METRADOS YANACOCHA

download METRADOS  YANACOCHA

of 23

  • date post

    03-Oct-2015
  • Category

    Documents

  • view

    8
  • download

    0

Embed Size (px)

description

HHH

Transcript of METRADOS YANACOCHA

01-02HOJA DE METRADOSPROYECTO: RECONSTRUCCION DE LA REPRESA YANACOCHAOBRA: ALIVIADERO DE DEMASIASUBICACIN: PASCO - PASCO - TINYAHUARCOELABORADO: CONSTRUCTURA GYGFECHA: MAYO 2011CODIGODETALLEUNDNDIMENSIONESPARCIALTOTALVECESLARGOANCHOALTO01.00TRABAJOS PRELIMINARES1.01Movilizacion y desmovilizacion de equipos y maquinasglb2.0022.001.02Trazo y replanteo inicialm218,000.00- Presa Yanacocha1145.0045.006,525.00- Obras Hidraulicas134.005.00170.00- Vertedero de demasias1105.002.20231.00- Canal de alivio150.001.4874.00- Canal de conduccion1500.002.001,000.001.03Cartel de identificacion de la obra 5.4x3.6mu11.002.00OBRAS TEMPORALES2.01Campamento, talleres y oficinam2150.00- Campamento115.005.0075.00- Talleres110.005.0050.00- Oficina15.005.0025.002.02Patio de Maquinasm22,000.00140.0050.002,000.002.03Caminos de Acceso - Apertura de TrochaKm3.5013.503.50

03 presaHOJA DE METRADOSPROYECTO: RECONSTRUCCION DE LA REPRESA YANACOCHAOBRA: ALIVIADERO DE DEMASIASUBICACIN: PASCO - PASCO - TINYAHUARCOELABORADO: CONSTRUCTURA GYGFECHA: MAYO 2011CODIGODETALLEUNDNDIMENSIONESPARCIALTOTALVECESLARGOANCHOALTO03.00PRESA YANACOCHA3.01DESVIO DE AGUAS SUPERFICIALES03.01.01Excavacin en terreno normal c/equipom310.00140.000.500.5010.0003.01.02Bombeo de superficied45.00145.0003.01.03Suministro e Instalacion de Tuberia PVC UF ISO-4422 D=400mmd120.001120.00120.003.02PRESA YANACOCHA03.02.01MOVIMIENTO DE TIERRAS03.02.01.01Control Topograficomes1.501.51.5003.02.01.02Limpieza y desbroce de terreno e=0.5mm215,000.001250.0060.0015,000.0003.02.01.03Excavacion masiva a maquina en terreno normalm312,460.00112,460.0003.02.01.04Excavacion con equipo en material saturadom33,115.0013,115.0003.02.01.05Relleno compactado p/cuerpo de presam335,250.00135,250.0003.02.01.06Relleno compactado p/filtrom32,175.35de +00 a +01017.9010.0079.00de +010 a +020111.9112.45148.28de +020 a +030117.3010.33178.71de +0.30 a +0.40118.6910.00186.90de +0.40 a +0.50119.1510.03192.07de +0.50 a +0.60121.0910.17214.49de +0.60 a +0.70122.1810.00221.80de +0.70 a +0.80121.7810.00217.80de +0.80 a +0.90121.2810.05213.86de +0.90 a +100117.8611.38203.25de +100 a +110112.1011.33137.09de +110 a +12017.9610.2781.75de +120 a +13516.6915.00100.3503.02.01.07Eliminacion de material excedente c/equipo hasta 0.4kmm33,115.0013,115.0003.02.02TRANSPORTE DE MATERIALES A OBRA03.02.02.01Transporte de material de relleno clasificado D=0.8kmm320,298.011.0319,675.0020,298.003.02.02.02Transporte de material granular clasificado D=10.0kmm31,952.7510.902,175.351,952.7503.02.03ENSAYOS03.02.03.01Ensayos de compactaciond45.0045.003.03DREN A PIE DE PRESA03.03.01Control Topogrraficomes0.10.1003.03.02Rellno compactado para drenm3ESPVOL150.88de +00 a +01011.0710.0010.70de +010 a +02011.0712.4513.32de +020 a +03011.0710.3311.05de +0.30 a +0.4011.0710.0010.70de +0.40 a +0.5011.0710.0310.73de +0.50 a +0.6011.0710.1710.88de +0.60 a +0.7011.0710.0010.70de +0.70 a +0.8011.0710.0010.70de +0.80 a +0.9011.0710.0510.75de +0.90 a +10011.0711.3812.18de +100 a +11011.0711.3312.12de +110 a +12011.0710.2710.99de +120 a +13511.0715.0016.0503.03.03Suministro e instalacion tuberia perforada PVC SAP 10"m141.01141.01141.0103.03.04Transporte de material granular clasificado D=10.0kmm3ESP16.80141.20150.880.016.803.04DENTELLON03.04.01Control topograficomes10.0014.005.000.5010.0003.04.02Suministro e instalacion de gaviones 5.0x2.0x0.2mu60.00de +00 a +0109.765.004.00de +010 a +02015.535.006.00de +020 a +03010.835.004.00de +0.30 a +0.4010.325.004.00de +0.40 a +0.5010.085.004.00de +0.50 a +0.6010.425.004.00de +0.60 a +0.7010.005.004.00de +0.70 a +0.8010.005.004.00de +0.80 a +0.9010.115.004.00de +0.90 a +10013.205.006.00de +100 a +11013.125.006.00de +110 a +12010.225.004.00de +120 a +13515.005.006.0003.04.03Suministro e instalacion de gaviones 1.5x1.0x5.0mu60.00de +00 a +0109.765.004.00de +010 a +02015.535.006.00de +020 a +03010.835.004.00de +0.30 a +0.4010.325.004.00de +0.40 a +0.5010.085.004.00de +0.50 a +0.6010.425.004.00de +0.60 a +0.7010.005.004.00de +0.70 a +0.8010.005.004.00de +0.80 a +0.9010.115.004.00de +0.90 a +10013.205.006.00de +100 a +11013.125.006.00de +110 a +12010.225.004.00de +120 a +13515.005.006.0003.04.04Transporte de piedra grande 8" Dist=2.0Kmm3564.64de +00 a +0103.809.7637.09de +010 a +0203.8015.5359.01de +020 a +0303.8010.8341.15de +0.30 a +0.403.8010.3239.22de +0.40 a +0.503.8010.0838.30de +0.50 a +0.603.8010.4239.60de +0.60 a +0.703.8010.0038.00de +0.70 a +0.803.8010.0038.00de +0.80 a +0.903.8010.1138.42de +0.90 a +1003.8013.2050.16de +100 a +1103.8013.1249.86de +110 a +1203.8010.2238.84de +120 a +1353.8015.0057.003.05IMPERMEABILIZACION EN TALUD AGUAS ARRIBA03.05.01Suministro e instalacion de Geotextilm28,912.88de +00 a +010217.849.76348.24de +010 a +020217.8415.53554.11de +020 a +030230.1010.83651.97de +0.30 a +0.40234.3810.32709.60de +0.40 a +0.50237.0110.08746.12de +0.50 a +0.60235.7410.42744.82de +0.60 a +0.70238.8410.00776.80de +0.70 a +0.80239.0810.00781.60de +0.80 a +0.90239.0810.11790.20de +0.90 a +100237.5213.20990.53de +100 a +110228.6313.12751.25de +110 a +120219.8710.22406.14de +120 a +135222.0515.00661.5003.05.02Suministro e instalacion de Geomebranam24,456.44de +00 a +010117.849.76174.12de +010 a +020117.8415.53277.06de +020 a +030130.1010.83325.98de +0.30 a +0.40134.3810.32354.80de +0.40 a +0.50137.0110.08373.06de +0.50 a +0.60135.7410.42372.41de +0.60 a +0.70138.8410.00388.40de +0.70 a +0.80139.0810.00390.80de +0.80 a +0.90139.0810.11395.10de +0.90 a +100137.5213.20495.26de +100 a +110128.6313.12375.63de +110 a +120119.8710.22203.07de +120 a +135122.0515.00330.7503.05.03Relleno Compactado para Transicionm31,024.78de +00 a +01013.259.7631.72de +010 a +02013.2515.5350.47de +020 a +03016.9310.8375.05de +0.30 a +0.4018.2110.3284.73de +0.40 a +0.5019.0010.0890.72de +0.50 a +0.6018.6210.4289.82de +0.60 a +0.7019.5510.0095.50de +0.70 a +0.8019.6210.0096.20de +0.80 a +0.9019.6210.1197.26de +0.90 a +10019.1613.20120.91de +100 a +11016.4913.1285.15de +110 a +12013.8610.2239.45de +120 a +13514.5215.0067.8003.05.04Transporte de material Para cama de apoyo dist= 8.0Kmm31,024.7811,024.7803.05.05Enrocado de proteccion RIP-RAPm33,410.01de +00 a +010110.639.76103.75de +010 a +020110.8415.53168.35de +020 a +030122.7410.83246.27de +0.30 a +0.40127.3810.32282.56de +0.40 a +0.50130.0110.08302.50de +0.50 a +0.60128.7410.42299.47de +0.60 a +0.70131.8410.00318.40de +0.70 a +0.80132.0710.00320.70de +0.80 a +0.90132.0710.11324.23de +0.90 a +100130.5213.20402.86de +100 a +110121.6313.12283.79de +110 a +120112.8710.22131.53de +120 a +135115.0415.00225.6003.05.06Transporte de piedra mediana 4" Dist=2.0Kmm33,410.0113,410.013.06IMPERMEABILIZACION EN TALUD AGUAS ABAJO03.06.01Relleno Compactado para Transicionm3573.81de +00 a +01011.8310.0018.30de +010 a +02011.8312.4522.78de +020 a +03014.2310.3343.70de +0.30 a +0.4015.0610.0050.60de +0.40 a +0.5015.0610.0350.75de +0.50 a +0.6015.3310.1754.21de +0.60 a +0.7015.9410.0059.40de +0.70 a +0.8015.9910.0059.90de +0.80 a +0.9015.9910.0560.20de +0.90 a +10015.6811.3864.64de +100 a +11013.9411.3344.64de +110 a +12012.2210.2722.80de +120 a +13511.4615.0021.9003.06.02Enrocado de proteccion RIP-RAPm22,178.76de +00 a +01017.9810.0079.80de +010 a +02017.9812.4599.35de +020 a +030115.9610.33164.87de +0.30 a +0.40118.7710.00187.70de +0.40 a +0.50118.7610.03188.16de +0.50 a +0.60119.6410.17199.74de +0.60 a +0.70121.6810.00216.80de +0.70 a +0.80121.8510.00218.50de +0.80 a +0.90121.8510.05219.59de +0.90 a +100120.8311.38237.05de +100 a +110115.0311.33170.29de +110 a +12019.3010.2795.51de +120 a +13516.7615.00101.4003.06.02Transporte de RIP-RAP 0.3-0.4m Dist=2.0Kmm22,178.7612,178.763.07CORONA03.07.01Relleno Compactado para Transicionm3243.00de +00 a +01011.8010.0018.00de +010 a +02011.8010.0018.00de +020 a +03011.8010.0018.00de +0.30 a +0.4011.8010.0018.00de +0.40 a +0.5011.8010.0018.00de +0.50 a +0.6011.8010.0018.00de +0.60 a +0.7011.8010.0018.00de +0.70 a +0.8011.8010.0018.00de +0.80 a +0.9011.8010.0018.00de +0.90 a +10011.8010.0018.00de +100 a +11011.8010.0018.00de +110 a +12011.8010.0018.00de +120 a +13511.8015.0027.0003.07.02Enrocado de proteccion RIP-RAPm2563.50de +00 a +01014.5010.0045.00de +010 a +02014.5010.0045.00de +020 a +03014.5010.0045.00de +0.30 a +0.4014.5010.0045.00de +0.40 a +0.5014.5010.0045.00de +0.50 a +0.6014.5010.0045.00de +0.60 a +0.7014.5010.0045.00de +0.70 a +0.8014.5010.0045.00de +0.80 a +0.9014.5010.0045.00de +0.90 a +10014.5010.0045.00de +100 a +11014.5010.0045.00de +110 a +12014.5015.0067.50de +120 a +13511.0003.07.02Transporte de RIP-RAP 0.3-0.4m Dist=2.0Kmm2563.501563.50

04 O hidralHOJA DE METRADOSPROYECTO: RECONSTRUCCION DE LA REPRESA YANACOCHAOBRA: ALIVIADERO DE DEMASIASUBICACIN: PASCO - PASCO - TINYAHUARCOELABORADO: CONSTRUCTURA GYGFECHA: MAYO 2011CODIGODETALLEUNDNDIMENSIONESPARCIALTOTALVECESLARGOANCHOALTO4.00OBRAS HIDRAULICAS DE SERVICIO4.01CAPTACION - CAJA DE VALVULA - POZA (CANAL DE RIEGO)04.01.01MOVIMIENTO DE TIERRAS04.01.01.01Control Topograficomes0.200.20.2004.01.01.02Limpieza y desbroce de terreno e=0.5mm270.00170.001.0070.0004.01.01.03Excavacion en terreno normal c/equipom365.77SALIDA DE LA PRESA16.003.302.4047.52CAJA DE CAPTACION3.903.601.3018.2504.01.01.04Refine y Nivelacion en Zanjam254.30154.301.001.0054.3004.01.01.05Colocacion de Cama de Aopyo para tuberiam34.03153.750.500.154.0304.01.02OBRAS DE CONCRETO04.01.02.01Solado concreto f'c=100kg/cm2 h=0.10mm20.42CAJA DE CAPTACION1.051.91.60.050.16CAJA DE VALVULA1.052.651.30.050.18POZA1.051.151.30.050.0804.01.02.02Encofrado y desencofradom285.91ANCLAJES20.001.001.0020.0020.000.401.008.00CAJA DE CAPTACIONMUROS4.001.901.4010.642.001.601.404.481.001.301.602.08CAJA DE VALVULAMUROS3.001.301.355.274.001.001.204.801.000.701.000.701.001.000.700.701.001.000.850.85POZA SALIDA2.003.501.7011.902.003.501.5510.852.001.201.102.642.001.201.253.0004.01.02.03Concreto f'c=210 kg/cm2m314.16ANCLAJES10.001.001.000.404.20CAJA DE CAPTACIONMUROS2.001.630.301.001.021.000.301.000.500.161.000.301.001.000.321.000.301.000.200.06P