Activity ID Activity Name OriginalDuration
Remaining Duration
Schedule %Complete
Start Finish Total Float
CE 01 Con
CE 01 Construccion del edifi 160 160 0% 20-Jan-16 29-Jul-16 0
CE 01.1 o
CE 01.1 obras preliminares 50 50 0% 20-Jan-16 18-Mar-16 110
A1000 limpieza de terreno 20 20 0% 20-Jan-16 11-Feb-16 0
A1010 corte de terreno 20 20 0% 06-Feb-16 01-Mar-16 0
A1020 relleno 1 de terreno 10 10 0% 25-Feb-16 07-Mar-16 120 A1030 relleno 2 de terreno 20 20 0% 25-Feb-16 18-Mar-16 0
CE 01.2 c
CE 01.2 concreto 110 110 0% 19-Mar-16 29-Jul-16 0
CE 01.2.1
CE 01.2.1 concreto simple 10 10 0% 19-Mar-16 30-Mar-16 0
A1040 cimentacion 10 10 0% 19-Mar-16 30-Mar-16 0
CE 01.2.2
CE 01.2.2 concreto armado 100 100 0% 31-Mar-16 29-Jul-16 0
CE 01.2.2
CE 01.2.2.1 column as 40 40 0% 31-Mar-16 17-May-16 0
A1050 acero 30 30 0% 31-Mar-16 05-May-16 0
A1060 encofrado 30 30 0% 07-Apr-16 11-May-16 0
A1070 concreto 10 10 0% 06-May-16 17-May-16 0
CE 01.2.2
CE 01.2.2.2 v igas 50 50 0% 18-May-16 15-Jul-16 0
A1080 acero 40 40 0% 18-May-16 04-Jul-16 0
A1090 encofrado 40 40 0% 24-May-16 09-Jul-16 0
A1100 concreto 10 10 0% 05-Jul-16 15-Jul-16 0
CE 01.2.2
CE 01.2.2.3 lozas aligeradas 60 60 0% 18-May-16 29-Jul-16 0
A1110 encofrado 30 30 0% 18-May-16 22-Jun-16 20
A1120 ladrillo 10 10 0% 17-Jun-16 28-Jun-16 20
A1130 acero 10 10 0% 17-Jun-16 28-Jun-16 20
A1140 concreto 10 10 0% 16-Jul-16 29-Jul-16 0
Jan Feb Mar
Qtr 1, 2016
18-Ma
limpieza de terreno
corte de terreno
relleno 1 de terrerellen
Classic Schedule Layout 10-Feb-16 08:54
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining W...
Page 1 of 2 TASK filter: All Activities
© Oracle Corporation
7/25/2019 promavera p6
http://slidepdf.com/reader/full/promavera-p6 2/2
Apr May Jun Jul Aug Sep Oct Nov
Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016
29-Jul-16, CE 01 Construccion del edificio azul
r-16, CE 01.1 obras preliminares
no 2 de terreno
29-Jul-16, CE 01.2 concreto
30-Mar-16, CE 01.2.1 concreto simple
cimentacion
29-Jul-16, CE 01.2.2 concreto armado
17-May-16 , CE 01.2.2.1 columnas
acero
encofrado
concreto
15-Jul-16, CE 01.2.2.2 vigas
acero
encofrado
concreto
29-Jul-16, CE 01.2.2.3 lozas aligeradas
encofrado
ladrillo
acero
concreto
Classic Schedule Layout 10-Feb-16 08:54
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining W...
Page 2 of 2 TASK filter: All Activities