"H2020: Energía limpia, segura y eficiente. Próximas oportunidades de participación". Pilar...

89
H2020: ENERGÍA LIMPIA, SEGURA Y EFICIENTE: PRÓXIMAS OPORTUNIDADES DE PARTICIPACIÓN Pilar González Gotor NCP Energía H2020 División de Programas de la UE CDTI [email protected] Málaga 6 de octubre de 2016

Transcript of "H2020: Energía limpia, segura y eficiente. Próximas oportunidades de participación". Pilar...

H2020: ENERGÍA LIMPIA, SEGURA Y EFICIENTE:

PRÓXIMAS OPORTUNIDADES DE PARTICIPACIÓN

Pilar González Gotor NCP Energía H2020

División de Programas de la UE CDTI

[email protected]

Málaga 6 de octubre de 2016

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

Ciencia excelente

Reforzar y ampliar la excelencia de la

base científica de la Unión, así como

consolidar el Espacio Europeo de

Investigación

Liderazgo industrial

Acelerar el desarrollo de las tecnologías

e innovaciones que sustentarán las

empresas del mañana

Retos sociales

Estimular la masa crítica de esfuerzos

de investigación e innovación necesaria

para alcanzar los objetivos políticos de la

Unión

Horizonte 2020: Estructura

5 (05/10/2016)

Estructura y Presupuesto

Modalidades de participación

A través de las convocatorias ordinarias

Vía Partenariados u otras Iniciativas europeas

Accediendo a la financiación de riesgo

Cómo participar en Horizonte 2020

Types of Actions

Research and Innovation Action (RIA)

- establish new knowledge and/or to explore the feasibility of a new or improved technology, product, process, service or solution

- 100% funding rate

- At least 3 legal entities from 3 different MS/AC

Innovation Action (IA)

- producing plans/arrangements or designs for new, altered or improved products, processes or services (incl. prototyping, testing, demonstrating, piloting, large-scale product validation and market replication)

- 70% funding rate (but 100% for non-profit organisations)

- At least 3 legal entities from 3 different MS/AC

Coordination and Support Action (CSA)

- accompanying measures such as standardisation, dissemination, awareness-raising and communication, networking, coordination or support services

- 100% funding rate

- At least 1 legal entity from MS/AC

Single indirect cost-model

20% ? 60% ?

Real ?

Simplified?

Single model: 25 % Flat Rate FP7

Technology Readiness Levels

Technology Readiness Levels

Technology Readiness Levels

Be Realistic

Understand Topic Text + Right TRLs

Impact for IAs

Sound Budget

Simple

Criterios de Evaluación

Excellence (3/5) Impact (3/5) Implementation (3/5) TOTAL* (10/15)

* Impact x1.5 en IAs y SME instrument!!!

OJO! para las convocatorias de 2017 el umbral en las PPP

está en 12/15 y 4/5 en los apartados de Excelencia e

Impacto!

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

14 (05/10/2016)

http://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52014DC0015&from=EN

15 (05/10/2016)

Political Context

2030 Climate-Energy Package • 40% reduction of Greenhouse Gases

• 27% of renewable energy

• 27% improvement in energy efficiency

Energy Union Energy security, solidarity and trust

A fully integrated internal energy market

Energy efficiency first

Transition to a low-carbon society

An Energy Union for Research,

Innovation and Competiveness

SET-Plan Integrated Roadmap

Communication on

Integrated SET-Plan (COM[2015]6317)

16 (05/10/2016)

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

17 (05/10/2016)

Secure Clean end

efficient Energy

Energy Efficiency 25 Topics

Budget: 194 M.€

Low Carbon

Technologies 36 topics

Budget: 720,22 M.€

Smart Cities and

Communities 1 topic

Budget: 131,5 M.€

EASME

(EACI)

INEA

(TEN-T EA)

RS3: Programme Structure Call 2016-2017

Cross-Cutting activities

18 (05/10/2016)

Indicative budget distribution per area for Energy calls

2016-2017

Total budget 2016-2017: EUR 1 344 million

* Other Actions = actions not implemented through calls for proposals (e.g. Risk Finance, procurements,

subscriptions, contributions, grant to identified beneficiaries)

19 (05/10/2016)

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

20 (05/10/2016)

Heating and cooling

Engaging consumer

Buildings Industry,

services and products

Innovative Financing

Call Energy Efficiency

Reducir el consumo de energía y la huella de carbono mediante un uso inteligente y sostenible

20%

≥27%

2020

2030

PPP E2B PPP SPIRE

21 (05/10/2016)

Heating & Cooling

• Tackling H&C consumption – Moderating demand

• Increasing energy efficiency in supply

• Maximising use of local sustainable and renewable energy sources

• Recovering waste heat

• Linking with electricity system

• Achieving affordable costs

22 (05/10/2016)

Heating & Cooling – Topics 2016-2017

• Topics EE-1-2017, EE-17-2016-2017, EE-20-2017

Innovation in waste heat recovery and reuse technologies (in cities and industry)

• Topics EE-1-2017, EE-2-2017

District heating networks: innovation in urban waste heat reuse in DH, replication of efficient retrofitting of DH networks

• Topic, EE-4-2016-2017

Research and innovation of efficient and low-carbon H&C technologies. Calefacción de distrito de baja temperatura con edificios de alto rendimiento.

23 (05/10/2016)

New deal for energy consumers: Empowering consumer Deploying demand side response Using smart technologies Protecting vulnerable customers

Objectives: Achieve a deeper understanding of consumer behaviour and motivation

structures Inform, engage and activate consumers

Consumer in the centre

24 (05/10/2016)

• Topic EE-6-2016-2017

Engaging private consumers towards sustainable energy

• Topic EE-7-2016-2017

Behavioural change toward energy-efficiency through ICT

• Topic EE-9-2016-2017

Engaging and activating public authorities

Consumer engagement – Topics 2016-2017

Consumer empowerment through smart homes system and demand response EE-12-2017

Consumer information through EU product efficiency legislation EE-16-2016-2017

25 (05/10/2016)

Buildings

Buildings account for 40% of the final energy consumption

• Increasing the rate, quality and effectiveness of renovation to reduce the

energy use in buildings, as well as their replication capacity;

• Integration of demand response in energy management systems while ensuring interoperability;

• Reducing the cost of designing and constructing new Near-Zero Energy Buildings (NZEBs) in order to increase their market uptake;

• Building capacity and provide support for sustainable energy policy implementation.

26 (05/10/2016)

Buildings – Topics 2016-2017

• Topics EE-11-2016-2017

Deep renovation of buildings

• Topic EE-12-2017 (EeB-PPP)

Demand response in energy management systems

• Topic EE-14-2016-2017

Construction skills

27 (05/10/2016)

Industry and service sectors represent more than 39% of the EU's final energy

consumption

Industry, services and products

• Design of manufacturing processes, energy recovery, energy

audits and energy management systems

• Re-use of industrial waste,

• Optimisation of the value chain

• Development and market uptake of innovative highly efficient

energy-related products, systems and services

.

28 (05/10/2016)

Industry, services and products – Topics 2016-2017

• Topic EE-15-2017, EE-18-2017

Capacity building in industry and energy services for industrial parks

• Topic EE-17-2016-2017 (SPIRE-PPP)

Waste heat recovery / Energy symbiosis in industrial systems

• Topic EE-16-2016-2017

Effective implementation of EU product legislation

• Topic EE-20-2017

Energy efficient and integrated data centres

• Topic EE-19-2017

Public procurement of innovative energy efficiency solutions

29 (05/10/2016)

Financing Energy Efficiency

100 bn € investments/year needed to achieve EE targets

Improve supply of large-scale finance at a low cost for by:

– Providing Project Development Assistance to public and private sectors to

deliver innovative and bankable sustainable energy investments; – Development of innovative financing schemes insuring flow of private finance

for EE investments; – Increase "readability" of market fundamentals for financiers and investors

through benchmarking and standardisation of EE investments; – Develop, demonstrate and standardise new types of energy efficiency services

and business models

30 (05/10/2016)

Financing Energy Efficiency – Topics 2016-2017

• Topic EE-22-2016-2017

Aggregation - Project development assistance

• EE-23-2017

Market based culture - Energy efficiency services and innovative financing schemes

31 (05/10/2016)

Energy Efficiency call 2017 - Overview

Deadline 19 January 2017

• Sub-budget: EUR 8 million

• EE-12

• Sub-budget: EUR 11 million

• EE-17

• Sub-budget: EUR 16 million

• EE-1

• EE-4

• Sub-budget: EUR 8 million

• EE-7

• Sub-budget: EUR 6 million

• EE-20

Deadline 7 June 2017

• EE-2

• EE-6

• EE-9

• EE-11

• EE-14

• EE-15

• EE-16

• EE-18

• EE-19

• EE-23

• EE-24

• EE-22

IA – green

CSA- orange

ERA-NET – black

PPI - purple

EUR 4 million

EUR 5 million EUR 7 million

EUR 8 million

EUR 11 million

EUR 4 million

EUR 8 million

EUR 8 million

32 (05/10/2016)

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

33 (05/10/2016)

Integrated EU energy system

Renewable energy

technologies

Decarbonisation of Fossil Fuels

Social, economic and human aspects

European Research Area

in Energy

Cross-cutting issues

Call

Competitive

Low Carbon

Energy

Suministro de electricidad a bajo coste y de baja emisión de

carbono

2020 2030

2020

2030

2020

2030

10%

≥27%

20%

15%

-40%

-20%

Interconnections

RES

GGE

34 (05/10/2016)

Energy System

● maturation of promising next generation technologies for the distribution network: demand-response, smart grid, storage and energy system integration

● demonstrating technologies for the distribution network integrating several technologies

● demonstration of integration of technologies with a center of gravity on the transmission network

35 (05/10/2016)

Energy System

● LCE-01-2016-2017. Maturation of promising next generation technologies for the distribution network: demand-response, smart grid. RIA. TRL 3-6. 2-4M€/project. 19 M€

● LCE-04-2017. Demonstration of integration of technologies with a center of gravity on the transmission network, but including links with the distribution network. IA. TRL 5-8. 15-20 M€/project. 65,29 M€

● LCE-05-2017. Tools and technologies for coordination and integration of the European energy system. RIA. 2-4 M€/project**. 30 M€

Deadline: 14/02/2017 **0.1 to 1 MEur if area 5 alone

36 (05/10/2016)

Renewable energies

● Support the next set of technologies for cost-competitiveness and market

introduction (off-shore wind, certain areas of PV, CSP, tidal and wave energy, and geothermal energy);

● Continue supporting those technologies that have started to reach cost-competiveness but where continued efforts are needed (on-shore wind, areas of PV, advanced biofuels, and solar heating and cooling);

● Continue supporting new and emerging technologies (e.g. advanced and solar fuels, ocean thermal energy conversion (OTEC), Salienty gradient energy, etc.), mature technologies where further innovation remains important (hydropower, PV-thermal) and replace critical pollutant/expensive materials by eco-friendly/sustainable materials.

37 (05/10/2016)

Renewable energies

Basic Research

(TRL <4)

Advanced

Research

(TRL 3-5)

Demonstration

(TRL 5-7)

Market

uptake

PV

LCE-6

LCE-7

LCE-9, LCE-10 LCE-21

CSP LCE-11

Solar Heating

and Cooling LCE-12

Wind Energy LCE-13, LCE-14

LCE-21

Ocean Energy LCE-15, LCE-16

Hydropower

Geothermal

Energy

LCE-17, LCE-23, LCE-

18

CHP

RES integration

in the system

Bio- and

Renewable

Alternative Fuels LCE-8, LCE-22

LCE-19, LCE-20

38 (05/10/2016)

Photovoltaics (PV)

Basic research (RIA)

• Upscaling technologies currently at lab-scale (excluding activities funded under NMBP 19-2016!) - LCE-6-2017

Advanced research (RIA)

• Next generation of perovskite PV cells and modules – LCE-7-2016-2017

Demonstration (IA)

• Reducing cost of PV electricity – LCE-10-2017

Market-uptake (CSA)

• Tackling the bottlenecks of high penetration levels of PV electricity into the electric power network – LCE-21-2017

• High power generation potential; • Reducing the total cost of installed solar energy systems and grid-integration

bottlenecks remains a priority for the sector; • PV R&D is necessary to re-launch an innovative and worldwide competitive

industry relying on the existing PV technology knowledge-base in Europe

39 (05/10/2016)

Concentrated Solar Power (CSP)

Basic research (RIA)

• Upscaling technologies currently at lab-scale - LCE-6-2017

Advanced research (RIA)

• New cycles and power blocks for reducing costs of CSP plants – LCE-7-2016-2017

Demonstration (IA)

• Reducing water consumption of CSP plants – LCE-11-2017 (EUR 12 million)

Market-uptake (CSA)

• Facilitating the supply of electricity from CSP plants in Southern Europe to Central and Northern European countries – LCE-21-2017

• Strong European industrial presence but the larger share of the market is outside Europe. The competition is growing.

• Need to reduce further the capital and the operational costs as well as to improve system operations, performances and environmental footprint (water consumption).

40 (05/10/2016)

Solar Heating and Cooling (SHC)

Basic research (RIA)

• Upscaling technologies currently at lab-scale - LCE-6-2017

Advanced research (RIA)

• Development of components for residential single-family solar-active houses – LCE-7-2016-2017

Demonstration (IA)

• Solar heat in industrial processes – LCE-12-2017

• Mature technology exists but it still remains under-exploited; • New technology is needed to enlarge the application sectors; • Issues of cost, performance and operability still exist; • Cost competitiveness and acceptability of solar heating systems need to be

improved

41 (05/10/2016)

Geothermal energy

Basic research (RIA)

• Upscaling technologies currently at lab-scale - LCE-6-2017

Advanced research (RIA)

• Materials for geothermal installations (deep geothermal) – LCE-7-2016-2017

Demonstration (IA)

• Geothermal systems for retrofitting buildings – LCE-17-2017

• EGS in different geological conditions – LCE-18-2017

Market-uptake (CSA)

• Tackling bottlenecks for high penetration – LCE-21-2017 • Accelerating the penetration of heat pumps for heating and cooling – LCE-21-

2017

• Geothermal energy has great untapped potential for diversifying the energy mix. • "Shallow geothermal": retroffiting existing installations with improved technology; • Enhanced geothermal systems (EGS): reduction of drilling costs and risks;

demonstration of viable technologies to create new reservoirs.

42 (05/10/2016)

Wind energy

Basic research (RIA)

• Improved understanding of the physics of wind as primary energy source and wind energy technology - LCE-6-2017

Advanced research (RIA)

• Reduction of environmental impact – LCE-7-2016-2017

Demonstration (IA)

• Large >10 MW wind turbines (logistics) – LCE-14-2017

Market-uptake (CSA)

• Increase market share of wind energy – LCE-21-2017

• European industries are still world leaders but the competition is growing; • Cost reductions for all components essential, in particular for offshore; • Offshore considered as the future market - large turbines to be demonstrated • Issues remain on environmental and social impact, and on public acceptance

43 (05/10/2016)

Ocean energy

Basic research (RIA)

• Upscaling technologies currently at lab-scale - LCE-6-2017

Advanced research (RIA)

• Innovative power take-off systems and control strategies – LCE-7-2016-2017

Demonstration (IA)

• Design tools for ocean energy devices and arrays development/deployment – LCE-16-2017

• European industries are leading the emergence of the technologies. • Many devices developed / prototypes tested, but market potential yet to be realised. • Demonstration of reliable and survivable systems essential. • Environmental, social and public impacts to be addressed

44 (05/10/2016)

Combined Heat and Power (CHP)

Basic research (RIA)

• Upscaling technologies currently at lab-scale - LCE-6-2017

Advanced research (RIA)

• Transforming renewable energy into intermediates – LCE-7-2016-2017

• CHP installations already in use, commercial applications exist and have been supported under previous framework programmes

• Market potential for residential scale and for specific industrial applications to increase generation flexibility.

45 (05/10/2016)

Integration of RES in the energy system

Advanced research (RIA)

LCE-7-2016-2017:

• Developing system support functions (or ancillary services) enabling RES technologies to contribute - at transmission and distribution grid level - to a stable and safe energy system;

• Define most suitable pathways for including integration considerations into the different RES development roadmaps

• Growing share of renewable energy sources requires rethink of system management; • Complementing activities supported under the area 'Integrated EU energy system',

integration is also addressed from the perspective of the generation sources in order to share burden and costs.

46 (05/10/2016)

Biofuels (1/2)

Basic research (RIA)

• Diversification of renewable fuel production through novel conversion routes/fuels - LCE-6-2017

Advanced research (RIA)

• LCE-8-2016-2017. Next generation of:

• Biofuels from CO2 in industrial waste flue gases through biochemical conversion by autotrophic ( chemo and photo –autotrophic) micro-organisms;

• Biofuels from organic fraction of municipal and industrial wastes through thermochemical, biochemical or chemical pathways with improved performance and sustainability;

• Biofuels from phototrophic algae & bacteria with improved performance and sustainability.

• European industries have leading technologies, but currently little deployment in EU; • Biofuels are medium-term solution for road and maritime transports and the only solution

for air transport; • Both biological and thermo-chemical pathways are necessary to provide technology

diversity, but the challenges in each pathway are different; • Large scale demonstrations are needed to boost market access; • Research needed to reduce cost, improve environmental impact and performance efficiency.

47 (05/10/2016)

Biofuels (2/2)

Demonstration (IA)

• LCE-19-2016-2017

• Biofuels from waste flue gases / other wastes and residues (2017)

• Biomass from aquatic biomass (2017)

• LCE-20-2016-2017

• Pre-commercial production of advanced aviation biofuels

Market-uptake (CSA)

• Market roll-out of liquid advanced biofuels and liquid renewable alternative fuels – LCE-21-2017

48 (05/10/2016)

Deadline 5 January 2017

• LCE-8 – budget: 10 M€

• LCE-21 – budget 15 M€

Deadline 7 September 2017

• LCE-10 – budget 10 M€

• LCE-11 – budget 12 M€

• LCE-12 – budget: 8 M

• LCE-14 – budget 25 M€

• LCE-16 – budget 7 M€

• LCE-17 – budget 8 M€

• LCE-18 – budget 10 M€

• LCE-19 – budget 15 M€

• LCE-20 – budget 10 M€

Renewable energy – Topic overview

Deadlines: 1st stage: 29/11/2016

2nd: 22/8/2017

• LCE-6 – budget 20 M€

• LCE-7 – budget 64,5 M€

RIA – blue IA – green

CSA- orange

49 (05/10/2016) 49

Decarbonisation of Fossil Fuels

● Fossil fuels will be used in Europe's power generation as well as in industrial processes for decades to come.

● A forward-looking approach to Carbon Capture and Storage (CCS) and Carbon Capture and Use (CCU) for the power and industrial sectors is crucial for reaching the 2050 climate objectives in a cost-effective way.

● Shale gas can contribute to our energy security, provided that issues of public acceptance and environmental impact are adequately addressed.

● New solutions for fossil fuel power plants to provide highly flexible yet efficient back-up power to stabilise the grid for RES integration.

Topics: LCE 27(15M€), 28 (15M€), 29 & 30 (20M€), RIA

Deadline: 5/1/2017

50 (05/10/2016)

Social Sciences and Humanities (SSH)

• Socioeconomic incentive structures that encourage or discourage energy-responsible behaviour;

• Political, institutional, and organizational frameworks that condition and structure citizen participation, including questions of inclusiveness, gender, democracy, organizational formats and business models.

• Topic: LCE31 RIA. 10M€ budget. Prop 2-4M€

Deadline: Dos fases: 1ª: 29/11/2016, 2ª: 22/8/2017

Transition to a low-carbon energy system is a complex societal problem because it changes the interrelations between all relevant actors in the

system (-> policy, economic, governance challenges)

51 (05/10/2016)

Supporting the development of the European Research Area in energy

• Encourage coordination of national and EU efforts to increase effectiveness and efficiency;

• Pool resources and create critical mass to address challenges that no country can tackle alone;

• Align efforts to develop a European Research Area in energy and to create the Energy Union, one of the political priorities of the Juncker Commission;

• The new Integrated SET Plan provides the strategic framework for setting priorities and for discussing implementation;

Topic: LCE 35,37 (ERA-NETs)

52 (05/10/2016)

Cross-cutting issues

Support to the energy stakeholders to contribute to the SET-Plan (LCE-36-2016-2017)

• Areas supported for 2017*:

– Geothermal Energy

53 (05/10/2016)

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

54 (05/10/2016)

Call Smart Cities and Communities

Improving quality of live, competitiveness and sustainability

Exporting European knowledge in a strong growth market estimated globally at €1.3 trillion in 2020

55 (05/10/2016)

WP CROSS-CUTTING ACTIVITIES

(ii) Internet of Things

(iii) Smart and Sustainable Cities

(i) Industry 2020 in the Circular Economy

Smart Cities and Communities (SCC-01)

Sustainable cities though Nature-based solutions (SCC-02)

SCC-1-2016-2017: Smart Cities and Communities light house projects

SCC-2-2016-2017: Demonstrating innovative nature-based solutions in cities

SCC-3-2016: New gobernance, business, financing models and economic impact assessment tools for sustainable cities with nature-based solutions (urban re-naturing)

SCC-4-2016: Sustainable urbanisation

56 (05/10/2016)

WP 2016-2017 Topic SCC-01

Smart and Sustainable Cities

Sustainable, cost-effective and replicable district-scale solutions at the intersection of energy, transport enabled by ICT

Intelligent, user-driven and demand-oriented city infrastructure and services

'Lighthouse project' approach continue

57 (05/10/2016)

INTEGRATION

BALANCED COMBINATION

REPLICATION

• smart buildings (existing/new)

• smart grids (electricity, DH, telecom, water, etc…)

• energy storage,

• electric vehicles and smart charging infrastructures,

• latest generation ICT platforms based on open specifications

Capitalizing on synergies between components to increase efficiency and reduce costs.

SCC1 calls 2016/2017 SCOPE

58 (05/10/2016)

Each PROJECT

Must:

• Be realised in 3 new ligthhouse cities situated in different EU member states or associated countries.

• Involved at least 3 follower cities from at least 3 different EU member states or associated countries.

SCC1 calls 2016/2017 SCOPE

59 (05/10/2016)

City 1 City 2

City 3

60 (05/10/2016)

City 1 City 2

City 3

61 (05/10/2016)

Important details

A city can be funded as a lighthouse city only once under Horizon2020

Follower cities are defined as cities that have not yet acquired the full technical

competence to become a lighthouse city

Sustainable Energy Actions Plans (SEAP - Covenant of Mayors approved or

evaluated by DG JRC as having at least similar quality) are obligatory for

lighthouse cities.

Performance monitoring for at least 2 years

Convincing and realistic work, replication and investment plans

Incorporate all performance data into SCIS (Smart Cities Information System)

SCC1 calls 2016/2017 SCOPE

62 (05/10/2016)

CALL CONDITIONS

Foreseen contribution from the EU: between EUR 12 to 18 million / selected project

Call 2017:

Deadline: 14 February 2017 Budget: 71,5 M.€

FAQ: https://ec.europa.eu/research/participants/portal/desktop/en/support/faq.html

Type of action: Innovation Action (IA)

63 (05/10/2016)

WP 2016-2017 ACTUALIZACIONES

64 (05/10/2016)

Índice

oVisión General H2020 oContexto Político oPrograma de Trabajo 2016-2017: Eficiencia energética Energía Baja en Carbono Ciudades Inteligentes

oOtros

65 (05/10/2016)

Energy outside the Energy Challenge

Cross-thematic priorities

Bottom-up activities

Implementation

• Materials, Key Enabling Technologies

• ICT

• Energy-efficiency in buildings/industry

• Biomass production

• Energy in transport

• Socio-economics

• Access to risk finance

• Research Infrastructures

• European Research Council (ERC)

• Marie Skłodowska-Curie actions

• Future and Emerging Technologies (FET)

• Fast-track to Innovation

• European Commission/ Executive Agencies

• Public-Private Partnerships

• Joint Technology Initiatives (JTI)

• EIT – KIC InnoEnergy

• European Investment Bank

66 (05/10/2016)

- Multi-annual Work-Plan 2014-2020 (support H2020)

- EU budget: 665 mill. EUR

- Objectives: reduce the (production) cost, increase the lifetime, increase

the efficiency, reduce ‘Critical raw materials’

JTI-FCH 2014-2020

67 (05/10/2016)

Resultados H2020: 2014-2015 y provisionales 2016

68

Tasas de éxito globales – 2014-2015 Propuestas Proyectos Tasa de Éxito

EE 781 87 11,1%

LCE 615 115 18,7%

SCC 80 9 11,2%

Total 1476 211 14,3%

RETORNOS – RS ENERGIA 2014-2015

1476 propuestas, de las cuales 211 se han financiado En 124 proyectos aprobados hay participación española 33 proyectos de los financiados están liderados por españoles. Retorno UE (27) – 13,1% (141,1 M.€) (Total adjudicado: 1.077,6 M.€) 2º Pais en retornos por detrás de Alemania (15,7%), y seguido de UK (13%) 55% de participación empresarial en proyectos aprobados.

69

Tasas de éxito globales – 2014-2015 Propuestas Proyectos Tasa de Éxito

EE 781 87 11,1%

LCE 615 115 18,7%

SCC 80 9 11,2%

Total 1476 211 14,3%

RETORNOS – RS ENERGIA 2014-2015

1476 propuestas, de las cuales 211 se han financiado En 124 proyectos aprobados hay participación española (58,7%)

33 proyectos de los financiados están liderados por españoles. (15,6%) Retorno UE (27) – 13,1% (141,1 M.€) (Total adjudicado: 1.077,6 M.€)

2º Pais en retornos por detrás de Alemania (15,7%), y seguido de UK (13%) 55% de participación empresarial en proyectos aprobados.

70

Calls EE 2014 y 2015:

0,0

2,0

4,0

6,0

8,0

10,0

12,0

14,0

16,0

18,0

20,0

Call EE - 2014-2015. Retornos por países M.€

De 87 proyectos, en 52 hay participación española. 15 proyectos liderados por España.

12,2% - tasa de éxito española. Entidades más destacadas: CIRCE, Diput.Girona, Giroa, SA, Wellness SC SL, Escan

SL, UPCatalunya, Tekniker, Deloitte, Accional Infraestructura

71

Calls LCE 2014 y 2015:

0,0

20,0

40,0

60,0

80,0

100,0

120,0

140,0

Call LCE - 2014-2015. Retornos por países M.€

De 115 proyectos, en 64 hay participación española. 15 proyectos liderados por España.

19,6% - tasa de éxito española. Retorno España 12,1% Entidades más destacadas: Acciona Infra, Esteyco, SA, Tecnalia, Adwen OS,SL, EDP

Renovables, SL, F.CENER-CIEMAT, CIRCE, Ciemat, CSIC.

72

SCC 2014 y 2015: Light House Projects, CSA

9 proyecto con participación española en 8. 3 liderados por España

Lighthouse cities: VALLADOLID, BARCELONA, SAN SEBASTIAN, VITORIA

Followers: SABADELL, SANTIAGO DE COMPOSTELA Lideres: Tecnalia, Fundación Cartif, Fomento de S.Sebastian, S.A.

73

Call 2014: Selected Proposal SELECTED PROPOSAL SCC-01

ACRONIMO LEAD CITIES FOLLOWERS CITIES

GrowSmarter Stockholm, Cologne and Barcelona

5: Valetta, Suceava, Porto, Cork and Graz

REMOURBAN Valladolid, Nottingham and Tepebasi

2: Seraing, Miskolc

TRIANGULUM Manchester, Eindhoven and Stavanger

3: Prague, Leipzig and Sabadell

74

Call 2015: Selected Proposal

SELECTED PROPOSAL SCC-01

ACRONIMO LEAD CITIES FOLLOWERS CITIES

SmartENcity Vitoria, Tartu, Sodenburg Lecce, Asenovgrad

REPLICATE San Sebastian, Florencia y Bristol

Essen, Nilufer, Lausanne

SMARTER TOGETHER

Lyon, Munich, Vienna Santiago, Sofía, Venecia, Kiev, Yokohama

SHARMLLM London, Lisboa, Milán. Burdeos, Varsovia, Burgas

75

Call 2016: Selected Proposal

SELECTED PROPOSAL SCC-01

ACRONIMO LEAD CITIES FOLLOWERS CITIES

mySMARTlife Nantes (France), Hamburg (Germany) and Helsinki (Finland)

Varna (Bulgaria), Bydgoszcz (Poland), Rijeka (Croatia) and Palencia (Spain)

Ruggedised Rotterdam (Netherland), Glasgow (UK) and UMEA (Suecia)

Brno (Czech Republic), Parma (Italia) and Gdansk (Polonia)

76

6,7

5,4 5,1 4,9 4,5

4,1

2,4

1,1 1,1 0,6 0,4 0,1 0,1

0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

Call 2016 - SCC

Call 2016: Sólo 8 propuestas evaluadas, y 2 financiadas (2014 – 19 (3); 2015 – 37(4)

Budget inicial: 60 M.€ - Sólo se adjudica 36,35 M.€ Retorno España: 2,38 M.€ (6,5% UE-27 y Total)

7ª posicion en retorno

77

Resultados EE-RIA-IA

Deadline: 21 enero 2016

77

Code EE Call 2016 Topics (Jan. deadline) Type Budget (M€)

EE-03 Standardised installation packages integrating renewable and energy efficiency solutions for heating, cooling and/or hot water preparation

IA

34 EE-04 New H/C solutions using low-grade sources of thermal energy RIA

EE-05 Models & tools for heating and cooling mapping and planning RIA

EE-07 Behavioural change toward energy efficiency through ICT IA

EE-08 Socio-economic research on consumer's behaviour related to energy efficiency

RIA

EE-10 Supporting accelerated and cost-effective deep renovation of buildings (EeB-PPP)

IA 16

EE-17 Valorisation of waste heat in industrial systems (SPIRE-PPP) IA

78

7,1

5,8

4,7 4,4 4,4

3,8 3,1

2,6 2,5 2,3 2,1

1,0 0,7 0,5 0,5 0,5

2,0

0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

Resultados EE-RIA/IA Deadline 21/1/2016 Estadísticas, retorno por país.

15 propuestas a financiar – Subvención solicitada: 47,76 M.€ Subv.España: 4,4 M.€

79

Resultados convocatoria Renovables, CCS, SSH . Deadline: 16 febrero 2016

Topic Activity Budget (€)

LCE-07-2016-2017 Developing the next generation technologies of renewable electricity and heating/cooling

61,300,000

LCE-08-2016-2017 Development of next generation biofuel technologies 10,000,000

LCE-23-2016 International Cooperation with Mexico on geothermal energy 10,000,000

LCE-24-2016 International Cooperation with South Korea on new generation high-efficiency capture processes

17,000,000

LCE-25-2016 Utilisation of captured CO2 as feedstock for the process industry 10,000,000

LCE-31-2016-2017 Social Sciences and Humanities Support for the Energy Union 10,000,000

Total 118,300,000

Tipo de instrumento: RIA. Incluye los siguientes topics:

80

26,7

12,3 11,4

9,4 8,0 7,7 7,5

5,8 4,8 4,4 3,9 3,4 3,3 3,0 3,0 2,0 1,3 1,2 1,0 1,0

3,7

0,0

5,0

10,0

15,0

20,0

25,0

30,0

Resultados convocatoria Renovables, CCS, SSH . Deadline: 16 febrero 2016. Estadísticas, retorno por país.

Retorno económico provisional en M.€

ESPAÑA: De un total de 24 proyectos financiados en esta convocatoria, 5 son liderados por España. 23 participaciones españolas financiadas de un total de

276. Retorno España: 9,4 M.€ de un total de 125 M.€ adjudicados.

81

Resultados Convocatoria - Smart Grid System Deadline: 5 Abril 2016

Topic Activity Budget (€)

LCE-01-2016-2017 Next generation innovative technologies enabling smart grids, storage and energy system integration with increasing share of renewables: distribution network

20,000,000

LCE-02-2016 Demonstration of smart grid, storage and system integration technologies with increasing share of renewables: distribution system

73,660,000

LCE-03-2016 Support to R&I strategy for smart grid and storage 4,000,000

Total 97,660,000

SMART GRID SYSTEM: LCE1 – RIA LCE2 – IA

LCE3 - CSA

82

Resultados 2ª convocatoria SGS Estadísticas, retorno por país.

Retorno económico provisional en M.€

12,5

11,1

8,0 7,2 7,1 6,9 6,5

5,9 5,8 5,6 5,3 4,8

4,0 3,0 2,6 2,3 2,0

1,2 1,1 1,0 1,7

0,0

2,0

4,0

6,0

8,0

10,0

12,0

14,0

ESPAÑA: De un total de 13 proyectos financiados en esta convocatoria, 4 son liderados por España. 21 participaciones españolas financiadas de un total de

171. Retorno España: 12,5 M.€ de un total de 105,6 M.€ adjudicados.

83

Resultados Convocatoria - ERA-SSH-RIA Deadline: 5 Abril 2016

Prop. elegibles

Prop. above threshold

Prop. A financiar

EU grant solicitado M.€.

%Ret/Elegibles

LCE-26-ERANET-Geoscience 1 1 1 10,0 100%

LCE-32-SSH 6 4 1 2,0 17%

LCE-33-ECRIA-RIA 11 4 4 10,7 36%

LCE-34-Eranets 2 2 2 16,7 100%

Total 20 11 8 39,4

84 (05/10/2016)

Y no olvidar…

Instrumento Pyme APC Programa de gestores en SOST Seminario de gestores…

29/01/2016 85

"The SME instrument is not an R&D programme. It is an accelerator for market introduction of promising

technological or non-technological innovations."

Subvención en fases para PYMES.

Sin requisito mínimo de consorcio.

Sólo para PYME como socios.

Subcontratación libre.

4 fechas de corte al año

29/01/2016 86

Implementación a través de topics Topics

Budgets (EUR million)

2016 2017

SMEInst-01-2016-2017: Open Disruptive Innovation Scheme 60,00 66,00

SMEInst-02-2016-2017: Accelerating the uptake of nanotechnologies advanced materials or advanced manufacturing and processing technologies by SMEs

31,83 35,32

SMEInst-03-2016-2017: Dedicated support to biotechnology SMEs closing the gap from lab to market

7,50 7,50

SMEInst-04-2016-2017: Engaging SMEs in space research and development 11,37 12,60

SMEInst-05-2016-2017: Supporting innovative SMEs in the healthcare biotechnology sector

35,00 45,00

SMEInst-06-2016-2017: Accelerating market introduction of ICT solutions for Health, Well-Being and Ageing Well

18,00 12,50

SMEInst-07-2016-2017: Stimulating the innovation potential of SMEs for sustainable and competitive agriculture, forestry, agri-food and bio-based sectors

25,81 32,54

SMEInst-08-2016-2017: Supporting SMEs efforts for the development - deployment and market replication of innovative solutions for blue growth

9,50 10,00

SMEInst-09-2016-2017: Stimulating the innovation potential of SMEs for a low carbon and efficient energy system

46,00 50,00

SMEInst-10-2016-2017: Small business innovation research for Transport and Smart Cities Mobility

57,57 61,23

SMEInst-11-2016-2017: Boosting the potential of small businesses in the areas of climate action, environment, resource efficiency and raw materials

25,00 27,50

SMEInst-12-2016-2017: New business models for inclusive, innovative and reflective societies

10,80 11,40

SMEInst-13-2016-2017: Engaging SMEs in security research and development 15,37 14,67

Overall indicative budget 353,75 386,26

29/01/2016 87

Fase 1:

Análisis de viabilidad

Fase2:

Proyecto de Innovación

• Viabilidad del concepto.

• Análisis de riesgos.

• Régimen PI.

• Planteamiento de proyecto.

• Estudio de diseño/s.

• Estrategia de innovación

• Desarrollo I+D, prototipos, y/o ensayos.

• “Demostrar” procesos, productos o servicios innovadores.

• Diseño de productos

• Planificación y desarrollo del escalado industrial.

• Actualización modelo de negocio.

Subvención (lump sum): 50 k€ / 6 meses

Fase 3: Comercialización

Subvención 70% Reembolso de costes

1-2,5 M€ financiación EC 12 -24 meses

• Etiqueta calidad para proyectos exitosos.

•Acciones de soporte a través de networking, formación, coaching, información ,etc.

•Dirigidos a la gestión de IPR, compartir conocimiento y promoción y difusión.

Sin financiación directa

Y

N

Y

N

Esquema de “Mentoring y Coaching” para las PYMES beneficiarias

Otros

Consorcios

y/o PYMES

Fases del Instrumento PYME Id

ea/

Co

nce

pto

P

lan

de

Ne

goci

os

I

Output: Plan de Negocio II Output: Plan de Negocio III “Investor ready”

88 (05/10/2016)

Roles en la gestión de Horizonte 2020

PARTICIPANTES

NCP

REPRESENTANTE

CCAA, Ministerios Expertos

Mª Pilar González Gotor (NCP CDTI): [email protected] Virginia Vivanco (NCP IDAE): [email protected] Cristina Quintana (NCP CIEMAT): [email protected]

Mª Luisa Revilla: [email protected]

MUCHAS GRACIAS

Pilar González Gotor

Reto Energía – Horizonte 2020

División Programas Europeos- CDTI

[email protected]