TDC Savings: Material cost (0.06 $/SU) Speed to Market: Asia “One Month” Roll Out Capability Business Need Project Work plan Zero safety & Quality incident Meet savings success criteria Meet PR Glide path GSUM+ & IWS Excellence Transforming "India 3Bn+ Dream" Safety and Construction excellence Standardization Seamless collaboration in MFT Right the first time- On time Startup after Shutdown Leveraging global site learning to capture all LFE RESULTS Readiness: Right to succeed Detailed 2 months PR Loss for the Zone -4 analyzed, action plans prior start up Discussed start up issues with the platform leaders, other start up leaders Learning & C/L packages from regional lead line sites Installation Identified BCP Clearly identified the construction and start up team Capability building leveraging lead & site-sister site concept TT&T- Developed package for Line leaders & Process Engineers Classroom and OJT to train and qualify start up team Smooth execution of every phase (installation, CQV) with minimum rework • 4M readiness • Integrated Review through Supply Chain Readiness DDS • Seamless collaboration with other plants CEEMEA, Cairo • One Team – Launch Team, Planning, Line Operations, PM, Safety, Quality Purchase, MDSO Design and construction – Well communicated to the vendor Standardized validation protocols across lines MRCL score >% AE spend with in target AM step 4 compliant equipments/PM step 2 readiness done. Rigor in following all GSUM+ tools 100% GSUM compliance – TT&T, MRCL etc. Design inputs – Ensured Forming shoulder tunnel dimension change key learning from Cairo lead line Leveraging daily DDS – work prioritization and action closure Achieved 92.6% PR in the 8 hour run in T-3 in LCC -4 on 5th march is the record for this project globally. Achieved 93.4% PR in the 8 hour run in T-5 in LCC -3 on 13th march is the record for this project globally Safety Incidents Zero Quality Incidents Zero U/H due to pouch open PR (8 Hour Run) T-3= 92.6% , T-5= 93.4% T-5 Becca=89% Cost Old PF Inventory Run Out < 100% G2T- Const. + Comm. 13.5 hrs v/s 16 hrs Reduced Pouch Film Initiative

Transcript of PF presentation

Page 1: PF presentation

TDC Savings: Material cost (0.06

$/SU)

Speed to Market:Asia “One Month” Roll

Out Capability

Business Need

Project Work plan

•Zero safety & Quality incident

•Meet savings success criteria

•Meet PR Glide path

GSUM+ & IWS Excellence

Transforming "India 3Bn+ Dream" Into Reality

Safety and Construction excellence

Standardization

Seamless collaboration in MFT

Right the first time-On time Startup after

Shutdown

Leveraging global site learning to capture all LFE

RESULTS

Readiness: Right to succeed • Detailed 2 months PR Loss for the Zone -4 analyzed,

action plans prior start up• Discussed start up issues with the platform leaders,

other start up leaders• Learning & C/L packages from regional lead line sites

Installation• Identified BCP• Clearly identified the construction and start up team

Capability building leveraging lead & site-sister site concept• TT&T- Developed package for Line leaders & Process Engineers• Classroom and OJT to train and qualify start up team

Smooth execution of every phase (installation, CQV) with minimum rework• 4M readiness• Integrated Review through Supply Chain Readiness DDS• Seamless collaboration with other plants CEEMEA, Cairo• One Team – Launch Team, Planning, Line Operations, PM, Safety, Quality Purchase, MDSO

Design and construction – Well communicated to

the vendor

Standardized validation

protocols across lines

MRCL score >% AE spend with in target AM step 4 compliant

equipments/PM step 2 readiness done.

Rigor in following all GSUM+ tools

100% GSUM compliance – TT&T, MRCL etc.

Design inputs – Ensured Forming shoulder tunnel dimension change key learning from Cairo lead line

Leveraging daily DDS – work prioritization and action closure

Achieved 92.6% PR in the 8 hour run in T-3 in

LCC -4 on 5th march is the record for this project globally.

Achieved 93.4% PR in the 8 hour run in T-5 in

LCC -3 on 13th march is the record for this project globally

Safety IncidentsZero Quality Incidents

Zero U/H due to pouch open

PR (8 Hour Run)

T-3= 92.6% ,T-5= 93.4% T-5 Becca=89%

Cost

Old PF Inventory Run Out < 100%

G2T- Const. + Comm.

13.5 hrs v/s 16 hrs

Reduced Pouch Film Initiative