401 PEON H-H 0.0554 9.95 0.55 0.71

Equipo481001 HERRAMIENTA %MO 3.0000 0.71 0.02 0.02

05011420 LOSA ALIGERADA.- BLOQUETA 15x25x30Rendimiento (UND/día) 150.0000 2.73Materiales

170513 BLOQUE HUECO CONC. TECHO 15X30X25 und 1.0500 1.30 1.37 1.37Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 1.32

Equipo481001 HERRAMIENTA %MO 3.0000 1.32 0.04 0.04

05011440 LOSA ALIGERADA.- BLOQUETA 15x30x30Rendimiento (UND/día) 150.0000 3.02Materiales

170514 BLOQUE HUECO CONC. TECHO 15X30X30 und 1.0500 1.58 1.66 1.66Mano de obra

470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 1.32

Equipo481001 HERRAMIENTA %MO 3.0000 1.32 0.04 0.04

Page 47: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

05011450 LOSA ALIGERADA.- BLOQUETA 20x30x30Rendimiento (UND/día) 120.0000 3.84Materiales

170515 BLOQUE HUECO CONC. TECHO 20X30X30 und 1.0500 2.05 2.15 2.15Mano de obra

470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 1.64

Equipo481001 HERRAMIENTA %MO 3.0000 1.64 0.05 0.05

05011460 ESCALERAS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 6.0000 292.55Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 6.9333 9.95 68.99 118.44

Equipo481001 HERRAMIENTA %MO 3.0000 118.44 3.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.6667 23.94 15.96 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.6667 7.30 4.87 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.6667 14.74 9.83 34.21

05011480 ESCALERAS.- CONCRETO 175 kg/cm2Rendimiento (M3 /día) 6.0000 304.27Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 6.9333 9.95 68.99 118.44

Equipo481001 HERRAMIENTA %MO 3.0000 118.44 3.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.6667 23.94 15.96 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.6667 7.30 4.87 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.6667 14.74 9.83 34.21

05011500 ESCALERAS.- CONCRETO 210 kg/cm2Rendimiento (M3 /día) 6.0000 321.34Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 6.9333 9.95 68.99 118.44

Equipo481001 HERRAMIENTA %MO 3.0000 118.44 3.55 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.6667 23.94 15.96 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.6667 7.30 4.87 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.6667 14.74 9.83 34.21

05011520 ESCALERAS.- ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 6.0000 56.72Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0800 2.39 0.19 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1000 2.39 0.24 0.00

Page 48: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

430101 MADERA TORNILLO p² 5.7400 2.70 15.50 15.93Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 0.6667 9.95 6.63 39.60

Equipo481001 HERRAMIENTA %MO 3.0000 39.60 1.19 1.19

05011540 ESCALERAS.- ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011640 CISTERNA, CONCRETO f'c=175 kg/cm2.Rendimiento (M3 /día) 5.0000 299.36Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.57

05011650 CISTERNA, CONCRETO F'c=210 kg/cm2.Rendimiento (M3 /día) 5.0000 316.43Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 28.57

05011660 CISTERNA, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 10.0000 39.50Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1500 2.39 0.36 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.1200 2.39 0.29 0.00430101 MADERA TORNILLO p² 3.6400 2.70 9.83 10.48

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 1.2000 11.01 13.21 0.00470401 PEON H-H 0.4000 9.95 3.98 28.17

Equipo481001 HERRAMIENTA %MO 3.0000 28.17 0.85 0.85

05011680 CISTERNA, ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29

Page 49: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011700 TANQUES ELEVADOS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 5.0000 299.43Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05011720 TANQUES ELEVADOS.- CONCRETO 175 kg/cm2Rendimiento (M3 /día) 5.0000 311.15Materiales

040501 ARENA GRUESA m3 0.4900 22.69 11.12 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5100 35.29 18.00 0.00053501 AGUA m3 0.2320 5.00 1.16 0.00210101 CEMENTO PORTLAND TIPO I bl 8.0200 15.13 121.34 151.62

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05011740 TANQUES ELEVADOS.- CONCRETO 210 kg/cm2Rendimiento (M3 /día) 5.0000 328.22Materiales

040501 ARENA GRUESA m3 0.5000 22.69 11.35 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5500 35.29 19.41 0.00053501 AGUA m3 0.2290 5.00 1.15 0.00210101 CEMENTO PORTLAND TIPO I bl 9.0400 15.13 136.78 168.69

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 8.0000 9.95 79.60 119.17

Equipo481001 HERRAMIENTA %MO 3.0000 119.17 3.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.8000 23.94 19.15 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8000 7.30 5.84 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.8000 14.74 11.79 40.36

05011760 TANQUES ELEVADOS.- ENCOFRADO Y DESENCOFRRendimiento (M2 /día) 12.0000 48.66Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.1600 2.39 0.38 0.00430101 MADERA TORNILLO p² 4.5100 2.70 12.18 13.04

Mano de obra

Page 50: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 0.6667 9.95 6.63 34.58

Equipo481001 HERRAMIENTA %MO 3.0000 34.58 1.04 1.04

05011780 TANQUES ELEVADOS.- ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011800 GRADAS EN PISO, CONCRETO f'c=140 kg/cm2.Rendimiento (M2 /día) 22.2200 54.84Materiales

040501 ARENA GRUESA m3 0.1000 22.69 2.27 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1520 35.29 5.36 0.00053501 AGUA m3 0.0380 5.00 0.19 0.00210101 CEMENTO PORTLAND TIPO I bl 1.4400 15.13 21.79 29.61

Mano de obra470101 CAPATAZ H-H 0.0360 13.59 0.49 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.3600 11.01 3.96 0.00470401 PEON H-H 1.4401 9.95 14.33 23.23

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0640 23.94 1.53 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0640 7.30 0.47 2.00

05011820 GRADAS EN PISO, CONCRETO F'c=175 kg/cm2.Rendimiento (M2 /día) 22.2200 57.18Materiales

040501 ARENA GRUESA m3 0.1085 22.69 2.46 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1242 35.29 4.38 0.00053501 AGUA m3 0.0380 5.00 0.19 0.00210101 CEMENTO PORTLAND TIPO I bl 1.6473 15.13 24.92 31.95

Mano de obra470101 CAPATAZ H-H 0.0360 13.59 0.49 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.3600 11.01 3.96 0.00470401 PEON H-H 1.4401 9.95 14.33 23.23

Equipo495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0640 23.94 1.53 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0640 7.30 0.47 2.00

05011830 GRADAS EN PISO, ENCOFRADO Y DESENCOFRADORendimiento (M2 /día) 10.0000 25.48Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0500 2.39 0.12 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00430101 MADERA TORNILLO p² 1.8000 2.70 4.86 5.10

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

05011840 GRADAS EN PISO, ACERO Fy=4,200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00

Page 51: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011850 BANCAS.- CONCRETO 140 kg/cm2Rendimiento (M3 /día) 10.0000 213.78Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5900 35.29 20.82 0.00053501 AGUA m3 0.1840 5.00 0.92 0.00210101 CEMENTO PORTLAND TIPO I bl 7.0000 15.13 105.91 139.90

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 4.0000 9.95 39.80 59.59

Equipo481001 HERRAMIENTA %MO 3.0000 59.59 1.79 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4000 7.30 2.92 14.29

05011860 BANCAS.- ENCOFRADO Y DESENCOFRADO CE 1028 ADM/DIRECTARendimiento (M2 /día) 9.0000 42.86Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.2400 2.39 0.57 0.00430101 MADERA TORNILLO p² 5.4100 2.70 14.61 15.66

Mano de obra470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470301 OFICIAL H-H 0.8889 11.01 9.79 0.00470401 PEON H-H 0.4444 9.95 4.42 26.41

Equipo481001 HERRAMIENTA %MO 3.0000 26.41 0.79 0.79

05011870 BANCAS.- ACERO Fy=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

05011900 CANALETAS PARA AGUAS PLUVIALES f'c=175Rendimiento (M /día) 7.0000 49.81Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0800 2.39 0.19 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0800 2.39 0.19 0.00030110 ACERO kg 2.1000 2.19 4.60 0.00040501 ARENA GRUESA m3 0.0150 22.69 0.34 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0230 35.29 0.81 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2600 15.13 3.93 0.00430101 MADERA TORNILLO p² 2.9000 2.70 7.83 17.89

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470301 OFICIAL H-H 1.1429 11.01 12.58 0.00470401 PEON H-H 0.2286 9.95 2.27 30.53

Equipo481001 HERRAMIENTA %MO 3.0000 30.53 0.92 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, H-M 0.0150 23.94 0.36 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0150 7.30 0.11 1.39

05012030 IMPERMEABILIZACION C/GEOMEMBRANAS S-750Rendimiento (M2 /día) 80.0000 29.46Materiales

Page 52: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

300104 PEGAMENTO THF SOLVENTE gal 0.0175 12.95 0.23 0.00300143 GEOMEMBRANA TIPO S-750 0.75 MM ANC m² 1.0500 22.46 23.58 23.81

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.1000 9.95 1.00 4.71

Equipo481001 HERRAMIENTA %MO 20.0000 4.71 0.94 0.94

05012035 IMPERMEAB. DE CIMIENTOS CON ASFALTO LIQ.Rendimiento (M2 /día) 45.0000 6.51Materiales

133001 ASFALTO LIQUIDO RC-250 gal 0.1200 7.55 0.91 0.91Mano de obra

470101 CAPATAZ H-H 0.0178 13.59 0.24 0.00470201 OPERARIO H-H 0.1778 12.36 2.20 0.00470401 PEON H-H 0.2667 9.95 2.65 5.09

Equipo481001 HERRAMIENTA %MO 10.0000 5.09 0.51 0.51

05012040 INYECCION EPOXICA EN FISURAS DE COLUMNAS,VIGAS Y SOBRECIM.Rendimiento (M /día) 20.0000 16.63Materiales

300212 INYECCION EPOXICA PARA RELLENO DE gal 0.0500 190.26 9.51 9.51Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 5.48

Equipo481001 HERRAMIENTA %MO 30.0000 5.48 1.64 1.64

07010100 CORREAS DE MADERA TORNILLORendimiento (P2 /día) 60.0000 6.53Materiales

021503 ALAMBRE DE FIERRO GALVANIZADO # 16 kg 0.0200 4.67 0.09 0.00430101 MADERA TORNILLO p² 1.1000 2.70 2.97 3.06

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 3.30

Equipo481001 HERRAMIENTA %MO 5.0000 3.30 0.17 0.17

07010108 COBERT-MET/ACERO RECUB.PREPINTADO C/ALEA CION ALUM-ZINC-SILICIORendimiento (M2 /día) 40.0000 49.94Materiales

610111 PLANCHA MET.PREPINTADA E=0.50mm R/ m² 1.0000 40.75 40.75 40.75Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470301 OFICIAL H-H 0.2000 11.01 2.20 0.00470401 PEON H-H 0.4000 9.95 3.98 8.92

Equipo481001 HERRAMIENTA %MO 3.0000 8.92 0.27 0.27

07010109 TAPAONDA-ACERO PREPINTADO LAM.EN FRIO C/ALEAC-AL-ZINC-SILICIRendimiento (M /día) 24.0000 26.33Materiales

265201 ACCESORIOS DE FIJACION jgo 1.0000 3.84 3.84 0.00610208 TAPAONDA-ACERO LAMINADO EN FRIO P m 1.0000 17.78 17.78 21.62

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

07010360 COBERTURA C/LAMINA TERMOACUSTICA TIPO TEJA C/ALMA ACERORendimiento (M2 /día) 65.0000 49.65Materiales

024502 TIRAFONES 1/4" X 2" und 1.0000 2.00 2.00 0.00301546 LAMINA TERMOACUSTICA ONDULADA ROJund 0.3200 131.20 41.98 43.98

Page 53: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0123 13.59 0.17 0.00470201 OPERARIO H-H 0.1231 12.36 1.52 0.00470301 OFICIAL H-H 0.1231 11.01 1.36 0.00470401 PEON H-H 0.2462 9.95 2.45 5.50

Equipo481001 HERRAMIENTA %MO 3.0000 5.50 0.17 0.17

07010365 CUMBRERA TERMOACUSTICA C/ALMA ACERO ROJO/BLANCORendimiento (M /día) 100.0000 51.27Materiales

024502 TIRAFONES 1/4" X 2" und 2.0000 2.00 4.00 0.00301541 CUMBRERA C/FALDON 0.90x0.44 C/ALMA und 1.1800 38.40 45.31 49.31

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0800 9.95 0.80 1.90

Equipo481001 HERRAMIENTA %MO 3.0000 1.90 0.06 0.06

07010474 COBERT-MET/ACERO PREPINTADO RECUB.C/ALEAC-AL-ZINC-SIL E=0.50Rendimiento (M2 /día) 40.0000 49.94Materiales

610111 PLANCHA MET.PREPINTADA E=0.50mm R/ m² 1.0000 40.75 40.75 40.75Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470301 OFICIAL H-H 0.2000 11.01 2.20 0.00470401 PEON H-H 0.4000 9.95 3.98 8.92

Equipo481001 HERRAMIENTA %MO 3.0000 8.92 0.27 0.27

07010510 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICARendimiento (M2 /día) 70.0000 3.73Materiales

133001 ASFALTO LIQUIDO RC-250 gal 0.1000 7.55 0.76 0.76Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 10.0000 2.70 0.27 0.27

09010100 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 cm (*)Rendimiento (M2 /día) 6.5000 87.04Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0580 22.69 1.32 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 69.0000 0.66 45.54 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5130 15.13 7.76 0.00300110 CAL (BOLSA X 20 kg) bl 0.3200 6.09 1.95 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 58.30

Mano de obra470101 CAPATAZ H-H 0.1231 13.59 1.67 0.00470201 OPERARIO H-H 1.2308 12.36 15.21 0.00470401 PEON H-H 1.1077 9.95 11.02 27.90

Equipo481001 HERRAMIENTA %MO 3.0000 27.90 0.84 0.84

09010120 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 cm (*)Rendimiento (M2 /día) 9.5000 52.05Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0260 22.69 0.59 0.00053501 AGUA m3 0.0090 5.00 0.05 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 39.0000 0.66 25.74 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2320 15.13 3.51 0.00300110 CAL (BOLSA X 20 kg) bl 0.1450 6.09 0.88 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 32.39

Mano de obra

Page 54: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0842 13.59 1.14 0.00470201 OPERARIO H-H 0.8421 12.36 10.41 0.00470401 PEON H-H 0.7579 9.95 7.54 19.09

Equipo481001 HERRAMIENTA %MO 3.0000 19.09 0.57 0.57

09010140 MURO DE LADRILLO KK TIPO IV CANTO M:1:1:4 E=1.5 cm (*)Rendimiento (M2 /día) 8.0000 44.24Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0150 22.69 0.34 0.00053501 AGUA m3 0.0050 5.00 0.03 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 28.0000 0.66 18.48 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1300 15.13 1.97 0.00300110 CAL (BOLSA X 20 kg) bl 0.0810 6.09 0.49 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 22.93

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.7000 9.95 6.97 20.69

Equipo481001 HERRAMIENTA %MO 3.0000 20.69 0.62 0.62

09010150 MURO LAD.KK-TIPO IV CABEZA/1CARAV.1LIMP M:1:1:4 (*)Rendimiento (M2 /día) 4.0000 105.01Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0580 22.69 1.32 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 69.0000 0.66 45.54 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5130 15.13 7.76 0.00300110 CAL (BOLSA X 20 kg) bl 0.3200 6.09 1.95 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 58.30

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 1.8000 9.95 17.91 45.35

Equipo481001 HERRAMIENTA %MO 3.0000 45.35 1.36 1.36

09010180 MURO LAD.KK-TIPO IV SOGA/1CARAV.1 LIMP M:1:1:4 (*)Rendimiento (M2 /día) 6.0000 63.53Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0260 22.69 0.59 0.00053501 AGUA m3 0.0090 5.00 0.05 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 39.0000 0.66 25.74 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2320 15.13 3.51 0.00300110 CAL (BOLSA X 20 kg) bl 0.1450 6.09 0.88 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 32.39

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.2000 9.95 11.94 30.23

Equipo481001 HERRAMIENTA %MO 3.0000 30.23 0.91 0.91

09010202 MURO DE CABEZA LAD/CONCRETO 24x13x9cm M:1:1:4 E=1 cm (*)Rendimiento (M2 /día) 7.0000 76.23Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0580 22.69 1.32 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00170518 BLOQUE MACIZO DE CONCRETO MURO 2 und 69.0000 0.55 37.95 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5130 15.13 7.76 0.00300110 CAL (BOLSA X 20 kg) bl 0.3200 6.09 1.95 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 50.71

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470401 PEON H-H 0.9143 9.95 9.10 24.78

Page 55: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 24.78 0.74 0.74

09010220 MURO DE SOGA LAD/CONCRETO 24x13x9cm M:1:1:4 E=1 cm (*)Rendimiento (M2 /día) 9.5000 47.76Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0260 22.69 0.59 0.00053501 AGUA m3 0.0090 5.00 0.05 0.00170518 BLOQUE MACIZO DE CONCRETO MURO 2 und 39.0000 0.55 21.45 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2320 15.13 3.51 0.00300110 CAL (BOLSA X 20 kg) bl 0.1450 6.09 0.88 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 28.10

Mano de obra470101 CAPATAZ H-H 0.0842 13.59 1.14 0.00470201 OPERARIO H-H 0.8421 12.36 10.41 0.00470401 PEON H-H 0.7579 9.95 7.54 19.09

Equipo481001 HERRAMIENTA %MO 3.0000 19.09 0.57 0.57

09010230 MURO DE CANTO LAD/CONCRETO 24x13x9cm M:1:1:4 E=1 cm (*)Rendimiento (M2 /día) 10.0000 37.72Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0200 2.39 0.05 0.00040501 ARENA GRUESA m3 0.0150 22.69 0.34 0.00053501 AGUA m3 0.0050 5.00 0.03 0.00170518 BLOQUE MACIZO DE CONCRETO MURO 2 und 28.0000 0.55 15.40 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1300 15.13 1.97 0.00300110 CAL (BOLSA X 20 kg) bl 0.0810 6.09 0.49 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 19.85

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.6400 9.95 6.37 17.35

Equipo481001 HERRAMIENTA %MO 3.0000 17.35 0.52 0.52

09010561 MURO DE MAMP. PIEDRA DE H=0.40 m.Rendimiento (M /día) 8.5000 41.65Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0100 2.39 0.02 0.00040501 ARENA GRUESA m3 0.0350 22.69 0.79 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.1000 29.96 3.00 0.00053501 AGUA m3 0.0090 5.00 0.05 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3080 15.13 4.66 0.00430101 MADERA TORNILLO p² 0.2000 2.70 0.54 9.06

Mano de obra470101 CAPATAZ H-H 0.0941 13.59 1.28 0.00470201 OPERARIO H-H 0.9412 12.36 11.63 0.00470401 PEON H-H 1.8824 9.95 18.73 31.64

Equipo481001 HERRAMIENTA %MO 3.0000 31.64 0.95 0.95

09010562 MURO DE MAMP. PIEDRA DE H=0.60 m.Rendimiento (M /día) 8.0000 51.77Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.0660 22.69 1.50 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.1910 29.96 5.72 0.00053501 AGUA m3 0.0180 5.00 0.09 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5890 15.13 8.91 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 17.14

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 2.0000 9.95 19.90 33.62

Equipo481001 HERRAMIENTA %MO 3.0000 33.62 1.01 1.01

09010564 MURO DE MAMP. PIEDRA DE H=0.80 M.Rendimiento (M /día) 8.0000 62.01

Page 56: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.1080 22.69 2.45 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.3115 29.96 9.33 0.00053501 AGUA m3 0.0295 5.00 0.15 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9605 15.13 14.53 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 27.38

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 2.0000 9.95 19.90 33.62

Equipo481001 HERRAMIENTA %MO 3.0000 33.62 1.01 1.01

09010566 MURO DE MAMP. PIEDRA DE H=1.00 m.Rendimiento (M /día) 7.0000 77.19Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.1500 22.69 3.40 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.4320 29.96 12.94 0.00053501 AGUA m3 0.0410 5.00 0.21 0.00210101 CEMENTO PORTLAND TIPO I bl 1.3320 15.13 20.15 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 37.62

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470401 PEON H-H 2.2857 9.95 22.74 38.42

Equipo481001 HERRAMIENTA %MO 3.0000 38.42 1.15 1.15

09010568 MURO DE MAMP. PIEDRA DE H=1.20 m.Rendimiento (M /día) 6.0000 95.73Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.1980 22.69 4.49 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.5730 29.96 17.17 0.00053501 AGUA m3 0.0540 5.00 0.27 0.00210101 CEMENTO PORTLAND TIPO I bl 1.7660 15.13 26.72 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 49.57

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 2.6667 9.95 26.53 44.82

Equipo481001 HERRAMIENTA %MO 3.0000 44.82 1.34 1.34

09010570 MURO DE MAMP. PIEDRA DE H=1.50 m.Rendimiento (M /día) 5.0000 125.86Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.2840 22.69 6.44 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 0.8190 29.96 24.54 0.00053501 AGUA m3 0.0770 5.00 0.39 0.00210101 CEMENTO PORTLAND TIPO I bl 2.5230 15.13 38.17 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 70.46

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470401 PEON H-H 3.2000 9.95 31.84 53.79

Equipo481001 HERRAMIENTA %MO 3.0000 53.79 1.61 1.61

09010572 MURO DE MAMP. PIEDRA DE H=1.80 m.Rendimiento (M /día) 4.0000 167.53Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.3970 22.69 9.01 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 1.1470 29.96 34.36 0.00053501 AGUA m3 0.1080 5.00 0.54 0.00210101 CEMENTO PORTLAND TIPO I bl 3.5320 15.13 53.44 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 98.27

Page 57: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ESTRUCTURAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 4.0000 9.95 39.80 67.24

Equipo481001 HERRAMIENTA %MO 3.0000 67.24 2.02 2.02

09010574 MURO DE MAMP. PIEDRA DE H=2.00 m.Rendimiento (M /día) 3.5000 192.12Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0110 2.39 0.03 0.00040501 ARENA GRUESA m3 0.4570 22.69 10.37 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 1.3200 29.96 39.55 0.00053501 AGUA m3 0.1240 5.00 0.62 0.00210101 CEMENTO PORTLAND TIPO I bl 4.0650 15.13 61.50 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 112.96

Mano de obra470101 CAPATAZ H-H 0.2286 13.59 3.11 0.00470201 OPERARIO H-H 2.2857 12.36 28.25 0.00470401 PEON H-H 4.5714 9.95 45.49 76.85

Equipo481001 HERRAMIENTA %MO 3.0000 76.85 2.31 2.31

09010576 MURO DE MAMP. PIEDRA CON MORTERO 1:4Rendimiento (m³ /día) 6.0000 127.03Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0100 2.39 0.02 0.00040501 ARENA GRUESA m3 0.3150 22.69 7.15 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 1.0000 29.96 29.96 0.00053501 AGUA m3 0.0860 5.00 0.43 0.00210101 CEMENTO PORTLAND TIPO I bl 2.8040 15.13 42.42 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 80.87

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 2.6667 9.95 26.53 44.82

Equipo481001 HERRAMIENTA %MO 3.0000 44.82 1.34 1.34

09010576 MURO DE MAMP. PIEDRA CON MORTERO 1:4Rendimiento (m³ /día) 6.0000 127.03Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0100 2.39 0.02 0.00040501 ARENA GRUESA m3 0.3150 22.69 7.15 0.00051004 PIEDRA SELECCIONADA PARA PIRCA m3 1.0000 29.96 29.96 0.00053501 AGUA m3 0.0860 5.00 0.43 0.00210101 CEMENTO PORTLAND TIPO I bl 2.8040 15.13 42.42 0.00430101 MADERA TORNILLO p² 0.3300 2.70 0.89 80.87

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 2.6667 9.95 26.53 44.82

Equipo481001 HERRAMIENTA %MO 3.0000 44.82 1.34 1.34

09010700 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROSRendimiento (KG /día) 660.0000 2.82Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 1.0500 2.39 2.51 2.51Mano de obra

470101 CAPATAZ H-H 0.0012 13.59 0.02 0.00470201 OPERARIO H-H 0.0121 12.36 0.15 0.00470301 OFICIAL H-H 0.0121 11.01 0.13 0.30

Equipo481001 HERRAMIENTA %MO 3.0000 0.30 0.01 0.01

Page 58: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

10010100 TARRAJEO PRIMARIO, MORTERO C:A 1:5Rendimiento (M2 /día) 16.0000 13.43Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 3.80

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470401 PEON H-H 0.2500 9.95 2.49 9.35

Equipo481001 HERRAMIENTA %MO 3.0000 9.35 0.28 0.28

10010120 TARRAJEO EN MURO: INTERIOR Y EXTERIORRendimiento (M2 /día) 15.0000 14.27Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 4.01

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.2667 9.95 2.65 9.96

Equipo481001 HERRAMIENTA %MO 3.0000 9.96 0.30 0.30

10010130 TARRAJEO EN MUROS EXT. A PARTIR 2do.PISORendimiento (M2 /día) 10.0000 20.97Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0222 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.8500 2.70 2.30 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 4.74

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4800 9.95 4.78 15.76

Equipo481001 HERRAMIENTA %MO 3.0000 15.76 0.47 0.47

10010140 TARRAJEO EN MUROS PARTE SUPERIORRendimiento (M2 /día) 10.0000 20.97Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0222 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.8500 2.70 2.30 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 4.74

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4800 9.95 4.78 15.76

Equipo481001 HERRAMIENTA %MO 3.0000 15.76 0.47 0.47

Page 59: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

10010160 TARRAJEO BRUÑADO Y COLOREADO EN MURORendimiento (M2 /día) 12.0000 18.05Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0160 22.69 0.36 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00300102 OCRE BAYER ROJO 130 IMPORTADO kg 0.1250 10.00 1.25 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 5.21

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

10010220 TARRAJEO DE COLUMNASRendimiento (M2 /día) 8.0000 22.36Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 0.00431001 MADERA CEDRO p² 0.0388 8.50 0.33 4.13

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.4000 9.95 3.98 17.70

Equipo481001 HERRAMIENTA %MO 3.0000 17.70 0.53 0.53

10010240 TARRAJEO DE VIGASRendimiento (M2 /día) 6.5000 30.45Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0440 2.39 0.11 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 2.0000 2.70 5.40 0.00431001 MADERA CEDRO p² 0.0388 8.50 0.33 8.02

Mano de obra470101 CAPATAZ H-H 0.1231 13.59 1.67 0.00470201 OPERARIO H-H 1.2308 12.36 15.21 0.00470401 PEON H-H 0.4923 9.95 4.90 21.78

Equipo481001 HERRAMIENTA %MO 3.0000 21.78 0.65 0.65

10010260 TARRAJEO PULIDO DE BANCAS DE CONCRETO (1:5)Rendimiento (M2 /día) 12.0000 15.46Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1290 15.13 1.95 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 2.62

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

Page 60: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

10010270 TARRAJEO PULIDO DE SARDINELES DE CONCRETO (1:5)Rendimiento (M2 /día) 12.0000 15.46Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1290 15.13 1.95 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 2.62

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

10010280 TARRAJEO DE MUROS DE CONCRETO (1:5)Rendimiento (M2 /día) 12.0000 16.85Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 0.00431001 MADERA CEDRO p² 0.0250 8.50 0.21 4.01

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

10010290 TARRAJEO PULIDO DE MUROS DE CONCRETORendimiento (M2 /día) 9.0000 24.38Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00053501 AGUA m3 0.0050 5.00 0.03 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2510 15.13 3.80 0.00430101 MADERA TORNILLO p² 0.4600 2.70 1.24 5.44

Mano de obra470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470401 PEON H-H 0.6222 9.95 6.19 18.39

Equipo481001 HERRAMIENTA %MO 3.0000 18.39 0.55 0.55

10010300 TARRAJEO CON IMPERMEABILIZANTERendimiento (M2 /día) 12.0000 20.30Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0200 2.39 0.05 0.00040502 ARENA FINA m3 0.0300 22.69 0.68 0.00053501 AGUA m3 0.0050 5.00 0.03 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1600 15.13 2.42 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CON gal 0.0800 21.00 1.68 0.00430101 MADERA TORNILLO p² 0.4600 2.70 1.24 6.10

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.4667 9.95 4.64 13.79

Equipo481001 HERRAMIENTA %MO 3.0000 13.79 0.41 0.41

10010320 VESTIDURA DE DERRAMES (1:5)

Page 61: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M /día) 18.0000 8.95Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00040502 ARENA FINA m3 0.0020 22.69 0.05 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0180 15.13 0.27 0.00430101 MADERA TORNILLO p² 0.1270 2.70 0.34 0.00431001 MADERA CEDRO p² 0.0730 8.50 0.62 1.31

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.1333 9.95 1.33 7.42

Equipo481001 HERRAMIENTA %MO 3.0000 7.42 0.22 0.22

10010340 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2Rendimiento (M /día) 12.0000 13.05Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00040502 ARENA FINA m3 0.0020 22.69 0.05 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0360 15.13 0.54 0.00430101 MADERA TORNILLO p² 0.1270 2.70 0.34 0.00431001 MADERA CEDRO p² 0.0730 8.50 0.62 1.58

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.2000 9.95 1.99 11.14

Equipo481001 HERRAMIENTA %MO 3.0000 11.14 0.33 0.33

10010360 BRUÑAS SEGUN DETALLE (1 x 1 cm)Rendimiento (M /día) 30.0000 4.59Mano de obra

470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.0800 9.95 0.80 4.46

Equipo481001 HERRAMIENTA %MO 3.0000 4.46 0.13 0.13

11010100 CIELO RASO CON MEZCLA C:A 1:5Rendimiento (M2 /día) 10.0000 23.56Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0090 2.39 0.02 0.00040502 ARENA FINA m3 0.0160 22.69 0.36 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 2.1600 2.70 5.83 0.00431001 MADERA CEDRO p² 0.0180 8.50 0.15 8.15

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 3.0000 14.96 0.45 0.45

11010140 CIELO RASO CON YESO (CON CINTAS, 1 cm)Rendimiento (M2 /día) 12.0000 23.53Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0090 2.39 0.02 0.00300160 YESO (BOLSA DE 28 KG) bl 0.3523 13.30 4.69 0.00430101 MADERA TORNILLO p² 2.1600 2.70 5.83 0.00431001 MADERA CEDRO p² 0.0180 8.50 0.15 10.69

Page 62: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

11010180 VESTIDURA EN FONDO DE ESCALERASRendimiento (M2 /día) 8.0000 24.60Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0040 2.39 0.01 0.00040502 ARENA FINA m3 0.0170 22.69 0.39 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1170 15.13 1.77 0.00430101 MADERA TORNILLO p² 1.0800 2.70 2.92 0.00431001 MADERA CEDRO p² 0.0270 8.50 0.23 5.34

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.5000 9.95 4.98 18.70

Equipo481001 HERRAMIENTA %MO 3.0000 18.70 0.56 0.56

12010100 PISO DE CEMENTO FROT. Y BRUÑ. 2" S/COLOREARRendimiento (M2 /día) 45.0000 19.30Materiales

040501 ARENA GRUESA m3 0.0210 22.69 0.48 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0270 35.29 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4540 15.13 6.87 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 8.83

Mano de obra470101 CAPATAZ H-H 0.0178 13.59 0.24 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 0.00470401 PEON H-H 0.4444 9.95 4.42 9.21

Equipo481001 HERRAMIENTA %MO 3.0000 9.21 0.28 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0711 13.84 0.98 1.26

12010110 PISO DE CEMENTO FROTACHADO 2" S/COLOREARRendimiento (M2 /día) 50.0000 18.48Materiales

040501 ARENA GRUESA m3 0.0210 22.69 0.48 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0270 35.29 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4540 15.13 6.87 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 8.83

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.2880 12.36 3.56 0.00470301 OFICIAL H-H 0.0480 11.01 0.53 0.00470401 PEON H-H 0.4000 9.95 3.98 8.50

Equipo481001 HERRAMIENTA %MO 3.0000 8.50 0.26 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0640 13.84 0.89 1.15

12010120 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREARRendimiento (M2 /día) 40.0000 20.75Materiales

040501 ARENA GRUESA m3 0.0210 22.69 0.48 0.00

Page 63: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0270 35.29 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4540 15.13 6.87 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 8.83

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.0600 11.01 0.66 0.00470401 PEON H-H 0.5000 9.95 4.98 10.63

Equipo481001 HERRAMIENTA %MO 3.0000 10.63 0.32 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0700 13.84 0.97 1.29

12010160 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" COLOREADORendimiento (M2 /día) 40.0000 24.14Materiales

040501 ARENA GRUESA m3 0.0210 22.69 0.48 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0270 35.29 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4540 15.13 6.87 0.00300102 OCRE BAYER ROJO 130 IMPORTADO kg 0.3390 10.00 3.39 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 12.22

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.0600 11.01 0.66 0.00470401 PEON H-H 0.5000 9.95 4.98 10.63

Equipo481001 HERRAMIENTA %MO 3.0000 10.63 0.32 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0700 13.84 0.97 1.29

12010180 PISO DE CEMENTO FROT.4" C/F.PISORendimiento (M2 /día) 60.0000 30.93Materiales

040501 ARENA GRUESA m3 0.0100 22.69 0.23 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5320 15.13 8.05 0.00380101 HORMIGON m3 0.1206 22.69 2.74 0.00431001 MADERA CEDRO p² 0.1300 8.50 1.11 12.13

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 1.0933 9.95 10.88 17.34

Equipo481001 HERRAMIENTA %MO 2.0000 17.34 0.35 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0800 13.84 1.11 1.46

12010200 PISO DE CEMENTO PUL. 4" C/F.PISORendimiento (M2 /día) 60.0000 36.55Materiales

040501 ARENA GRUESA m3 0.0290 22.69 0.66 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8300 15.13 12.56 0.00380101 HORMIGON m3 0.0810 22.69 1.84 0.00431001 MADERA CEDRO p² 0.1300 8.50 1.11 16.17

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 1.2000 9.95 11.94 18.89

Equipo481001 HERRAMIENTA %MO 2.0000 18.89 0.38 0.00

Page 64: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0800 13.84 1.11 1.49

12010220 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" C/REDOXRendimiento (M2 /día) 40.0000 22.37Materiales

040501 ARENA GRUESA m3 0.0210 22.69 0.48 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0270 35.29 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4540 15.13 6.87 0.00300108 OCRE TIPO REDOX ROJO kg 0.2030 7.98 1.62 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 10.45

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.3600 12.36 4.45 0.00470301 OFICIAL H-H 0.0600 11.01 0.66 0.00470401 PEON H-H 0.5000 9.95 4.98 10.63

Equipo481001 HERRAMIENTA %MO 3.0000 10.63 0.32 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0700 13.84 0.97 1.29

12010240 PISO DE CEMENTO PULIDO Y BRUÑADO E=3" S/COLOREARRendimiento (M2 /día) 38.0000 25.09Materiales

040501 ARENA GRUESA m3 0.0350 22.69 0.79 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0440 35.29 1.55 0.00053501 AGUA m3 0.0160 5.00 0.08 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6380 15.13 9.65 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 12.54

Mano de obra470101 CAPATAZ H-H 0.0421 13.59 0.57 0.00470201 OPERARIO H-H 0.3789 12.36 4.68 0.00470301 OFICIAL H-H 0.0632 11.01 0.70 0.00470401 PEON H-H 0.5263 9.95 5.24 11.19

Equipo481001 HERRAMIENTA %MO 3.0000 11.19 0.34 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0737 13.84 1.02 1.36

12010260 PISO DE CEMENTO PULIDO Y BRUÑADO E=3" COLOREADORendimiento (M2 /día) 38.0000 28.48Materiales

040501 ARENA GRUESA m3 0.0350 22.69 0.79 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0440 35.29 1.55 0.00053501 AGUA m3 0.0160 5.00 0.08 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6380 15.13 9.65 0.00300102 OCRE BAYER ROJO 130 IMPORTADO kg 0.3390 10.00 3.39 0.00430101 MADERA TORNILLO p² 0.1000 2.70 0.27 15.93

Mano de obra470101 CAPATAZ H-H 0.0421 13.59 0.57 0.00470201 OPERARIO H-H 0.3789 12.36 4.68 0.00470301 OFICIAL H-H 0.0632 11.01 0.70 0.00470401 PEON H-H 0.5263 9.95 5.24 11.19

Equipo481001 HERRAMIENTA %MO 3.0000 11.19 0.34 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0737 13.84 1.02 1.36

12010281 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT.Y BRUÑADORendimiento (M2 /día) 105.0000 36.22Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0480 22.69 1.09 0.00

Page 65: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040502 ARENA FINA m3 0.0140 22.69 0.32 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0490 35.29 1.73 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9920 15.13 15.01 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 19.84

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.4952 12.36 6.12 0.00470301 OFICIAL H-H 0.0762 11.01 0.84 0.00470401 PEON H-H 0.7238 9.95 7.20 14.88

Equipo481001 HERRAMIENTA %MO 3.0000 14.88 0.45 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0762 13.84 1.05 1.50

12010282 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=5" FROT.Y BRUÑADORendimiento (M2 /día) 100.0000 42.97Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0600 22.69 1.36 0.00040502 ARENA FINA m3 0.0113 22.69 0.26 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0900 35.29 3.18 0.00053501 AGUA m3 0.0251 5.00 0.13 0.00210101 CEMENTO PORTLAND TIPO I bl 1.2288 15.13 18.59 0.00430101 MADERA TORNILLO p² 0.8250 2.70 2.23 25.76

Mano de obra470101 CAPATAZ H-H 0.0560 13.59 0.76 0.00470201 OPERARIO H-H 0.5200 12.36 6.43 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.7600 9.95 7.56 15.63

Equipo481001 HERRAMIENTA %MO 3.0000 15.63 0.47 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0800 13.84 1.11 1.58

12010291 PATIOS Y VEREDA CONCRETO 175 kg/cm² E=6" FROT.Y BRUÑADORendimiento (M2 /día) 105.0000 45.73Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0770 22.69 1.75 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0780 35.29 2.75 0.00053501 AGUA m3 0.0310 5.00 0.16 0.00210101 CEMENTO PORTLAND TIPO I bl 1.4340 15.13 21.70 0.00430101 MADERA TORNILLO p² 0.9860 2.70 2.66 29.35

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.4952 12.36 6.12 0.00470301 OFICIAL H-H 0.0762 11.01 0.84 0.00470401 PEON H-H 0.7238 9.95 7.20 14.88

Equipo481001 HERRAMIENTA %MO 3.0000 14.88 0.45 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0762 13.84 1.05 1.50

12010325 PATIO,VEREDAS Y SARDINELES.- ACERO FY=4200 kg/cm2Rendimiento (KG /día) 200.0000 3.54Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0700 2.19 2.34 2.46

Mano de obra470101 CAPATAZ H-H 0.0040 13.59 0.05 0.00470201 OPERARIO H-H 0.0400 12.36 0.49 0.00470301 OFICIAL H-H 0.0400 11.01 0.44 0.98

Equipo481001 HERRAMIENTA %MO 10.0000 0.98 0.10 0.10

Page 66: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

12010328 PISO DE ADOQUINES DE CONCRETO 0.105x0.21 e=4cmRendimiento (M2 /día) 18.0000 36.61Materiales

040501 ARENA GRUESA m3 0.0280 22.69 0.64 0.00040502 ARENA FINA m3 0.0050 22.69 0.11 0.00170542 ADOQUINES DE CONCRETO 0.105x0.20 e=4 m² 1.0000 26.43 26.43 0.00381001 AFIRMADO m3 0.0350 25.21 0.88 28.06

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.2222 9.95 2.21 8.30

Equipo481001 HERRAMIENTA %MO 3.0000 8.30 0.25 0.25

12010336 RAMPA DE CONCRETO 175 kg/cm2 E=4" BRUÑADO S/DISEÑORendimiento (M2 /día) 85.0000 40.30Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0480 22.69 1.09 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0490 35.29 1.73 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9920 15.13 15.01 0.00430101 MADERA TORNILLO p² 0.6600 2.70 1.78 20.05

Mano de obra470101 CAPATAZ H-H 0.0659 13.59 0.90 0.00470201 OPERARIO H-H 0.6118 12.36 7.56 0.00470301 OFICIAL H-H 0.0941 11.01 1.04 0.00470401 PEON H-H 0.8941 9.95 8.90 18.40

Equipo481001 HERRAMIENTA %MO 3.0000 18.40 0.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0941 13.84 1.30 1.85

12010337 RAMPAS DE CONCRETO 175 kg/cm2 E=5" BRUÑADO S/DISEÑORendimiento (M2 /día) 85.0000 46.44Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0600 22.69 1.36 0.00040502 ARENA FINA m3 0.0113 22.69 0.26 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0900 35.29 3.18 0.00053501 AGUA m3 0.0251 5.00 0.13 0.00210101 CEMENTO PORTLAND TIPO I bl 1.2288 15.13 18.59 0.00430101 MADERA TORNILLO p² 0.9860 2.70 2.66 26.19

Mano de obra470101 CAPATAZ H-H 0.0659 13.59 0.90 0.00470201 OPERARIO H-H 0.6118 12.36 7.56 0.00470301 OFICIAL H-H 0.0941 11.01 1.04 0.00470401 PEON H-H 0.8941 9.95 8.90 18.40

Equipo481001 HERRAMIENTA %MO 3.0000 18.40 0.55 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0941 13.84 1.30 1.85

12010400 CONTRAPISO DE 40 mmRendimiento (M2 /día) 100.0000 18.62Materiales

040502 ARENA FINA m3 0.0420 22.69 0.95 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3930 15.13 5.95 0.00431001 MADERA CEDRO p² 0.0600 8.50 0.51 7.47

Mano de obra470101 CAPATAZ H-H 0.0240 13.59 0.33 0.00470201 OPERARIO H-H 0.2400 12.36 2.97 0.00

Page 67: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 8.96

Equipo481001 HERRAMIENTA %MO 3.0000 8.96 0.27 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0800 23.94 1.92 2.19

12010420 CONTRAPISO DE 48 mmRendimiento (M2 /día) 100.0000 19.76Materiales

040502 ARENA FINA m3 0.0509 22.69 1.15 0.00053501 AGUA m3 0.0136 5.00 0.07 0.00210101 CEMENTO PORTLAND TIPO I bl 0.4549 15.13 6.88 0.00431001 MADERA CEDRO p² 0.0600 8.50 0.51 8.61

Mano de obra470101 CAPATAZ H-H 0.0240 13.59 0.33 0.00470201 OPERARIO H-H 0.2400 12.36 2.97 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 8.96

Equipo481001 HERRAMIENTA %MO 3.0000 8.96 0.27 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0800 23.94 1.92 2.19

12010450 CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOSRendimiento (M2 /día) 60.0000 37.41Materiales

040502 ARENA FINA m3 0.0140 22.69 0.32 0.00053501 AGUA m3 0.0280 5.00 0.14 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9480 15.13 14.34 0.00380101 HORMIGON m3 0.1600 22.69 3.63 0.00431001 MADERA CEDRO p² 0.0500 8.50 0.43 18.86

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.8000 9.95 7.96 14.91

Equipo481001 HERRAMIENTA %MO 3.0000 14.91 0.45 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.1333 23.94 3.19 3.64

12010510 SARDINEL H=0.50m F'c=175 kg/cm2 ACABADO 1:2Rendimiento (M /día) 16.0000 36.00Materiales

040501 ARENA GRUESA m3 0.0780 22.69 1.77 0.00040502 ARENA FINA m3 0.0030 22.69 0.07 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0850 35.29 3.00 0.00053501 AGUA m3 0.0270 5.00 0.14 0.00210101 CEMENTO PORTLAND TIPO I bl 1.2180 15.13 18.43 0.00431001 MADERA CEDRO p² 0.0075 8.50 0.06 23.47

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.2500 11.01 2.75 0.00470401 PEON H-H 0.2500 9.95 2.49 12.10

Equipo495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0200 13.84 0.28 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0200 7.30 0.15 0.43

12010520 ENCOFRADO DE SARDINELRendimiento (M2 /día) 16.0000 16.51Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2000 2.39 0.48 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0800 2.39 0.19 0.00430101 MADERA TORNILLO p² 1.1470 2.70 3.10 3.77

Page 68: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

Equipo481001 HERRAMIENTA %MO 3.0000 12.37 0.37 0.37

12010522 SARDINEL.- ACERO FY=4200 kg/cm2Rendimiento (KG /día) 250.0000 3.29Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.0500 2.39 0.12 0.00030110 ACERO kg 1.0500 2.19 2.30 2.42

Mano de obra470101 CAPATAZ H-H 0.0032 13.59 0.04 0.00470201 OPERARIO H-H 0.0320 12.36 0.40 0.00470301 OFICIAL H-H 0.0320 11.01 0.35 0.79

Equipo481001 HERRAMIENTA %MO 10.0000 0.79 0.08 0.08

12010530 SARDINEL P/RAMPA MEZCLA 1:12 ACABADO 1:2 INC/ENCOFRADORendimiento (M /día) 16.0000 44.24Materiales

040502 ARENA FINA m3 0.0060 22.69 0.14 0.00053501 AGUA m3 0.0300 5.00 0.15 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9310 15.13 14.09 0.00380101 HORMIGON m3 0.2840 22.69 6.44 0.00430101 MADERA TORNILLO p² 4.0200 2.70 10.85 0.00431001 MADERA CEDRO p² 0.0050 8.50 0.04 31.71

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.2500 11.01 2.75 0.00470401 PEON H-H 0.2500 9.95 2.49 12.10

Equipo495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0200 13.84 0.28 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0200 7.30 0.15 0.43

12010540 SARDINEL EN DUCHA REVEST. CON MAYOLICARendimiento (M /día) 6.3800 36.75Materiales

040502 ARENA FINA m3 0.0230 22.69 0.52 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 9.0000 0.66 5.94 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1850 15.13 2.80 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 0.3400 15.00 5.10 14.36

Mano de obra470201 OPERARIO H-H 1.2539 12.36 15.50 0.00470401 PEON H-H 0.6270 9.95 6.24 21.74

Equipo481001 HERRAMIENTA %MO 3.0000 21.74 0.65 0.65

12010545 SARDINEL EN URINARIO REVEST. CON MAYOLICA H=0.30mRendimiento (M /día) 5.0000 55.24Materiales

040502 ARENA FINA m3 0.0440 22.69 1.00 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 12.0000 0.66 7.92 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3500 15.13 5.30 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 0.8300 15.00 12.45 26.67

Mano de obra470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470401 PEON H-H 0.8000 9.95 7.96 27.74

Equipo481001 HERRAMIENTA %MO 3.0000 27.74 0.83 0.83

Page 69: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

12010580 PISO LOSETA VENECIANA 30x30 COLOR CLARORendimiento (M2 /día) 12.0000 38.61Materiales

040502 ARENA FINA m3 0.0270 22.69 0.61 0.00053501 AGUA m3 0.0070 5.00 0.04 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2610 15.13 3.95 0.00400510 LOSETA VENECIANA 30x30 - COLOR GRIS m² 1.0500 20.00 21.00 0.00431001 MADERA CEDRO p² 0.0200 8.50 0.17 25.77

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.3333 9.95 3.32 12.47

Equipo481001 HERRAMIENTA %MO 3.0000 12.47 0.37 0.37

12010590 PISO CERAMICO 30 x 30 SERIE COLOR - NACIONALRendimiento (M2 /día) 15.0000 32.78Materiales

040502 ARENA FINA m3 0.0105 22.69 0.24 0.00053501 AGUA m3 0.0029 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0935 15.13 1.41 0.00241003 PISO CERAMICO NACIONAL 30X30 SERIE m² 1.0500 19.70 20.69 0.00431001 MADERA CEDRO p² 0.0200 8.50 0.17 22.52

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.2667 9.95 2.65 9.96

Equipo481001 HERRAMIENTA %MO 3.0000 9.96 0.30 0.30

12010610 PISO EMPEDRADO, ASENTADO Y FRAGUADO C/MEZCLA C:A 1:4Rendimiento (M2 /día) 20.0000 21.85Materiales

040501 ARENA GRUESA m3 0.0400 22.69 0.91 0.00040502 ARENA FINA m3 0.0100 22.69 0.23 0.00051006 PIEDRA SELECCIONADA PARA EMPEDRAD m² 1.0000 10.00 10.00 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0200 15.13 0.30 11.44

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 10.0000 9.46 0.95 0.95

12010615 SARDINEL H=0.375 P/EMPEDRADO MEZCLA 1:8 ACABADO 1:2Rendimiento (M /día) 22.0000 15.90Materiales

040502 ARENA FINA m3 0.0040 22.69 0.09 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3440 15.13 5.20 0.00380101 HORMIGON m3 0.0630 22.69 1.43 0.00431001 MADERA CEDRO p² 0.0020 8.50 0.02 6.80

Mano de obra470101 CAPATAZ H-H 0.0364 13.59 0.49 0.00470201 OPERARIO H-H 0.3636 12.36 4.49 0.00470301 OFICIAL H-H 0.1818 11.01 2.00 0.00470401 PEON H-H 0.1818 9.95 1.81 8.79

Equipo495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0145 13.84 0.20 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0145 7.30 0.11 0.31

12010630 PISO DE MAYOLICA BLANCA 20x20 (PRIMERA)Rendimiento (M2 /día) 9.0000 37.05

Page 70: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales040502 ARENA FINA m3 0.0210 22.69 0.48 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1870 15.13 2.83 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.0500 15.00 15.75 0.00300101 PORCELANA BLANCA kg 0.1950 2.52 0.49 0.00431001 MADERA CEDRO p² 0.0450 8.50 0.38 19.93

Mano de obra470101 CAPATAZ H-H 0.0889 13.59 1.21 0.00470201 OPERARIO H-H 0.8889 12.36 10.99 0.00470401 PEON H-H 0.4444 9.95 4.42 16.62

Equipo481001 HERRAMIENTA %MO 3.0000 16.62 0.50 0.50

12010645 PISO LOSETA VINILICA DE ALTO TRANSITO e=3.2mmRendimiento (M2 /día) 60.0000 40.44Materiales

131505 PEGAMENTO ASFALTICO PARA PISOS gal 0.0600 24.36 1.46 0.00160102 LOSETA VINILICA 30.5x30.5 e=3.2 MM m² 1.0500 35.29 37.05 0.00521536 FILETE DE ALUMINIO 00-0305 34.92x3.18 m 0.0185 2.97 0.05 38.56

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 1.83

Equipo481001 HERRAMIENTA %MO 3.0000 1.83 0.05 0.05

12010680 MACHIHEMBRADO MAD.1"x4" DURMIENTE 2"x3"x4" 1er PisoRendimiento (M2 /día) 6.0000 81.83Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00430101 MADERA TORNILLO p² 17.6400 2.70 47.63 47.87

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Equipo481001 HERRAMIENTA %MO 3.0000 32.97 0.99 0.99

12010700 MACHIHEMBRADO MAD.1"x4" DURMIENTE 3"x1½" 2do PisoRendimiento (M2 /día) 8.0000 60.30Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00430101 MADERA TORNILLO p² 12.8100 2.70 34.59 34.83

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

12010760 PISO DE CONFITILLO E=2"Rendimiento (M2 /día) 100.0000 3.36Materiales

050510 CONFITILLO m3 0.0550 26.89 1.48 1.48Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0800 9.95 0.80 1.79

Equipo481001 HERRAMIENTA %MO 5.0000 1.79 0.09 0.09

12010780 PISO DE ARENA FINA E=6"Rendimiento (M2 /día) 100.0000 5.58Materiales

Page 71: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040502 ARENA FINA m3 0.1650 22.69 3.74 3.74Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0800 9.95 0.80 1.79

Equipo481001 HERRAMIENTA %MO 3.0000 1.79 0.05 0.05

12010790 PISO DE ADOQUINES DE CONCRETO 0.105x0.06x0.21Rendimiento (M2 /día) 18.0000 58.27Materiales

040502 ARENA FINA m3 0.0020 22.69 0.05 0.00170540 ADOQUINES DE CONCRETO .105 X.06 X.21 und 47.6000 1.04 49.50 0.00431001 MADERA CEDRO p² 0.0200 8.50 0.17 49.72

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.2222 9.95 2.21 8.30

Equipo481001 HERRAMIENTA %MO 3.0000 8.30 0.25 0.25

12010820 SARDINEL BORDE ZONA JUEGOS INF.F'c 140(13x35)+CIMEN 1:10Rendimiento (M /día) 16.0000 38.21Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1800 2.39 0.43 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1100 2.39 0.26 0.00040501 ARENA GRUESA m3 0.0200 22.69 0.45 0.00040502 ARENA FINA m3 0.0110 22.69 0.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0300 35.29 1.06 0.00053501 AGUA m3 0.0200 5.00 0.10 0.00210101 CEMENTO PORTLAND TIPO I bl 0.7400 15.13 11.20 0.00300110 CAL (BOLSA X 20 kg) bl 0.0200 6.09 0.12 0.00430101 MADERA TORNILLO p² 2.1200 2.70 5.72 0.00431001 MADERA CEDRO p² 0.0500 8.50 0.43 20.02

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 0.00470401 PEON H-H 0.5000 9.95 4.98 17.35

Equipo481001 HERRAMIENTA %MO 3.0000 17.35 0.52 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 1 H-M 0.0200 13.84 0.28 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0050 7.30 0.04 0.84

12010900 CANALETA "MEDIA CAñA" EN CIRCULACIONRendimiento (M /día) 15.0000 10.15Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0100 2.39 0.02 0.00040502 ARENA FINA m3 0.0030 22.69 0.07 0.00053501 AGUA m3 0.0020 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0300 15.13 0.45 0.00431001 MADERA CEDRO p² 0.0500 8.50 0.43 0.98

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.1600 9.95 1.59 8.90

Equipo481001 HERRAMIENTA %MO 3.0000 8.90 0.27 0.27

12010960 CUNETA DE MORTERO P/EVACUACION PLUVIAL EN TECHO A=0.10mRendimiento (M /día) 12.0000 18.34Materiales

040501 ARENA GRUESA m3 0.0050 22.69 0.11 0.00

Page 72: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040502 ARENA FINA m3 0.0025 22.69 0.06 0.00053501 AGUA m3 0.0020 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0924 15.13 1.40 0.00431001 MADERA CEDRO p² 0.0600 8.50 0.51 2.09

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.6667 9.95 6.63 15.78

Equipo481001 HERRAMIENTA %MO 3.0000 15.78 0.47 0.47

13010100 CONTR.S/COLOREAR H=10 cm MZ 1:2 e=1.5 cmRendimiento (M /día) 24.0000 6.12Materiales

040502 ARENA FINA m3 0.0010 22.69 0.02 0.00053501 AGUA m3 0.0004 5.00 0.00 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0240 15.13 0.36 0.38

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 0.00470401 PEON H-H 0.1000 9.95 1.00 5.57

Equipo481001 HERRAMIENTA %MO 3.0000 5.57 0.17 0.17

13010120 CONTR.S/COLOREAR H=15 cm MZ 1:2 e=1.5 cmRendimiento (M /día) 22.0000 6.85Materiales

040502 ARENA FINA m3 0.0020 22.69 0.05 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0360 15.13 0.54 0.60

Mano de obra470101 CAPATAZ H-H 0.0364 13.59 0.49 0.00470201 OPERARIO H-H 0.3636 12.36 4.49 0.00470401 PEON H-H 0.1091 9.95 1.09 6.07

Equipo481001 HERRAMIENTA %MO 3.0000 6.07 0.18 0.18

13010140 CONTR.S/COLOREAR H=20 cm MZ 1:2 e=1.5 cmRendimiento (M /día) 20.0000 7.68Materiales

040502 ARENA FINA m3 0.0030 22.69 0.07 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0480 15.13 0.73 0.81

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.1200 9.95 1.19 6.67

Equipo481001 HERRAMIENTA %MO 3.0000 6.67 0.20 0.20

13010160 CONTR.S/COLOREAR H=25 cm MZ 1:2 e=1.5 cmRendimiento (M /día) 18.0000 8.63Materiales

040502 ARENA FINA m3 0.0030 22.69 0.07 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0600 15.13 0.91 0.99

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.1333 9.95 1.33 7.42

Equipo481001 HERRAMIENTA %MO 3.0000 7.42 0.22 0.22

Page 73: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

13010180 CONTR.S/COLOREAR H=30 cm MZ 1:2 e=1.5 cmRendimiento (M /día) 17.0000 9.29Materiales

040502 ARENA FINA m3 0.0040 22.69 0.09 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0720 15.13 1.09 1.19

Mano de obra470101 CAPATAZ H-H 0.0471 13.59 0.64 0.00470201 OPERARIO H-H 0.4706 12.36 5.82 0.00470401 PEON H-H 0.1412 9.95 1.40 7.86

Equipo481001 HERRAMIENTA %MO 3.0000 7.86 0.24 0.24

13010200 CONTR.S/COLOREAR H=35 cm MZ 1:2 E=1.5 cmRendimiento (M /día) 17.0000 9.49Materiales

040502 ARENA FINA m3 0.0047 22.69 0.11 0.00053501 AGUA m3 0.0015 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0840 15.13 1.27 1.39

Mano de obra470101 CAPATAZ H-H 0.0471 13.59 0.64 0.00470201 OPERARIO H-H 0.4706 12.36 5.82 0.00470401 PEON H-H 0.1412 9.95 1.40 7.86

Equipo481001 HERRAMIENTA %MO 3.0000 7.86 0.24 0.24

13010210 CONTR.S/COLOREAR H=50 cm MZ 1:2 E=1.5 cmRendimiento (M /día) 15.0000 11.14Materiales

040502 ARENA FINA m3 0.0060 22.69 0.14 0.00053501 AGUA m3 0.0020 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1200 15.13 1.82 1.97

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.1600 9.95 1.59 8.90

Equipo481001 HERRAMIENTA %MO 3.0000 8.90 0.27 0.27

13010220 CONTR.S/COLOREAR H=60 cm MZ 1:2 E=1.5 cmRendimiento (M /día) 15.0000 11.54Materiales

040502 ARENA FINA m3 0.0080 22.69 0.18 0.00053501 AGUA m3 0.0020 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1440 15.13 2.18 2.37

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.1600 9.95 1.59 8.90

Equipo481001 HERRAMIENTA %MO 3.0000 8.90 0.27 0.27

13010230 CONTR.S/COLOREAR H=1.0 m MZ 1:2 E=1.5 cmRendimiento (M /día) 14.0000 13.76Materiales

040502 ARENA FINA m3 0.0120 22.69 0.27 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2400 15.13 3.63 3.92

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470401 PEON H-H 0.1714 9.95 1.71 9.55

Equipo

Page 74: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 9.55 0.29 0.29

13010240 CONTR.S/COLOREAR H=1.20 m, MZ 1:2 E=1.5 cmRendimiento (M /día) 12.0000 16.21Materiales

040502 ARENA FINA m3 0.0160 22.69 0.36 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2880 15.13 4.36 4.74

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.2000 9.95 1.99 11.14

Equipo481001 HERRAMIENTA %MO 3.0000 11.14 0.33 0.33

13010330 CONTRAZ.MAYOLICA BLANCA DE PRIMERA 20 x 20Rendimiento (M /día) 14.0000 13.74Materiales

040502 ARENA FINA m3 0.0040 22.69 0.09 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0370 15.13 0.56 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 0.2100 15.00 3.15 0.00300101 PORCELANA BLANCA kg 0.0390 2.52 0.10 3.90

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470401 PEON H-H 0.1714 9.95 1.71 9.55

Equipo481001 HERRAMIENTA %MO 3.0000 9.55 0.29 0.29

13010340 CONTRAZOCALO MAD. CEDRO 3/4"X4" + RODON 3/4"Rendimiento (M /día) 40.0000 13.25Materiales

022502 CLAVO PARA CEMENTO GALVANIZADO DE und 5.0000 0.10 0.50 0.00431001 MADERA CEDRO p² 1.0000 8.50 8.50 9.00

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1400 9.95 1.39 4.13

Equipo481001 HERRAMIENTA %MO 3.0000 4.13 0.12 0.12

13010360 CONTRAZOCALO DE LOSETA VENECIANA 10x30 CLARORendimiento (M /día) 12.0000 19.79Materiales

040502 ARENA FINA m3 0.0020 22.69 0.05 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0180 15.13 0.27 0.00400515 CONTRAZ. DE LOSETA VENECIANA 10X30 m 1.0000 8.00 8.00 8.32

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 0.2000 9.95 1.99 11.14

Equipo481001 HERRAMIENTA %MO 3.0000 11.14 0.33 0.33

13010420 COLOCACION DE CONTRAZOCALO MAD. CEDRO 3/4"X4"+RODON 3/4"Rendimiento (M /día) 40.0000 4.26Materiales

022502 CLAVO PARA CEMENTO GALVANIZADO DE und 0.0500 0.10 0.01 0.01Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1400 9.95 1.39 4.13

Equipo

Page 75: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 4.13 0.12 0.12

14010110 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.)Rendimiento (M2 /día) 7.0000 41.14Materiales

040502 ARENA FINA m3 0.0210 22.69 0.48 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1870 15.13 2.83 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.0500 15.00 15.75 0.00300101 PORCELANA BLANCA kg 0.1950 2.52 0.49 0.00300180 RODOPLAST 6mm m 0.5500 3.50 1.93 21.48

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470401 PEON H-H 0.3429 9.95 3.41 19.09

Equipo481001 HERRAMIENTA %MO 3.0000 19.09 0.57 0.57

14010115 ZOCALO DE CERAMICO 30x20Rendimiento (M2 /día) 10.0000 39.67Materiales

040502 ARENA FINA m3 0.0105 22.69 0.24 0.00053501 AGUA m3 0.0029 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0935 15.13 1.41 0.00240110 PISO-PARED CERAMICO 20x30 SERIE COL m² 1.0500 21.52 22.60 24.26

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 3.0000 14.96 0.45 0.45

14021000 ZOCALO DE CEMENTO PULIDO H=1.00 m.Rendimiento (M /día) 10.0000 19.61Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0200 2.39 0.05 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00053501 AGUA m3 0.0050 5.00 0.03 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2510 15.13 3.80 4.20

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 0.4000 9.95 3.98 14.96

Equipo481001 HERRAMIENTA %MO 3.0000 14.96 0.45 0.45

16010100 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASORendimiento (M /día) 8.0000 22.21Materiales

040502 ARENA FINA m3 0.0130 22.69 0.29 0.00053501 AGUA m3 0.0040 5.00 0.02 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1540 15.13 2.33 0.00431001 MADERA CEDRO p² 0.0360 8.50 0.31 2.95

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.5000 9.95 4.98 18.70

Equipo481001 HERRAMIENTA %MO 3.0000 18.70 0.56 0.56

16010140 REVEST.CEMENTO PUL.TRIBUNAS P=.7,C/P=.4Rendimiento (M /día) 7.0000 29.28Materiales

040502 ARENA FINA m3 0.0310 22.69 0.70 0.00

Page 76: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

210101 CEMENTO PORTLAND TIPO I bl 0.2460 15.13 3.72 0.00431001 MADERA CEDRO p² 0.3350 8.50 2.85 7.27

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470401 PEON H-H 0.5714 9.95 5.69 21.37

Equipo481001 HERRAMIENTA %MO 3.0000 21.37 0.64 0.64

16010160 CONTRAZOCALO RECTO DE ESCALERASRendimiento (M /día) 14.0000 11.44Materiales

040502 ARENA FINA m3 0.0100 22.69 0.23 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0120 15.13 0.18 0.00431001 MADERA CEDRO p² 0.1400 8.50 1.19 1.60

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470401 PEON H-H 0.1714 9.95 1.71 9.55

Equipo481001 HERRAMIENTA %MO 3.0000 9.55 0.29 0.29

16010200 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADORendimiento (M2 /día) 14.0000 19.85Materiales

040502 ARENA FINA m3 0.0280 22.69 0.64 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3390 15.13 5.13 0.00431001 MADERA CEDRO p² 0.0170 8.50 0.14 5.91

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470401 PEON H-H 0.5714 9.95 5.69 13.53

Equipo481001 HERRAMIENTA %MO 3.0000 13.53 0.41 0.41

17010100 CUB.DE LADR.PASTELERO ASENTADO CON BARRO e=2"C/FRAGUARendimiento (M2 /día) 21.0000 18.78Materiales

040501 ARENA GRUESA m3 0.0040 22.69 0.09 0.00041001 TIERRA DE CHACRA m3 0.0420 22.69 0.95 0.00173005 LADRILLO PASTELERO (HUECO) 24x24x03 und 17.0000 0.37 6.29 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0350 15.13 0.53 0.00431001 MADERA CEDRO p² 0.0070 8.50 0.06 7.92

Mano de obra470101 CAPATAZ H-H 0.0381 13.59 0.52 0.00470201 OPERARIO H-H 0.3810 12.36 4.71 0.00470401 PEON H-H 0.5333 9.95 5.31 10.54

Equipo481001 HERRAMIENTA %MO 3.0000 10.54 0.32 0.32

17010190 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICARendimiento (M2 /día) 70.0000 3.73Materiales

133001 ASFALTO LIQUIDO RC-250 gal 0.1000 7.55 0.76 0.76Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 10.0000 2.70 0.27 0.27

17010210 JUNTA DE DILATACION EN COB.LAD.PAST.C/MORTERO ASFALTICORendimiento (M /día) 70.0000 3.43

Page 77: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales040502 ARENA FINA m3 0.0100 22.69 0.23 0.00133001 ASFALTO LIQUIDO RC-250 gal 0.2100 7.55 1.59 1.82

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 1.56

Equipo481001 HERRAMIENTA %MO 3.0000 1.56 0.05 0.05

18010320 PUERTA CN C/TABLEROS MAD.,780-AULASRendimiento (M2 /día) 2.0000 427.03Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 32.5800 8.50 276.93 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 278.66

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 6.0000 12.36 74.16 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 123.64

Equipo481001 HERRAMIENTA %MO 20.0000 123.64 24.73 24.73

18010340 PTA.CN C/TABLEROS DE MAD.DOS HOJAS, 780Rendimiento (M2 /día) 2.4000 374.25Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0400 2.39 0.10 0.00431001 MADERA CEDRO p² 34.1500 8.50 290.28 0.00431025 COLA SINTETICA gal 0.1100 20.76 2.28 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 293.80

Mano de obra470101 CAPATAZ H-H 0.3333 13.59 4.53 0.00470201 OPERARIO H-H 3.3333 12.36 41.20 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 0.6667 9.95 6.63 67.04

Equipo481001 HERRAMIENTA %MO 20.0000 67.04 13.41 13.41

18010345 PUERTA CEDRO C/TABLERO C/SOBRELUZ EN SSHHRendimiento (M2 /día) 2.2000 402.88Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0400 2.39 0.10 0.00431001 MADERA CEDRO p² 31.2300 8.50 265.46 0.00431025 COLA SINTETICA gal 0.0625 20.76 1.30 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 268.00

Mano de obra470101 CAPATAZ H-H 0.3636 13.59 4.94 0.00470201 OPERARIO H-H 5.4545 12.36 67.42 0.00470301 OFICIAL H-H 3.6364 11.01 40.04 112.40

Equipo481001 HERRAMIENTA %MO 20.0000 112.40 22.48 22.48

18010360 PUERTA CEDRO-CONTRAPL.TRIP.6mm - INTERIORESRendimiento (M2 /día) 3.0000 245.18Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 16.0000 8.50 136.00 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 1.0000 25.21 25.21 166.05

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00

Page 78: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 2.6667 11.01 29.36 65.94Equipo

481001 HERRAMIENTA %MO 20.0000 65.94 13.19 13.19

18010400 PTA.CN C/TRIP.9mm (1.4x0.6),CAB.SSHH.780Rendimiento (M2 /día) 3.0000 247.25Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 16.7800 8.50 142.63 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440106 TRIPLAY LUPUNA 9 mm x 4' x 8' und 0.7000 38.66 27.06 171.42

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 15.0000 65.94 9.89 9.89

18010410 PTA.CN C/TRIP.9mm (1.6x0.7), GRUPO ELECTROGENORendimiento (M2 /día) 3.0000 269.09Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 18.4400 8.50 156.74 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440106 TRIPLAY LUPUNA 9 mm x 4' x 8' und 0.9000 38.66 34.79 193.26

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 15.0000 65.94 9.89 9.89

18010420 PTA.CN EN MESA DE LABORATORIORendimiento (M2 /día) 3.0000 153.35Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 7.0650 8.50 60.05 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 0.3700 25.21 9.33 74.22

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 20.0000 65.94 13.19 13.19

18010430 PUERTA CEDRO PARA CLOSET Y MUEBLE BAJO CE 110Rendimiento (M2 /día) 2.5000 188.66Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 10.8200 8.50 91.97 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 93.70

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 3.2000 11.01 35.23 79.13

Equipo481001 HERRAMIENTA %MO 20.0000 79.13 15.83 15.83

Page 79: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

18010440 PTA.CEDRO Y C/TRIP.6mm (MUEBLE BAJO)Rendimiento (M2 /día) 3.0000 153.35Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 7.0650 8.50 60.05 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 0.3700 25.21 9.33 74.22

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 20.0000 65.94 13.19 13.19

18010480 PTA.CLOSET CN-CONTRAPLAC.TRIPLAY 6mmRendimiento (M2 /día) 3.0000 245.18Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00431001 MADERA CEDRO p² 16.0000 8.50 136.00 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 0.5000 1.14 0.57 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 1.0000 25.21 25.21 166.05

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 20.0000 65.94 13.19 13.19

18010490 PUERTA CN.CORREDIZA CONTRAP.TRIPLAY 4mm, MUEBLES BAJOSRendimiento (M2 /día) 2.2500 226.89Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0500 2.39 0.12 0.00022012 CLAVOS SIN CABEZA DE 1" kg 0.0250 2.95 0.07 0.00431001 MADERA CEDRO p² 12.1000 8.50 102.85 0.00431025 COLA SINTETICA gal 0.0200 20.76 0.42 0.00436503 LIJA PARA MADERA und 2.0000 1.14 2.28 0.00440101 TRIPLAY LUPUNA 4 mm x 4' x 8' und 0.7000 16.81 11.77 0.00541005 BARNIZ MARINO gal 0.0400 37.82 1.51 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0700 33.61 2.35 121.37

Mano de obra470101 CAPATAZ H-H 0.3556 13.59 4.83 0.00470201 OPERARIO H-H 3.5556 12.36 43.95 0.00470301 OFICIAL H-H 3.5556 11.01 39.15 87.93

Equipo481001 HERRAMIENTA %MO 20.0000 87.93 17.59 17.59

18010500 ESTANTERIA DE MADERA CEDRORendimiento (M2 /día) 3.0000 149.40Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1800 2.39 0.43 0.00431001 MADERA CEDRO p² 8.1000 8.50 68.85 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 3.0200 1.14 3.44 76.87

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 10.0000 65.94 6.59 6.59

18010520 ESTANTERIA DE MADERA CEDRO

Page 80: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 1.8600 195.27Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1800 2.39 0.43 0.00431001 MADERA CEDRO p² 8.1000 8.50 68.85 0.00431025 COLA SINTETICA gal 0.2000 20.76 4.15 0.00436503 LIJA PARA MADERA und 3.0200 1.14 3.44 76.87

Mano de obra470101 CAPATAZ H-H 0.4301 13.59 5.85 0.00470201 OPERARIO H-H 4.3011 12.36 53.16 0.00470301 OFICIAL H-H 4.3011 11.01 47.36 106.37

Equipo481001 HERRAMIENTA %MO 11.3100 106.37 12.03 12.03

18010540 VENTANA CEDRO C/SEG.Ý 1/2",780Rendimiento (M2 /día) 3.2000 238.19Materiales

020531 FIERRO LISO 1/2" m 2.6700 3.22 8.60 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0300 2.39 0.07 0.00431001 MADERA CEDRO p² 20.0200 8.50 170.17 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5600 1.14 0.64 180.52

Mano de obra470101 CAPATAZ H-H 0.2500 13.59 3.40 0.00470201 OPERARIO H-H 2.5000 12.36 30.90 0.00470301 OFICIAL H-H 1.2500 11.01 13.76 48.06

Equipo481001 HERRAMIENTA %MO 20.0000 48.06 9.61 9.61

18010560 VENTANA CEDRO S/SEG., 780Rendimiento (M2 /día) 4.0000 218.06Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0300 2.39 0.07 0.00431001 MADERA CEDRO p² 20.0200 8.50 170.17 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5600 1.14 0.64 171.92

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 38.45

Equipo481001 HERRAMIENTA %MO 20.0000 38.45 7.69 7.69

18010562 VENTANA CEDRO C/SEG.Ý 1/2",780 PARA SS.HH.Rendimiento (M2 /día) 4.0000 284.24Materiales

020531 FIERRO LISO 1/2" m 2.0000 3.22 6.44 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0300 2.39 0.07 0.00431001 MADERA CEDRO p² 27.5000 8.50 233.75 0.00431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5600 1.14 0.64 241.94

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 38.45

Equipo481001 HERRAMIENTA %MO 10.0000 38.45 3.85 3.85

18010570 VENTANA CEDRO C/SEG.Ý 1/2", SIERRA 01 Y 02 PISOSRendimiento (M2 /día) 3.2000 243.28Materiales

020531 FIERRO LISO 1/2" m 4.2500 3.22 13.69 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0300 2.39 0.07 0.00431001 MADERA CEDRO p² 20.0200 8.50 170.17 0.00

Page 81: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

431025 COLA SINTETICA gal 0.0500 20.76 1.04 0.00436503 LIJA PARA MADERA und 0.5600 1.14 0.64 185.61

Mano de obra470101 CAPATAZ H-H 0.2500 13.59 3.40 0.00470201 OPERARIO H-H 2.5000 12.36 30.90 0.00470301 OFICIAL H-H 1.2500 11.01 13.76 48.06

Equipo481001 HERRAMIENTA %MO 20.0000 48.06 9.61 9.61

18010800 TAB.CN,C/TRIPLAY 4mm H=1.3m,INC.PTA S/CERRA + MAD.SUP.Rendimiento (M /día) 4.0000 159.97Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00431001 MADERA CEDRO p² 9.5300 8.50 81.01 0.00431025 COLA SINTETICA gal 0.0200 20.76 0.42 0.00440101 TRIPLAY LUPUNA 4 mm x 4' x 8' und 0.8000 16.81 13.45 95.12

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 0.00470401 PEON H-H 0.6000 9.95 5.97 55.43

Equipo481001 HERRAMIENTA %MO 17.0000 55.43 9.42 9.42

18010830 TAB.C/TRIPLAY 6mm H=2.1m, RESTO VIDRIO INC.PTA S/CERRARendimiento (M /día) 4.0000 221.73Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1000 2.39 0.24 0.00431001 MADERA CEDRO p² 15.3940 8.50 130.85 0.00431025 COLA SINTETICA gal 0.0280 20.76 0.58 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 1.0000 25.21 25.21 156.88

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 0.00470401 PEON H-H 0.6000 9.95 5.97 55.43

Equipo481001 HERRAMIENTA %MO 17.0000 55.43 9.42 9.42

18010850 PUERTA CEDRO C/TABLERO DE CEDRO (Mod.Lab-D/Comp.Deposito)Rendimiento (M² /día) 2.2000 354.14Materiales

022014 CLAVOS SIN CABEZA DE 2 1/2" kg 0.1250 2.95 0.37 0.00431001 MADERA CEDRO p² 25.5200 8.50 216.92 0.00431025 COLA SINTETICA gal 0.0400 20.76 0.83 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 219.26

Mano de obra470101 CAPATAZ H-H 0.3636 13.59 4.94 0.00470201 OPERARIO H-H 5.4545 12.36 67.42 0.00470301 OFICIAL H-H 3.6364 11.01 40.04 112.40

Equipo481001 HERRAMIENTA %MO 20.0000 112.40 22.48 22.48

18010902 TICERO DE MADERA CEDRO (L=4 m) BARNIZADORendimiento (UND/día) 5.0000 177.12Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0480 2.39 0.11 0.00024010 TORNILLO DE FIJACION 2" C/TARUGOS DE und 5.0000 0.21 1.05 0.00431001 MADERA CEDRO p² 17.5000 8.50 148.75 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00541005 BARNIZ MARINO gal 0.0368 37.82 1.39 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0616 33.61 2.07 154.51

Mano de obra

Page 82: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 21.95

Equipo481001 HERRAMIENTA %MO 3.0000 21.95 0.66 0.66

18010903 TICERO DE MADERA CEDRO (L=5 m) BARNIZADORendimiento (UND/día) 5.0000 215.38Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0600 2.39 0.14 0.00024010 TORNILLO DE FIJACION 2" C/TARUGOS DE und 6.0000 0.21 1.26 0.00431001 MADERA CEDRO p² 21.8700 8.50 185.90 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00541005 BARNIZ MARINO gal 0.0460 37.82 1.74 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0770 33.61 2.59 192.77

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 21.95

Equipo481001 HERRAMIENTA %MO 3.0000 21.95 0.66 0.66

19010100 VENTANA.C/S PERF.1"x1"x1/8" ,780Rendimiento (M2 /día) 3.6000 109.02Materiales

020531 FIERRO LISO 1/2" m 2.8100 3.22 9.05 0.00262511 BISAGRA PIN und 4.4500 1.70 7.57 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2300 9.90 2.28 0.00510501 PERFIL TEE 1/8" X 3/4" X 3/4" m 4.5800 2.86 13.10 0.00510505 PERFIL TEE 1/8" X 1" X 1" m 3.5600 3.63 12.92 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 1.9900 3.57 7.10 0.00512002 PLATINA DE FIERRO 1/8" x 1" X 6M m 2.8000 2.05 5.74 57.76

Mano de obra470101 CAPATAZ H-H 0.2222 13.59 3.02 0.00470201 OPERARIO H-H 2.2222 12.36 27.47 0.00470301 OFICIAL H-H 1.1111 11.01 12.23 42.72

Equipo481001 HERRAMIENTA %MO 20.0000 42.72 8.54 8.54

19010120 VENTANA.S/S PERF.1"x1"x1/8" ,780Rendimiento (M2 /día) 4.0000 86.79Materiales

262511 BISAGRA PIN und 4.4500 1.70 7.57 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1900 9.90 1.88 0.00510501 PERFIL TEE 1/8" X 3/4" X 3/4" m 4.5800 2.86 13.10 0.00510505 PERFIL TEE 1/8" X 1" X 1" m 3.5600 3.63 12.92 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 1.9900 3.57 7.10 42.57

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 38.45

Equipo481001 HERRAMIENTA %MO 15.0000 38.45 5.77 5.77

19010142 JUNTA C/SILICONA E=1.50cmx1" VENT-METALICARendimiento (M /día) 24.0000 17.27Materiales

430101 MADERA TORNILLO p² 0.1200 2.70 0.32 0.00600104 SILICONA (TUBO DE 305 ml) und 1.2500 10.17 12.71 13.03

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470301 OFICIAL H-H 0.3333 11.01 3.67 4.12

Equipo481001 HERRAMIENTA %MO 3.0000 4.12 0.12 0.12

Page 83: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

19010180 PUERTA DE FIERRO PARA CASETA DE GASRendimiento (M2 /día) 3.2000 124.64Materiales

262505 BISAGRA FIERRO ALUMINIZAD0 PESADO DEund 2.0500 2.40 4.92 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2500 9.90 2.48 0.00460510 MALLA MET.ELECTROSOLDADA GALV.#10 2" m² 0.3770 18.97 7.15 0.00510501 PERFIL TEE 1/8" X 3/4" X 3/4" m 4.1000 2.86 11.73 0.00511001 ANGULO FIERRO 1/8" x 3/4" x 3/4" x 6 m m 3.9000 2.72 10.61 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 1.9500 3.57 6.96 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.2300 107.39 24.70 68.55

Mano de obra470101 CAPATAZ H-H 0.2500 13.59 3.40 0.00470201 OPERARIO H-H 2.5000 12.36 30.90 0.00470401 PEON H-H 1.2500 9.95 12.44 46.74

Equipo481001 HERRAMIENTA %MO 20.0000 46.74 9.35 9.35

19010190 PUERTA METALICA PARA CASETA GRUPO ELECTROGENO 0.80x2.00mRendimiento (M2 /día) 3.2000 139.18Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2500 9.90 2.48 0.00460510 MALLA MET.ELECTROSOLDADA GALV.#10 2" m² 0.9000 18.97 17.07 0.00510501 PERFIL TEE 1/8" X 3/4" X 3/4" m 1.5000 2.86 4.29 0.00511001 ANGULO FIERRO 1/8" x 3/4" x 3/4" x 6 m m 6.0000 2.72 16.32 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 3.0000 3.57 10.71 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.3000 107.39 32.22 83.09

Mano de obra470101 CAPATAZ H-H 0.2500 13.59 3.40 0.00470201 OPERARIO H-H 2.5000 12.36 30.90 0.00470401 PEON H-H 1.2500 9.95 12.44 46.74

Equipo481001 HERRAMIENTA %MO 20.0000 46.74 9.35 9.35

19010205 PUERTA CASETA DE ELECTROBOMBA (CISTERNA Y TQUE DE 6 Y 3 M³)Rendimiento (UND/día) 4.0000 160.82Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2500 9.90 2.48 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 11.3000 3.57 40.34 0.00512001 PLATINA DE FIERRO 1/8" x 3/4" m 0.6000 1.56 0.94 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.4000 107.39 42.96 86.72

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 1.2000 9.95 11.94 57.00

Equipo481001 HERRAMIENTA %MO 30.0000 57.00 17.10 17.10

19010210 PUERTA CASETA DE ELECTROBOMBA (CISTERNA Y TQUE DE 15 Y 5 M³)Rendimiento (UND/día) 3.0000 204.82Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2500 9.90 2.48 0.00511002 ANGULO FIERRO 1/8" x 1" x 1" x 6 m m 13.7000 3.57 48.91 0.00512001 PLATINA DE FIERRO 1/8" x 3/4" m 0.6000 1.56 0.94 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.5000 107.39 53.70 106.03

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.1333 11.01 23.49 0.00470401 PEON H-H 1.6000 9.95 15.92 75.99

Equipo481001 HERRAMIENTA %MO 30.0000 75.99 22.80 22.80

Page 84: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

19010220 PUERTA INGRESO PRINCIPAL C/PERFILES 3/16"Rendimiento (M2 /día) 2.7500 240.42Materiales

030110 ACERO kg 0.1600 2.19 0.35 0.00262510 BISAGRA CON EJE 5/8" und 0.6400 3.57 2.28 0.00263020 CERROJO 1/2"x1"x5" und 0.2200 2.97 0.65 0.00265004 RUEDA CON SOPORTE Y GUIA und 0.1600 18.59 2.97 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2500 9.90 2.48 0.00511007 ANGULO FIERRO 3/16" x 2" x 2" m 1.8000 11.88 21.38 0.00512004 PLATINA DE FIERRO 3/16" X 2 1/2" m 3.5000 7.68 26.88 0.00512005 PLATINA DE FIERRO 3/16" x 2" X 6M m 9.2000 6.21 57.13 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.0600 107.39 6.44 120.56

Mano de obra470101 CAPATAZ H-H 0.2909 13.59 3.95 0.00470201 OPERARIO H-H 2.9091 12.36 35.96 0.00470301 OFICIAL H-H 2.9091 11.01 32.03 0.00470401 PEON H-H 2.0364 9.95 20.26 92.20

Equipo481001 HERRAMIENTA %MO 30.0000 92.20 27.66 27.66

19010280 PASAMANO DE TUBO F°G° DE 2" EN ESCALERARendimiento (M /día) 5.9200 76.05Materiales

300125 LIJA PARA FIERRO und 0.3000 1.26 0.38 0.00300135 THINNER gal 0.0080 14.23 0.11 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0600 9.90 0.59 0.00542001 PINTURA ANTICORROSIVA gal 0.0080 33.61 0.27 0.00650105 TUBERIA FºGº 1 1/2" m 0.2000 14.80 2.96 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 1.0000 31.64 31.64 35.95

Mano de obra470101 CAPATAZ H-H 0.1351 13.59 1.84 0.00470201 OPERARIO H-H 1.3514 12.36 16.70 0.00470301 OFICIAL H-H 1.3514 11.01 14.88 33.42

Equipo481001 HERRAMIENTA %MO 20.0000 33.42 6.68 6.68

19010285 PASAMANO DE TUBO F°N° DE 2"Rendimiento (M /día) 5.9200 59.75Materiales

020531 FIERRO LISO 1/2" m 0.2500 3.22 0.81 0.00300125 LIJA PARA FIERRO und 0.3000 1.26 0.38 0.00300135 THINNER gal 0.0080 14.23 0.11 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0600 9.90 0.59 0.00541520 PINTURA ESMALTE gal 0.0060 33.61 0.20 0.00542001 PINTURA ANTICORROSIVA gal 0.0100 33.61 0.34 0.00650502 TUBERIA DE F°N° 2" STANDARD m 1.0000 17.22 17.22 19.65

Mano de obra470101 CAPATAZ H-H 0.1351 13.59 1.84 0.00470201 OPERARIO H-H 1.3514 12.36 16.70 0.00470301 OFICIAL H-H 1.3514 11.01 14.88 33.42

Equipo481001 HERRAMIENTA %MO 20.0000 33.42 6.68 6.68

19010290 PASAMANO DE TUBO F°N° DE 1 1/2" EN SS.HH.Rendimiento (M /día) 6.0000 62.74Materiales

023567 PERNO CAB. HEXAGONAL 5/16" x 3/4" und 4.0000 0.15 0.60 0.00030106 FIERRO CORRUGADO 3/8" m 0.4000 1.21 0.48 0.00300125 LIJA PARA FIERRO und 0.3000 1.26 0.38 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00512011 PLATINA DE FIERRO 1/4" x 2" m 0.4000 8.33 3.33 0.00541520 PINTURA ESMALTE gal 0.0070 33.61 0.24 0.00542001 PINTURA ANTICORROSIVA gal 0.0105 33.61 0.35 0.00

Page 85: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

560101 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza 0.0070 427.35 2.99 0.00650514 TUBERIA DE F°N° 1 1/2" LIVIANO m 1.3000 10.63 13.82 23.18

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Equipo481001 HERRAMIENTA %MO 20.0000 32.97 6.59 6.59

19010300 PASAMANO DE TUBO F°G° DE 3" EN ESCALERARendimiento (M /día) 5.9200 89.92Materiales

020531 FIERRO LISO 1/2" m 0.2500 3.22 0.81 0.00300125 LIJA PARA FIERRO und 0.3000 1.26 0.38 0.00300135 THINNER gal 0.0080 14.23 0.11 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0600 9.90 0.59 0.00541505 PINTURA ESMALTE ANTICORROSIVO PARA gal 0.0100 37.17 0.37 0.00541510 DISOLVENTE PARA ESMALTE ANTICORROS gal 0.0010 37.52 0.04 0.00650108 TUBERIA FºGº 3" STANDAR m 1.0000 47.52 47.52 49.82

Mano de obra470101 CAPATAZ H-H 0.1351 13.59 1.84 0.00470201 OPERARIO H-H 1.3514 12.36 16.70 0.00470301 OFICIAL H-H 1.3514 11.01 14.88 33.42

Equipo481001 HERRAMIENTA %MO 20.0000 33.42 6.68 6.68

19010320 BARANDA DE FIERRO GALVANIZADO DE 1 1/2"Rendimiento (M /día) 5.0000 68.68Materiales

300125 LIJA PARA FIERRO und 0.0200 1.26 0.03 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00513012 FIERRO CUADRADO 1/2" x 6m m 1.2500 3.65 4.56 0.00541505 PINTURA ESMALTE ANTICORROSIVO PARA gal 0.0200 37.17 0.74 0.00541510 DISOLVENTE PARA ESMALTE ANTICORROS gal 0.0020 37.52 0.08 0.00650105 TUBERIA FºGº 1 1/2" m 1.0000 14.80 14.80 21.20

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 39.57

Equipo481001 HERRAMIENTA %MO 20.0000 39.57 7.91 7.91

19010340 BARANDA DE FIERRO GALVANIZADO DE 2"Rendimiento (M /día) 6.0000 141.89Materiales

300125 LIJA PARA FIERRO und 0.0200 1.26 0.03 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00541505 PINTURA ESMALTE ANTICORROSIVO PARA gal 0.0400 37.17 1.49 0.00541510 DISOLVENTE PARA ESMALTE ANTICORROS gal 0.0040 37.52 0.15 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 3.1500 31.64 99.67 102.33

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Equipo481001 HERRAMIENTA %MO 20.0000 32.97 6.59 6.59

19010390 BARANDA DE TUBOS Ý 2",1½" F°NEGRO STANDARD H=0.70mRendimiento (M /día) 6.0000 88.52Materiales

300125 LIJA PARA FIERRO und 0.2500 1.26 0.32 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00541520 PINTURA ESMALTE gal 0.0100 33.61 0.34 0.00

Page 86: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

542001 PINTURA ANTICORROSIVA gal 0.0160 33.61 0.54 0.00650502 TUBERIA DE F°N° 2" STANDARD m 2.1100 17.22 36.33 0.00650507 TUBERIA DE FºNº 1 1/2" STANDARD m 1.1000 12.48 13.73 52.25

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Equipo481001 HERRAMIENTA %MO 10.0000 32.97 3.30 3.30

19010395 BARANDA DE TUBOS 2" y 1 ½" F°GDO. H=0.85MRendimiento (M /día) 6.0000 131.81Materiales

300125 LIJA PARA FIERRO und 0.0200 1.26 0.03 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00541505 PINTURA ESMALTE ANTICORROSIVO PARA gal 0.0400 37.17 1.49 0.00541510 DISOLVENTE PARA ESMALTE ANTICORROS gal 0.0040 37.52 0.15 0.00650105 TUBERIA FºGº 1 1/2" m 2.0000 14.80 29.60 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 2.0000 31.64 63.28 95.54

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Equipo481001 HERRAMIENTA %MO 10.0000 32.97 3.30 3.30

19010400 CANTONERA DE FIERRO EN ESCALERARendimiento (M /día) 16.0000 33.36Materiales

541520 PINTURA ESMALTE gal 0.0080 33.61 0.27 0.00542001 PINTURA ANTICORROSIVA gal 0.0125 33.61 0.42 0.00570124 PLANCHA ESTRIADA 3/16" X 4' X 8' (4.8mm) und 0.0700 365.69 25.60 26.29

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 6.86

Equipo481001 HERRAMIENTA %MO 3.0000 6.86 0.21 0.21

19010435 ESCALERA GATO F.G. 1 1/2" y 1"-CERCA AL MARRendimiento (M /día) 5.0000 110.85Materiales

023015 PERNOS DE EXPANSION DE 3/8"x3" C/ARA und 2.2300 3.19 7.11 0.00300125 LIJA PARA FIERRO und 0.5000 1.26 0.63 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.3000 9.90 2.97 0.00541504 PINTURA ESMALTE EPOXI-POLIAMIDA P/S gal 0.0167 56.88 0.95 0.00541512 DILUYENTE PARA ESMALTE EPOXICO gal 0.0017 29.25 0.05 0.00541513 DILUYENTE PARA IMPRIMANTE DE ADHERE gal 0.0025 29.25 0.07 0.00542011 IMPRIMANTE VINILICO P/SUPERF. GALVAN gal 0.0250 69.93 1.75 0.00650103 TUBERIA FºGº 1" m 2.0000 11.44 22.88 0.00650105 TUBERIA FºGº 1 1/2" m 2.1000 14.80 31.08 67.49

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470401 PEON H-H 0.8000 9.95 7.96 29.91

Equipo481001 HERRAMIENTA %MO 15.0000 29.91 4.49 0.00496050 SOLDADORA A GASOLINA H-M 0.8000 11.20 8.96 13.45

19010440 ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNARendimiento (UND/día) 2.0000 229.40Materiales

520101 TUBO DE ALUMINIO DE 30 MM Y e=3MM m 6.0000 12.00 72.00 0.00520102 CODO DE ALUMINIO DE 30 MM und 14.0000 5.10 71.40 143.40

Page 87: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 2.0000 9.95 19.90 74.78

Equipo481001 HERRAMIENTA %MO 15.0000 74.78 11.22 11.22

19010500 CERCO MALLA ELECT.2"X2" C/PERF.COLUM.F°G°STANDAR 2"(SISTEMICRendimiento (M2 /día) 10.0000 103.42Materiales

300125 LIJA PARA FIERRO und 0.5000 1.26 0.63 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.5000 9.90 4.95 0.00460510 MALLA MET.ELECTROSOLDADA GALV.#10 2" m² 0.9120 18.97 17.30 0.00510506 PERFIL TEE 1/8" X 1 1/2" X 1 1/2" m 0.3330 6.27 2.09 0.00511020 ANGULO FIERRO 1 1/2" x 1 1/2" x 1/8" m 1.6740 5.67 9.49 0.00512001 PLATINA DE FIERRO 1/8" x 3/4" m 2.2380 1.56 3.49 0.00513005 TUBO ELECTROSOLDADO CUAD. 1"x1mm m 0.3100 3.45 1.07 0.00560104 PLANCHA DE ACERO LAC 3/16"(4.8mm) pza 0.0010 326.64 0.33 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 0.6600 31.64 20.88 60.23

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 0.00470401 PEON H-H 0.4000 9.95 3.98 33.66

Equipo481001 HERRAMIENTA %MO 15.0000 33.66 5.05 0.00496050 SOLDADORA A GASOLINA H-M 0.4000 11.20 4.48 9.53

19010820 MARCO Y TAPA DE FIERRO D=0.60mRendimiento (UND/día) 4.0000 161.82Materiales

260114 ALDABAS DE 3" PARA CANDADO und 2.0000 1.50 3.00 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00511505 ANGULO DE FIERRO 1 1/2"x2"x1/4" m 3.4000 13.80 46.92 0.00570126 PLANCHA ESTRIADA 1/8" X 4' X 8' (3.3mm) m² 0.7200 93.44 67.28 118.19

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 1.0000 9.95 9.95 37.39

Equipo481001 HERRAMIENTA %MO 10.0000 37.39 3.74 0.00496049 SOLDADORA ELECTRICA H-M 0.5000 5.00 2.50 6.24

19010830 MARCO Y TAPA DE FIERRO .80x.80m P/TQUE CISTERNA APOYADO 6M3Rendimiento (UND/día) 4.0000 142.23Materiales

260114 ALDABAS DE 3" PARA CANDADO und 1.0000 1.50 1.50 0.00264501 CANDADO DE BRONCE 60mm TIPO PESAD und 1.0000 26.83 26.83 0.00300125 LIJA PARA FIERRO und 0.1000 1.26 0.13 0.00511005 ANGULO FIERRO 3/16" x 1" x 1" x 6 m m 6.5000 5.34 34.71 0.00512003 PLATINA DE FIERRO 3/16" x 1" X 6M m 3.2000 3.10 9.92 0.00541520 PINTURA ESMALTE gal 0.0408 33.61 1.37 0.00542001 PINTURA ANTICORROSIVA gal 0.0640 33.61 2.15 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.3300 107.39 35.44 112.05

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 27.44

Equipo481001 HERRAMIENTA %MO 10.0000 27.44 2.74 2.74

20010100 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTARendimiento (PZA/día) 100.0000 3.39Materiales

Page 88: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

262505 BISAGRA FIERRO ALUMINIZAD0 PESADO DEund 1.0000 2.40 2.40 2.40Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010120 BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTARendimiento (PZA/día) 100.0000 2.49Materiales

262504 BISAGRA 3" und 1.0000 1.50 1.50 1.50Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010130 BISAGRA DE ACERO ALUMINIZADO DE 2.5" EN ESTANTERIARendimiento (PZA/día) 100.0000 2.19Materiales

262503 BISAGRA 2 1/2" PESADA FIERRO ALUMINIZ und 1.0000 1.20 1.20 1.20Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010140 BISAGRA DE ACERO ALUMINIZADO DE 2" PESADA EN PUERTARendimiento (PZA/día) 100.0000 2.09Materiales

262502 BISAGRA 2" PESADA FIERRO ALUMINIZADO und 1.0000 1.10 1.10 1.10Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010150 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTARendimiento (PZA/día) 100.0000 2.19Materiales

262503 BISAGRA 2 1/2" PESADA FIERRO ALUMINIZ und 1.0000 1.20 1.20 1.20Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010170 BISAGRA DE ACERO ALUMINIZADO DE 2" PESADA EN VENTANASRendimiento (PZA/día) 100.0000 2.09Materiales

262502 BISAGRA 2" PESADA FIERRO ALUMINIZADO und 1.0000 1.10 1.10 1.10Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010180 BISAGRA DE ACERO ALUMINIZADO DE 1" EN VENTANARendimiento (PZA/día) 100.0000 1.99Materiales

262506 BISAGRA FIERRO ALUMINIZADO 1" und 1.0000 1.00 1.00 1.00Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010200 BISAGRAS CAPUCHINAS ACERO ALUMINIZADO 3 1/2"Rendimiento (PZA/día) 100.0000 2.99Materiales

262501 BISAGRA CAPUCHINA ALUMINIZ. 3 1/2" x 3 1 par 1.0000 2.00 2.00 2.00Mano de obra

470201 OPERARIO H-H 0.0800 12.36 0.99 0.99

20010240 BRAZO DE EXTENSIONRendimiento (UND/día) 40.0000 5.42Materiales

512066 PLATINA 1/4"x3/4"x8" und 1.0000 0.69 0.69 0.69Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.2000 9.95 1.99 4.73

20010260 CERRADURA DOS GOLPES EN PUERTA

Page 89: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (PZA/día) 8.0000 48.36Materiales

260404 CERRADURA 2 GOLPES TIPO FORTE M-220 und 1.0000 36.00 36.00 36.00Mano de obra

470201 OPERARIO H-H 1.0000 12.36 12.36 12.36

20010280 CERRADURA LGO PARA PUERTA EXTERIORRendimiento (PZA/día) 8.0000 39.36Materiales

260406 CERRADURA DE 2 GOLPES PARA PUERTA und 1.0000 27.00 27.00 27.00Mano de obra

470201 OPERARIO H-H 1.0000 12.36 12.36 12.36

20010300 CERRADURA LGO PARA PUERTA INTERIOR DOBLE PERILLARendimiento (PZA/día) 8.0000 39.36Materiales

260405 CERRADURA DE UN GOLPE PARA PUERTA und 1.0000 27.00 27.00 27.00Mano de obra

470201 OPERARIO H-H 1.0000 12.36 12.36 12.36

20010320 CERROJO DE 2" ALUMINIZADO PARA PUERTARendimiento (PZA/día) 50.0000 3.92Materiales

263021 CERROJO 2" und 1.0000 1.94 1.94 1.94Mano de obra

470201 OPERARIO H-H 0.1600 12.36 1.98 1.98

20010340 CERROJO DE 3" ALUMINIZADO PARA PUERTARendimiento (PZA/día) 50.0000 4.11Materiales

263022 CERROJO 3" und 1.0000 2.13 2.13 2.13Mano de obra

470201 OPERARIO H-H 0.1600 12.36 1.98 1.98

20010360 CERROJO "SAPITO" SEGURIDAD BAT.VENTANARendimiento (PZA/día) 40.0000 5.58Materiales

260131 CERRADURA "SAPITO" DE BRONCE und 1.0000 3.11 3.11 3.11Mano de obra

470201 OPERARIO H-H 0.2000 12.36 2.47 2.47

20010380 CHAPA EMBUTIR C/DOBLE TAMBOR Y PERILLARendimiento (PZA/día) 8.0000 42.36Materiales

260520 CHAPA EMBUTIR C/DOBLE TAMBOR Y PERI und 1.0000 30.00 30.00 30.00Mano de obra

470201 OPERARIO H-H 1.0000 12.36 12.36 12.36

20010400 CANDADO TIPO FORTE 60 mm.Rendimiento (PZA/día) 8.0000 26.83Materiales

264501 CANDADO DE BRONCE 60mm TIPO PESAD und 1.0000 26.83 26.83 26.83

20010420 CANDADO TIPO FORTE 40 mm.Rendimiento (PZA/día) 8.0000 12.18Materiales

264505 CANDADO DE BRONCE 40mm TIPO PESAD und 1.0000 12.18 12.18 12.18

20010440 CADENA GALVANIZADA DE 1/8",DOS PZA 30CM BAT.VENTANARendimiento (UND/día) 40.0000 5.16Materiales

263040 CADENA GALVANIZADA DE 1/8" m 0.6000 2.21 1.33 0.00263041 ARMELLA GALVANIZADA DE 1¼" und 4.0000 0.34 1.36 2.69

Page 90: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470201 OPERARIO H-H 0.2000 12.36 2.47 2.47

20010460 MANIJA DE BRONCE 4" PARA PORTAÑ.DE VENT.Rendimiento (PZA/día) 55.0000 8.52Materiales

264011 MANIJA DE BRONCE DE 4" PARA PORTAÑU und 1.0000 6.72 6.72 6.72Mano de obra

470201 OPERARIO H-H 0.1455 12.36 1.80 1.80

20010480 MANIJA DE BRONCE 4" PARA PUERTASRendimiento (PZA/día) 55.0000 6.42Materiales

264010 MANIJA DE BRONCE DE 4" PARA PUERTA und 1.0000 4.62 4.62 4.62Mano de obra

470201 OPERARIO H-H 0.1455 12.36 1.80 1.80

20010500 MANIJA DE BRONCE 3" PARA PUERTASRendimiento (PZA/día) 55.0000 5.58Materiales

264009 MANIJA DE BRONCE DE 3" PARA PUERTA und 1.0000 3.78 3.78 3.78Mano de obra

470201 OPERARIO H-H 0.1455 12.36 1.80 1.80

20010520 PICAPORTE DE 12", DE FIERRORendimiento (PZA/día) 32.0000 12.33Materiales

263003 PICAPORTE 12" und 1.0000 9.24 9.24 9.24Mano de obra

470201 OPERARIO H-H 0.2500 12.36 3.09 3.09

20010540 PICAPORTE DE 6", DE FIERRORendimiento (PZA/día) 32.0000 9.81Materiales

263002 PICAPORTE DE 6" und 1.0000 6.72 6.72 6.72Mano de obra

470201 OPERARIO H-H 0.2500 12.36 3.09 3.09

20010560 PICAPORTE DE 4"Rendimiento (PZA/día) 32.0000 5.54Materiales

263007 PICAPORTE DE 4" und 1.0000 2.45 2.45 2.45Mano de obra

470201 OPERARIO H-H 0.2500 12.36 3.09 3.09

20010600 PICAPORTE DE 2"Rendimiento (PZA/día) 32.0000 4.73Materiales

263005 PICAPORTE DE 2" und 1.0000 1.64 1.64 1.64Mano de obra

470201 OPERARIO H-H 0.2500 12.36 3.09 3.09

20010620 ZIG ZAG C/RODILLO EN MUEBLESRendimiento (UND/día) 50.0000 2.82Materiales

264015 ZIG-ZAG C/RODILLO und 1.0000 0.84 0.84 0.84Mano de obra

470201 OPERARIO H-H 0.1600 12.36 1.98 1.98

20010700 MECANISMO DE ABERTURA DE BATIENTE VENTANARendimiento (UND/día) 30.0000 10.72Materiales

262530 MECANISMO DE ABERTURA BATIENTE VEN und 1.0000 7.38 7.38 7.38

Page 91: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0027 13.59 0.04 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 3.34

20010800 ARMELLAS PARA CANDADORendimiento (PZA/día) 100.0000 0.79Materiales

260110 ARMELLAS PARA CANDADO und 1.0000 0.30 0.30 0.30Mano de obra

470201 OPERARIO H-H 0.0400 12.36 0.49 0.49

20010900 TIRADORES DE PUERTA EN MUEBLES BAJOSRendimiento (PZA/día) 48.0000 3.83Materiales

264020 TIRADOR PARA PUERTA MUEBLE BAJO und 1.0000 2.80 2.80 2.80Mano de obra

470201 OPERARIO H-H 0.0833 12.36 1.03 1.03

21010110 VIDRIOS SEMIDOBLES IMPORTADORendimiento (P2 /día) 150.0000 2.08Materiales

304120 VIDRIO SEMIDOBLE IMPORTADO INC. COL p² 1.0500 1.98 2.08 2.08

21010120 VIDRIOS DOBLES IMPORTADORendimiento (P2 /día) 150.0000 2.57Materiales

304130 VIDRIO DOBLE IMPORTADO INC. COLOCAC p² 1.0500 2.45 2.57 2.57

21010140 VIDRIOS DOBLES TIPO CATEDRALRendimiento (P2 /día) 150.0000 2.63Materiales

304140 VIDRIO DOBLE TIPO CATEDRAL INC. COLO p² 1.0500 2.50 2.63 2.63

22010120 SELLADO DE CONCRETO CARAVISTARendimiento (M2 /día) 70.0000 4.36Materiales

300164 ADITIVO SELLADOR DE CONCRETO CARAV gal 0.0500 27.83 1.39 1.39Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 10.0000 2.70 0.27 0.27

22010180 PINTURA LATEX 2 MANOS EN C/RASO FIBRABLOCKRendimiento (M2 /día) 60.0000 3.18Materiales

540105 PINTURA LATEX gal 0.0440 28.57 1.26 1.26Mano de obra

470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 1.83

Equipo481001 HERRAMIENTA %MO 5.0000 1.83 0.09 0.09

22010200 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGASRendimiento (M2 /día) 60.0000 5.28Materiales

436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 1.96

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00

Page 92: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.1333 9.95 1.33 3.16Equipo

481001 HERRAMIENTA %MO 5.0000 3.16 0.16 0.16

22010210 PINTURA LATEX 2 MANOS EN CIELO RASORendimiento (M2 /día) 60.0000 5.28Materiales

436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 1.96

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.1333 9.95 1.33 3.16

Equipo481001 HERRAMIENTA %MO 5.0000 3.16 0.16 0.16

22010220 PINTURA LATEX 2 MANOS EN FALSO/CIELO RASORendimiento (M2 /día) 60.0000 5.28Materiales

436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 1.96

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.1333 9.95 1.33 3.16

Equipo481001 HERRAMIENTA %MO 5.0000 3.16 0.16 0.16

22010240 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNARendimiento (M2 /día) 70.0000 4.59Materiales

436503 LIJA PARA MADERA und 0.0200 1.14 0.02 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 1.75

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 5.0000 2.70 0.14 0.14

22010260 PINTURA LATEX 2 MANOS EN MUROS EXT.A PARTIR 2DO.PISORendimiento (M2 /día) 60.0000 7.63Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0220 2.39 0.05 0.00430101 MADERA TORNILLO p² 0.8500 2.70 2.30 0.00436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 4.31

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.1333 9.95 1.33 3.16

Equipo481001 HERRAMIENTA %MO 5.0000 3.16 0.16 0.16

22010265 PINTURA LATEX 2 MANOS EN PARTE ALTA DE MURORendimiento (M2 /día) 70.0000 4.80Materiales

436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00540105 PINTURA LATEX gal 0.0440 28.57 1.26 0.00

Page 93: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

544001 SELLADOR BLANCO PARA MUROS gal 0.0350 13.45 0.47 1.96Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 5.0000 2.70 0.14 0.14

22010340 PINT.ANTICOR.Y ESMALTE 2 MANOS-PTA/VENT.Rendimiento (M2 /día) 30.0000 8.24Materiales

300125 LIJA PARA FIERRO und 0.2000 1.26 0.25 0.00541520 PINTURA ESMALTE gal 0.0319 33.61 1.07 0.00542001 PINTURA ANTICORROSIVA gal 0.0500 33.61 1.68 3.00

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.1333 9.95 1.33 4.99

Equipo481001 HERRAMIENTA %MO 5.0000 4.99 0.25 0.25

22010350 PINT.ANTICOR. ESMALTE 2 MANOS PTA-VENT OBRAS CERCANAS AL MARRendimiento (M2 /día) 30.0000 11.13Materiales

300125 LIJA PARA FIERRO und 0.2000 1.26 0.25 0.00541504 PINTURA ESMALTE EPOXI-POLIAMIDA P/S gal 0.0333 56.88 1.89 0.00541512 DILUYENTE PARA ESMALTE EPOXICO gal 0.0033 29.25 0.10 0.00541513 DILUYENTE PARA IMPRIMANTE DE ADHERE gal 0.0050 29.25 0.15 0.00542011 IMPRIMANTE VINILICO P/SUPERF. GALVAN gal 0.0500 69.93 3.50 5.89

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.1333 9.95 1.33 4.99

Equipo481001 HERRAMIENTA %MO 5.0000 4.99 0.25 0.25

22010360 PINT.ANTICOR.Y ESMALTE 2 MANOS C/ANDAMIORendimiento (M2 /día) 25.0000 9.61Materiales

300125 LIJA PARA FIERRO und 0.2000 1.26 0.25 0.00430101 MADERA TORNILLO p² 0.1250 2.70 0.34 0.00541520 PINTURA ESMALTE gal 0.0314 33.61 1.06 0.00542001 PINTURA ANTICORROSIVA gal 0.0500 33.61 1.68 3.33

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.1600 9.95 1.59 5.98

Equipo481001 HERRAMIENTA %MO 5.0000 5.98 0.30 0.30

22010370 PINT.ANTICOR.Y ESMALTE 2 MANOS EN BARRAS DE SEGURIDADRendimiento (M /día) 100.0000 2.37Materiales

300125 LIJA PARA FIERRO und 0.0200 1.26 0.03 0.00541520 PINTURA ESMALTE gal 0.0100 33.61 0.34 0.00542001 PINTURA ANTICORROSIVA gal 0.0160 33.61 0.54 0.91

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 1.39

Equipo481001 HERRAMIENTA %MO 5.0000 1.39 0.07 0.07

Page 94: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

22010380 PINTURA ANTICORROSIVA Y ESM. EN BARANDASRendimiento (M /día) 40.0000 4.84Materiales

300125 LIJA PARA FIERRO und 0.0200 1.26 0.03 0.00541520 PINTURA ESMALTE gal 0.0100 33.61 0.34 0.00542001 PINTURA ANTICORROSIVA gal 0.0160 33.61 0.54 0.91

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1000 9.95 1.00 3.74

Equipo481001 HERRAMIENTA %MO 5.0000 3.74 0.19 0.19

22010400 PINTURA BARNIZ EN MUROS CARAVISTARendimiento (M2 /día) 70.0000 4.55Materiales

300115 AGUARRAS gal 0.0040 13.10 0.05 0.00541005 BARNIZ MARINO gal 0.0440 37.82 1.66 1.71

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 5.0000 2.70 0.14 0.14

22010420 PINTURA BARNIZ EN CARP.DE MADERARendimiento (M2 /día) 20.0000 14.55Materiales

300115 AGUARRAS gal 0.0046 13.10 0.06 0.00436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00541005 BARNIZ MARINO gal 0.0460 37.82 1.74 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0770 33.61 2.59 4.62

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 5.0000 9.46 0.47 0.47

22010430 PINTURA BARNIZ EN CARP.DE MADERA(OBRA CERCANA AL MAR)-2004Rendimiento (M2 /día) 20.0000 16.47Materiales

300115 AGUARRAS gal 0.0086 13.10 0.11 0.00436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00541001 BARNIZ ESPECIAL PARA ZONAS CERCANAS gal 0.0860 72.10 6.20 6.54

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 5.0000 9.46 0.47 0.47

22010440 PINTURA BARNIZ EN CORREAS INTERIORESRendimiento (M /día) 40.0000 4.83Materiales

436503 LIJA PARA MADERA und 0.0600 1.14 0.07 0.00541005 BARNIZ MARINO gal 0.0220 37.82 0.83 0.90

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1000 9.95 1.00 3.74

Equipo481001 HERRAMIENTA %MO 5.0000 3.74 0.19 0.19

Page 95: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

22010445 PRESERVANTE PARA MADERARendimiento (M2 /día) 40.0000 7.47Materiales

300115 AGUARRAS gal 0.0046 13.10 0.06 0.00300152 PRESERVANTE PARA MADERA gal 0.0625 35.35 2.21 0.00436503 LIJA PARA MADERA und 0.2000 1.14 0.23 2.50

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.2000 9.95 1.99 4.73

Equipo481001 HERRAMIENTA %MO 5.0000 4.73 0.24 0.24

22010450 PINTURA BARNIZ EN VIGAS DE MADERARendimiento (M2 /día) 20.0000 16.85Materiales

300115 AGUARRAS gal 0.0046 13.10 0.06 0.00430101 MADERA TORNILLO p² 0.8500 2.70 2.30 0.00436503 LIJA PARA MADERA und 0.2000 1.14 0.23 0.00541005 BARNIZ MARINO gal 0.0460 37.82 1.74 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0770 33.61 2.59 6.92

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 5.0000 9.46 0.47 0.47

22010460 PINTURA BARNIZ EN CONTRAZOCALOSRendimiento (M2 /día) 40.0000 4.71Materiales

436503 LIJA PARA MADERA und 0.0600 1.14 0.07 0.00541005 BARNIZ MARINO gal 0.0220 37.82 0.83 0.90

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1000 9.95 1.00 3.74

Equipo481001 HERRAMIENTA %MO 2.0000 3.74 0.07 0.07

22010462 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA H=0.10mRendimiento (M /día) 40.0000 4.39Materiales

300115 AGUARRAS gal 0.0005 13.10 0.01 0.00436503 LIJA PARA MADERA und 0.0200 1.14 0.02 0.00541005 BARNIZ MARINO gal 0.0046 37.82 0.17 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0077 33.61 0.26 0.46

Mano de obra470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.2000 12.36 2.47 0.00470401 PEON H-H 0.1000 9.95 1.00 3.74

Equipo481001 HERRAMIENTA %MO 5.0000 3.74 0.19 0.19

22010480 PINTURA ESMALTE 2 MANOS EN CARPINTERIA MAD.Rendimiento (M2 /día) 60.0000 5.69Materiales

436503 LIJA PARA MADERA und 0.0200 1.14 0.02 0.00541520 PINTURA ESMALTE gal 0.0500 33.61 1.68 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0200 33.61 0.67 2.37

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00

Page 96: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.1333 9.95 1.33 3.16

Equipo481001 HERRAMIENTA %MO 5.0000 3.16 0.16 0.16

22010500 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALOSRendimiento (M2 /día) 30.0000 7.70Materiales

436503 LIJA PARA MADERA und 0.1000 1.14 0.11 0.00541520 PINTURA ESMALTE gal 0.0500 33.61 1.68 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0500 13.45 0.67 2.46

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.1333 9.95 1.33 4.99

Equipo481001 HERRAMIENTA %MO 5.0000 4.99 0.25 0.25

22010505 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=0.10Rendimiento (M /día) 140.0000 1.37Materiales

436503 LIJA PARA MADERA und 0.0100 1.14 0.01 0.00541520 PINTURA ESMALTE gal 0.0050 33.61 0.17 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0050 13.45 0.07 0.25

Mano de obra470101 CAPATAZ H-H 0.0057 13.59 0.08 0.00470201 OPERARIO H-H 0.0571 12.36 0.71 0.00470401 PEON H-H 0.0286 9.95 0.28 1.07

Equipo481001 HERRAMIENTA %MO 5.0000 1.07 0.05 0.05

22010510 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=0.20Rendimiento (M /día) 120.0000 1.78Materiales

436503 LIJA PARA MADERA und 0.0100 1.14 0.01 0.00541520 PINTURA ESMALTE gal 0.0100 33.61 0.34 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0100 13.45 0.13 0.48

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470401 PEON H-H 0.0333 9.95 0.33 1.24

Equipo481001 HERRAMIENTA %MO 5.0000 1.24 0.06 0.06

22010515 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=0.30Rendimiento (M /día) 100.0000 2.29Materiales

436503 LIJA PARA MADERA und 0.0100 1.14 0.01 0.00541520 PINTURA ESMALTE gal 0.0150 33.61 0.50 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0150 13.45 0.20 0.71

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0400 9.95 0.40 1.50

Equipo481001 HERRAMIENTA %MO 5.0000 1.50 0.08 0.08

22010520 PINTURA ESMALTE 2 MANOS EN BORDES BOLEADOSRendimiento (M /día) 110.0000 2.14Materiales

436503 LIJA PARA MADERA und 0.0100 1.14 0.01 0.00541520 PINTURA ESMALTE gal 0.0150 33.61 0.50 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0150 13.45 0.20 0.71

Page 97: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0073 13.59 0.10 0.00470201 OPERARIO H-H 0.0727 12.36 0.90 0.00470401 PEON H-H 0.0364 9.95 0.36 1.36

Equipo481001 HERRAMIENTA %MO 5.0000 1.36 0.07 0.07

22010560 PUENTE DE ADHERENCIA UNION DE CONCRETO FRESCO-ENDURECIDORendimiento (M2 /día) 70.0000 37.39Materiales

300153 PUENTE DE ADHERENCIA UNION CONCRET kg 0.5000 68.84 34.42 34.42Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470401 PEON H-H 0.1143 9.95 1.14 2.70

Equipo481001 HERRAMIENTA %MO 10.0000 2.70 0.27 0.27

22010600 PINTURA DEMARCACION DE LOSA DEPORTIVARendimiento (UND/día) 4.0000 118.43Materiales

300132 CORDEL m 30.0000 0.15 4.50 0.00300160 YESO (BOLSA DE 28 KG) bl 0.1700 13.30 2.26 0.00543001 PINTURA PARA TRAFICO gal 1.0000 59.60 59.60 66.36

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 10.0000 47.34 4.73 4.73

22021100 PINTURA ANTICORROSIVA ESMALTE 2 MANOS EN TUBERIAS 2"Rendimiento (M /día) 110.0000 2.15Materiales

300125 LIJA PARA FIERRO und 0.2000 1.26 0.25 0.00541520 PINTURA ESMALTE gal 0.0160 33.61 0.54 0.00542001 PINTURA ANTICORROSIVA gal 0.0080 33.61 0.27 1.06

Mano de obra470101 CAPATAZ H-H 0.0073 13.59 0.10 0.00470301 OFICIAL H-H 0.0727 11.01 0.80 0.00470401 PEON H-H 0.0145 9.95 0.14 1.04

Equipo481001 HERRAMIENTA %MO 5.0000 1.04 0.05 0.05

23010100 LIMPIEZA PERMANENTE DE LA OBRARendimiento (GLB/día) 1.0000 2.00Materiales

481003 HERRAMIENTA - LT glb 1.0000 1.00 1.00 1.00Mano de obra

475002 MANO DE OBRA - LT glb 1.0000 1.00 1.00 1.00

23010120 JUNTA C/SILICONA E=1.50cmx1" VENT-METAL.Rendimiento (M /día) 24.0000 17.27Materiales

430101 MADERA TORNILLO p² 0.1200 2.70 0.32 0.00600104 SILICONA (TUBO DE 305 ml) und 1.2500 10.17 12.71 13.03

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470301 OFICIAL H-H 0.3333 11.01 3.67 4.12

Equipo481001 HERRAMIENTA %MO 3.0000 4.12 0.12 0.12

23010122 JUNTA C/SILICONA E=1.00cmx2" VENT-MADERA

Page 98: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M /día) 24.0000 22.10Materiales

600104 SILICONA (TUBO DE 305 ml) und 1.7489 10.17 17.79 0.00600105 TECKNOPOR 1/2" und 0.0088 7.50 0.07 17.86

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470301 OFICIAL H-H 0.3333 11.01 3.67 4.12

Equipo481001 HERRAMIENTA %MO 3.0000 4.12 0.12 0.12

23010140 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSORendimiento (M /día) 25.0000 13.51Materiales

300109 PEGAMENTO EN BASE A CAUCHO SINTETIC gal 0.0250 50.00 1.25 0.00600103 ESPUMA PLASTICA DURA A/DENSIDAD 2X1 und 0.0630 30.00 1.89 0.00600109 JEBE MICROPOROSO 1"x1cm und 0.0270 211.86 5.72 8.86

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 4.39

Equipo481001 HERRAMIENTA %MO 6.0000 4.39 0.26 0.26

23010165 IMPERMEABILIZACION DE JUNTAS CON ASFALTO LIQUIDORendimiento (M2 /día) 60.0000 5.11Materiales

133001 ASFALTO LIQUIDO RC-250 gal 0.1200 7.55 0.91 0.91Mano de obra

470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470401 PEON H-H 0.2000 9.95 1.99 3.82

Equipo481001 HERRAMIENTA %MO 10.0000 3.82 0.38 0.38

23010170 CARTON EMBREADO 4mm x 4" EN JUNTA DE PISORendimiento (M /día) 100.0000 1.89Materiales

309930 CARTON EMBREADO DE 4 mm ESPESOR (4'xund 0.0382 18.50 0.71 0.71Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0160 9.95 0.16 1.15

Equipo481001 HERRAMIENTA %MO 3.0000 1.15 0.03 0.03

23010171 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"Rendimiento (M /día) 70.0000 4.48Materiales

040502 ARENA FINA m3 0.0100 22.69 0.23 0.00133001 ASFALTO LIQUIDO RC-250 gal 0.3500 7.55 2.64 2.87

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 1.56

Equipo481001 HERRAMIENTA %MO 3.0000 1.56 0.05 0.05

23010172 CARTON EMBREADO 4mm x12" EN JUNTARendimiento (M /día) 100.0000 3.10Materiales

309930 CARTON EMBREADO DE 4 mm ESPESOR (4'xund 0.1040 18.50 1.92 1.92Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0160 9.95 0.16 1.15

Page 99: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 1.15 0.03 0.03

23010175 JUNTA DE DILATACION TIPO TOFFOLORendimiento (M /día) 100.0000 15.98Materiales

300650 JUNTA DE TOFOLLO ALT.8CM. MODELO 80 m 1.0500 13.74 14.43 14.43Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470401 PEON H-H 0.0400 9.95 0.40 1.50

Equipo481001 HERRAMIENTA %MO 3.0000 1.50 0.05 0.05

23010180 TAPAJUNTA METALICA EN PISOSRendimiento (M /día) 32.0000 32.47Materiales

024010 TORNILLO DE FIJACION 2" C/TARUGOS DE und 4.0000 0.21 0.84 0.00433005 TARUGO 2" Ý 1.5 cm. und 4.0000 0.30 1.20 0.00541520 PINTURA ESMALTE gal 0.0050 33.61 0.17 0.00542001 PINTURA ANTICORROSIVA gal 0.0075 33.61 0.25 0.00560101 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza 0.0550 427.35 23.50 25.96

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 10.0000 5.92 0.59 0.59

23010185 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL)Rendimiento (M /día) 25.0000 17.81Materiales

024006 TORNILLO DE FIJACION 2" und 5.0000 0.21 1.05 0.00433010 TARUGO 1/2" X 2" und 5.0000 0.25 1.25 0.00541520 PINTURA ESMALTE gal 0.0050 33.61 0.17 0.00542001 PINTURA ANTICORROSIVA gal 0.0075 33.61 0.25 0.00570101 PLANCHA DE ACERO LAF 1/16" x 4' x 8'(1.5 und 0.0560 107.39 6.01 8.73

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.3200 9.95 3.18 7.57

Equipo481001 HERRAMIENTA %MO 20.0000 7.57 1.51 1.51

23010195 TAPAJUNTA METALICA EN TECHOS ENTRE MODULOSRendimiento (M /día) 20.0000 64.76Materiales

024005 TORNILLO DE FIJACION 1.5" und 4.0000 0.21 0.84 0.00210101 CEMENTO PORTLAND TIPO I bl 0.2800 15.13 4.24 0.00380101 HORMIGON m3 0.0940 22.69 2.13 0.00433002 TARUGO 1 1/2" X 2" und 4.0000 0.30 1.20 0.00541520 PINTURA ESMALTE gal 0.0260 33.61 0.87 0.00542001 PINTURA ANTICORROSIVA gal 0.0405 33.61 1.36 0.00610216 PLANCHA DE ACERO GALVANIZADA 1/16" und 0.2800 156.11 43.71 54.35

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 10.0000 9.46 0.95 0.95

23010196 TAPAJUNTA METALICA ENTRE ESCALERA Y MODULORendimiento (M /día) 20.0000 38.69

Page 100: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales024005 TORNILLO DE FIJACION 1.5" und 4.0000 0.21 0.84 0.00433002 TARUGO 1 1/2" X 2" und 4.0000 0.30 1.20 0.00541520 PINTURA ESMALTE gal 0.0150 33.61 0.50 0.00542001 PINTURA ANTICORROSIVA gal 0.0227 33.61 0.76 0.00610216 PLANCHA DE ACERO GALVANIZADA 1/16" und 0.1600 156.11 24.98 28.28

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 10.0000 9.46 0.95 0.95

23010200 PIZARRA CEMENTO 5.0x1.20 SIN TISERORendimiento (PZA/día) 1.5000 168.75Materiales

040502 ARENA FINA m3 0.1200 22.69 2.72 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8640 15.13 13.07 0.00431001 MADERA CEDRO p² 0.1200 8.50 1.02 0.00436503 LIJA PARA MADERA und 5.0000 1.14 5.70 0.00541530 PINTURA VERDE PARA PIZARRA gal 0.3000 54.84 16.45 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.1200 13.45 1.61 0.00544015 PASTA MURAL KEM gal 0.6000 24.25 14.55 55.12

Mano de obra470101 CAPATAZ H-H 0.5333 13.59 7.25 0.00470201 OPERARIO H-H 5.3333 12.36 65.92 0.00470401 PEON H-H 3.7333 9.95 37.15 110.32

Equipo481001 HERRAMIENTA %MO 3.0000 110.32 3.31 3.31

23010210 PIZARRA CEMENTO 4.0X1.20 SIN TISERORendimiento (PZA/día) 1.5000 148.14Materiales

040502 ARENA FINA m3 0.0960 22.69 2.18 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6912 15.13 10.46 0.00431001 MADERA CEDRO p² 0.1200 8.50 1.02 0.00436503 LIJA PARA MADERA und 5.0000 1.14 5.70 0.00541530 PINTURA VERDE PARA PIZARRA gal 0.2400 54.84 13.16 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0960 13.45 1.29 0.00544015 PASTA MURAL KEM gal 0.4800 24.25 11.64 45.45

Mano de obra470101 CAPATAZ H-H 0.5333 13.59 7.25 0.00470201 OPERARIO H-H 5.3333 12.36 65.92 0.00470401 PEON H-H 2.6667 9.95 26.53 99.70

Equipo481001 HERRAMIENTA %MO 3.0000 99.70 2.99 2.99

23010240 PIZARRA CEMENTO 3.00x1.20mRendimiento (PZA/día) 1.7000 135.49Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0360 2.39 0.09 0.00040502 ARENA FINA m3 0.0720 22.69 1.63 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5184 15.13 7.84 0.00431001 MADERA CEDRO p² 0.0720 8.50 0.61 0.00436503 LIJA PARA MADERA und 3.0000 1.14 3.42 0.00541530 PINTURA VERDE PARA PIZARRA gal 0.2000 54.84 10.97 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0720 13.45 0.97 0.00544015 PASTA MURAL KEM gal 0.4000 24.25 9.70 35.23

Mano de obra470101 CAPATAZ H-H 0.4706 13.59 6.40 0.00470201 OPERARIO H-H 4.7059 12.36 58.16 0.00470401 PEON H-H 3.2941 9.95 32.78 97.34

Equipo

Page 101: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 97.34 2.92 2.92

23010290 PIZARRA FORMICA BLANCA C/MARCO AL.1.20x2.40Rendimiento (UND/día) 2.0000 416.69Materiales

022010 CLAVOS SIN CABEZA DE 1 1/2" kg 0.0300 2.50 0.08 0.00260120 PLATINA SUJETADOR 1" x 2" und 2.0000 0.36 0.72 0.00300120 FORMICA pch 1.0000 78.99 78.99 0.00431001 MADERA CEDRO p² 14.0000 8.50 119.00 0.00431025 COLA SINTETICA gal 0.0312 20.76 0.65 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 1.0000 25.21 25.21 0.00522010 ANGULO DE ALUMINIO DE 1" x 1" m 7.2000 7.74 55.73 0.00522020 ANGULO DE ALUMINIO DE 2 1/2" x 2 1/2" m 1.0000 21.41 21.41 302.93

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 15.0000 98.92 14.84 14.84

23010300 ASTA DE BANDERA TIPICORendimiento (PZA/día) 1.0000 886.26Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.5000 2.39 1.20 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.5920 2.39 1.41 0.00023517 PERNO 1/2" x 3" CON TUERCA und 6.0000 0.75 4.50 0.00023550 ARANDELA 1/2" und 6.0000 0.20 1.20 0.00024025 TUERCA und 6.0000 0.05 0.30 0.00040501 ARENA GRUESA m3 0.2550 22.69 5.79 0.00040502 ARENA FINA m3 0.1380 22.69 3.13 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.3800 35.29 13.41 0.00053501 AGUA m3 0.0920 5.00 0.46 0.00210101 CEMENTO PORTLAND TIPO I bl 4.3260 15.13 65.45 0.00265005 MECANISMO DE IZAJE und 1.0000 16.84 16.84 0.00300125 LIJA PARA FIERRO und 2.0000 1.26 2.52 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.1000 9.90 0.99 0.00303002 CUERDA DE NYLON m 18.0000 0.57 10.26 0.00430101 MADERA TORNILLO p² 12.1160 2.70 32.71 0.00541520 PINTURA ESMALTE gal 0.0570 33.61 1.92 0.00542001 PINTURA ANTICORROSIVA gal 0.1000 33.61 3.36 0.00610203 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m² 0.0300 88.03 2.64 0.00650502 TUBERIA DE F°N° 2" STANDARD m 2.7000 17.22 46.49 0.00650503 TUBERIA DE F°N° 3" STANDARD m 2.7000 29.39 79.35 0.00650504 TUBERIA DE F°N° 4" STANDARD m 3.3000 40.40 133.32 427.25

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 16.0000 11.01 176.16 0.00470401 PEON H-H 16.0000 9.95 159.20 445.11

Equipo481001 HERRAMIENTA %MO 2.0000 445.11 8.90 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.1600 23.94 3.83 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1600 7.30 1.17 13.90

23010340 MESA C.A. REVESTIDO CON MAYOLICARendimiento (M2 /día) 1.6200 297.01Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1630 2.39 0.39 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.2010 2.39 0.48 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.2940 2.39 0.70 0.00024003 TORNILLO 3/8" und 8.0000 0.07 0.56 0.00024004 TORNILLO DE FIJACION 1" und 16.0000 0.16 2.56 0.00

Page 102: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

030110 ACERO kg 8.5860 2.19 18.80 0.00040501 ARENA GRUESA m3 0.0750 22.69 1.70 0.00040502 ARENA FINA m3 0.0700 22.69 1.59 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0760 35.29 2.68 0.00051001 PIEDRA MEDIANA (MAX. 4") m3 0.0070 25.21 0.18 0.00053501 AGUA m3 0.0190 5.00 0.10 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 30.0000 0.66 19.80 0.00210101 CEMENTO PORTLAND TIPO I bl 1.6510 15.13 24.98 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.4000 15.00 21.00 0.00300101 PORCELANA BLANCA kg 0.3470 2.52 0.87 0.00300180 RODOPLAST 6mm m 5.5000 3.50 19.25 0.00380101 HORMIGON m3 0.0170 22.69 0.39 0.00430101 MADERA TORNILLO p² 5.5570 2.70 15.00 0.00431001 MADERA CEDRO p² 0.1300 8.50 1.11 0.00440106 TRIPLAY LUPUNA 9 mm x 4' x 8' und 0.3750 38.66 14.50 0.00513501 SOPORTE DE FIERRO 3" x 5" x 3/32" und 8.0000 2.72 21.76 168.40

Mano de obra470101 CAPATAZ H-H 0.4938 13.59 6.71 0.00470201 OPERARIO H-H 4.9383 12.36 61.04 0.00470301 OFICIAL H-H 1.4815 11.01 16.31 0.00470401 PEON H-H 3.9506 9.95 39.31 123.37

Equipo481001 HERRAMIENTA %MO 3.0000 123.37 3.70 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0494 23.94 1.18 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0494 7.30 0.36 5.24

23010360 MESA C.A. REVEST.CON MAYOLICA - LAVADERORendimiento (M2 /día) 1.7500 279.69Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1510 2.39 0.36 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1850 2.39 0.44 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.2670 2.39 0.64 0.00024003 TORNILLO 3/8" und 8.0000 0.07 0.56 0.00024004 TORNILLO DE FIJACION 1" und 16.0000 0.16 2.56 0.00030110 ACERO kg 7.9260 2.19 17.36 0.00040501 ARENA GRUESA m3 0.0690 22.69 1.57 0.00040502 ARENA FINA m3 0.0650 22.69 1.47 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0680 35.29 2.40 0.00051001 PIEDRA MEDIANA (MAX. 4") m3 0.0070 25.21 0.18 0.00053501 AGUA m3 0.0160 5.00 0.08 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 30.0000 0.66 19.80 0.00210101 CEMENTO PORTLAND TIPO I bl 1.5050 15.13 22.77 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.2700 15.00 19.05 0.00300101 PORCELANA BLANCA kg 0.3150 2.52 0.79 0.00300180 RODOPLAST 6mm m 5.5000 3.50 19.25 0.00380101 HORMIGON m3 0.0170 22.69 0.39 0.00430101 MADERA TORNILLO p² 5.0750 2.70 13.70 0.00431001 MADERA CEDRO p² 0.1190 8.50 1.01 0.00440106 TRIPLAY LUPUNA 9 mm x 4' x 8' und 0.3750 38.66 14.50 0.00513501 SOPORTE DE FIERRO 3" x 5" x 3/32" und 8.0000 2.72 21.76 160.64

Mano de obra470101 CAPATAZ H-H 0.4571 13.59 6.21 0.00470201 OPERARIO H-H 4.5714 12.36 56.50 0.00470301 OFICIAL H-H 1.3714 11.01 15.10 0.00470401 PEON H-H 3.6571 9.95 36.39 114.20

Equipo481001 HERRAMIENTA %MO 3.0000 114.20 3.43 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0457 23.94 1.09 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0457 7.30 0.33 4.85

23010380 MESA DE PREPARACION 2.7x0.6Rendimiento (PZA/día) 1.2000 584.15Materiales

Page 103: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

021001 ALAMBRE NEGRO Nro. 8 kg 0.1620 2.39 0.39 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.2880 2.39 0.69 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.4690 2.39 1.12 0.00030110 ACERO kg 12.3050 2.19 26.95 0.00040501 ARENA GRUESA m3 0.0610 22.69 1.38 0.00040502 ARENA FINA m3 0.1270 22.69 2.88 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0910 35.29 3.21 0.00053501 AGUA m3 0.0220 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 1.9350 15.13 29.28 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.7010 15.00 25.52 0.00300101 PORCELANA BLANCA kg 0.4210 2.52 1.06 0.00300151 IMPRIMANTE (TEMPLE FINO SINOLIT BLAN kg 0.9480 3.63 3.44 0.00300180 RODOPLAST 6mm m 6.6000 3.50 23.10 0.00430101 MADERA TORNILLO p² 7.0390 2.70 19.01 0.00431001 MADERA CEDRO p² 11.1350 8.50 94.65 0.00431025 COLA SINTETICA gal 0.2700 20.76 5.61 0.00436503 LIJA PARA MADERA und 5.0750 1.14 5.79 0.00540105 PINTURA LATEX gal 0.2840 28.57 8.11 0.00541520 PINTURA ESMALTE gal 0.1500 33.61 5.04 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0500 33.61 1.68 259.02

Mano de obra470101 CAPATAZ H-H 1.3333 13.59 18.12 0.00470201 OPERARIO H-H 13.3333 12.36 164.80 0.00470301 OFICIAL H-H 6.6667 11.01 73.40 0.00470401 PEON H-H 4.6667 9.95 46.43 302.75

Equipo481001 HERRAMIENTA %MO 7.0000 302.75 21.19 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0380 23.94 0.91 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0380 7.30 0.28 22.38

23010400 MESA DE PREPARACION 1.1x0.6Rendimiento (PZA/día) 2.7100 263.17Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0660 2.39 0.16 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1960 2.39 0.47 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1970 2.39 0.47 0.00030110 ACERO kg 8.3780 2.19 18.35 0.00040501 ARENA GRUESA m3 0.0260 22.69 0.59 0.00040502 ARENA FINA m3 0.0630 22.69 1.43 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0380 35.29 1.34 0.00053501 AGUA m3 0.0090 5.00 0.05 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8660 15.13 13.10 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 0.6930 15.00 10.40 0.00300101 PORCELANA BLANCA kg 0.1720 2.52 0.43 0.00300151 IMPRIMANTE (TEMPLE FINO SINOLIT BLAN kg 0.5000 3.63 1.82 0.00300180 RODOPLAST 6mm m 3.4000 3.50 11.90 0.00430101 MADERA TORNILLO p² 2.9820 2.70 8.05 0.00431001 MADERA CEDRO p² 4.5480 8.50 38.66 0.00431025 COLA SINTETICA gal 0.1100 20.76 2.28 0.00436503 LIJA PARA MADERA und 2.1830 1.14 2.49 0.00540105 PINTURA LATEX gal 0.1500 28.57 4.29 0.00541520 PINTURA ESMALTE gal 0.0660 33.61 2.22 0.00544010 BARNIZ SELLADOR PARA MADERA gal 0.0220 33.61 0.74 119.24

Mano de obra470101 CAPATAZ H-H 0.5904 13.59 8.02 0.00470201 OPERARIO H-H 5.9041 12.36 72.97 0.00470301 OFICIAL H-H 2.9520 11.01 32.50 0.00470401 PEON H-H 2.0664 9.95 20.56 134.05

Equipo481001 HERRAMIENTA %MO 7.0000 134.05 9.38 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0160 23.94 0.38 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0160 7.30 0.12 9.88

Page 104: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

23010420 MESA C.A. REV.C/MAYOLICA (3.60mx0.60m)Rendimiento (UND/día) 0.7500 671.59Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.2250 2.39 0.54 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.4150 2.39 0.99 0.00030110 ACERO kg 8.3500 2.19 18.29 0.00040501 ARENA GRUESA m3 0.1025 22.69 2.33 0.00040502 ARENA FINA m3 0.0360 22.69 0.82 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1581 35.29 5.58 0.00053501 AGUA m3 0.0310 5.00 0.16 0.00170502 BLOQUE HUECO CONC. MURO 14x19x39 und 17.0000 1.73 29.41 0.00210101 CEMENTO PORTLAND TIPO I bl 1.9140 15.13 28.96 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 2.3600 15.00 35.40 0.00300101 PORCELANA BLANCA kg 0.5850 2.52 1.47 0.00300180 RODOPLAST 6mm m 7.2000 3.50 25.20 0.00430101 MADERA TORNILLO p² 9.2000 2.70 24.84 0.00431001 MADERA CEDRO p² 0.1010 8.50 0.86 174.85

Mano de obra470101 CAPATAZ H-H 1.0667 13.59 14.50 0.00470201 OPERARIO H-H 21.3333 12.36 263.68 0.00470301 OFICIAL H-H 10.6667 11.01 117.44 0.00470401 PEON H-H 7.4667 9.95 74.29 469.91

Equipo481001 HERRAMIENTA %MO 5.0000 469.91 23.50 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.1067 23.94 2.55 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1067 7.30 0.78 26.83

23010440 MESA DE CONCRETO PARA LAVATORIO (01 POZA) ALDEARendimiento (UND/día) 1.6000 408.79Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.5200 2.39 1.24 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.3000 2.39 0.72 0.00030115 FIERRO CORRUGADO 8mm kg 9.3000 2.16 20.09 0.00040501 ARENA GRUESA m3 0.2010 22.69 4.56 0.00040502 ARENA FINA m3 0.0240 22.69 0.54 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1810 35.29 6.39 0.00053501 AGUA m3 0.0740 5.00 0.37 0.00103021 TRAMPA P DE 2" PVC CON REGISTRO und 1.0000 11.75 11.75 0.00103501 GRIFO BRONCE 1/2" TIPO VAINSA und 1.0000 19.37 19.37 0.00210101 CEMENTO PORTLAND TIPO I bl 2.8030 15.13 42.41 0.00300115 AGUARRAS gal 0.0200 13.10 0.26 0.00430101 MADERA TORNILLO p² 13.3100 2.70 35.94 0.00431001 MADERA CEDRO p² 0.0765 8.50 0.65 0.00436503 LIJA PARA MADERA und 0.6540 1.14 0.75 0.00542501 OLEO MATE gal 0.2000 35.29 7.06 0.00544005 SELLADOR BLANCO KEM O-LITE PARA M/O gal 0.1308 85.00 11.12 0.00775112 REJILLA BRONCE Ý 3" ROSCADA und 1.0000 12.71 12.71 175.93

Mano de obra470101 CAPATAZ H-H 0.5000 13.59 6.80 0.00470201 OPERARIO H-H 10.0000 12.36 123.60 0.00470301 OFICIAL H-H 5.0000 11.01 55.05 0.00470401 PEON H-H 3.5000 9.95 34.83 220.28

Equipo481001 HERRAMIENTA %MO 5.0000 220.28 11.01 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0500 23.94 1.20 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0500 7.30 0.37 12.58

23010460 MESA DE CONCRETO PARA LAVATORIO (02 POZAS) ALDEARendimiento (UND/día) 0.9000 723.33Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.9000 2.39 2.15 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.3000 2.39 0.72 0.00030115 FIERRO CORRUGADO 8mm kg 16.0700 2.16 34.71 0.00

Page 105: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

040501 ARENA GRUESA m3 0.3430 22.69 7.78 0.00040502 ARENA FINA m3 0.0460 22.69 1.04 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.3230 35.29 11.40 0.00053501 AGUA m3 0.1290 5.00 0.65 0.00103021 TRAMPA P DE 2" PVC CON REGISTRO und 2.0000 11.75 23.50 0.00103501 GRIFO BRONCE 1/2" TIPO VAINSA und 2.0000 19.37 38.74 0.00210101 CEMENTO PORTLAND TIPO I bl 4.9460 15.13 74.83 0.00300115 AGUARRAS gal 0.0300 13.10 0.39 0.00430101 MADERA TORNILLO p² 21.7300 2.70 58.67 0.00431001 MADERA CEDRO p² 0.0765 8.50 0.65 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00542501 OLEO MATE gal 0.3000 35.29 10.59 0.00544005 SELLADOR BLANCO KEM O-LITE PARA M/O gal 0.2000 85.00 17.00 0.00775112 REJILLA BRONCE Ý 3" ROSCADA und 2.0000 12.71 25.42 309.38

Mano de obra470101 CAPATAZ H-H 0.8889 13.59 12.08 0.00470201 OPERARIO H-H 17.7778 12.36 219.73 0.00470301 OFICIAL H-H 8.8889 11.01 97.87 0.00470401 PEON H-H 6.2222 9.95 61.91 391.59

Equipo481001 HERRAMIENTA %MO 5.0000 391.59 19.58 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0889 23.94 2.13 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0889 7.30 0.65 22.36

23010470 MESA DE CONCRETO REVST.C/MAYOLICA LABORAT.(6.80x0.60)Rendimiento (UND/día) 1.5000 860.38Materiales

021002 ALAMBRE NEGRO Nro.16 kg 1.9000 2.39 4.54 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 1.3300 2.39 3.18 0.00030110 ACERO kg 28.8900 2.19 63.27 0.00040501 ARENA GRUESA m3 0.2800 22.69 6.35 0.00040502 ARENA FINA m3 0.3600 22.69 8.17 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.3800 35.29 13.41 0.00053501 AGUA m3 0.2000 5.00 1.00 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 132.6000 0.66 87.52 0.00210101 CEMENTO PORTLAND TIPO I bl 8.9600 15.13 135.56 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 5.3600 15.00 80.40 0.00300101 PORCELANA BLANCA kg 1.0000 2.52 2.52 0.00300151 IMPRIMANTE (TEMPLE FINO SINOLIT BLAN kg 0.5000 3.63 1.82 0.00300180 RODOPLAST 6mm m 2.8100 3.50 9.84 0.00430101 MADERA TORNILLO p² 12.5000 2.70 33.75 0.00431001 MADERA CEDRO p² 1.3200 8.50 11.22 0.00431025 COLA SINTETICA gal 0.1100 20.76 2.28 0.00436503 LIJA PARA MADERA und 2.1830 1.14 2.49 0.00540105 PINTURA LATEX gal 0.1500 28.57 4.29 471.61

Mano de obra470101 CAPATAZ H-H 1.0667 13.59 14.50 0.00470201 OPERARIO H-H 10.6667 12.36 131.84 0.00470301 OFICIAL H-H 10.6667 11.01 117.44 0.00470401 PEON H-H 5.3333 9.95 53.07 316.85

Equipo481001 HERRAMIENTA %MO 3.0000 316.85 9.51 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 2.3467 23.94 56.18 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.8533 7.30 6.23 71.92

23010472 ESTANTERIA DE CONCRETO ACAB. CEMENTO FROTACHADORendimiento (UND/día) 1.2000 255.20Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.4500 2.39 1.08 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.3300 2.39 0.79 0.00030110 ACERO kg 6.4200 2.19 14.06 0.00040501 ARENA GRUESA m3 0.1100 22.69 2.50 0.00040502 ARENA FINA m3 0.0700 22.69 1.59 0.00

Page 106: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1300 35.29 4.59 0.00053501 AGUA m3 0.0500 5.00 0.25 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 28.0800 0.66 18.53 0.00210101 CEMENTO PORTLAND TIPO I bl 2.1100 15.13 31.92 0.00300110 CAL (BOLSA X 20 kg) bl 0.1000 6.09 0.61 0.00430101 MADERA TORNILLO p² 11.6000 2.70 31.32 0.00431001 MADERA CEDRO p² 0.2800 8.50 2.38 109.62

Mano de obra470101 CAPATAZ H-H 0.6667 13.59 9.06 0.00470201 OPERARIO H-H 6.6667 12.36 82.40 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 3.3333 9.95 33.17 139.31

Equipo481001 HERRAMIENTA %MO 3.0000 139.31 4.18 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 0.0667 23.94 1.60 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0667 7.30 0.49 6.27

23010480 LOSA C.A. REVEST.CON MAYOLICA 3.6x0.6Rendimiento (M2 /día) 0.7500 146.73Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1200 2.39 0.29 0.00040502 ARENA FINA m3 0.0400 22.69 0.91 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0500 35.29 1.76 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8500 15.13 12.86 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 ( m² 1.2000 15.00 18.00 0.00300101 PORCELANA BLANCA kg 0.3000 2.52 0.76 0.00380101 HORMIGON m3 0.0500 22.69 1.13 0.00430101 MADERA TORNILLO p² 2.4100 2.70 6.51 0.00610202 PLANCHA DE ACERO LAC DE 1/4" (6.3mm) m² 0.1600 150.85 24.14 66.36

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 0.4000 11.01 4.40 0.00470401 PEON H-H 2.0000 9.95 19.90 79.18

Equipo481001 HERRAMIENTA %MO 1.5000 79.18 1.19 1.19

23010500 LOSA C.A. PARA MESA DE LABORATORIORendimiento (M2 /día) 29.3000 31.09Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1500 2.39 0.36 0.00030110 ACERO kg 1.2000 2.19 2.63 0.00040501 ARENA GRUESA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0400 35.29 1.41 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5800 15.13 8.78 0.00430101 MADERA TORNILLO p² 0.3000 2.70 0.81 14.44

Mano de obra470101 CAPATAZ H-H 0.0273 13.59 0.37 0.00470201 OPERARIO H-H 0.5461 12.36 6.75 0.00470301 OFICIAL H-H 0.2730 11.01 3.01 0.00470401 PEON H-H 0.5461 9.95 5.43 15.56

Equipo481001 HERRAMIENTA %MO 7.0000 15.56 1.09 1.09

23010520 LOSA C.A. e=8cm. ANCHO 55cm.ACAB.C.PULRendimiento (M /día) 2.5000 192.64Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0730 2.39 0.17 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1666 2.39 0.40 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1460 2.39 0.35 0.00030110 ACERO kg 7.1337 2.19 15.62 0.00040501 ARENA GRUESA m3 0.0922 22.69 2.09 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0334 35.29 1.18 0.00

Page 107: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

053501 AGUA m3 0.0080 5.00 0.04 0.00210101 CEMENTO PORTLAND TIPO I bl 1.0642 15.13 16.10 0.00430101 MADERA TORNILLO p² 2.7232 2.70 7.35 43.30

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 0.9600 11.01 10.57 0.00470401 PEON H-H 2.5600 9.95 25.47 79.94

Equipo481001 HERRAMIENTA %MO 2.0000 79.94 1.60 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 2.8277 23.94 67.70 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0140 7.30 0.10 69.40

23010540 LOSA C.A.e=10cm.ANCHO 55cm.ACAB.C.PULIRendimiento (M /día) 2.5000 204.04Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0913 2.39 0.22 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.2083 2.39 0.50 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1825 2.39 0.44 0.00030110 ACERO kg 8.9171 2.19 19.53 0.00040501 ARENA GRUESA m3 0.1153 22.69 2.62 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0418 35.29 1.48 0.00053501 AGUA m3 0.0100 5.00 0.05 0.00210101 CEMENTO PORTLAND TIPO I bl 1.3303 15.13 20.13 0.00430101 MADERA TORNILLO p² 3.4040 2.70 9.19 54.16

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 0.9600 11.01 10.57 0.00470401 PEON H-H 2.5600 9.95 25.47 79.94

Equipo481001 HERRAMIENTA %MO 2.0000 79.94 1.60 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 2 H-M 2.8500 23.94 68.23 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0150 7.30 0.11 69.94

23010560 LOSA C.A. PARA ASIENTOS EN DUCHAS S.H.G.Rendimiento (PZA/día) 6.2500 101.75Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1500 2.39 0.36 0.00030110 ACERO kg 2.8400 2.19 6.22 0.00040501 ARENA GRUESA m3 0.0120 22.69 0.27 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0300 35.29 1.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.3500 15.13 5.30 0.00430101 MADERA TORNILLO p² 3.9300 2.70 10.61 23.82

Mano de obra470101 CAPATAZ H-H 0.1278 13.59 1.74 0.00470201 OPERARIO H-H 2.5559 12.36 31.59 0.00470301 OFICIAL H-H 1.2780 11.01 14.07 0.00470401 PEON H-H 2.5559 9.95 25.43 72.83

Equipo481001 HERRAMIENTA %MO 7.0000 72.83 5.10 5.10

23010600 ARCO Y TABLERO FULBITO-BASKET(MET-MAD)Rendimiento (UND/día) 1.0000 2258.67Materiales

020520 FIERRO REDONDO LISO G-60 3/4" X 20' var 0.3000 31.38 9.41 0.00020531 FIERRO LISO 1/2" m 1.0000 3.22 3.22 0.00023512 PERNO 1/2" x 2" CON TUERCA und 12.0000 0.55 6.60 0.00025005 ARMELLA 2"+GANCHO DE FIJACION und 8.0000 4.86 38.88 0.00040501 ARENA GRUESA m3 0.1100 22.69 2.50 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1600 35.29 5.65 0.00210101 CEMENTO PORTLAND TIPO I bl 1.8700 15.13 28.29 0.00264505 CANDADO DE BRONCE 40mm TIPO PESAD und 4.0000 12.18 48.72 0.00

Page 108: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

300125 LIJA PARA FIERRO und 1.0000 1.26 1.26 0.00300173 CADENA DE FIERRO GALVANIZADO 1/4" m 2.4000 6.30 15.12 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.8000 9.90 7.92 0.00303003 RED DE ARCO DE BASKET DE NYLON BLA jgo 1.0000 20.00 20.00 0.00303004 RED DE ARCO DE FULBITO NYLON BLANCO jgo 1.0000 150.00 150.00 0.00431001 MADERA CEDRO p² 24.0000 8.50 204.00 0.00431025 COLA SINTETICA gal 0.0700 20.76 1.45 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00511007 ANGULO FIERRO 3/16" x 2" x 2" m 4.2000 11.88 49.90 0.00511021 ANGULO FIERRO 1 1/2" x 1 1/2" x 3/16" m 0.7000 8.38 5.87 0.00541520 PINTURA ESMALTE gal 0.5000 33.61 16.81 0.00542001 PINTURA ANTICORROSIVA gal 0.4000 33.61 13.44 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 21.3000 31.64 673.93 0.00650108 TUBERIA FºGº 3" STANDAR m 7.1000 47.52 337.39 0.00722203 TUBO PVC-SAL - 4" (3M) m 0.8000 7.46 5.97 0.00775103 REGISTRO BRONCE Ý 4" ROSCADO und 8.0000 15.25 122.00 1769.47

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 8.0000 9.95 79.60 376.31

Equipo481001 HERRAMIENTA %MO 30.0000 376.31 112.89 112.89

23010620 TUBOS C.VOLEY,INC.RED Y DADOS CONCRETORendimiento (JGO/día) 2.0000 453.18Materiales

025005 ARMELLA 2"+GANCHO DE FIJACION und 2.0000 4.86 9.72 0.00040501 ARENA GRUESA m3 0.0800 22.69 1.82 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1200 35.29 4.23 0.00053501 AGUA m3 0.0300 5.00 0.15 0.00210101 CEMENTO PORTLAND TIPO I bl 1.3000 15.13 19.67 0.00303005 RED DE VOLEY DE NYLON Nº42 FILETE DE und 1.0000 60.00 60.00 0.00650108 TUBERIA FºGº 3" STANDAR m 5.7000 47.52 270.86 366.45

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 0.00470401 PEON H-H 2.0000 9.95 19.90 69.38

Equipo481001 HERRAMIENTA %MO 25.0000 69.38 17.35 17.35

23010630 PASAMANOS METALICOS L=2.80m (JUEGO INFANTIL)Rendimiento (UND/día) 1.0000 956.58Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.1600 25.21 4.03 0.00053501 AGUA m3 0.0300 5.00 0.15 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9700 15.13 14.68 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.2000 9.90 1.98 0.00380101 HORMIGON m3 0.3000 22.69 6.81 0.00541520 PINTURA ESMALTE gal 0.0640 33.61 2.15 0.00542001 PINTURA ANTICORROSIVA gal 0.1000 33.61 3.36 0.00650402 CODO DE ACERO NEGRO 3" und 4.0000 17.41 69.64 0.00650501 TUBERIA DE F°N° 1" STANDARD m 6.4000 8.52 54.53 0.00650503 TUBERIA DE F°N° 3" STANDARD m 19.2000 29.39 564.29 721.62

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 4.0000 9.95 39.80 228.12

Equipo481001 HERRAMIENTA %MO 3.0000 228.12 6.84 6.84

23010631 COLUMPIO METALICOS L=3.10m (JUEGO INFANTIL) CON 03 ASIENTO

Page 109: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 1.0000 1060.11Materiales

020532 FIERRO LISO 5/8" m 3.0000 5.17 15.51 0.00023512 PERNO 1/2" x 2" CON TUERCA und 4.0000 0.55 2.20 0.00051001 PIEDRA MEDIANA (MAX. 4") m3 0.3400 25.21 8.57 0.00053501 AGUA m3 0.0700 5.00 0.35 0.00210101 CEMENTO PORTLAND TIPO I bl 2.0500 15.13 31.02 0.00300173 CADENA DE FIERRO GALVANIZADO 1/4" m 7.2000 6.30 45.36 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.5000 9.90 4.95 0.00380101 HORMIGON m3 0.5800 22.69 13.16 0.00430101 MADERA TORNILLO p² 4.5100 2.70 12.18 0.00511005 ANGULO FIERRO 3/16" x 1" x 1" x 6 m m 4.5000 5.34 24.03 0.00512003 PLATINA DE FIERRO 3/16" x 1" X 6M m 0.7500 3.10 2.33 0.00512024 PLATINA DE FIERRO 1/2" X 1" m 3.6000 8.47 30.49 0.00541520 PINTURA ESMALTE gal 0.0500 33.61 1.68 0.00542001 PINTURA ANTICORROSIVA gal 0.0750 33.61 2.52 0.00650501 TUBERIA DE F°N° 1" STANDARD m 1.6000 8.52 13.63 0.00650503 TUBERIA DE F°N° 3" STANDARD m 16.0000 29.39 470.24 678.22

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470301 OFICIAL H-H 12.0000 11.01 132.12 0.00470401 PEON H-H 4.0000 9.95 39.80 370.77

Equipo481001 HERRAMIENTA %MO 3.0000 370.77 11.12 11.12

23010632 TOBOGAN H=1.85M (JUEGO INFANTIL)Rendimiento (UND/día) 1.0000 944.35Materiales

051001 PIEDRA MEDIANA (MAX. 4") m3 0.3430 25.21 8.65 0.00053501 AGUA m3 0.0700 5.00 0.35 0.00210101 CEMENTO PORTLAND TIPO I bl 2.0700 15.13 31.32 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.6000 9.90 5.94 0.00380101 HORMIGON m3 0.5900 22.69 13.39 0.00541520 PINTURA ESMALTE gal 0.0670 33.61 2.25 0.00542001 PINTURA ANTICORROSIVA gal 0.1050 33.61 3.53 0.00610214 PLANCHA GALVANIZADA DE FIERRO DE 1/20und 1.0000 125.40 125.40 0.00650500 TUBERIA DE F°N° 3/4" STANDARD m 12.8000 5.24 67.07 0.00650501 TUBERIA DE F°N° 1" STANDARD m 15.2000 8.52 129.50 0.00650502 TUBERIA DE F°N° 2" STANDARD m 12.8000 17.22 220.42 607.82

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 4.0000 9.95 39.80 326.73

Equipo481001 HERRAMIENTA %MO 3.0000 326.73 9.80 9.80

23010633 SUBE Y BAJA (JUEGO INFANTIL) CON 08 ASIENTOSRendimiento (UND/día) 1.0000 1286.51Materiales

023512 PERNO 1/2" x 2" CON TUERCA und 48.0000 0.55 26.40 0.00051001 PIEDRA MEDIANA (MAX. 4") m3 0.1610 25.21 4.06 0.00053501 AGUA m3 0.0340 5.00 0.17 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9740 15.13 14.74 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.5000 9.90 4.95 0.00380101 HORMIGON m3 0.2780 22.69 6.31 0.00430101 MADERA TORNILLO p² 5.7700 2.70 15.58 0.00511005 ANGULO FIERRO 3/16" x 1" x 1" x 6 m m 3.6000 5.34 19.22 0.00512017 PLATINA DE FIERRO 1/4" X 5/8" m 2.0000 2.60 5.20 0.00541520 PINTURA ESMALTE gal 0.1080 33.61 3.63 0.00542001 PINTURA ANTICORROSIVA gal 0.1700 33.61 5.71 0.00650501 TUBERIA DE F°N° 1" STANDARD m 3.2000 8.52 27.26 0.00

Page 110: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS ARQUITECTURA

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

650502 TUBERIA DE F°N° 2" STANDARD m 17.4000 17.22 299.63 0.00650504 TUBERIA DE F°N° 4" STANDARD m 12.8000 40.40 517.12 949.98

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 4.0000 9.95 39.80 326.73

Equipo481001 HERRAMIENTA %MO 3.0000 326.73 9.80 9.80

23010900 CARTON EMBREADO 4mm x12" EN JUNTARendimiento (M /día) 100.0000 3.10Materiales

309930 CARTON EMBREADO DE 4 mm ESPESOR (4'xund 0.1040 18.50 1.92 1.92Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0160 9.95 0.16 1.15

Equipo481001 HERRAMIENTA %MO 3.0000 1.15 0.03 0.03

Page 111: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

24010100 INODORO BLANCO C/TAPA TQUE ALTO F°FUNDIDO C/ACCESORIOSRendimiento (PZA/día) 3.0000 364.58Materiales

100501 INODORO LOSA 1ra C/ASIENTO+TQUE ALTO F°und 1.0000 267.10 267.10 0.00513502 PLATINA DE SOPORTE 1"x3/16" C/03 TORNILL und 2.0000 3.73 7.46 0.00710502 ABRAZADERA F°F° 2 X 1" DE DOS OREJAS und 2.0000 9.10 18.20 0.00722104 TUBERIA PVC-CLASE 10 SP 1 1/4" X 5M m 2.0000 3.41 6.82 299.58

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010130 INODORO BLANCO D/LOSA 1ERA.NAC.+T.ALTO DE PVC INC ACCESORIOSRendimiento (PZA/día) 4.0000 212.82Materiales

024010 TORNILLO DE FIJACION 2" C/TARUGOS DE PL und 6.0000 0.21 1.26 0.00100513 INODORO ASIENTO LOZA C/TANQUE PVC ADUund 1.0000 143.94 143.94 0.00512002 PLATINA DE FIERRO 1/8" x 1" X 6M m 3.2000 2.05 6.56 0.00512003 PLATINA DE FIERRO 3/16" x 1" X 6M m 2.7000 3.10 8.37 0.00512007 PLATINA DE FIERRO 3/16" x 1/2" m 2.5000 1.57 3.93 164.06

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

24010140 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)Rendimiento (PZA/día) 3.0000 249.64Materiales

100502 INODORO LOSA 1ra C/ASIENTO+TQE.BAJO AD und 1.0000 184.64 184.64 184.64Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010150 INODORO TANQUE BAJO DE LOSA NIÑOS (NAC. BLANCO)Rendimiento (PZA/día) 3.0000 237.27Materiales

100503 INODORO TQUE.BAJO NIÑOS,NAC.BCO.COMP und 1.0000 172.27 172.27 172.27Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010180 INODORO LOSA VITRIFICADA BLANCORendimiento (PZA/día) 6.0000 147.66Materiales

100535 INODORO ADULTO NAC. LOSA VITRIFICADA B und 1.0000 115.15 115.15 115.15Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

24010230 URINARIO CORRIDO SEGUN DISEÑO REV.C/MAYOLICA 20 x 20

Page 112: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M /día) 2.5000 112.46Materiales

040502 ARENA FINA m3 0.2000 22.69 4.54 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5000 15.13 7.57 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 (NACm² 1.6000 15.00 24.00 0.00300101 PORCELANA BLANCA kg 0.3000 2.52 0.76 0.00300180 RODOPLAST 6mm m 2.2000 3.50 7.70 0.00650101 TUBERIA FºGº 1/2" m 1.0300 6.10 6.28 50.85

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470401 PEON H-H 1.6000 9.95 15.92 59.82

Equipo481001 HERRAMIENTA %MO 3.0000 59.82 1.79 1.79

24010240 URINARIO PICO DE LORO DE LOSA VITRIFICADARendimiento (PZA/día) 3.0000 176.06Materiales

100511 URINARIO PICO DE LORO CON GRIFERIA und 1.0000 102.35 102.35 102.35Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 16.8000 63.11 10.60 10.60

24010245 LAVATORIO DE LOSA BLANCA DE PRIMERA 545x460mmRendimiento (PZA/día) 3.0000 154.50Materiales

100520 LAVATORIO LOSA BLANCA DE 1ERA CALIDAD und 1.0000 51.09 51.09 0.00103515 LLAVE DE LAVATORIO STANDAR L/ECO 130.E und 1.0000 38.41 38.41 89.50

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010250 LAVATORIO DE LOSA BLANCA 545X460mm C/MEZCLADORARendimiento (PZA/día) 3.0000 179.28Materiales

100520 LAVATORIO LOSA BLANCA DE 1ERA CALIDAD und 1.0000 51.09 51.09 0.00103516 LLAVE P/LAVAT. C/MEZCLADORA L/ECO 145.E und 1.0000 63.19 63.19 114.28

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010300 LAVADERO ACERO INOXIDABLE S/ESCURRIDERARendimiento (PZA/día) 3.0000 289.49Materiales

101510 LAVAD. ACERO INOX. 1 POZA S/ESC 21"x25" und 1.0000 184.23 184.23 0.00103520 LLAVE DE LAVADERO PICO GIRATORIO L/ECO und 1.0000 40.26 40.26 224.49

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010320 LAVADERO ACERO INOXIDABLE PARA COCINA

Page 113: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (PZA/día) 3.0000 258.20Materiales

101520 LAVAD. ACERO INOX. 1 POZA C/ESC 19"X37" und 1.0000 152.94 152.94 0.00103520 LLAVE DE LAVADERO PICO GIRATORIO L/ECO und 1.0000 40.26 40.26 193.20

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010340 LAVADERO ACERO INOXIDABLE PARA COCINA C/MEZCLADORARendimiento (PZA/día) 3.0000 319.92Materiales

101520 LAVAD. ACERO INOX. 1 POZA C/ESC 19"X37" und 1.0000 152.94 152.94 0.00103525 LLAVE LAVAD.PARED PICO GIRAT.C/MEZC.L/E und 1.0000 101.98 101.98 254.92

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010360 LAVADERO DE GRANITORendimiento (PZA/día) 3.0000 145.00Materiales

102010 LAVADERO DE GRANITO 1 POZA + ESCURR. und 1.0000 80.00 80.00 80.00Mano de obra

470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470401 PEON H-H 2.6667 9.95 26.53 63.11

Equipo481001 HERRAMIENTA %MO 3.0000 63.11 1.89 1.89

24010390 BEBEDERO CORRIDO DE CONCRETO REVEST.C/MAYOLICA 20x20Rendimiento (M /día) 2.0000 205.18Materiales

030110 ACERO kg 5.0000 2.19 10.95 0.00040501 ARENA GRUESA m3 0.2000 22.69 4.54 0.00040502 ARENA FINA m3 0.2000 22.69 4.54 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.2000 35.29 7.06 0.00103021 TRAMPA P DE 2" PVC CON REGISTRO und 1.0000 11.75 11.75 0.00103505 LLAVE ESFERICA T/MARIPOSA DE 1/2" PESAD und 1.7000 20.17 34.29 0.00210101 CEMENTO PORTLAND TIPO I bl 1.0000 15.13 15.13 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 (NACm² 1.6000 15.00 24.00 0.00300101 PORCELANA BLANCA kg 0.2000 2.52 0.50 0.00300180 RODOPLAST 6mm m 4.4000 3.50 15.40 128.16

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 2.0000 9.95 19.90 74.78

Equipo481001 HERRAMIENTA %MO 3.0000 74.78 2.24 2.24

24010400 ACCESORIO INTERNO PVC PESADO DE INODOROS TANQUE BAJORendimiento (UND/día) 8.0000 45.07Materiales

103033 ACCESORIO INTERNO DE INODORO jgo 1.0000 21.01 21.01 0.00656101 TUBO DE ABASTO und 1.0000 9.93 9.93 30.94

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 13.72

Equipo

Page 114: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 13.72 0.41 0.41

24010405 ACCESORIOS DE W.C. TANQUE ALTO+TUB.BAJADARendimiento (UND/día) 8.0000 63.69Materiales

103033 ACCESORIO INTERNO DE INODORO jgo 1.0000 21.01 21.01 0.00300130 CINTA TEFLON m 2.0000 0.24 0.48 0.00710502 ABRAZADERA F°F° 2 X 1" DE DOS OREJAS und 2.0000 9.10 18.20 0.00722104 TUBERIA PVC-CLASE 10 SP 1 1/4" X 5M m 1.8000 3.41 6.14 45.83

Mano de obra470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.5000 9.95 4.98 17.34

Equipo481001 HERRAMIENTA %MO 3.0000 17.34 0.52 0.52

24010410 GRIFERIA PARA URINARIORendimiento (UND/día) 24.0000 47.16Materiales

103015 GRIFERIA PARA URINARIO und 1.0000 42.45 42.45 42.45Mano de obra

470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

24010420 GRIFERIA PARA LAVATORIORendimiento (UND/día) 24.0000 43.12Materiales

103515 LLAVE DE LAVATORIO STANDAR L/ECO 130.E und 1.0000 38.41 38.41 38.41Mano de obra

470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

24010440 GRIFERIA PARA LAVADERORendimiento (UND/día) 24.0000 44.97Materiales

103520 LLAVE DE LAVADERO PICO GIRATORIO L/ECO und 1.0000 40.26 40.26 40.26Mano de obra

470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

24010460 GRIFERIA PARA BEBEDERORendimiento (UND/día) 24.0000 24.88Materiales

103505 LLAVE ESFERICA T/MARIPOSA DE 1/2" PESAD und 1.0000 20.17 20.17 20.17Mano de obra

470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

24010480 GRIFERIA PARA BOTADERORendimiento (UND/día) 24.0000 24.08Materiales

103501 GRIFO BRONCE 1/2" TIPO VAINSA und 1.0000 19.37 19.37 19.37Mano de obra

470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 4.57

Equipo

Page 115: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 4.57 0.14 0.14

24010500 DUCHA SIMPLE CON GRIFERIARendimiento (PZA/día) 8.0000 63.88Materiales

103550 DUCHA SIMPLE C/GRIFERIA Y BRAZO M/VAINSund 1.0000 39.50 39.50 39.50Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 1.0000 9.95 9.95 23.67

Equipo481001 HERRAMIENTA %MO 3.0000 23.67 0.71 0.71

24010520 DUCHA CON MEZCLADORARendimiento (PZA/día) 6.0000 158.56Materiales

103551 DUCHA MEZCLADORA C/GRIFERIA Y BRAZO und 1.0000 126.05 126.05 126.05Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

24010540 JABONERA LOSA BLANCARendimiento (UND/día) 8.0000 31.55Materiales

102520 JABONERA LOSA BLANCA 15 x 15 cm und 1.0000 6.72 6.72 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0200 15.13 0.30 0.00300101 PORCELANA BLANCA kg 0.0600 2.52 0.15 7.17

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 1.0000 9.95 9.95 23.67

Equipo481001 HERRAMIENTA %MO 3.0000 23.67 0.71 0.71

24010560 PAPELERA DE CERAMICARendimiento (UND/día) 8.0000 28.95Materiales

102510 PAPELERA LOSA BLANCA 15 x 15 cm und 1.0000 9.24 9.24 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0200 15.13 0.30 0.00300101 PORCELANA BLANCA kg 0.0600 2.52 0.15 9.69

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.5000 9.95 4.98 18.70

Equipo481001 HERRAMIENTA %MO 3.0000 18.70 0.56 0.56

24010580 PAPELERAS CROMADARendimiento (UND/día) 8.0000 40.35Materiales

102514 PAPELERA CROMADA C/EJE und 1.0000 15.97 15.97 15.97Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 1.0000 9.95 9.95 23.67

Equipo481001 HERRAMIENTA %MO 3.0000 23.67 0.71 0.71

24010600 ESPEJO CON MARCO DE CEDRORendimiento (UND/día) 8.0000 64.75

Page 116: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales024010 TORNILLO DE FIJACION 2" C/TARUGOS DE PL und 4.0000 0.21 0.84 0.00431001 MADERA CEDRO p² 1.6000 8.50 13.60 0.00433001 TARUGO 1"x1/2" und 4.0000 0.20 0.80 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00440103 TRIPLAY LUPUNA 6 mm x 4' x 8' und 0.1300 25.21 3.28 0.00440201 NORDEX 4 mm 4'x8' und 0.1300 30.00 3.90 0.00541005 BARNIZ MARINO gal 0.0300 37.82 1.13 0.00796101 ESPEJO p² 4.0000 3.92 15.68 40.37

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 1.0000 9.95 9.95 23.67

Equipo481001 HERRAMIENTA %MO 3.0000 23.67 0.71 0.71

24010620 COLOCACION DE APARATOS SANITARIOSRendimiento (UND/día) 2.0000 74.78Mano de obra

470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 2.0000 9.95 19.90 74.78

25010100 EMPALME A RED EXISTENTE, DESAGÜERendimiento (UND/día) 4.0000 54.92Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00722203 TUBO PVC-SAL - 4" (3M) m 1.0000 7.46 7.46 7.58

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

25010120 SALIDA DE DESAGUE EN PVCRendimiento (PTO/día) 4.0000 74.53Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0500 118.52 5.93 0.00722201 TUBO PVC-SAL - 2" (3M) m 0.6000 2.88 1.73 0.00722203 TUBO PVC-SAL - 4" (3M) m 0.6000 7.46 4.48 0.00725201 CODO PVC-SAL 2" x 90 und 0.5000 1.67 0.84 0.00725202 CODO PVC-SAL 3" x 90 und 0.5000 3.83 1.92 0.00725203 CODO PVC-SAL 4" x 90 und 0.8000 6.82 5.46 0.00725231 YEE PVC-SAL 2" x 2" und 0.2000 3.05 0.61 0.00725235 YEE PVC-SAL 4" x 4" und 0.6000 10.36 6.22 27.19

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

25010130 SALIDA PARA VENTILACIONRendimiento (PTO/día) 4.0000 56.56Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00722201 TUBO PVC-SAL - 2" (3M) m 2.0000 2.88 5.76 0.00725201 CODO PVC-SAL 2" x 90 und 2.0000 1.67 3.34 9.22

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

25010135 TUBO DE VENTILACION DE FºGº DE 3" P/TQUE APOYADORendimiento (UND/día) 4.0000 87.60Materiales

Page 117: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

650108 TUBERIA FºGº 3" STANDAR m 0.3000 47.52 14.26 0.00655931 CODO FºGº 3" x 90 und 2.0000 13.00 26.00 40.26

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

25010140 SOMBRERO PARA VENTILACION EN PVCRendimiento (UND/día) 1.0000 4.27Materiales

725162 SOMBRERO PARA VENTILACION DE PVC und 1.0000 4.27 4.27 4.27

25010145 PICADO DE MURO Y RESANE (SECCION 10x7.5 cm)Rendimiento (M /día) 15.0000 15.59Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0010 2.39 0.00 0.00030110 ACERO kg 0.2500 2.19 0.55 0.00040502 ARENA FINA m3 0.0068 22.69 0.15 0.00053501 AGUA m3 0.0022 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1197 15.13 1.81 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 2.59

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

25010146 PICADO DE PISO Y RESANE (SECCION 10x7.5 cm)Rendimiento (M /día) 18.0000 11.90Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0013 2.39 0.00 0.00030110 ACERO kg 0.2250 2.19 0.49 0.00040502 ARENA FINA m3 0.0026 22.69 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0156 15.13 0.24 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 0.86

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.4444 9.95 4.42 10.51

Equipo481001 HERRAMIENTA %MO 5.0000 10.51 0.53 0.53

25010150 EXCAVACION DE ZANJAS PARA REDES EXT.SANIT.-ELECT.Rendimiento (M3 /día) 5.0000 18.63Mano de obra

470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470401 PEON H-H 1.6000 9.95 15.92 18.09

Equipo481001 HERRAMIENTA %MO 3.0000 18.09 0.54 0.54

25010152 RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT.ELEC.SANIT).Rendimiento (M3 /día) 6.0000 15.53Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470401 PEON H-H 1.3333 9.95 13.27 15.08

Equipo481001 HERRAMIENTA %MO 3.0000 15.08 0.45 0.45

25010160 TUBERIA PVC-SAL 2"Rendimiento (M /día) 20.0000 16.93Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00

Page 118: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

722201 TUBO PVC-SAL - 2" (3M) m 1.0300 2.88 2.97 3.09Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010180 TUBERIA PVC-SAL 3"Rendimiento (M /día) 20.0000 18.93Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00722202 TUBO PVC-SAL - 3" (3M) m 1.0300 4.83 4.97 5.09

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010200 TUBERIA PVC-SAL 4"Rendimiento (M /día) 20.0000 21.76Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0020 118.52 0.24 0.00722203 TUBO PVC-SAL - 4" (3M) m 1.0300 7.46 7.68 7.92

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010220 TUBERIA PVC-SAL 6"Rendimiento (M /día) 10.0000 50.35Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0200 118.52 2.37 0.00722204 TUBO PVC-SAL - 6" (5M) m 1.0300 19.68 20.27 22.64

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470401 PEON H-H 1.6000 9.95 15.92 26.90

Equipo481001 HERRAMIENTA %MO 3.0000 26.90 0.81 0.81

25010240 TUBERIA PVC-SAP 2"Rendimiento (M /día) 20.0000 19.39Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00722401 TUBERIA PVC-SAP 2" (DESAGUE) m 1.0300 5.27 5.43 5.55

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010260 TUBERIA DE BAJADA PVC-SAL 2"Rendimiento (M /día) 16.0000 24.03Materiales

265201 ACCESORIOS DE FIJACION jgo 1.0000 3.84 3.84 0.00722201 TUBO PVC-SAL - 2" (3M) m 1.0000 2.88 2.88 6.72

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00

Page 119: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470401 PEON H-H 1.0000 9.95 9.95 16.81

Equipo481001 HERRAMIENTA %MO 3.0000 16.81 0.50 0.50

25010280 TUBERIA DE BAJADA PVC-SAL 3" P/LLUVIASRendimiento (M /día) 20.0000 20.58Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0010 118.52 0.12 0.00722202 TUBO PVC-SAL - 3" (3M) m 1.0300 4.83 4.97 0.00725202 CODO PVC-SAL 3" x 90 und 0.4300 3.83 1.65 6.74

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010300 TUBERIA DE DRENAJE PVC-SAL 2" EN MURO D/CONCRETO L=0.30m.Rendimiento (UND/día) 20.0000 7.88Materiales

722201 TUBO PVC-SAL - 2" (3M) m 0.3500 2.88 1.01 1.01Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.1200 9.95 1.19 6.67

Equipo481001 HERRAMIENTA %MO 3.0000 6.67 0.20 0.20

25010310 TUBERIA DE DRENAJE PVC-SAP 2" EN PIRCA L=0.60m.Rendimiento (UND/día) 20.0000 10.03Materiales

722401 TUBERIA PVC-SAP 2" (DESAGUE) m 0.6000 5.27 3.16 3.16Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.1200 9.95 1.19 6.67

Equipo481001 HERRAMIENTA %MO 3.0000 6.67 0.20 0.20

25010320 CANALETA DE FIERRO GALVANIZADORendimiento (M /día) 20.0000 50.50Materiales

024004 TORNILLO DE FIJACION 1" und 1.0000 0.16 0.16 0.00512021 PLATINA DE FIERRO 3/8" x 1" m 1.0000 6.35 6.35 0.00610212 PLANCHA GALVANIZADA DE FIERRO DE 1/27"( und 0.3620 94.61 34.25 40.76

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 3.0000 9.46 0.28 0.28

25010330 CANALETA CONC.175 P/EVAC.PLUVIAL e=.10m h=.30m (X-X)Rendimiento (M /día) 18.0000 48.72Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1700 2.39 0.41 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1250 2.39 0.30 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1200 2.39 0.29 0.00030110 ACERO kg 2.7000 2.19 5.91 0.00040501 ARENA GRUESA m3 0.0447 22.69 1.01 0.00040502 ARENA FINA m3 0.0090 22.69 0.20 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0482 35.29 1.70 0.00

Page 120: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

053501 AGUA m3 0.0200 5.00 0.10 0.00210101 CEMENTO PORTLAND TIPO I bl 1.0300 15.13 15.58 0.00300110 CAL (BOLSA X 20 kg) bl 0.0302 6.09 0.18 0.00300132 CORDEL m 0.1200 0.15 0.02 0.00430101 MADERA TORNILLO p² 2.1800 2.70 5.89 0.00431001 MADERA CEDRO p² 0.0200 8.50 0.17 0.00533001 BREA gal 0.0212 6.00 0.13 31.89

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470301 OFICIAL H-H 0.4444 11.01 4.89 0.00470401 PEON H-H 0.4444 9.95 4.42 0.00470501 TOPOGRAFO H-H 0.0044 14.27 0.06 15.46

Equipo481001 HERRAMIENTA %MO 3.0000 15.46 0.46 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 18 H H-M 0.0400 13.84 0.55 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0400 7.30 0.29 0.00497512 TEODOLITO Y MIRA H-M 0.0044 16.00 0.07 1.37

25010332 CANALETA CONC.175 P/EVAC,PLUVIAL CON REJILLA (Y-Y)Rendimiento (M /día) 14.0000 142.69Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1300 2.39 0.31 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1500 2.39 0.36 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0900 2.39 0.22 0.00030110 ACERO kg 3.0500 2.19 6.68 0.00040501 ARENA GRUESA m3 0.0543 22.69 1.23 0.00040502 ARENA FINA m3 0.0100 22.69 0.23 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0600 35.29 2.12 0.00053501 AGUA m3 0.0300 5.00 0.15 0.00210101 CEMENTO PORTLAND TIPO I bl 1.0700 15.13 16.19 0.00300110 CAL (BOLSA X 20 kg) bl 0.0200 6.09 0.12 0.00300132 CORDEL m 0.0900 0.15 0.01 0.00301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.7000 9.90 6.93 0.00430101 MADERA TORNILLO p² 1.7000 2.70 4.59 0.00431001 MADERA CEDRO p² 0.0200 8.50 0.17 0.00510505 PERFIL TEE 1/8" X 1" X 1" m 2.0000 3.63 7.26 0.00512023 PLATINA DE FIERRO 1/4" X 1" m 17.0000 4.16 70.72 0.00533001 BREA gal 0.0200 6.00 0.12 117.41

Mano de obra470101 CAPATAZ H-H 0.0571 13.59 0.78 0.00470201 OPERARIO H-H 0.5714 12.36 7.06 0.00470301 OFICIAL H-H 0.5714 11.01 6.29 0.00470401 PEON H-H 0.5714 9.95 5.69 0.00470501 TOPOGRAFO H-H 0.0057 14.27 0.08 19.90

Equipo481001 HERRAMIENTA %MO 5.0000 19.90 1.00 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 18 H H-M 0.0514 13.84 0.71 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0514 7.30 0.38 0.00496050 SOLDADORA A GASOLINA H-M 0.2857 11.20 3.20 0.00497512 TEODOLITO Y MIRA H-M 0.0057 16.00 0.09 5.38

25010338 CUNETA SEMICIRCULAR P/EVACUACION PLUVIALRendimiento (M /día) 15.0000 9.93Materiales

040502 ARENA FINA m3 0.0020 22.69 0.05 0.00053501 AGUA m3 0.0010 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0180 15.13 0.27 0.00431001 MADERA CEDRO p² 0.0500 8.50 0.43 0.76

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.1600 9.95 1.59 8.90

Page 121: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 8.90 0.27 0.27

25010340 RED DE DESAGUE CSN 4"Rendimiento (M /día) 2.7800 49.30Materiales

690101 TUBO C.S.N. DIAM. 4" x 1 M C/ANILLO und 1.0300 11.77 12.12 12.12Mano de obra

470101 CAPATAZ H-H 0.2878 13.59 3.91 0.00470201 OPERARIO H-H 0.2878 12.36 3.56 0.00470401 PEON H-H 2.8777 9.95 28.63 36.10

Equipo481001 HERRAMIENTA %MO 3.0000 36.10 1.08 1.08

25010360 RED DE DESAGUE CSN 6"Rendimiento (M /día) 2.7800 52.43Materiales

690102 TUBO C.S.N. DIAM. 6" x 1 M C/ANILLO und 1.0300 14.81 15.25 15.25Mano de obra

470101 CAPATAZ H-H 0.2878 13.59 3.91 0.00470201 OPERARIO H-H 0.2878 12.36 3.56 0.00470401 PEON H-H 2.8777 9.95 28.63 36.10

Equipo481001 HERRAMIENTA %MO 3.0000 36.10 1.08 1.08

25010380 RED DE DESAGUE CSN 8"Rendimiento (M /día) 2.7800 57.91Materiales

690103 TUBO C.S.N. DIAM. 8" x 1 M C/ANILLO und 1.0300 20.13 20.73 20.73Mano de obra

470101 CAPATAZ H-H 0.2878 13.59 3.91 0.00470201 OPERARIO H-H 0.2878 12.36 3.56 0.00470401 PEON H-H 2.8777 9.95 28.63 36.10

Equipo481001 HERRAMIENTA %MO 3.0000 36.10 1.08 1.08

25010400 SUMIDERO DE BRONCE 2"Rendimiento (UND/día) 4.0000 33.37Materiales

681101 SUMIDERO DE BRONCE 2" und 1.0000 5.93 5.93 5.93Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 27.44

25010420 SUMIDERO DE BRONCE 3"Rendimiento (UND/día) 4.0000 40.15Materiales

681102 SUMIDERO DE BRONCE 3" und 1.0000 12.71 12.71 12.71Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 27.44

25010440 SUMIDERO DE BRONCE 4"Rendimiento (UND/día) 4.0000 42.69Materiales

681103 SUMIDERO DE BRONCE 4" und 1.0000 15.25 15.25 15.25Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 27.44

25010460 REGISTRO DE BRONCE 2"Rendimiento (UND/día) 6.0000 26.56Materiales

Page 122: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

775101 REGISTRO BRONCE Ý 2" ROSCADO und 1.0000 8.27 8.27 8.27Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 18.29

25010480 REGISTRO DE BRONCE 3"Rendimiento (UND/día) 6.0000 31.00Materiales

775102 REGISTRO BRONCE Ý 3" ROSCADO und 1.0000 12.71 12.71 12.71Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 18.29

25010500 REGISTRO DE BRONCE 4"Rendimiento (UND/día) 6.0000 33.54Materiales

775103 REGISTRO BRONCE Ý 4" ROSCADO und 1.0000 15.25 15.25 15.25Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 18.29

25010520 REJILLA DE BRONCE 3"Rendimiento (UND/día) 6.0000 31.00Materiales

775112 REJILLA BRONCE Ý 3" ROSCADA und 1.0000 12.71 12.71 12.71Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 18.29

25010540 REJILLA DE BRONCE 4"Rendimiento (UND/día) 6.0000 33.54Materiales

775113 REJILLA BRONCE Ý 4" ROSCADA und 1.0000 15.25 15.25 15.25Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 18.29

25010560 CAJA SUMIDERO CON REJILLA DE FIERRORendimiento (UND/día) 4.0000 91.76Materiales

040502 ARENA FINA m3 0.0200 22.69 0.45 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0100 15.13 0.15 0.00652501 REJILLA Y MARCO DE FIERRO und 1.0000 42.40 42.40 43.00

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

25010580 CAJA DE REG.ALB.10"x20" C/TAPA CONCRETORendimiento (UND/día) 2.0000 166.70Materiales

030110 ACERO kg 10.0000 2.19 21.90 0.00040501 ARENA GRUESA m3 0.0200 22.69 0.45 0.00040502 ARENA FINA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0100 35.29 0.35 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 35.0000 0.66 23.10 0.00210101 CEMENTO PORTLAND TIPO I bl 1.5000 15.13 22.70 0.00380101 HORMIGON m3 0.0100 22.69 0.23 69.18

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00

Page 123: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 4.0000 9.95 39.80 94.68Equipo

481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010600 CAJA DE REG.ALB.12"x24" C/TAPA CONCRETORendimiento (UND/día) 2.0000 175.89Materiales

030110 ACERO kg 12.0000 2.19 26.28 0.00040501 ARENA GRUESA m3 0.0200 22.69 0.45 0.00040502 ARENA FINA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0100 35.29 0.35 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 40.0000 0.66 26.40 0.00210101 CEMENTO PORTLAND TIPO I bl 1.6000 15.13 24.21 0.00380101 HORMIGON m3 0.0100 22.69 0.23 78.37

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010620 CAJA DE REG.ALB.24"x24" C/TAPA CONCRETORendimiento (UND/día) 2.0000 196.61Materiales

030110 ACERO kg 15.0000 2.19 32.85 0.00040501 ARENA GRUESA m3 0.0400 22.69 0.91 0.00040502 ARENA FINA m3 0.0400 22.69 0.91 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0200 35.29 0.71 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 50.0000 0.66 33.00 0.00210101 CEMENTO PORTLAND TIPO I bl 2.0000 15.13 30.26 0.00380101 HORMIGON m3 0.0200 22.69 0.45 99.09

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010640 CAJA DE REG.PREFAB.12"x24" C/TAPA CONC.Rendimiento (UND/día) 4.0000 97.26Materiales

040502 ARENA FINA m3 0.0200 22.69 0.45 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5000 15.13 7.57 0.00312500 CAJA PREFABRICADA DE CONCRETO C/TAPA und 1.0000 40.48 40.48 48.50

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

25010648 CAJA DE REG.ALB.12"x24"C/TRES SALIDAS T/CONCRETORendimiento (UND/día) 2.0000 180.24Materiales

030110 ACERO kg 13.6000 2.19 29.78 0.00040501 ARENA GRUESA m3 0.0225 22.69 0.51 0.00040502 ARENA FINA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0138 35.29 0.49 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 40.0000 0.66 26.40 0.00210101 CEMENTO PORTLAND TIPO I bl 1.6433 15.13 24.86 0.00380101 HORMIGON m3 0.0100 22.69 0.23 82.72

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00

Page 124: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010650 TAPA DE CONCRETO DE CAJAS DE REGISTRORendimiento (UND/día) 8.0000 41.94Materiales

312001 TAPA DE CONCRETO und 1.0000 17.56 17.56 17.56Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 1.0000 9.95 9.95 23.67

Equipo481001 HERRAMIENTA %MO 3.0000 23.67 0.71 0.71

25010652 CAJA DE DISTRIBUCION DE CONCRETO C1 DE 20"x24"Rendimiento (UND/día) 2.0000 142.69Materiales

040501 ARENA GRUESA m3 0.1520 22.69 3.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1330 35.29 4.69 0.00053501 AGUA m3 0.0520 5.00 0.26 0.00210101 CEMENTO PORTLAND TIPO I bl 2.4300 15.13 36.77 45.17

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010654 CAJA DE DISTRIBUCION DE CONCRETO C2 DE 24"x24"Rendimiento (UND/día) 2.0000 177.05Materiales

040501 ARENA GRUESA m3 0.1820 22.69 4.13 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1600 35.29 5.65 0.00053501 AGUA m3 0.0620 5.00 0.31 0.00210101 CEMENTO PORTLAND TIPO I bl 2.8950 15.13 43.80 0.00560101 PLANCHA DE ACERO LAC 1/4" 4'x8' (6.0mm) pza 0.0600 427.35 25.64 79.53

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010656 CAJA DE DISTRIBUCION DE CONCRETO C4Rendimiento (UND/día) 2.0000 151.65Materiales

040501 ARENA GRUESA m3 0.1830 22.69 4.15 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1590 35.29 5.61 0.00053501 AGUA m3 0.0620 5.00 0.31 0.00210101 CEMENTO PORTLAND TIPO I bl 2.9120 15.13 44.06 54.13

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010660 ZANJAS FILTRANTES CON GRAVA+TUB 4" CONCRETO SIMPLERendimiento (M /día) 20.0000 40.46Materiales

050515 GRAVILLA m3 0.4800 29.70 14.26 0.00

Page 125: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

690101 TUBO C.S.N. DIAM. 4" x 1 M C/ANILLO und 1.0500 11.77 12.36 26.62Mano de obra

470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.8000 9.95 7.96 13.44

Equipo481001 HERRAMIENTA %MO 3.0000 13.44 0.40 0.40

25010665 ZANJAS FILTRANTES CON GRAVA+TUB 4" CONCRETO SIMPLE - *Rendimiento (M /día) 10.0000 57.74Materiales

050515 GRAVILLA m3 0.4800 29.70 14.26 0.00690101 TUBO C.S.N. DIAM. 4" x 1 M C/ANILLO und 1.0500 11.77 12.36 26.62

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 2.0000 9.95 19.90 25.93

Equipo481001 HERRAMIENTA %MO 20.0000 25.93 5.19 5.19

25010667 ZANJAS FILTRANT.C/GRAVA+TUB 4" CONCRET.SIMPLE -SUELO C/BOLONRendimiento (M /día) 8.0000 64.04Materiales

050515 GRAVILLA m3 0.4800 29.70 14.26 0.00690101 TUBO C.S.N. DIAM. 4" x 1 M C/ANILLO und 1.0500 11.77 12.36 26.62

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 2.5000 9.95 24.88 31.18

Equipo481001 HERRAMIENTA %MO 20.0000 31.18 6.24 6.24

25010670 ZANJAS FILTRANTES C/ARCILLA+GRAVA+TUB 6" CON VINIMANTA,Df=2.00mRendimiento (M /día) 12.0000 133.43Materiales

041010 TIERRA CERNIDA m3 0.8250 25.21 20.80 0.00050515 GRAVILLA m3 0.5000 29.70 14.85 0.00300117 GEOMEMBRANA DE PVC DE E=1mm (VINIMANTm² 2.6000 22.46 58.40 0.00690104 TUBO C.S.N. DIAM. 6" x 1 M C/PERFORACIO und 1.0500 15.51 16.29 110.34

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 1.3333 9.95 13.27 22.42

Equipo481001 HERRAMIENTA %MO 3.0000 22.42 0.67 0.67

25010672 DREN C/TUBO DE PVC DE 8" + GRAVA H=1.80 CE 86502Rendimiento (M /día) 12.0000 89.97Materiales

050531 GRAVA DE 2" REDONDEADA Y LIMPIA m3 1.2000 38.14 45.77 0.00722205 TUBO PVC-SAL - 8" (5M) m 1.0500 20.10 21.11 66.88

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 0.00470401 PEON H-H 1.3333 9.95 13.27 22.42

Equipo481001 HERRAMIENTA %MO 3.0000 22.42 0.67 0.67

25010675 REUBICACION DE TUBERIAS DE DESAGUE EN TANQUE SEPTICORendimiento (UND/día) 2.0000 135.17Materiales

040501 ARENA GRUESA m3 0.0030 22.69 0.07 0.00040502 ARENA FINA m3 0.0320 22.69 0.73 0.00

Page 126: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0030 35.29 0.11 0.00053501 AGUA m3 0.0110 5.00 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.6110 15.13 9.24 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CONCRE gal 0.3055 21.00 6.42 0.00725242 TEE PVC-SAL Ý 4" X 4" und 2.0000 10.51 21.02 37.65

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

25010678 TANQUE SEPTICO 3 m3Rendimiento (PZA/día) 0.5000 4081.57Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 3.5300 2.39 8.44 0.00021002 ALAMBRE NEGRO Nro.16 kg 7.1200 2.39 17.02 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 7.5100 2.39 17.95 0.00030110 ACERO kg 139.1000 2.19 304.63 0.00040501 ARENA GRUESA m3 1.6800 22.69 38.12 0.00040502 ARENA FINA m3 0.5500 22.69 12.48 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 2.5100 35.29 88.58 0.00053501 AGUA m3 0.7200 5.00 3.60 0.00210101 CEMENTO PORTLAND TIPO I bl 32.3600 15.13 489.61 0.00300110 CAL (BOLSA X 20 kg) bl 0.3700 6.09 2.25 0.00300132 CORDEL m 1.4100 0.15 0.21 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CONCRE gal 1.4700 21.00 30.87 0.00380101 HORMIGON m3 0.2900 22.69 6.58 0.00430101 MADERA TORNILLO p² 162.7300 2.70 439.37 0.00725242 TEE PVC-SAL Ý 4" X 4" und 2.0000 10.51 21.02 1480.73

Mano de obra470101 CAPATAZ H-H 12.0000 13.59 163.08 0.00470201 OPERARIO H-H 48.0000 12.36 593.28 0.00470301 OFICIAL H-H 35.2000 11.01 387.55 0.00470401 PEON H-H 112.0000 9.95 1114.40 2258.31

Equipo481001 HERRAMIENTA %MO 3.0000 2258.31 67.75 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 2.4000 23.94 57.46 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 2.0800 7.30 15.18 0.00496501 CAMION VOLQUETE 4x2, 120/140 HP, 4 M3 H-M 1.6000 126.34 202.14 342.53

25010680 TANQUE SEPTICO 5 m3Rendimiento (PZA/día) 0.5000 4584.51Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 4.0000 2.39 9.56 0.00021002 ALAMBRE NEGRO Nro.16 kg 8.0000 2.39 19.12 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 9.0000 2.39 21.51 0.00030110 ACERO kg 168.0000 2.19 367.92 0.00040501 ARENA GRUESA m3 2.0000 22.69 45.38 0.00040502 ARENA FINA m3 0.6800 22.69 15.43 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 3.0000 35.29 105.87 0.00053501 AGUA m3 0.8600 5.00 4.30 0.00210101 CEMENTO PORTLAND TIPO I bl 38.5000 15.13 582.51 0.00300110 CAL (BOLSA X 20 kg) bl 0.4400 6.09 2.68 0.00300132 CORDEL m 1.6500 0.15 0.25 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CONCRE gal 1.8000 21.00 37.80 0.00380101 HORMIGON m3 0.3600 22.69 8.17 0.00430101 MADERA TORNILLO p² 193.8000 2.70 523.26 0.00725242 TEE PVC-SAL Ý 4" X 4" und 2.0000 10.51 21.02 1764.78

Mano de obra470101 CAPATAZ H-H 6.4000 13.59 86.98 0.00470201 OPERARIO H-H 64.0000 12.36 791.04 0.00470301 OFICIAL H-H 40.0000 11.01 440.40 0.00

Page 127: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 128.0000 9.95 1273.60 2592.02Equipo

481001 HERRAMIENTA %MO 3.0000 2592.02 77.76 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 4.8000 23.94 114.91 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 4.8000 7.30 35.04 227.71

25010700 POZO PERCOLADORRendimiento (PZA/día) 1.3000 1025.34Materiales

021002 ALAMBRE NEGRO Nro.16 kg 0.2000 2.39 0.48 0.00030110 ACERO kg 6.5000 2.19 14.24 0.00040501 ARENA GRUESA m3 0.2000 22.69 4.54 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.3000 35.29 10.59 0.00170501 BLOQUE HUECO CONC. MURO 09x19x39 und 243.0000 1.28 311.04 0.00210101 CEMENTO PORTLAND TIPO I bl 2.7000 15.13 40.85 381.74

Mano de obra470101 CAPATAZ H-H 1.8462 13.59 25.09 0.00470201 OPERARIO H-H 12.3077 12.36 152.12 0.00470301 OFICIAL H-H 0.6154 11.01 6.78 0.00470401 PEON H-H 44.3077 9.95 440.86 624.85

Equipo481001 HERRAMIENTA %MO 3.0000 624.85 18.75 18.75

25010710 LETRINA SANITARIARendimiento (UND/día) 1.0000 637.42Materiales

022000 CLAVOS CON CABEZA DE 2" kg 0.0680 2.39 0.16 0.00022003 CLAVOS CON CABEZA DE 3" kg 0.1850 2.39 0.44 0.00022004 CLAVOS CON CABEZA DE 4" kg 0.0980 2.39 0.23 0.00022006 CLAVOS CON CABEZA DE 1/2" kg 0.0360 2.39 0.09 0.00262505 BISAGRA FIERRO ALUMINIZAD0 PESADO DE 4"und 3.0000 2.40 7.20 0.00300115 AGUARRAS gal 0.0189 13.10 0.25 0.00430101 MADERA TORNILLO p² 30.5000 2.70 82.35 0.00436503 LIJA PARA MADERA und 1.0000 1.14 1.14 0.00541005 BARNIZ MARINO gal 0.1890 37.82 7.15 0.00591001 PLANCHA PERFIL 4 DE 1.83MX1.10X4MM und 1.0000 22.45 22.45 0.00593505 PLANCHA FIBROCEMENTO 1.22x2.44mx4mm und 2.0000 20.44 40.88 0.00594501 TAZA LETRINA und 1.0000 44.53 44.53 0.00594502 LOSA LETRINA und 1.0000 60.60 60.60 0.00594503 TAPA PARA LETRINA und 1.0000 10.94 10.94 278.41

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470401 PEON H-H 24.0000 9.95 238.80 348.55

Equipo481001 HERRAMIENTA %MO 3.0000 348.55 10.46 10.46

25010800 CAMARA DE BOMBEO CONC 175 Kg/cm2,D=1.2,H=3.00, TARR.IMPERM.Rendimiento (PZA/día) 1.0000 1651.50Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 3.3500 2.39 8.01 0.00021002 ALAMBRE NEGRO Nro.16 kg 3.0000 2.39 7.17 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 5.1400 2.39 12.28 0.00030110 ACERO kg 64.2000 2.19 140.60 0.00040501 ARENA GRUESA m3 1.5800 22.69 35.85 0.00040502 ARENA FINA m3 0.4400 22.69 9.98 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 2.3600 35.29 83.28 0.00053501 AGUA m3 0.6600 5.00 3.30 0.00210101 CEMENTO PORTLAND TIPO I bl 29.7200 15.13 449.66 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CONCRE gal 1.1800 21.00 24.78 0.00380101 HORMIGON m3 0.1800 22.69 4.08 0.00430101 MADERA TORNILLO p² 64.1200 2.70 173.12 952.11

Mano de obra

Page 128: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 16.0000 11.01 176.16 0.00470401 PEON H-H 32.0000 9.95 318.40 604.31

Equipo481001 HERRAMIENTA %MO 5.0000 604.31 30.22 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 HP H-M 2.4000 19.60 47.04 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.4000 23.94 9.58 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3200 7.30 2.34 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 0.4000 14.74 5.90 95.08

26010100 EMPALME A RED EXISTENTE, AGUARendimiento (UND/día) 4.0000 63.07Materiales

300130 CINTA TEFLON m 20.0000 0.24 4.80 0.00650102 TUBERIA FºGº 3/4" m 0.5000 7.81 3.91 0.00655731 UNION UNIVERSAL FºGº 3/4" und 1.0000 5.60 5.60 14.31

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

26010120 SALIDA DE AGUA FRIA.- PVCRendimiento (PTO/día) 4.0000 62.51Materiales

300103 PEGAMENTO PARA TUBERIA PVC gal 0.0312 118.52 3.70 0.00300130 CINTA TEFLON m 1.8000 0.24 0.43 0.00722101 TUBERIA PVC-CLASE 10 SP 1/2" X 5M m 1.5000 1.47 2.21 0.00722102 TUBERIA PVC-CLASE 10 SP 3/4" X 5M m 1.0000 1.89 1.89 0.00725101 CODO PVC-SAP-CLASE 10 SP - 1/2" x 90 und 2.0000 1.12 2.24 0.00725102 CODO PVC-SAP-CLASE 10 SP - 3/4" x 90 und 1.0000 1.97 1.97 0.00725111 TEE PVC-SAP-CLASE 10 SP - 1/2" und 1.0000 1.40 1.40 0.00725112 TEE PVC-SAP-CLASE 10 SP - 3/4" und 0.5000 2.55 1.28 0.00727501 HIPOCLORITO DE CALCIO 70% kg 0.0100 5.00 0.05 15.17

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

26010130 PUNTO DE GAS CON UNA SALIDA - COBRERendimiento (PTO/día) 6.0000 109.12Materiales

541520 PINTURA ESMALTE gal 0.0120 33.61 0.40 0.00542001 PINTURA ANTICORROSIVA gal 0.0300 33.61 1.01 0.00680101 TUBERIA DE COBRE TIPO "L" 1/2" M 5.0000 9.59 47.95 0.00682201 UNION DE COBRE 1/2" und 1.0000 0.61 0.61 0.00682301 CODO DE COBRE 1/2" und 3.0000 1.40 4.20 0.00682401 TEE DE COBRE 1/2" und 1.0000 1.36 1.36 0.00777020 PITON DE BRONCE DE 1/2" PARA SALIDA GAS und 1.0000 18.87 18.87 74.40

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 10.0000 31.56 3.16 3.16

26010140 PUNTO DE GAS CON DOS SALIDAS - COBRERendimiento (PTO/día) 5.0000 149.29Materiales

541520 PINTURA ESMALTE gal 0.0120 33.61 0.40 0.00542001 PINTURA ANTICORROSIVA gal 0.0300 33.61 1.01 0.00

Page 129: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

680101 TUBERIA DE COBRE TIPO "L" 1/2" M 6.0000 9.59 57.54 0.00682201 UNION DE COBRE 1/2" und 2.0000 0.61 1.22 0.00682301 CODO DE COBRE 1/2" und 5.0000 1.40 7.00 0.00682401 TEE DE COBRE 1/2" und 2.0000 1.36 2.72 0.00777020 PITON DE BRONCE DE 1/2" PARA SALIDA GAS und 2.0000 18.87 37.74 107.63

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470401 PEON H-H 1.6000 9.95 15.92 37.87

Equipo481001 HERRAMIENTA %MO 10.0000 37.87 3.79 3.79

26010180 SUMINISTRO E INST.EQUIPO SOL-GAS 100(2BAL)Rendimiento (UND/día) 4.0000 1277.36Materiales

309905 MANOMETRO DE 0-100psi und 1.0000 45.71 45.71 0.00309906 MANOMETRO DE 0-300psi und 1.0000 51.43 51.43 0.00651001 BALON DE GAS 100 lbs.(INCLUYE GAS) und 2.0000 291.88 583.76 0.00651010 REGULADOR FISHER C/NIPLES DE CONEX.R96und 1.0000 500.00 500.00 0.00774103 VALVULA DE GLOBO DE 1/2" PARA GAS und 3.0000 15.90 47.70 1228.60

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

26010200 TUBERIA DE F°GDO ½"Rendimiento (M /día) 30.7700 12.87Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00650101 TUBERIA FºGº 1/2" m 1.0300 6.10 6.28 0.00655710 UNION SIMPLE FºGº 1/2" und 0.2000 1.10 0.22 6.54

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010220 TUBERIA DE F°GDO 3/4"Rendimiento (M /día) 30.7700 14.71Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00650102 TUBERIA FºGº 3/4" m 1.0300 7.81 8.04 0.00655711 UNION SIMPLE FºGº 3/4" und 0.2000 1.50 0.30 8.38

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010240 TUBERIA DE F°GDO 1"Rendimiento (M /día) 30.7700 19.71Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00650103 TUBERIA FºGº 1" m 1.0300 11.44 11.78 0.00655712 UNION SIMPLE FºGº 1" und 0.2000 2.40 0.48 0.00655913 CODO F°GDO 1" und 0.2150 5.00 1.08 13.38

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00

Page 130: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.2600 9.95 2.59 6.15Equipo

481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010260 TUBERIA DE F°GDO 1¼"Rendimiento (M /día) 30.7700 22.20Materiales

300130 CINTA TEFLON m 0.1800 0.24 0.04 0.00650104 TUBERIA FºGº 1 1/4" m 1.0300 14.64 15.08 0.00655713 UNION SIMPLE FºGº 1 1/4" und 0.2000 3.74 0.75 15.87

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010280 TUBERIA DE F°GDO 1½"Rendimiento (M /día) 30.7700 22.57Materiales

300130 CINTA TEFLON m 0.2000 0.24 0.05 0.00650105 TUBERIA FºGº 1 1/2" m 1.0300 14.80 15.24 0.00655714 UNION SIMPLE FºGº 1 1/2" und 0.2000 4.74 0.95 16.24

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010300 TUBERIA DE F°GDO 2"Rendimiento (M /día) 30.7700 42.33Materiales

300130 CINTA TEFLON m 0.2000 0.24 0.05 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 1.0300 31.64 32.59 0.00655715 UNION SIMPLE FºGº 2" und 0.2000 6.15 1.23 0.00655920 CODO FºGº 2" x 90 und 0.2650 8.05 2.13 36.00

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010340 TUBERIA DE F°GDO. 1/2" PARA GASRendimiento (M /día) 30.7700 12.65Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00650101 TUBERIA FºGº 1/2" m 1.0300 6.10 6.28 6.32

Mano de obra470101 CAPATAZ H-H 0.0260 13.59 0.35 0.00470201 OPERARIO H-H 0.2600 12.36 3.21 0.00470401 PEON H-H 0.2600 9.95 2.59 6.15

Equipo481001 HERRAMIENTA %MO 3.0000 6.15 0.18 0.18

26010490 TUBERIA PVC CLASE 10 - 1/2" ROSCADARendimiento (M /día) 32.0000 8.73Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00722122 TUBERIA PVC-CLASE 10 1/2" x 5m ROSCADA m 1.0300 2.34 2.41 0.00725130 UNION SIMPLE PVC-SAP CLASE 10 1/2" ROSCAund 0.2000 0.90 0.18 2.63

Mano de obra

Page 131: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010491 TUBERIA PVC CLASE 10 - 3/4" ROSCADARendimiento (M /día) 32.0000 10.15Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00722123 TUBERIA PVC-CLASE 10 3/4" x 5m ROSCADA m 1.0300 3.62 3.73 0.00725131 UNION SIMPLE PVC-SAP-CLASE 10 3/4" ROSCAund 0.2000 1.40 0.28 4.05

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010492 TUBERIA PVC CLASE 10 - 1" ROSCADARendimiento (M /día) 32.0000 11.78Materiales

300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00722124 TUBERIA PVC-CLASE 10 1" X 5M ROSCADA m 1.0300 5.10 5.25 0.00725132 UNION SIMPLE PVC-SAP-CLASE 10 1" ROSCA und 0.2000 1.97 0.39 5.68

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010493 TUBERIA PVC CLASE 10 - 1 1/4" ROSCADARendimiento (M /día) 32.0000 14.81Materiales

300130 CINTA TEFLON m 0.1800 0.24 0.04 0.00722125 TUBERIA PVC-CLASE 10 1 1/4" X 5M ROSCADA m 1.0300 7.73 7.96 0.00725133 UNION SIMPLE PVC-SAP-CLASE 10 1 1/4" ROS und 0.2000 3.56 0.71 8.71

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010494 TUBERIA PVC CLASE 10 - 1 1/2" ROSCADARendimiento (M /día) 32.0000 17.27Materiales

300130 CINTA TEFLON m 0.2000 0.24 0.05 0.00722126 TUBERIA PVC-CLASE 10 1 1/2" X 5M ROSCADA m 1.0300 10.04 10.34 0.00725134 UNION SIMPLE PVC-SAP-CLASE 10 1 1/2" ROS und 0.2000 3.89 0.78 11.17

Mano de obra470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010495 TUBERIA PVC CLASE 10 - 2" ROSCADARendimiento (M /día) 32.0000 24.08Materiales

300130 CINTA TEFLON m 0.2500 0.24 0.06 0.00722127 TUBERIA PVC-CLASE 10 2" X 5M ROSCADA m 1.0300 15.97 16.45 0.00

Page 132: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

725135 UNION SIMPLE PVC-SAP-CLASE 10 SP 2" ROS und 0.2000 7.34 1.47 17.98Mano de obra

470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 0.00470401 PEON H-H 0.2500 9.95 2.49 5.92

Equipo481001 HERRAMIENTA %MO 3.0000 5.92 0.18 0.18

26010500 TUBERIA PVC CLASE 10 - 4"Rendimiento (M /día) 30.0000 35.28Materiales

300130 CINTA TEFLON m 0.2500 0.24 0.06 0.00722110 TUBERIA PVC-CLASE 10 SP 4" X 5M m 1.0300 24.93 25.68 0.00725129 UNION SIMPLE PVC-SAP-CLASE 10 SP -4" und 0.2000 15.18 3.04 28.78

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.2667 9.95 2.65 6.31

Equipo481001 HERRAMIENTA %MO 3.0000 6.31 0.19 0.19

26010508 MURETE CONC 140 kg/cm2 TARRAJ. APOYO TUBO ABAST AGUA CISTERRendimiento (UND/día) 8.0000 50.95Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1600 2.39 0.38 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0800 2.39 0.19 0.00040501 ARENA GRUESA m3 0.0500 22.69 1.13 0.00040502 ARENA FINA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1100 35.29 3.88 0.00053501 AGUA m3 0.0200 5.00 0.10 0.00210101 CEMENTO PORTLAND TIPO I bl 0.9800 15.13 14.83 0.00430101 MADERA TORNILLO p² 2.0100 2.70 5.43 26.39

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 0.00470401 PEON H-H 1.0000 9.95 9.95 22.32

Equipo481001 HERRAMIENTA %MO 3.0000 22.32 0.67 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.0500 23.94 1.20 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0500 7.30 0.37 2.24

26010510 PINTURA ANTICORR.Y ESMALTE 2 MANOS EN TUBERIASRendimiento (M2 /día) 24.0000 9.54Materiales

300125 LIJA PARA FIERRO und 0.2000 1.26 0.25 0.00541520 PINTURA ESMALTE gal 0.0319 33.61 1.07 0.00542001 PINTURA ANTICORROSIVA gal 0.0500 33.61 1.68 3.00

Mano de obra470101 CAPATAZ H-H 0.0333 13.59 0.45 0.00470201 OPERARIO H-H 0.3333 12.36 4.12 0.00470401 PEON H-H 0.1667 9.95 1.66 6.23

Equipo481001 HERRAMIENTA %MO 5.0000 6.23 0.31 0.31

26010520 VALVULA DE COMPUERTA DE BRONCE 1/2"Rendimiento (UND/día) 6.0000 60.23Materiales

300130 CINTA TEFLON m 2.0000 0.24 0.48 0.00655606 NIPLE FºGº 1/2" x 1 1/4" und 2.0000 1.07 2.14 0.00655730 UNION UNIVERSAL FºGº 1/2" und 2.0000 4.87 9.74 0.00770101 VALVULA DE COMPUERTA 1/2" und 1.0000 15.36 15.36 27.72

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00

Page 133: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010540 VALVULA DE COMPUERTA DE BRONCE 3/4"Rendimiento (UND/día) 6.0000 64.21Materiales

300130 CINTA TEFLON m 2.0000 0.24 0.48 0.00655607 NIPLE FºGº 3/4" x 1 1/4" und 2.0000 1.10 2.20 0.00655731 UNION UNIVERSAL FºGº 3/4" und 2.0000 5.60 11.20 0.00770102 VALVULA DE COMPUERTA 3/4" und 1.0000 17.82 17.82 31.70

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010560 VALVULA DE COMPUERTA DE BRONCE 1"Rendimiento (UND/día) 6.0000 73.82Materiales

300130 CINTA TEFLON m 2.0000 0.24 0.48 0.00655612 NIPLE FºGº 1" x 1 1/2" und 2.0000 1.30 2.60 0.00655732 UNION UNIVERSAL FºGº 1" und 2.0000 7.45 14.90 0.00770103 VALVULA DE COMPUERTA 1" und 1.0000 23.33 23.33 41.31

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010580 VALVULA DE COMPUERTA DE BRONCE 1 1/4"Rendimiento (UND/día) 6.0000 92.88Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00655613 NIPLE FºGº 1 1/4" x 1 1/2" und 2.0000 1.78 3.56 0.00655733 UNION UNIVERSAL FºGº 1 1/4" und 2.0000 11.64 23.28 0.00770104 VALVULA DE COMPUERTA 1 1/4" und 1.0000 32.93 32.93 60.37

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010600 VALVULA DE COMPUERTA DE BRONCE 1 1/2"Rendimiento (UND/día) 6.0000 110.58Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00655621 NIPLE FºGº 1 1/2" x 2" und 2.0000 1.97 3.94 0.00655734 UNION UNIVERSAL FºGº 1 1/2" und 2.0000 15.15 30.30 0.00770105 VALVULA DE COMPUERTA 1 1/2" und 1.0000 43.23 43.23 78.07

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010620 VALVULA DE COMPUERTA DE BRONCE 2"Rendimiento (UND/día) 6.0000 150.11

Page 134: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00655627 NIPLE FºGº 2" x 2 1/2" und 2.0000 3.63 7.26 0.00655735 UNION UNIVERSAL FºGº 2" und 2.0000 22.10 44.20 0.00770106 VALVULA DE COMPUERTA 2" und 1.0000 65.54 65.54 117.60

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010640 VALVULA DE COMPUERTA DE BRONCE 2 1/2"Rendimiento (UND/día) 6.0000 256.37Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00655628 NIPLE FºGº 2 1/2" x 3" und 2.0000 6.00 12.00 0.00655736 UNION UNIVERSAL FºGº 2 1/2" und 2.0000 41.50 83.00 0.00770107 VALVULA DE COMPUERTA 2 1/2" und 1.0000 128.26 128.26 223.86

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010660 VALVULA CHECK DE BRONCE ½"Rendimiento (UND/día) 6.0000 58.07Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771101 VALVULA CHECK Ý 1/2" und 1.0000 24.96 24.96 25.56

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010680 VALVULA CHECK DE BRONCE 3/4"Rendimiento (UND/día) 6.0000 65.21Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771102 VALVULA CHECK Ý 3/4" und 1.0000 32.10 32.10 32.70

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010700 VALVULA CHECK DE BRONCE 1"Rendimiento (UND/día) 6.0000 79.13Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771103 VALVULA CHECK Ý 1" und 1.0000 46.02 46.02 46.62

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010720 VALVULA CHECK DE BRONCE 1¼"

Page 135: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 6.0000 100.98Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771104 VALVULA CHECK Ý 1 1/4" und 1.0000 67.87 67.87 68.47

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010740 VALVULA CHECK DE BRONCE 1½"Rendimiento (UND/día) 6.0000 135.73Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771105 VALVULA CHECK Ý 1 1/2" BRONCE und 1.0000 102.62 102.62 103.22

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010760 VALVULA CHECK DE BRONCE 2"Rendimiento (UND/día) 6.0000 200.37Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771109 VALVULA CHECK Ý 2" und 1.0000 167.26 167.26 167.86

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010780 VALVULA CHECK DE BRONCE 2½"Rendimiento (UND/día) 6.0000 375.22Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771107 VALVULA CHECK Ý 2 1/2" und 1.0000 342.11 342.11 342.71

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010800 VALVULA CHECK DE BRONCE 3"Rendimiento (UND/día) 6.0000 483.25Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00771108 VALVULA CHECK Ý 3" und 1.0000 450.14 450.14 450.74

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010820 VALVULA GLOBO 1/2"Rendimiento (UND/día) 6.0000 62.93Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00

Page 136: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

774101 VALVULA GLOBO 1/2" und 1.0000 29.82 29.82 30.42Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010840 VALVULA FLOTADORA 3/4"Rendimiento (UND/día) 6.0000 79.16Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00772102 VALVULA FLOTADORA Ý 3/4" und 1.0000 46.05 46.05 46.65

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010860 VALVULA FLOTADORA 1"Rendimiento (UND/día) 6.0000 102.23Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00772103 VALVULA FLOTADORA Ý 1" und 1.0000 69.12 69.12 69.72

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010880 VALVULA FLOTADORA 2"Rendimiento (UND/día) 6.0000 295.51Materiales

300130 CINTA TEFLON m 2.5000 0.24 0.60 0.00772106 VALVULA FLOTADORA Ý 2" und 1.0000 262.40 262.40 263.00

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.3333 9.95 13.27 31.56

Equipo481001 HERRAMIENTA %MO 3.0000 31.56 0.95 0.95

26010910 LLAVE DE RIEGO C/GRIFO DE ½" EN CAJUELA CONCRETO F'c 140 S/DRendimiento (UND/día) 6.0000 96.69Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1900 2.39 0.45 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1300 2.39 0.31 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1200 2.39 0.29 0.00030110 ACERO kg 2.7900 2.19 6.11 0.00040501 ARENA GRUESA m3 0.0300 22.69 0.68 0.00040502 ARENA FINA m3 0.0100 22.69 0.23 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0600 35.29 2.12 0.00053501 AGUA m3 0.0100 5.00 0.05 0.00103501 GRIFO BRONCE 1/2" TIPO VAINSA und 1.0000 19.37 19.37 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5600 15.13 8.47 0.00300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00430101 MADERA TORNILLO p² 2.8400 2.70 7.67 0.00431001 MADERA CEDRO p² 0.0300 8.50 0.26 0.00541520 PINTURA ESMALTE gal 0.0400 33.61 1.34 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0400 13.45 0.54 47.93

Mano de obra

Page 137: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 0.00470401 PEON H-H 1.3333 9.95 13.27 46.24

Equipo481001 HERRAMIENTA %MO 3.0000 46.24 1.39 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 18 H H-M 0.0533 13.84 0.74 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.0533 7.30 0.39 2.52

26010920 CAJA DE MADERA PARA VALVULARendimiento (PZA/día) 6.0000 39.51Materiales

436502 CAJA DE MADERA P/VALVULA und 1.0000 13.84 13.84 13.84Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 0.6667 9.95 6.63 24.92

Equipo481001 HERRAMIENTA %MO 3.0000 24.92 0.75 0.75

26010930 CAJA PARA VALVULA (NICHO DE MAYOLICA)Rendimiento (UND/día) 8.0000 19.37Materiales

040502 ARENA FINA m3 0.0021 22.69 0.05 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0187 15.13 0.28 0.00243004 MAYOLICA O AZULEJO BLANCO DE 20x20 (NACm² 0.1050 15.00 1.58 0.00300101 PORCELANA BLANCA kg 0.1000 2.52 0.25 2.16

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470401 PEON H-H 0.3000 9.95 2.99 16.71

Equipo481001 HERRAMIENTA %MO 3.0000 16.71 0.50 0.50

26010935 CAJA DE VALVULA BYPASS DE CONCRETORendimiento (UND/día) 2.0000 157.32Materiales

040501 ARENA GRUESA m3 0.1830 22.69 4.15 0.00040502 ARENA FINA m3 0.2500 22.69 5.67 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1590 35.29 5.61 0.00053501 AGUA m3 0.0620 5.00 0.31 0.00210101 CEMENTO PORTLAND TIPO I bl 2.9120 15.13 44.06 59.80

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 4.0000 9.95 39.80 94.68

Equipo481001 HERRAMIENTA %MO 3.0000 94.68 2.84 2.84

26010940 CAJA PREFABRICADA DE CONCRETORendimiento (PZA/día) 4.0000 89.24Materiales

312500 CAJA PREFABRICADA DE CONCRETO C/TAPA und 1.0000 40.48 40.48 40.48Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

26010960 EQUIPO DE BOMBEO, ELECTROBOMBA 1/2 HPRendimiento (UND/día) 1.0000 2687.46Materiales

Page 138: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 30.0000 0.88 26.40 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 18.0000 1.42 25.56 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 4.0000 1.34 5.36 0.00122001 TABLERO ALTERN. DE ELECT. MONOF. C/FUSIund 1.0000 721.60 721.60 0.00496002 ELECTROBOMBA 1/2 HP und 2.0000 765.60 1531.20 0.00496010 CONTROL DE NIVEL (NACIONAL) und 2.0000 35.29 70.58 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 15.0000 1.90 28.50 0.00773202 VALVULA DE PIE 1 1/2" und 2.0000 81.51 163.02 2572.22

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 109.75

Equipo481001 HERRAMIENTA %MO 5.0000 109.75 5.49 5.49

26010980 EQUIPO DE BOMBEO, 2 ELECTROBOMBAS 1.4HPRendimiento (UND/día) 1.0000 3339.18Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 30.0000 0.88 26.40 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 18.0000 1.42 25.56 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 4.0000 1.34 5.36 0.00122001 TABLERO ALTERN. DE ELECT. MONOF. C/FUSIund 1.0000 721.60 721.60 0.00496001 ELECTROBOMBA 1.4 HP MONOFASICA und 2.0000 1130.00 2260.00 0.00496010 CONTROL DE NIVEL (NACIONAL) und 2.0000 35.29 70.58 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 15.0000 1.90 28.50 0.00773201 VALVULA DE PIE 1" und 2.0000 42.97 85.94 3223.94

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 109.75

Equipo481001 HERRAMIENTA %MO 5.0000 109.75 5.49 5.49

26010990 EQUIPO DE BOMBEO, 2 ELECTROBOMBAS 1.4HP (C.15m³-TE.5m³)Rendimiento (UND/día) 1.0000 3684.37Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 68.0000 0.88 59.84 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 16.0000 1.42 22.72 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 4.0000 1.34 5.36 0.00122002 TABLERO ALTERN. DE ELECT. TRIFASICA C/F und 1.0000 968.00 968.00 0.00122514 INTERRUPTOR DE CUCHILLA TICINO 3X30A und 1.0000 43.49 43.49 0.00496001 ELECTROBOMBA 1.4 HP MONOFASICA und 2.0000 1130.00 2260.00 0.00496010 CONTROL DE NIVEL (NACIONAL) und 2.0000 35.29 70.58 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 28.0000 1.90 53.20 0.00773201 VALVULA DE PIE 1" und 2.0000 42.97 85.94 3569.13

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 109.75

Equipo481001 HERRAMIENTA %MO 5.0000 109.75 5.49 5.49

26011000 EQUIPO DE BOMBEO, 2 ELECTROBOMBAS 1.9 HPRendimiento (UND/día) 1.0000 3559.07Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 30.0000 0.88 26.40 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 18.0000 1.42 25.56 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 4.0000 1.34 5.36 0.00122002 TABLERO ALTERN. DE ELECT. TRIFASICA C/F und 1.0000 968.00 968.00 0.00122514 INTERRUPTOR DE CUCHILLA TICINO 3X30A und 1.0000 43.49 43.49 0.00496003 ELECTROBOMBA 1.9 HP TRIFASICA und 2.0000 1095.00 2190.00 0.00496010 CONTROL DE NIVEL (NACIONAL) und 2.0000 35.29 70.58 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 15.0000 1.90 28.50 0.00773201 VALVULA DE PIE 1" und 2.0000 42.97 85.94 3443.83

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00

Page 139: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 8.0000 12.36 98.88 109.75Equipo

481001 HERRAMIENTA %MO 5.0000 109.75 5.49 5.49

26011020 TANQUES DE ETERNIT DE 500 LITROSRendimiento (UND/día) 1.0000 281.10Materiales

597502 TANQUE DE ETERNIT 500 LTS C/TAPA und 1.0000 154.45 154.45 154.45Mano de obra

470101 CAPATAZ H-H 1.6000 13.59 21.74 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 120.62

Equipo481001 HERRAMIENTA %MO 5.0000 120.62 6.03 6.03

26011040 TANQUES DE ETERNIT DE 1 m³Rendimiento (UND/día) 1.0000 489.75Materiales

597501 TANQUE DE ETERNIT 1000 LTS C/TAPA und 1.0000 259.27 259.27 259.27Mano de obra

470101 CAPATAZ H-H 1.6000 13.59 21.74 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 219.50

Equipo481001 HERRAMIENTA %MO 5.0000 219.50 10.98 10.98

26011060 TANQUES DE FIBRA DE VIDRIO 1OOO LTSRendimiento (UND/día) 1.0000 612.78Materiales

309902 TANQUE DE FIBRA DE VIDRIO 1000 LTS und 1.0000 382.30 382.30 382.30Mano de obra

470101 CAPATAZ H-H 1.6000 13.59 21.74 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 219.50

Equipo481001 HERRAMIENTA %MO 5.0000 219.50 10.98 10.98

26011080 TAPA DE FIERRO EN CISTERNA Y T.ALTORendimiento (UND/día) 4.0000 74.64Materiales

541520 PINTURA ESMALTE gal 0.0160 33.61 0.54 0.00542001 PINTURA ANTICORROSIVA gal 0.0250 33.61 0.84 0.00652510 TAPA DE FIERRO und 1.0000 45.00 45.00 46.38

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 27.44

Equipo481001 HERRAMIENTA %MO 3.0000 27.44 0.82 0.82

26011100 REBOSE DE CISTERNA Y TANQUE E. DE FoGo Ý 2"Rendimiento (UND/día) 10.0000 51.79Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0500 9.90 0.50 0.00610203 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m² 0.0700 88.03 6.16 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 0.1000 31.64 3.16 0.00655920 CODO FºGº 2" x 90 und 1.0000 8.05 8.05 0.00725150 REDUCCION PVC-SAP Ý 4" A 2" und 1.0000 7.16 7.16 0.00725162 SOMBRERO PARA VENTILACION DE PVC und 1.0000 4.27 4.27 0.00775111 REJILLA BRONCE Ý 2" ROSCADA und 1.0000 5.93 5.93 35.23

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

Equipo481001 HERRAMIENTA %MO 10.0000 10.98 1.10 0.00496050 SOLDADORA A GASOLINA H-M 0.4000 11.20 4.48 5.58

Page 140: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

26011110 REBOSE DE CISTERNA DE FoGo Ý 3"Rendimiento (UND/día) 10.0000 57.95Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0500 9.90 0.50 0.00610203 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m² 0.0700 88.03 6.16 0.00650108 TUBERIA FºGº 3" STANDAR m 0.1000 47.52 4.75 0.00655931 CODO FºGº 3" x 90 und 1.0000 13.00 13.00 0.00725162 SOMBRERO PARA VENTILACION DE PVC und 1.0000 4.27 4.27 0.00775112 REJILLA BRONCE Ý 3" ROSCADA und 1.0000 12.71 12.71 41.39

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

Equipo481001 HERRAMIENTA %MO 10.0000 10.98 1.10 0.00496050 SOLDADORA A GASOLINA H-M 0.4000 11.20 4.48 5.58

26011115 REBOSE DE TANQUE ALTO DE FoGo Ý 2"Rendimiento (UND/día) 10.0000 51.79Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0500 9.90 0.50 0.00610203 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m² 0.0700 88.03 6.16 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 0.1000 31.64 3.16 0.00655920 CODO FºGº 2" x 90 und 1.0000 8.05 8.05 0.00725150 REDUCCION PVC-SAP Ý 4" A 2" und 1.0000 7.16 7.16 0.00725162 SOMBRERO PARA VENTILACION DE PVC und 1.0000 4.27 4.27 0.00775111 REJILLA BRONCE Ý 2" ROSCADA und 1.0000 5.93 5.93 35.23

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

Equipo481001 HERRAMIENTA %MO 10.0000 10.98 1.10 0.00496050 SOLDADORA A GASOLINA H-M 0.4000 11.20 4.48 5.58

26011120 MANDIL PROTECTOR PARA TUBO PVC (Máx Ý 2"Rendimiento (PZA/día) 8.0000 39.07Materiales

024004 TORNILLO DE FIJACION 1" und 8.0000 0.16 1.28 0.00433001 TARUGO 1"x1/2" und 8.0000 0.20 1.60 0.00610204 PLANCHA GALVANIZADA DE FIERRO DE 1/16"( m² 0.1200 54.21 6.51 9.39

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 20.0000 24.73 4.95 4.95

26011140 ABRAZADERA DE FIJACION DE TUBO (Máx Ý3")Rendimiento (PZA/día) 30.0000 14.80Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0830 2.39 0.20 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0830 2.39 0.20 0.00024004 TORNILLO DE FIJACION 1" und 2.0000 0.16 0.32 0.00430101 MADERA TORNILLO p² 1.2720 2.70 3.43 0.00512003 PLATINA DE FIERRO 3/16" x 1" X 6M m 0.1510 3.10 0.47 4.62

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470301 OFICIAL H-H 0.2667 11.01 2.94 0.00470401 PEON H-H 0.2667 9.95 2.65 9.25

Equipo481001 HERRAMIENTA %MO 10.0000 9.25 0.93 0.93

26011160 ABRAZADERA DE FIJACION DE TUBO

Page 141: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (PZA/día) 30.0000 14.15Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.0830 2.39 0.20 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0830 2.39 0.20 0.00024004 TORNILLO DE FIJACION 1" und 2.0000 0.16 0.32 0.00430101 MADERA TORNILLO p² 1.2720 2.70 3.43 0.00512003 PLATINA DE FIERRO 3/16" x 1" X 6M m 0.1510 3.10 0.47 4.62

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470301 OFICIAL H-H 0.2667 11.01 2.94 0.00470401 PEON H-H 0.2667 9.95 2.65 9.25

Equipo481001 HERRAMIENTA %MO 3.0000 9.25 0.28 0.28

26011180 ROMPE AGUARendimiento (PZA/día) 10.0000 39.13Materiales

301001 ELECTRODO TIPO 6011 - CELLOCORD kg 0.0500 9.90 0.50 0.00610203 PLANCHA DE ACERO LAC DE 1/8" (3.3mm) m² 0.0700 88.03 6.16 0.00650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 0.4000 31.64 12.66 19.32

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 1.0400 12.36 12.85 13.94

Equipo481001 HERRAMIENTA %MO 10.0000 13.94 1.39 0.00496050 SOLDADORA A GASOLINA H-M 0.4000 11.20 4.48 5.87

26011190 ACCESORIOS PARA TANQUE APOYADO DE 6m3Rendimiento (UND/día) 1.0000 881.04Materiales

650106 TUBERIA FºGº 2" STANDAR (E=3.25mm) m 14.5000 31.64 458.78 0.00655715 UNION SIMPLE FºGº 2" und 3.0000 6.15 18.45 0.00655735 UNION UNIVERSAL FºGº 2" und 8.0000 22.10 176.80 0.00655813 TEE F°G° 2" und 3.0000 10.17 30.51 0.00655918 CODO FºGº 2" x 45 und 4.0000 9.32 37.28 0.00655920 CODO FºGº 2" x 90 und 5.0000 8.05 40.25 0.00775111 REJILLA BRONCE Ý 2" ROSCADA und 1.0000 5.93 5.93 768.00

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 109.75

Equipo481001 HERRAMIENTA %MO 3.0000 109.75 3.29 3.29

26011195 HIPOCLORADOR PARA TANQUE APOYADO DE 6m3Rendimiento (UND/día) 8.0000 44.59Materiales

722106 TUBERIA PVC-CLASE 10 SP 2" X 5M m 0.4000 7.05 2.82 0.00722110 TUBERIA PVC-CLASE 10 SP 4" X 5M m 0.4000 24.93 9.97 0.00727514 TAPA PARA TUBO DE 4" und 2.0000 2.30 4.60 17.39

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 10.0000 24.73 2.47 2.47

26011200 EQUIPO CLORO-GAS INCLUIDO ACCESORIOSRendimiento (UND/día) 0.5000 13640.48Materiales

496012 EQUIPO CLORINADOR und 1.0000 7040.00 7040.00 0.00496013 CILINDRO CARGADO DE CLORO 150 LBS und 1.0000 1900.00 1900.00 0.00496014 COMPARADOR CLORIMETRICO und 1.0000 528.00 528.00 0.00

Page 142: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

496015 MASCARA DE PROTECCION TIPO CANIESTER und 1.0000 528.00 528.00 0.00496016 BALANZA PLATAFORMA DE 500 KG-NACIONAL und 1.0000 880.00 880.00 0.00496017 BOMBA INYECTORA DE CLORO 2B 1 1/2"x2"-3. und 1.0000 2464.00 2464.00 0.00727515 VALVULA GLOBO DE PVC 1" und 1.0000 70.00 70.00 13410.00

Mano de obra470101 CAPATAZ H-H 1.6000 13.59 21.74 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 219.50

Equipo481001 HERRAMIENTA %MO 5.0000 219.50 10.98 10.98

26011210 LLAVE DE RIEGO C/GRIFO DE ½" EN CAJA CONCRETO F'c 175 S/DRendimiento (UND/día) 5.0000 196.82Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.1900 2.39 0.45 0.00021002 ALAMBRE NEGRO Nro.16 kg 0.1300 2.39 0.31 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.1200 2.39 0.29 0.00030110 ACERO kg 8.0000 2.19 17.52 0.00040501 ARENA GRUESA m3 0.0300 22.69 0.68 0.00040502 ARENA FINA m3 0.0200 22.69 0.45 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0300 35.29 1.06 0.00053501 AGUA m3 0.0100 5.00 0.05 0.00103501 GRIFO BRONCE 1/2" TIPO VAINSA und 1.0000 19.37 19.37 0.00210101 CEMENTO PORTLAND TIPO I bl 0.5600 15.13 8.47 0.00264501 CANDADO DE BRONCE 60mm TIPO PESADO und 1.0000 26.83 26.83 0.00300130 CINTA TEFLON m 0.1500 0.24 0.04 0.00430101 MADERA TORNILLO p² 2.8400 2.70 7.67 0.00431001 MADERA CEDRO p² 0.0300 8.50 0.26 0.00541520 PINTURA ESMALTE gal 0.0400 33.61 1.34 0.00544001 SELLADOR BLANCO PARA MUROS gal 0.0400 13.45 0.54 0.00652511 REJILLA DE FIERRO EN CAJA GRIFO 1/2" und 1.0000 42.00 42.00 0.00655730 UNION UNIVERSAL FºGº 1/2" und 2.0000 4.87 9.74 0.00655911 CODO FºGº 1/2" und 1.0000 2.60 2.60 139.67

Mano de obra470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470201 OPERARIO H-H 1.6000 12.36 19.78 0.00470301 OFICIAL H-H 1.6000 11.01 17.62 0.00470401 PEON H-H 1.6000 9.95 15.92 55.49

Equipo481001 HERRAMIENTA %MO 3.0000 55.49 1.66 1.66

26011300 POZO ARTESIANO CONC.210 kg/cm²,H=5.15m,D=1.20m, C/TAPA METALRendimiento (UND/día) 0.3300 7132.44Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 14.4000 2.39 34.42 0.00021002 ALAMBRE NEGRO Nro.16 kg 6.0500 2.39 14.46 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 7.6100 2.39 18.19 0.00030110 ACERO kg 127.0500 2.19 278.24 0.00040501 ARENA GRUESA m3 1.9500 22.69 44.25 0.00040502 ARENA FINA m3 0.5800 22.69 13.16 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 2.1500 35.29 75.87 0.00053501 AGUA m3 0.9900 5.00 4.95 0.00210101 CEMENTO PORTLAND TIPO I bl 38.3600 15.13 580.39 0.00264501 CANDADO DE BRONCE 60mm TIPO PESADO und 2.0000 26.83 53.66 0.00300125 LIJA PARA FIERRO und 1.0000 1.26 1.26 0.00300149 IMPERMEABILIZANTE LIQUIDO PARA CONCRE gal 1.5500 21.00 32.55 0.00430101 MADERA TORNILLO p² 154.9200 2.70 418.28 0.00512086 PUERTA METALICA 0.30X0.40 P.ARTESIANO UND 1.0000 39.50 39.50 0.00512087 TAPA METALICA D=0.80m POZO ARTESIANO UND 1.0000 65.10 65.10 0.00541520 PINTURA ESMALTE gal 0.0400 33.61 1.34 0.00542001 PINTURA ANTICORROSIVA gal 0.0600 33.61 2.02 1677.64

Mano de obra470101 CAPATAZ H-H 9.6970 13.59 131.78 0.00470201 OPERARIO H-H 96.9697 12.36 1198.55 0.00

Page 143: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470301 OFICIAL H-H 96.9697 11.01 1067.64 0.00470401 PEON H-H 193.9394 9.95 1929.70 0.00470501 TOPOGRAFO H-H 2.4242 14.27 34.59 4362.26

Equipo481001 HERRAMIENTA %MO 3.0000 4362.26 130.87 0.00493501 PLANCHA COMPACTADORA VIBRAT. 4.0 HP H-M 4.8485 19.60 95.03 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 7.2727 23.94 174.11 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 9.6970 7.30 70.79 0.00496501 CAMION VOLQUETE 4x2, 120/140 HP, 4 M3 H-M 3.6364 126.34 459.42 0.00497501 WINCHE - 2 BALDES, 3.6 HP H-M 9.6970 14.74 142.93 0.00497512 TEODOLITO Y MIRA H-M 1.2121 16.00 19.39 1092.54

27010100 SALIDA DE AGUA CALIENTE - CPVCRendimiento (PTO/día) 4.0000 75.06Materiales

300106 PEGAMENTO PARA TUBERIA CPVC gal 0.0300 351.52 10.55 0.00726102 TUBO CPVC - 1/2" x 5 M m 2.5000 5.03 12.58 0.00727101 CODO CPVC 1/2" x 90 und 3.0000 0.71 2.13 0.00727111 TEE CPVC 1/2" x 90 und 1.0000 1.04 1.04 26.30

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

Equipo481001 HERRAMIENTA %MO 3.0000 47.34 1.42 1.42

27010120 CALENTADOR DE AGUA DE 80 LTSRendimiento (UND/día) 2.0000 764.49Materiales

498001 CALENTADOR DE AGUA DE 80 LTS und 1.0000 600.00 600.00 0.00770101 VALVULA DE COMPUERTA 1/2" und 2.0000 15.36 30.72 0.00771101 VALVULA CHECK Ý 1/2" und 1.0000 24.96 24.96 655.68

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 10.0000 98.92 9.89 9.89

27010200 TUBERIA CPVC - 1/2"Rendimiento (M /día) 25.0000 24.76Materiales

300106 PEGAMENTO PARA TUBERIA CPVC gal 0.0300 351.52 10.55 0.00726102 TUBO CPVC - 1/2" x 5 M m 1.1000 5.03 5.53 0.00727101 CODO CPVC 1/2" x 90 und 0.5000 0.71 0.36 0.00727111 TEE CPVC 1/2" x 90 und 0.5000 1.04 0.52 16.96

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.3200 9.95 3.18 7.57

Equipo481001 HERRAMIENTA %MO 3.0000 7.57 0.23 0.23

27010220 TUBERIA CPVC - 3/4"Rendimiento (M /día) 25.0000 24.76Materiales

300106 PEGAMENTO PARA TUBERIA CPVC gal 0.0300 351.52 10.55 0.00726102 TUBO CPVC - 1/2" x 5 M m 1.1000 5.03 5.53 0.00727101 CODO CPVC 1/2" x 90 und 0.5000 0.71 0.36 0.00727111 TEE CPVC 1/2" x 90 und 0.5000 1.04 0.52 16.96

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00

Page 144: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. SANITARIAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.3200 9.95 3.18 7.57Equipo

481001 HERRAMIENTA %MO 3.0000 7.57 0.23 0.23

27010225 BUZON STANDAR DE D=1.20m H=1.40mRendimiento (UND/día) 0.7500 909.49Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3500 2.39 0.84 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.3500 2.39 0.84 0.00030110 ACERO kg 19.0000 2.19 41.61 0.00040501 ARENA GRUESA m3 0.5200 22.69 11.80 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5150 35.29 18.17 0.00053501 AGUA m3 0.1660 5.00 0.83 0.00210310 MARCO Y TAPA DE BUZON DE CONCRETO D=1und 1.0000 55.00 55.00 0.00220101 CEMENTO TIPO MS bl 6.7500 15.00 101.25 0.00430101 MADERA TORNILLO p² 12.4000 2.70 33.48 263.82

Mano de obra470101 CAPATAZ H-H 1.0667 13.59 14.50 0.00470201 OPERARIO H-H 21.3333 12.36 263.68 0.00470301 OFICIAL H-H 5.3333 11.01 58.72 0.00470401 PEON H-H 26.6667 9.95 265.33 602.23

Equipo481001 HERRAMIENTA %MO 5.0000 602.23 30.11 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.4267 23.94 10.22 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4267 7.30 3.11 43.44

27010230 BUZON STANDAR DE D=1.20m Hprom.=2.20mRendimiento (UND/día) 0.5000 1353.40Materiales

021001 ALAMBRE NEGRO Nro. 8 kg 0.3000 2.39 0.72 0.00022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.3000 2.39 0.72 0.00030110 ACERO kg 34.9000 2.19 76.43 0.00040501 ARENA GRUESA m3 0.8230 22.69 18.67 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.8370 35.29 29.54 0.00053501 AGUA m3 0.2700 5.00 1.35 0.00210101 CEMENTO PORTLAND TIPO I bl 10.3400 15.13 156.44 0.00210310 MARCO Y TAPA DE BUZON DE CONCRETO D=1und 1.0000 55.00 55.00 0.00430101 MADERA TORNILLO p² 18.9000 2.70 51.03 389.90

Mano de obra470101 CAPATAZ H-H 1.6000 13.59 21.74 0.00470201 OPERARIO H-H 32.0000 12.36 395.52 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 0.00470401 PEON H-H 40.0000 9.95 398.00 903.34

Equipo481001 HERRAMIENTA %MO 5.0000 903.34 45.17 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.4800 23.94 11.49 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.4800 7.30 3.50 60.16

Page 145: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

29010100 CONEXION A RED EXISTENTERendimiento (UND/día) 4.0000 49.37Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0000 1.90 1.90 2.03

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 2.0000 9.95 19.90 47.34

29010120 SALIDA DE TECHO (CENTRO DE LUZ)Rendimiento (PTO/día) 6.0000 74.32Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 16.0000 0.88 14.08 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.3000 1.34 0.40 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.2000 1.34 1.61 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.1500 6.13 0.92 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 6.5000 1.90 12.35 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.5000 2.53 6.33 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.5000 1.07 2.68 41.35

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

29010125 SALIDA CENTRO DE LUZ EN TECHO MS-122Rendimiento (PTO/día) 6.0000 73.96Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 15.0000 0.88 13.20 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.2230 1.34 0.30 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.4000 1.34 1.88 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.2230 6.13 1.37 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 0.00710503 ABRAZADERA F°G° PARA TUBO PVC DE 3/4" und 5.0000 1.00 5.00 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 4.5000 1.90 8.55 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.2000 2.53 5.57 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 40.99

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

29010140 SALIDA DE CENTRO DE ALUMBRADO EMPOTRADORendimiento (PTO/día) 6.0000 88.24Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 14.0000 0.88 12.32 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.2500 1.34 0.34 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.1000 1.34 1.47 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.1500 6.13 0.92 0.00124010 CAJA DE MADERA TORNILLO und 1.0000 17.91 17.91 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 6.0000 1.90 11.40 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.2500 2.53 5.69 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.2500 1.07 2.41 55.27

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

Page 146: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

29010160 SALIDA DE CENTRO DE ALUMBRADO EN TIJERALRendimiento (PTO/día) 4.0000 98.46Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 24.0000 0.88 21.12 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.2500 1.34 0.34 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.2500 1.34 1.68 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.2500 6.13 1.53 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 8.0000 1.90 15.20 0.00725003 CURVA PVC-P (ELEC.) 20mm und 1.0000 2.53 2.53 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 47.52

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

Equipo481001 HERRAMIENTA %MO 3.0000 49.46 1.48 1.48

29010180 SALIDA PARA BRAQUETE (PARED)Rendimiento (PTO/día) 6.0000 72.06Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 16.0000 0.88 14.08 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.3000 1.34 0.40 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.2000 1.34 1.61 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.1500 6.13 0.92 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 7.8000 1.90 14.82 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.5000 2.53 6.33 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.5000 1.07 2.68 43.82

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470401 PEON H-H 1.0000 9.95 9.95 28.24

29010200 CABLEADO DE SALIDA DE TECHORendimiento (PTO/día) 6.0000 47.05Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 16.0000 0.88 14.08 14.08Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

29010220 INTERRUPTOR DE 01 GOLPE ESC.NAC.BELLAS ARTESRendimiento (PTO/día) 32.0000 6.94Materiales

122502 INTERRUPTOR 1 GOLPE TIPO TICINO und 1.0000 3.41 3.41 3.41Mano de obra

470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 3.43

Equipo481001 HERRAMIENTA %MO 3.0000 3.43 0.10 0.10

29010240 INTERRUPTOR DE 02 GOLPES ESC.NAC.BELLAS ARTESRendimiento (PTO/día) 32.0000 9.66Materiales

122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 1.0000 6.13 6.13 6.13Mano de obra

470101 CAPATAZ H-H 0.0250 13.59 0.34 0.00470201 OPERARIO H-H 0.2500 12.36 3.09 3.43

Equipo

Page 147: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 3.43 0.10 0.10

29010260 SALIDA PARA TOMACORRIENTE DOBLERendimiento (PTO/día) 7.0000 77.85Materiales

070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 15.5000 1.42 22.01 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 1.0000 1.34 1.34 0.00123004 TOMACORRIENTE DOBLE BAKELITA und 1.0000 5.74 5.74 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0020 131.92 0.26 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 7.5000 1.90 14.25 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.0000 2.53 5.06 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 50.80

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470401 PEON H-H 1.1429 9.95 11.37 27.05

29010280 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRARendimiento (PTO/día) 7.0000 87.50Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 7.0000 0.88 6.16 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 14.0000 1.42 19.88 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 1.0000 1.34 1.34 0.00123020 TOMACORRIENTE DOBLE C/ LINEA DE TIERRAund 1.0000 10.74 10.74 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 7.0000 1.90 13.30 0.00725003 CURVA PVC-P (ELEC.) 20mm und 1.2000 2.53 3.04 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 59.24

Mano de obra470101 CAPATAZ H-H 0.1143 13.59 1.55 0.00470201 OPERARIO H-H 1.1429 12.36 14.13 0.00470301 OFICIAL H-H 1.1429 11.01 12.58 28.26

29010300 CABLEADO DE SALIDA DE TOMACORRIENTE C/TIERRARendimiento (PTO/día) 6.0000 51.57Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 5.0000 0.88 4.40 0.00070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 10.0000 1.42 14.20 18.60

Mano de obra470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470201 OPERARIO H-H 1.3333 12.36 16.48 0.00470301 OFICIAL H-H 1.3333 11.01 14.68 32.97

29010360 SALIDA TRIFASICARendimiento (PTO/día) 4.0000 158.72Materiales

070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 12.0000 1.42 17.04 0.00070509 CONDUCTOR TW SOLIDO 1x6 mm2 m 24.0000 2.09 50.16 0.00121511 CAJA GALV. OCTOGONAL PESADA 4" und 1.0000 1.34 1.34 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 12.0000 2.38 28.56 0.00725004 CURVA PVC-P (ELEC.) 25mm und 2.0000 3.69 7.38 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 109.26

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

29010375 POZO PUESTA A TIERRA-2004 P-1 ( R<15 Ohms)Rendimiento (UND/día) 1.0000 645.77Materiales

041010 TIERRA CERNIDA m3 1.5000 25.21 37.82 0.00062001 CONECTOR und 1.0000 3.84 3.84 0.00

Page 148: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

065523 VARILLA DE COBRE 3/4"x 2.40m C/PUNTA und 1.0000 182.00 182.00 0.00072003 CABLE 1x16 mm2 COBRE DESNUDO m 1.0000 2.21 2.21 0.00300157 DOSIS QUIMICA THOR GEL DE 5 kg und 2.0000 63.22 126.44 0.00312501 CAJA DE CONCRETO C/TAPA und 1.0000 65.46 65.46 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0000 1.90 1.90 419.67

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470401 PEON H-H 16.0000 9.95 159.20 219.51

Equipo481001 HERRAMIENTA %MO 3.0000 219.51 6.59 6.59

29010380 POZO PUESTA A TIERRA INC. CABLE-2004 P-2 ( R<5 Ohms)Rendimiento (UND/día) 1.0000 866.61Materiales

041010 TIERRA CERNIDA m3 2.0000 25.21 50.42 0.00062001 CONECTOR und 3.0000 3.84 11.52 0.00065523 VARILLA DE COBRE 3/4"x 2.40m C/PUNTA und 1.0000 182.00 182.00 0.00072003 CABLE 1x16 mm2 COBRE DESNUDO m 1.0000 2.21 2.21 0.00072008 CABLE 1x50 mm2 COBRE DESNUDO m 17.5000 8.71 152.43 0.00300157 DOSIS QUIMICA THOR GEL DE 5 kg und 2.0000 63.22 126.44 0.00312501 CAJA DE CONCRETO C/TAPA und 1.0000 65.46 65.46 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0000 1.90 1.90 592.38

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 24.0000 9.95 238.80 266.24

Equipo481001 HERRAMIENTA %MO 3.0000 266.24 7.99 7.99

29010400 MURETE PORTAMEDIDOR TRIFASICORendimiento (UND/día) 4.0000 82.43Materiales

179101 MURETE DE LADRILLO 1.15x0.6x0.25 mt. und 1.0000 36.45 36.45 36.45Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 0.00470401 PEON H-H 2.0000 9.95 19.90 44.64

Equipo481001 HERRAMIENTA %MO 3.0000 44.64 1.34 1.34

29010410 MURETE F'c=140 kg/cm2 (1.8x0.7x0.3)TARRAJEADO ENTERRADO 0.Rendimiento (UND/día) 8.0000 194.53Materiales

040501 ARENA GRUESA m3 0.1560 22.69 3.54 0.00040502 ARENA FINA m3 0.0500 22.69 1.13 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.1970 35.29 6.95 0.00051002 PIEDRA GRANDE (MAX. 8") m3 0.0640 25.21 1.61 0.00053501 AGUA m3 0.0860 5.00 0.43 0.00210101 CEMENTO PORTLAND TIPO I bl 3.4160 15.13 51.68 0.00380101 HORMIGON m3 0.1100 22.69 2.50 0.00430101 MADERA TORNILLO p² 15.0400 2.70 40.61 108.45

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 0.00470401 PEON H-H 5.0000 9.95 49.75 74.48

Equipo481001 HERRAMIENTA %MO 3.0000 74.48 2.23 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.3000 23.94 7.18 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.3000 7.30 2.19 11.60

29010420 BUZON

Page 149: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 4.0000 147.82Materiales

622001 BUZON DE CONCRETO und 1.0000 101.84 101.84 101.84Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 0.00470401 PEON H-H 2.0000 9.95 19.90 44.64

Equipo481001 HERRAMIENTA %MO 3.0000 44.64 1.34 1.34

30010100 SALIDA DE TELEFONO y/o INTERCOMUNICADORESRendimiento (PTO/día) 5.3300 65.55Materiales

121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 1.0000 1.34 1.34 0.00123560 PLACA SALIDA PARA TV o TELEFONO und 1.0000 3.11 3.11 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 4.0000 1.90 7.60 0.00725003 CURVA PVC-P (ELEC.) 20mm und 1.2000 2.53 3.04 15.09

Mano de obra470101 CAPATAZ H-H 0.1501 13.59 2.04 0.00470201 OPERARIO H-H 1.5009 12.36 18.55 0.00470401 PEON H-H 3.0019 9.95 29.87 50.46

30010120 SALIDA PARA TV CABLERendimiento (PTO/día) 5.3300 68.13Materiales

123560 PLACA SALIDA PARA TV o TELEFONO und 1.0000 3.11 3.11 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 5.0000 1.90 9.50 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.0000 2.53 5.06 17.67

Mano de obra470101 CAPATAZ H-H 0.1501 13.59 2.04 0.00470201 OPERARIO H-H 1.5009 12.36 18.55 0.00470401 PEON H-H 3.0019 9.95 29.87 50.46

30010140 SALIDA PARA TIMBRERendimiento (PTO/día) 5.3300 70.34Materiales

070504 CONDUCTOR TW SOLIDO 1x1.5mm2 m 5.0000 0.54 2.70 0.00121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 1.0000 1.34 1.34 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 5.0000 1.90 9.50 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.0000 2.53 5.06 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 1.2000 1.07 1.28 19.88

Mano de obra470101 CAPATAZ H-H 0.1501 13.59 2.04 0.00470201 OPERARIO H-H 1.5009 12.36 18.55 0.00470401 PEON H-H 3.0019 9.95 29.87 50.46

30010160 SALIDA PARA PARLANTERendimiento (PTO/día) 5.3300 58.69Materiales

722003 TUBO PVC-P (ELEC.) 20mm 3M m 3.0000 1.90 5.70 0.00725003 CURVA PVC-P (ELEC.) 20mm und 1.0000 2.53 2.53 8.23

Mano de obra470101 CAPATAZ H-H 0.1501 13.59 2.04 0.00470201 OPERARIO H-H 1.5009 12.36 18.55 0.00470401 PEON H-H 3.0019 9.95 29.87 50.46

30010180 SALIDA PARA INTERCOMUNICADORRendimiento (PTO/día) 4.0000 111.91Materiales

180101 CABLE TELEFONICO XPT 2 X 0.64 MM2 m 15.0000 0.58 8.70 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 15.0000 1.90 28.50 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.0000 2.53 5.06 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.2500 1.07 2.41 44.67

Page 150: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 4.0000 9.95 39.80 67.24

31010080 PICADO DE PISO Y RESANE (SECCION 10x7.5 cm)Rendimiento (M /día) 18.0000 11.90Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0013 2.39 0.00 0.00030110 ACERO kg 0.2250 2.19 0.49 0.00040502 ARENA FINA m3 0.0026 22.69 0.06 0.00210101 CEMENTO PORTLAND TIPO I bl 0.0156 15.13 0.24 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 0.86

Mano de obra470101 CAPATAZ H-H 0.0444 13.59 0.60 0.00470201 OPERARIO H-H 0.4444 12.36 5.49 0.00470401 PEON H-H 0.4444 9.95 4.42 10.51

Equipo481001 HERRAMIENTA %MO 5.0000 10.51 0.53 0.53

31010082 PICADO DE MURO Y RESANE (SECCION 10x7.5 cm)Rendimiento (M /día) 15.0000 15.59Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0010 2.39 0.00 0.00030110 ACERO kg 0.2500 2.19 0.55 0.00040502 ARENA FINA m3 0.0068 22.69 0.15 0.00053501 AGUA m3 0.0022 5.00 0.01 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1197 15.13 1.81 0.00430101 MADERA TORNILLO p² 0.0260 2.70 0.07 2.59

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470401 PEON H-H 0.5333 9.95 5.31 12.62

Equipo481001 HERRAMIENTA %MO 3.0000 12.62 0.38 0.38

31010086 PICADO Y RESANE PARA COLOCACION DE TABLERORendimiento (M2 /día) 8.0000 16.71Materiales

022001 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 0.0100 2.39 0.02 0.00040502 ARENA FINA m3 0.0166 22.69 0.38 0.00053501 AGUA m3 0.0840 5.00 0.42 0.00210101 CEMENTO PORTLAND TIPO I bl 0.1166 15.13 1.76 2.58

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 13.72

Equipo481001 HERRAMIENTA %MO 3.0000 13.72 0.41 0.41

31010088 PICADO Y RESANE DE PISO Y VEREDA DE CONCRETORendimiento (M2 /día) 85.0000 41.25Materiales

022003 CLAVOS CON CABEZA DE 3" kg 0.0060 2.39 0.01 0.00040501 ARENA GRUESA m3 0.0460 22.69 1.04 0.00040502 ARENA FINA m3 0.0140 22.69 0.32 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.0570 35.29 2.01 0.00053501 AGUA m3 0.0210 5.00 0.11 0.00210101 CEMENTO PORTLAND TIPO I bl 0.8650 15.13 13.09 0.00430101 MADERA TORNILLO p² 0.5800 2.70 1.57 18.15

Mano de obra470101 CAPATAZ H-H 0.0659 13.59 0.90 0.00470201 OPERARIO H-H 0.6118 12.36 7.56 0.00470301 OFICIAL H-H 0.0941 11.01 1.04 0.00

Page 151: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470401 PEON H-H 0.9412 9.95 9.36 18.86Equipo

481001 HERRAMIENTA %MO 3.0000 18.86 0.57 0.00490505 COMP. NEUMATICA - 93 HP - 335/375 PCM H-M 0.0235 90.76 2.13 0.00490523 MARTILLO NEUMATICO - 25/29 KG H-M 0.0235 10.14 0.24 0.00495003 MEZCLADORA DE CONC.(TAMBOR) 7 P3, 18 H H-M 0.0941 13.84 1.30 4.24

31010090 EXCAVACION DE ZANJAS PARA REDES EXT.SANIT.-ELECT.Rendimiento (M3 /día) 5.0000 18.63Mano de obra

470101 CAPATAZ H-H 0.1600 13.59 2.17 0.00470401 PEON H-H 1.6000 9.95 15.92 18.09

Equipo481001 HERRAMIENTA %MO 3.0000 18.09 0.54 0.54

31010095 RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT.ELEC.SANIT).Rendimiento (M3 /día) 6.0000 15.53Mano de obra

470101 CAPATAZ H-H 0.1333 13.59 1.81 0.00470401 PEON H-H 1.3333 9.95 13.27 15.08

Equipo481001 HERRAMIENTA %MO 3.0000 15.08 0.45 0.45

31010100 ENTUBADO DE CENTRO DE ALUMBRADORendimiento (PTO/día) 8.6000 67.28Materiales

121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 0.3000 1.34 0.40 0.00121510 CAJA GALV. OCTOGONAL LIVIANA 4" und 1.2000 0.59 0.71 0.00122502 INTERRUPTOR 1 GOLPE TIPO TICINO und 0.1000 3.41 0.34 0.00122504 INTERRUPTOR 2 GOLPE TIPO TICINO und 0.1500 6.13 0.92 0.00124010 CAJA DE MADERA TORNILLO und 1.0000 17.91 17.91 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0200 131.92 2.64 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 6.5000 1.90 12.35 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.5000 2.53 6.33 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.5000 1.07 2.68 44.28

Mano de obra470101 CAPATAZ H-H 0.0930 13.59 1.26 0.00470201 OPERARIO H-H 0.9302 12.36 11.50 0.00470301 OFICIAL H-H 0.9302 11.01 10.24 23.00

31010120 ENTUBADO DE TOMACORRIENTE DOBLERendimiento (PTO/día) 8.6000 51.79Materiales

121502 CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4 und 1.0000 1.34 1.34 0.00123004 TOMACORRIENTE DOBLE BAKELITA und 1.0000 5.74 5.74 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0020 131.92 0.26 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 7.5000 1.90 14.25 0.00725003 CURVA PVC-P (ELEC.) 20mm und 2.0000 2.53 5.06 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 2.0000 1.07 2.14 28.79

Mano de obra470101 CAPATAZ H-H 0.0930 13.59 1.26 0.00470201 OPERARIO H-H 0.9302 12.36 11.50 0.00470301 OFICIAL H-H 0.9302 11.01 10.24 23.00

31010140 TUBERIA PVC-SEL 3/4" PARA INST. 2do.PISORendimiento (M /día) 30.0000 10.36Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0100 131.92 1.32 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0000 1.90 1.90 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.1100 2.53 0.28 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 0.3333 1.07 0.36 3.86

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00

Page 152: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.2667 9.95 2.65 6.31

Equipo481001 HERRAMIENTA %MO 3.0000 6.31 0.19 0.19

31010160 TUBERIA PVC-P 20mmRendimiento (M /día) 30.0000 9.11Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0000 1.90 1.90 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.1100 2.53 0.28 0.00725013 UNION SIMPLE PVC-P (ELEC.) 20mm und 0.3333 1.07 0.36 2.61

Mano de obra470101 CAPATAZ H-H 0.0267 13.59 0.36 0.00470201 OPERARIO H-H 0.2667 12.36 3.30 0.00470401 PEON H-H 0.2667 9.95 2.65 6.31

Equipo481001 HERRAMIENTA %MO 3.0000 6.31 0.19 0.19

31010180 TUBERIA PVC-P 25mmRendimiento (M /día) 25.0000 11.14Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0000 2.38 2.38 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.1100 3.69 0.41 0.00725014 UNION SIMPLE PVC-P (ELEC.) 25mm und 0.3333 1.43 0.48 3.34

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.3200 9.95 3.18 7.57

Equipo481001 HERRAMIENTA %MO 3.0000 7.57 0.23 0.23

31010200 TUBERIA PVC-P 35mmRendimiento (M /día) 25.0000 12.69Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0000 3.42 3.42 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.1100 5.89 0.65 0.00725015 UNION SIMPLE PVC-P (ELEC.) 35mm und 0.3333 2.25 0.75 4.89

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.3200 9.95 3.18 7.57

Equipo481001 HERRAMIENTA %MO 3.0000 7.57 0.23 0.23

31010220 TUBERIA PVC-P 40mmRendimiento (M /día) 25.0000 15.87Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0000 4.47 4.47 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.1100 8.28 0.91 0.00725018 UNION SIMPLE PVC-P (ELEC.) 65mm und 0.3333 7.86 2.62 8.07

Mano de obra470101 CAPATAZ H-H 0.0320 13.59 0.43 0.00470201 OPERARIO H-H 0.3200 12.36 3.96 0.00470401 PEON H-H 0.3200 9.95 3.18 7.57

Equipo481001 HERRAMIENTA %MO 3.0000 7.57 0.23 0.23

31010240 TUBERIA PVC-P 50mmRendimiento (M /día) 20.0000 19.65

Page 153: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0000 6.82 6.82 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.1100 10.90 1.20 0.00725016 UNION SIMPLE PVC-P (ELEC.) 50mm und 0.3333 5.47 1.82 9.91

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 3.0000 9.46 0.28 0.28

31010260 TUBERIA PVC-P 65mmRendimiento (M /día) 20.0000 24.79Materiales

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0005 131.92 0.07 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0000 10.35 10.35 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.1100 24.15 2.66 0.00725017 UNION SIMPLE PVC-P (ELEC.) 60mm und 0.3333 5.91 1.97 15.05

Mano de obra470101 CAPATAZ H-H 0.0400 13.59 0.54 0.00470201 OPERARIO H-H 0.4000 12.36 4.94 0.00470401 PEON H-H 0.4000 9.95 3.98 9.46

Equipo481001 HERRAMIENTA %MO 3.0000 9.46 0.28 0.28

32010060 CAJA DE PASE F°G° 4x4x1.5"Rendimiento (UND/día) 10.0000 22.31Materiales

121501 CAJA DE PASE GALVANIZADA 4" x 4" x 1.5" und 1.0000 1.93 1.93 1.93Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

32010080 CAJA DE PASE F°G° 4X4X2"Rendimiento (UND/día) 10.0000 22.48Materiales

121515 CAJA DE PASE GALVANIZADA 4" x 4" x 2" und 1.0000 2.10 2.10 2.10Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

32010100 CAJA DE PASE F°G° 4X4X2.5"Rendimiento (UND/día) 10.0000 22.90Materiales

121517 CAJA DE PASE GALVANIZADA 4" x 4" x 2.5" und 1.0000 2.52 2.52 2.52Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Equipo481001 HERRAMIENTA %MO 3.0000 19.79 0.59 0.59

32010120 CAJA DE PASE F°G° 4x4x3"Rendimiento (UND/día) 9.4000 25.46Materiales

121518 CAJA DE PASE GALVANIZADA 4" x 4" x 3" und 1.0000 3.78 3.78 3.78

Page 154: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0851 13.59 1.16 0.00470201 OPERARIO H-H 0.8511 12.36 10.52 0.00470301 OFICIAL H-H 0.8511 11.01 9.37 21.05

Equipo481001 HERRAMIENTA %MO 3.0000 21.05 0.63 0.63

32010140 CAJA DE PASE F°G° 6x6x3"Rendimiento (UND/día) 8.0000 30.93Materiales

121521 CAJA DE PASE GALVANIZADA 6" x 6" x 3" und 1.0000 5.46 5.46 5.46Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

32010160 CAJA DE PASE F°G° 6x6x4"Rendimiento (UND/día) 8.0000 31.60Materiales

121522 CAJA DE PASE GALVANIZADA 6" x 6" x 4" und 1.0000 6.13 6.13 6.13Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

32010180 CAJA DE PASE F°G° 6x6x8"Rendimiento (UND/día) 6.6500 45.64Materiales

121523 CAJA DE PASE GALVANIZADA 6" x 6" x 8" und 1.0000 15.00 15.00 15.00Mano de obra

470101 CAPATAZ H-H 0.1203 13.59 1.63 0.00470201 OPERARIO H-H 1.2030 12.36 14.87 0.00470301 OFICIAL H-H 1.2030 11.01 13.25 29.75

Equipo481001 HERRAMIENTA %MO 3.0000 29.75 0.89 0.89

32010200 CAJA DE PASE F°G° 8X8X6"Rendimiento (UND/día) 6.1500 45.41Materiales

121525 CAJA DE PASE GALVANIZADA 8" x 8" x 6" und 1.0000 12.27 12.27 12.27Mano de obra

470101 CAPATAZ H-H 0.1301 13.59 1.77 0.00470201 OPERARIO H-H 1.3008 12.36 16.08 0.00470301 OFICIAL H-H 1.3008 11.01 14.32 32.17

Equipo481001 HERRAMIENTA %MO 3.0000 32.17 0.97 0.97

32010220 CAJA DE PASE F°G° 8X8X12"Rendimiento (UND/día) 5.7000 62.64Materiales

121526 CAJA DE PASE GALVANIZADA 8" x 8" x 12" und 1.0000 26.89 26.89 26.89Mano de obra

470101 CAPATAZ H-H 0.1404 13.59 1.91 0.00470201 OPERARIO H-H 1.4035 12.36 17.35 0.00470301 OFICIAL H-H 1.4035 11.01 15.45 34.71

Equipo481001 HERRAMIENTA %MO 3.0000 34.71 1.04 1.04

32010240 CAJA DE PASE F°G° 12x8x6"

Page 155: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 5.7000 60.12Materiales

121528 CAJA DE PASE GALVANIZADA 6" x 8" x 12" und 1.0000 24.37 24.37 24.37Mano de obra

470101 CAPATAZ H-H 0.1404 13.59 1.91 0.00470201 OPERARIO H-H 1.4035 12.36 17.35 0.00470301 OFICIAL H-H 1.4035 11.01 15.45 34.71

Equipo481001 HERRAMIENTA %MO 3.0000 34.71 1.04 1.04

32010260 CAJA DE PASE F°G° 12X12X6"Rendimiento (UND/día) 4.0000 68.00Materiales

121531 CAJA DE PASE GALVANIZADA 12" x 12" x 6" und 1.0000 17.06 17.06 17.06Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

Equipo481001 HERRAMIENTA %MO 3.0000 49.46 1.48 1.48

32010280 CAJA DE PASE F°G° 12X12X8"Rendimiento (UND/día) 4.0000 72.03Materiales

121529 CAJA DE PASE GALVANIZADA 12" x 12" x 8" und 1.0000 21.09 21.09 21.09Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

Equipo481001 HERRAMIENTA %MO 3.0000 49.46 1.48 1.48

32010300 CAJA PORTAMEDIDOR TRIFASICORendimiento (UND/día) 10.0000 203.54Materiales

124031 CAJA PORTAMEDIDOR TRIFASICO LT und 1.0000 180.44 180.44 180.44Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 1.0400 11.01 11.45 22.43

Equipo481001 HERRAMIENTA %MO 3.0000 22.43 0.67 0.67

32010320 CAJA TOMA TIPO 1Rendimiento (UND/día) 10.0000 318.05Materiales

124032 CAJA DE TOMA TIPO F1 und 1.0000 294.95 294.95 294.95Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 1.0400 11.01 11.45 22.43

Equipo481001 HERRAMIENTA %MO 3.0000 22.43 0.67 0.67

33000100 TAB.AUT. 2-2X30,1-2X20,1-2X15ARendimiento (UND/día) 2.0000 481.91Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 1.0000 40.34 40.34 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 379.03

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00

Page 156: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010000 TAB.AUT. 2-2X30,2-2X15ARendimiento (UND/día) 2.0000 481.91Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 379.03

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010100 TAB.AUT. 1-2X20, 2-2X15ARendimiento (UND/día) 3.0000 554.89Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 486.31

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 4.0000 65.94 2.64 2.64

33010120 INTERRUPTOR CON FUSIBLE 2X26A, FUSIBLE DE 10ARendimiento (UND/día) 12.0000 37.69Materiales

122523 LLAVE CUCHILLA C/FUSIBLES - 2 x 26 A und 1.0000 26.14 26.14 0.00431001 MADERA CEDRO p² 0.2500 8.50 2.13 28.27

Mano de obra470101 CAPATAZ H-H 0.0667 13.59 0.91 0.00470201 OPERARIO H-H 0.6667 12.36 8.24 9.15

Equipo481001 HERRAMIENTA %MO 3.0000 9.15 0.27 0.27

33010160 TAB.AUT. 1-2X30, 2-2X15ARendimiento (UND/día) 3.0000 406.61Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 338.69

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 3.0000 65.94 1.98 1.98

33010161 TAB.AUT. 1-2X30, 1-2X20ARendimiento (UND/día) 4.0000 496.91Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 445.97

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00

Page 157: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

Equipo481001 HERRAMIENTA %MO 3.0000 49.46 1.48 1.48

33010162 TAB.AUT. 1-2x30,2-2x20ARendimiento (UND/día) 3.0000 406.61Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 338.69

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 3.0000 65.94 1.98 1.98

33010163 TAB.AUT. 1-2X30, 3-2X20ARendimiento (UND/día) 3.0000 414.55Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560530 GABINETE METALICO CON BARRA DE COBRE und 1.0000 184.61 184.61 345.97

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 4.0000 65.94 2.64 2.64

33010165 TAB.AUT. 1-2X30, 1-2X20, 1-2X15ARendimiento (UND/día) 3.0000 406.61Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 1.0000 40.34 40.34 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 338.69

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 3.0000 65.94 1.98 1.98

33010166 TAB.AUT. 1-2X30, 1-2X20, 2-2X15ARendimiento (UND/día) 2.0000 480.92Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 379.03

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010170 TAB.AUT. 2-2X30,1-2X20,1-2X15ARendimiento (UND/día) 2.0000 481.91Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 1.0000 40.34 40.34 0.00

Page 158: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 379.03

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010178 TAB.AUT. 1-3X30, 4-2X20ARendimiento (UND/día) 2.0000 687.85Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560510 GABINETE METALICO CON BARRA DE COBRE und 1.0000 281.05 281.05 585.96

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010179 TAB.AUT. 1-3X30, 5-2X20ARendimiento (UND/día) 2.0000 728.19Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 5.0000 40.34 201.70 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560510 GABINETE METALICO CON BARRA DE COBRE und 1.0000 281.05 281.05 626.30

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010180 TAB.AUT. 1-3X30, 1-2X20, 1-2X15ARendimiento (UND/día) 3.0000 481.37Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 1.0000 40.34 40.34 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560530 GABINETE METALICO CON BARRA DE COBRE und 1.0000 184.61 184.61 408.84

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 2.6667 11.01 29.36 65.94

Equipo481001 HERRAMIENTA %MO 10.0000 65.94 6.59 6.59

33010182 TAB.AUT. 1-3X30, 1-2X20, 2-2X15ARendimiento (UND/día) 2.0000 584.13Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 482.24

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 159: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010183 TAB.AUT. 1-3X30, 1-2X20, 4-2X15ARendimiento (UND/día) 2.0000 728.19Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 4.0000 40.34 161.36 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560510 GABINETE METALICO CON BARRA DE COBRE und 1.0000 281.05 281.05 626.30

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010184 TAB.AUT. 1-3X30, 3-2X20, 3-2X15ARendimiento (UND/día) 2.0000 868.77Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 3.0000 40.34 121.02 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 766.88

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010185 TAB.AUT. 1-3X30, 3-2X20, 4-2X15ARendimiento (UND/día) 2.0000 909.11Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 4.0000 40.34 161.36 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 807.22

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010187 TAB.AUT. 1-3X30, 3-2X20, 5-2X15ARendimiento (UND/día) 2.0000 949.45Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 5.0000 40.34 201.70 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 847.56

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010188 TAB.AUT. 1-3X30, 4-2X20, 5-2X15ARendimiento (UND/día) 2.0000 989.79Materiales

Page 160: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 5.0000 40.34 201.70 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 887.90

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010190 TAB.AUT. 1-3X30, 2-2X20, 1-2X30ARendimiento (UND/día) 2.0000 747.75Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 645.86

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010191 TAB.AUT. 1-3X30, 3-2X20, 1-2X30ARendimiento (UND/día) 2.0000 772.09Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 670.20

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010200 TAB.AUT. 1-3X40, 4-2X20A.Rendimiento (UND/día) 2.0000 783.64Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 681.75

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010201 TAB.AUT. 1-3X40, 1-2X20, 2-2X15ARendimiento (UND/día) 2.0000 595.68Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 493.79

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00

Page 161: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010202 TAB.AUT. 1-3X40, 1-2X20, 4-2X15ARendimiento (UND/día) 2.0000 823.98Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 4.0000 40.34 161.36 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 722.09

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010203 TAB.AUT. 1-3X40, 2-2X20, 2-2X15ARendimiento (UND/día) 2.0000 783.64Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 681.75

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010204 TAB.AUT. 1-3X40, 2-2X20, 4-2X15A.Rendimiento (UND/día) 2.0000 1104.32Materiales

122517 INTERRUPTOR DIFERENCIAL 2x25A-30mA und 2.0000 120.00 240.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 4.0000 40.34 161.36 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1002.43

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010205 TAB.AUT. 1-2X30, 1-2X20, 1-2X15A,1-IDF 25AMPRendimiento (UND/día) 2.0000 679.40Materiales

122517 INTERRUPTOR DIFERENCIAL 2x25A-30mA und 1.0000 120.00 120.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 1.0000 40.34 40.34 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122583 INTERRUPTOR TERMOMAGNETICO - 2 x 40 A und 1.0000 55.44 55.44 0.00560510 GABINETE METALICO CON BARRA DE COBRE und 1.0000 281.05 281.05 577.51

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 162: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010206 TAB.AUT. 1-3x40, 3-2x20, 6-2x15ARendimiento (UND/día) 2.0000 985.34Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 6.0000 40.34 242.04 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 883.45

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010207 TAB.AUT. 1-3X40, 5-2X20, 4-2X15ARendimiento (UND/día) 2.0000 985.34Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 4.0000 40.34 161.36 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 5.0000 40.34 201.70 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 883.45

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010208 TAB.AUT. 1-3X40, 5-2X20, 6-2X15ARendimiento (UND/día) 2.0000 1066.02Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 6.0000 40.34 242.04 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 5.0000 40.34 201.70 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 964.13

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010209 TAB.AUT. 1-3X40, 4-2X20, 1-2X30ARendimiento (UND/día) 2.0000 823.98Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 722.09

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010210 TAB.AUT. 1-3X40, 1-3X30, 3-2X20A.Rendimiento (UND/día) 2.0000 886.85Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00

Page 163: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 784.96Mano de obra

470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010212 TAB.AUT. 1-3X100, 1-3X70, 1-3X60, 1-3X40ARendimiento (UND/día) 2.0000 1176.68Materiales

122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1074.79

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010220 TAB.AUT. 2-2X50, 4-2X30Rendimiento (UND/día) 2.0000 755.42Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 4.0000 40.34 161.36 0.00122584 INTERRUPTOR TERMOMAGNETICO - 2 x 50 A und 2.0000 55.44 110.88 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 653.53

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010221 TAB.AUT. 1-3X50, 4-2X20, 3-2X15ARendimiento (UND/día) 2.0000 904.66Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 3.0000 40.34 121.02 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 802.77

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010224 TAB.AUT. 1-3X50, 1-3X30, 1-2X20ARendimiento (UND/día) 2.0000 822.17Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 720.28

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Page 164: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010240 TAB.AUT. 1-3X60, 3-2X20, 7-2X15ARendimiento (UND/día) 2.0000 1025.68Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 7.0000 40.34 282.38 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 923.79

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010241 TAB.AUT. 1-3X60, 3-2X20, 1-2X30ARendimiento (UND/día) 2.0000 799.64Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 697.75

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010242 TAB.AUT. 1-3X60, 5-2X20, 8-2X15ARendimiento (UND/día) 2.0000 1146.70Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 8.0000 40.34 322.72 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 5.0000 40.34 201.70 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1044.81

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010243 TAB.AUT. 1-3X60, 6-2X20, 7-2X15ARendimiento (UND/día) 2.0000 1146.70Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 7.0000 40.34 282.38 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 6.0000 40.34 242.04 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1044.81

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010244 TAB.AUT. 1-3X60, 3-2X30, 4-2X20ARendimiento (UND/día) 2.0000 920.66Materiales

Page 165: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 3.0000 40.34 121.02 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 818.77

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010247 TAB.AUT. 1-3X60, 2-3X40, 1-2X30ARendimiento (UND/día) 2.0000 972.82Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 870.93

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010260 TAB.AUT. 1-3X70, 3-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1166.86Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 3.0000 155.10 465.30 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1063.98

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010261 TAB.AUT. 1-3X70, 2-3X40, 1-2X30, 1-3X30ARendimiento (UND/día) 2.0000 1154.32Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1052.43

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010262 TAB.AUT. 1-3X70, 1-3X50, 3-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1326.66Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 3.0000 143.55 430.65 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1224.77

Page 166: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010263 TAB.AUT. 1-3X70, 1-3X50, 3-3X30, 3-2X20ARendimiento (UND/día) 2.0000 1383.00Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 3.0000 143.55 430.65 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1281.11

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010270 TAB.AUT. 1-3X80, 1-3X50, 2-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1183.11Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122587 INTERRUPTOR TERMOMAGNETICO - 3 x 80 A und 1.0000 193.05 193.05 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 2.0000 143.55 287.10 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1081.22

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010280 TAB.AUT. 1-3X100, 2-3X70ARendimiento (UND/día) 2.0000 1059.53Materiales

122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 2.0000 193.05 386.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 957.64

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010281 TAB.AUT. 1-3X100, 4-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1334.17Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 4.0000 155.10 620.40 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1232.28

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo

Page 167: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010282 TAB.AUT. 1-3X100, 1-3X50, 1-3X30, 4-2X20ARendimiento (UND/día) 2.0000 1133.44Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1031.55

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010283 TAB.AUT. 1-3X100, 1-3X50, 3-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1510.96Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 3.0000 143.55 430.65 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 2.0000 155.10 310.20 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1409.07

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010284 TAB.AUT. 1-3X100, 1-3X50, 2-3X30, 4-2X20ARendimiento (UND/día) 2.0000 1276.99Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 2.0000 143.55 287.10 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1175.10

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010285 TAB.AUT. 1-3X100, 1-3X50, 2-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1196.31Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 2.0000 143.55 287.10 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1094.42

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 168: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010286 TAB.AUT. 1-3X100, 1-3X60, 1-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1068.76Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 966.87

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010290 TAB.AUT. 1-3X100, 1-3X60, 1-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1023.97Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 922.08

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010291 TAB.AUT. 1-3X100, 1-3X60, 1-3X40, 1-3X30, 2-2X30ARendimiento (UND/día) 2.0000 1207.86Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1105.97

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010292 TAB.AUT. 1-3X100, 1-3X60, 2-3X40, 1-3X30, 1-2X30ARendimiento (UND/día) 2.0000 1322.62Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1220.73

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 169: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010293 TAB.AUT. 1-3X100, 1-3X60, 2-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1196.06Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1093.18

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010295 TAB.AUT. 1-3X100, 1-3X60, 2-3X40, 2-2X30ARendimiento (UND/día) 2.0000 1236.40Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1133.52

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010297 TAB.AUT. 1-3X100, 1-3X60, 3-3X40, 1-3X30, 1-2X30ARendimiento (UND/día) 2.0000 1477.72Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 3.0000 155.10 465.30 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1375.83

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010310 TAB.AUT. 1-3X100, 1-3X70, 3-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1389.11Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 3.0000 155.10 465.30 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1286.23

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

Page 170: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010314 TAB.AUT. 1-3X100, 1-3X70, 2-3X60, 1-3X40, 2-2X30ARendimiento (UND/día) 2.0000 1429.45Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 2.0000 155.10 310.20 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1326.57

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010316 TAB.AUT. 1-3X100, 2-3X70, 1-3X40, 1-2X30ARendimiento (UND/día) 2.0000 1254.97Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 2.0000 193.05 386.10 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1153.08

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010320 TAB.AUT. 1-3X100, 1-3X40, 1-3X30, 2-2X30, 1-IH16ARendimiento (UND/día) 2.0000 1228.75Materiales

122501 INTERRUPTOR HORARIO 16 A und 1.0000 175.00 175.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1125.87

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 4.0000 98.92 3.96 3.96

33010330 TAB.AUT. 1-3X125, 1-3X50, 2-2X30, 4-2X20ARendimiento (UND/día) 2.0000 1290.37Materiales

122576 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A und 1.0000 426.05 426.05 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1188.48

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 171: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010332 TABLERO INT.AUT. 1-3X125, 1-3X50, 3-3X30, 2-2X20ARendimiento (UND/día) 2.0000 1575.66Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122576 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A und 1.0000 426.05 426.05 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 3.0000 143.55 430.65 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1473.77

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010334 TAB.AUT. 1-3X125, 1-3X50, 2-3X30, 3-2X20ARendimiento (UND/día) 2.0000 1456.45Materiales

122576 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A und 1.0000 426.05 426.05 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 2.0000 143.55 287.10 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1354.56

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010335 TAB.AUT. 1-3X125, 1-3X50, 2-2X30, 4-2X20ARendimiento (UND/día) 2.0000 1290.37Materiales

122576 INTERRUPTOR TERMOMAGNETICO - 3 x 125 A und 1.0000 426.05 426.05 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 1.0000 155.10 155.10 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1188.48

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010350 TAB.AUT. 1-3X150, 2-3X50, 1-3X30, 3-2X30A.Rendimiento (UND/día) 2.0000 1833.95Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 3.0000 40.34 121.02 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 2.0000 155.10 310.20 0.00122597 INTERRUPTOR TERMOMAGNETICO - 3 x 150 A und 1.0000 792.00 792.00 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1732.06

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010354 TAB.AUT. 1-3X150, 3-3X60, 2-3X30, 2-2X20A

Page 172: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 2.0000 2092.26Materiales

122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 2.0000 143.55 287.10 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 3.0000 155.10 465.30 0.00122597 INTERRUPTOR TERMOMAGNETICO - 3 x 150 A und 1.0000 792.00 792.00 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1990.37

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010360 TAB.AUT. 1-3X200,1-3X100,1-3X70, 1-3X60,2-3X40A,1-2X30ARendimiento (UND/día) 2.0000 2182.12Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122589 INTERRUPTOR TERMOMAGNETICO - 3 x 70 A und 1.0000 193.05 193.05 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00122598 INTERRUPTOR TERMOMAGNETICO - 3 x 200 A und 1.0000 810.00 810.00 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 2080.23

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010370 TAB.AUT. 1-3X300, 1-3X200, 2-3X100, 1-3X30ARendimiento (UND/día) 2.0000 3149.23Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122577 INTERRUPTOR TERMOMAGNETICO - 3 x 300 A und 1.0000 1300.00 1300.00 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 2.0000 206.25 412.50 0.00122598 INTERRUPTOR TERMOMAGNETICO - 3 x 200 A und 1.0000 810.00 810.00 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 3047.34

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010390 TABLERO TA-1 1-3X100,2-3X50,4-2X20,6-2X15Rendimiento (UND/día) 2.0000 1403.03Materiales

024502 TIRAFONES 1/4" X 2" und 8.0000 2.00 16.00 0.00122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 6.0000 40.34 242.04 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 4.0000 40.34 161.36 0.00122595 INTERRUPTOR TERMOMAGNETICO - 3 x 50 A und 2.0000 155.10 310.20 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1301.14

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

Page 173: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

33010400 T.A. 1-3X100,1-3X60,2-3X40,1-3X30,2-2X30,1-IH16ARendimiento (UND/día) 2.0000 1537.96Materiales

122501 INTERRUPTOR HORARIO 16 A und 1.0000 175.00 175.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 2.0000 40.34 80.68 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 1.0000 143.55 143.55 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 2.0000 155.10 310.20 0.00122594 INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 1.0000 155.10 155.10 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1436.07

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33010940 TAPA METALICA DE GABINETERendimiento (UND/día) 8.0000 36.09Materiales

560502 TAPA METALICA DE GABINETE und 1.0000 21.96 21.96 21.96Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 13.72

Equipo481001 HERRAMIENTA %MO 3.0000 13.72 0.41 0.41

33010945 TABLERO INT.AUTOMATICO 1-2X20, 2-2X15 (SS.HH.ALUMINIO)Rendimiento (UND/día) 1.0000 563.45Materiales

122578 INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 2.0000 40.34 80.68 0.00122580 INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 1.0000 40.34 40.34 0.00520201 LAMINA DE ALUMINIO LISO DE 0.4 MM m² 1.0000 21.00 21.00 0.00560520 GABINETE METALICO CON BARRA DE COBRE "und 1.0000 217.67 217.67 359.69

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 197.83

Equipo481001 HERRAMIENTA %MO 3.0000 197.83 5.93 5.93

33020100 LLAVE CUCHILLA DE TRANSFERENCIA 1-3X100Rendimiento (UND/día) 8.0000 149.90Materiales

122537 LLAVE CUCHILLA TRANSFERENCIA - 3 X 100 A und 1.0000 122.56 122.56 0.00431001 MADERA CEDRO p² 0.2200 8.50 1.87 124.43

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

33020300 LLAVE DE CUCHILLA 1-2X20ARendimiento (UND/día) 8.0000 53.48Materiales

122520 LLAVE CUCHILLA C/FUSIBLES - 2 x 20 A und 1.0000 26.14 26.14 0.00431001 MADERA CEDRO p² 0.2200 8.50 1.87 28.01

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo

Page 174: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

33020310 LLAVE DE CUCHILLA 1-3x30ARendimiento (UND/día) 8.0000 70.83Materiales

122532 LLAVE CUCHILLA C/FUSIBLES - 3 x 30 A und 1.0000 43.49 43.49 0.00431001 MADERA CEDRO p² 0.2200 8.50 1.87 45.36

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Equipo481001 HERRAMIENTA %MO 3.0000 24.73 0.74 0.74

33020400 INTERRUPTOR DE TRANSFERENCIA MANUAL 2X60 EN GABINETERendimiento (UND/día) 4.0000 205.78Materiales

122516 INTERRUPTOR TRANSFERENCIA MANUAL 2X6 und 1.0000 84.84 84.84 0.00560541 GABINETE METALICO CON PUERTA Y CHAPA und 1.0000 70.00 70.00 154.84

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470301 OFICIAL H-H 2.0000 11.01 22.02 49.46

Equipo481001 HERRAMIENTA %MO 3.0000 49.46 1.48 1.48

33020500 T.G.AUT. 1-3X100, 3-3X40, 1-2X30, 1-IH16ARendimiento (UND/día) 2.0000 1354.07Materiales

122501 INTERRUPTOR HORARIO 16 A und 1.0000 175.00 175.00 0.00122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 1.0000 40.34 40.34 0.00122593 INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 3.0000 155.10 465.30 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1252.18

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

33020600 T.G.1-3X100,4-3X30,5-2X30Rendimiento (UND/día) 2.0000 1449.33Materiales

122582 INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 5.0000 40.34 201.70 0.00122592 INTERRUPTOR TERMOMAGNETICO - 3 x 30 A und 4.0000 143.55 574.20 0.00122596 INTERRUPTOR TERMOMAGNETICO - 3 x 100 A und 1.0000 206.25 206.25 0.00560501 GABINETE METALICO CON BARRA DE COBRE und 1.0000 365.29 365.29 1347.44

Mano de obra470101 CAPATAZ H-H 0.4000 13.59 5.44 0.00470201 OPERARIO H-H 4.0000 12.36 49.44 0.00470301 OFICIAL H-H 4.0000 11.01 44.04 98.92

Equipo481001 HERRAMIENTA %MO 3.0000 98.92 2.97 2.97

34010005 ALIM.CAB. NYY (3-1X120+1X70)mm2Rendimiento (M /día) 75.0000 206.93Materiales

190503 CABLE DE ENERGIA NYY 1x120 mm2 m 3.0500 54.05 164.85 0.00190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 1.0500 31.58 33.16 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 199.83

Mano de obra

Page 175: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470301 OFICIAL H-H 0.1067 11.01 1.17 0.00470401 PEON H-H 0.4267 9.95 4.25 6.89

Equipo481001 HERRAMIENTA %MO 3.0000 6.89 0.21 0.21

34010006 ALIM.CAB. NYY (3-1X120+1X16)mm2Rendimiento (M /día) 75.0000 184.65Materiales

190503 CABLE DE ENERGIA NYY 1x120 mm2 m 3.0500 54.05 164.85 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 175.37

Mano de obra470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470301 OFICIAL H-H 0.1067 11.01 1.17 0.00470401 PEON H-H 0.6400 9.95 6.37 9.01

Equipo481001 HERRAMIENTA %MO 3.0000 9.01 0.27 0.27

34010007 ALIM.CAB. NYY 3-1X120mm2Rendimiento (M /día) 80.0000 178.03Materiales

190503 CABLE DE ENERGIA NYY 1x120 mm2 m 3.0500 54.05 164.85 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725010 CURVA PVC-P (ELEC.) 100mm und 0.0500 59.02 2.95 169.33

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.6000 9.95 5.97 8.45

Equipo481001 HERRAMIENTA %MO 3.0000 8.45 0.25 0.25

34010010 ALIM.CAB. NYY (3-1X70+1X70)mm2Rendimiento (M /día) 75.0000 139.00Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 4.0500 31.58 127.90 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 129.72

Mano de obra470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470301 OFICIAL H-H 0.1067 11.01 1.17 0.00470401 PEON H-H 0.6400 9.95 6.37 9.01

Equipo481001 HERRAMIENTA %MO 3.0000 9.01 0.27 0.27

34010011 ALIM.CAB. NYY (3-1X70+1X50)mm2Rendimiento (M /día) 75.0000 131.28Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 3.0500 31.58 96.32 0.00190516 CABLE DE ENERGIA NYY 1x 50 mm2 m 1.0500 22.72 23.86 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 122.00

Mano de obra470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470301 OFICIAL H-H 0.1067 11.01 1.17 0.00470401 PEON H-H 0.6400 9.95 6.37 9.01

Equipo

Page 176: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 9.01 0.27 0.27

34010012 ALIM.CAB. NYY (3-1X70+1X35)mm2Rendimiento (M /día) 75.0000 124.96Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 3.0500 31.58 96.32 0.00190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 1.0500 16.70 17.54 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 115.68

Mano de obra470101 CAPATAZ H-H 0.0107 13.59 0.15 0.00470201 OPERARIO H-H 0.1067 12.36 1.32 0.00470301 OFICIAL H-H 0.1067 11.01 1.17 0.00470401 PEON H-H 0.6400 9.95 6.37 9.01

Equipo481001 HERRAMIENTA %MO 3.0000 9.01 0.27 0.27

34010013 ALIM.CAB. NYY (3-1X70+1X25)mm2Rendimiento (M /día) 80.0000 120.18Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 3.0500 31.58 96.32 0.00190515 CABLE DE ENERGIA NYY 1x 25 mm2 m 1.0500 12.70 13.34 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 111.48

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.6000 9.95 5.97 8.45

Equipo481001 HERRAMIENTA %MO 3.0000 8.45 0.25 0.25

34010014 ALIM.CAB. NYY (3-1X70+1X16)mm2Rendimiento (M /día) 80.0000 115.54Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 3.0500 31.58 96.32 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 106.84

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.6000 9.95 5.97 8.45

Equipo481001 HERRAMIENTA %MO 3.0000 8.45 0.25 0.25

34010015 ALIM.CAB. NYY 3-1X70mm2Rendimiento (M /día) 90.0000 106.80Materiales

190505 CABLE DE ENERGIA NYY 1x 70 mm2 m 3.0500 31.58 96.32 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 99.06

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010016 ALIM.CAB. NYY 3-1X50mm2Rendimiento (M /día) 100.0000 78.08

Page 177: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales190516 CABLE DE ENERGIA NYY 1x 50 mm2 m 3.0500 22.72 69.30 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 71.12

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010017 ALIM.CAB. NYY 3-1X35mm2Rendimiento (M /día) 120.0000 59.47Materiales

190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 3.0500 16.70 50.94 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 53.68

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.4000 9.95 3.98 5.62

Equipo481001 HERRAMIENTA %MO 3.0000 5.62 0.17 0.17

34010018 ALIM.CAB. NYY (3-1X35+1X35)mm2Rendimiento (M /día) 90.0000 78.62Materiales

190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 4.0500 16.70 67.64 0.00301550 BANDA SEÑALIZADORA m 4.0500 0.50 2.03 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 70.88

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010019 ALIM.CAB. NYY (3-1X35+1X25)mm2Rendimiento (M /día) 90.0000 73.84Materiales

190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 3.0500 16.70 50.94 0.00190515 CABLE DE ENERGIA NYY 1x 25 mm2 m 1.0500 12.70 13.34 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 66.10

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010020 ALIM.CAB. NYY (3-1X35+1X16)mm2Rendimiento (M /día) 90.0000 69.46Materiales

190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 3.0500 16.70 50.94 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 61.72

Mano de obra

Page 178: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010021 ALIM.CAB. NYY (3-1X35+1X35+1X16)mm2Rendimiento (M /día) 80.0000 86.86Materiales

190507 CABLE DE ENERGIA NYY 1x 35 mm2 m 4.0500 16.70 67.64 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 78.16

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.6000 9.95 5.97 8.45

Equipo481001 HERRAMIENTA %MO 3.0000 8.45 0.25 0.25

34010023 ALIM.CAB. NYY 3-1X25mm2Rendimiento (M /día) 100.0000 47.52Materiales

190515 CABLE DE ENERGIA NYY 1x 25 mm2 m 3.0500 12.70 38.74 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 40.56

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010025 ALIM.CAB. NYY (3-1X25+1X16)mm2Rendimiento (M /día) 90.0000 57.00Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00190515 CABLE DE ENERGIA NYY 1x 25 mm2 m 3.0500 12.70 38.74 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 49.26

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010028 ALIM.CAB. NYY 3-1X16mm2Rendimiento (M /día) 100.0000 34.06Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 3.0500 8.29 25.28 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 27.10

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo

Page 179: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010030 ALIM.CAB. NYY 1-1X16mm2Rendimiento (M /día) 120.0000 15.31Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 1.0500 8.29 8.70 0.00301550 BANDA SEÑALIZADORA m 1.0500 0.50 0.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 9.52

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.4000 9.95 3.98 5.62

Equipo481001 HERRAMIENTA %MO 3.0000 5.62 0.17 0.17

34010032 ALIM.CAB. NYY (3-1X16+1X16)mm2Rendimiento (M /día) 100.0000 42.24Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 4.0500 8.29 33.57 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 35.28

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010034 ALIM.CAB. NYY (3-1X16+1X16+1X16)mm2Rendimiento (M /día) 90.0000 51.42Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 5.0500 8.29 41.86 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 43.68

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010036 ALIM.CAB. NYY (3-1X16+1X16+1X10)mm2Rendimiento (M /día) 90.0000 48.74Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 4.0500 8.29 33.57 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 1.0500 5.34 5.61 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 41.00

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010038 ALIM.CAB. NYY (3-1X16+1X10)mm2Rendimiento (M /día) 90.0000 40.45Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 3.0500 8.29 25.28 0.00

Page 180: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 1.0500 5.34 5.61 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 32.71

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010040 ALIM.CAB. NYY (2-1X16+1X10)mm2Rendimiento (M /día) 90.0000 32.16Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 2.0500 8.29 16.99 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 1.0500 5.34 5.61 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 24.42

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010041 ALIM.CAB. NYY (2-1X16+1X10)mm2 - 40mm Ø PVC-PRendimiento (M /día) 90.0000 32.28Materiales

190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 2.0500 8.29 16.99 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 1.0500 5.34 5.61 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 24.54

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.5333 9.95 5.31 7.51

Equipo481001 HERRAMIENTA %MO 3.0000 7.51 0.23 0.23

34010050 ALIM.CAB. NYY 3-1X10mm2Rendimiento (M /día) 100.0000 25.07Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 18.11

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010054 ALIM.CAB. NYY (3-1X10+1X10+1X10)mm2Rendimiento (M /día) 100.0000 35.75Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 5.0500 5.34 26.97 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 28.79

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00

Page 181: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010056 ALIM.CAB. NYY (3-1X10+1X10)mm2Rendimiento (M /día) 100.0000 30.41Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 4.0500 5.34 21.63 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 23.45

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010058 ALIM.CAB. NYY (3-1X10+2-1X10)mm2Rendimiento (M /día) 100.0000 35.75Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 5.0500 5.34 26.97 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 28.79

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010060 ALIM.CAB. NYY (2-1X10+1X10)mm2Rendimiento (M /día) 100.0000 25.07Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 18.11

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010063 ALIM.CAB. NYY (3-1X10+1X6)mm2Rendimiento (M /día) 100.0000 29.00Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 1.0500 3.74 3.93 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 22.04

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

Page 182: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34010066 ALIM.CAB. NYY (3-1X10+1X4)mm2Rendimiento (M /día) 100.0000 28.16Materiales

190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00190514 CABLE DE ENERGIA NYY 1 x 4 mm2 m 1.0500 2.94 3.09 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 21.20

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.4800 9.95 4.78 6.76

Equipo481001 HERRAMIENTA %MO 3.0000 6.76 0.20 0.20

34010070 ALIM.CAB. NYY 3-1X6mm2Rendimiento (M /día) 120.0000 16.86Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 3.0500 3.74 11.41 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 13.12

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.2000 9.95 1.99 3.63

Equipo481001 HERRAMIENTA %MO 3.0000 3.63 0.11 0.11

34010071 ALIM.CAB. NYY 2-1X6mm2Rendimiento (M /día) 150.0000 12.38Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 2.0500 3.74 7.67 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 9.38

Mano de obra470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 0.00470401 PEON H-H 0.1600 9.95 1.59 2.91

Equipo481001 HERRAMIENTA %MO 3.0000 2.91 0.09 0.09

34010073 ALIM.CAB. NYY 1-1X6mm2Rendimiento (M /día) 150.0000 8.64Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 1.0500 3.74 3.93 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 5.64

Mano de obra470101 CAPATAZ H-H 0.0053 13.59 0.07 0.00470201 OPERARIO H-H 0.0533 12.36 0.66 0.00470301 OFICIAL H-H 0.0533 11.01 0.59 0.00470401 PEON H-H 0.1600 9.95 1.59 2.91

Equipo481001 HERRAMIENTA %MO 3.0000 2.91 0.09 0.09

34010074 ALIM.CAB. NYY (3-1X6+1X6)mm2Rendimiento (M /día) 110.0000 23.18Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 4.0500 3.74 15.15 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 16.86

Page 183: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0073 13.59 0.10 0.00470201 OPERARIO H-H 0.0727 12.36 0.90 0.00470301 OFICIAL H-H 0.0727 11.01 0.80 0.00470401 PEON H-H 0.4364 9.95 4.34 6.14

Equipo481001 HERRAMIENTA %MO 3.0000 6.14 0.18 0.18

34010075 ALIM.CAB. NYY (3-1X6+1X6+1X6)mm2Rendimiento (M /día) 110.0000 26.92Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 5.0500 3.74 18.89 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 20.60

Mano de obra470101 CAPATAZ H-H 0.0073 13.59 0.10 0.00470201 OPERARIO H-H 0.0727 12.36 0.90 0.00470301 OFICIAL H-H 0.0727 11.01 0.80 0.00470401 PEON H-H 0.4364 9.95 4.34 6.14

Equipo481001 HERRAMIENTA %MO 3.0000 6.14 0.18 0.18

34010076 ALIM.CAB. NYY (2-1X6+1X6)mm2Rendimiento (M /día) 120.0000 18.91Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 3.0500 3.74 11.41 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 13.12

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.4000 9.95 3.98 5.62

Equipo481001 HERRAMIENTA %MO 3.0000 5.62 0.17 0.17

34010077 ALIM.CAB. NYY (2-1X6+2X6)mm2Rendimiento (M /día) 120.0000 22.65Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 4.0500 3.74 15.15 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 16.86

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.4000 9.95 3.98 5.62

Equipo481001 HERRAMIENTA %MO 3.0000 5.62 0.17 0.17

34010078 ALIM.CAB. NYY (3-1X6+1X4)mm2Rendimiento (M /día) 120.0000 20.06Materiales

190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 3.0500 3.74 11.41 0.00190514 CABLE DE ENERGIA NYY 1 x 4 mm2 m 1.0500 2.94 3.09 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 16.32

Mano de obra470101 CAPATAZ H-H 0.0067 13.59 0.09 0.00470201 OPERARIO H-H 0.0667 12.36 0.82 0.00470301 OFICIAL H-H 0.0667 11.01 0.73 0.00470401 PEON H-H 0.2000 9.95 1.99 3.63

Equipo

Page 184: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 3.63 0.11 0.11

34010111 ALIM. CAB. TW 3-1X70mm2, Ý 50mm PVC-PRendimiento (M /día) 70.0000 69.81Materiales

071020 CONDUCTOR TW CABLEADO 1X70 mm2 m 3.0500 18.28 55.75 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 63.39

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.3429 9.95 3.41 6.23

Equipo481001 HERRAMIENTA %MO 3.0000 6.23 0.19 0.19

34010115 ALIM. CAB. TW (3-1X70+1-1X35)mm2, Ý 65mm PVC-PRendimiento (M /día) 60.0000 84.77Materiales

071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 1.0500 9.16 9.62 0.00071020 CONDUCTOR TW CABLEADO 1X70 mm2 m 3.0500 18.28 55.75 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 77.27

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.4000 9.95 3.98 7.28

Equipo481001 HERRAMIENTA %MO 3.0000 7.28 0.22 0.22

34010117 ALIM. CAB. TW (3-1X70+1-1X25)mm2, Ý 65mm PVC-PRendimiento (M /día) 60.0000 84.77Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 1.0500 9.16 9.62 0.00071020 CONDUCTOR TW CABLEADO 1X70 mm2 m 3.0500 18.28 55.75 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 77.27

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.4000 9.95 3.98 7.28

Equipo481001 HERRAMIENTA %MO 3.0000 7.28 0.22 0.22

34010125 ALIM. CAB. TW 3-1X50mm2, Ý 50mm PVC-PRendimiento (M /día) 70.0000 54.75Materiales

071018 CONDUCTOR TW CABLEADO 1x50 mm2 m 3.0500 13.34 40.69 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 48.33

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.3429 9.95 3.41 6.23

Equipo481001 HERRAMIENTA %MO 3.0000 6.23 0.19 0.19

Page 185: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34010127 ALIM. CAB. TW 1-1X50mm2, Ý 25mm PVC-PRendimiento (M /día) 90.0000 21.75Materiales

071018 CONDUCTOR TW CABLEADO 1x50 mm2 m 1.0500 13.34 14.01 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 16.75

Mano de obra470101 CAPATAZ H-H 0.0089 13.59 0.12 0.00470201 OPERARIO H-H 0.0889 12.36 1.10 0.00470301 OFICIAL H-H 0.0889 11.01 0.98 0.00470401 PEON H-H 0.2667 9.95 2.65 4.85

Equipo481001 HERRAMIENTA %MO 3.0000 4.85 0.15 0.15

34010129 ALIM. CAB. TW (3-1X50+1-1X35)mm2, Ý 65mm PVC-PRendimiento (M /día) 60.0000 66.29Materiales

071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 1.0500 9.16 9.62 0.00071018 CONDUCTOR TW CABLEADO 1x50 mm2 m 3.0500 13.34 40.69 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 62.21

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34010130 ALIM. CAB. TW (3-1X50+1-1X25)mm2, Ý 65mm PVC-PRendimiento (M /día) 60.0000 66.29Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 1.0500 9.16 9.62 0.00071018 CONDUCTOR TW CABLEADO 1x50 mm2 m 3.0500 13.34 40.69 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 62.21

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34010134 ALIM. CAB. TW (3-1X50+1-1X16)mm2, Ý 65mm PVC-PRendimiento (M /día) 60.0000 63.02Materiales

071012 CONDUCTOR TW CABLEADO 1x16 mm2 m 1.0500 6.05 6.35 0.00071018 CONDUCTOR TW CABLEADO 1x50 mm2 m 3.0500 13.34 40.69 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 58.94

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

Page 186: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34010136 ALIM. CAB. TW 1-1X40mm2, Ý 35mm PVC-PRendimiento (M /día) 100.0000 61.56Materiales

071012 CONDUCTOR TW CABLEADO 1x16 mm2 m 1.0500 6.05 6.35 0.00071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 3.0500 9.16 27.94 0.00071017 CONDUCTOR TW CABLEADO 1x40 mm2 m 1.0500 12.64 13.27 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 59.11

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34010140 ALIM. CAB. TW 3-1X35mm2, Ý 50mm PVC-PRendimiento (M /día) 80.0000 43.48Materiales

071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 3.0500 9.16 27.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 35.58

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.3000 11.01 3.30 0.00470401 PEON H-H 0.3000 9.95 2.99 7.67

Equipo481001 HERRAMIENTA %MO 3.0000 7.67 0.23 0.23

34010142 ALIM. CAB. TW 1-1X35mm2, Ý 25mm PVC-PRendimiento (M /día) 100.0000 18.67Materiales

071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 1.0500 9.16 9.62 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 12.36

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.2400 11.01 2.64 0.00470401 PEON H-H 0.2400 9.95 2.39 6.13

Equipo481001 HERRAMIENTA %MO 3.0000 6.13 0.18 0.18

34010143 ALIM. CAB. TW (3-1X35+1-1X35)mm2, Ý 50mm PVC-PRendimiento (M /día) 70.0000 48.23Materiales

071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 4.0500 9.16 37.10 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 44.74

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Page 187: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34010144 ALIM. CAB. TW (3-1X35+1-1X25)mm2, Ý 50mm PVC-PRendimiento (M /día) 70.0000 51.16Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 1.0000 9.16 9.16 0.00071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 3.0500 9.16 27.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 44.74

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.3429 9.95 3.41 6.23

Equipo481001 HERRAMIENTA %MO 3.0000 6.23 0.19 0.19

34010145 ALIM. CAB. TW (3-1X35+1-1X16)mm2, Ý 50mm PVC-PRendimiento (M /día) 70.0000 48.35Materiales

071012 CONDUCTOR TW CABLEADO 1x16 mm2 m 1.0500 6.05 6.35 0.00071016 CONDUCTOR TW CABLEADO 1x35 mm2 m 3.0500 9.16 27.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 41.93

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.3429 9.95 3.41 6.23

Equipo481001 HERRAMIENTA %MO 3.0000 6.23 0.19 0.19

34010148 ALIM. CAB. TW 3-1X25mm2, Ý 40mm PVC-PRendimiento (M /día) 100.0000 37.54Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 3.0500 9.16 27.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 33.04

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.2400 9.95 2.39 4.37

Equipo481001 HERRAMIENTA %MO 3.0000 4.37 0.13 0.13

34010150 ALIM. CAB. TW 2-1X25mm2, Ý 40mm PVC-PRendimiento (M /día) 100.0000 28.38Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 2.0500 9.16 18.78 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 23.88

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.2400 9.95 2.39 4.37

Equipo

Page 188: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 4.37 0.13 0.13

34010152 ALIM. CAB. TW 1-1X25mm2, Ý 20mm PVC-PRendimiento (M /día) 100.0000 16.04Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 1.0200 9.16 9.34 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 11.54

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.2400 9.95 2.39 4.37

Equipo481001 HERRAMIENTA %MO 3.0000 4.37 0.13 0.13

34010155 ALIM. CAB. TW (3-1X25+1-1X25)mm2, Ý 40mm PVC-PRendimiento (M /día) 70.0000 45.69Materiales

071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 4.0500 9.16 37.10 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 42.20

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34010157 ALIM. CAB. TW (3-1X25+1-1X16)mm2, Ý 40mm PVC-PRendimiento (M /día) 70.0000 42.88Materiales

071012 CONDUCTOR TW CABLEADO 1x16 mm2 m 1.0500 6.05 6.35 0.00071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 3.0500 9.16 27.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 39.39

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34010159 ALIM. CAB. TW (2-1X25+1-1X16)mm2, Ý 40mm PVC-PRendimiento (M /día) 70.0000 33.72Materiales

071012 CONDUCTOR TW CABLEADO 1x16 mm2 m 1.0500 6.05 6.35 0.00071014 CONDUCTOR TW CABLEADO 1x25 mm2 m 2.0500 9.16 18.78 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 30.23

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

Page 189: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34020002 ALIM. CAB. THW (3-1X70+1X35)mm2 Ý65mm PVC-PRendimiento (M /día) 70.0000 82.21Materiales

071508 CONDUCTOR THW CABLEADO 1X70 mm2 m 3.0500 18.59 56.70 0.00071509 CONDUCTOR THW CABLEADO 1X35 mm2 m 1.0500 9.64 10.12 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722008 TUBO PVC-P (ELEC.) 65mm 3M m 1.0200 10.35 10.56 0.00725008 CURVA PVC-P (ELEC.) 65mm und 0.0500 24.15 1.21 78.72

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020010 ALIM. CAB. THW (3-1X50+1X35)mm2 Ý50mm PVC-PRendimiento (M /día) 70.0000 77.95Materiales

071508 CONDUCTOR THW CABLEADO 1X70 mm2 m 3.0500 18.59 56.70 0.00071509 CONDUCTOR THW CABLEADO 1X35 mm2 m 1.0500 9.64 10.12 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 74.46

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020015 ALIM. CAB. THW (3-1X25+1X16+1X16)mm2 Ý50mm PVC-PRendimiento (M /día) 70.0000 40.78Materiales

071505 CONDUCTOR THW CABLEADO 1X16 mm2 m 2.0500 4.36 8.94 0.00071511 CONDUCTOR THW CABLEADO 1X25 mm2 m 3.0500 6.79 20.71 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722007 TUBO PVC-P (ELEC.) 50mm 3M m 1.0200 6.82 6.96 0.00725007 CURVA PVC-P (ELEC.) 50mm und 0.0500 10.90 0.55 37.29

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020020 ALIM. CAB. THW (3-1X16+2X10)mm2 Ý35mm PVC-PRendimiento (M /día) 70.0000 26.26Materiales

071505 CONDUCTOR THW CABLEADO 1X16 mm2 m 3.0500 4.36 13.30 0.00071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 2.0500 2.71 5.56 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 22.77

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo

Page 190: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020023 ALIM. CAB. THW (3-1X16+1X10)mm2 Ý40mm PVC-PRendimiento (M /día) 70.0000 24.74Materiales

071505 CONDUCTOR THW CABLEADO 1X16 mm2 m 3.0500 4.36 13.30 0.00071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 1.0500 2.71 2.85 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 21.25

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020024 ALIM. CAB. THW (3-1X16+1X10)mm2 Ý35mm PVC-PRendimiento (M /día) 70.0000 23.46Materiales

071505 CONDUCTOR THW CABLEADO 1X16 mm2 m 3.0500 4.36 13.30 0.00071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 1.0200 2.71 2.76 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 19.97

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020030 ALIM. CAB. THW (3-1X10+1X10+1X10)mm2 Ý35mm PVC-PRendimiento (M /día) 70.0000 21.09Materiales

071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 5.0500 2.71 13.69 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 17.60

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020034 ALIM. CAB. THW (3-1X10+1X10)mm2 Ý35mm PVC-PRendimiento (M /día) 70.0000 18.38Materiales

071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 4.0500 2.71 10.98 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 14.89

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

Page 191: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34020037 ALIM. CAB. THW (3-1X10+1X6)mm2 Ý40mm PVC-PRendimiento (M /día) 70.0000 18.80Materiales

071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 3.0500 2.71 8.27 0.00071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 1.0500 1.85 1.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722006 TUBO PVC-P (ELEC.) 40mm 3M m 1.0200 4.47 4.56 0.00725006 CURVA PVC-P (ELEC.) 40mm und 0.0500 8.28 0.41 15.31

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020040 ALIM. CAB. THW (2-1X10+1X10)mm2 Ý25mm PVC-PRendimiento (M /día) 70.0000 14.50Materiales

071506 CONDUCTOR THW CABLEADO 1X10 mm2 m 3.0500 2.71 8.27 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 11.01

Mano de obra470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020060 ALIM. CAB. THW 2-1X6mm2 Ý20mm PVC-PRendimiento (M /día) 100.0000 8.44Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 2.0500 1.85 3.79 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 5.99

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34020065 ALIM. CAB. THW (3-1X6+1X6+1X6)mm2 Ý25mm PVC-PRendimiento (M /día) 80.0000 15.15Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 5.0500 1.85 9.34 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 12.08

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020066 ALIM. CAB. THW (3-1X6+1X6+1X6)mm2 Ý35mm PVC-P

Page 192: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M /día) 80.0000 16.32Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 5.0500 1.85 9.34 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722005 TUBO PVC-P (ELEC.) 35mm 3M m 1.0200 3.42 3.49 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 13.25

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020068 ALIM. CAB. THW (3-1X6+1X6)mm2 Ý25mm PVC-PRendimiento (M /día) 80.0000 13.30Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 4.0500 1.85 7.49 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 10.23

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020070 ALIM.CAB.THW (2-1x6+1-1x6)mm2, Ø 25mm PVC-PRendimiento (M /día) 80.0000 11.45Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 3.0500 1.85 5.64 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 8.38

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020074 ALIM. CAB. THW (2-1X6+1X4)mm2 Ý20mm PVC-PRendimiento (M /día) 80.0000 10.35Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 2.0500 1.85 3.79 0.00071510 CONDUCTOR THW CABLEADO 1X4 mm2 m 1.0500 1.23 1.29 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 7.28

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020080 ALIM. CAB. THW (2-1X4+1X4)mm2 Ý20mm PVC-PRendimiento (M /día) 80.0000 9.02Materiales

Page 193: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

071510 CONDUCTOR THW CABLEADO 1X4 mm2 m 3.0500 1.23 3.75 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 5.95

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020100 ALIM. CAB. THW 3-1X35mm2Rendimiento (M /día) 70.0000 32.89Materiales

071509 CONDUCTOR THW CABLEADO 1X35 mm2 m 3.0500 9.64 29.40 29.40Mano de obra

470101 CAPATAZ H-H 0.0114 13.59 0.15 0.00470201 OPERARIO H-H 0.1143 12.36 1.41 0.00470301 OFICIAL H-H 0.1143 11.01 1.26 0.00470401 PEON H-H 0.0571 9.95 0.57 3.39

Equipo481001 HERRAMIENTA %MO 3.0000 3.39 0.10 0.10

34020101 ALIM. CAB. THW 1-1X6mm2Rendimiento (M /día) 100.0000 4.39Materiales

071507 CONDUCTOR THW CABLEADO 1X6 mm2 m 1.0500 1.85 1.94 1.94Mano de obra

470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34020102 ALIM. CAB. THW 1-1X2.5mm2Rendimiento (M /día) 80.0000 3.93Materiales

071512 CONDUCTOR THW CABLEADO 1X2.5 mm2 m 1.0500 0.82 0.86 0.86Mano de obra

470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

34020150 ALIMENT. (2-1X16+1-1X10)mm2 NYY + 1-1X10mm2 TWRendimiento (M /día) 80.0000 30.17Materiales

070511 CONDUCTOR TW SOLIDO 1x10 mm2 m 1.0500 2.55 2.68 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 2.0500 8.29 16.99 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 1.0500 5.34 5.61 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 27.10

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.0500 9.95 0.50 2.98

Equipo481001 HERRAMIENTA %MO 3.0000 2.98 0.09 0.09

Page 194: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

34020170 ALIMENT. (3-1X10+1-1X6)mm2 NYY + 1-1X6mm2 TWRendimiento (M /día) 80.0000 29.86Materiales

070509 CONDUCTOR TW SOLIDO 1x6 mm2 m 1.0500 2.09 2.19 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 1.0500 3.74 3.93 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 24.23

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020171 ALIMENT. (3-1X6+1-1X6)mm2 NYY + 1-1X6mm2 TWRendimiento (M /día) 80.0000 24.79Materiales

070509 CONDUCTOR TW SOLIDO 1x6 mm2 m 1.0500 2.09 2.19 0.00190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 4.0500 3.74 15.15 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 19.16

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020175 ALIMENT. 3-1X10mm2 NYY + 1-1X10mm2 TWRendimiento (M /día) 80.0000 27.65Materiales

071010 CONDUCTOR TW CABLEADO 1x10 mm2 m 1.0500 3.72 3.91 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 3.0500 5.34 16.29 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 22.02

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020181 ALIMENT. 2-1X16 mm2 NYY + 1-1X10mm2 TWRendimiento (M /día) 80.0000 27.12Materiales

070511 CONDUCTOR TW SOLIDO 1x10 mm2 m 1.0500 2.55 2.68 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 2.0500 8.29 16.99 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 21.49

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020182 ALIMENT. 2-1X16 mm2 NYY + 1-1X6mm2 TW

Page 195: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (M /día) 80.0000 26.63Materiales

070509 CONDUCTOR TW SOLIDO 1x6 mm2 m 1.0500 2.09 2.19 0.00190509 CABLE DE ENERGIA NYY 1x 16 mm2 m 2.0500 8.29 16.99 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 21.00

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020183 ALIMENT. 2-1X10 mm2 NYY + 1-1X10mm2 TWRendimiento (M /día) 80.0000 21.08Materiales

070511 CONDUCTOR TW SOLIDO 1x10 mm2 m 1.0500 2.55 2.68 0.00190511 CABLE DE ENERGIA NYY 1x 10 mm2 m 2.0500 5.34 10.95 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 15.45

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020184 ALIMENT. 2-1X6mm2 NYY + 1-1X6mm2 TWRendimiento (M /día) 80.0000 17.31Materiales

070509 CONDUCTOR TW SOLIDO 1x6 mm2 m 1.0500 2.09 2.19 0.00190512 CABLE DE ENERGIA NYY 1 x 6 mm2 m 2.0500 3.74 7.67 0.00301550 BANDA SEÑALIZADORA m 3.0500 0.50 1.53 0.00725005 CURVA PVC-P (ELEC.) 35mm und 0.0500 5.89 0.29 11.68

Mano de obra470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 0.00470401 PEON H-H 0.3000 9.95 2.99 5.47

Equipo481001 HERRAMIENTA %MO 3.0000 5.47 0.16 0.16

34020200 ALIM.SOL.TW 2-1x1.5mm2, Ý 20mm PVC-PRendimiento (M /día) 100.0000 5.76Materiales

070504 CONDUCTOR TW SOLIDO 1x1.5mm2 m 2.0500 0.54 1.11 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 3.31

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34020210 ALIM.SOL.TW 2-1x1.5mm2, Ý 25mm PVC-PRendimiento (M /día) 100.0000 6.30Materiales

070504 CONDUCTOR TW SOLIDO 1x1.5mm2 m 2.0500 0.54 1.11 0.00

Page 196: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 3.85

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34020220 ALIM.SOL.TW 2-1x2.5mm2, Ý 20mm PVC-PRendimiento (M /día) 100.0000 6.45Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 2.0500 0.88 1.80 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 4.00

Mano de obra470101 CAPATAZ H-H 0.0080 13.59 0.11 0.00470201 OPERARIO H-H 0.0800 12.36 0.99 0.00470301 OFICIAL H-H 0.0800 11.01 0.88 0.00470401 PEON H-H 0.0400 9.95 0.40 2.38

Equipo481001 HERRAMIENTA %MO 3.0000 2.38 0.07 0.07

34030010 CABLE COBRE DESNUDO 1x35mm2, Ý 20mm PVC-PRendimiento (M /día) 60.0000 13.05Materiales

072005 CABLE 1x35 mm2 COBRE DESNUDO m 1.0500 6.45 6.77 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 8.97

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34030020 CABLE COBRE DESNUDO 1x25mm2, Ý 20mm PVC-PRendimiento (M /día) 60.0000 11.14Materiales

072001 CABLE 1x25 mm2 COBRE DESNUDO m 1.0500 4.63 4.86 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 7.06

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34030030 CABLE COBRE DESNUDO 1x25mm2, Ý 25mm PVC-PRendimiento (M /día) 60.0000 11.68Materiales

072001 CABLE 1x25 mm2 COBRE DESNUDO m 1.0500 4.63 4.86 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 1.0200 2.38 2.43 0.00725004 CURVA PVC-P (ELEC.) 25mm und 0.0500 3.69 0.18 7.60

Page 197: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34030040 CABLE COBRE DESNUDO 1x16mm2, Ý 20mm PVC-PRendimiento (M /día) 60.0000 8.60Materiales

072003 CABLE 1x16 mm2 COBRE DESNUDO m 1.0500 2.21 2.32 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 4.52

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34030050 CABLE COBRE DESNUDO 1x10mm2, Ý 20mm PVC-PRendimiento (M /día) 60.0000 8.22Materiales

072002 CABLE 1x10 mm2 COBRE DESNUDO m 1.0500 1.85 1.94 0.00300105 PEGAMENTO PARA TUBERIA PVC (ELECT.) gal 0.0010 131.92 0.13 0.00722003 TUBO PVC-P (ELEC.) 20mm 3M m 1.0200 1.90 1.94 0.00725003 CURVA PVC-P (ELEC.) 20mm und 0.0500 2.53 0.13 4.14

Mano de obra470101 CAPATAZ H-H 0.0133 13.59 0.18 0.00470201 OPERARIO H-H 0.1333 12.36 1.65 0.00470301 OFICIAL H-H 0.1333 11.01 1.47 0.00470401 PEON H-H 0.0667 9.95 0.66 3.96

Equipo481001 HERRAMIENTA %MO 3.0000 3.96 0.12 0.12

34040001 EMPALMES PARA CABLES ELECTRICOS 0(16/6)Rendimiento (UND/día) 15.0000 24.87Materiales

125001 EMPALME CON ACCESORIOS 0(16/6) und 1.0000 7.07 7.07 0.00171020 LADRILLO KK TIPO IV 24X13X09 CM und 4.0000 0.66 2.64 9.71

Mano de obra470101 CAPATAZ H-H 0.0533 13.59 0.72 0.00470201 OPERARIO H-H 0.5333 12.36 6.59 0.00470301 OFICIAL H-H 0.5333 11.01 5.87 13.18

Equipo481001 HERRAMIENTA %MO 15.0000 13.18 1.98 1.98

34050100 CABLE EXTRAFLEXIBLE 2x2.5mm2Rendimiento (M /día) 80.0000 10.98Materiales

192501 CABLE EXTRAFLEXIBLE 2x2.5mm2 m 1.0500 8.03 8.43 8.43Mano de obra

470101 CAPATAZ H-H 0.0100 13.59 0.14 0.00470201 OPERARIO H-H 0.1000 12.36 1.24 0.00470301 OFICIAL H-H 0.1000 11.01 1.10 2.48

Equipo481001 HERRAMIENTA %MO 3.0000 2.48 0.07 0.07

34050110 CABLE WP 16 mm2Rendimiento (M /día) 300.0000 4.07

Page 198: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Materiales060201 CABLE WP 16 MM2 m 1.0000 3.69 3.69 3.69

Mano de obra470101 CAPATAZ H-H 0.0027 13.59 0.04 0.00470201 OPERARIO H-H 0.0267 12.36 0.33 0.37

Equipo481001 HERRAMIENTA %MO 3.0000 0.37 0.01 0.01

34050120 POSTE DE MADERA TRATADA DE 6 m C/PORTALINEA Y AISLADORRendimiento (UND/día) 4.0000 252.69Materiales

070507 CONDUCTOR TW SOLIDO 1x4 mm2 m 1.0000 1.42 1.42 0.00112515 PORTALINEA DE 04 VIAS und 1.0000 16.95 16.95 0.00300134 Cinta Met.tipo band-it de 3/4" inc.hebil m 3.0000 7.00 21.00 0.00432501 POSTE DE MADERA TRATADA 6 M und 1.0000 93.22 93.22 0.00432503 AISLADOR DE PORCELANA NEMA 53-1 pza 2.0000 25.42 50.84 183.43

Mano de obra470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 2.0000 12.36 24.72 0.00470401 PEON H-H 4.0000 9.95 39.80 67.24

Equipo481001 HERRAMIENTA %MO 3.0000 67.24 2.02 2.02

35010152 PARARRAYO C/DISPOSITIVO D/CEBADO C/03 P/TIERRA, ADOSADORendimiento (UND/día) 1.0000 7369.87Materiales

041010 TIERRA CERNIDA m3 7.0000 25.21 176.47 0.00062005 CONECTOR DE BARRA DE 5/8" Y 3/4" und 10.0000 9.06 90.60 0.00063001 HELICOIDAL DE 9m Cu 1/0 PARA KIT 1.5m und 3.0000 66.61 199.83 0.00065523 VARILLA DE COBRE 3/4"x 2.40m C/PUNTA und 3.0000 182.00 546.00 0.00112510 SOPORTE P/TENSADO MOD.SA-9 DE FºGº C/AI und 3.0000 21.98 65.94 0.00112512 SOPORTE P/TENSADO MOD.SA-7 DE FºGº C/AI und 6.0000 21.98 131.88 0.00112541 CAPTOR CON DISPOSITIVO DE CEBADO und 1.0000 3561.20 3561.20 0.00196001 CABLE DESNUDO 50MM2 (1/0 AWG) m 40.0000 9.12 364.80 0.00300157 DOSIS QUIMICA THOR GEL DE 5 kg und 6.0000 63.22 379.32 0.00312505 CAJA DE CONCRETO C/TAPA 40x40x40cm und 3.0000 34.60 103.80 0.00610215 PCHA FºGº P/MASTIL 1/8" 15x20cm C/ABRAZ und 1.0000 46.00 46.00 0.00650110 TUBO PROTECTOR DE FºGº 2"x3m C/02 ABRAZund 1.0000 85.75 85.75 0.00650119 MASTIL DE FºGº 2"Y 3" X3.5M C/ACOPLE S/D und 2.0000 190.00 380.00 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 15.0000 2.38 35.70 6167.29

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470215 OPERARIO ELECTRICISTA H-H 32.0000 12.36 395.52 0.00470401 PEON H-H 40.0000 9.95 398.00 1002.15

Equipo481001 HERRAMIENTA %MO 20.0000 1002.15 200.43 200.43

35010154 PARARRAYO C/DISPOSIT.DE CEBADO C/03P/TIERRA,EN POSTE (2004)Rendimiento (UND/día) 1.0000 7126.05Materiales

041010 TIERRA CERNIDA m3 7.0000 25.21 176.47 0.00062005 CONECTOR DE BARRA DE 5/8" Y 3/4" und 10.0000 9.06 90.60 0.00063001 HELICOIDAL DE 9m Cu 1/0 PARA KIT 1.5m und 3.0000 66.61 199.83 0.00065523 VARILLA DE COBRE 3/4"x 2.40m C/PUNTA und 3.0000 182.00 546.00 0.00112541 CAPTOR CON DISPOSITIVO DE CEBADO und 1.0000 3561.20 3561.20 0.00196001 CABLE DESNUDO 50MM2 (1/0 AWG) m 40.0000 9.12 364.80 0.00300157 DOSIS QUIMICA THOR GEL DE 5 kg und 6.0000 63.22 379.32 0.00312505 CAJA DE CONCRETO C/TAPA 40x40x40cm und 3.0000 34.60 103.80 0.00650110 TUBO PROTECTOR DE FºGº 2"x3m C/02 ABRAZund 1.0000 85.75 85.75 0.00650119 MASTIL DE FºGº 2"Y 3" X3.5M C/ACOPLE S/D und 2.0000 190.00 380.00 0.00722004 TUBO PVC-P (ELEC.) 25mm 3M m 15.0000 2.38 35.70 5923.47

Mano de obra

Page 199: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 16.0000 12.36 197.76 0.00470215 OPERARIO ELECTRICISTA H-H 32.0000 12.36 395.52 0.00470401 PEON H-H 40.0000 9.95 398.00 1002.15

Equipo481001 HERRAMIENTA %MO 20.0000 1002.15 200.43 200.43

35010160 POSTE DE CONCRETO CENTRIFUGADO 9 m.Rendimiento (UND/día) 5.0000 724.31Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.6700 35.29 23.64 0.00053501 AGUA m3 0.1900 5.00 0.95 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 7.3600 15.13 111.36 0.00620116 POSTE DE CONCRETO CENTRIF. 9ML und 1.0000 270.60 270.60 432.80

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 11.2000 11.01 123.31 0.00470401 PEON H-H 11.2000 9.95 111.44 278.65

Equipo481001 HERRAMIENTA %MO 3.0000 278.65 8.36 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1440 23.94 3.45 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1440 7.30 1.05 12.86

36010000 ARTEF.FLUORESCENTE 1/18W (BE JOSFEL)Rendimiento (UND/día) 10.0000 64.79Materiales

120561 ARTEF.FLUORESC. BE-1x18W AF (REACTOR A und 1.0000 44.83 44.83 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 45.00

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010115 ARTEF.FLUORESCENTE 1/36W (BE-1 JOSFEL)Rendimiento (UND/día) 10.0000 60.47Materiales

120502 ARTEF. FLUORESC. 1x36 W AF (REACTOR ALPund 1.0000 40.51 40.51 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 40.68

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010120 ARTEF.FLUORESCENTE 1/36W (SIM.BE JOSFEL) C/SOPORTERendimiento (UND/día) 8.0000 85.25Materiales

120502 ARTEF. FLUORESC. 1x36 W AF (REACTOR ALPund 1.0000 40.51 40.51 0.00120528 SOPORTE S-2 SUSP. C/2 VARILLAS 1m und 1.0000 19.84 19.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 60.52

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010130 ARTEF.FLUORESCENTE 2/18W (BE JOSFEL)Rendimiento (UND/día) 10.0000 80.66Materiales

120509 ARTEF. FLUORESC. 2x18 W AF (REACTOR ALPund 1.0000 60.70 60.70 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 60.87

Mano de obra

Page 200: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010135 ARTEF.FLUORESCENTE 2/18W (SIM.BE JOSFEL) C/SOPORTERendimiento (UND/día) 8.0000 105.44Materiales

120509 ARTEF. FLUORESC. 2x18 W AF (REACTOR ALPund 1.0000 60.70 60.70 0.00120528 SOPORTE S-2 SUSP. C/2 VARILLAS 1m und 1.0000 19.84 19.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 80.71

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010140 ARTEF.FLUORESCENTE 2/36W (SIM.BE JOSFEL)Rendimiento (UND/día) 10.0000 85.37Materiales

120504 ARTEF. FLUORESC. 2x36 W AF (REACTOR ALPund 1.0000 65.41 65.41 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 65.58

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010150 ARTEF.FLUORESCENTE 2/36W (SIM.BE JOSFEL) C/SOPORTERendimiento (UND/día) 8.0000 110.15Materiales

120504 ARTEF. FLUORESC. 2x36 W AF (REACTOR ALPund 1.0000 65.41 65.41 0.00120528 SOPORTE S-2 SUSP. C/2 VARILLAS 1m und 1.0000 19.84 19.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 85.42

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010160 ARTEF.FLUORESCENTE 3/36W (SIM.BE JOSFEL)Rendimiento (UND/día) 10.0000 109.08Materiales

120506 ARTEF. FLUORESC. 3x36 W AF (REACTOR ALPund 1.0000 89.12 89.12 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 89.29

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010170 ARTEF.FLUORESCENTE 3/36W (SIM.BE JOSFEL) C/SOPORTERendimiento (UND/día) 10.0000 128.92Materiales

120506 ARTEF. FLUORESC. 3x36 W AF (REACTOR ALPund 1.0000 89.12 89.12 0.00120528 SOPORTE S-2 SUSP. C/2 VARILLAS 1m und 1.0000 19.84 19.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 109.13

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010180 ARTEFACTO ISPE 2/36W DE JOSFELRendimiento (UND/día) 10.0000 130.29Materiales

070505 CONDUCTOR TW SOLIDO 1x2.5mm2 m 2.0000 0.88 1.76 0.00120550 ARTEFACTO ISPE AF 2/36W und 1.0000 97.34 97.34 0.00300170 CADENA GALVANIZADA m 3.0000 3.80 11.40 110.50

Page 201: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010200 ARTEFACTO ISPE 3/36W DE JOSFELRendimiento (UND/día) 10.0000 164.79Materiales

072502 CONDUCTOR NLT 3x2.5 mm2 und 2.0000 6.51 13.02 0.00120551 ARTEFACTO ISPE AF 3/36W und 1.0000 120.58 120.58 0.00300170 CADENA GALVANIZADA m 3.0000 3.80 11.40 145.00

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010220 ART.FLUOR.2/18W EMPOTRADO MARCO ALUM (DIF.PLAS)Rendimiento (UND/día) 8.0000 154.02Materiales

120511 ARTEF. EL-A 1'x2'/2x18W AF EMPOTRADO DIF und 1.0000 129.12 129.12 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 129.29

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010222 ART.FLUOR.2/18W EMPOTRADO MARCO ALUM(DIF.PLAS) MS-122Rendimiento (UND/día) 10.0000 153.22Materiales

120517 ARTEF.EL-A 1'x2'/2x18W AF EMPOT.DIF.PRIS und 1.0000 138.23 138.23 0.00265201 ACCESORIOS DE FIJACION jgo 1.0000 3.84 3.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 142.24

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

36010224 ART.FLUOR.2/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122Rendimiento (UND/día) 10.0000 153.36Materiales

120522 ARTEF.FLUORESC.2x36W AF C/REJ.MET.SIMIL und 1.0000 138.37 138.37 0.00265201 ACCESORIOS DE FIJACION jgo 1.0000 3.84 3.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 142.38

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

36010226 ART.FLUOR.3/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122Rendimiento (UND/día) 10.0000 239.95Materiales

120523 ARTEF.FLUORESC.3x36W AF C/REJ.MET.SIMIL und 1.0000 224.96 224.96 0.00265201 ACCESORIOS DE FIJACION jgo 1.0000 3.84 3.84 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 228.97

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 10.98

36010240 ARTEFACTO FLUORESCENTE CIRCULAR DE 32WRendimiento (UND/día) 8.0000 64.26Materiales

120515 ARTEF.FLUORESCENTE CIRC.A.F.32W (REAC und 1.0000 39.36 39.36 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 39.53

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00

Page 202: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010250 ARTEFACTO FLUORESCENTE CIRCULAR DE 22WRendimiento (UND/día) 8.0000 52.28Materiales

120514 ARTEF.FLUORESCENTE CIRC.A.F.22W (REAC und 1.0000 27.38 27.38 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 27.55

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010260 ART.FLUORESCENTE. 2X18W (TPR PRISMA - 218 JOSFEL)Rendimiento (UND/día) 8.0000 133.80Materiales

120520 ART. FLUORESCENTE 2X18W (TPR PRISMA-218und 1.0000 108.90 108.90 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 109.07

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010270 ART.FLUOR.CIRCULAR 22W (TPR PRISMA - 122 JOSFEL)Rendimiento (UND/día) 8.0000 82.95Materiales

120527 ART.T/PLAST.LAMP.CIRC.22W (TPR-122) und 1.0000 58.05 58.05 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 58.22

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010280 ART.T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32WRendimiento (UND/día) 8.0000 113.70Materiales

120525 ART.T/PLAST.LAMP.CIRC.32W (TPC-132) und 1.0000 88.80 88.80 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 88.97

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010340 ART.WALLSOCKET/REJ.SEG./LAMP.INC./75WRendimiento (UND/día) 8.0000 67.14Materiales

121005 ART. WS-150 R WALLSOCKET/REJ.SEG. C/LAMund 1.0000 42.24 42.24 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 42.41

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010360 ART.BRAQ.CONICO DIRIG.DOBLE LAMP.I/50WRendimiento (UND/día) 8.0000 170.82Materiales

121001 ART.BRAQUETE C/2 LAMPARAS 50W DWS-220 und 1.0000 145.92 145.92 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 146.09

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

Page 203: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

36010380 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 50WRendimiento (UND/día) 16.0000 54.78Materiales

121002 ART. WS-150 CON SOCKET DE PORCELANA L und 1.0000 42.24 42.24 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 42.41

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

36010400 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP.100WRendimiento (UND/día) 16.0000 54.78Materiales

121003 ART. WS-150 CON SOCKET DE PORCELANA L und 1.0000 42.24 42.24 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 42.41

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 0.00470301 OFICIAL H-H 0.5000 11.01 5.51 12.37

36010420 ART.BRAQ.CONICO DOBLE DIRIG. LAMP.I/100 WRendimiento (UND/día) 8.0000 192.26Materiales

121006 ART.BRAQUETE C/2 LAMPARAS 100W DWS-22 und 1.0000 167.36 167.36 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 167.53

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010440 BRAQ. C/FAROL ESFERICO Ý 25CM C/2 LAMP AHORRADORA ENERGIARendimiento (UND/día) 8.0000 175.87Materiales

113604 BRAQ.C/FAROL E-25 BA C/2LAMPX9W und 1.0000 151.14 151.14 151.14Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010450 BRAQUET-REFLECTOR C/LAMP.2X18W-AHORRAD, SIM.JOSFEL RSP-2Rendimiento (UND/día) 10.0000 231.18Materiales

111518 BRAQ-REFLECTOR RSP-2TC-D18 LAMP.2X18Wund 1.0000 211.39 211.39 211.39Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010455 REFLECTOR C/LAMP 250W HG LUXIOD EXRendimiento (UND/día) 10.0000 474.83Materiales

110533 LAMPARA DE VAPOR DE MERCURIO 250W LUXund 1.0000 455.04 455.04 455.04Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010460 LUMINARIA C/SOQUET PORCELANA Y LAMPARA AHORRADORA DE ENERGIA, TIPO GLOBO 18WRendimiento (UND/día) 8.0000 66.90Materiales

113603 SOQUET PORCELANA C/LAMP.AHORRADOR T und 1.0000 42.00 42.00 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 42.17

Mano de obra

Page 204: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010465 SOQUETE PORCELANA C/LAMP INC. 50WRendimiento (UND/día) 45.0000 7.98Materiales

120101 SOQUETE DE PORCELANA und 1.0000 4.50 4.50 0.00120562 FOCO 50 W und 1.0000 1.11 1.11 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 5.78

Mano de obra470201 OPERARIO H-H 0.1778 12.36 2.20 2.20

36010470 ARTEFACTO MBM DE MECRIL C/LAMPARA AHORRADORA 11WRendimiento (UND/día) 8.0000 104.90Materiales

120512 ARTEF.MBM C/LAMPARA AHORRADORA 11W und 1.0000 80.00 80.00 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 80.17

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010475 ARTEFACTO SPOT LIGHT C/LAMPARA AHORRADORA 18WRendimiento (UND/día) 16.0000 112.03Materiales

121015 ARTEF. SPOT LIGHT C/LAMP. AHORRADORA 1 und 1.0000 105.00 105.00 0.00300145 CINTA AISLANTE m 0.5000 0.34 0.17 105.17

Mano de obra470101 CAPATAZ H-H 0.0500 13.59 0.68 0.00470201 OPERARIO H-H 0.5000 12.36 6.18 6.86

36010480 FAROLA HPC 144 PHILIPS LAMPARA HG 250WRendimiento (UND/día) 10.0000 270.68Materiales

111501 FAROLA HPC 144 PHILIPS LAMP.HG 250W und 1.0000 250.55 250.55 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 250.89

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010500 FAROLA JP 250 LAMPARA HG 125WRendimiento (UND/día) 10.0000 249.79Materiales

111502 FAROLA JP 250 LAMPARA 125W HG OPAL und 1.0000 229.66 229.66 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 230.00

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010505 FAROLA ESFERICA JOSFEL E-35 LAMPARA 150WRendimiento (UND/día) 10.0000 392.13Materiales

111512 FAROLA E-35-BR 150W SODIO (ACRILICO CRISund 1.0000 372.00 372.00 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 372.34

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010510 FAROLA JP 250 LAMPARA NA 70W

Page 205: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 10.0000 231.13Materiales

111521 FAROLA JP 250 LAMPARA 70W NA und 1.0000 211.00 211.00 0.00300145 CINTA AISLANTE m 1.0000 0.34 0.34 211.34

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010520 LAMPARA DE VAPOR DE MERCURIO 400WRendimiento (UND/día) 8.0000 74.87Materiales

110526 LAMPARA DE VAPOR DE MERCURIO 400 W TI und 1.0000 50.14 50.14 50.14Mano de obra

470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010540 LAMPARA MIRH-64/125W JOSFEL O SIMILARRendimiento (UND/día) 10.0000 157.55Materiales

110530 LAMPARA MIRH-64/125W VM und 1.0000 137.76 137.76 137.76Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010560 REFLECTOR RL 40 JOSFELRendimiento (UND/día) 10.0000 579.95Materiales

111505 REFLECTOR RL-40 JOSFEL,400W (COMPLETO)und 1.0000 560.16 560.16 560.16Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010580 REFLECTOR HLF432 PHILLIPS COMPLETORendimiento (UND/día) 10.0000 328.82Materiales

111506 REFLECT.HLF432 PHILLIPS C/LAMP SODIO 250und 1.0000 309.03 309.03 309.03Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010600 REFLECTOR JOSFEL RSP 125W, HGRendimiento (UND/día) 10.0000 244.98Materiales

111503 REFLECTOR RSP C/LAMPARA 125 W HG (COM und 1.0000 225.19 225.19 225.19Mano de obra

470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

36010610 REFLECTOR JOSFEL RSP 125W, HG,C/SEG, PORTADA DE INGRESORendimiento (UND/día) 10.0000 248.23Materiales

111503 REFLECTOR RSP C/LAMPARA 125 W HG (COM und 1.0000 225.19 225.19 0.00512027 PLATINA DE FIERRO 1/8" X 1 1/2" m 1.0000 3.25 3.25 228.44

Mano de obra470101 CAPATAZ H-H 0.0800 13.59 1.09 0.00470201 OPERARIO H-H 0.8000 12.36 9.89 0.00470301 OFICIAL H-H 0.8000 11.01 8.81 19.79

Page 206: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

36010620 POSTE DE CONCRETO CENTRIFUGADO 6 m.Rendimiento (UND/día) 6.0000 537.14Materiales

040501 ARENA GRUESA m3 0.4320 22.69 9.80 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5360 35.29 18.92 0.00053501 AGUA m3 0.1520 5.00 0.76 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 5.9600 15.13 90.17 0.00620101 POSTE DE CONCRETO CENTRIF. 6/70/90/180 und 1.0000 160.15 160.15 293.80

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 9.3333 11.01 102.76 0.00470401 PEON H-H 9.3333 9.95 92.87 232.21

Equipo481001 HERRAMIENTA %MO 3.0000 232.21 6.97 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1333 23.94 3.19 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1333 7.30 0.97 11.13

36010640 POSTE DE CONCRETO CENTRIFUGADO 7 m.Rendimiento (UND/día) 6.0000 578.89Materiales

040501 ARENA GRUESA m3 0.4320 22.69 9.80 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.5360 35.29 18.92 0.00053501 AGUA m3 0.1520 5.00 0.76 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 5.9600 15.13 90.17 0.00620103 POSTE DE CONCRETO CENTRIF. 7/100/120/225und 1.0000 201.91 201.91 335.56

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 9.3333 11.01 102.76 0.00470401 PEON H-H 9.3333 9.95 92.87 232.21

Equipo481001 HERRAMIENTA %MO 3.0000 232.21 6.97 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1330 23.94 3.18 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1330 7.30 0.97 11.12

36010660 POSTE DE CONCRETO CENTRIFUGADO 8 m.Rendimiento (UND/día) 6.0000 613.89Materiales

040501 ARENA GRUESA m3 0.4860 22.69 11.03 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.6030 35.29 21.28 0.00053501 AGUA m3 0.1220 5.00 0.61 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 6.6240 15.13 100.22 0.00620105 POSTE DE CONCRETO CENTRIF.8/100/120/240 und 1.0000 223.42 223.42 370.56

Mano de obra470101 CAPATAZ H-H 0.2667 13.59 3.62 0.00470201 OPERARIO H-H 2.6667 12.36 32.96 0.00470301 OFICIAL H-H 9.3333 11.01 102.76 0.00470401 PEON H-H 9.3333 9.95 92.87 232.21

Equipo481001 HERRAMIENTA %MO 3.0000 232.21 6.97 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1330 23.94 3.18 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1330 7.30 0.97 11.12

36010670 POSTE DE CONCRETO CENTRIFUGADO 9 m.Rendimiento (UND/día) 5.0000 724.31Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.6700 35.29 23.64 0.00

Page 207: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

053501 AGUA m3 0.1900 5.00 0.95 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 7.3600 15.13 111.36 0.00620116 POSTE DE CONCRETO CENTRIF. 9ML und 1.0000 270.60 270.60 432.80

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 11.2000 11.01 123.31 0.00470401 PEON H-H 11.2000 9.95 111.44 278.65

Equipo481001 HERRAMIENTA %MO 3.0000 278.65 8.36 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1440 23.94 3.45 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1440 7.30 1.05 12.86

36010675 POSTE DE CONCRETO CENTRIFUGADO 9 m.C/CRUCETA 1.20mRendimiento (UND/día) 5.0000 774.34Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.6700 35.29 23.64 0.00053501 AGUA m3 0.1900 5.00 0.95 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 7.3600 15.13 111.36 0.00620116 POSTE DE CONCRETO CENTRIF. 9ML und 1.0000 270.60 270.60 0.00621203 CRUCETA DE CONCRETO 1.20m und 1.0000 50.03 50.03 482.83

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 11.2000 11.01 123.31 0.00470401 PEON H-H 11.2000 9.95 111.44 278.65

Equipo481001 HERRAMIENTA %MO 3.0000 278.65 8.36 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1440 23.94 3.45 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1440 7.30 1.05 12.86

36010680 POSTE DE CONCRETO CENTRIFUGADO 11 m.Rendimiento (UND/día) 5.0000 906.81Materiales

040501 ARENA GRUESA m3 0.5400 22.69 12.25 0.00050501 PIEDRA CHANCADA DE 1/2" Y 3/4" m3 0.6700 35.29 23.64 0.00053501 AGUA m3 0.1900 5.00 0.95 0.00112505 CORTACIRCUITO PARA POSTE DE CONCRETOund 1.0000 14.00 14.00 0.00210101 CEMENTO PORTLAND TIPO I bl 7.3600 15.13 111.36 0.00620110 POSTE DE CONCRETO CENTRIF. 11/200/120/28und 1.0000 453.10 453.10 615.30

Mano de obra470101 CAPATAZ H-H 0.3200 13.59 4.35 0.00470201 OPERARIO H-H 3.2000 12.36 39.55 0.00470301 OFICIAL H-H 11.2000 11.01 123.31 0.00470401 PEON H-H 11.2000 9.95 111.44 278.65

Equipo481001 HERRAMIENTA %MO 3.0000 278.65 8.36 0.00495005 MEZCLADORA DE CONC.(TAMBOR) 11 P3, 22 HH-M 0.1440 23.94 3.45 0.00495012 VIBRADOR A GASOLINA Ý 1 3/4", 4 HP H-M 0.1440 7.30 1.05 12.86

36010700 CRUCETA CONCRETO ARMADO DE 120mmRendimiento (UND/día) 40.0000 66.14Materiales

621203 CRUCETA DE CONCRETO 1.20m und 1.0000 50.03 50.03 50.03Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 0.6000 12.36 7.42 0.00470401 PEON H-H 0.6000 9.95 5.97 16.11

36010720 PASTORAL TIPO SUCRE "C" SIMPLE REC-120mm

Page 208: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

Rendimiento (UND/día) 40.0000 57.66Materiales

621001 PASTORAL CONC. SUCRE "C" SIMPLE REC-12 und 1.0000 44.00 44.00 44.00Mano de obra

470101 CAPATAZ H-H 0.0200 13.59 0.27 0.00470201 OPERARIO H-H 0.6000 12.36 7.42 0.00470401 PEON H-H 0.6000 9.95 5.97 13.66

36010740 PASTORAL TIPO SUCRE "C" DOBLE REC-120mmRendimiento (UND/día) 40.0000 73.96Materiales

621003 PASTORAL CONC. SUCRE "C" DOBLE REC-120 und 1.0000 57.85 57.85 57.85Mano de obra

470101 CAPATAZ H-H 0.2000 13.59 2.72 0.00470201 OPERARIO H-H 0.6000 12.36 7.42 0.00470401 PEON H-H 0.6000 9.95 5.97 16.11

36010750 CAMPANILLA DE TIMBRE DE 2" CON TRANF 220/12VRendimiento (UND/día) 8.0000 63.07Materiales

113004 CAMPANILLA DE TIMBRE DE 2" DE DIAMETRO und 1.0000 31.79 31.79 0.00124501 PULSADOR DE TIMBRE und 1.0000 6.55 6.55 38.34

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010755 CAMPANILLA DE TIMBRE DE 3" CON TRANSF.220/12VRendimiento (UND/día) 8.0000 70.78Materiales

113003 CAMPANILLA DE TIMBRE DE 3" und 1.0000 39.50 39.50 0.00124501 PULSADOR DE TIMBRE und 1.0000 6.55 6.55 46.05

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010760 CAMPANILLA DE TIMBRE DE 4" CON TRANSF.220/12VRendimiento (UND/día) 8.0000 70.78Materiales

113002 CAMPANILLA DE TIMBRE DE 4" DE DIAMETRO und 1.0000 39.50 39.50 0.00124501 PULSADOR DE TIMBRE und 1.0000 6.55 6.55 46.05

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010780 CAMPANILLA DE TIMBRE DE 8" CON TRANF 220/12VRendimiento (UND/día) 8.0000 69.10Materiales

113001 CAMPANILLA DE TIMBRE DE 8" DE DIAMETRO und 1.0000 37.82 37.82 0.00124501 PULSADOR DE TIMBRE und 1.0000 6.55 6.55 44.37

Mano de obra470101 CAPATAZ H-H 0.1000 13.59 1.36 0.00470201 OPERARIO H-H 1.0000 12.36 12.36 0.00470301 OFICIAL H-H 1.0000 11.01 11.01 24.73

36010800 GRUPO ELECTROGENO DE 7 KW MODELO DIM - 7.7 - LPWRendimiento (UND/día) 1.0000 25161.13Materiales

010502 ACEITE GRADO 40 gal 0.2500 55.60 13.90 0.00485001 BATERIA RECORD 12 VDC, 9 PLACAS und 1.0000 100.00 100.00 0.00496068 GRUPO ELECTROGENO 7 KW MOD.DIM-7.7-LP und 1.0000 24796.62 24796.62 0.00

Page 209: ANALISIS DE COSTOS Y CANTIDADES EN MATERILES PARA EDIFICACIONES

ANALISIS DE COSTOS UNITARIOS I. ELECTRICAS

PARTIDA CODIGO INSUMO UND CANT PRECIO PARCIAL SUBTOTAL

530102 PETROLEO DIESEL # 2 gal 0.5000 6.64 3.32 24913.84Mano de obra

470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 197.83

Equipo481001 HERRAMIENTA %MO 25.0000 197.83 49.46 49.46

36010820 GRUPO ELECTROGENO DE 10 KW,TRIFASICO, PETROLERORendimiento (UND/día) 1.0000 28690.12Materiales

010502 ACEITE GRADO 40 gal 0.2500 55.60 13.90 0.00485001 BATERIA RECORD 12 VDC, 9 PLACAS und 1.0000 100.00 100.00 0.00496064 GRUPO ELECTROGENO 10 KW,TRIFASICO,PE und 1.0000 28325.61 28325.61 0.00530102 PETROLEO DIESEL # 2 gal 0.5000 6.64 3.32 28442.83

Mano de obra470101 CAPATAZ H-H 0.8000 13.59 10.87 0.00470201 OPERARIO H-H 8.0000 12.36 98.88 0.00470301 OFICIAL H-H 8.0000 11.01 88.08 197.83

Equipo481001 HERRAMIENTA %MO 25.0000 197.83 49.46 49.46