•Established in 1997 •Field Service Engineers from and OEM Equipment Trained Familiar with OEM Procedures Knowledgeable on All Manufacturers Equipment Safety Awareness – OSHA HV Training, All PPE •Many Established Fortune 500 Customers Automotive Chemical Utility Nuclear Generating Plants

Transcript of Linkedin Presentation

Page 1: Linkedin Presentation

•Established in 1997•Field Service Engineers from and

OEM Equipment TrainedFamiliar with OEM ProceduresKnowledgeable on All Manufacturers Equipment Safety Awareness – OSHA HV Training, All PPE

•Many Established Fortune 500 CustomersAutomotive ChemicalUtilityNuclearGenerating Plants

Page 2: Linkedin Presentation

•Fully Outfitted Service Vehicles / Trailers•Full Compliment of Test Equipment

•Standardized on DoblePower Factor – M4000Relay - ProTestTime/Travel

•High Current Test Set•All Secondary Injection Test Sets(ABB, Westinghouse, Cutler Hammer, Siemens, GE, Square D)•Meggers, DLRO’s, High Pots

•Breaker Repair FacilityServicing over 200 LV/MV Breakers yearly

Page 3: Linkedin Presentation

• Authorized Service Provider (ASP) Factory trained Certified personnel/methods

/facility 200+ MV Breaker Replacements

•Manufacturers Representative – Industrial Markets

Page 4: Linkedin Presentation

Large Transformer Repair & Maintenance

Page 5: Linkedin Presentation

Nuclear Site: HV Bushing ReplacementComplete GSU Regasketing

Page 6: Linkedin Presentation

Transformer Radiator Replacement at Gas Generating Plant

Page 7: Linkedin Presentation

LTC Board Replacement at Municipality

Page 8: Linkedin Presentation

Complete LTC Rebuild On-site

Page 9: Linkedin Presentation

On Site HV Circuit Breaker Testing and Maintenance

Page 10: Linkedin Presentation

Live Tank/Dead Tank SF6 including Dilo Reclaiming

Page 11: Linkedin Presentation

OCB Internal Inspections, Testing and Replacements with VAC/SF6

Page 12: Linkedin Presentation

Engineered Solutions

Page 13: Linkedin Presentation

Bushing Redesign and Installation at Utility

Page 14: Linkedin Presentation

Transformer Replacement after Determining New Load Requirements

and Poor Test Results

Page 15: Linkedin Presentation

Bolted Pressure Switch Replacement with LV Circuit Breaker

Page 16: Linkedin Presentation

Bus Duct / Cable Bus Replacement Project

Page 17: Linkedin Presentation

Complete MV Switch Rebuild On-site

Page 18: Linkedin Presentation

Replacement of “Unsafe” Design Oil Switch

Old Oil Switch and Transformer Throat

Page 19: Linkedin Presentation

New SF6 Load Interrupting Switch and Transition

Page 20: Linkedin Presentation

Arc Flash Analysis Data collection Arc Flash incident energy calculations Provide Engineer’s Report and Customer Review Provide recommendations for PPE Provide incident Energy Hazard Labels Provide new Electrical One-line Drawings Provide NFPA 70E Training Provide Arc Flash Incident Energy Mitigation Techniques Provide electrical equipment maintenance Provide low and medium voltage circuit breaker upgrade, recondition, retrofit and replacement Provide new equipment to lower arc flash incident energy levels

Page 21: Linkedin Presentation

On-site Switchgear Testing and Maintenance

Page 22: Linkedin Presentation
Page 23: Linkedin Presentation

LV/HV Breaker Repair Facility

Page 24: Linkedin Presentation

LV BreakersGeneral Testing and Maintenance

to Complete Tear Down and Rebuilds

Page 25: Linkedin Presentation

LV BreakersGeneral Testing and Maintenance to Complete Tear Down and Rebuilds

Page 26: Linkedin Presentation

MV Breakers

Page 27: Linkedin Presentation

MV Reclosures

Page 28: Linkedin Presentation
Page 29: Linkedin Presentation