Hoja1VALORIZACION N 01VALORIZACION N 02VALORIZACION N 03PARTIDASUNDMETRADOPRECIO U.PARCIALMETRADOPARCIALMETRADOPARCIALMETRADOPARCIALEXCAVACION DE ZANJA CON MAQUINARIAM332008.527,200.00250021,250.009007,650.00SUMINISTRO E INSTALACION DE TUBERIAML22003577,000.0050017,500.0060021,000.00RELLENO DE CAMA DE APOYOM32206514,300.00RELLENO CON MATERIAL PROPIOM329001337,700.00COSTO DIRECTO156,200.0021,250.0017,500.0028,650.00GASTOS GENERALES15,620.002,125.001,750.002,865.00UTILIDAD15,620.002,125.001,750.002,865.00SUB TOTAL187,440.0025,500.0021,000.0034,380.00I.G.V.33,739.20MONTO DE EJECUCION221,179.20